Loading...
1b. TH312/212 Project: Approve Change Orders with MnDot CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park 81 Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning 81 Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us lb MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme,. ~ .E., Dir. of Public W orks/City Engineer~ (!)', FROM: DATE: September 25,2006 o~. SUBJ: TH 312/212 Project 03-09: Approve TH 212 Change Orders with MnDot: 1. Turn Lane for proposed future Fire Station. 2. Changing signal lighting from cobra head to shoe box fixtures. REQUESTED ACTION Approve change orders for TH 212 Improvements. On July 10, session and on the TH 212 project ata work the TH 212 contract. . DISCUSSION Staff has negotiatedtxYp/;~c9~ypli~nges or,ders.tot~e1'Iit~J~~~tliM~(1?r;1'J1t first change order is tefl,' ....' . .tq11);~M,~iIT~~~Il,.. . ..... '. . site locatedjust~9~~~'..~l~t,.~'()itpftJ~rn~fl~OU..> >',;~~a(,..<.. ........ '.' .'.'.' Drive. Since the'Ju1~.1.;ZQ06Council meeting, the tum lane has beeninstfafe(L Staff just recently received the change order paper work. Staff has reviewed the costs and finds them acceptable. Staff is still waiting for a change order from MnDOT for the, sewer extension to the site. These improvements have also been installed. The turnlane change order amount is for $23,787.43. The total cost for the fire station improvements will be well below the original estimate of $83,000. The second change order request is for substituting Cobra head light fixtures which are standard MnDOT fixtures at signalized intersections, with shoebox fixtures which are the City's standard fixtures for the intersection lighting at signalized intersection. Also, the shoebox, fixtures will better match the street light fixtures along the corridors. All seven signals that will be constructed in Chanhassen in conjunction with the TH 212 project are proposed to have the shoebox light fixtures. All of the signals are proposed to be painted brown to The City 01 Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Todd Gerhardt September 25, 2006 Page 2 . match the existing downtown street lights. The change order amount is for $14,802.46. ... The following is a summary of the changes made to the TH 212 contract to date if the.proposed change orders are approved: Improvement Items Cost (+/-) Deduct - Bluff Creek Bridge - $260,000 Add - lights on Powers Blvd. (Council Approved (Feb. 13th) + $120,000 Add - Future Fire Station Turn Lane Improvements + $ 23,787 Add - Signal Shoebox Fixture Improvements + $ 14,802 Total - $101,411 The changes being proposed would be under the contract amount with MnDOT. Funding for the TH 212 improvements is being financed with the State of Minnesota Loan Agreement. Staff recommends approval of the change orders at this time. Attachments c: Charles Cadenhead, MnDOT G:\ENGITIl3121092506 bkgd 212 CO boxfix fs tl.doc STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 DESIGN/BUILD CHANGE ORDER NO. 35 DESIGN/BUILD PROJECT: TH 212 Design Build LOCATION OF WORK: New alignment for TH 212 in Hennepin and Carver County from 850 feet east of CSAH 41TH 312 interchange to approximately 6,050 feet west of the existing intersection ofCR 147 and existing TH 212. CONTRACTOR NAME AND ADDRESS: Zumbro River Constructors 312 Lake Hazeltine Drive Suite 100 Chaska, Minnesota 55318 Page 1 of 3 STATE PROJECT NO. 1017-12 FEDERAL PROJECT NO. NH 0212 (308) CHANGE ORDER TOTAL $23,787.34 APPROVAL LEVEL REQUIRED [8] Level 1 o Level 2 This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: I. SCOPE OF WORK WHEREAS: This Project encompasses new design and construction for the realignment of TH 212, creating a controlled access highway from existing TH 312 termination to approximately 0.75 miles west of the intersection of Carver County Road 147 and TH 212, and WHEREAS: The project consists of the design and construction of four-lane controlled access highway, and WHEREAS: The Project generally consists of grading, surfacing, noise berms, noise walls, ponds, signals, lighting, and signing and bridge construction, and WHEREAS: Additional major responsibilities include but are not limited to environmental coordination, public relations, utility coordination, and warranties, and WHEREAS: The new TH 212 will be part of the National Highway System, and WHEREAS: The original project contract documents and plans do not indicate a right turn lane on eastbound Lyman Boulevard for a fire station site to be developed by the City of Chanhassen, and WHEREAS: The City of Chanhassen has requested that a right-turn lane be provided for eastbound Lyman Boulevard to the new fire station site to the South of Lake Susan Drive, and WHEREAS: The Contractor will need to design and construct a right turn lane for eastbound Lyman Boulevard to future fire station as per Request for Cost Proposal Letter No. 13, NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1) The Contractor is directed to design and construct a right turn lane on eastbound Lyman Boulevard to future fire station at approximate stationing of 21 +00 to 25+00, which is to include, but not limited to excavation, common fill, granular fill, aggregate base, bituminous surfacing, curb and gutter, striping and signing all in accordance with the contract documents. 2) The Contractor shall not make claim of any kind or character whatsoever for any other costs or expenses which they may have incurred or which they may hereafter incur, in performing the work and furnishing the materials required by this Agreement. STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 DESIGN/BUILD CHANGE ORDER NO. 35 II. COST ESTIMATE Reduced Contract Items: Estimate of Cost Group # Item Construct Turn Lane Unit $LS Subcontracted Work: Group # Item Design and Survey Bituminous Paving Permanent Traffic Control Pavement Markings Signing Curb and Gutter Unit $LS $LS $LS $LS $LS $LS Materials: Group # Item Materials Unit $LS Group Distribution: 100% City of Chanhassen, Group 054 III. IMPACT DELAY ANALYSIS The Contractor agrees there are no additional impacts for this work. IV. ATTACHMENTS Impact Delay Analysis D Original Critical Path Contract Schedule D Revised Critical Path Contract Schedule Other Documents D Plans D Specifications D Other V. DISCLAIMER Page 2 of 3 Quantity 1 Unit Price $ 13,116.67 Amount $ 13,116.67 Amount $ 1,783.00 $ 1,432.20 $ 1,500.00 $ 2,370.00 $ 600.00 $ 30.76 $ 7,715.96 $ 771.60 $ 8,487.56 Amount $ 1,168.38 $ 175.26 $ 1,343.64 $ 839.47 Unit Price $ 1,783.00 $ 1,432.00 $ 1,500.00 $ 2,370.00 $ 600.00 $ 30.76 Subtotal Prime Contractor's Allowance 10% Total Subcontracted Work Quantity 1 1 1 1 1 1 Unit Quantity Price 1 $ 1,168.38 Contractor Markup 15% Total Material Costs Contractor's Risk Markup Total Net Increase $ 23,787.34 This Change Order represents a complete and equitable adjustment to the contract price and time; and includes all costs, both direct and indirect, associated with delays, impacts, and time extensions. STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 DESIGN/BUILD CHANGE ORDER NO. 35 Page 3 of 3 VI. SIGNATURES Level 1 & 2 APPROVALS Level 2 APPROVALS Onl CONTRACTOR Zumbro River Constructors COMMISSIONER OF TRANSPORTATION By: By: Date: Date: ANAGER COMMISSIONER OF ADMINISTRATION By: By: Date: Date: Mn/DOT ASSIST ANT DISTRICT ENGINEER (AD E) MUNICIPAL APPROVAL (IF REQUIRED) By: By: Date: Date: VII. FUND ENCUMBERANCE AMOUNT , , AMOUNT I GROUP NO. I APPR. I AMOUNT I GROUP NO. APPR. GROUP NO. APPR. DATE ENCUMBERED ORIGNINAL ENCMUBRANCE: CHANGE ORDER TOTAL $ BY: $ ENCUMBERED TO DATE: Individual signing certifies that funds have been encumbered as reauired bv Minn. Stat. ~ 16A.15 ,S 61. f~ ( ( r,f\ <-R ~ Minnesota Department of Transportation Memo Metro Division TH 212 Project 312 Lake Hazeltine Dr., Ste. 100 Chaska, Minnesota 55318 Office: 952-368-5630 Fax: 952-368-5601 August 24, 2006 To: Terry Zoller, P.E. Metro Division Construction Engine~r t1 ~ From: Charles Cadenhead, p.lJ1'Mf3U~ VJ Project Engineer L..P" Subject: Change Order No. 39; SP 1017-12 Transmitted herewith, for your approval, is Change Order No. 39 for the above referenced project. This Agreement provides for payment to the Contractor for the design and construction of Shoebox style light fixtures instead of Cobra head style light fixtures within the limits of the City ofChanhassen and within the limits of the project. The amount shown in the Estimate of Cost is a negotiated final and represents a cost to be paid 100% by the City of Chanhassen. I recommend approval of this Agreement as submitted. cc: Jon Chiglo, P.E. File 1017-12 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 DESIGN/BUILD CHANGE ORDER NO. 39 ( DESIGN/BUILD PROJECT: rn 212 Design Build LOCATION OF WORK: New alignment for TH 212 in Hennepin and Carver County from 850 feet east ofCSAH 41TH 312 interchange to approximately 6,050 feet west of the existing intersection ofCR 147 and existilllz rn 212. CONTRACTOR NAME AND ADDRESS: Zumbro. River Constructors 312 Lake Hazeltine Drive Suite 100 Chaska, Minnesota 55318 Page 1 of 3 STATE PROJECT NO. 1017-12 FEDERAL PROJECT NO. NH 0212 (308) CHANGE ORDER TOTAL $14,802.46 ~.. f. .. APPROVAL LEVEL REQUIRED [8J Levell o Level 2 This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: I. SCOPE OF WORK WHEREAS: This Project encompasses new design and construction for the realignment of TH 212, creating a controlled access highway from existing TH 312 termination to approximately 0.75 miles west of the intersection of Carver County Road 147 and TH 212, and ( ..:REAS: The project consists of the design and construction of four-lane controlled access highway, and WHEREAS: The Project generally consists of grading, surfacing, noise berms, noise walls, ponds, signals, lighting, and signing and bridge construction, and WHEREAS: Additional major responsibilities include but are not limited to environmental coordination, public relations, utility coordination, and warranties, and WHEREAS: The new TH 212 will be part of the National Highway System, and WHEREAS: The original contract documents provided for the use of Cobra style lighting fixtures for all intersections within the City of Chanhassen limits, and WHEREAS: The City of Chanhassen has requested that the Cobra style lighting fixtures be exchanged for the Shoebox style lighting fixtures to match the inplace ornamental lighting, and WHEREAS: With this request the original number of fixtures has increased from 12 total fixtures to 27 total fixtures, and WHEREAS: The project manager has determined that this is an increase and scope and the Contractor will be compensated for said increase in fixtures. \JOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1) The Contractor is directed to design and construct Shoebox fixtures inplace of Cobra head fixtures at each of the intersections within the limits of the City of Chanhassen and within the limits of the Project. 2) The Contractor shall not make claim of any kind or character whatsoever for any other costs or expenses which they may have incurred or which they may hereafter incur, in performing the work and furnishing the materials required by the modifications as detailed in this Agreement. STATE 'oF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 (~ DESIGN/BUILD CHANGE ORDER NO. 39 II. COST ESTIMATE Page 2 of 3 New Contract Items: Subcontracted Items Estimate of Cost GrouD # Item 054 Shoebox Fixtures 054 Design Unit Unit Quantity Price Amount $lS 1 $ 12,102.98 $ 12,102.98 $lS 1 $ 713.00 $ 713.00 Subtotal $ 12,815.98 Prime Contractor Allowance (10% of $12,815.98) $ 1,281.60 Total Subcontracted Work $ 14,097.58 Contractor's Risk Markup $ 704.88 Total Net Increase $ 14,802.46 Group Distribution: Group #054 = 100% City of Chanhassen III. IMPACT DELAY ANALYSIS ( The Contractor agrees that there are no additional time impacts for this work. IV. ATTACHMENTS Impact Delay Analysis o Original Critical Path Contract Schedule o Revised Critical Path Contract Schedule Other Documents o Plans o Specifications o other 1/. DISCLAIMER rhis Change Order represents a complete and equitable adjustment to the contract price and time; and includes all costs, both direct and indirect, associated vith delays, impacts, and time extensions. . 'STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. S05063 DESIGN/BUILD CHANGE ORDER NO. 39 ( Page 3 of 3 VI. SIGNATURES level 1 & 2 APPROVALS level 2 APPROVALS Onl .....' .':.. COMMISSIONER OF TRANSPORTATION By: By: Date: Mn/DOT COMMISSIONER OF ADMINISTRATION By: By: Date: Date: Mn/DOT ASSISTANT DISTRICT ENGINEER lADE) MUNICIPAL APPROVAL (IF REQUIRED) By: By: Date: Date: VII. FUND ENCUMBERANCE I GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT DATE ENCUMBERED ORIGNINAL ENCMUBRANCE: CHANGE ORDER TOTAL $ BY: $ ENCUMBERED TO DATE: Individual signing certifies that funds have been encumbered as reauired bv Minn. Stat. & 16A.15