2005-07
.
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE:
Januarv 10. 2005
RESOLUTION NO:
2005-07
MOTION BY:
Labatt
SECONDED BY:
Lundquist
RESOLUTION ACCEPTING QUOTE FROM TRAUT WELLS FOR WELL NO. 10 TEST
WELL IN CONJUNCTION WITH THE WATER TREATMENT PLANT
PROJECT NO. 04-08A
WHEREAS, on May 24, 2004, Council reviewed the Lotus Lake Well Siting Study and
confirmed that a glacial drift and Prairie du Chien-Jordan aquifer could each provide one new 1,000
gpm well at both the East Water Treatment Plant site and the South Lotus Lake Park Site, and
WHEREAS, staff recommended a test well be constructed and installed at the above-
referenced proposed well sites to verify and confirm the presence, capacities, and water quality of
the buried glacial drift aquifer and the Prairie du Chien-Jordan bedrock aquifer, and
WHEREAS, on October 25, 2004, Council authorized a contract with SEH, Inc. to begin
design on the East Water Treatment Plant and solicit quotes for drilling a test well as included in
the contract to see if a well is feasible at this site, the ultimate location of the well, location of a
future roadway and location of future of raw water pipes to service the well, and
e
WHEREAS, two quotes each were received from Traut Wells, Inc. and Keys Well Drilling
Co. with one of the quotes included for fewer water quality tests.
NOW THEREFORE BE IT RESOLVED that the Chanhassen City Council accept a
quote from Traut Wells for the Well No. 10 Test Well drilling and water quality testing at the future
water treatment plant site in the amount of $29,630. Funding for this well work was included in the
East Water Treatment plant project.
Passed and adopted by the Chanhassen City Council this 10th day of January 2005.
A~4l\JJu -~ ~
Todd Gerhardt, City Manager '" Thomas A. Furlong, Mayor
YES NO ABSENT
Furlong None None
Ayotte
e Labatt
Lundquist
Peterson