4. Koehnen Area/Yosemite Ave. Street Reconstruction Project 07-01: Public Hearing: Authorize Preparation of Plans & Specs. CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanllasser-i. MtJ 55317 Administration Phor18 952 227 1100 Fa> 952 227 1110 Building Inspections Phofle 952 227 1180 F2X 9~2 227 1190 Engineering pilone 952 227 1160 Fax 9522271170 Finance PhDiif 952 227 1140 Fax 9522271110 Park & Recreation Pnrlne 952 227 1120 Fax 95i 2271110 Rpt :reatl UI' Cer,ter 2310 Ccultsr BDulevard Prlone 952 227 1400 Fax 952 227 1404 Planning & Natural Resources PnO!le 952 227 1130 Fax 952 i27 111 (] Public Works 1SQl Pork R03G P~lcinp 952 227 1300 Fax 9::)2227 131 C Senior Center PilCH-Ie 952 227 1125 F3X 952227 1110 Web Site WWVv charJ,asserl us Li- - MEMORANDUM TO: Paul Oehme, City Engineer/Dir. of Public Works Alyson Fauske, Assistant City Engineer ar FROM: DATE: of:0 \ Koehnen/Yosemite Reconstruction, Project No. 07-01 Hold Public Hearing Authorize Preparation of Plans and Specifications November 27,2006 SUBJECT: BACKGROUND On September 26, 2005, Council authorized the preparation of the 2006 Street Improvement Feasibility Report. On January 9, 2006 Council accepted the feasibility report and called for the public hearing for the project. On January 23,2006 Council held the Public Hearing for the Koehnen area reconstruction project. In April, 2006 it was determined that the reconstruction project could not be completed until late fall, 2006 due to the MNDOT State Aid Review process for the Yosemite A venue portion of the project. On April 10, 2006 Council approved deleting the Koehnen area reconstruction from the 06-01 proj ect. On September 25, 2006 Council approved the Professional Services Agreement Addendum. On November 8, 2006 Staff hosted a Neighborhood Meeting On November 13,2006 Council authorized and accepted the Feasibility Study and called the Public Hearing. DISCUSSION These proposed street improvements were identified using the City's Pavement Management program and because of the utility problems in the area. Streets are recommended for reconstruction in the Koehnen area. These streets are 35 years old and are in need of replacement and do not have concrete curb and gutter. The reconstruction area includes approximately 1.05 miles of street, including West 63rd Street, Koehnen Circle East, Koehnen Circle West, Cardinal Avenue, Blue Jay Circle, Audubon Circle and Yosemite Avenue (from 6440 Yosemite Avenue to the City limits). Concrete curb and gutter will be included in the street design. Also, the street improvement project will include replacement of all watermain, replacement of some sanitary sewer, installation of storm sewer and construction of storm water treatment ponds. The City of Chanhassen .A growing community with clean lakes. quality schools. a c!larfTilng dcwntGWri, tnrlv';ilg bUSlllpsses, Wlrluirig trails. ancJ beautllui A great ~iiaC(; tr, :Ive Nork and play The watermain in this area is cast iron which has resulted in 23 documented watermain breaks. It is recommended to replace the watermain in this area along with the water services in the right-of-way. Televising of the sanitary sewer indicates that portions of this utility are "egged", sagging and/or cracked. Bolton & Menk, the consultant engineer the City has contracted for this project, recommends that portions of the sanitary sewer exhibiting "extreme" sagging or segments that are cracked be replaced. Storm sewer will be installed and will outlet to one of three ponds that will be constructed in conjunction with the project. The ponds will treat the runoff before discharging to other water bodies. Forty percent (40%) of the street rehabilitation costs are proposed to be assessed to the benefiting property owners within the project area. The preliminary assessment amount for the Koehnen area is $7,100/lot and is proposed to be assessed over a 10-year period at 6% interest. The total estimate assessment amount is $468,600.00. Approximately seven residents (representing five properties) attended the open house on November 8, 2006. The following summarizes the questions, comments and concerns heard at the open house. All property owners' questions were answered at the meeting or with a follow-up letter or phone call. . What is the estimated time to complete the project? . What type of curb will be installed? . Will Yosemite be wider? . Can vacant parcels be assessed? · Can Shorewood assess us in the future for street improvements? . Will I have access to my property? . Will mail delivery be interrupted? Funding for this project is proposed as follows: ITEM ESTIMA TED FUNDING PROJECT COST $ 1,200,000.00 Revolving assessment fund Streets $ 1,681,888.00 500,000.00 Municipal State Aid Storm Sewer 599,750.00 610,000.00 Storm Sewer Utility Fund Sanitary Sewer 191,808.00 230,000.00 Sanitary Sewer Fund Reconstruction Watermain 610,284.00 660,000.00 Water Utility Fund Reconstruction TOTAL $ 3,083,730.00 $ 3,200,000.00 The anticipated schedule of the project is as follows: Neighborhood Meeting March, 2007 Assessment Hearing/Award Contract April, 2007 Start Construction May, 2007 Substantial Completion August, 2007 RECOMMENDA TION Staff recommends that City Council order the preparation of plans and specifications for City Project 07- 01. c: Marcus Thomas, Bolton & Menk G:\ENG\PUBLIC\07-01 KoehnenYosmite Road Imp\II-27-06 public hearing auth plans & specs.doc