92-44 City of Chanhassen
Carver and Hennepin Counties, Minnesota
DATE: March 23. 1992
RESOLUTION NO: 92-44
MOTION BY: Wing
SECONDED BY: Mason
A RESOLUTION ACCEPTING FEASIBILITY STUDY UPDATE
FOR COUNTY ROAD 17 IMPROVEMENTS (FROM TH 5 TO 400' SOUTH
OF LAKE DRIVE); CALL FOR PUBLIC HEARING, PROJECT NO. 90-4
WHEREAS, on July 23, 1990 the City Council authorized
preparation of plans and specifications for the County Road 17
upgrade from TH 5 to 400' south of Lake Drive. Due to the delay
in the TH 5 schedule, this project has not proceeded past the
preparation of plans and specifications; and
WHEREAS, since no construction has begun on this project
within one year of the last public hearing, State Statute 429
requires the feasibility process and corresponding public h%aring
be re-initiated; and
WHEREAS, BRW, the project consultant engineer, has'prepared a
brief update report to the original feasibility study. The primary
elements of the County Road 17 project have remained unchanged.
The revised cost estimate includes the special construction work
and 1992 construction costs.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council of the
City. of Chanhassen accepts the feasibility study update for County
Road 17 Upgrade south of TH 5 and a public hearing will be set for
April 13, 1992.
Passed and adopted by the Chanhassen city Council this 24th
day of March, 1992.
ATTEST:
Don Ashworth, City Clerk/Manager
YES
NO
ABSENT
Chmiel
Dimler
Workman
Mason
Wing
None
None