Loading...
4.5 Award of Bid, Fire Dept. Engine from 2006 Capital Improvement Program (CIP) Lj,s- ... w CHANHASSEN FIRE DEPARTMENT P.O. Box 97 . 7610 Laredo Drive. Chanhassen, MN 55317 Bus. Phone 934-9191 . Minnewashta Station NO.2. Phone 474-7094 MEMORANDUM TO: Todd Gerhardt, City Manager Greg Sticha, Finance Director FROM: Gregg Geske, Fire Chief Sherri Walsh, First Assistant Fire Chief Randy Wahl, Second Assistant Fire Chief ~. DA TE: August 3, 2006 SUBJ: A ward of Bid, Fire Department Engine from 2006 Capital Improvement Program (CIP) REQUESTED ACTION Authorize Purchase of Fire Department engine. DISCUSSION Annually, the city considers replacement of vehIcles and equipment that have reached their life expectancy and are no longer reliable. It has been the city's practice to replace these vehicles in a tlmely manner. JUSTIFICA TION The 1981 pumper IS scheduled for replacement in the 2006 CIP. The 1981 engine does not meet NFP A standards for a front lme engine. This engine does meet NFP A standards for a reserve pumper and will be used as a reserve pumper in the future. In 2004, the Chanhassen Fire Department established a truck committee to research a new engme, taking mto conSIderation that this will be the first truck used for fires and personal injury accidents in the Station 2 distnct (Minnewashta Fire Station). The committee worked closely with vendors m discussing design considerations and features. Specifications were put out for bid on June 1, 2006. Mr. Todd Gerhardt, City Manager Mr. Greg Sticha, Finance Director August 3, 2006 Page 2 The bids were as follows: General Safety Crimson Fire $ 318,630.00 (does not meet specifications) $ 339,990.00 During the comparison and evaluation of the bids submitted by General Safety Fire Apparatus and Crimson Fire, the Fire Board noted that General Safety Fire Apparatus did not meet specifications by adding a line within their terms for prepayment on the chassis, which was not included in the department's specifications. Due to this prepayment requirement, the City must reject the bid, thus, leaving Crimson Fire as the only company remaining. The Fire Board has thoroughly reviewed the bid submitted by Crimson Fire and note that all specifications have been met. Therefore, the Fire Board recommends the approval of the Crimson Fire bid at the cost of $339,990.00. The city will be supplying the pump system and accessories per the bid specifications. The pump system is an engmeering test unit. Purchasing the pump system and accessories dIrectly from Waterous Company saves the city a tremendous amount of money (see attached quotation). The following quotes have been received for the pump system and accessories: Waterous Company Pump and CAF system Waterous Company Accessories Total Waterous Bid $12,500.00 $17,067.00 $29,567.00 North Central Ambulance Pump and CAF system North Central Ambulance Accessories Total NCA Bid (21 % discount from list) Manufacturer Price $68,982.13 $38,887.17 $107,869.30 Dealer Price $54,862.86 $31,087.84 $85,950.70 The 2006 Capital Improvement Program included $370,000 for replacement of the engine. The actual cost will be $369,557.05 using the Crimson bid and the Waterous Company pump system and accessones. RECOMMENDA TION It is recommended that the City Council approve purchase of the replacement engine from Crimson Fire In the amount of $339,990 and from Waterous Company for the pump system and accessories in the amount of $29,567, for a total bid of $369,557.05. Approval of this purchase requires a simple majority vote of those City Council members present. ATTACHMENT 1. Quote from Waterous Company 2. Quote from North Central Ambulance 3. CIP for Fire Vehicles WATEROUS COMPANY 125 Hardman Avenue South South St. Paul, MN 55075-2456 USA Fax: 800.488.1228 Intl Fax: +1.651.450.5090 E-mail: sales&service@waterousco.com QUOTE WATEROUS NO: DATE: PAGE: PQ17917 AUG 3, 2006 1 BILL TO: 08088500 DELIVER TO: 08088500 CITY OF CHANHASSEN CITY OF CHANHASSEN 690 COULTER DRIVE 7700 MARKET BLVD PO BOX 147 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CONTACT NAME: GAG CONSIGNEE P/O: CUSTOMER PIO ORDER DATE DATE REQD FREIGHT CARRIER FREIGHT TYPE RUOTE AUG 3, 2006 AUG 3, 2006 UPS GROUND COMERCIAL PREPAY/BILL UNIT LIST UNIT NET LINE # QUANTITY DESCRIPTION PRICE DISC % PRICE PUMP PRICING LESS 35% DISCOUNT. PRICING WILL BE APPROVED BY DJH BEFORE ORDER WILL BE PLACED. 1 1 81963-5G 95.00 35.00 61. 75 BODY ASSY CM04 2 1 81961-1C 803.00 35.00 521. 95 VALVE ASSY 3.5FF TSBV (SI) 3 2 V 2837 190.00 35.00 123.50 YOKE END 1710 SERIES YX 4 1 82643-1A 977 . 00 35.00 635.05 PRIMING PUMP ASSY 12V VPO 5 2 81647-1M 352.00 35.00 228.80 PRIMING VALVE & PIPING ASSY PRVPIP 6 1 82301 975.00 35.00 633.75 FITTING INTAKE 6 CM/CS 7 4 W 6540 17.00 35.00 11.05 PLUG PIPE 2-1/2 CAST IRON FIRE 8 8 62939-A 34.00 35.00 22.10 BLIND FLANGE GROUP CM/CS * 9 2 82743-1A 3796.00 35.00 2467.40 BFV ASSY 6 IN. 12 VOLT (JAMESBURY) CM/CS PAYMENT TERMS: IEXTENDEDTOTALS: US DOLLARS WATEROUS COMPANY 125 Hardman Avenue South South St. Paul, MN 55075-2456 USA Fax: 800.488.1228 Intl Fax: +1.651.450.5090 E-mail: sales&service@waterousco.com BILL TO: 08088500 CITY OF CHANHASSEN 7700 MARKET BLVD PO BOX 147 CHANHASSEN, MN 55317 CONTACT NAME: GAG CUSTOMER PIO ORDER DATE DATE REQD UOTE AUG 3, 2006 AUG 3, 2006 LINE # QUANTITY DESCRIPTION , 10 72717-1A INTAKE NIPPLE GROUP 6 NH THD CM/CS 2 11 82256-6 RELIEF VALVE ASSY INTAKE INTRV 1 12 72569-A BLIND FLANGE GROUP 4INRV 2 13 61403 SCREEN INTAKE 6 ZINC FIRE 2 14 82302 FITTING INTAKE 6 CM/CS 1 15 71600-8 FITTING DISCHARGE CM/CS 1 16 80489-2R.9 DISCHARGE VALVE ASSY FIG 9 2.5STD 3 17 82617-1A.1 DISCHARGE VALVE ASSY FIG 1 3.5STD 2 18 72257-A TAPPED FLANGE GROUP 3 NPT CM/CS 1 19 82916-1A AUTO TANK FILL ASSY 1 QUOTE WATEROUS NO: DATE: PAGE: DELIVER TO: 08088500 CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 CONSIGNEE P/O: FREIGHT CARRIER UPS GROUND COMERCIAL UNIT LIST PRICE 556.00 1238.00 81. 00 * 38.00 1151.00 674.00 * 537.00 2590.00 83.00 * 2150.00 PAYMENT TERMS: IEXTENDEDTOTALS. US DOLLARS DISC % 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 PQ17917 AUG 3, 2006 2 FREIGHT TYPE PREPAY/BILL UNIT NET PRICE 361.40 804.70 52.65 24.70 748.15 438.10 349.05 1683.50 53.95 1397.50 . WATEROUS COMPANY 125 Hardman Avenue South South St. Paul, MN 55075-2456 USA Fax: 800.488.1228 Intl Fax: +1.651.450.5090 E-mail: sales&service@waterousco.com QUOTE W A TEROUS NO: DATE: PAGE: PQ17917 AUG 3, 2006 3 BILL TO: 08088500 DELIVER TO: 08088500 CITY OF CHANHASSEN CITY OF CHANHASSEN 690 COULTER DRIVE 7700 MARKET BLVD PO BOX 147 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317 CONTACT NAME: GAG CONSIGNEE P/O: CUSTOMER PIO ORDER DATE DATE REQD FREIGHT CARRIER FREIGHT TYPE bUOTE AUG 3, 2006 AUG 3, 2006 UPS GROUND COMERCIAL PREPAY/BILL LINE # . QUANTITY DESCRIPTION UNIT LIST UNIT NET PRICE DISC '10 PRICE 20 1 71803-5 289.00 35.00 187.85 DRAIN VALVE ASSY DRNVAL 21 1 81871-1E 665.00 35.00 432.25 PNEUMATIC SHIFT ASSY PNUSFT PAYMENT TERMS: NET 30 IEXTENDED TOTALS; 26257.00 . . 17067.05 US DOLLARS . If you have any questions regarding this quote, please call: TODD BACIGALUPO 651.450.5210 Chanhassen Fire Department Chic Anding 612-210-2770 North Central Ambulance Tim Lepel 18448 County Road 9 Lester Prairie, MN 55354 320-395-2911 763-493-4348 tleDel@ncambulance.com Exp. Date: Quote No: 10/13/2005 10093-0028 Create Date: 09/13/2005 PLUMBING: TOTAL: 08/03/2006 CF-PMP-PLM Star Pumper/Midship Pump Plumbing 6.360 08/24/05 85,950.70 85,950.70 . PART NO DESCRIPTION QTY ID EACH EXTENDED == Star Pumper/Midship Pump Plumbing - 6.360 08/24/05 1 CRSN 0.00 0.00 08-30-5000 DARLEY LDMC, 1250 gpm (sls) 1 CRSN 31070.03 31070.03 08-31-9000 1-- LDMC Verbiage 1 CRSN 0.00 0.00 09-01-0500 1-- Master Drain (e) (hd) 1 CRSN 314.80 314.80 09-33-1000 1-- Mechanical Seal 1 CRSN 2248.34 2248.34 09-34-1 000 1-- Air Pump Shift 1 CRSN 575.56 575.56 09-73-6100 1-- NO Manual Over Ride for Pump Shift Provided 1 CRSN 0.00 000 09-35-1 000 1-- Primer (oil-less) 1 CRSN 1624.29 1624.29 09-35-9000 1-- Push/Pull Primer Control 1 CRSN 396.53 396.53 09-37-0000 1-- Bauer B101 AutoCAFS Compressor & Valve Pkg (for 1 CRSN 32752.58 32752.58 10-14-1200 1-- 6" Inlets w/ Short Tubes (D) 1 CRSN 469.99 469.99 10-21-7000 1-- 6" Elkhart Electric Wafer Valve (Inside Panel) 2 CRSN 2939.17 5878 34 09-09-5000 1-- Auxiliary Gated Intake Suction Relief - Elkhart 2 CRSN 603.38 1206.76 10-25-1000 1-- 6" Long Handled, Chrome Plated Cap 2 CRSN 234.78 469.56 18-40-2000 1-- Hypro Foam Pro 2001 sgl/dual to 3% 2.6 gpm 1 CRSN 8559.70 8559 70 18-40-9000 1-- FoamPro plumbed to 1 tank 1 CRSN 110.19 110.19 18-70-1000 1-- 1 CRSN 0.00 0.00 18-90-3000 1-- 1 CRSN 0.00 0.00 18-90-4000 1-- 1 CRSN 0.00 0.00 18-90-5000 1-- 1 CRSN 0.00 0.00 18-91-3000 1-- 1 CRSN 0.00 0.00 18-40-9400 1-- 1 CRSN 0.00 0.00 09-73-1000 1 CRSN 0.00 0.00 12-10-1000 1 CRSN 0.00 0.00 14-20-4000 1 CRSN 0.00 000 09-09-5000 1-- 1 CRSN 0.00 0.00 14-30-8000 I-- Akron Elect Valve - 5" 1 CRSN 2943.23 2943.23 14-45-7100 1-- 1 CRSN 0.00 0.00 14-55-3500 1-- 1 CRSN 000 0.00 14-60-1 000 1-- 1 CRSN 0.00 0.00 14-75-4000 1-- 1 CRSN 0.00 0.00 14-20-2000 1 CRSN 0.00 000 14-30-4000 1-- Akron 8000 Series Valve - 2 1/2" 1 CRSN 614.88 614.88 14-35-3000 1-- 1 CRSN 0.00 0.00 14-45-4000 1-- 1 CRSN 000 0.00 14-55-1 000 1-- 1 CRSN 0.00 0.00 16-20-4000 2 CRSN 0.00 0.00 16-30-4200 1-- Akron Electrically Actuated Valve - 2 1/2" 2 CRSN 2066.62 4133.24 16-45-4200 1-- 2 CRSN 0.00 000 16-52-1000 1-- 2 CRSN 0.00 0.00 Pa e 1 PDF created with pdfFactory trial version www.pdffactorv.com 08/03/2006 . . 16-60-3000 1-- 2 CRSN 0.00 0.00 16-20-7000 1 CRSN 0.00 0.00 16-30-4200 I-- Akron Electrically Actuated Valve - 2 1/2" 1 CRSN 2066.62 2066 62 16-45-3500 1-- 1 CRSN 0.00 0.00 16-46-1 000 1-- 1 CRSN 0.00 0.00 16-50-1010 1-- 1 CRSN 0.00 0.00 16-75-4000 I-- Locate FBD in Bottom of Hosewell 1 CRSN 179.59 179.59 16-60-3000 1-- 1 CRSN 0.00 0.00 16-10-1500 No Right Side Discharges Supplied 1 CRSN 0.00 0.00 16-20-2500 1 CRSN 0.00 0.00 16-30-7200 1-- Akron Electrically Actuated Valve - 4" 1 CRSN 2632.88 2632.88 16-45-6000 1-- 1 CRSN 0.00 0.00 16-53-6000 1-- 1 CRSN 0.00 0.00 16-60-3000 1-- 1 CRSN 0.00 0.00 16-20-3500 1 CRSN 000 0.00 16-30-4200 1-- Akron Electrically Actuated Valve - 2 1/2" 1 CRSN 2066.62 2066.62 16-45-4200 1-- 1 CRSN 000 0.00 16-52-1000 1-- 1 CRSN 0.00 0.00 16-60-3000 1-- 1 CRSN 0.00 0.00 16-20-4600 1 CRSN 0.00 0.00 16-20-4800 1-- 3 CRSN 0.00 0.00 16-30-3200 I-- Akron Electrically Actuated Valve - 2" 3 CRSN 1993.47 5980.41 16-45-31 00 1-- 3 CRSN 0.00 0.00 16-50-1 000 1-- 3 CRSN 0.00 0.00 16-60-3000 1-- 3 CRSN 0.00 0.00 16-64-1 000 1-- 1 CRSN 0.00 0.00 16-65-0050 1-- 1 CRSN 0.00 0.00 78-00-0800 1-- 1 CRSN 0.00 0.00 16-20-6500 1 CRSN 0.00 0.00 16-20-6600 1-- 1 CRSN 0.00 0.00 16-30-5200 I-- Akron Electrically Actuated Valve - 3" 1 CRSN 2222.07 2222.07 16-45-5400 1-- 1 CRSN 0.00 0.00 16-80-1500 1-- 1 CRSN 0.00 0.00 16-60-3000 1-- 1 CRSN 0.00 0.00 16-79-1000 1-- locate pipe center above pump 1 CRSN 18.29 18.29 16-80-SPSP 1 0.00 0.00 20-00-1000 1 CRSN 0.00 0.00 20-30-5200 1-- Akron Electrically Actuated Valve - 3" 1 CRSN 2213.25 2213.25 20-00-5000 Integral Tank to Pump Check Valve 1 CRSN 398.32 398 32 20-10-1200 1 CRSN 0.00 0.00 20-30-4200 1-- Akron Electrically Actuated Valve - 2 1/2" 1 CRSN 2057.79 2057.79 20-80-SPSP FD Supplied Waterous Auto Tank Fill System 1 4496.33 4496.33 23-23-SPSP Discount from List 1 -31749.49 -31749.49 Total 85,950.70 PDF created with pdfFactory trial version www.odffactorv.com Capital Improvement Program City of Chanhassen, MN 2006 thru 2010 Contact Unassigned Department Major Equipment Account # 1 Account # 3 Type Vehicles Useful Life 10-15 years Category Fire Priority I Maintain Existing Service Project # EQ-054 Project Name Fire Vehicles Account #2 Total Project Cost $575,000 Description I This item allows for the replacement of existing equipment. Vehicles are purchased off either the Hennepin County or State of Minnesota cooperative bid. Orders are typically required to be placed up to one (I) year in advance of delivery Justification I As vehiucles age they become less reliable. Also, they require more costly maintenance. Vehicles proposed for replacement are: Unit 216 - 1990 Heavy Rescue Refurbish (2005) $10,000, Unit 217 - 1977 Ford Pick-up (2005) $45,000 Unit 210 - 1981 Pumper Truck (2006) $400,000 Unit 207 - 1995 Astro Van (2009) $40,000, Unit 219 - 1988 Chev I ton (2007) $85,000 Unit 706 - 1997 Expedition (2007) $40,000 Unit 703 - 1999 Explorer (2009) $40,000 Expenditures Vehicles 2006 370.000 370,000 2007 125.000 125,000 2008 2009 80,000 80,000 2010 Total 575.000 575,000 Total Funding Sources Capital Replacement Fund Total 2006 370,000 370,000 2007 125.000 125,000 2008 2009 80,000 80,000 2010 Total 575,000 575,000 Operational Impact/Other I These purchases will include a limited warranty and will reduce the annual maintenance and repair costs. The electrical work on the Aerial Truck will correct an existing problem that has been a concern of the mechanics for some time.