4. Adoption of the 2007 Budget & Levy
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax 952.227.1310
Senior Center
Phone 952.227.1125
Fax 952.227.1110
Web Site
www.ci.chanhassen.mn.us
4-
MEMORANDUM
TO:
Mayor
City Council
r f1'
Greg Sticha, Finance Director ~~
December 11, 2006
FROM:
DATE:
SUBJ:
Adoption of the Proposed 2007 Budget and CIP
The City of Chanhassen has gone through an extensive process in evaluating its
budgets and capital improvement plans (CIP) for 2007 through 2011. This
process was finalized with the Truth-in- Taxation hearing last Monday. Staff i,s
recommending that the 2007 Budget and the CIP be adopted as presented.
It should be noted that during 2007 staff will be looking for opportunities to find
one time expenditure savings in the general fund that would potentially reduce
the amount of cash being used to write-down the debt levies (i.e. $63,000).
BACKGROUND
The final 2007 Budget being adopted is for a total levy of $9,575,778, which is
$220,888 or 2.4% less than the 2006 levy. The average homeowner should see
no increase in the city portion of their property tax bill, and in most cases,
residents will see a slight decrease.
CIP
The CIP funds larger .construction and building projects such as a public works
facility, a fire station, and the eventual purchase of a second water treatment
plant. Thet,..IPWSQatcoutitSfor ot/jer in1j'astlUcture purchases such ll!l streets,
water lines ~nd wells, storm water construction and upgrades, and sanitary sewer
lines. In addition, the CIP funds ourcapital replacement fund with a levy of
$824,000 on an annual basis, to fund ongoing equipment replacements and
purchases.
RECOMMENDATION
Staff recommends that the City Council adopt the budget and CIP as presented on
December 11, 2006. This vote requires a simple majority of those present.
The City ot Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thrivinn businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Adoption of the Proposed 2007 Budget and CIP
December 11,2006
Page 2 of2
ATTACHMENTS:
1. Proposed Resolution Adopting the 2007 Budget
2. PowerPoint Presentation: 2007 Budget & CIP Adoption
3. 2007 Budget
4. 2007-11 CIP
5. General Fund Levy and Tax History spreadsheet
6. 2006 Vs. 2007 Budget Increase by line item
-r-
c:
0
.-
c ....
c.
Q) 0
tn -c
<(
tn
CD co
cu c.. 0
0
- N
..c 0 (J -.:t'~
~
C 0 -C <l)
..c
CU c: E
<l)
N cu u
..c <l)
0
U >.
>
..... Q)
..J
0
-
cu
c:
...... .-
-- LL
U
C'\I
Q)U)
0')0 .....-.
CO ';:!2.. ';:!2.. ';:!2.. '~ ';:!2.. ';:!2.. ';!.
caN 0 0 0 0 0 0
.t: E -.:::t ('f) 0') ex:> 0') 0 CO
. . . . . 0 .
00 -.:::t ('f) 0') -.:::t ('f) ~ ~
--
~'-
o ....
0 0 0 0 0 0
+of 0 0 0 0 0 0
...... Q) N CD -.:::t Q') ('f) ~
'" '" '" .- '" "'
00') 0') I"- 0') ~ -.:::t N
0"0 I"- ('f) ex:> ~ -.:::t U)
(/) N ~ 0') ex:> 0 -.:::t I"- 0
'" .- .- fJ7 .- "'
to ~ N N ~ en
Q) fJ7 fJ7 fJ7 fJ7 ~
I- 0 0 0 0 0 0 0
~ +of 0 0 0 0 0 0 0
U) Q) ~ I"- -.:::t ex:> ~ 0 ~
...... '" '" '" .- '" '" "'
00') L.() I"- 0 N 0'> L.() 0
-- 0"0 0') -.:::t 0 0') I"- ex:> 0
-c N ~ ex:> I"- 0') ('f) CD N en
to .- '" .- fJ7 .- fJ7 "'
~ N ~ ~ CO
c:: fJ7 fJ7 fJ7 fJ7 ~
Q)
C. +-'
C (1)
>< (1) 0
E .-
W +-' >
C c.. '-
(1) 0 C (1)
E +-' - 0 (f)
C (1) .-
C > +-' +-'
(1) ro ..0
'- E (1) (1) (1)
(1) (/) 0 '- 0
> (1) ~ 0
0 0 '- ~ (1) 0
C) '- 0 +-' c::
$ +-'
S C '-
ro c :::J oes ~
'- W 0 E
(1) .- (/) (/) -
- E ~ c C'O
C ~ ..0 '- ro +'
(1) ro :::J 0 ro '- 0
C) ...J c.. () c.. ..... I-
("I')
(1) CD
0)0 ~ ~ ~
CO ~ ~ ~ ~
0 0 0
(UN 0 0 0 0 ~ 00 0
.c E 00 . 0 N . N
. 0 . . 00 0 .
(J 0 ~ N 0 0 I'- ~ Lt)
~ '-
o "t-
O 0 0 0 0 0 0
.... 0 0 0 0 0 0 0
I'- (1) ~ ('i') 0 L() L() 0 ~
~ ~ ~ ~ ~ ~ ..
00) 00 L() L() 0 <0 I'- N
0"'C 00 N 0 <0 ('i') ~ CD
N ::s N L() N <0 ~ N 0
~ ~ Y7 Y7 Y7 Y7 ..
a:1 <0 ~ CD
Y7 Y7 ~
0 0 0 0 0 0 0
U) .... 0 0 0 0 0 0 0
CD (1) <0 L() 0 L() L() 0 ~
~ ~ ~ ~ ~ ~ ..
(1) 00) 0') ~ L() 0') <0 ('i') Lt)
0"'C I'- I'- 0 L() I'- N ~
:::::s N ::s ~ N N <0 Y7 N CD
~ ~ Y7 Y7 Y7 ..
a:1 <0 ~ CO
c: Y7 Y7 ~
(1)
>
(1) .
l1:: >
(l) (/)
(/) ~ (l)
......., ()
CO .- (/)
E ......., C (l)
'- c (l) .- (l) CD
(l) (l) .......,
C/) CO ::s :::J
>< a.. E c c c:
CO c '- (l) CD
~ S (l)
I- '- > >
~ (/) (l) (/) a.. (l) CD
(l) > ~ ~ 0::
t::: 0 (l)
(l) (/) 0)
c 0) (/) '- -
c.. '- (l) ns
(l) '- CO (l)
0 (l) ..c ....,
'- () ......., ..c c ......., 0
.- c () .- 0
a.. ...J LL I-
(1) ('-
CJ'-
co
cao
..eN
(.)1-
tnO
1-.....
0......
......(1)
(.) C)
ca-c
.....::s
.......0
ca
..e(1)
3:=
I.()
"'C '-
(]). 0 _
en en (]).c eo
eo........ en 0.. '-(])
(]) en
'- 0 eo E e
UU ~o (])
e - U '- C')
.- (]) e '+-
'- :J . _ '- (])
o '+- en (]) ..c
- '"C Q) 't5 :::
Q)e L...e 0
(/)("02ro ......r---:
'C C> .- L... · :J 0
= e "'CI-~ 00
.~ ~ a3 ~ ~ Q) N
en (]) c.._ ."'C e
>< ~ ~ eo.-
~..c Q) fu (/) E Q)u
:J "'C "'C C/).- (])._
~ee (]) ~
"'Ceo ........ .oL
e ,^ :J.o en (])
Vol u.. (]) eo -
~t)roO~~~
>< 0 '-..c u ,-.0
(]) U Q)....... s: Q) ~
C') - e.- '+- '-'
e (]) (]) ~ (]) en '-
.- e fn .....c e 0
........ e '-'........0........ eo '+-
eo 0 0 ~ ... '-
'- rom'-........"'C
Q) ~ ...... ~ ro 0 e
c.(]) 0 · (]) z:J
OC.I-LO~ '+-
C') L() co (j) N co l"- t-- CD
J: . . . . . . .
N -,:- L() 0 0 0 N
(.) + + -,:- + + + +
~ +
0
U) 0 0 0 0 0 CO CO
(1) 0 0 L() 0 CO .q- t--
C) -,:- 0 I"- L() N L() ~
t-- "" ... "" "" "" "" ...
c:: 0 CO .q- 0 (j) CO N M
0 L() N L() N CO N It)
ca N L() CO N -,:- L() -,:- ~
"" fF7 fF7 fF7 fF7 fF7 ...
-'= CO CO
fF7 ~
(.) 0 0 0 0 .q- CO N
~ 0 0 0 0 -,:- .q- (0
(0 CO 0 L() C"') CO 0 0
> "" "" "" "" "" "" ...
0 (j) 0 CO (j) .q- N N
(1) 0 (j) 0 -,:- N CO N M
N C"') CO N -,:- L() -,:- N
....I "" fF7 fF7 fF7 fF7 fF7 ...
CO CO
~ fF7 ~
......
--
U .......,
..c .......,
ca ...-.. (l) ..c
......., 0 (l)
c. U) ......., E 0
(1) c 0) ......., CJ)
ca .- (l) ~ c
> (l) c W
(.) (1) E E 0 -
......., .- >
...J (l) c .......,
() (l) 00 CO W
>< ~ '"C CO E 00 0) ~~
... c (l) .-
- -
.- 0- 00 ..c
ca (.) ::J (l)
n:s LL (l) > 00 0 .......,
l- e. ~ co <( ..c I-!::
- a.. - (l) ...J(.)
n:s co - co
- co 0
(.) "- co .............. "- <c<C
(l) .- (l) ,
......., <( ()
.- <( I-D..
>< c 0- (l) C
n:s (l) co (j) 0- (l) 0 O<C
I- <.9 () ~ (j) <.9 w 1-(.)
fn
C1)
C)
c
co
..c
(.)
~
>
C1)
...I
C1)
~
co
>
.....
C1)
~
....
co
:E
C) ~ I..C) ~
. -
.
..c: 0 0 0
(..) I + I
~
0
0 0 0
0 0 0
I..C) ~ c.o
t-- ... ... ~
('f) (j) N
0 ('f) CO N
0 CD ~ ~
N Y7 Y7 ~
~
~
CO 0 CO
N 0 N
~ I"- CO
... ... ~
c.o CD CD N
0 ('f) CO N
0 CD ~ ~
N Y7 Y7 ~
~
~
en
Q)
--
~ E
..J ::J
Q) '"0
::::J c:
- Q)
'-
ea ~
> Q)
a; n::
~ ~
I... '-
ea co
:E 0..
E
::J
'"0
c:
Q)
'-
~
Q)
n::
~
co
'-
..0
.-
-I
I'-
I-
wen
~w
0::-
<c(ij
:E..J
..Jw
<C::J
I-..J
O<c
1->
(f)
...
(.)
(1)
~
w
>.
>
(1)
....I
><
co
I-
...
(1)
z
"
~
L()
N~
\f- ~
o "
(1.)
(f)
CO
(1.)
l-
e..>
C
"-
o
+-'
CO
+-'
CO
i:i=
(f)
C
"-
CO
E
CJ.)
I-
~
>
CJ.)
-
(1.)
e..>
"S: "
I- (1.)
CJ.) (f)
C/)co_
(1.) CO
I- +-'
e..> 0
C I-
+-'
.c
0')
.-
-
(f)
~
>
CJ.)
-
-c
C
::J
u..
-
CO
I-
CJ.) :E
C (1.)
~ 0._
co
"
~
o
~
.
N
I-
o
CO
CO
CO
...
o
N
N
Y7
\f-
o
CJ.)
(f)
CO
(1.)
l-
e..>
C
.-
>.
>
(1.)
-
x
CO
+-'
(j)
U)
s-
CD
c
3:
o
CD
E
o
:I:
c
o
....
(.)
CD
=
W
CJ.)
o -~ CJ.) .c
,,-CJ.)::J+-',,-
CJ.) ~ CO _ ~ CJ.)
N -r- >
'+- CJ.) :5
COOQ)C10
CJ.)C~~O
CJ.)O"-CJ.)+-'
en -- CO
=~EfO~
-~ 0.. _~ CJ.) -c
"- en CJ.) .c 0"-
.... .c +-'
CJ.)Z'+-'cen
c -- C1 CO +-'
~()C.cc
o CJ.) - - +-' CJ.) -
~.c E CJ.) E2
1:: +-' ::J "- CJ.) C
CJ.) c en 0 > CJ.)
0..-- en E P E
o CJ.) CO a. +-'
"-en::=?hE~
0.. CO ..c CO
CJ.)~><CJ.)+-,:.c
g>ocot;::Jco
"- _~ +-' C 0 -c
CJ.) +-' ~ - - .c CJ.)
>c1::+-'~~
CO CJ.) CJ.) 0 :> v ~
CJ.) 0 0.. C .... CJ.)
.cCi3e:2~~
I- 0.. 0.. -c 0 CO
o
-r-
en
CO
0..
-
()
-0
C C
0 co
...
-- +-'
....... 0)
ctS C)
-c -0
::J
C .c
Q) ...
~
E >
0)
-
E ><
co
0 +-'
0)-0
(.)
..c 0)
Q) +-' +-'
C
~ +-' 0)
0.. en
o 0)
-0 "-
<:(0..
~
o
...
.!
::J:
CI)
c'"
CI) ClI
U)D:
U) ><
ClI ClI
.ct-
~oO
.c'tl
o c
O~
~iU
.- ...
o !
CI)
C)
~
CI)
..J
#- #- #- #- .~
~ 8 ... ~ lD
C N '"'
Gl C 0 oj 9 N
l:! CIl
Gl .c
11. U
... to ;JI; ~ CIO
~ ... J::: u;
i ai ai ~ 'f, Ili <Ii
~ '"' '"' ... '"'
lD lD '"' '" m
o:i o:i ai ai ai
I- ..J
... ...
#- #- ;f. ;f. ~
~ '"' '"' lD
C ~ ... '" ~
<:i <s? ... <:i
Gl C
l:! CIl
Gl .c
11. U
'" ~ l'il 8 ~ '"
" '"' l2
c m CIO. lD
::J Ili o:i ai g ,.:
Il. ~ ... M 0; ~ CIO
... N ::.
i! <Ii <Ii Ili <Ii <Ii
GI ..J
c
GI
~
... ...
;f. ;f. #- ;f. ;f.
.. ~ al N ~ N ~
C '"' "!
Gl C 9 "i ,..; ~ ...;
l:! CIl
Gl .c
11. U
'" 8 l'il 8 8 '"
'" :t.
i! ~ "!. ... m ...
u; N ~ ~ N <5
Gl 18 ~
c " ... '"'
GI ::J o:i o:i o:i o:i ai
~ lJl
~ "
C
::J
l- ll.
...
0 '" , ~
3 ... 0;.
r! ...
~ ~ N Ili
~ CIO
GI CIO N
Ul c
.25 l!
GI l-
e
...
#- ;f. ;f. ;f. #-
8 III 0 ~ g:
...
.. ~ 0 Lri ...; Lri ~
c
fl c
l! CIl
.c
Gl U
11.
e '" '" 0 ~ 0 ~
" CIO CIO N 0
... ... m ... lD.
C ~ 0 ,.: ~ N
::J W lD g ~ <5
Il. " CIO lD N.
i! .l!! ,.: ,.: o:i o:i ai
Gl l!
c "
Gl ::J
~ lJl
... ...
'"' ~ '" ~ ... ...
8 8 8 ~
N N N N
l- E
CIl '"'
~ ~
~
!E
c
#- ;f. ;f. ;f. ;f.
'"' :g 0 18 ~
lD '"'
.. ~ ~ ~ or? <s? ~
c
~ c
CIl
GI .c
11. U
gj 0; N CIO ~ ~
m ~ to ...
oj N o:i ~ ... N
'"' '"' N N ...
.l!! ::
III /}.
I-
;f. ;f. ;f. ;f. ;f.
~ CIO ;:: N 0;
.. N m
'" N N N N ~
ii c
0
::J U
~ ~
z
~
3
'tl
c:
ar l()
e ~
~ .5
CD 'tl
Cl .sl
'tl c:
c: CD
IV E
l !
'" .-
,S ~
III ...
~ N
III ~
Ul. '5
~ ~
~ !J
'tl _
c: c:
" CD
LL E
C 8
~ .!ll
8 g-
.!ll a:
g- ~
a: c.
:[ ~
8 ~
"
U
.E
~ CIO '"' CIO ~ ... lD ... ~
N to ~ 0; S; ~ It;
CIO '"'
~ ~ o:i ~ o:i g ~ N ,..;
U) ! N N '"' '"' '"'
0
0
N
'" ~
!
III
I-
Gl
:c
l! ~
~ 5i CD
E u .l2 i 'C: !
Ul ~
0 Ul i ~ .!l!
U .l2 ! ].i e !
Ul c: c: c: 8
<5 <5 c: CD ! ~
:iE ~ " .ll
en w en :>
City of Chanhassen
Breakdown of 2006 Budget Vs. 2007
Type of expense 2006 Budget 2007 Budaet Dollar Increase Percent Increase
Salaries and Benefits 5,092,200 5,248,700 156,500 3.07%
Police Contract 1,205,000 1,250,000 45,000 3.73%
Fire Relief Donation 0 12,500 12,500 100.00%
Legal fees 145,000 168,000 23,000 15.86%
Assessment Services 87,000 100,000 13,000 14.94%
Street Maint - Salt 20,000 55,000 35,000 175.00%
Street Maint - Eqpt 40,000 47,000 7,000 17.50%
Street Lighting - Utility's 230,000 290,000 60,000 26.09%
Street Lighting - Repairs 8,200 17,000 8,800 107.32%
Fuels 105,000 140,000 35,000 33.33%
Rec center Utilities 28,000 36,500 8,500 30.36%
MIS Fees for Services 64,600 78,100 13,500 20.90%
417,800
Total Difference from 2006 is $162,300, but in 2006 we had a transfer to debt service out
of the General Fund that we do not have in 2007, so total difference is $447,300
GENERAL GOVERNMENT
1110 Legislative
1120 Administration
1130 Finance
1140 Legal
1150 Assessing
1160 MIS
1170 City Hall
1180 Elections
1190 Library Building
TOTAL
LAW ENFORCEMENT
1210 Law Enforcement
1220 Fire
1250 Building Inspection
1260 CSO
TOTAL
PUBLIC WORKS
1310 Engineering
1320 Street Maintenance
1350 Street Lighting
1370 Vehicle Maintenance
TOTAL
COMMUNITY DEVELOPMENT
1410 Planning Commission
1420 Planning Administration
1430 Senior Commission
· TOTAL
PARKS & RECREATION
1510 Park & Rec. Commission
1520 Park Administration
1530 Recreation Center
1540 Lake Ann
1550 Park Maintenance
1560 Senior Center
1600 Recreation Programs
1700 Self-Supporting Programs
TOTAL
Total Operational Expenditures
Transfer to Debt Service
** TOTAL GENERAL FUND
CITY OF CHANHASSEN
2007 BUDGET
Expenditures
Personal Materials & Contractual Capital 2006 %
Services Supplies Services Outlay Total Total Change
34,200 200 89,000 - 123,400 120,400 2.49%
385,500 500 52,000 - 438,000 425,500 2.94%
226,000 300 91,500 200 318,000 310,500 2.42%
- - 168,000 - 168,000 145,000 15.86%
- - 100,100 - 100,100 87,100 14.93%
160,000 2,400 118,800 - 281,200 266,400 5.56%
66,600 42,500 319,500 - 428,600 423,800 1.13%
13,500 - 6,200 - 19,700 18,700 5.35%
- 2,000 100,200 - 102,200 97,700 4.61%
885,800 47,900 1,045,300 200 1,979,200 1,895,100 4.44%
74,200 - 1,259,500 - 1,333,700 1,280,000 4.20%
515,600 47,000 116,000 - 678,600 663,400 2.29%
724,000 8,700 23,400 - 756,100 744,900 1.50%
54,200 3,900 11 ,1 00 - 69,200 59,400 16.50%
1,368,000 59,600 1,410,000 - 2,837,600 2,747,700 3.27%
497,400 900 29,800 300 528,400 509,400 3.73%
615,300 136,500 33,400 1,300 786,500 730,500 7.67%
- 4,500 310,400 - 314,900 243,300 29.43%
258,000 150,400 45,200 6,000 459,600 417,200 10.16%
1,370,700 292,300 418,800 7,600 2,089,400 1,900,400 9.95%
- 200 4,000 - 4,200 3,200 31.25%
362,800 700 14,100 - 377,600 360,900 4.63%
19,900 - 10,200 - 30,100 28,700 4.88%
382,700 900 28,300 - 411,900 392,800 4.86%
- 200 2,000 - 2,200 1,300 69.23%
113,400 1,000 9,100 - 123,500 130,500 -5.36%
214,100 11,500 43,500 - 269,100 252,300 6.66%
14,400 13,400 44,000 - 71,800 70,500 1.84%
652,100 81 ,300 82,200 4,000 819,600 787,300 4.10%
31,100 3,800 17,500 - 52,400 50,300 4.17%
175,600 16,600 82,000 - 274,200 249,800 9.77%
40,800 8,600 82,100 - 131,500 137,100 -4.08%
1,241,500 136,400 362,400 4,000 1,744,300 1,679,100 3.88%
5,248,700 537,100 3,264,800 11,800 9,062,400 8,615,100 5.19%
285,000
9,062,400 8,900,100 1.82%
CITY OF CHANHASSEN
2007 BUDGET
REVENUE
101 General Fund
2005 2006 2006 2007 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
GENERAL PROPERTY TAX
3010 Current Property Tax 5,943,027 6,399,600 6,399,600 6,558,100 2.5%
3002 Allowance for Delinquent Taxes (320,000) (320,000) (320,000)
3011 Delinquent Property Tax 41 ,469 100,000 50,000 50,000
3041 Homestead & Ag Credit
3090 Other Property Taxes 245,098
3500 Local Government Aid
* TOTAL GENERAL PROPERTY TAX 6,229,593 6,179,600 6,129,600 6,288,100 1.8%
LICENSES
3203 Dog Kennel 275 700 700 500
3205 Dog or Cat 5,289 4,000 4,000 4,500
3213 Solicitor 375 500 500 500
3223 3.2 Off and On Sale 10,010 3,000 2,200
3226 Liquor On and Off Sale 63,024 52,000 80,000 84,000
3227 Club and Sunday 10,609 32,000 1,600
3230 Rental Housing Licenses 41 ,250 15,000 5,000 15,000
3284 Rubbish 2,100 3,000 3,000 3,000
* TOTAL LICENSES 132,932 110,200 97,000 107,500 -2.5%
PERMITS
3301 Building 519,977 600,000 725,000 825,000
3302 Plan Check 261,803 320,000 320,000 330,000
3305 Heating & AlC 108,139 110,000 110,000 120,000
3306 Plumbing 68,280 80,000 80,000 85,000
3307 Trenching 40,658 30,000 30,000 35,000
3308 Gun 890 1,000 1,000 1,000
3309 Sprinkler 19,470 12,000 12,000 14,000
3311 Sign 7,335 6,000 6,000 6,500
3320 Stable 210 300 300 300
3330 Elec Permit App Forms 73
3331 Firework's Application Fee 300
3390 Misc. Permits 70 2,000 2,000 1,000
* TOTAL PERMITS 1,027,205 1,161,300 1,286,300 1,417 ,800 20.0%
FINES & PENALTIES
3401 Traffic & Ordinance Violation 98,256 70,000 110,000 130,000
3402 Vehicle Lockouts 2,799 2,500 2,500 2,500
3404 Dog/Cat Impound 3,907 4,000 4,000 4,000
* TOTAL FINES & PENALTIES 104,962 76,500 116,500 136,500 78.4%
CITY OF CHANHASSEN
2007 BUDGET
REVENUE
101 General Fund
2005 2006 2006 2007 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
INTERGOVERNMENTAL REVENUE
3509 Other Shared Taxes 168,783 165,000 165,000 165,000
3510 Grants-State 50,728 40,000 40,000 40,000
* TOTAL INTERGOVERNMENTAL REV 219,511 205,000 205,000 205,000 0.0%
CHARGES FOR CURRENT SERVICES
3601 Sale of Documents 1,659 4,000 4,000 4,000
3602 Use & Variance Permits 32,614 36,000 45,000 45,000
3603 Rezoning Fees 1,750 1,500 2,000 2,000
3604 Assessment Searches 465 500 500 500
3605 Plat Recording Fees 11,830 6,000 10,000 10,000
3613 Misc.-General Government 8,064 10,000 10,000 10,000
3614 Admin. Charge-2% Constr. 181,929 120,000 120,000 120,000
3617 Engineering General 235 1,000 1,000 1,000
3619 Investment Management Fee 65,000 75,000 75,000 75,000
3629 Misc.-Public Safety 7,628 4,000 4,000 4,000
3630 Recreation Program Fees 28,704 20,000 30,000
3631 Recreation Center 130,070 175,000 100,000 135,000
3633 Park Equipment Rental 156 200 200 200
3634 Park Facility Usage Fee 9,435 15,500 11,000 12,000
3635 Watercraft Rental 3,636 4,000 4,000 4,000
3636 Self-Supporting Programs 158,368 157,000 157,000 160,000
3637 Senior Programs 26,763 30,000 30,000 30,000
3638 Food Concessions 11 ,252 14,000 10,000 12,000
3639 MiSC.-Park & Rec. 1,788 800 800 800
3649 MiSC.-Public Works 15,600 5,000 5,000 5,000
3651 Merchandise Sales 584
* TOTAL CURRENT SERVICES 697,531 659,500 609,500 660,500 0.2%
OTHER REVENUE
3801 Interest Earnings 125,292 120,000 80,000 70,000
3802 Equipment Rental & Sale 125,028 60,000 90,000 110,000
3803 Building Rental 7,192
3807 Donations 37,758 20,000 20,000 20,000
3808 Ins. Recoveries & Reimburse 2,989 5,000 5,000 5,000
3816 SAC Retainer 5,545 5,000 5,000 5,000
3818 Sur-Tax Retainer 727 1,500 1,500 1,500
3820 Misc. Other Revenue 135 5,000 5,000 5,000
3829 Interest/Penalties-Other 500 500 500
3903 Refunds/Reimbursements 84,303 6,000 10,000 30,000
3910 Misc. Revenue 1,147
3980 Cash Short/Over (3)
* TOTAL OTHER REVENUE 390,113 223,000 217,000 247,000 10.8%
** TOTAL GENERAL FUND REVENUE 8,801,847 8,615,100 8,660,900 9,062,400 5.2%
TOTAL GENERAL FUND EXPENDITURES 9,062,400
NET LEVY REMAINING (Use of Gen Fund Reserves)
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1110 Legislative
IACCOUNT 2005 2006 2007
DESCRIPTION ACTUAL BUDGET BUDGET
4020 Salaries & Wages-Temp 29,250 31,600 31,600 0.0%
4030 Contributions-Retirement 2,238 2,500 2,500 0.0%
4050 Workers Compensation 71 100 100 0.0%
* TOTAL PERSONAL SERVICES 31,558 34,200 34,200 0.0%
4210 Books & Periodicals 200 200 0.0%
* TOTAL MATERIALS & SUPPLIES 200 200 0.0%
4300 Fees, Services 12,714 10,000 13,000 30.0%
4330 Postage 4,113 6,000 6,000 0.0%
4340 Printing & Publishing 34,936 35,000 37,000 5.7%
4360 Subscriptions & Memberships 26,530 30,000 28,000 (6.7%)
4370 Travel & Training 2,611 3,000 3,000 0.0%
4375 Promotional Expense 1,894 2,000 2,000 0.0%
* TOTAL CONTRACTUAL SERVICES 82,798 86,000 89,000 3.5%
** TOTAL LEGISLATIVE 114,356 120,400 123,400 2.5%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1120 Administration
IACCOUNT 2005 2006 2007
DESCRIPTION ACTUAL BUDGET BUDGET
4010 Salaries & Wages-Reg 279,115 289,800 295,000 1.8%
4020 Salaries & Wages-Temp 6,000 6,000 0.0%
4030 Contributions-Retirement 35,416 39,600 41,100 3.8%
4040 Contributions-I nsurance 31,755 35,000 42,300 20.9%
4050 Workers Compensation 850 1,000 1,100 10.0%
* TOTAL PERSONAL SERVICES 347,136 371,400 385,500 3.8%
4120 Supplies-Equipment 11 200 200 0.0%
4130 Supplies-Program 100 100 0.0%
4210 Books & Periodicals 200 200 0.0%
* TOTAL MATERIALS & SUPPLIES 11 500 500 0.0%
4300 Fees, Services 2,170 2,000 2,000 0.0%
4310 Telephone 1,304 1,800 1,500 (16.7%)
4330 Postage 10,529 15,000 13,000 (13.3%)
4340 Printing & Publishing 1,701 1,300 1,500 15.4%
4360 Subscriptions & Memberships 2,044 2,500 2,500 0.0%
4370 Travel & Training 4,865 5,000 5,500 10.0%
4380 Mileage 7,030 7,200 7,200 0.0%
4410 Rental-Equipment 17 ,644 18,500 18,500 0.0%
4530 Repair & Maintenance-Equip 300 300 0.0%
4807 Property Tax Expense 4,381 0.0%
4933 Sales Tax 3 0.0%
* TOTAL CONTRACTUAL SERVICES 51,671 53,600 52,000 (3.0%)
4703 Office Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL ADMINISTRATION 398,818 425,500 438,000 2.9%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1130 Finance
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 167,661 176,700 177,900 0.7%
4011 Overtime 247 200 0.0%
4020 Temporary & Seasonal Wages 2,380 0.0%
4030 Contributions-Retirement 21,387 24,200 24,700 2.1%
4040 Contributions-I nsurance 21,558 25,000 22,200 (11.2%)
4050 Workers Compensation 1,506 600 1,000 66.7%
* TOTAL PERSONAL SERVICES 214,739 226,500 226,000 (0.2%)
4120 Supplies-Equipment 421 200 200 0.0%
4210 Books & Periodicals 100 100 0.0%
* TOTAL MATERIALS & SUPPLIES 421 300 300 0.0%
4300 Fees, Services 51,589 40,000 42,000 5.0%
4301 Fees, Financial/Audit 38,171 37,000 38,000 2.7%
4310 Telephone and Communications 339 300 0.0%
4330 Postage 200 200 0.0%
4340 Printing & Publishing 1,646 1,000 1,500 50.0%
4360 Subscriptions & Memberships 350 200 400 100.0%
4370 Travel & Training 3,673 5,000 9,000 80.0%
4530 Repair & Maintenance-Equip 100 100 0.0%
4901 Refunds/Reimbursements 147 0.0%
* TOTAL CONTRACTUAL SERVICES 95,916 83,500 91,500 9.6%
4703 Office Equipment 129 200 200 0.0%
* TOTAL CAPITAL OUTLAY 129 200 200 0.0%
** TOTAL FINANCE 311,205 310,500 318,000 2.4%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1140 Legal
IACCOUNT 2005 2006 2007
DESCRIPTION ACTUAL BUDGET BUDGET
4302 Fees, Legal 127,179 145,000 168,000
* TOTAL CONTRACTUAL SERVICES 127,179 145,000 168,000
15.9%
15.9%
**
TOTAL LEGAL
127,179
145,000
168,000
15.9%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1150 Property Assessment
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4300 Fees, Services 85,937 87,000 100,000 14.9%
4340 Printing & Publishing 100 100 0.0%
* TOTAL CONTRACTUAL SERVICES 85,937 87,100 100,100 14.9%
**
TOTAL PROPERTY ASSESSMENT
85,937
87,100
100,100
14.9%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1160 M.I.S.
IACCOUNT 2005 2006 2007
DESCRIPTION ACTUAL BUDGET BUDGET
4010 Salaries & Wages-Reg 115,293 118,000 124,300 5.3%
4030 Contributions-Retirement 14,800 16,100 17,300 7.5%
4040 Contributions-I nsurance 15,136 16,200 17,900 10.5%
4050 Workers Compensation 391 400 500 25.0%
* TOTAL PERSONAL SERVICES 145,620 150,700 160,000 6.2%
4150 Maintenance Materials 527 1,400 1,300 (7.1%)
4210 Books & Periodicals 402 600 600 0.0%
4220 Software Licenses 11,140 8,600 (100.0%)
4260 Small Tools & Equipment 256 500 500 0.0%
* TOTAL MATERIALS & SUPPLIES 12,325 11,100 2,400 (78.4%)
4300 Fees, Services 35,572 64,600 78,100 20.9%
4310 Telephone 857 1 ,400 1,400 0.0%
4320 Utilities 13,229 12,000 12,600 5.0%
4350 Cleaning and Waste Removal 43 0.0%
4370 Travel & Training 26,630 21,600 21,700 0.5%
4530 Repair & Maintenance-Equip 2,858 5,000 5,000 0.0%
4933 Sales Tax 84 0.0%
* TOTAL CONTRACTUAL SERVICES 79,273 104,600 118,800 13.6%
4703 Office Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL M.I.S. 237,218 266,400 281,200 5.6%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1170 City Hall
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 47,369 48,900 49,600 1.4%
4011 Overtime-Reg 3,473 2,000 2,000 0.0%
4030 Contributions-Retirement 6,648 6,700 6,900 3.0%
4040 Contributions-I nsurance 5,460 5,900 6,600 11.9%
4050 Workers Compensation 1,353 1 ,400 1,500 7.1%
* TOTAL PERSONAL SERVICES 64,304 64,900 66,600 2.6%
4110 Supplies-Office 37,090 35,000 37,000 5.7%
4120 Supplies-Equipment 1,577 700 1,000 42.9%
4140 Supplies-Vehicles 1,032 700 1,000 42.9%
4150 Maintenance Materials 2,858 2,500 3,000 20.0%
4260 Small Tools & Equipment 299 500 500 0.0%
* TOTAL MATERIALS & SUPPLIES 42,855 39,400 42,500 7.9%
4300 Fees, Services 3,652 6,000 6,000 0.0%
4310 Telephone 14,892 16,000 16,000 0.0%
4320 Utilities 40,507 52,000 52,000 0.0%
4350 Cleaning & Waste Removal 31,541 33,000 33,000 0.0%
4410 Equipment Rental 37 0.0%
4440 License & Registration 100 100 0.0%
4483 Insurance-General Liability 168,222 205,500 205,500 0.0%
4510 Repair & Maintenance-Building 8,419 5,000 5,000 0.0%
4520 Repair & Maintenance-Vehicles 59 400 400 0.0%
4530 Repair & Maintenance-Equip 1,781 1,500 1,500 0.0%
* TOTAL CONTRACTUAL SERVICES 269,109 319,500 319,500 0.0%
4705 Other Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL CITY HALL 376,267 423,800 428,600 1.1%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1180 Elections
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 12,500 12,500 0.0%
4030 Contributions-Retirement 1,000 1,000 0.0%
4050 Workers Compensation 0.0%
* TOTAL PERSONAL SERVICES 13,500 13,500 0.0%
4110 Office Supplies 200 200 0.0%
4300 Fees, Services 3,000 3,000 0.0%
4340 Printing & Publishing 1,508 1,000 2,000 100.0%
4370 Travel & Training 1,000 1,000 0.0%
* TOTAL CONTRACTUAL SERVICES 1,508 5,200 6,200 19.2%
** TOTAL ELECTIONS 1,508 18,700 19,700
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1190 Library Building
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4120 Supplies-Equipment 69 0.0%
4150 Maintenance Materials 1,648 2,000 2,000 0.0%
4260 Small Tools & Equipment 91 0.0%
* TOTAL MATERIALS & SUPPLIES 1,809 2,000 2,000 0.0%
4300 Fees, Services 974 500 1,000 100.0%
4310 Telephone 2,023 2,200 2,200 0.0%
4320 Utilities 58,896 63,000 63,000 0.0%
4350 Cleaning & Waste Removal 30,708 27,000 30,000 11.1%
4510 Repair & Maintenance-Building 2,742 2,000 2,000 0.0%
4530 Repair & Maintenance-Equip 3,907 1,000 2,000 100.0%
4933 Sales Tax 4 0.0%
* TOTAL CONTRACTUAL SERVICES 99,252 95,700 100,200 4.7%
** TOTAL LIBRARY 101,061 97,700 102,200 4.6%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1210 Police Administration
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 55,050 56,800 58,800 3.5%
4030 Contributions-Retirement 7,192 7,800 8,200 5.1%
4040 Contributions-I nsurance 5,506 5,900 6,700 13.6%
4050 Workers Compensation 354 500 500 0.0%
* TOTAL PERSONAL SERVICES 68,102 71,000 74,200 4.5%
4130 Program Supplies 5,201 5,000 0.0%
4300 Fees, Services 1,165,786 1,205,000 1,250,000 3.7%
4370 Travel and Training 142 0.0%
4375 Promotional Expense 4,306 4,000 4,500 12.5%
4933 Sales Tax 137 0.0%
* TOTAL CONTRACTUAL SERVICES 1,175,572 1,209,000 1,259,500 4.2%
** TOTAL POLICE ADMINISTRATION 1,243,674 1,280,000 1,333,700 4.2%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1220 Fire Prevention Administration
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 125,361 128,900 133,500 3.6%
4011 Overtime 822 1,000 1,000 0.0%
4020 Salaries & Wages-Temp 129,862 171,500 160,000 (6.7%)
4030 Contributions-Retirement 172,216 187,000 187,000 0.0%
4040 Contributions-I nsurance 16,492 17,700 19,600 10.7%
4050 Workers Compensation 12,958 14,500 14,500 0.0%
* TOTAL PERSONAL SERVICES 457,710 520,600 515,600 (1.0%)
4120 Supplies-Equipment 11,651 10,500 11,000 4.8%
4130 Supplies-Program 1,588 5,000 5,000 0.0%
4140 Supplies-Vehicles 12,023 7,000 7,000 0.0%
4150 Maintenance Materials 336 1,000 1,000 0.0%
4170 Motor Fuels and Lubrication 85 0.0%
4210 Books & Periodicals 2,130 700 1,000 42.9%
4240 Uniforms & Clothing 13,806 13,500 13,500 0.0%
4260 Small Tools & Equipment 2,888 6,000 5,000 (16.7%)
4290 Misc. Materials & Supplies 3,564 3,500 3,500 0.0%
* TOTAL MATERIALS & SUPPLIES 48,070 47,200 47,000 (0.4%)
4300 Fees, Services 14,047 16,500 16,500 0.0%
4310 Telephone 4,565 6,000 6,000 0.0%
4320 Utilities 21,115 18,500 23,000 24.3%
4330 Postage 64 0.0%
4340 Printing and Publishing 485 0.0%
4350 Cleaning & Waste Removal 6,563 6,500 7,000 7.7%
4360 Subscriptions & Memberships 3,075 2,500 3,000 20.0%
4370 Travel & Training 8,687 10,000 10,000 0.0%
4375 Promotional Expense 9,437 9,000 9,000 0.0%
4483 Insurance-General Liability 301 2,100 1,000 (52.4%)
4510 Repair & Maintenance-Building 7,820 6,000 7,000 16.7%
4520 Repair & Maintenance-Vehicles 19,092 7,000 7,000 0.0%
4530 Repair & Maintenance-Equip 8,133 5,000 5,000 0.0%
4531 Repair & Maintenance-Radios 3,894 6,500 9,000 38.5%
4901 Refunds/Reimbursements 240 0.0%
Contribution for Performance 12,500 100.0%
4933 Sales Tax 394 0.0%
* TOTAL CONTRACTUAL SERVICES 107,911 95,600 116,000 21.3%
** TOTAL FIRE PREVENTION ADMIN 613,692 663,400 678,600 2.3%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1250 Code Enforcement
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 473,767 521,500 524,000 0.5%
4011 Overtime-Reg 518 2,000 2,000 0.0%
4020 Salaries & Wages-Temp 1,261 30,000 30,000 0.0%
4030 Contributions-Retirement 59,851 71,200 72,900 2.4%
4040 Contributions-I nsurance 70,106 84,000 91,700 9.2%
4050 Workers Compensation 2,766 4,100 3,400 (17.1%)
* TOTAL PERSONAL SERVICES 608,269 712,800 724,000 1.6%
4120 Supplies-Equipment 663 1,000 1,000 0.0%
4130 Supplies-Program 355 800 800 0.0%
4140 Supplies-Vehicles 2,274 1,500 1,500 0.0%
4150 Maintenance Materials 51 0.0%
4210 Books & Periodicals 450 3,500 3,500 0.0%
4240 Uniforms & Clothing 1,106 1,500 1,500 0.0%
4260 Small Tools & Equipment 35 400 400 0.0%
* TOTAL MATERIALS & SUPPLIES 4,933 8,700 8,700 0.0%
4300 Fees, Services 1,000 1,000 0.0%
4310 Telephone 3,122 4,000 4,000 0.0%
4340 Printing & Publishing 741 2,000 2,000 0.0%
4360 Subscriptions & Memberships 660 1,000 1,000 0.0%
4370 Travel & Training 6,675 11 ,000 11 ,000 0.0%
4375 Promotional Expense 200 200 0.0%
4440 License & Registration 45 200 200 0.0%
4520 Repair & Maintenance-Vehicles 424 1,500 1,500 0.0%
4530 Repair & Maintenance-Equip 1,688 2,500 2,500 0.0%
4901 Refunds/Reimbursements 1,096 0.0%
4933 Sales Tax 16 0.0%
4903 Bad Debt Expense 0.0%
* TOTAL CONTRACTUAL SERVICES 14,467 23,400 23,400 0.0%
4705 Other Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL CODE ENFORCEMENT 627,670 744,900 756,100 1.5%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1260 Community Service
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 36,190 39,000 47,000 20.5%
4021 Overtime-Temp 1,000 1,000 0.0%
4030 Contributions-Retirement 4,779 4,700 4,900 4.3%
4040 Contributions-I nsurance 590 600 600 0.0%
4050 Workers Compensation 704 600 700 16.7%
* TOTAL PERSONAL SERVICES 42,263 45,900 54,200 18.1%
4120 Supplies-Equipment 453 500 500 0.0%
4130 Supplies-Program 18 700 700 0.0%
4140 Supplies-Vehicles 477 700 700 0.0%
4210 Books & Periodicals 200 200 0.0%
4240 Uniforms & Clothing 390 1,800 1,800 0.0%
* TOTAL MATERIALS & SUPPLIES 1,338 3,900 3,900 0.0%
4300 Fees, Services 8,302 6,000 7,000 16.7%
4310 Telephone 744 1,000 1,000 0.0%
4340 Printing & Publishing 752 300 500 66.7%
4360 Subscriptions & Memberships 133 300 300 0.0%
4370 Travel & Training 444 1,000 700 (30.0%)
4520 Repair & Maintenance-Vehicles 5,358 400 1,000 150.0%
4530 Repair & Maintenance-Equip 300 300 0.0%
4531 Repair & Maintenance-Radios 99 300 300 0.0%
4901 Refunds/Reimbursements 25 0.0%
4903 Bad Debt Expense 107 0.0%
* TOTAL CONTRACTUAL SERVICES 15,965 9,600 11,100 15.6%
4705 Other Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL COMMUNITY SERVICE 59,566 59,400 69,200 16.5%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1310 Engineering
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 358,895 375,300 383,900 2.3%
4011 Overtime-Reg 1,000 1,000 0.0%
4020 Salaries & Wages-Temp 12,725 7,500 10,000 33.3%
4021 Temp/Seasonal Overtime 157 0.0%
4030 Contributions-Retirement 47,125 51,300 53,400 4.1%
4040 Contributions-I nsurance 49,031 41,800 46,300 10.8%
4050 Workers Compensation 2,168 2,800 2,800 0.0%
* TOTAL PERSONAL SERVICES 470,102 479,700 497,400 3.7%
4120 Supplies-Equipment 200 200 0.0%
4140 Supplies-Vehicles 40 300 300 0.0%
4210 Books & Periodicals 292 400 400 0.0%
* TOTAL MATERIALS & SUPPLIES 332 900 900 0.0%
4300 Fees, Services 10,578 17,000 18,000 5.9%
4303 Engineering Consulting 3,400 0.0%
4310 Telephone 1,581 2,000 2,000 0.0%
4330 Postage 400 400 0.0%
4340 Printing & Publishing 377 1,100 1,100 0.0%
4360 Subscriptions & Memberships 875 1,200 1,200 0.0%
4370 Travel & Training 2,566 2,700 3,000 11.1%
4380 Mileage 200 200 0.0%
4440 License & Registration 300 300 0.0%
4520 Repair & Maintenance-Vehicles 500 500 0.0%
4530 Repair & Maintenance-Equip 1,816 3,000 3,000 0.0%
4531 Repair & Maintenance-Radios 100 100 0.0%
4901 Refunds/Reimbursements 517 0.0%
4933 Sales Tax 3 0.0%
* TOTAL CONTRACTUAL SERVICES 21,714 28,500 29,800 4.6%
4705 Other Equipment 129 300 300 0.0%
* TOTAL CAPITAL OUTLAY 129 300 300 0.0%
** TOTAL ENGINEERING 492,277 509,400 528,400 3.7%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1320 Street Maintenance
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 423,086 442,400 436,400 (1.4%)
4011 Overtime-Reg 9,639 7,500 10,000 33.3%
4020 Salaries & Wages-Temp 8,126 17,800 17 ,800 0.0%
4021 Temp/Seasonal Overtime 201 0.0%
4030 Contributions-Retirement 56,077 60,400 60,700 0.5%
4040 Contributions-I nsurance 56,234 66,200 72,900 10.1%
4050 Workers Compensation 17 ,220 9,800 17 ,500 78.6%
* TOTAL PERSONAL SERVICES 570,584 604,100 615,300 1.9%
4120 Supplies-Equipment 46,352 40,000 47,000 17.5%
4140 Supplies-Vehicles 27,232 25,000 28,000 12.0%
4150 Maintenance Materials 55,061 20,000 55,000 175.0%
4160 Chemicals 400 (100.0%)
4170 Motor Fuels & Lubricants 2,784 0.0%
4210 Books & Periodicals 100 100 0.0%
4240 Uniforms & Clothing 1,851 3,700 3,700 0.0%
4260 Small Tools & Equipment 1,042 2,500 2,700 8.0%
* TOTAL MATERIALS & SUPPLIES 134,322 91 ,700 136,500 48.9%
4300 Fees, Services 1,752 1,000 1,000 0.0%
4310 Telephone 3,549 3,500 3,500 0.0%
4340 Printing & Publishing 300 300 0.0%
4350 Cleaning & Waste Removal 240 300 300 0.0%
4360 Subscriptions & Memberships 135 100 100 0.0%
4370 Travel & Training 1 ,435 1,500 1,500 0.0%
4410 Rental-Equipment 1,500 1,500 0.0%
4440 License & Registration 105 600 600 0.0%
4510 Repair & Maintenance-Building 285 500 500 0.0%
4520 Repair & Maintenance-Vehicles 648 2,400 2,400 0.0%
4530 Repair & Maintenance-Equip 1,929 5,500 5,500 0.0%
4531 Repair & Maintenance-Radios 2,000 2,000 0.0%
4540 Repair & Maintenance-Streets 500 500 0.0%
4560 Repair & Maintenance-Signs 5,404 13,700 13,700 0.0%
4933 Sales Tax 1,278 0.0%
* TOTAL CONTRACTUAL SERVICES 16,761 33,400 33,400 0.0%
4703 Office Equipment 300 300 0.0%
4705 Other Equipment 1,279 1,000 1,000 0.0%
* TOTAL CAPITAL OUTLAY 1,279 1,300 1,300 0.0%
** TOTAL STREET MAINTENANCE 722,946 730,500 786,500 7.7%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1350 Street Lighting & Signals
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4120 Supplies-Equipment 3,132 1,500 4,500 200.0%
4150 Maintenance Materials 0.0%
* TOTAL MATERIALS & SUPPLIES 3,132 1,500 4,500 200.0%
4300 Fees, Services 300 300 0.0%
4310 Telephone 526 500 600 20.0%
4320 Utilities 241 ,300 230,000 290,000 26.1%
4410 Rental-Equipment 300 (100.0%)
4530 Repair & Maintenance-Equip 1,233 2,500 2,500 0.0%
4560 Repair & Maint-Signs 21 0.0%
4565 Repair & Maintenance-Lights&Signals 18,472 8,200 17,000 107.3%
* TOTAL CONTRACTUAL SERVICES 261,551 241,800 310,400 28.4%
** TOTAL STREET LIGHT & SIGNALS 264,683 243,300 314,900 29.4%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1370 City Garage
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC}
4010 Salaries & Wages-Reg 180,960 186,700 187,400 0.4%
4011 Overtime-Reg 561 6,500 6,500 0.0%
4030 Contributions-Retirement 22,652 25,500 26,100 2.4%
4040 Contributions-I nsurance 27,662 29,500 32,000 8.5%
4050 Workers Compensation 5,176 4,600 6,000 30.4%
* TOTAL PERSONAL SERVICES 237,011 252,800 258,000 2.1%
4120 Supplies-Equipment 2,441 3,300 3,300 0.0%
4140 Supplies-Vehicles 141 500 500 0.0%
4150 Maintenance Materials 494 1,000 1,000 0.0%
4170 Motor Fuels & Lubricants 81,015 105,000 140,000 33.3%
4240 Uniforms & Clothing 1,335 1,200 1,200 0.0%
4260 Small Tools & Equipment 3,077 4,400 4,400 0.0%
* TOTAL MATERIALS & SUPPLIES 88,504 115,400 150,400 30.3%
4300 Fees, Services 825 700 1,300 85.7%
4310 Telephone 2,899 3,200 3,800 18.8%
4320 Utilities 19,149 22,000 23,000 4.5%
4340 Printing & Publishing 100 100 0.0%
4350 Cleaning & Waste Removal 6,531 6,100 6,100 0.0%
4360 Subscriptions & Memberships 190 200 200 0.0%
4370 Travel & Training 1,906 1,500 1,500 0.0%
4410 Rental-Equipment 119 500 500 0.0%
4440 License & Registration 83 500 500 0.0%
4510 Repair & Maintenance-Building 4,428 4,000 4,000 0.0%
4520 Repair & Maintenance-Vehicles 300 300 0.0%
4530 Repair & Maintenance-Equip 1,419 3,800 3,800 0.0%
4531 Repair & Maintenance-Radios 100 100 0.0%
* TOTAL CONTRACTUAL SERVICES 37,549 43,000 45,200 5.1%
4703 Office Equipment 493 500 500 0.0%
4705 Other Equipment 4,666 5,500 5,500 0.0%
* TOTAL CAPITAL OUTLAY 5,158 6,000 6,000 0.0%
** TOTAL CITY GARAGE 368,222 417,200 459,600 10.2%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1410 Planning Commission
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4210 Books & Periodicals 63 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 63 200 200 0.0%
4300 Fees, Services 2,101 0.0%
4340 Printing & Publishing 5,207 2,000 3,000 50.0%
4360 Subscriptions & Memberships 115 200 200 0.0%
4370 Travel & Training 937 800 800 0.0%
TOTAL CONTRACTUAL SERVICES 8,360 3,000 4,000 33.3%
** TOTAL PLANNING COMMISSION 8,423 3,200 4,200 31.3%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1420 Planning Administration
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/CDEC)
4010 Salaries & Wages-Reg 260,971 272,500 283,200 3.9%
4020 Temp & Seasonal 0.0%
4021 Temp & Seasonal Overtime 0.0%
4030 Contributions-Retirement 32,476 37,200 39,400 5.9%
4040 Contributions-Insurance 27,280 35,500 39,200 10.4%
4050 Workers Compensation 883 900 1,000 11.1%
TOTAL PERSONAL SERVICES 321,610 346,100 362,800 4.8%
4120 Supplies-Equipment 81 300 300 0.0%
4130 Supplies-Program 100 100 0.0%
4140 Supplies-Vehicles 115 100 100 0.0%
4210 Books & Periodicals 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 196 700 700 0.0%
4300 Fees, Services 5,000 5,000 0.0%
4310 Telephone 144 200 200 0.0%
4340 Printing & Publishing 377 200 200 0.0%
4360 Subscriptions & Memberships 1,414 1,500 1,500 0.0%
4370 Travel & Training 2,955 7,000 7,000 0.0%
4520 Repair & Maintenance-Vehicles 200 200 0.0%
4901 Refunds/Reimbursements 745 0.0%
TOTAL CONTRACTUAL SERVICES 5,635 14,100 14,100 0.0%
** TOTAL PLANNING ADMINISTRATION 327,440 360,900 377,600 4.6%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1430 Senior Commission
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 14,591 15,300 15,900 3.9%
4030 Contributions-Retirement 1,852 2,100 2,200 4.8%
4040 Contributions-I nsurance 1,380 1,500 1,700 13.3%
4050 Workers Compensation 50 100 100 0.0%
TOTAL PERSONAL SERVICES 17,873 19,000 19,900 4.7%
4110 Supplies-Equipment 181 0.0%
4210 Books & Periodicals 0.0%
TOTAL MATERIALS & SUPPLIES 181 0.0%
4300 Fees, Services 9,116 9,000 9,500 5.6%
4370 Travel & Training 200 200 0.0%
4375 Promotional Expense 500 500 0.0%
TOTAL CONTRACTUAL SERVICES 9,116 9,700 10,200 5.2%
** TOTAL SENIOR COMMISSION 27,170 28,700 30,100 4.9%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1510 Park & Ree Commission
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4130 Supplies-Program 100 100 0,0%
4210 Books & Periodicals 100 100 0,0%
TOTAL MATERIALS & SUPPLIES 200 200 0.0%
4340 Printing & Publishing 856 900 0,0%
4360 Subscriptions & Memberships 700 700 0,0%
4370 Travel & Training 345 400 400 0.0%
TOTAL CONTRACTUAL SERVICES 1,201 1,100 2,000 81.8%
** TOTAL PARK & REC COMMISSION 1,201 1,300 2,200 69.2%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1520 Park & Rec Administration
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 83,985 85,400 89,200 4.4%
4030 Contributions-Retirement 10,342 11 ,700 12,400 6.0%
4040 Contributions-I nsurance 9,757 10,500 11,400 8.6%
4050 Workers Compensation 284 300 400 33.3%
TOTAL PERSONAL SERVICES 104,368 107,900 113,400 5.1%
4120 Supplies-Equipment 505 500 500 0.0%
4130 Supplies-Program 76 200 200 0.0%
4210 Books & Periodicals 100 100 0.0%
4240 Uniforms & Clothing 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 581 1,000 1,000 0.0%
4300 Fees, Services 488 1,100 100.0%
4310 Telephone 575 900 900 0.0%
4330 Postage 1,800 400 (77.8%)
4340 Printing & Publishing 1,340 14,000 1,500 (89.3%)
4360 Subscriptions & Memberships 1,260 1,200 1,200 0.0%
4370 Travel & Training 2,637 3,600 3,800 5.6%
4380 Mileage 19 100 200 100.0%
TOTAL CONTRACTUAL SERVICES 6,319 21,600 9,100 (57.9%)
** TOTAL PARK & REC ADMINISTRATION 111,268 130,500 123,500 (5.4%)
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1530 Recreation Center
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 44,731 45,800 43,300 (5.5%)
4020 Salaries & Wages-Temp 132,709 123,400 132,000 7.0%
4021 Temp/Seasonal Overtime 147 0.0%
4030 Contributions-Retirement 22,847 28,000 28,000 0.0%
4040 Contributions-I nsurance 3,754 5,900 6,600 11.9%
4050 Workers Compensation 3,206 5,200 4,200 (19.2%)
4060 Unemployment 1,888 0.0%
* TOTAL PERSONAL SERVICES 209,282 208,300 214,100 2.8%
4120 Supplies-Equipment 953 3,000 8,000 166.7%
4130 Supplies-Program 3,381 8,000 3,000 (62.5%)
4150 Maintenance Materials 500 500 0.0%
TOTAL MATERIALS & SUPPLIES 4,335 11,500 11,500 0.0%
4300 Fees, Services 950 500 500 0.0%
4310 Telephone 1,394 1,000 1,500 50.0%
4320 Utilities 29,213 28,000 36,500 30.4%
4340 Printing and Publishing 409 0.0%
4360 Subscriptions & Memberships 274 300 300 0.0%
4370 Travel & Training 154 400 400 0.0%
4375 Promotional Expense 1,011 300 300 0.0%
4510 Repair & Maintenance-Building 2,314 500 2,500 400.0%
4530 Repair & Maintenance-Equip 690 1,000 1,000 0.0%
4590 Misc. Contractual Services 3,121 500 500 0.0%
4903 Bad Debt Expense 65 0.0%
4933 Sales Tax 3 0.0%
TOTAL CONTRACTUAL SERVICES 39,599 32,500 43,500 33.8%
** TOTAL RECREATION CENTER 253,216 252,300 269,100 6.7%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1540 Lake Ann Park Operations
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 8,299 12,300 12,800 4.1%
4021 Overtime-Temp 431 300 500 66.7%
4030 Contributions-Retirement 668 800 800 0.0%
4050 Workers Compensation 175 300 300 0.0%
TOTAL PERSONAL SERVICES 9,573 13,700 14,400 5.1%
4120 Supplies-Equipment 3,700 3,800 2.7%
4130 Supplies-Program 6,566 8,600 9,100 5.8%
4240 Uniforms & Clothing 490 500 500 0.0%
TOTAL MATERIALS & SUPPLIES 7,056 12,800 13,400 4.7%
4300 Fees, Services 28,443 31,800 31,800 0.0%
4310 Telephone 3,221 3,600 3,600 0.0%
4320 Utilities 7,598 8,300 8,300 0.0%
4340 Printing & Publishing 107 300 300 0.0%
TOTAL CONTRACTUAL SERVICES 39,369 44,000 44,000 0.0%
** TOTAL LAKE ANN PARK OPERATIONS 55,998 70,500 71,800 1.8%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1550 Park Maintenance
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCICDEC)
4010 Salaries & Wages-Reg 398,039 408,500 422,800 3.5%
4011 Overtime-Reg 8,441 4,000 8,000 100.0%
4020 Salaries & Wages-Temp 76,397 77,000 79,000 2.6%
4021 Overtime-Temp 2,411 3,000 3,000 0.0%
4030 Contributions-Retirement 57,200 58,500 58,800 0.5%
4040 Contributions-Insurance 60,416 64,800 71,000 9.6%
4050 Workers Compensation 8,172 9,500 9,500 0.0%
4060 Unemployment 579 0.0%
TOTAL PERSONAL SERVICES 611,655 625,300 652,100 4.3%
4120 Supplies-Equipment 29,122 31,000 32,000 3.2%
4140 Supplies-Vehicles 5,849 8,000 8,000 0.0%
4150 Maintenance Materials 36,369 33,000 33,000 0.0%
4151 Irrigation Materials 1,624 3,000 3,000 0.0%
4240 Uniforms & Clothing 2,316 2,800 2,800 0.0%
4260 Small Tools & Equipment 1,308 2,500 2,500 0.0%
TOTAL MATERIALS & SUPPLIES 76,589 80,300 81,300 1.2%
4300 Fees, Services 23,279 17,000 18,000 5.9%
4310 Telephone 3,238 3,700 3,700 0.0%
4320 Utilities 7,558 5,500 6,000 9.1%
4340 Printing & Publishing 167 400 400 0.0%
4350 Cleaning & Waste Removal 6,008 9,000 9,000 0.0%
4360 Subscriptions & Memberships 35 400 400 0.0%
4370 Travel & Training 685 2,000 2,000 0.0%
4400 Rental-Land & Buildings 23,663 22,500 23,500 4.4%
4410 Rental-Equipment 143 2,000 2,000 0.0%
4440 License & Registration 700 700 0.0%
4510 Repair & Maintenance-Building 801 3,000 3,000 0.0%
4520 Repair & Maintenance-Vehicles 503 2,500 2,500 0.0%
4530 Repair & Maintenance-Equip 8,421 6,500 6,500 0.0%
4531 Repair & Maintenance-Radios 500 500 0.0%
4541 Repair & Maintenance-Trails 92 0.0%
4560 Repair & Maintenance-Signs 1,251 3,000 4,000 33.3%
4901 Refunds/Reimbursements 130 0.0%
4933 Sales Tax 49 0.0%
TOTAL CONTRACTUAL SERVICES 76,022 78,700 82,200 4.4%
4703 Office Equipment 117 0
4705 Other Equipment 3,710 3,000 4,000 33.3%
TOTAL CAPITAL OUTLAY 3,826 3,000 4,000 33.3%
** TOTAL PARK MAINTENANCE 768,092 787.300 819.600 4.1%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1560 Senior Citizens Center
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCUDEC)
4010 Salaries & Wages-Reg 21,167 26,000 26,900 3.5%
4030 Contributions-Retirement 2,790 3,600 3,700 2.8%
4040 Contributions-Insurance 300 300 0.0%
4050 Workers Compensation 71 200 200 0.0%
TOTAL PERSONAL SERVICES 24,028 30,100 31,100 3.3%
4120 Supplies-Equipment 100 400 300 (25.0%)
4130 Supplies-Program 2,677 2,700 3,500 29.6%
TOTAL MATERIALS & SUPPLIES 2,778 3,100 3,800 22.6%
4300 Fees, Services 20,185 16,100 16,500 2.5%
4340 Printing & Publishing 100 100 0.0%
4350 Cleaning & Waste Removal 150 200 200 0.0%
4360 Subscriptions & Memberships 55 100 100 0.0%
4370 Travel & Training 232 300 300 0.0%
4375 Promotional Expense 265 200 200 0.0%
4380 Mileage 100 100 0.0%
4901 Refunds/Reimbursements 144 0.0%
TOTAL CONTRACTUAL SERVICES 21,031 17,100 17,500 2.3%
** TOTAL SENIOR CITIZENS CENTER 47,836 50,300 52,400 4.2%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1600 Recreation Programs
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 85,649 89,000 84,600 (4.9%)
4020 Salaries & Wages-Temp 31,940 45,200 64,300 42.3%
4021 Overtime-Temp 214 200 200 0.0%
4030 Contributions-Retirement 13,903 14,900 14,900 0.0%
4040 Contributions-I nsurance 8,402 9,500 10,600 11.6%
4050 Workers Compensation 798 1,500 1,000 (33.3%)
* TOTAL PERSONAL SERVICES 140,906 160,300 175,600 9.5%
4120 Supplies-Equipment 2,000 2,000 0.0%
4130 Supplies-Program 15,673 12,400 13,100 5.6%
4240 Uniforms & Clothing 875 1,400 1,500 7.1%
TOTAL MATERIALS & SUPPLIES 16,548 15,800 16,600 5.1%
4300 Fees, Services 43,965 45,600 47,400 3.9%
4310 Telephone 1 ,452 2,700 3,300 22.2%
4320 Utilities 2,226 2,200 2,500 13.6%
4330 Postage 200 200 0.0%
4340 Printing & Publishing 3,316 4,800 4,400 (8.3%)
4360 Subscriptions & Memberships 100 (100.0%)
4370 Travel & Training 32 400 500 25.0%
4380 Mileage 418 500 500 0.0%
4400 Rental-Land & Buildings 3,228 3,500 5,500 57.1%
4410 Rental-Equipment 11 ,266 13,700 17,700 29.2%
TOTAL CONTRACTUAL SERVICES 65,904 73,700 82,000 11.3%
** TOTAL RECREATION PROGRAMS 223,359 249,800 274,200 9.8%
CITY OF CHANHASSEN
2007 BUDGET
101 General Fund
1700 Self-Supporting Programs
2006 to
2005 2006 2007 2007
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 21,412 22,300 21,200 (4.9%)
4020 Salaries & Wages-Temp 3,334 5,300 13,600 156.6%
4030 Contributions-Retirement 3,107 3,300 3,300 0.0%
4040 Contributions-I nsurance 2,101 2,400 2,600 8.3%
4050 Workers Compensation 106 100 100 0.0%
TOTAL PERSONAL SERVICES 30,059 33,400 40,800 22.2%
4120 Supplies-Equipment 83 600 600 0.0%
4130 Supplies-Program 9,839 7,900 8,000 1.3%
TOTAL MATERIALS & SUPPLIES 9,922 8,500 8,600 1.2%
4300 Fees, Services 104,772 95,200 82,100 (13.8%)
TOTAL CONTRACTUAL SERVICES 104,772 95,200 82,100 (13.8%)
** TOTAL SELF-SUPPORTING PROGRAMS 144,753 137,100 131,500 (4.1%)
"I
City of Chanhassen, MN
Capital Improvement Program
2007 thru 2011
DEPARTMENT SUMMARY
Department 2007 2008 2009 2010 2011 Total
Major Equipment 916,000 842,900 871,100 1,689,300 945,400 (j, 264, 700
Municipal Buildings 220,000 3,700,000 20,000 3,625,000 7,565,000
Park & Trail Improvements 576,000 185,000 636,000 486.000 291,000 2,174,000
Planning 120,000 30,000 150,000
Sanitary Sewer Improvements 705,000 500,000 375,000 2,005,000 255,000 3,840,000
Street Improvements 4,831,000 4,635,000 10,785,000 2,285,000 1,885,000 24,421,000
Surface Water Management 1,543,500 870,000 770,000 960,000 670,000 4,813,500
Water System Improvements 995,000 820,000 490,000 945,000 45,000 3,295,000
GRAND TOTAL 9,906,500 11,582,900 13,947,100 11,995,300 4,091,400 51,523,200
City of Chanhassen, MN
Capital Improvement Program
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
/Major Equipment ,
Fire Dept.: SCBA Equipment EQ-004 0 70,000 5,000 5,000 5.000 300,000 385,000
Laptop Computers EQ-009 0 50,000 50,000
PPE: Tumout/Helmets EQ-010 0 15,000 15,000 15,000 15,000 15,000 75,000
Computer/Network Equipment PurchaseslUpgrades EQ-013 0 103,000 106,700 96,100 105,200 104,600 515,600
Telecommunication Purchases/Upgrades EQ-014 0 10.400 5,000 7,000 24,000 46,400
Community Dev.. Light Duty Trucks EQ-015 0 26,000 30,000 55,000 28,000 29,000 168,000
Dump/Plow Truck Replacements/Additions EQ.016 0 153,000 161,000 338,000 371,800 1,023,800
Vibratory Roll Packer EQ.019 0 45,000 45,000
Equipment Trailers EQ-021 0 25,000 25,000
Tar Kettle EQ-022 0 30,000 30,000
Ford 555C Backhoe EQ-023 0 80,000 80,000
Line Striper EQ-025 0 9,000 9,000
AudioNisual Equipment EQ-026 0 10,000 10,000 10,000 10,000 10,000 50,000
Groundsmaster 580 Mower Replacement EQ-028 0 82,000 82,000
Light Duty Trucks: Public Works EQ-029 0 31,000 32,000 31,000 94,000
Park Bobcat Snow Accessories EQ-030 0 7,000 7,000
Sewer Bobcat Snow Accessories EQ-031 0 7,000 7,000
Grounds Mower Replacement EQ-034 0 37,000 37,000
Tractor & Broom EQ-036 0 84,000 84,000
Mailing Folder/Inserter EQ-041 0 20,000 20,000
Software Purchases EQ-048 0 36,100 55,600 22,000 13,000 22,000 148,700
Computerized Records Retention System EO-049 0 9,500 9,500 30,000 8,600 9,000 66,600
Light Duty Trucks: Parks EO-052 0 98,000 33,000 65,000 196,000
Cushman Trail Vehicle & Sprayer: Parks EQ-053 0 24,000 24,000
Fire Vehicles EO-054 0 85,000 40,000 40,000 40,000 205,000
Aerial Photography for City GIS Datasets EO-055 0 20,000 20,000
Front-End Loaders EO-056 0 160,000 170,000 330,000
Sander EO-058 0 8,000 8,000
Skid loader Planer EO-061 0 15,000 15,000
Light Duty Trucks: Utilities EO-062 0 32,000 54,000 70,000 156,000
Administration Vehicle EQ-063 0 25,000 25,000
Engineering Vehicles EO-065 0 58,000 58,000
Fire Station 3 Vehicles and Equipment EO-068 0 1,000,000 1,000,000
Veterans Monument EO-080 0 50,000 50,000
Storage Area Network EO-081 0 33,100 28,000 13,500 14,000 88,600
Fine Grader - Tractor Attachment EQ-082 0 10,000 10,000
CSOTruck EQ-083 0 30,000 30,000
Major Equipment Total 916,000 842,900 871,100 1,689,300 945,400 5, 264,700
iMunicipal Buildings ~
Public Works Facility Improvements MB-003 0 220,000 3,700,000 3,920,000
Siding and Backing Replacement MB-008 0 20,000 20,000
Department Project# Priority 2007 2008 2009 2010 2011 Total
Fire Station 3 MB-009 0 3,500,000 3,500,000
City Hall Remodel MB-010 0 125,000 125,000
Municipal Buildings Total 220,000 3,700,000 20,000 3,625,000 7,565,000
IPark & Trail Improvements ~
Hwy 101 North Trail Connection PK&T-f)2g 0 114,000 114,000
Phase II Playground:Roundhouse Park PK&T-037 0 30,000 30,000
Phase II Playground:Sugarbush Park PK&T-038 0 30,000 30,000
Phase II Playground:Power Hill Park PK&T-041 0 30,000 30,000
Picnic Tables/Park Benches PK&T-042 0 6,000 6,000 6,000 6,000 6,000 30,000
Trees PK& T-043 0 5,000 5,000 5,000 5,000 5,000 25,000
Arboretum Business Park Lot 12 Trail PK&T-047 0 190,000 190,000
Athletic Field Lighting (2 fields) PK&T-065 0 150,000 150,000
Power Hill Park Trail PK&T-066 0 75,000 75,000
Lake Ann Park 'Parkview' Picnic Shener PK&T-068 0 95,000 95,000
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK&T-069 0 125,000 125,000
Tennis Court Repair PK&T-072 0 45,000 45,000
Mtka Middle School West Tennis Court Project PK&T-073 0 30,000 30,000
Rice Marsh Lake Trail PK&T-074 0 350,000 350,000
Liberty at Creekside Trail PK&T-075 0 175,000 175,000
The Preserve Trail and Bridge PK&T-076 0 450,000 450,000
Lakeside Trail (Lyman Boulevard) PK&T-077 0 60,000 60,000
Pioneer Pass Park Acqulsttion PK&T-078 0 170,000 170,000
Park & Trail Improvements Total 576,000 185,000 636,000 486,000 291,000 2,174,000
IPlanning I
Update of Comprehensive Plan PL-001 0 120,000 30,000 150,000
Planning Total 120,000 30,000 150,000
ISanitary Sewer Improvements I
Inflow and Infiltration Abatement SS-012 0 210,000 200,000 200,000 200,000 200,000 1,010,000
Santtary Sewer Replacement SS-014 0 230,000 250,000 250,000 730,000
Santtary Lift Station Rehabilitation Program SS-017 0 265,000 50,000 50,000 55,000 55,000 475,000
Dell Roadl77th Street Forcemain Replacement SS-018 0 125,000 125,000
2010 MUSA Sanitary LIft Station SS-020 0 1,500,000 1,500,000
Sanitary Sewer Improvements Total 705,000 500,000 375,000 2,005,000 255,000 3,840,000
IStreet Improvements I
West 78th St Streetlights ST-001 0 300,000 300,000
Lyman Boulevard Improvements ST-003 0 9,100.000 9,100,000
Annual Street Improvement Program ST-012 0 4,436,000 4,100,000 1,300,000 1,900,000 1,200,000 12,936,000
TH 101 Corridor Preservation Planning ST-017 0 150,000 150,000
Pavement Management ST-018 0 385,000 385,000 385,000 385,000 385,000 1,925,000
TH 5 Corridor Study - TH 41 to TH 212 ST-019 0 10,000 10,000
Street Improvements Total 4,831,000 4,635,000 10,785,000 2,285,000 1,885,000 24,421,000
ISurface Water Management ,
SWMP Implementation SWMP-012 0 450,000 300,000 300,000 300,000 300,000 1,650,000
Property Acquisition SWMP-014 0 245,000 100,000 100.000 200.000 200,000 845,000
Department Project# Priority 2007 2008 2009 2010 2011 Total
StreetJmprovement Projects - Storm Water Mgmt SWMP-019 0 640,000 300,000 150,000 1,090,000
Leaf Vacuum SWMP-021 0 40,000 40,000
Excavator SWMP-022 0 70,000 70,000
Vactor, Used SWMP-023 0 200,000 200,000
Bluff Cr. Nal. Resources Mgmt Plan Implementation SWMP-024 0 150,000 150,000 150,000 150,000 150,000 750,000
Lake Minnewashta Outiet SWMP-026 0 30,000 30,000
Natural Resources Stewardship Plan SWMP-027 0 50,000 20,000 20,000 20,000 20,000 130,000
Water truck boom sprayer SWMP-028 0 8,500 8,500
Surface Water Management Total 1,543,SOO 870,000 770,000 960,000 670,000 4,813,~
IWater System Improvements ,
Repainting: West 76th SI. Water Tower W-015 0 80,000 80,000
Arboretum Water Main W-020 0 20,000 200,000 220,000
Watermaln Replacement W-024 0 660,000 660,000 700,000 2,020,000
Well #4 Improvements W-025 0 350,000 350,000
Pressure Reducing Station 8 W-027 0 65,000 65,000
Well Rehabilitation Program W-032 0 40,000 40,000 40,000 45,000 45,000 210,000
TH 101 Trunk Watermain Replacement W-033 0 200,000 200,000
Well Head Protection Plan Update W-036 0 30,000 30,000
Stand by Generator for wells W-038 0 120,000 120,000
Water System Improvements Total 995,000 820,000 490,000 945,000 45,000 3,295,000
GRAND TOTAL 9,906,SOO 11,582,900 13,947,100 11,995,300 4,091,400 51,523,200
City of Chanhassen, MN
Capital Improvement Program
2007 thru 2011
FUNDING SOURCE SUMMARY
Source 2007 2008 2009 2010 2011 Total
Abatement District Funds 5,000,000 5,000,000
Assessment Bonds 1,009,000 1,009,000
Assessment/Revolving Assessment Fund 2,936,000 1,600,000 1,000,000 1,900,000 1,200,000 8,636,000
Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000
Capital Replacement Fund 824,000 832,900 820,100 804,300 865,400 4,146,700
Developer Assessments 1,000,000 1,000,000
General Fund 50,000 30,000 80,000
GO Bonds 220,000 2,800,000 4,500,000 7,520,000
MSA 644,250 2,667,125 417,125 117,125 417,125 4,262,750
Other Agency Contribution 100,000 1,731,000 1,831,000
Park Dedication Fund m,ooo 185,000 636,000 486,000 291,000 2,375,000
Reforestation 58,500 20,000 20,000 20,000 20,000 138,500
Sewer Utility Fund 755,000 1,200,000 429,000 2,005,000 325,000 4,714,000
Surface Water Utility Fund 1,334,000 1,050,000 1,450,000 940,000 650,000 5,424,000
Tax Levy 250,750 267,875 267,875 267,875 267,875 1,322,250
Water Utility Fund 1,047,000 820,000 1,157,000 945,000 45,000 4,014,000
GRAND TOTAL 9,906,500 11,582,900 13,947,100 11,995,300 4,091,400 51,523,200
City of Chanhassen, MN
Capital Improvement Program
2007 thru 2011
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2007 2008 2009 2010 2011 Total
IAbatement District Funds I
Lyman Boulevard Improvements ST-003 0 5,000,000 5,000,000
Abatement District Funds Total 5,000,000 5,000,000
~-_.._----_. ,
Assessment Bonds
Lyman Boulevard Improvements ST-003 0 1,009,000 1,009,000
Assessment Bonds Total 1,009,000 1,009,000
IAssessmentIRevolving Assessment Fun ,
Annual Street Improvement Program ST-012 0 2,936,000 1,600,000 1,000,000 1,900,000 1,200,000 8,636,000
Assessment/Revolving Assessment Fund 2,936,000 1,600,000 1,000,000 1,900,000 1,200,000 8,636,000
Total
ICable TV Fund I
AudioNisual Equipment EQ-026 0 10,000 10,000 10,000 10,000 10,000 50,000
Cable TV Fund Total 10,000 10,000 10,000 10,000 10,000 50,000
ICapital Replacement Fund ,
Fire Dept.: SCBA Equipment EQ-004 0 70,000 5,000 5,000 5,000 300,000 385,000
Laptop Computers EQ-009 0 50,000 50,000
PPE: Tumout/Helmets EQ-010 0 15,000 15,000 15,000 15,000 15,000 75,000
Computer/Network Equipment Purchases/Upgrades EQ-013 0 103,000 106,700 96,100 105,200 104,600 515,600
Telecommunication PurchaseslUpgrades EQ-014 0 10,400 5,000 7,000 24,000 46,400
Community Dev.: Light Duty Trucks EQ-015 0 26.000 30,000 55,000 28,000 29,000 168,000
DumpIPlow Truck Replacements/Additions EQ-016 0 153,000 161,000 338,000 371,800 1,023,800
Vibratory Roll Packer EQ-019 0 45,000 45,000
Equipment Trailers EQ-021 0 25,000 25,000
Tar Kellle EQ-022 0 30,000 30,000
Ford 555C Backhoe EQ-023 0 80,000 80,000
Line Striper EQ-025 0 9,000 9,000
Groundsmaster 580 Mower Replacement EQ-028 0 82,000 82,000
Light Duty Trucks: Public Works EQ-029 0 31,000 32,000 31,000 94,000
Park Bobcat Snow Accessories EQ-030 0 7,000 7,000
Grounds Mower Replacement EQ-034 0 37,000 37,000
Tractor & Broom EQ-036 0 84,000 84,000
Mailing Folderllnserter EQ-041 0 20,000 20,000
Software Purchases EQ-048 0 36,100 55,600 22,000 13,000 22,000 148,700
Computerized Records Retention System EQ-049 0 9,500 9,500 30,000 8,600 9,000 66,600
Light Duty Trucks: Parks EQ-052 0 98,000 33,000 65,000 196,000
Source Project# Priority 2007 2008 2009 2010 2011 Total
Cushman Trail Vehicle & Sprayer: Parks EQ-053 0 24,000 24,000
Fire Vehicles EQ-054 0 85,000 40,000 40,000 40,000 205,000
Aerial Photography for City GIS Datasets EQ-055 0 20,000 20,000
Front-End Loaders EQ-056 0 160,000 170,000 330,000
Sander EQ-058 0 8,000 8,000
Skid loader Planer EQ-061 0 15,000 15,000
Administration Vehicle EQ-063 0 25,000 25,000
Engineering Vehicles EQ-065 0 58,000 58,000
Storage Area Network EQ-081 0 33,100 28,000 13,500 14,000 88,600
Fine Grader - Tractor Attachment EQ-OB2 0 10,000 10,000
CSO Truck EQ-OB3 0 30,000 30,000
Siding and Backing Replacement MB-008 0 20,000 20,000
City Hall Remodel MB-010 0 125,000 125,000
Capital Replacement Fund Total 824,000 832,900 820,100 804,300 865,400 4, 146,700
IDeveloper Assessments I
Annual Street Improvement Program ST-012 0 1,000,000 1,000,000
Developer Assessments Total 1,000,000 1,000,000
IGeneral Fund - .
Update of Comprehensive Plan PL -00 t 0 50.000 30,000 80,000
General Fund Total 50,000 30,000 80,000
IGO Bonds .
Fire Station 3 Vehicles and Equipment EQ-068 0 1,000,000 1,000,000
Public Works Facility Improvements MB-003 0 220,000 2,800,000 3,020,000
Fire Station 3 MB-009 0 3,500,000 3,500,000
GO Bonds Total 220,000 2,800,000 4,500,000 7,520,000
IMSA I
West 78th St Streetlights ST-OOt 0 300,000 300,000
Annual Street Improvement Program ST-012 0 500,000 2,500,000 300,000 3,300,000
TH 101 Corridor Preservation Planning ST-017 0 50,000 50,000
Pavement Management ST-018 0 134,250 117,125 117,125 117,125 117,125 602,750
TH 5 Corridor Study - TH 41 to TH 212 ST-019 0 10,000 10,000
MSA Total 644,250 2,667,125 417,125 117,125 417,125 4,262,750
IOther Agency Contribution I
Lyman Boulevard Improvements ST-003 0 1.131,000 1,731,000
TH 101 Corridor Preservation Planning ST-017 0 100,000 100,000
Other Agency Contribution Total 100,000 1,731,000 1,831,000
IPark Dedication Fund ,
Veterans Monument EQ-080 0 50,000 50,000
Hwy 101 North Trail Connection PK&T-029 0 114,000 114,000
Phase II Playground:Roundhouse Park PK&T-037 0 30,000 30,000
Source Pro.iect# Priority 2007 2008 2009 2010 2011 Total
Phase II Playground:Sugarbush Park PK&T-038 0 30,000 30,000
Phase II Playground:Power Hill Park PK&T-041 0 30,000 30,000
Picnic Tables/Park Benches PK&T-042 0 6,000 6,000 6,000 6,000 6,000 30,000
Trees PK&T..o43 0 5.000 5.000 5.000 5,000 5,000 25,000
Arboretum Business Park Lot 12 Trail PK&T-047 0 190,000 190,000
Athletic Field Lighting (2 fields) PK&T-065 0 150,000 150,000
Power Hill Park Trail PK&T-066 0 75,000 75,000
Lake Ann Park 'Parkview' Picnic Shelter PK&T-068 0 95,000 95,000
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK&T ..069 0 125,000 125,000
Tennis Court Repair PK&T-072 0 45,000 45,000
Mtka Middle School West Tennis Court Project PK&T-073 0 30,000 30,000
Rice Marsh Lake Trail PK&T-074 0 350,000 350,000
Liberty at Creekside Trail PK&T-075 0 175,000 175,000
The Preserve Trail and Bridge PK&T-076 0 450,000 450,000
Lakeside Trail (Lyman Boulevard) PK&T-077 0 60,000 60,000
Pioneer Pass Park AcquiSition PK&T-078 0 170,000 170,000
Property Acquisition SWMP-014 0 151,000 151,000
Park Dedication Fund Total 777,000 185,000 636,000 486,000 291,000 2,375,000
IReforestation I
Natural Resources Stewardship Plan SWMP-027 0 50,000 20,000 20,000 20,000 20,000 130,000
Water truck boom sprayer SWMP..o28 0 8.500 8,500
Reforestation Total 58,500 20,000 20,000 20,000 20,000 138,500
ISewer Utility Fund ,
Light Duty Trucks: Utilities EQ-062 0 54,000 70,000 124,000
Public Works Facility Improvements MB..o03 0 700,000 700,000
Update of Comprehensive Plan PL-001 0 50,000 50,000
Inflow and Infiltration Abatement 5S-012 0 210,000 200,000 200,000 200,000 200,000 1,010,000
Sanitary Sewer Replacement 55-014 0 230,000 250,000 250,000 730,000
Sanitary Lift Stalion Rehabffitation Program 55..017 0 265,000 50,000 50,000 55,000 55,000 475,000
Dell Roadl77th Street Forcemaln Replacement 55-018 0 125,000 125,000
2010 MUSA Sanitary Lift Station 55-020 0 1,500,000 1,500,000
Sewer Utility Fund Total 755,000 1,200,000 429,000 2,005,000 325,000 4,714,000
ISurface Water Utility Fund I
Public Works Facility Improvements MB-003 0 200,000 200,000
Lyman Boulevard Improvements ST-003 0 700,000 700,000
SWMP Implementation 5WMP-012 0 450,000 300,000 300,000 300,000 300,000 1,650,000
Property Acquisition 5WMP-014 0 94,000 100,000 100,000 200,000 200,000 694,000
Street Improvement Projects - Stonm Water Mgmt 5WMP-019 0 640,000 300,000 150,000 1,090,000
Leaf Vacuum SWMP-021 0 40,000 40,000
Excavator SWMP.022 0 70,000 70,000
Vactor, Used SWMP..o23 0 200,000 200,000
Bluff Cr. Nat. Resources Mgmt Plan Implementation SWMP-024 0 150,000 150,000 150,000 150,000 150,000 750,000
Lake Minnewashta Outlet SWMP-026 0 30,000 30,000
Surface Water Utility Fund Total 1,334,000 1,050,000 1,450,000 940,000 650,000 5,424,000
ITax Levy I
Source Project# Priority 2007 2008 2009 2010 2011 Total
Pavement Management ST-018 0 250,750 267,875 267,875 267,875 267,875 1,322,250
Tax Levy Total 250,750 267,875 267,875 267,875 267,875 1,322,250
~Utility Fund I
Sewer Bobcat Snow Accessories EQ-031 0 7,000 7,000
Light Duty Trucks: Utilities EQ-062 0 32,000 32,000
Update of Comprehensive Plan PL -001 0 20,000 20,000
Lyman Boulevard Improvements ST-003 0 660,000 660,000
Repainting: West 76th St. Water Tower W-01S 0 80,000 80,000
Arboretum Water Main W-020 0 20,000 200,000 220,000
Watennaln Replacement W-024 0 660,000 660,000 700,000 2,020,000
Well #4 Improvements W-025 0 350,000 350,000
Pressure Reducing Station 8 W-027 0 65,000 65,000
Well Rehabilitation Program W-032 0 40,000 40,000 40,000 45,000 45,000 210,000
TH 101 Trunk Watennain Replacement W-033 0 200,000 200,000
Well Head Protection Plan Update W-036 0 30,000 30,000
Stand by Generator for wells W-038 0 120,000 120,000
Water Utility Fund Total 1,047,000 820,000 1,157,000 945,000 45,000 4,014,000
GRAND TOTAL 9,906,500 11,582,900 13,947,100 11,995,300 4,091,400 51,523,200
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-004 Type Equipment
Useful Life 20 years
Project Name Fire Dept.: SCBA Equipment Category Fire
Accou nt # 1 400-4115-4705 Account # 3 Priority nla
Account #2 Total Project Cost 5390,000
Description I
This program is to provide additional SCBA bottles and upgrade air packs as needed.
Justification I
SCBA packs will be 20 years old in 2011. Replacement will bring packs to new standards. Bottles replaced in 2007 due to DOT/NFP A expiration
will be traded in or used with new packs if the same brand is purchased.
Prior Expenditures 2007 2008 2009 2010 2011 Total
I 5,000 I Equipment 70,000 5,000 5.000 5,000 300,000 385,000
Total Total 70,000 5,000 5,000 5,000 300,000 385,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 5,000 I Capital Replacement Fund 70,000 5.000 5.000 5,000 300,000 385,000
Total Total 70,000 5,000 5,000 5,000 300,000 385,000
Operational Impact/Other 1
This assists the department on emergency scenes and helps reduce on-scene times by eliminating the need to shuttle bottles from the scene to the
fire station for re-filling.
i
!
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-009
Project Name Laptop Computers
Account # 1 400-4127-4703
2007 thru 2011
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 7-10 years
Category Fire
Priority n/a
Account # 3
Account #2
Total Project Cost SSO,OOO
Description
Involves installing laptops in all front-line vehicles to enable responding personnel to access building pre-plans, hazardous materials data, hydrant
and other utility maps, address locations, etc.
Justification
The project will enhance Fire Department operations, allowing for increased safety as a result of easy access to important information. It will also
make it easier to find best routes andlor alternative routes when responding to emergencies.
Expenditures
Office Equipment
2007
2008
2009
2010
50,000
50,000
2011
Total
50,000
50,000
Total
Funding Sources
Capital Replacement Fund
Total
2007
2008
2009
2010
50,000
50,000
2011
Total
50,000
50,000
Operational Impact/Other
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-OIO
Project Name PPE: Turnout/Helmets
Account # 1 400-4105-4705
Account #2
Account # 3
2007 thru 2011
Contact
Department Major Equipment
Type Unassigned
Useful Life 20 years
Category Fire
Priority n/a
Total Project Cost $75,000
Description
Replacement of 3-5 sets per year as a result of damage received from firefighting activities. The city will also provide new members with new gear
after they complete their probationary period.
Justification
Turnout gear lasts approximately 5-7 years on average.
Expenditures
Maintenance
Total
Funding Sources
Capital Replacement Fund
Total
2007
15,000
15,000
2007
15,000
15,000
2008
15,000
15,000
2008
15,000
15,000
2009
15,000
15,000
2009
15,000
15,000
2010
15,000
15,000
2010
15,000
15,000
2011
15,000
15,000
Total
75,000
75,000
2011
15,000
15,000
Total
75,000
15,000
Operational Impact/Other
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-013
I'roject Name Computer/Network Equipment PurchaseslUpgrades
2007 thru 2011
Account # 1 400-4126-4703
Account # 3
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority nla
Total Project Cost $515,600
Account #2
Description 1
Funds the purchase of replacement user and network computers, printers, peripherals, and networking hardware. The replacement schedule was
adopted in 1999 and is subject to modifications by the MIS Coordinator with approval from the City Manager and department heads.
Justification I
Budgeting and purchasing computer equipment through this project allows the city greater flexibility to direct equipment to where it is needed the
most, rather than in individual budgets. The replacement schedule was developed in 1998 by the MIS Coordinator and was approved by the 1999
council appointed IT task force. Expenditures in the 2007 budget request are for replacement of 2 servers, 10 PCs, 3 workstations, 7 notebook PCs
and the primary tape backup device. Replaced equipment will be recycled if possible or otherwise sold on the city public surplus auction site.
Replacement Schedule
3-5 Years - Personal Computers and Network Servers
4-8 Years - Network Printers
Expenditures
Office Equipment
2007
103,000
103,000
2008
106,700
106,700
2009
96,100
96,100
2010
105,200
105,200
2011
104,600
104,600
Total
515,600
515,600
Total
Funding Sources
Capital Replacement Fund
Total
2007
103,000
103,000
2008
106,700
106,700
2009
96,100
96,100
2010
105,200
105,200
2011
104,600
104,600
Total
515,600
515,600
Operational Impact/Other I
Capital Improvement Program
City ofChanhassen, MN
2007 thru 2011
Contact Unassigned
Department Major Equipment
Capitallrnprovement Program
City of Chanhassen, MN
Project # EQ-014
Project Name Telecommunication PurchaseslUpgrades
2007 thru 2011
Account # t 400-4101-4703
Account # 3
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 5-7 years
Category Administration
Priority nfa
Account #2
Description I
This project funds the expansion and upgrades to the city telephone systems excluding cellular equipment which remains an individual department
budget item. The current system is an lntertel Axxess PBX which serves City Hall, Public Works, the main fire Station, the Recreation Center and
the Water Treatment Plant. A new call accounting application will be installed in 2007. Equipment will be installed to permit conferencing in the
three conference rooms.
Total Project Cost $46,400
Justification
I
The city PBX server hardware and software will continue to be upgraded as needed for additional capacity and for related support issues.
Replacement handset will be used to replace spare phones that were assigned to new rooms in 2006. POIP will be provided for phones in the
Treatment Facility. Conferencing phones are being added to facilitate web based conferences, training and demos.
Expenditures
Office Equipment
2007
10,400
10,400
2008
5.000
5,000
2009
7,000
7,000
2010
24,000
24,000
2011
Total
46,400
46,400
Total
Funding Sources
Capital Replacement Fund
Total
2007
10,400
10,400
2008
5,000
5,000
2009
7,000
7,000
2010
24,000
24,000
2011
Total
46,400
46,400
Operational Impact/Other I
The 5 year warranty period, which was purchased with the current phone system will expire in November of 2006. The MIS operational budget
now reflects an annual maintenance cost of roughly $8500.
Capital Improvement Program 2007 thru 2011 Contact Unassigned
City of Chanhassen, MN Department Major Equipment
EQ-015 Type Vehicles
Project # Useful Life Unassigned
Project Name Community Dev.: Light Duty Trucks Category Community Development
Account # 1 400-4107-4704 Account # 3 Priority II/a
Account #2 Total Project Cost $168,000
Description I
Provides for scheduled replacements, starting in 200 I. These purchases are consistent with the Vehicle Replacement Schedule. Replacement units
are generally purchased early in the year to accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative
Purchasing Program.
Justification 1
These vehicles are used to provide building inspection services throughout the community. The average replacement age is over 10 years.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 26,000 30,000 55,000 28,000 29,000 168,000
Total 26,000 30,000 55,000 28,000 29,000 168,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 26,000 30,000 55,000 28,000 29,000 168,000
Total 26,000 30,000 55,000 28,000 29,000 168,000
Operational Impact/Other 1
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
!
-=
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-016
Project Name DumplPlow Truck Replacements/Additions
2007 thru 2011
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost $1,023,800
Account # 1 400-4108-4704
Account # 3
Account #2
Description
These purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow
and sander. Truck chassis costs are higher due to new federal mandated anti-lock braking requirements effective since 2000. These vehicles are
purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed
up to one year in advance of delivery
Justification
These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
snow. The average replacement age is 16.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the
community creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule.
Expenditures
Vehicles
2007
153,000
153,000
2008
161,000
161,000
2009
338,000
338,000
2010
2011
371,800
371,800
Total
1,023,800
1,023,800
Total
Funding Sources
Capital Replacement Fund
Total
2007
153,000
153,000
2008
161.000
161,000
2009
338,000
338,000
2010
2011
371,800
371,800
Total
1,023,600
1,023,800
Operational Impact/Other
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2007 thru 2011 Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-019 Type Equipment
Useful Life Unassigned
Project Name Vibratory Roll Packer Category Street Equipment
Account # 1 400-0000-4704 Account # 3 Priority nfa
Acconnt #2 Total Project Cost $45,000
Description I
Purchase is scheduled to replace the 1987 Rosco Vibratory Roll Packer. The purchase is consistent with the Vehicle Replacement Schedule.
Justification I
This machine is used extensively in the patching and overlaying of City streets. The unit will be 21 years old at the time of replacement.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 45,000 45,000
Total 45,000 45,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 45,000 45,000
Total 45,000 45,000
: Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced.
,
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-021
Project Name Equipment Trailers
2007 thru 2011
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n/a
Account # 1 400-0000-4705
Account # 3
Account #2
Total Project Cost $25,000
Description
Provides for replacement of an existing and the addition of a 20,000 Ib (10 ton) capacity tandem axle trailer.
Justification
These trailers are used extensively in the paving operation to transport the paver machine, roll packer, skidloader and other equipment to and from
the job sites. The utility and parks departments also utilize this trailer for their work. The existing trailer is 20 years old.
Expenditures
Equipment
2007
2008
25,000
25,000
2009
2010
2011
Total
25,000
25,000
Total
Funding Sources
Capital Replacement Fund
Total
2007
2008
25,000
25,000
2009
2010
2011
Total
25.000
25,000
Operational Impact/Other
Both purchases include a limited warranty.
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-022 Type Equipment
Useful Life Unassigned
Project Name Tar Kettle
Category Street Equipment
Account # 1 400-0000-4705 Account # 3 Priority nla
Account #2
Total Project Cost $30,000
Description I
Provides for replacement of the existing tar kettle.
Justification I
The existing tar kettle is used extensively in the pavement maintenance operations. Due to the nature of its use, the life expectancy of this unit is
limited. The kettle was purchased in 1997 and will be II years old at the time of trade-in.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 30,000 30,000
Total 30,000 30,000
Operational Impact/Other I
This purchase will include a limited warranty and will eliminate an expensive overhaul on the existing unit.
I
-.
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-023 Type Equipment
Useful Life Unassigned
Project Name Ford 555C Backhoe Category Street Equipment
Account # I 400-4111-4705 Account # 3 Priority nla
Account #2 Total Project Cost $80,000
Description I
Provides for the replacement of an existing 1989 Tractor Backhoe.
Justification I
The tractor backhoe is used extensively in maintenance operations. The backhoe is sometimes used by the Utility Department for watermain breaks
and utility replacement projects. The Parks Department also uses the backhoe for their projects. This purchase is consistent with the Equipment
Replacement Schedule.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 80,000 80,000
i Total 80,000 80,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 80,000 80,000
Total 80,000 80,000
i
Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced.
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-025 Type Equipment
Useful Life Unassigned
Project Name Line Striper
Category Street Equipment
Account # 1 400-0000-4705 Account # 3 Priority nla
Accollnt #2
Total Project Cost $9,000
Description I
Provides for the replacement of an existing line-striping machine.
Justification I
This machine is used to paint pavement markings and stripe lanes on roads. This purchase will ensure timely and reliable pavement marking
operations. The purchase is consistent with the Equipment Replacement Schedule.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 9,000 9,000
Total 9,000 9,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 9,000 9,000
Total 9,000 9,000
I Operational Impact/Other I
This purchase will include a limited warranty.
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City ofChanhassen, MN Department Major Equipment
Project # EQ-026 Type Equipment
Useful Life Unassigned
Project Name AudioNisual Equipment Category Administration
Account # 1 210-0000-4705 Account # 3 Priority II/a
Account #2 Total Project Cost $50,000
Description I
Provides for the systematic maintenance and upgrading of audio/visual equipment.
Justification I
The original NV equipment was purchased in 1989, with the remainder purchased in 1994. This project calls for the systematic maintenance and
upgrading ofthe A/V equipment and additional equipment as new technology develops. Potential projects include: replacing the spotlight system
in the Council Chambers and staff microphones. These replacements will ensure the quality of official City meetings and video productions.
Expenditures 2007 2008 2009 2010 2011 Total
Maintenance 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
;
Funding Sources 2007 2008 2009 2010 2011 Total
Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
I
Operational Impact/Other I
This purchase will include a limited warranty.
!
Capital Improvement Program 2007 thru 2011 Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-028 Type Equipment
Useful Life Unassigned
Project Name Groundsmaster 580 Mower Replacement Category Park
Account # 1 400-0000-4705 Account # 3 Priority nla
Account #2 Total Project Cost $82,000
Description I
Provides for the replacement ofan existing Toro 580, 15 foot, high volume grounds mower.
Justification I
The City currently has 3 high-production grounds mowers that cut a 15' pass. Each machine is used daily during the growing season and takes the
place of 2 112 smaller machines used by the City. Due to additional park development, an additional high-capacity machine is needed.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 82,000 82,000
Total 82,000 82,000
I
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 82,000 82,000
Total 82,000 82,000
Operational Impact/Other I
This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced. Also, each of these
machines takes the place of2 1/2 smaller machines and makes the mowing operation 150% more efficient.
I
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
EQ-029 Type Vehicles
Project # Useful Life Unassigned
Project Name Light Duty Trucks: Public Works Category Street Equipment
Account # 1 400-4120-4704 Account # 3 Priority nla
AccouJlt #2 Total Project Cost
$94,000
Description -1
Provides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in
the year in order to accommodate the time frames established by Hennepin County and the State ofMN Cooperative Purchasing Program.
Justification 1
These vehicles are used for a variety of services throughout the community. The average replacement age is 13 years. These purchases are
consistent with the Vehicle Replacement Program.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 31,000 32,000 31,000 94,000
Total 31,000 32,000 31,000 94,000
I Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 31,000 32,000 31,000 94,000
Total 31,000 32,000 31,000 94,000
Operational Impact/Other I
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced.
!
i
I
.. -
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-030 Type Equipment
Useful Life Unassigned
Project Name Park Bobcat Snow Accessories
Category Park
Account # 1 400-0000-4705 Account # 3 Priority n/a
Account #2
Total Project Cost $7,000
Description I
Provides for replacement of parts for an existing Bobcat Snow Blower.
Justification I
The existing unit will be 15 years old and is at the end of its useful life. Rebuilding is not cost effective. This purchase is consistent with the
Equipment Replacement Schedule.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 7,000 7,000
Total 7,000 7,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 7,000 7,000
Total 7,000 7,000
Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit.
,
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-031 Type Improvement
Useful Life 10-15 years
Project Name Sewer Bobcat Snow Accessories Category Utilities
Account # 1 700-0000-4705 Account # 3 Priority n/a
Account #2 70] -0000-4705
Total Project Cost $7,000
Description I
The snowblower attachment is nearing its useful life and needs replacement.
Justification I
This equipment is necessary for cleaning snow from water and sewer locations.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 7,000 7,000
Total 7,000 7,000
Funding Sources 2007 2008 2009 2010 2011 Total
I Water Utility Fund 7,000 7,000
Total 7,000 7,000
Operational Impact/Other I
Capital Improvement Program 2007 thru 2011
COlltact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-034 Type Equipment
Useful Life Unassigned
Project Name Grounds Mower Replacement Park
Category
Account # t 400-0000-4705 Account # 3 Priority nla
Account #2
Total Project Cost $37,000
Description I
Provides for replacement of lawn mowers.
Justification I
With the amount of parkland consistently growing, there is increased wear and tear on the City's lawn mowers. They are 12-16 years old and are
not dependable. Rebuilding is not cost effective. This is consistent with the Equipment Replacement Program.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 37,000 37,000
Total 37,000 37,000
,
I
I
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 37.000 37.000
Total 37,000 37,000
Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit.
I
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-036 Type Equipment
Useful Life \0-15 years
Project Name Tractor & Broom Category Street Equipment
Account # 1 400-4111-4705 Account # 3 Priority nla
Account #2 Total Project Cost $84,000
Description 1
Provides for replacement of a Tractor ($55,000) with a broom attachment ($9,000) and side and rear mowers($20,OOO).
.
Justification I
This tractor is used year round for mowing and snow removal on the skating rinks and trails. This purchase is consistent with the Equipment
Replacement Schedule.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 84,000 84,000
Total 84,000 84,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 84,000 84,000
Total 84,000 84,000
Operational Impact/Other 1
This purchase will not increase maintenance and repair expenses.
:
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-041 Type Equipment
Useful Life Unassigned
Project Name Mailing Folder/Inserter Administration
Category
Account # 1 400-4114-4703 Account # 3 Priority nla
Account #2 Total Project Cost
$20,000
Description I
This is a replacement for the existing Folder/Inserter in the Administration Department. It is used for folding and mailing all city-wide and smaller
bulk mailings. It will be used more after the utility bill format is changed.
Justification 1
We are leasing the current machine with no option to purchase. The cost is higher than the cost to lease a new machine with a purchase option for
a dollar at the end of the lease at a financing rate of 18%. It makes more economic sense for us to purchase the machine at the city's cost of capital
of 6% and finance it over four or five years through the issuance of equipment certificates.
Expenditures 2007 2008 2009 2010 2011 Total
Office Equipment 20,000 20,000
Total 20,000 20,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 20,000 20,000
Total 20,000 20,000
Operational Impact/Other 1
I
I
i
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-048 Type Equipment
Useful Life 5-7 years
Project Name Software Purchases Administration
Category
Account # 1 400-4117-4707 Account # 3 Priority nla
Account #2
Total Project Cost $148,700
Description 1
This project funds the purchase of new software for all city departments that is not specifically associated with a specific individual project.
Annual support and license fees for existing software applications are funded out of account 1160-4300.
Justification 1
The majority offunds requested in this account are for Microsoft software upgrades. The 2006 budget reflected a purchase of Microsoft Office
2007 upgrades for the entire userbase, and an upgrade to Exchange 2007 Both products were expected to be available in 2006. Microsoft has
pushed the release dates for both products to early 2007. An enterprise software agreement has been established by the State with Microsoft, which
is now available to cities. The 2007 capital budget reflects the initial purchase of Office under that agreement, which covers support and all future
upgrades. Years 2-6 would be funded out ofthe operational budget.
Expenditures 2007 2008 2009 2010 2011 Total
Office Equipment 36,100 55,600 22,000 13,000 22,000 148,700
Total 36,100 55,600 22,000 13,000 22,000 148,700
Funding Sources 2007 2008 2009 2010 2011 Total
I Capital Replacement Fund 36,100 55,600 22,000 13,000 22,000 148,700
Total 36,100 55,600 22,000 13,000 22,000 148,700
i
Operational Impact/Other 1
The Microsoft enterprise agreement will add $13,000 to the 4300 account in the operational budget each year for the next 5 years.
Capital Improvement Program 2007 thru 2011 Contact Unassigned
City ofChanhassen, MN Department Major Equipment
Project # EQ-049 Type Equipment
Useful Life Unassigned
Project Name Computerized Records Retention System Category Administration
Account # ] 400-4124-4703 Account # 3 Priority n/a
Account #2 Total Project Cost $66,600
Description I
This project originally funded the purchase of an electronic records retention system. The project is now used to fund its expansion and the
replacement of scanning equipment, which has a useful life expectancy of 3 to 4 years. The black and white scanner purchased in 2002 is being
replaced with a faster color scanner.
Justification 1
This system allows for quick and simultaneous retrieval of documents from any computer on the city network. Both document storage space and
the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access are available from
any internet capable computer. Efforts will continue to integrate the imaging system with mapping, permitting and financial applications.
Expenditures 2007 2008 2009 2010 2011 Total
Office Equipment 9.500 9,500 30,000 8,600 9.000 66,600
Total 9,500 9,500 30,000 8,600 9,000 66,600
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 9.500 9.500 30.000 8.600 9,000 66,600
Total 9,500 9,500 30,000 8,600 9,000 66,600
I Operational Impact/Other I
Tthere are no operational impacts for CIP purchases in this project for 2007
I
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
EQ-052 Type Vehicles
Project # Useful Life Unassigned
Project Name Light Duty Trucks: Parks Category Park
Account # 1 400-0000-4704 Account # 3 Priority nla
Account #2 Total Project Cost $196,000
Description I
Provides for scheduled replacement of light duty trucks in the Park Maintenance Department.
Justification I
These vehicles are used for multiple park maintenancer operations including towing mowers, bobcat, snowplowing, sanding, etc. The average
replacement age ofthese vehicles is 13.5 yrs.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 98,000 33,000 65,000 196,000
Total 98,000 33,000 65,000 196,000
, Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 98,000 33,000 65,000 196,000
Total 98,000 33,000 65,000 196,000
Operational Impact/Other I
..
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-053 Type Equipment
Useful Life Unassigned
Project Name Cushman Trail Vehicle & Sprayer: Parks Category Park
Account # t 400-0000-4705 Account # 3 Priority nla
Account #2 Total Project Cost $24,000
Description 1
This vehicle is used for park trail cleanup and maintenance.
Justification 1
This replaces a 1990 model.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 24,000 24,000
Total 24,000 24,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 24,000 24,000
Total 24,000 24,000
Operational Impact/Other 1
!
!
-
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
EQ-054 Type Vehicles
Project #
Useful Life 10-15 years
Project Name Fire Vehicles Category Fire
Account # 1 400-4 135-4704 Account # 3 Priority nla
Account #2 Total Project Cost $205,000
Description 1
This item allows for the replacement of existing equipment. Vehicles are purchased off either the Hennepin County or State of Minnesota
cooperative bid. Orders are typically required to be placed up to one (l) year in advance of delivery.
Justification 1
As vehicles age they become less reliable. Also, they require more costly maintenance. Vehicles proposed for replacement are:
Unit 219. 1988 chev 1 ton (2007) $85,000
Unit 703.1999 Explorer (2008) $40,000
Unit 207 - 1995 Astro Van (2009) $40,000
Unit 706 - 1997 Expedition (2010) $40,000
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 85,000 40,000 40,000 40,000 205,000
Total 85,000 40,000 40,000 40,000 205,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 85,000 40,000 40,000 40,000 205,000
Total 85,000 40,000 40,000 40,000 205,000
Operational Impact/Other 1
These purchases will include a limited warranty and wi1\ reduce the annual maintenance and repair costs. The electrical work on the Aerial Truck
will correct an existing problem that has been a concern of the mechanics for some time.
I
Capital Improvement Program
City of Chanhassen, MN
Account # 1 400-0000-4752
Account # 3
2007 thru 2011 Unassigned
Contact
Department Major Equipment
Type Improvement
Useful Life 5-7 years
Category Administration
Priority nla
Total Project Cost $20,000
Project # EQ-055
Project Name Aerial Photography for City GIS Datasets
Account #2
Description
This expenditure is to fly the city in new development areas. The last time aerials were taken was in 2005. It is anticipated this project will partner
with Carver County.
Justification
City Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents,
and contractors without repeated site visits. It has also proven useful to the police and fire departments when conducting area searches for missing
persons. The Engineering Department uses this information to plan for future projects and helps in the preliminary designs.
Expenditures
Maintenance
2007
2008
2009
20,000
20,000
2010
2011
Total
20,000
20,000
Total
Funding Sources
Capital Replacement Fund
Total
2007
2008
2009
20,000
20,000
2010
2011
Total
20,000
20,000
Operational Impact/Other
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-056 Type Equipment
Useful Life Unassigned
Project Name Front-End Loaders Category
Street Equipment
Account # t 400-0000-4705 Account # 3 Priority nla
Account #2
Total Project Cost 5330,000
Description I
This item replaces the front-end loaders used in street maintenance. This loader is used very frequently at the shop. The loader was purchased in
1971 and will be 36 years old at the time of trade-in. The loader is also used for plowing residential streets.
Justification I
The loader requires more frequent and expensive repairs. Replacement parts are hard to find.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 160,000 170,000 330,000
Total 160,000 170,000 330,000
I
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 160,000 170,000 330,000
Total 160,000 170,000 330,000
!
Operational Impact/Other I
,
I
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
I P"j'" , EQ-OS8 I Type Equipment
Useful Life Unassigned
Project Name Sander Category Park
Account # 1 400-0000-4705 Account # 3 Priority nla
Account #2 Total Project Cost $8,000
Description I
This sander attachment is scheduled to be replaced.
Justification 1
This is scheduled based on equipment age.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 8,000 8,000
Total 8,000 8,000
, Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 8,000 8,000
Total 8,000 8,000
Operational Impact/Other 1
I
I
-
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-061 Type Equipment
Useful Life Unassigned
Project Name Skidloader Planer
Category Street Equipment
Account # 1 400-0000-4705 Account # 3 Priority nla
Account #2
Total Project Cost $15,000
Description I
This bobcat attachment is to be used for grinding out distressed pavement areas for patching. This attachment is used extensively during the
summer to remove distressed pavement areas for patching.
Justification 1
This is necessary for effective pavement patching.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 15,000 15,000
Total 15,000 15,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 15,000 15,000
Total 15,000 15,000
,
Operational Impact/Other 1
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
EQ-062 Type Vehicles
Project #
Useful Life Unassigned
Project Name Light Duty Trucks: Utilities
Category Utilities
Account # 1 700-0000-4704 2007 Account # 3 701-0000-4704 2011 Priority n/a
Account #2 701-0000-4704 2009
Total Project Cost $156,000
Description I
This allows for replacement of existing vehicles in the Water and Sewer department.
Justification I
This replaces pickups in accordance with the vehicle replacement plan.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 32,000 54,000 70,000 156,000
Total 32,000 54,000 70,000 156,000
Funding Sources 2007 2008 2009 2010 2011 Total
Sewer Utility Fund 54,000 70,000 124,000
Water Utility Fund 32.000 32,000
Total 32,000 54,000 70,000 156,000
Operational Impact/Other I
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Projcct # EQ-063 Type Vehicles
Useful Life Unassigned
Project Name Administration Vehicle
Category Administration
Account # 1 400-0000-4704 Account # 3 Priority nla
Account #2
Total Projcct Cost $25,000
Description I
This allows for replacement of an existing vehicle for City HalJ.
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 25,000 25,000
Total 25,000 25,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 25,000 25,000
Total 25,000 25,000
Operational Impact/Other I
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Major Equipment
EQ-065 Type Vehicles
Project # Useful Life Unassigned
Project Name Engineering Vehicles Category Street Equipment
Account # 1 400-0000-4704 Account # 3 Priority n/a
Account #2 Total Project Cost $58,000
Description I
The engineering van was purchased in 1995 and is used for engineering fieldwork and job site inspections.
The Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections.
Justification I
These replacements are in accordance with the vehicle replacement plan.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 58,000 58,000
Total 58,000 58,000
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 58,000 58,000
Total 58,000 58,000
I Operational ImpacVOthe< I I
I
..
Capital Improvement Program 2007 thru 2011 Contact Unassigned
City of Chanhassen, MN Department Major Equipment
Project # EQ-068 Type Equipment
Useful Life 20 years
Project Name Fire Station 3 Vehicles and Equipment Category Fire
Account # 1 Account # 3 Priority n/a
Account #2 Total Project Cost $1,000,000
Description I
This project will be to provide trucks and fire/rescue equipment for Station 3.
Justification I
Based on the city's "Comprehensive Plan 2020", it shows our growth to the southern end ofthe city. Our current response time to that area is
approximately 7.10 minutes. Our downtown station will not be adequate to provide coverage to those citizens and businesses. Currently, the city's
growth rate will drive the need ofthe station.
Expenditures 2007 2008 2009 2010 2011 Total
Vehicles 1,000,000 1,000,000
Total 1,000,000 1,000,000
Funding Sources 2007 2008 2009 2010 2011 Total
GO Bonds 1,000,000 1,000,000
Total 1,000,000 1,000,000
,
i
! Operational Impact/Other I
The operational impact wi] I be for the staffing and maintenance of personnel and equipment for the station once in place.
;
Capital Improvement Program 2007 thru 2011
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-080 Type Unassigned
Useful Life
Project Name Veterans Monument Category Unassigned
Account # 1 410-4141-4701 Account # 3 Priority nla
Account #2 Total Project Cost S50,000
Description 1
Construction of a Veterans Momument is to acknowledge and honor all service personnel. The total project costs are estimated at $115,000.00
The city is working with the Legion and local utility companies for their financial assistance in the construction of the monument. Legion.
$50,000.00. Utility Companies. $15,000.00. City ofChanhassen . $50,000.00.
Justification 1
This is a collaborative effort of the City ofChanhassen, Chanhassen Legion and local utility companies to acknowledge and honor all service
personnel with a public monument.
Expenditures 2007 2008 2009 2010 2011 Total
Land Improvement 50,000 50,000
Total 50,000 50,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 50,000 50,000
Total 50,000 50,000
I
i
Operational Impact/Other I
I
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Projeet #
EQ-081
Project Name Storage Area Network
Account # t 400-4126-4703
Account # 3
Account #2
Contact
Department Major Equipment
Type Improvement
Useful Life 5-7 years
Category Administration
Priority n/a
Total Project Cost $88,600
Description I
This project funds the purchase of a storage area network, (SAN) which will gradually replace all internal disk drives in existing network servers.
The storage area network is a central storage device made up of individual storage modules, and managed from a single console. The SAN allows
disk storage to be modified as storage needs change, without any downtime for city users.
Justification I
The need for digital storage space for city documentation and applications is growing at a rate of 50GB to 1000B per year. Existing storage space
is becoming difficult to manage on individual network servers. Internal storage utilization is inefficient, and requires system downtime to
reconfigure. SAN storage allows for real time redundant copies of data. The initial San installation would reside in the server room at city hall.
Additional storage modules would be located on the city fiber backbone, but at other city buildings to facilitate disaster recovery. One TB
redundant San would be implemented in year I, and a second added in year 2. Individual add on units will be added as needed in the following
years. As each module is added, the overall performance ofthe SAN as a whole is increased.
Expenditures
Equipment
2007
2008
33,100
33,100
2009
28,000
28,000
2010
13,500
13,500
Total
Funding Sources
Capital Replacement Fund
Total
2007
2008
33,100
33,100
2009
28,000
28,000
2010
13,500
13,500
2011
14,000
14,000
Total
88,600
88,600
2011
14,000
14,000
Total
88.600
88,600
Operational Impact/Other I
Initial purchase would include installation fees and a spare parts kit. It is anticipated that MIS staff will do all maintenance on the SAN and future
replacement parts would be funded out of the 4530 Repair and Replacement account. It may be beneficial or necessary at a future date to purchase
updates to the management software.
Capital Improvement Program 2007 thru 2011
Contact
City of Chanhassen, MN Department Major Equipment
Project # EQ-082 Type Unassigned
Useful Life
Project Name Fine Grader - Tractor Attachment Category Park
Account # 1 400-0000-4705 Account # 3 Priority nla
Account #2 Total Project Cost $10,000
Description 1
This tractor attachment will be used to fine grade and prepare soil for seeding. The attachment will be used by the Parks Department for park
improvement projects.
Justification 1
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 10,000 10,000
Total 10,000 10,000
I
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Replacement Fund 10,000 10,000
Total 10,000 10,000
Operational Impact/Other I
O.
Capital Improvement Program
City of Chanhassen, MN
I Project /I EQ-083
PrOject Name CSO Truck
Account # 1 400-4129-4704 Account /13
Account #2
Description
This allows for replacement of an existing CSO truck.
Justification
This replaces a vehicle in accordance with the vehicle replacement plan.
Expenditures
Vehicles
2007
2008
Total
Funding Sources
Capital Replacement Fund
Total
2007
2008
Operational Impact/Other
2007 thru 2011
2009
2009
2010
30,000
30,000
2010
30,000
30,000
Contact
Department Major Equipment
Type Vehicles
Useful Life
Category Administration
Priority nla
Total Project Cost $30,000
2011
Total
30,000
30,000
2011
Total
30,000
30,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Municipal Buildings
Type Improvement
Useful Life Unassigned
Category Street Equipment
Priority n/a
Project #
MB-003
Project Name Public Works Facility Improvements
Account # t
Account # 3
Acconnt #2
Total Project Cost $3,920,000
Description
This project provides for a Facilities Master Plan study and design work in 2007 with construction in 2008. The City is expected to grow an
additional 30% before ultimate build out. The existing facility is located on a 5 acre site which is already cramped for storage and operation space.
The Facilities Master Plan will evaluate ifit is in the best interest of the City to expand the public works facility at the present location or move to a
new site.
Justification
The Operations and Maintenance Department needs additional space for repairs, meeting facilities, files, storage, supervisory offices and proper
equipment storage. In addition, the current facility does not meet the City building code.
Expenditures
Planning/Design
2007
220.000
220,000
2008
3,700,000
3,700,000
2009
2010
2011
Total
3.920,000
3,920,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
GO Bonds 220,000 2,800,000 3,020,000
Sewer Utility Fund 700.000 700,000
Surface Water Utility Fund 200,000 200.000
Total 220,000 3,700,000 3,920,000
Operational Impact/Other
This project would increase operational costs based on the percentage of the footprint expansion.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contatt Unassigned
Department Municipal Buildings
Type Improvement
Useful Life 20 years
Category Fire
Priority nla
Projett #
MB-008
Project Name Siding and Backing Replacement
Account # t 400-4003-4702
Account #2
Account # 3
Total ProJett Cost $20,000
Description I
This project would be to replace the epoxy sealant on the bay floors at Station 2.
Justification I
The West satellite station was originally built in 1980. Siding and roofing will be 30 years old. The current siding is original. It has some holes in
it and had some rotten spots replaced. Currently we have a problem with bug infestation. Replacement would also bring it up to the current code.
Expenditures
Maintenance
2007
2008
2009
20,000
20,000
2010
2011
Total
20,000
20,000
Total
Funding Sources 2007
Capital Replacement Fund
Total
2008
2009
20,000
20,000
2010
2011
Total
20,000
20,000
Operational Impact/Other 1
There should be no operational impact to this project.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #
MB-009
Project Name Fire Station 3
Account # I
Account #2
Account # 3
Description
This is for a possible fire station in the southern part of the city which will be developed after 2005.
Justification
Response time from the other two stations will be unacceptable after Highway 212 is completed.
Expenditures
Construction
2007
2008
2009
2010
3,500,000
3,500,000
Total
Funding Sources
GO Bonds
2007
2008
2009
2010
3,500,000
3,500,000
Total
Contact Unassigned
Department Municipal Buildings
Type Improvement
Useful Life 20 years
Category Fire
Priority nla
Total Project Cost $3,500,000
2011
Total
3,500,000
3,500,000
2011
Total
3,500,000
3,500,000
Operational Impact/Other
The operational impact will be for the staffing and maintenance of personnel and equipment for the station once in place.
Capital Improvement Program 2007 thru 2011
City of Chanhassen, MN
Project # MB-OIO
Project Name City Hall Remodel
Account # 1 Account # 3
Accollnt #2
Description
Remodel and refurbish areas of City Hall that need paint, carpet or storage areas added.
Justification
Certain areas of City Hall wi 11 be in need of some small repair and maintenance needs in 20 I O.
Expenditures
Maintenance
2007
2008
2009
Total
Funding Sources 2007
Capital Replacement Fund
Total
2008
2009
Operational Impact/Other
2010
125,000
125,000
2010
125,000
125,000
Contact
Department Municipal Buildings
Type Improvement
Useful Life
Category Administration
Priority nla
Total Project Cost $125,000
2011
Total
125,000
125,000
2011
Total
125.000
125,000
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -029 Type Improvement
Useful Life 30 Years
Project Name Hwy 101 North Trail Connection Category Park
Aeeount # 1 410-0000-4710 Aeeount # 3 Priority nla
Account #2
Total Projeet Cost $114,000
Description I
Construction of a 1 O-foot wide pedestrian trail along the west side of Highway 10 1 from Pleasant View Road to Townline Road.
Justification I
The last segment of a trail that was originally constructed in 2001.
Expenditures 2007 2008 2009 2010 2011 Total
Construction 114,000 114,000
Total 114,000 114,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 114,000 114.000
Total 114,000 114,000
Operational Impact/Other I
Overlay every 10-12 years.
Capital Improvement Program
City of Chanhassen, MN
Projcct # PK&T -037
Project Name Phase II Playground:Roundhouse Park
Account # 1 410-4132-4705
Account # 3
Account #2
Description
Addition ofa Phase II playground for children ages 2-5
2007 thru 2011
Contact Unassigned
Department Park & Trail Improvements
Type Improvement
Useful Life 20 years
Category Park
Priority nla
Total Project Cost $30,000
Justification
Phase I was completed in the mid 1980s and is intended for children ages 6-12. Space is available within the existing playground container for
Phase II.
Expenditures
Equipment
2007
2008
Total
Funding Sources 2007
Park Dedication Fund
2008
Total
Operational Impact/Other
2009
2010
2009
2010
2011
30.000
30,000
Total
30,000
30,000
2011
30,000
30,000
Total
30,000
30,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Park & Trail Improvements
Type Improvement
Useful Life 20 years
Category Park
Priority n/a
Project #
PK&T -038
Project Name Phase II Playground:Sugarbush Park
Account # 1 410-4132-4705
Account # 3
Account #2
Total Project Cost $30,000
Description
Addition ofa phase II playground for children ages 2-5.
Justification
Phase I was completed in the mid 19805 and is intended for children ages 6-12. Space is available within the existing playground container for
Phase II.
Expenditures 2007
Equipment
2008
2009
2010
2011
30,000
30,000
Total
30,000
30,000
Total
Funding Sources 2007
Park Dedication Fund
2008
2009
2010
2011
30,000
30,000
Total
30,000
30,000
Total
Operational Impact/Other
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Park & Trail Improvements
Project # PK&T-041 Type Improvement
Useful Life 20 years
Project Name Phase II Playground:Power Hill Park
Category Park
Account # 1 410-4132-4705 Account # 3 Priority nla
Account #2
Total Project Cost $30,000
Description I
Addition ofa Phase II playground for children ages 2-5.
Justification I
Phase I was completed in the mid 1980s and is intended for children ages 6-12. Space is available within the existing playground container for
Phase II.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2007 2008 2009 2010 2011 Total
i Park Dedication Fund 30,000 30,000
Total 30,000 30,000
Operational Impact/Other I
I
__m
Capital Improvement Program 2007 thru 2011 Unassigned
Contact
City of Chanhassen, MN Department Park & Trail Improvements
Project # PK&T-042 Type Improvement
Useful Life 10- ] 5 years
Project Name Picnic Tables/Park Benches
Category Park
Account # 1 41O-000-470S Account # 3 Priority n/a
Account #2
Total Project Cost $30,000
Description 1
Purchase of picnic tables and park benches.
Justification I
New tables and benches are needed to replace old stock and meet new needs.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 6,000 6,000 6,000 6,000 6.000 30,000
Total 6,000 6,000 6,000 6,000 6,000 30,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 6,000 6.000 6.000 6,000 6,000 30,000
Total 6,000 6,000 6,000 6,000 6,000 30,000
Operational Impact/Other 1
i
Capital Improvement Program
City of Chanhassen, MN
I Pro)"" PK&T-043
. Project Name Trees
Account # 1 410-0000-4701 Account # 3
Account #2
Description
Annual tree planting program.
Justification
Planting trees is one of the best investments we can make in our future.
Expenditures
Land Improvement
2007
5,000
5,000
Total
Funding Sources
Park Dedication Fund
2007
5,000
5,000
Total
I Operational Impact/Other
2008
5,000
5.000
2008
5,000
5,000
2007 thru 2011
2009
5,000
5,000
2009
5,000
5,000
2010
5,000
5,000
2010
5,000
5,000
Contact Unassigned
Department Park & Trail Improvements
Type Improvement
Useful Life 50 Years
Category Park
Priority nla
Total Project Cost $25,000
2011
5,000
5,000
Total
25,000
25,000
2011
5.000
5,000
Total
25,000
25,000
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Park & Trail Improvements
Project # PK&T-047 Type Improvement
Useful Life 30 Years
Project Name Arboretum Business Park Lot 12 Trail Category Park
Account # 1 4\ 0-0000-47\ 0 Account # 3 Priority nla
Account #2 Total Project Cost $190,000
Description I
Construction of an 8-foot wide asphalt trail in the Chanhassen nature preserve.
Justification I
Represents the final phase in a four part trail construction initiative.
Expenditures 2007 2008 2009 2010 2011 Total
Land Improvement 190,000 190,000
Total 190,000 190,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 190,000 190,000
Total 190,000 190,000
Operational Impact/Other I
Overlay every 10 - 12 years.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project 1# PK&T -065
Project Name Athletic Field Lighting (2 fields)
Account 1# 1 410-0000-4705
Account 1#2
Description
Athletic field lighting for two fields.
Account 1# 3
Justification
More economical to add field capacity through lighting than constructing more fields.
Expenditures
Equipment
Total
Funding Sources
Park Dedication Fund
Total
Operational Impact/Other
Electricity.
2007
150,000
150,000
2008
2009
2007
150,000
150,000
2008
2009
2010
2010
Contact
Department Park & Trail Improvements
Type Improvement
Useful Life 50 Years
Category Park
Priority nla
Total Project Cost $150,000
20ll
Total
150,000
150,000
20ll
Total
150,000
150,000
Capital Improvement Program
City of Chanhassen, MN
Project #
PK&T -066
Project Name Power Hill Park Trail
Account # 1 410-0000-4710
Account #2
Aecount # 3
2007 thru 2011
Description
Construction of an 8-foot wide pedestrian trail linking the north and south ends ofthe park.
Justification
Accessibility within the park will be greatly improved.
Expenditures
Construction
2007
75.000
Total 75,000
Funding Sources
Park Dedication Fund
Total
Operational Impact/Other
2008
2007
75,000
75,000
2008
2009
2009
2010
2010
Contad
Department Park & Trail Improvements
Type Improvement
Useful Life 30 Years
Category Park
Priority nla
Total Project Cost $75,000
2011
Total
75,000
75,000
2011
Total
75.000
75,000
Capital Improvement Program
City of Chanhassen, MN
Project #
PK&T -068
Project Name Lake Ann Park "Parkview" Picnic Shelter
Account #] 410-0000-4702
Account #2
Account # 3
Description
Construction ofa traditional picnic shelter and concrete slab in Lake Ann Park.
Justification
The City's park system has limited picnic shelters.
Expenditures
Construction
Total
Funding Sources
Park Dedication Fund
Total
Operational Impact/Other
2007
95,000
95,000
2007
95,000
95,000
2008
2008
2007 thru 2011
2009
2009
2010
2010
Contact
Department Park & Trail Improvements
Type Improvement
Useful Life
Category Park
Priority nla
Total Project Cost $95,000
2011
Total
95,000
95,000
2011
Total
95,000
95,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #
PK&T -069
Project Name Hwy 41 Pedestrian UnderpasslTrail Grant Match
Account # 1 410-0000-4706
Account # 3
Account #2
Contact
Department Park & Trail Improvements
Type Improvement
Useful Life 50 Years
Category Park
Priority n/a
Total Project Cost $125,000
Description
Carver County has applied for a federal grant to provide these improvements. The city has supported the application pledging a $115,000
contribution if the full grant is received.
Justification
A pedestrian underpass to Minnewashta Regional Park is a highly sought after improvement.
Expenditures 2007
Construction
2008
2009
Total
Funding Sources 2007
Park Dedication Fund
2008
2009
Total
Operational Impact/Other
2010
125.000
125,000
2010
125,000
125,000
2011
Total
125.000
125,000
2011
Total
125,000
125,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Department Park & Trail Improvements
Project Name Tennis Court Repair
Account # 1 410-000-4706
Account # 3
Type Unassigned
Useful Life
Category Park
Priority nla
Project #
PK&T -072
Account #2
Total Project Cost $45,000
Description
Patch and resurface courts at North Lotus Lake Park, Lake Ann Park, City Center Park and the Recreation Center.
Justification
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts.
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle.
Expenditures
Maintenance
2007
45,000
45,000
2008
2009
2010
2011
Total
45,000
45,000
Total
Funding Sources
Park Dedication Fund
2007
45,000
45,000
2008
2009
2010
2011
Total
45,000
45,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Department Park & Trail Improvements
Type Unassigned
Useful Life
Category Park
Priority nla
Project #
PK&T-073
Project Name Mtka Middle School West Tennis Court Project
Account # 1 410-0000-4706
Account # 3
Account #2
Total Project Cost $30,000
Description I
A parent organized volunteer group with cooperation of School District 276 is attempting to move forward a project to construct six new tennis
courts at Minnetonka Middle School West. The total cost of the proposed project is $240,000. Our $30,000 contribution would only be made if
the entire project is undertaken.
Justification
I
The Minnetonka West Middle School campus serves as the "neighborhood" park for residents residing in an area ofthe city approximately one
square mile in size. The City in cooperation with the District has developed four "official" pedestrian connections to the school and playfields from
adjoining neighborhoods.
Expenditures
Construction
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30,000
Total
Funding Sources
Park Dedication Fund
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30,000
Total
Operational Impact/Other I
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Account # I
Account # 3
Department Park & Trail Improvements
Type Unassigned
Useful Life
Category Park
Priority n/a
Project #
PK&T-074
Project Name Rice Marsh Lake Trail
Aecollnt #2
Total Project Cost $350,000
Description
The Rice Marsh Lake Trail will travel south of Rice Marsh Lake connecting the cities ofChanhassen and Eden Prairie. Construction of new
Highway 212 and an associated trail underpass near the border of the two cities will permit connection of this trail to the Lake Riley area. This
section of trail will be 3600 feet in length and when combined with trails in Eden Prairie will provide a complete trail loop around Rice Marsh
Lake approximately 3 miles in length.
Justification
This important section of pedestrian trail will prove to be a favorite among residents. The entire trail corridor is situated in wooded and wetland
areas. Connecting to Eden Prairie, the Highway 212 underpass and extensive trail systems to the east will provide significant benefits for trail users.
Expenditures
Construction
2007
2008
2009
2010
350,000
350,000
2011
Total
350,000
350,000
Total
Funding Sources
Park Dedication Fund
2007
2008
2009
2010
350,000
350,000
2011
Total
350,000
350,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contad
Account # 1
Account # 3
Department Park & Trail Improvements
Type Unassigned
Useful Life
Category Park
Priority nla
Projed #
PK&T-075
Project Name Liberty at Creekside Trail
Account #2
Total Projed Cost $175,000
Description
The Liberty at Creek side trail is a 2600 foot pedestrian trail improvement tied to the development of Liberty at Creek side. This trail will be
situated in the Bluff Creek preservation corridor traveling from the "east/west collector" south to new Highway 212.
Town and Country Homes is responsible for construction of this trail as a condition of their development contract with the city. Upon completion
ofthe trail we will reimburse Town and Country Homes for the cost ofthe project materials.
Justification
This section oftrail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures
Construction
2007
2008
2009
175,000
175,000
2010
2011
Total
175,000
175,000
Total
Funding Sources
Park Dedication Fund
2007
2008
2009
175,000
175,000
2010
2011
Total
175,000
175,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Account # 1
Account #2
Account # 3
Department Park & Trail Improvements
Type Unassigned
Useful Life
Category Park
Priority nla
Project #
PK&T-076
Project Name The Preserve Trail and Bridge
Total Project Cost $450,000
Description
The Preserve trail is a 2800 foot pedestrian trail improvement tied to the development ofthe Preserve. This trail will be situated in the Bluff Creek
preservation corridor traveling from the "east/west collector" road north to Lyman Boulevard. A large bridge crossing of Bluff Creek will be the
signature component of this project. Rottlund Homes is responsible for the construction ofthe trail and bridge as a condition of their development
contract with the City Upon completion ofthe trail we will reimburse Rottlund Homes for the cost ofthe project materials.
Justification
This section of trail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures 2007
Construction
2008
2009
450,000
450,000
2010
2011
Total
450,000
450,000
Total
Funding Sources 2007
Park Dedication Fund
2008
2009
450,000
450,000
2010
2011
Total
450,000
450,000
Total
I Opera1ionallnq>actlOd1er
Capital Improvement Program 2007 thru 2011
Contact
City of Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -077 Type Unassigned
Useful Life
Project Name Lakeside Trail (Lyman Boulevard) Category Park
Account # 1 Account # 3 Priority n/a
Account #2 Total Project Cost $60,000
Description I
The Lakeside Trail is a foot extension of a trail already in place along Lyman Boulevard. This section will connect with a future trail in Eden
Prairie. Sienna Corporation is responsible for the construction of the trail as a condition of their development contract with the City. Upon
completion of the trail we will reimburse Sienna Corporation for the cost of the project materials.
Justification I
This section of trail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures 2007 2008 2009 2010 2011 Total
Construction 60,000 60,000
Total 60,000 60,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 60,000 60,000
Total 60,000 60,000
Operational Impact/Other I
I
I
..
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Account # 1
Account # 3
Department Park & Traillrnprovernents
Type Unassigned
Useful Life
Category Park
Priority nfa
Project #
PK&T -078
Project Name Pioneer Pass Park Acquisition
Account #2
Total Project Cost $170,000
Description
As a condition of approval for the subdivision of the Pioneer Pass development the City is acquiring a 4,72 acre parcel to be dedicated in lieu of
payment of park dedication fees. The dedication credit only covers the first 3.79 acres. The remaining .93 acres will be purchased at a cost of
$169,986.75.
Justification
This acquisition satisfies a significant void in the Cities comprehensive park plan. It will serve neighborhood park needs for over 500 homes
located with V. mile of its location.
Expenditures
Land Acquisition
2007
170,000
170,000
2008
2009
2010
2011
Total
170,000
170,000
Total
Funding Sources
Park Dedication Fund
2007
170,000
170,000
2008
2009
2010
2011
Total
170,000
170,000
Total
Operational Impact/Other
Account # 1
Account #2
Account # 3
2007 thru 2011 Contact Unassigned
Department Planning
Type Improvement
Useful Life 10-15 years
Category Planning
Priority nla
Total Project Cost $150,000
Capital Improvement Program
City of Chanhassen, MN
Project #
PL-OOl
Project Name Update of Comprehensive Plan
Description
Update to city's 2020 Comprehensive Plan. Start the process in 2007 and complete in 2008.
Justification
Mandated by State Statute that the comprehensive plan be updated every 10 years. This is an opportunity to evaluate and re-evaluate the city's land
use designation and MUSA staging, infrastructure plan (roads, sewer, storm wter, water) and parks and open space.
Expenditures
Comp Plan Update
2007
120,000
120,000
2008
30,000
30,000
2009
2010
2011
Total
150,000
150,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
General Fund 50,000 30,000 80,000
Sewer Utility Fund 50,000 50,000
Water Utility Fund 20,000 20,000
Total 120,000 30,000 150,000
Operational Impact/Other
The update of the comprehensive provides additional information for capital improvements that may be needed to accommodate growth of the city.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Sanitary Sewer Improvements
Account # I 701-0000-4509
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
88-012
Project Name Inflow and Infiltration Abatement
Account #2
Total Project Cost $1,010,000
Description I
This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration
Report. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees.
Justification I
City staff has identified numerous older sewer lines that are in need of repair. The City ofChanhassen pays the Metropolitan Council for sewage
treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its
way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to
the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES may place a surcharge on cities that are not trying to
improve the inflow and infiltration problem.
Expenditures
Maintenance
2007
210,000
Total 210,000
2008
200,000
200,000
2009
200,000
200,000
2010
200,000
200,000
2011
200,000
200,000
Total
1,010,000
1,010,000
Funding Sources
Sewer Utility Fund
2007
210,000
Total 210,000
2008
200,000
200,000
2009
200,000
200,000
2010
200,000
200,000
2011
200,000
200,000
Total
1,010,000
1,010,000
Operational Impact/Other I
The efforts may decrease operational costs, emergency calI outs and maintenance costs. It is also the city's intent to use connection charges to help
fund for those costs. It is the city's belief that as new customers come on line those connection fees should help fund future infiltration problems.
II
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Sanitary Sewer Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Project #
SS-014
Project Name Sanitary Sewer Replacement
Account # 1 701-0000-4751
Account # 3
Account #2
Total Project Cost $730,000
Description
Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street.
Justification
The City considers the condition ofthe existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects.
Expenditures
Construction
2007
230,000
Total 230,000
2008
250.000
250,000
2009
2010
250,000
250,000
2011
Total
730,000
730,000
Funding Sources
Sewer Utility Fund
2007
230,000
Total 230,000
2008
250,000
250,000
2009
2010
250,000
250,000
2011
Total
730,000
730,000
Operational Impact/Other
This project will decrease maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #
SS-017
Project Name Sanitary Lift Station Rehabilitation Program
Accou nt # 1 701-0000-4751
Account # 3
Account #2
Contact Unassigned
Department Sanitary Sewer Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Total Project Cost $475,000
Description
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The
City currently maintains 30 lift stations. Many ofthese lift stations are high service pumps and need frequent servicing. The program will service
or replace pumps, pipe gallery, and electrical components as needed. Lift Station #3 is recommended for improvements in 2007. Lift Station #3
located on the north side of Highway 7 takes all the flow from the properties on the west side of Lake Minnewashta and properties on the north side
of Highway 7. The wet well capacity has become undersized for flows. The electrical panel has become unreliable and needs to be replaced. The
electrical power in this area is unreliable, so a permanent backup generator is recommended.
Justification
Reduce emergency cans and potential sewer backups.
Expenditures
Maintenance
2008
50,000
50,000
2010
55,000
55,000
2007
265,000
265,000
2009
50,000
50,000
Total
Funding Sources
Sewer Utility Fund
2007
265,000
265,000
2008
50,000
50,000
2009
SO,OOO
50,000
2010
55,000
55,000
Total
I Operational ImpacrlOthcr
2011
55,000
55,000
Total
475,000
475,000
2011
55,000
55,000
Total
475,000
475,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Sanitary Sewer Improvements
Account # 1 701-0000-4751
Account #2
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
SS-o 18
Project Name Dell Road/77th Street Forcemain Replacement
Total Project Cost $125,000
Description
The forcemain on Dell Road and 77th Street that pumps the sewage from the industrial park has had several breaks in the past few years and needs
to be replaced. This project will be included with the street improvements in 2009.
Justification
Eliminate emergency calls and sewer spills.
Expenditures
Maintenance
2007
2008
2009
125,000
125,000
2010
20U
Total
125,000
125,000
Total
Funding Sources
Sewer Utility Fund
2007
2008
2009
125,000
125,000
2010
20U
Total
125,000
125,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Department Sanitary Sewer Improvements
Account # 1 701-0000-4702
Account # 3
Type Unassigned
Useful Life
Category Unassigned
Priority nla
Project # 88-020
Project Name 2010 MUSA Sanitary Lift Station
Account #2
Total Project Cost $1,500,000
Description
This lift station will be located on Powers Boulevard south ofTH 212 to service the future 2010 MUSA area and will also be used by future
MUSA areas.
Justification
Required for future development of the 2010 MUSA area. The cost will be assessed to future MUSA areas using connection fees.
Expenditures
Construction
2007
2008
2009
2010
1 ,500.000
1,500,000
2011
Total
1,500,000
1,500,000
Total
Funding Sources
Sewer Utility Fund
2007
2008
2009
2010
1.500,000
1,500,000
2011
Total
1.500.000
1,500,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
Project # ST -001
Project Name West 78th St Streetlights
2007 thru 2011
Contact Unassigned
Department Street Improvements
Account # 1
Account # 3
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority nla
Account #2
Total Project Cost 5300,000
Description
Install street lights on West 78th Street from the Western edge of Lake Ann Park to TH 41. Street lights already exist on the section of West 78th
Street east of this section of road.
Justification
Visibility will be improved with the installation of street lights.
Expenditures
Equipment
2007
2008
2009
2010
2011
300,000
300,000
Total
300,000
300,000
Total
Funding Sources
MSA
2007
2008
2009
2010
2011
300,000
300,000
Total
300,000
300,000
Total
Operational Impact/Other
This project will increase maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Street Improvements
Type Improvement
Useful [,ire Unassigned
Category
Priority nla
Project #
ST -003
Project Name Lyman Boulevard Improvements
Account # 1
Account # 3
Account #2
Total Project Cost $9,100,000
Description
The city will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TII 41. The street segment is proposed
to be widened and urbanized to accommodate increased traffic volume from TII 212, new development and potentially a high school.
Improvements include roadway widening, signals, stormsewer improvements, trail improvement and trunk watermain improvement.
Justification
To improve safety and mobility along the corridor.
Expenditures
Construction
2007
2008
2009
9,100,000
9,100,000
2010
2011
Total
9,100,000
9,100,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Abatement District Funds 5,000,000 5,000,000
Assessment Bonds 1,009,000 1,009,000
Other Agency Contribution 1,731,000 1,731,000
Surface Water Utility Fund 700,000 700,000
Water Utility Fund 660,000 660,000
Total 9,100,000 9,100,000
Operational Impact/Other
This project will increase maintenance costs in relation to the increase in City Utilities and Trails constructed with the project.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Street Improvements
Account # 1 601-0000-4751
Account #2
Account # 3
Type hnprovement
Useful Life Unassigned
Category StreetslHighways
Priority nla
Project #
ST-012
Project Name Annual Street Improvement Program
Total Project Cost $12,936,000
Description
Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas:
2007 2008 2009 2010 2011
Residential S ShoreDr Laredo Dr/Ln Chaparral Erie Ave Area Carver Beach Road area
Bighorn Dr Saratoga Dr/Cir Lone Cedar Area Sandy Hook Rd area
Pleasant View Cove Audubon Road Holly Lane
Preakness Ln area
Dogwoodffanadoona
KoehnenlYosemite area
MSA
W 78th St
Justification
The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
Rehabilitation projects extend the life of the street. In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to
a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the merits
of the project and scope of work.
Expenditures
Construction
2007
4,436,000
Total 4,436,000
2008
4,100,000
4,100,000
2009
1,300,000
1,300,000
2010
1,900,000
1,900,000
2011
1,200,000
1,200,000
Total
12,936,000
12,936,000
Funding Sources 2007 2008 2009 2010 2011 Total
AssessmenVRevolvlng Assess 2,936,000 1,600,000 1,000,000 1,900,000 1,200,000 8,636,000
Developer Assessments 1,000,000 1,000,000
MSA 500,000 2,500,000 300,000 3,300,000
Total 4,436,000 4,100,000 1,300,000 1,900,000 1,200,000 12,936,000
Operational Impact/Other
This project may decrease maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Street Improvements
Account # 1 415-0000-4300
Account # 3
2007 thru 2011 Contact Unassigned
Department Street Improvements
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
Total Project Cost $150,000
Capital Improvement Program
City of Chanhassen, MN
Projeet# ST-017
Project Name TH 101 Corridor Preservation Planning
Account #2
Description
A preliminary design, environmental scoping study wiII be worked on in 2007. A study to complete the environmental review for the corridor is
scheduled for 2008. No funding for improvements have been identified at this time.
Justification
To improve safety and mobility along the corridor and plan for future growth.
Expenditures
Planning/Design
2007
2008
150,000
150,000
2009
2010
2011
Total
150,000
150,000
Total
Funding Sources 2007
MSA
Other Agency Contribution
Total
2008
50,000
100,000
150,000
2009
2010
2011
Total
50.000
100,000
150,000
Operational Impact/Other
Capital Improvement Program 2007 thru 2011 Contact Paul Oehme
City of Chanhassen, MN Department Street Improvements
ST -018 Type Maintenance
Project # Useful Life 7-10 years
Project Name Pavement Management Category StreetslHighways
Account # 1 420-0000-4751 Account # 3 Priority nla
Account #2 Total Project Cost $1,925,000
Description I
This project will provide maintenance such as crack sealing, seal-coating, pothole patching for city streets. The projects will be determined
annually based on the pavement condition index as generated by the pavement management program.
Justification I
This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures.
Expenditures 2007 2008 2009 2010 2011 Total
Maintenance 385,000 385.000 385,000 385,000 385,000 1,925,000
Total 385,000 385,000 385,000 385,000 385,000 1,925,000
Funding Sources 2007 2008 2009 2010 2011 Total
MSA 134,250 117,125 117,125 117,125 117,125 602,750
Tax Levy 250,750 267,875 267,875 267,875 267,875 1,322,250
Total 385,000 385,000 385,000 385,000 385,000 1,925,000
Operational Impact/Other I
This will reduce the need to reconstruct streets and will allow us to more closely match the life of streets to the utility lines that lie underneath
them. This will allow better coordination when we need to replace water and sewer lines with replacing roads.
I
Capital Improvement Program
City of Chanhassen, MN
Project # ST -019
Project Name TH 5 Corridor Study - TH 41 to TH 212
2007 thru 2011
Contact
Department Street Improvements
Account # 1 415-0000-4300
Account # 3
Type Unassigned
Useful Life
Category Unassigned
Priority nla
Account #2
Total Project Cost $10,000
Description
This is a joint project between Carver County, MnDot and the cities along the corridor to plan for future improvements..
Justification
This study is the first step in preliminary design and scoping to plan for improvements to the corridor. The city's portion of the project will be used
for the segment between TH 41 and the west city limits.
Expenditures
Planning/Design
2007
10,000
Total 10,000
2008
2009
2010
2011
Total
10,000
10,000
Funding Sources
MSA
2007
10,000
Total 10,000
2008
2009
2010
2011
Total
10,000
10,000
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #
SWMP-012
Project Name SWMP Implementation
Account # 1 720-0000-4300
Account #2
Account # 3
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost $1,650,000
Description
This project implements projects identified as high priority by the City's Surface Water Management Plan, the National Pollutant Discharge
Elimination System (NPDES) Phase II permit, City Council and/or City staff.
Justification
These projects are necessary to meet state and federal government requirements for storm drainage; address storm water issues in existing
developments; maintain existing infrastructure; and construct the infrastructure recommended by the City's Surface Water Management Plan.
Expenditures
Construction
2007
450,000
450,000
2008
300,000
300,000
2009
300,000
300,000
2010
300,000
300,000
Total
Funding Sources
Surface Water Utility Fund
Total
2007
450,000
450,000
2008
300,000
300,000
2009
300,000
300,000
2010
300,000
300,000
Operational Impact/Other
Citywide. No map.
2011
300,000
300,000
Total
1,650,000
1,650,000
2011
300,000
300,000
Total
1,650,000
1,650,000
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Surface Water Management
Project # SWMP-014 Type Improvement
Useful Life Unassigned
Project Name Property Acquisition Category SWMP
Account # t 720-0000-4701 Account # 3 Priority nla
Account #2 410-0000-4701 Total Project Cost $845,000
Description I
The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans.
Justification I
Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans.
Expenditures 2007 2008 2009 2010 2011 Total
Land Acquisition 245,000 100,000 100,000 200,000 200,000 845,000
Total 245,000 100,000 100,000 200,000 200,000 845,000
Funding Sources 2007 2008 2009 2010 2011 Total
Park Dedication Fund 151,000 151.000
Surface Water Utility Fund 94,000 100,000 100,000 200,000 200,000 694,000
Total 245,000 100,000 100,000 200,000 200,000 845,000
Operational Impact/Other I
Citywide. No map.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Surface Water Management
Project # SWMP-019 Type Improvement
Useful Life Unassigned
Project Name Street Improvement Projects - Storm Water Mgmt Category SWMP
Account # 1 720-0000-4702 Account # 3 Priority nia
Account #2 Total Project Cost $1,090,000
Description I
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments.
Justification I
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Expenditures 2007 2008 2009 2010 2011 Total
Construction 640,000 300,000 150,000 1,090,000
Total 640,000 300,000 150,000 1,090,000
Funding Sources 2007 2008 2009 2010 2011 Total
Surface Water Utility Fund 640,000 300,000 150,000 1,090 ,000
Total 640,000 300,000 150,000 1,090,000
Operational Impact/Other I
Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
II
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Surface Water Management
Type Equipment
Useful Life 10-15 years
Category SWMP
Priority nta
Project #
SWMP-021
Project Name Leaf Vacuum
Account # 1 720-0000-4705
Account # 3
Account #2
Total Project Cost $40,000
Description
Purchase of a leaf vacuum trailer to address street sweeping requirements ofNPDES Phase II MS4 permit.
Justification
A leaf vacuum will be more effective at picking up leaves, wet and dry, from streets than a street sweeper. This will prolong the life of the street
sweeper, which is a more expensive piece of equipment. The leaf vacuum also shreds leaves to increase productivity between dumping.
Expenditures
Equipment
2007
2008
2009
2010
40,000
40,000
2011
Total
40,000
40,000
Total
Funding Sources
Surface Water Utlllty Fund
Total
2007
2008
2009
2010
40.000
40,000
2011
Total
40,000
40,000
Operational Impact/Other
The collected material will have to be disposed of properly.
Capital Improvement Program
City ofChanhassen, MN
Project # SWMP-022
Project Name Excavator
2007 thru 2011
Contact Unassigned
Department Surface Water Management
Type Equipment
Useful Life 10-15 years
Category SWMP
Account # 1 720-0000-4705 Account # 3 Priority nla
ACCllUnt #2 Total Project Cost $70,000
Description I
Purchase ofa small excavator designed with rubber tracks to access storm water infrastructure for maintenance purposes. Equipment will have a
boom capable of revolving 360 degrees.
Justification I
The small size of this excavator wilI allow street crews to maintain infrastructure in small easements or in areas with limited access potential. Light
weight minimizes damage to properties. Revolving boom minimizes site disturbance. Once inventory and inspection of stormwater infrastructure
has taken place, it is anticipated that many ponds and drainageways will require maintenance to comply with NPDES Phase II.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 70,000 70,000
Total 70,000 70,000
Funding Sources 2007 2008 2009 2010 2011 Total
Surface Water Utility Fund 70,000 70,000
Total 70,000 70,000
Operational Impact/Other I
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Surface Water Management
Type Equipment
Useful Life Unassigned
Category SWMP
Priority nla
Project #
SWMP-023
Project Name Vactor, Used
Account # 1 720-0000-4705
Account #2
Account # 3
Total Project Cost $200,000
Description
Purchase of a small vactor truck for maintenance of storm water infrastructure.
Justification
Development adds stormwater infrastrucure. Currently, street department shares equipment with utility department. Utility department has
increased use of current vactor and streets department has increased need for additional vactor. The small vactor will be used off road in easements
where the larger vactor cannot maneuver. Also, the small vactor wiIl be used on trails where the larger vactor should not go do due to damage it
caused to the bituminous trail due to its weight. Will increase efficiency of SWMP cleanouts and other maintenance. Will also serve as a backup
to current vactor in an emergency. Will assist in achieving compliance with NPDES Phase II MS4 permit.
Expenditures
Equipment
2007
2008
2009
200,000
200,000
2010
2011
Total
200,000
200,000
Total
Funding Sources
Surface Water Utility Fund
Total
2007
2008
2009
200,000
200,000
2010
2011
Total
200,000
200,000
Operational Impact/Other
The collected material wiII have to be disposed of properly.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #
SWMP-024
Project Name Bluff Cr. Nat. Resources Mgmt Plan Implementation
Account # 1 720-0000-4751
Account # 3
Account #2
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost $750,000
Description
Construction and restoration as recommended in the Bluff Creek Natural Resource Management Plan. It is unknown how much funding the Riley-
Purgatory-Bluff Creek Watershed District will contribute to this project.
Justification
Implementation of recommendations in 1996 Bluff Creek Natural Resource Management Plan in cooperation with the Riley-Purgatory-BluffCreek
Watershed District. These projects will improve habitat and aesthetics in the Bluff Creek Watershed.
Expenditures
Construction
2007
150,000
150,000
2008
150,000
150,000
2009
150,000
150,000
2010
150,000
150,000
Total
Funding Sources
Surface Water Utility Fund
Total
2007
150,000
150,000
2008
150,000
150,000
2009
150,000
150,000
2010
150,000
150,000
Operational Impact/Other
The restored areas wiII require regular maintenance to sustain the native plant communities.
2011
150,000
150,000
Total
750,000
750,000
2011
150,000
150,000
Total
750,000
750,000
Capital Improvement Program
City of Chanhassen, MN
Project #
SWMP-026
Project Name Lake Minnewashta Outlet
Account # 1 720-0000-4751
Acconnt # 3
Account #2
Description
Install a permanent outlet structure at the outlet for Lake Minnewashta.
2007 thru 2011
Contact
Department Surface Water Management
Type Improvement
Useful Life
Category SWMP
Priority nla
Total Project Cost $30,000
Justification
The current outlet is sand and is therefore easily altered. Alterations to the outlet can cause the entire lake to drain down to the outlet elevation.
Expenditures
Construction
2007
2008
Total
Funding Sources 2007
Surface Water Utility Fund
Total
2008
Operational Impact/Other
None
2009
2009
2010
30,000
30,000
2010
30,000
30,000
2011
2011
Total
30,000
30,000
Total
30,000
30,000
Capital Improvement Program
City of Chanhassen, MN
Project #
SWMP-027
Project Name Natural Resources Stewardship Plan
Account # 1 720-7202-4300
Account # 3
Account #2
2007 thru 2011
Description
This project would develop and implement over time a stewardship plan for all public natural resources.
Contact
Department Surface Water Management
Type Improvement
Useful Life
Category SWMP
Priority nla
Total Project Cost $130,000
Justification
The plan is necessary to enhance and protect the city's public natural resource investments in land and vegetation. The plan could prioritize
strategies, sites and processes as well as inventory the existing conditions of publically held properties.
Expenditures
Planning/Design
2007
50,000
Total 50,000
Funding Sources
Reforestation
2007
50,000
Total 50,000
Operational Impact/Other
2008
20,000
20,000
2009
20,000
20,000
2010
20,000
20,000
2008
20,000
20,000
2009
20,000
20,000
2010
20,000
20,000
2011
20,000
20,000
Total
130,000
130,000
2011
20,000
20,000
Total
130,000
130,000
Capital Improvement Program
2007 thru 2011
Contact
City of Chanhassen, MN Department Surface Water Management
Project # SWMP-028 Type Equipment
Useful Life 10-15 years
Project Name Water truck boom sprayer Category SWMP
Account # 1 720-7202-4705 Account # 3 Priority nJa
Account #2 Total Project Cost $8,500
Description I
A remote control boom sprayer attachment for city's water truck used to water trees, sod, plants.
Justification I
Watering trees, sod and plants using a boom sprayer is the most efficient, effective and safest method. The sprayer allows for a convenient and
direct approach for tree and plant maintenance. The greatest factor in young boulevard and park tree mortality is stress due to lack of water.
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 8,500 8,500
Total B,500 B,500
Funding Sources 2007 2008 2009 2010 2011 Total
Reforestation 8,500 8,500
Total B,500 B,500
Operational Impact/Other I
All boulevard and park trees city wide.
,
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Project #
W-015
Project Name Repainting: West 76th St. Water Tower
Account # 1 700-0000-4751
Account # 3
Account #2
Total Project Cost $80,000
Description
Provides for the recoating of the interior and exterior surfaces of the W. 76th St. Water Tower. The water tower is currently not used for water
storage because of the hydraulic changes that were made when the Lake Lucy RoadlPowers Boulevard tower was made.
Justification
This type of infrastructure requires recoating to protect the life of the metal structure.
Expenditures
Construction
2007
2008
2009
80,000
80,000
2010
2011
Total
80,000
80,000
Total
Funding Sources
Water Utility Fund
2007
2008
2009
80,000
80,000
2010
2011
Total
80,000
80,000
Total
Operational Impact/Other
This project does not increase operational costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
WR020
Project Name Arboretum Water Main
Account # 1
Account #2
Account # 3
Total Project Cost $220,000
Description
Installation of a missing piece of water main to provide better looping and system reliability between the Arboretum Water Tower and W 78th
Street.
Justification
Completing this section of water main will complete a missing loop in the system providing improved water quality and pressure as well as
increasing operational reliability. This project was identified in the 2003 Master Water Study.
Expenditures
Planning/Design
Construction
2007
2008
2009
20,000
2010
2011
Total
20,000
200,000
220,000
Total
20,000
200,000
200,000
Funding Sources
Water Utility Fund
2007
2008
2009
20.000
20,000
2010
200,000
200,000
2011
Total
220,000
220,000
Total
Operational Impact/Other
This project will increase maintenance costs.
C . tal I
tPr
2007 h 2011
apl mprovemen ogram tm Contact Unassigned
City of Chanhassen, MN Department Water System Improvements
Project # W-024 Type Improvement
Useful Life Unassigned
Project Name Watermain Replacement Category Utilities
A\:\:oullt # 1 700-0000-4751 A\:\:ount # 3 Priority nla
A\:count #2 Total Projed Cost $2,020,000
Description I
Replacement of existing water main lines in coordination with the reconstruction of the City street.
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Expenditures 2007 2008 2009 2010 2011 Total
Construction 660,000 660,000 700,000 2,020,000
Total 660,000 660,000 700,000 2,020,000
Funding Sources 2007 2008 2009 2010 2011 Total
Water Utility Fund 660,000 660,000 700,000 2,020,000
Total 660,000 660,000 700,000 2,020,000
Operational Impact/Other I
These projects will decrease maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contad Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
W -025
Project Name Well #4 Improvements
Account # 1 700-0000-4751
Account #2
Account # 3
Total Projed Cost 5350,000
Description
Engineering has reviewed the test data of the water from Well #4 and currently, the radium levels are at the MDH guidelines. In 2004, staff
reviewed the radium problems with the Minnesota Dept of Health (MDH). The well is currently used as a peak well during high demand periods
which blends the Well #4 water with the other well water in the system. If the radium levels continue to rise, the City may have to enter into a
monitoring program with the MDH on a temporary basis. The MDH at that time will determine the acceptable amount of water that can be
pumped into the City system from Well #4. If an agreement with the MDH cannot be reached, the well may have to be redeveloped, capped or have
a small treatment plant built for this well. Redevelopment of the well is budgeted for 2008.
Justification
Well #4 continues to test high for RADIUM.
Expenditures
Construction
2007
2008
2009
350,000
350,000
2010
2011
Total
350,000
350,000
Total
Funding Sources
Water Utility Fund
2007
2008
2009
350,000
350,000
2010
2011
Total
350,000
350,000
Total
Operational Impact/Other
This project will not increase operations cost.
Capital Improvement Program 2007 thru 2011
Contact Unassigned
City of Chanhassen, MN Department Water System Improvements
Project # W-027 Type Improvement
Useful Life Unassigned
Project Name Pressure Reducing Station 8 Category
Account # 1 700-0000-4751 Account # 3 Priority n/a
Account #2 Total Project Cost $65,000
Description I
Construction of a pressure reducing valve station in the 2005 MUSA area by Pioneer Trail. The station may be constructed in conjunction with a
development.
Justification I
Identified in the 2003 Master Water Plan and the 1998 Comprehensive Water Supply Plan. Needed to control watermain pressure due to elevation
changes.
Expenditures 2007 2008 2009 2010 2011 Total
Construction 65,000 65,000
Total 65,000 65,000
Funding Sources 2007 2008 2009 2010 2011 Total
Water Utility Fund 65,000 65,000
Total 65,000 65,000
Operational Impact/Other 1
This project will increase maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category
Priority nla
Project #
W -030
Project Name Raw Well Water Collection System
Account # 1 700-0000-4751
Aceount # 3
Aceount #2
Total Project Cost $500,000
Description
This project includes designing and installing watermain from new and existing well sites to the phase II treatment plant at the west end of the city.
Justification
Raw water lines are required to feed the water directly from the wells to the treatment plant prior to distribution to the water system. These
imporvements were identified in the 2003 Master Water Plan.
Expenditures
Construction
2007
2008
2009
500,000
500,000
2010
2011
Total
500,000
500,000
Total
Funding Sources
Water Utility Fund
2007
2008
2009
500,000
500,000
2010
2011
Total
500,000
500,000
Total
Operational Impact/Other
This project will increase maintenance costs.
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Project #I
W-032
Project Name Well Rehabilitation Program
Account #I t 700-0000-4530
Account # 3
Account #2
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Total Project Cost $210,000
Description
This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years.
Justification
To extend the life and ensure reliability of the City's well fields. Performing regular maintenance will extend the life of well components, reduce
emergency calls and have a more reliable water supply system.
Expenditures
Maintenance
2007
40,000
Total 40,000
2008
40,000
40,000
2009
40,000
40,000
2010
45,000
45,000
Funding Sources
Water Utility Fund
2007
40,000
40,000
2008
40,000
40,000
2009
40,000
40,000
2010
45,000
45,000
Total
Operational Impact/Other
2011
45,000
45,000
Total
210,000
21 0,000
2011
45,000
45,000
Total
210,000
210,000
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
W-033
Project Name TH 101 Trunk Watermain Replacement
Account # 1 700-0000-4751
Account # 3
Account #2
Total Project Cost $200,000
Description
A segment of 12" watermain along TH 101 from Brule Circle to Gray Fox Curve has had several watermain breaks over the past years. Inspection
of the watermain indicates this watermain has deteriorated significantly due to the hot soils in the area, is in very poor condition and should be
replaced.
Justification
To reduce emergency cans and disruption of water service to residents.
Expenditures
Construction
2007
200,000
Total 200,000
2008
2009
2010
2011
Total
200,000
200,000
Funding Sources
Water Utility Fund
2007
200,000
Total 200,000
2008
2009
2010
2011
Total
200,000
200,000
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
Project # W -036
Project Name Well Head Protection Plan Update
2007 thru 2011
Contact
Account # 1 700-0000-4751
Account # 3
Department Water System Improvements
Type Unassigned
Useful Life
Category Utilities
Priority nla
Account #2
Total Project Cost $30,000
Description
Well head protection is designed to protect public water supply wells. Cities are required to have well head protection programs under the
provisions of the 1986 amendments to the Federal Safe Drinking Water Act. The city has a well head protection program but it needs to be
updated due to the new wells in service. The update will include wells 9, 10, and 11.
Justification
Federal and state requirements.
Expenditures
Comp Plan Update
2007
30,000
Total 30,000
2008
2009
2010
2011
Total
30,000
30,000
Funding Sources
Water Utility Fund
2007
30,000
Total 30,000
2008
2009
2010
2011
Total
30,000
30,000
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2007 thru 2011
Contact
Account # t 700-0000-4705
Account #2
Account # 3
Department Water System Improvements
Type Unassigned
Useful Life
Category Unassigned
Priority nla
Project #
W-038
Project Name Stand by Generator for wells
Total Project Cost $120,000
Description
With the addition ofthe water treatment plant standby generation for wells is needed to keep water supplied to the treatment plant. The treatment
plant has a standby generator for the plant but only one well. The requested standby generator will be able to run an additional two wells. This
wiII allow the plant to treat water to meet an average day demand.
Justification
To meet average day water demand for the city if power is disrupted for an extended period of time.
Expenditures
Equipment
2007
2008
120.000
120,000
2009
2010
2011
Total
120.000
120,000
Total
Funding Sources
Water Utility Fund
2007
2008
120,000
120,000
2009
2010
2011
Total
120,000
120,000
Total
Operational Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2008 thru 2012
Contact
Department Water System Improvements
Account # 1
Account # 3
Type Unassigned
Useful Life
Category Utilities
Priority nla
Project #
W-037
Project Name West Water Treatment Plant
Account #2
Total Project Cost $0
Description
The treatment of potable water for the high zone area and the west side oftown is planned for construction in 2012. This treatment plant, along
with the east treatment plant, will treat 100% of the city's potable water for an average day's usage. The estimate for the treatment plant is
$11,000,000
Justification
To remove iron and manganese from the water prior to distributing.
Operational Impact/Other