Loading...
92-44 City of Chanhassen Carver and Hennepin Counties, Minnesota DATE: March 23. 1992 RESOLUTION NO: 92-44 MOTION BY: Wing SECONDED BY: Mason A RESOLUTION ACCEPTING FEASIBILITY STUDY UPDATE FOR COUNTY ROAD 17 IMPROVEMENTS (FROM TH 5 TO 400' SOUTH OF LAKE DRIVE); CALL FOR PUBLIC HEARING, PROJECT NO. 90-4 WHEREAS, on July 23, 1990 the City Council authorized preparation of plans and specifications for the County Road 17 upgrade from TH 5 to 400' south of Lake Drive. Due to the delay in the TH 5 schedule, this project has not proceeded past the preparation of plans and specifications; and WHEREAS, since no construction has begun on this project within one year of the last public hearing, State Statute 429 requires the feasibility process and corresponding public h%aring be re-initiated; and WHEREAS, BRW, the project consultant engineer, has'prepared a brief update report to the original feasibility study. The primary elements of the County Road 17 project have remained unchanged. The revised cost estimate includes the special construction work and 1992 construction costs. NOW, THEREFORE, BE IT RESOLVED THAT the City Council of the City. of Chanhassen accepts the feasibility study update for County Road 17 Upgrade south of TH 5 and a public hearing will be set for April 13, 1992. Passed and adopted by the Chanhassen city Council this 24th day of March, 1992. ATTEST: Don Ashworth, City Clerk/Manager YES NO ABSENT Chmiel Dimler Workman Mason Wing None None