Loading...
2b. Eagle Scout Project, Scout Cummings CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.2271100 Fax 952.2271110 Building Inspections Phone 9522271180 Fax 9522271190 Engineering Phone 952.2271160 Fax 952.2271170 Finance Phone 9522271140 Fax 9522271110 Park & Recreation Phone: 952.2271120 Fax 952.2271110 Recreation Center 2310 Coulter Boulevard Phone 9522271400 Fax 952.2271404 Planning & Natural Resources Phone 9522271130 Fax 9522271110 Public Works 1591 Park Road Phone 9522271300 Fax 9522271310 Senior Center Phone 9522271125 Fax 9522271110 Web Site www.ci.chanhassen.mn.us ;Lb - ----- MEMORANDUM TO: Todd Gerhardt, City Manager Todd Hoffman, Park & Recreation Director ff September 20,2006 FROM: DA TE: SUBJ: Eagle Scout Project, Scout Cummings I have been working with Eagle Scout candidate Scott Cummings for the past couple of months. Scott is a member of local Scout Troop 330 and is planning on completing his selected project in early November. This particular project was identified through input that Park and Recreation Commission Chair Glenn Stolar and I received during a neighborhood meeting in Carver Beach this past summer. A complete description of Scott's project is attached. Scott is still looking for a hauling company to transport the wood chips from the Arboretum to the project site. City staff is pleased to be working with Mr. Cummings as he seeks to attain the rank of Eagle Scout. The City of Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place fo live, work, and play. G:\park\tH\Cummings Eagle Scout CC memo. doc Eagle Scout Project Scott Cummings September 20, 2006 Description My Eagle Scout Project will consist of refurbishing a walking trail for the City of Chanhassen. The trail is located between two beaches on the west side of Lotus Lake. This trail is roughly four tenths of a mile long and worn completely down to dirt with evidence of several areas of erosion. My plan is to fix all 5 areas of harsh erosion with gravel rock or fallen logs in the surrounding area. A nice finish will be added to the trail with woodchips for easier walking between the two beaches. After a walk through meeting at the site with City of Chanhassen Park and Recreation Director Todd Hoffman, we developed a plan. We decided that fixing the trail with woodchips and erosion stoppers seemed to be the best idea for the site. Benefit My project will benefit the Community of Chanhassen by enriching a walking trail. Only one percent of Chanhassen' s walking trails are not asphalted, so maintenance is necessary from time to time. The trail has taken a hit with water streaming down from the adjacent hill to the shoreline. This leaves a place with little sunlight and many roots sticking out. The woodchips will cover up any trip hazards and give the path a nice look to it. It will also to provide longevity to the path. I will fix any erosion areas with either gravel rock or logs in the area provided. Mr. Hoffman has informed me that the residents around Lotus Lake will appreciate the refurbishing of the trail. This will create a positive sense of community for Chanhassen residents living near Lotus Lake and a positive sense of community about the Boy Scouts. Project Details This beautiful trail connects two local beaches at Lotus Lake. The path is widely used by all the residents nearby and it is clearly in need of some maintenance and touching up. Method 15 -25 people 6 hours 7:45 My Mom and Dad will arrive early and get things situated 8:00 Helpers arrive 8: 10 Give a demo and woodchips and divide into groups 8:20 Woodchips the trail with wheel barrels 10:00 Midmorning break with refreshments. 12:00 Break for Lunch 2:20 Finish Trail, take break 2:30 Fix all erosion areas 3:00 Final cleanup and check of materials 3:15 Everyone goes home Plans and Drawings Before pictures of site and method of applying are attached. Materials Description Landscape Wood chips Delivery Bobcat Quantity 110 Cubic yd 20 Trucks Loads 1 Unit Price Free TBD TBD Cost Free TBD TBD Source Arboretum TBD TBD Supplies Do not foresee any. Tools Wheelbarrows Rakes Shovels Work gloves Project Helpers 2-3 help shovel woodchips into wheelbarrows 14-16 Transporting woodchips to trail 3-4 rake woodchips evenly throughout trail 4-5 fixing erosion Funding The City of Chanhassen will provide up to $1,000 in supplies, if any are required, which must be approved as a part of the project. Safety Hazards Refurbishing the trails is overall a safe project. I will talk to the bobcat operator prior to the start of the refurbishing. I will explain the lay of the land and discuss the plan for unloading the chips. We may have the bobcat unload the chips before any boy scouts arrive. This would prevent any accidents between the bobcat driver and boy scouts. In case of an accident: . I will provide a basic first aid kit. . We will have cell phone access. Obstacles: The trail is accessible at both ends by roads. The length might be long, but a having a bobcat dropping the chips at intervals on the trail would make the job easier. G:\park\tH\Cummings Eagle Scout Project Description.doc