Loading...
1i. Approve TH 212 Change Order with MnDOT: Sanitary Sewer Extension to the Future Fire Station on Lyman Blvd CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax 952.227.1110 Park & Recreation Phone 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us 1.,i ,.-- MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, Dir. of Public Works/City Engineer ~ tJ l FROM: DATE: 6~ November 13, 2006 SUBJ: TH 312/212 Project 03-09: Approve TH 212 Change Order with MnDOT: Sanitary Sewer Extension to the Future Fire Station on Lyman Boulevard REQUESTED ACTION Approve change order for TH 212 Improvements. BACKGROUND On September 25,2006, the Council approved a change order to the TH 212 contract for turn lane for proposed future Fire Station and changing signal lighting from cobra head to shoe box fixtures. On February 13,2006, the Council approved a change order to the TH 212 contract for adding decorative street lights to the Powers Boulevard bridge. On July 10, 2006, staffupdated the Council on the TH 212 project at a work session and discussed other changes to the TH 212 contract. DISCUSSION Staff has negotiated a change order to the TH 212 contract with MnDOT for extending sanitary sewer service to the future satellite fire station on Lyman Boulevard in the amount of $13,270.38. Since the July 10, 2006 Council meeting, the sanitary sewer pipe to the fire station has been installed. Staff just recently received the change order paper work. Staff has reviewed the costs and finds them acceptable. This is the last change order necessary for the future satellite fire station. The total cost for the fire station improvements is $37,057 which is well below the original estimate of $83,000 that staff discussed with the council on July 10,2006. The following is a summary of the changes made to the TH 212 contract to date if the proposed change order is approved: The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Todd Gerhardt November 13, 2006 Page 2 1m rovement Items Deduct - Bluff Creek Brid e Add - Li hts on Powers Blvd. - Council A) roved 2/13/06 Add - Signal Shoebox Fixture Improvements - Council A roved 9/25/06 Add - Future Fire Station Turn Lane Improvements - Council A roved 9/25/06 Add - Future Fire Station Sanitar Sewer Extension Cost (+/-) - $260,000 + $120,000 + $ 14,802 + $ 23,787 + $ 13,270 Total - $ 88,141 The changes being proposed would be under the original contract amount with MnDOT. Funding for the TH 212 improvements is being financed with the State of Minnesota Loan Agreement. The only other change orders left for the Council to consider is a casing for future watermain along Bluff Creek Drive and sewer and water stubs at TH 10 1. Staff recommends approval of the change order at this time. Attachment c: Charles Cadenhead, MnDOT G:\ENGItH 312\111306 bkgd 212 CO san fs.doc STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract NO.S05063 DESIGN/BUILD CHANGE ORDER NO. 45 DESIGN/BUILD PROJECT: Zumbro River Constructors Page 1 of 3 STATE PROJECT NO. 1017-12 LOCA nON OF WORK: Constructing 8 inch sanitary sewer line for proposed Chanhassen Fire Station on Lyman Blvd for proposed location at approximately Station 25+00. CONTRACTOR NAME AND ADDRESS: 312 Lake Hazeltine Drive Suite 100 Chaska, Minnesota 55318 FEDERAL PROJECT NO. NH 0212 (308) CHANGE ORDER TOTAL $13,270.38 APPROV AL LEVEL REQUIRED I:8J Levell D Level 2 This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: I. SCOPE OF WORK WHEREAS: This Project encompasses new design and construction for the realignment of TH 212, creating a controlled access highway from existing TH 312 termination to approximately 0.75 miles west of the intersection of Carver County Road 147 and TH 212, and WHEREAS: The project consists of the design and construction of four-lane controlled access highway, and WHEREAS: The Project generally consists of grading, surfacing, noise berms, noise walls, ponds, signals, lighting, and signing and bridge construction, and WHEREAS: Additional major responsibilities include but are not limited to environmental coordination, public relations, utility coordination, and warranties, and WHEREAS: The new TH 212 will be part of the National Highway System, and WHEREAS: The original project contract documents and plans do not indicate a right turn lane on eastbound Lyman Boulevard for a fire station site to be developed by the City of Chanhassen, and WHEREAS: The City of Chanhassen has requested that a right-turn lane be provided for eastbound Lyman Boulevard to the new fire station site to the South of Lake Susan Drive, and WHEREAS: The City of Chanhassen has requested the addition of an a-inch sanitary sewer pipe extension from Lake Susan Drive to the future fire station nearest the intersection of Lake Susan Drive and Lyman Boulevard, NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1) The Contractor is directed to design and construct an a-inch PVC sanitary sewer extension from Lake Susan Drive to the future fire station nearest the intersection of Lake Susan Drive and Lyman Boulevard. 2) All design and construction for this change will be made as per the Contract documents, the Department's standards and the City of Chanhassen's standards. 3) Payment will be as per the negotiated lump sum for all labor, equipment and materials associated with the design and construction of the utility modifications as listed below in the 'Estimate of Cost'. 4) The Contractor shall not make claim of any kind or character whatsoever for any other costs or expenses which they may have incurred or which they may hereafter incur, in performing the work and furnishing the materials required by this Agreement. II. COST ESTIMATE STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract NO.S05063 DESIGN/BUILD CHANGE ORDER NO. 45 Estimate of Cost Increased Contract Items: Item No. Item Install Sanitary Stub (Labor and Equipment) Unit Quantity $LS 1 Unit Price $ 10,047.27 Materials $LS $ 1,098.20 Tax (0.065) Subtotal Materials Markup Materials (0.15) Total Materials 1 Subcontracted Work Item No. Item Engineering and Survey Core MH Televise Sanitary Unit Quantity Unit Price $LS 1 $ 692.00 $LS 1 $ 250.00 $LS 1 $ 400.00 Subtotal Subcontractors Markup Subcontractors (0.10) Total Subcontractors Subtotal Cost Contractor Risk (0.04 L&E) Total Net Increase Page 2 of 3 Amount $10,047.27 $ 1,098.20 $ 71.38 $ 1,169.58 $ 175.44 $ 1,345.02 Amount $ 692.00 $ 250.00 $ 400.00 $ 1,342.00 $ 134.20 $ 1,476.20 $12,868.49 $ 401.89 $13,270.38 Group Distribution: 100% City of Chanhassen, Group 054 III. IMPACT DELAY ANALYSIS The Contractor agrees that there are no additional time impacts for this work. IV. ATTACHMENTS Other Documents o Plans o Specifications o Other V. DISCLAIMER This Change Order represents a complete and equitable adjustment to the contract price and time; and includes all costs, both direct and indirect, associated with delays, impacts, and time extensions. STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract NO.S05063 DESIGN/BUILD CHANGE ORDER NO. 45 Page 3 of 3 VI. SIGNATURES level 1 & 2 APPROVALS level 2 APPROVALS Onl CONTRACTOR Zumbro River Constmctors COMMISSIONER OF TRANSPORTATION By: By: Date: Date: COMMISSIONER OF ADMINISTRATION By: By: Date: Date: Mn/DOT ASSISTANT DISTRICT ENGINEER (ADE) MUNICIPAL APPROVAL (IF REQUIRED) City of Chaska By: By: Date: Date: VII. FUND ENCUMBERANCE GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT GROUP NO. APPR. AMOUNT DATE ENCUMBERED ORIGNINAL ENCMUBRANCE: CHANGE ORDER TOTAL $ $ ENCUMBERED TO DATE: