Loading...
2004-85 . e e DATE: CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA RESOLUTION NO: December 13. 2004 2004-85 MOTION BY: Avotte SECONDED BY: LundQuist RESOLUTION IN SUPPORT OF IMPROVEMENTS TO TRUNK HIGHWAY 5 - PW310 WHEREAS, the number of households in Carver County is projected to increase by over 110% by 2030, with a population that will have grown from 48,000 in 1990 to 154,540 in 2030; WHEREAS, development of both housing and new businesses is increasing dramatically in communities along Trunk Highway 5; WHEREAS, the current two-lane highway west of Trunk Highway 41 is clearly inadequate to meet today's needs resulting in congestion and safety problems and will obviously not be adequate to meet the demands that will be placed on it in the next few years; WHEREAS, the safety problems on Trunk Highway 5 necessitate immediate improvements in some critical areas; WHEREAS, the Trunk Highway 5 Task force of the Southwest Corridor Transportation Coalition consisting of Carver County, the cities of Chanhassen, Norwood Young America, Victoria and Waconia and Laketown Township worked to assess and identify specific improvements to Trunk Highway 5 needed in the short-term and in the long-term; WHEREAS, the Minnesota Department of Transportation is currently in the process of updating its 20-year Transportation System Plan; NOW, THEREFORE, BE IT RESOLVED, that the members of the Trunk Highway 5 Task Force and the Southwest Corridor Transportation Coalition believe that the list of projects identified on Exhibit A is needed to improve the mobility and safety on Trunk Highway 5 and request the Minnesota Department of Transportation to include those projects in the Metro District's Transportation System Plan for completion during the year indicated on Exhibit A. . e e Passed and adopted by the Chanhassen City Council this 13th day of December 2004. A TrEST: Todd Ge YES Furlong Ayotte Labatt Lundquist Peterson Thomas A. Furlong, Mayor NO None ABSENT None . e e WCOrrldOr 1i'ansportatlon Coalition Exhibit A State Highway 5 m212toTH41 2004 Corridor Review Grouoine and Prioritization of Perceived and Documented Needs Short Term (2005 throw!b 1007) . Official Mapping ofTH 5 The following are not listed in priority order. . Reconstruction TH 5 o Realign TH 5 in area of Lake Waconia Regional Park . Traffic Signal Upgrades o CSAH 30 West Leg Intersection o TH 284 / CSAH 57 Intersection (Waconia) o CSAH 13 Intersection (Victoria) . Intersection Upgrade o CSAH 11 East Intersection (Victoria) Documented Documented Documented Documented Documented . Left and Right Turn Lane Construction o CSAH 34 (NY A) o 5th Avenue NE / Tacoma Avenue (NY A) . Right Turn Lane and Bypass Lane Construction o 2nd Street SW (NY A) Documented Documented Documented . Pavement Marking o Consistency in marking Crossing Intersection having Right Turn Lanes . Traffic Signal Installation o CSAH 30 East Leg Intersection o Minnewashta Parkway 1 Arboretum Drive Intersection (Chanhassen) . Elimination of Existing Access o CR 110 (Waconia) . Access Management / Frontage Road Plan o Norwood Young America o Waconia . includes elimination of 10th Street and 5th Street accesses o Victoria . Consider "Depressed" TH 5 Construction Option (CSAH 11 West to 78th Street . Intersection Street Light Installation o CSAH 33 o CSAH 511 CR 151 . Tree and Brush Control o Entire Corridor . . 4-lane Roadway Construction o Designated Locations based on Corridor Study . Double Left Turn Lane Construction o East Bound at TH 41 (Chanhassen) Near Term (2008 throullh 2014) . Left and Right Turn Lane Construction o All Intersections through Downtown Victoria Documented . Traffic Signal Installation o CSAH 11 West Intersection (Victoria) o Kochia Lane Intersection (Victoria) o Arboretwn Drive 1 Crimson Bay Road Intersection (Chanhassen) . Wider and Paved Shoulders (2-lane Roadway) o Along all Segments with existing Narrow Shoulders . 10-ton Structural Capacity Upgrade o Applicable to entire Corridor . 4~lane Roadway Construction o Designated Locations based on Corridor Study Lou Term (201S throullh 2024) . Intersection Reconstruction o TII 25 1 Salem A venue Intersection Area Documented . Interchange Construction o TII 212 1111 5 & 251 CSAH 33 Area (NYA) o Frontage Road Access at CSAH 33 (NY A) Documented Documented e . 4-lane Roadway Construction o Entire Corridor Other Priority Items; . Bypass Lane Construction o 10200 Street (westbound) . Left and Right Turn Lane Construction o CSAH 33 (NY A) o 4th Avenue SW (NY A) o Central Avenue (NY A) o Rome A venue o CSAH5l/CR151 o Orchard Road o Island View Road o Scandia Road o Parley Lake Road o Laketown Road o Krey Avenue o Maple Drive o Auburn Drive . Elimination of Existing Accesses o 94th Street o Lone Cedar Lane e . Traffic Signal Installation o Maple Street Intersection