Loading...
C3.5 SWPPP NOTES & DETAILSNORTH KEY PLAN DRAWING NUMBER DRAWING TITLE CLIENT 4201 cedar avenue so. - minneapolis, MN 55407 tel. (612) 904-1332 - fax (612) 904-7366 NOT F O R C O N S T R U C TI O N PROJECT NUMBER 21602.0A REVISION DATE DESCRIPTION BY 1891 Arboretum Boulevard Chanhassen, MN 55317 Xcel Energy Service Center Chanhassen Title: Zachary B. Moen - PE Registration Number: 58688 Date: XX/XX/XXXX By: Title: Professional Engineer I hereby certify that this drawing was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. LOUCKS PROJECT NO. 21602 10/25/2022 WATERSHED SUBMITTAL 11/16/2022 TEP SUBMITTAL 11/16/2022 SCHEMATIC DESIGN PACKAGE 12/05/2022 SD PACKAGE ADDENDUM 01/12/2023 CITY SUBMISSION C3.5 SWPPP NOTES & DETAILS SWPPP NOTES SITE VICINITY MAP CONSTRUCTION STORMWATER SPECIAL WATERS SEARCH MAP PROJECT SITE * BIO-ROLL OR ROCK LOG NOTES: 1.PLACE BOTTOM EDGE OF WIRE FENCE INTO 6 IN DEEP TRENCH. 2.POSTS SHALL BE: ·6 FT MAX. SPACING. ·STANDARD STEEL T-TYPE POSTS. ·5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE GROUND. 3.ATTACH WIRE FENCE TO STEEL POSTS WITH NO. 9 GA. ALUMINUM WIRE OR NO. 9 GALVANIZED STEEL PRE-FORMED CLIPS. 4.ATTACH FABRIC TO WIRE FENCING WITH WIRE OR ZIP TIES. A MIN. OF 3 ZIP TIES PER POST. EXTEND BOTTOM OF FABRIC INTO TRENCH. 5.BACKFILL TRENCH & COMPACT. 6.STRAW, WOOD CHIP, COMPOST OR ROCK LOGS PER MNDOT SPECS 3890, 3897. DRAWN 11/2016 LOUCKS PLATE NO. 3002LOUCKS 2'' X 2'' X 18'' LONG WOODEN STAKES AT 2'-0'' SPACING. DRIVE THROUGH NETTING, NOT PENETRATING FIBER LOG. STRAW OR WOOD FIBER 9" OR 12'' DIA. SEDIMENT LOG ROLL ENCLOSED IN POLYPROPYLENE NETTING FL O W TRENCH IF LOOSE SOILS FLOW ENDS SECURELY CLOSED TO PREVENT LOSS OF OPEN GRADED AGGREGATE FILL. SECURED WITH 50 PSI. ZIP TIE 1 NOTES: SEE SPECS. 2573, 3137, 3890 & 3897. MANUFACTURED ALTERNATIVES LISTED ON Mn/DOT'S APPROVED PRODUCTS LIST MAY BE SUBSTITUTED. 1.GEOTEXTILE SOCK BETWEEN 4-10 FEET LONG AND 4-6 INCH DIAMETER. SEAM TO BE JOINED BY TWO ROWS OF STITCHING WITH A PLASTIC MESH BACKING OR PROVIDE A HEAT BONDED SEAM (OR APPROVED EQUIVALENT). FILL ROCK LOG WITH OPEN GRADED AGGREGATE CONSISTING OF SOUND DURABLE PARTICLES OF COARSE AGGREGATE CONFORMING TO SPEC. 3137 TABLE 3137-1; CA-3 GRADATION. EROSION CONTROL BLANKET 6" 6" 1' TO 3'ANCHOR TRENCH 1.DIG 6"X6" TRENCH 2.LAY BLANKETS IN TRENCH 3.STAPLE AT 1.5' INTERVALS 4.BACKFILL WITH NATURAL SOIL AND COMPACT. 5.BLANKET LENGTH SHALL NOT EXCEED 100' WITHOUT AN ANCHOR TRENCH NOTE: SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLUMPS, STICKS, VEHICLE IMPRINTS, AND GRASS. BLANKETS SHALL HAVE GOOD SOIL CONTACT. ANCHOR TRENCH (SEE DETAIL AND NOTES BELOW) OVERLAP END JOINTS MINIMUM OF 6" AND STAPLE OVERLAP AT 1.5' INTERVALS. OVERLAP LONGITUDINAL JOINTS MINIMUM OF 6" STAPLE PATTERN/DENSITY SHALL FOLLOW MANUFACTURERS SPECIFICATIONS. DI R E C T I O N O F SU R F A C E F L O W STAGGER JOINTS DRAWN 2/2016 LOUCKS PLATE NO. 3016LOUCKS * PROJECT SITE 1.THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING PROPOSED BUILDINGS, SURFACE PAVEMENTS, UTILITIES, AND STORMWATER MANAGEMENT SYSTEMS. 2.THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS: 1.INSTALL VEHICLE TRACKING BMP (SUMMER 2023) 2.INSTALL INLET PROTECTION (SUMMER 2023) 3.INSTALL SILT FENCE AROUND SITE (SUMMER 2023) 4.CLEAR AND GRUB SITE (SUMMER 2023) 5.STRIP AND STOCKPILE TOPSOIL (SUMMER 2023) 6.REMOVE PAVEMENTS AND UTILITIES (SUMMER 2023) 7.ROUGH GRADE SITE (SUMMER 2023) 8.IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE (SUMMER 2023) 9.INSTALL UTILITIES (FALL 2023) 10.INSTALL BUILDING FOUNDATIONS (FALL 2023) 11.INSTALL CURB AND GUTTER (SPRING 2024) 12.INSTALL PAVEMENTS AND WALKS (SPRING 2024) 13.FINAL GRADE SITE (SPRING 2024) 14.REMOVE ACCUMULATED SEDIMENT FROM STORMWATER SYSTEMS (DATE) 15.SEED AND MULCH (SUMMER 2024) 16.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE, INLET PROTECTION, AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. 3.SITE DATA: DISTURBED AREA: 17.200 AC PRE-CONSTRUCTION IMPERVIOUS AREA: 0.000 AC POST-CONSTRUCTION IMPERVIOUS AREA: 9.415 AC GENERAL SOIL TYPE:SEE GEOTECHNICAL REPORT B2207371, DATED NOVEMBER 4, 2022, PROVIDED BY BRAUN INTERTEC HYDROLOGY INFORMATION: SEE HYDROLOGY REPORT PREPARED BY LOUCKS 4.EROSION AND SEDIMENT CONTROLS WERE DESIGNED TO EFFECTIVELY CONTROL STORMWATER RUNOFF WITHIN THE PROJECT AREAS. EROSION AND SEDIMENT CONTROL HAVE BEEN PROPOSED TO MINIMIZE CHANNEL EROSION AND SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS. FACTORS THAT WERE CONSIDERED INCLUDE PROPOSED IMPERVIOUS AREAS, SLOPE OF IMPERVIOUS SURFACES, STORMWATER INFRASTRUCTURE DISCHARGE POINTS, AND ANNUAL AVERAGE PRECIPITATION DATA FOR THE PROJECT AREA. 5.CARVER COUNTY RECEIVES AN AVERAGE OF 31 INCHES OF PRECIPITATION PER YEAR. THE FOLLOWING CARVER COUNTY 24-HOUR STORM EVENTS ARE BASED ON ATLAS 14 RAINFALL DATA: 2-YR 2.87 INCHES 10-YR 4.27 INCHES 100-YR 7.41 INCHES 6.SEE "EXHIBIT: PROPOSED DRAINAGE AREAS" FOR SITE MAP WITH DRAINAGE AREA BOUNDARIES. 7.THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. 8.CONTRACTOR SHALL INSTALL RAIN GAUGE ON SITE. 9.GROUNDWATER & DEWATERING A.REFER TO THE GEOTECHNICAL REPORT BY BRAUN INTERTEC FOR INFORMATION INCLUDING BUT NOT LIMITED TO GROUNDWATER CONDITIONS AND RECOMMENDATIONS FOR EXCAVATION DEWATERING. B.FOLLOW LOCAL, STATE, AND FEDERAL REGULATIONS FOR GROUNDWATER PUMPING AND OBTAIN ALL NECESSARY PERMITS. A WATER USE PERMIT FROM THE DNR IS REQUIRED WHEN WITHDRAWING MORE THAN 10,000 GALLONS OF WATER PER DAY OR 1 MILLION GALLONS PER YEAR. C.DISPERSE DISCHARGE USING APPROPRIATE ENERGY DISSIPATION MEASURES. D.BMPS SHALL BE USED TO PREVENT TURBID OR SEDIMENT LADEN WATERS FROM LEAVING SITE. E.DEWATERING SHALL NOT CAUSE NUISANCE CONDITIONS INCLUDING BUT NOT LIMITED TO EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR INUNDATION OF WETLANDS THAT CAUSES SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND. 10.REFER TO THE GEOTECHNICAL REPORT PREPARED BY BRAUN INTERTEC FOR INFORMATION AND RECOMMENDATIONS RELATED TO SOIL CONTAMINATION. 11.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) OR MORE DAYS SHALL BE STABILIZED BY SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT CONTROL MEASURE. 12.ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. 13.ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE STABILIZED. 14.SOIL COMPACTION SHALL BE MINIMIZED DURING CONSTRUCTION. 15.TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEPMT EX: CLEAN AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES. 16.SEDIMENT CONTROL PRACTICES SHALL BE INSTALLED ON ALL DOWNGRADIENT PERIMETERS AND UPGRADIENT OF ANY BUFFER ZONES. 17.SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMP'S. 18.SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 19.NO VEHICLE WASHING ALLOWED ON SITE. 20.NO ENGINE DEGREASING IS ALLOWED ON SITE. 21.THE OWNER IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR IS RESPONSIBLE FOR COMPLIANCE WITH SECTIONS 3, 4, 6-22, 24 AND APPLICABLE REQUIREMENTS FOR CONSTRUCTION ACTIVITY IN SECTION 23. 22.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER THE FOLLOWING CONDITIONS HAVE BEEN MET: A.PERMIT TERMINATION CONDITIONS, PER NPDES PERMIT SECTION 13.1 HAVE BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE. A.A.PERMANENT UNIFORM PERENNIAL VEGETATIVE COVER MUST BE ESTABLISHED AT 70% DENSITY OF ITS EXPECTED FINAL GROWTH. A.B.THE PERMANENT STORMWATER TREATMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS, AND IS OPERATING AS DESIGNED. A.C.ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED. A.D.CLEAN OUT SEDIMENT FROM CONVEYANCE SYSTEMS AND PERMANENT STORMWATER TREATMENT SYSTEMS (RETURN TO DESIGN CAPACITY). 23. INSPECTIONS A.INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED. B.EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24 HOUR RAIN EVENT. C.STABILIZED AREAS: ONCE EVERY 30 DAYS D.FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION. E.INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S) CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR PERIOD. F.OBSERVE ANY DISCHARGE OCCURRING ONSITE AND DOCUMENT CORRECTIVE ACTIONS TAKEN. DISCHARGE SHOULD BE DESCRIBED AND PHOTOGRAPHED. 24. MINIMUM MAINTENANCE A.ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY OR AS SOON AS FIELD CONDITIONS ALLOW. B.REPAIR, REPLACE, OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1 2 THE HEIGHT OF THE DEVICE. C.SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME. D.SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN CALENDAR DAYS OF DISCOVERY. E.CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITHIN (1)ONE CALENDAR DAY. F.PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS GREATER THAN 12" IN 24 HOURS. 25.THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL CONTROL OF THE SITE. 26.OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION. 27.SWPPP MUST BE AMENDED WHEN: A.THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE B.INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS. C.THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT. 28.CONCRETE WASHOUT AREA A.THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, CONCRETE, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS SHALL BE PROPERLY CONTAINED AND DISPOSED OF. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND USING APPROVED METHODS OF CONTAINMENT SUCH AS PRE-FABRICATED WASHOUT CONTAINERS, CONCRETE WASHOUT TOTE, READY MIX TRUCKS WITH SELF-CONTAINED CHUTE CLEANOUT, ETC. B.ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY. 22.IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER. 23.PIPE OULTETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. 24.FINAL STABILIZATION FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACVTIVITIES HAVE BEEN COMPLETED AND THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN CAPACITY. 25.RESPONSIBILITIES A.THE OWNER MUST IDENTIFY A PERSON WHO WILL OVERSEE THE SWPPP IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE: CONTACT:TBD COMPANY:TBD PHONE: TBD B.THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM: CONTACT:TBD COMPANY: TBD PHONE: TBD 33.THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR AS-BUILT DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS. 34.EROSION CONTROL DEVICES CANNOT BE REMOVED UNTIL THE WATERSHED DISTRICT HAS DETERMINED THE SITE HAS BEEN PERMANENTLY RESTABALIZED AND SHALL BE REMOVED WITHIN 30 DAYS THEREAFTER.