Loading...
CAS-09_PIONEER PASS - FILE 1 OF 2/ tt � "1'1 e i �• Total upland area (excluding wetlands, bluffs, park) 61.33 cc MBaseline canopy coverage 11.7% or 7.20 cc. 0 Minimum canopy coverage allowed 25% or 15.30 cc. 0 N Proposed tree preservation 10.2% or 6.28 cc J !� L ! 4 t F' Total reforestation area (15.30— 7.20 cc.) Required canopy coverage (one tree provides 1,089 SF of canopy) TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT Ln NDifference in canopy coverage 0.92 cc. SITE DATA TOTAL NO. OF SIGNIFICANT TREES (6" AND GREATER) Multiplier 1.2 TOTAL NO. OF SIGNIFICANT TREES SAVED 3 Total replacement 1.10 cc. or 47,916 SF TOTAL NO. OF SIGNIFICANT TREES REMOVED LO TOTAL NO. OF SIGNIFICANT TREES REMOVED (BY OTHERS) Total number of trees to be planted 44 trees N 8.10 ac or 352,836 SF 324 trees 324+44=368 TREES 692 561 81 % 105 15% 26 4% TLOT _ � f z" 4 �- CUTLOT F f j! 4\ l LEGEND EXISTING TREE SAVED EXISTING TREE REMOVED EXISTING TREE REMOVED BY OTHERS TREE CANOPY AREA SAVED (INCLUDES OUTLOT D) TREE CANOPY AREA REMOVED OUTLOT B CITY OF CHANHASSEN RECEIVED FF8 1 5 2006 CHANHASSEN PLANNING DEP I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA, DATED THIS 16TH DAY OF JANUARY , 2006. JAMES STURM, ASLA REGISTRATION NUMBER 18380 BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY — N. SIDE OF PIONEER TRAIL — ELEV.= 910,34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM Z C) NEW SCALE IN FEET 0 100 200 300 1 inch = 100 feet � cn W N �- adCn N p N M W LLJ z N cc_LJ Z W rn ^ N � m L L-j z wZ � N O W wcc O U Z 5 0 Z i i Q � s m m 0 rM a �oL0 z 0 11��,, I/—' 0 Di 0 c ZZ F+� w W Oy � 0 N J W ' 0 PL4 w Z Z W I . Y Q J z ao C O Ld a zo 0-4 = Z W w VL = U 'wr�- ^ E z OO ..� WU O O W m a z Z W Y FFF��iii A co O N a' a DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996 TP PROJECT NO. 21996 TP1 r \ _ J _ rR BLUE 1CREEK �^ OVERLAY DISTRICTA = DELINEATED WETLAND BY gRAHAM ENVIRONMENTAL �ERMIICE 2D' BC�OD CRADING,_LIMIT LINE - 7- 40' BCOD BUILDING SETBACK UMIT� = rt K h, r t t { 1.`tj .Aitip •-� F� kpN� �� � �;r •� t N 4 1 r, It - it Y t•ii L n qY , x L a ' '�. y. .1 l-�, fia _ 3 1 / 20' BCOD GRA ING LIMIT L INpS 0 BCOD BUILDING, . . I :III .�J,II' yy � � , • , - t.✓/ J. P _.ill® i� ■ ® _ - i �_ , —� L-- _ _ SEC. 27 SEC. 26 i. 116, R. 23 VICINITY MAP NO SCALE Z � SCALE IN FEET 0 100 200 300 iiia 1 inch = 100 feet cn n n .T� C/) 4 mLL C6 N v t � p n 2 W O W i Z w G tT N p, z L6I 3 < mw F n EE z cc QJ m m Q E Qn � Wo Z z Z OwJ Q � J ^ F�1 w W W <c Z z �z J O w � (N 114 w w � U) a x O p FTI w E-4 U Z z oLij oU xm cr Y �1 00 0 DRAWN BY RSS DATE 11/15/05 REVISIONS 11/15/05—REV. CONCEPT CAD FILE 21996CPEXH PROJECT NO. 21996 FILE NO. DRAWER SHEET 1 OF 1 _ tlJ.OS3NNIM m 'mNI�'NOJ30HgiI 0 � M1 SLN3 Aim 5a33N m / Sa3NNYId �` -°- 133HS 3'IIU OUl IpiH °H sawed )UH3dO-8d NOSN3,L3d € ni z a : ;=a 9 Id W . a g I CSo a 8 to C7 a d '• a O0 e H LLW F-� � 2 : sPE 7- 4Eole / o co Q f�. •Ia { /.. �) 3u//'i i9;i?sEak Z W x Z F•may J (1 3; �� 's ® — ' -:i4 O 4- NN F�--I Zi /-� J 1� 12, w / U y E- j E�_ O� c� — 4gG9 W ' l m _- ---- eo N �a —�__ ____' ___ •_.. __._tom_ �g_c_________.- --- $� 'rea S�gs�.l Yt Ph, i will, N ' l } I 'k a�}Yi \.i $50xmy / S83tlM3 MI / SId dNI 'N01310H 710 SNOLLIONO3 ONLISM - �u1 IN b s8wer _ UHNaOad NOMI.41.-4 /Wiz_ � ,,. SUM�}S1A / ^ '¥H' sower ` - - zf/ 2 (§ ~ | 2 2 Am \ ®� t �m i $ ¥, loll ME me ! - ' E � r &ZE, y/ A ,. �� • ~ x �` ®x — %� «� z x / , « � � , �� � y �• l4 \ ..r.,^ .�,•9„ '°" tlJ.09NNIR - �N[ 'NOlUON ll'Oa S80ANMI5 / SY]Y[IN3 / 58YWtlld Ind ANtlNIRI'I3Nd � : oC aul piH a sawed Ayaaaoaa~NOS2I3L3d 5 g 1 2 M HN 89$$^88R _ y9 '92 IT 8So £<'� XMXdL a3 JU ji ::� 9Xa }y ee s9999X X� ; 'aaI S . 3 YY£iii`i is9>< eX �•. •' � w � YFRXEi�. s} i� _}z e n [ $ RyZ. oz $ X . 1S19LW5 CSZLC: r6' - - d � yb �/ • �ll� .Y —_ i '�. Ate, Np d O b All CN %ol r \\.� n� p / ✓ ` �i \ A ('r i '_.s _. ••R_"t0. rY _ S it +� � nj. � �/x 'o'' -1R �Sx _n3 <i ,� 1• %"� �f �J Z ali O03aLS o_ ��tT �9 Ns Y3 .Y✓./..>!q. �,. q. •R, 7tl S'\�'QI rl N}� xJ 1 33L1S a r n M r> O' ¢a r \ 1� 1 — ..sv.saaoY zs on9 .., e-.,,o ,.. __ / tl10S3NNIY{ 'OONI 'NOJAOH n-a a m S o 34af5 / SLlaxCx3R/ Sa3mrtd NOI,LtlWHOANI ails e o �u� '11!H •a saweP - _ �a2,dOdd NosaaJ.3a a Fr i g. :f fi4 .ems Q Cs X I i mpgIT 5 I _ a 5�y �eq ti at <r j ,I H Ali ch �j 1 8 N TQ o /,_ <m\na „ \@ I.,)• 'A¥H2@ar-G� !® ! � I lipƒ Gm my me ■: | 'NOIMOH 7{ 4 Sao, 3,1b3 / Sa3�H3 / 5a3rNY,d (\ J SIftlL90 'IONiN00 1N3Y/I03S � NOISON34p a I LE �E f+ ��! II1H .a Sa11Jel _ _ - — C.LiI8d021dMNOS2i3,13d 3 ci' JI (I) . 11' - iI 1J1J iilli f! `!� i 1 e j; ,, 1, it ,I.1 Hill e=o =.. , li!;i Iit! _pga. ifit i{ill` ' -` 7 11 el• t .Y-`p i!N,{ iE dill t11r{ 1 ii 1`i l k d• l bI I aV IIj'liip !;J t fii ,1 ii ill I°I IJj! i IIh' 1' ,Ij 11 jjlf I'(i!t jl it ail if 11'I' i i 1{ t{ I !' I ' ii:313eflab �Ir{ jIi l ,'t IjtE, ! r ti 1,1 ,I G I! e! , ! 1111 �(IIGi 11{i iil li ,ai Lift 1 rli ! n �I,1 Ifl tf:' jJ I ! • ,j'. ,•t +, II. L J IJE!I! iti (;t PI I I 11i'l ll!i Jill Itl1l },i Il'i g Hill G', � ;! " � a;i r I a� .•, v �: !r iJl ,1 ,,! f: , (i, I1E}! f� iiil ill. , u 10 t l x'tIIl1E ,ii ' -�9 ��ii i }t !i jtp i!i� , !i tfi I in L J eba €Pif'P 1hill ! li 1t, j ;al if Jill + Ii i,ll JE ,, I ; Ji[y I; .I t Gj ! , ;r i, {I 1,. •.i !i iry' , it 1tl �,I i e E. 1{I{' V'I! IIIi ili �i Q vv $ban �,�� ii �,I •It i�i. iG �I iIi�lt n ilt e I,EI H ii ill a ,t :! {� iliiit „1 fl lilt if hE s s ii 1 J ! ti }t ii t Ill t1i Gi l 9= 1 fit ji ! E1i�I i!i fly„ Eli+,f 3° 3 — 3� 1 G';J it fy E i $ E I Iit Ij ! E{I(�lil ,fill! Y i' IN ; i1i 1 ,• •,, 'l S F t - . ; I�, i g l t s 11i1I'ljriJiiiF €! i I i i {11i'1 itil ii i(Iiliij.il!!�i jij ; '.il iil+ li $iEI ti if fill lj tf'r!' t i111ni(+� J 1 E Ih1 i ti tj 1 t!' I if; ; GIl i i lJ,ili iI 1 ! 1 i� I, it 1 ij JJ ' ' r•' i i� �-` E It! iJ{�1�I!tlli !ti{ !i i 1� 11 l�!�ilitl�ii!!i !11 �i �itl r iill! j!] iiiii iil �' j� ii� I i� E i i !E fill ei i E�E � et EI ,EE "5 999 J!iil i9� is tt'' ff�� p 9i .li lit Eis! EI ljEi 1 !' ui ' 1'ii I ; e- ' ' i !� - & i ' 1'a j: 3v i;s j r :Z,'' t:i :: I:i if: I'c {i i I 'i •" �1� i i ; lit d E ' d r € I' �: 7,€,i yE jNJ E-':'1€I71:.G 'iI !:tI4 e. E6Id€. 1-1{E E E•-! E0;[a••41:1!i.1 il:1 i:i.1 r�ili Ill It€ 3,iI a}'EY .111i 1 1 i Es1i ErJ ltli i... i.... IE I E Ii I l E Et I... E... I...1... i... I... , �IIE i d u n it iB AGE k t tli09NNIE1 — ON n-vAim �u tlar \ ➢OH aft V10S3NNHf — 'ONI�•NOIMOH 71'O y � tMd •IOHJ.NOJ NOISOM 8 £ eg w `f SLRfIY>d — lawNwaa •`.INIGVHD MYNINI73Nd Yr Sul IIIH .a sewer - acasaoaa rtosHalaa PMR ��o, .\ J at s3uB3a xm , t f ' Sbq 1 sg 4 a6`bs awl $'!a N 6* x e z� J 9�c[ffi Sz -0177 unlpcmA. - _ ,, 04 \ — SA H �t14 i4 r %+g xczms c t �tl $1N3H1531N1 Ys^— ..` .._ tl10SiNNt11 - "CHI 'NOLiIOH . �e 9pt3W6/SM33aN0/Sa3Eatd mnd mouvAN3m m ANtlNmnamad $ gin y1 zli gel II!H I sawed Aaaaoua MOSS313d 01 \\ \\ 1 > _ ox OWN i.. ni� r .-✓Fz'¢.�..�ti x'°'✓`^.,., ; # rx �-d.: i i m r yy ✓ all- 14 000 if ,a z yr� <<x 4 lads i l t ` VA 7 FINK ✓Q1 HOW off 3 iOff r mow! / L ..�.., stu i>Na / 5a3Brixl / 5a3elYW I ) tl1053NNIA — 'mNl 'NOIHOH il'O °m a Ntl'Id AJ.I7I1I7 A21tlN1AI73Nd -oul "IH .a SOW ,C,L213d021d* .mm.„ «ra,� s®.�_ ��• vlOSiNfiYl( - �qI '"O"Ox Tl11 ya i SMAmA / Sa3 om / ww" I- L11 Mnd 3dVOSUW I AHVYUYRi3a i i og 9u) '1IH •a sower AL2i3dOZ1d NOSZIHY.ad a as _� l h RHIS 5 s z V . y a A 1, x C a a e a � l9az ppY m s i io s r f w 0 rY ° �y s 'ems y.t tl Y 3I aaip'i T aaEE- ills � �- a1Y SA"SaP a"Y Is, 1a F 5• Y^ I a) FF.lE i- 9 t�',_, iE� Tplaa3 olio �'� •Ya 3 �;gaa j� °fie _ ~ itl OS?NNNI - �NI�'NOJ.NOH ZI'O � �- Stl0.lAlY15 / SN3MYJp / Sa3avroW SNtlJ3U C s o r y u! II!H A.LBflYIOBd NOSiI3.L3Y# JK rya af� s4 x Ep"n Pi' g tbi a3a TYTa YFz, ;M 1a 1ii2s T L ?I 1y i?i a h3:t S e v1 Ei i y _ I d #is ;aq �3� n • 1 ! I � 13gF isei Ia ! F `ooa®DIaq - is ai.d Fla �€ a # 5 i `E � I€ Ssrxi E-` es }� y�a4ipiFa a?�iir9 /y irnt5a�a aidd E9•a_ � kf a iSS t + � 8 S31dga q# fS6si4'I A!_# rE � �v qyyLFea'+ n39 F a 1 I . 33i. #d1 91 €FF7l,K5111 ; jaj'•pg aa3 gill 137 1' 1aie;./ ; aat•�yDa 3 I ,�- I;F`11a a §s� 33E :241`141Qs, iIii?saGi.€e€°ye S �=t$"f�''hx ?E.a 1i34i iq 3t g 9ada 9 ' a3 Fd. r1Eda 1a a° at jh a Iha s a PP€�3- pp y 1?- avv <s 1`I 3 - 3'3a d e s 9k?:. yy# a 1 aN la 1-# YujF "fin . # :agg FL-1 _� a . s ?'S atl�5i ps S 1y.a F' Fa qa#` q.3x Sa Z. E ! i gg _ w -•33 # h1 F gE F€ d.4 a �. !Ss? y!p E�$3' R,le sv 9? aF dill 1� t ! 1?aF 3 #d s?Q lyl# k;�. E d gll•F 31€ahq q#s a _ �qq n 9.:1 ' $ NY- Si-- 1q# ai?;jd., diiqq a €? # y ti va E•n g vaa_q a65q F 13cS!F- d"+a# q.€?as-- #9s sa�- 1 asG;9G�a 11 q 1q'a,1a 3i=E i #E # a. �d Y aa?ss q` F F laq , a 3 Q 3# y..aJ#;iy : ; #rF ..F b• 3 �t4_: asF_Qa 3i '1attfl_•i1'`sl Sts ._fig a F €-€€ # 3 al,; _ i• 7't �€ Q 3? s-; q$,• i`€, d a � fir. Essd s . d1 a= 7 Eaa FxeQ-#x.; a 'e1 t :-'g�9 IiC 14 y 1 a 3€ § Q €. . F:..I €E � I -Idaa :;3° � 3pis€gpdsa€ I � Fla F�[�3 d$q§Ie' o�y xLingg311-f€ �- s � _: dfa to I E €',T� 1�� .1.d..Ey "Fs _ ?Y s::6:i ?l;Eh 2rE El i = SiP?t eii# a?i:i:iF1 ON 0. Q a3 "a eA a:sa i I f; V # s F- s - -- - - it 4q. ,._ t . E a - EE I 3q I €- k 3 q. f € y g "�F#C YiS� :li•�� II iI x . 11 t 0 U N V,LOSiNHIIf m[a•�'NQINOH 71'Q NV'Id 70IM03 NOESON3 8 '90VNEVNO !)MGVNJ AHVNIPU'Md s PE-3 •.7u� 'I��H •a _ ' �� saver _ d.I.uadoua NosrP ad x O � r 1 Dula 9f5 I I - a e8d `ask., fib._' a =� \ 1 \I ! �AM= 1 ' PP , . ��N,sINV y NNN Nm yp� i ' e Y;cl 3Q�3 r 1 fa .m@@r 2qs°� GGbIZZC SZ ON Gld I ppg Y'YYe a �QES: RP SN33NF7N3 / SONNY/ld�NPid xwxoi+ a afIS/ 70lISN0OISOtPd 8C v.LOSZKNM = 2SMINd it9 SsawB - - g x.Luaaoa s '969 § NUS 14 - sE€s` §18 Y5 VIM 3 tl f\ $i Sy�BE gY SE'� C H ir. RE 10. ;L� n kWI �.nm., ..amn>d ,••• '•••n••••�'•� •• SNRlNtxS / S+IDrg1O / su3ra/nd tl1053NNIIl — ONI 'NOLHOH TI'0 NY'Id TOlL4NO3 NOISOH3 8 n k>3 8 — gal II!H 8 Saw r 3OVNItlHO OHIOyus dHVNHH73Hd A_ Amaaoaa NOIWIXMd H: § 5 � W E dYE63 :E98E €€€ fffs �` f R f ffAK CIO: iy i I leg77Aa F4 o E 6 o �S 005 ?ab fix fffi see i w `efA��o • • � • y,iii*a i�ve 'di •b� 4 e,,,»� R sa0e3wi5 / SN3Fa9n3 / S7;11-li IIL Y.LOS3NNO[ — 'CHI 'NOLIIOH 2I"O NYId NOLLYAEMS MZU kHVNIKrMd i <g � y: �� k gel IIIH 'a sawed AMHd011d �HOSHUad i Cd Y S yy3 t e n 3 fr 3 € 8 E p D , i =x p 90 r� oe8 �x ANC) m Z 8nA�..a t51=1 0 0 mZ y>ro Uo a to II In Zdl—IdL l0 1083 ZIS—LIS Zdd—Idd IOX3 IS1 U_ u 3y SNOVOAS ADO N NI IW Wn1V0 SS MbN-f,If ='133 3NI3 M; H 03S3dOed NO 3NI1 1163dOdd H1005 9 1N3n0NON M18 NOIV dOl ¢9 INA _r0 EP 2"trN Vf O:n - "m - IN& a33N01d AO MIS N - AVM3n IM0 30 1S" 310d d 11f 1S1 30 �`A IUll S 3AI 'd tl -1O r18 MRRROMB SIIV130 NVId 3dVJSONV-1 ANVNIYIIl38d NVId-k"'Ufl k8VNiv4n3?Jd NVId NOLLVA83S321d 332LL ANYNIW1138d NVId 10 UN00 NOIS083 A '30VNIV80 'ONIOVLIO A8VNIH1138d SlIV130 10&N00 1N3Y11(13S V NOIS083 NOLlVN603NI 31IS 1VId ANVNINII3ad SNOLLIQN00 ONLLSIX3 133HS 311LL MYM 1dll 9NINN'fld N3SSVHNVH0 SON E 0 833 03A1303H N3SSVHNVHZ) 30 A110 _:nn3130 39 01 1130N31'. `:iNtl3l3O 3B OL NLLVINT=: iX - 3R09 NIINB - f NbO 30 in d tfl3NYJN3 ] .G (0) 691t-996-(ZS6) NEStlNNtlIIJ 1p A110 _ tl33NV1 NNIN- NI* SHn01A >Il- - 3NH30 lNON A10 ON) m".-$96-(ZS6) tl1053NNIW-'JNI 'NOliHJH 60 - 1gV9NillllN NON a3d]1L30 (0) 0369-069-(Z19) ON) H09-068-(ZS6) ']NI 'TIN 'tl S3NVf - V d 'n31p] 9 l3IM K33NCIN3 1J3f@Id 0.) ocss-s9n-V19) JO Tm 'a s3Ntlr - ONYOODD A3N5 35ur1NMTMAI 1J]'0Nd (n) lar9-ws-([19) JNI 'nw n s3Nar - a3¢reu 93ltl-r.ur1N3s3aa3n 1�3,'oaa 0017L-996 (ZS6) XVJ LZ8L-986 (ZS6) 3NOHd -�-VOSS V10SINNIN '3-nlA] iv3 'OOL :BIAS '1Nf100 300I2i8N3>1 0980Z VILOSINNIW - 'ONI `NOLLMOH -M -G N0i SLLISIIIXg LLVZd kHV14IW1rM1d dlOS3NNIW 'N3SSV'HNdHO .Zjacf Id NOSNHZHd IVId 3Hl NO 031VJIONI 3SMH3H10 SS33Nn 'S3NIl 101 9V3d ONV S3Nn 133 5 ONINUrOV ONr H10W NI 1333 Ol ONV 'S3N11 101 305 9NINIMaV ONV H1OM NI 133d S ON13H --T-- II II 9+I II Ins II 9rou r slx3rv3sr3 Auwn axr �VNrxroHGao Im00r-W�l d'dW 3SVHd 3 vm ON dvw Ills U.1 _.,.._ � ......�,....�_. T153U3d 38udT3USt 39LLSU3 9' I 3 All WU UtlN 9 =T313 ® 4Utl3NM, UWII3 _ -. - 3NIl M/tl KOdrtld N3NAUYW , 9lI08 lqS 9 9 Hlws ® 1H3W w.1 N/A WNIY ,31 -z9 WH `JHLLSrs3 �I H3Y33 rydU15 `, ® k_ 5^flITr08 9111WI ' WfLLM Be UAYN ttN =1313 - 1 M,3 u 1 Ild X, H 3U5 sN - lX)"i 0 X 15ld 3Y:d j3Y.3, NtI.Ell O CNil13M U3l Y3N l3U 'JH1SIk3 �.i tl3Mta lil S 3Jtl3 Htll^S 3dC1Rd5fp8�e' NFWtl91YM 9NLL9=]� ...... R'Iiw'1 �W!3f NEV11fl IM 3�NjN(5 13tvti 9NI151F3 a'yilwU W1LLSid- - URTM 3pajd11^a PbHa$v 9NLLSY 3 - u �---�- ) t _ a•e .................... v.....� • ...q=...tea / t id.3.. 11 7 d "''A\ 11 Ile / / // •i ! 'll `\`\ / / I 1 ! I � Q II FiTFt 1 ) 1 _..; --------_-- 1, Ir 1, It r Q \\ / loll 1 +. / I I \\ _\ +\ • / o r I % li /� ,,F r{ r r r!• p• I• t, I r ! r (r I�r (N•, I O i r Y r i t r r / j // \ I 1 r v i _ L_ i (� .. / i II � i i }'�1 ! !, I;1 �d•1 1 I ! �1 �! �-rti Y�l, / \ / � 1 i I i :•,f; F; F� r ;.�i Fr (r Ir Fr Fr it 6r lQ F{/�!R 1 \ Qg' O \ I 1 i /. / \I i i Fr F; 1; 1; 1; 1; Lr 1, I�ll�•�r�i. .L.I'It �g )yviO I / it (OI / ! O 64 Do I 1 Cl - -- — — — --- __ _ _ O nr-i--- .. Vd� F C •'D'On .rw n, n f5.r. rvrn1 _ it 1 I Ir 1'j1 1 I I I I I I I I I I I I I I I __ aid r �n bin_-3nlrrn 1aN --_ s� ao H Az m=Fron �._0 s�A��jroL�xyy x L �nN s Ell 0 9 17 C. z =3 BCD Pull COP) wfl� LP $X N Z1 (n Cl) 1Vld 3W NO WOOS SV 'S3Nn 101 0Y3d OW S3NIl AVM 30 1N918 ONINWOY 031VOIONI MMN3Wo SS31Nn WON NI 1333 OI 9NI3o ONV S3Ml 101 MIS MlJ fotl '031r]IONI 3SiNN3Hl0 5831Nn 'WON NI 133,1 S ON139 1 33rJ5 OI JON I lilir _A—`—�— Snm NMON 3Nr SJN3H3VJ AlnUn ONV 39VNNM0 1081NOD S53OOtl N 133J SZ dr3d 1334 9 (133N15) 3O6 133J S (3)VdV0 ON, MMH) MM 1333 9Z 1N0113 AMN135 Pill SMJV0135 ONYX 306 1331 06 ONIOnIJNI 101 Nil WA NJV813S 1V WON 101 'NIN 1331 06 SpVeim ONVA 306 ONIOn1JN1 X Ymm 1V WON Im 'NIN 1333 001 101113148OJ NOJ IOVN135 1V WON iM Win iMA 99 N vwm 1V WON Im'N1n is 001'6 v3Nr 101 'NIN 'J'S OOC'SI V 1011110 WHIM V3W ONOd 0350d0Nd 'J'S 061'91 V3Mv 101 30vm3 w 1331 WON H1OIM 101 mvd3AV VIVO 53NOV YL'OZl 1V101 53NJV ♦Z'Y H lOjlfq - ANVd- 53N0V CL'OZ 0 8 J '3 'V 101 M - Al"'ll 31ON6 - SH3H10- 53NJV Le'6 0 1 J '6 1011n0 - 11431Mil 3UMW- SNTIZ'8 1Od-0 O i J 'B S - SOVONNOIS11US11n, 53NJV Z9'L 0S (5NIDRIAD AB) 133MS - O OdAll,0dd- 538JB'LY SOd A1Nn(J 91411Sp- 53NJV 69'9Z M'O'N Allml 3DN6- S3dOV IL OZ1 101 SSO80 3rnr/'n'0 C"1 V 0 'N 1O1f10-TK A1NMDZ:r 0d0� \O $11Nn ONf113410 A16130 5101 zv A1INVd 3TJN6- 101 3saY E2 aHvaN 'yyo dl 'el°savulp glunOJ +aveJ N lsad ela Vl Pue P" 1 'AZ no9aa5 !° .sayaenp 1seaVVo Wl to IIeN gsaM C2 aeuay Y3.90N 9l1 dNSLu 1 '9y uoOaaS to a91 to raven D lsaMgln°S ay1 451100 ❑ I ; / I v ....vm -n 'Llliii wily �-ni L_i -v iln v�ii In viva_ ininn' L �iC v i wv v-iwcJlvv ii�vC iivl v. 00909Z0SZ ON Old OZIZ9ZOTZ 'ON Old NOOVIOOSSv 3100 CIO OJn01SNOJ Z1 MN 1411 / M33140 31n1e _ M.100.69N MOM - M„OO,Z Lo68N OY'ZZ£t / 1 , 6LZ 3OV '691M000 did 143143SV3 AVMs l oDz 1 a to Il nO A�'4 i T' /002. L�6.d0°O Y �31V8.1 833NO1d5 ° s aS�`p . bt 'ON 'HYS-3-" 6 . n� „ � - 90�p 69'9tC 66 Z5� � CB'lBZiq 2CA �� -�'M�I�.�w "3- I �\ d cl r O 4 m xxo y a (� 6Z �°� a d imin0 r1pVd �p �N gZ "m) 0 ��� bZ SZ - �rN D �� — N; m 91 u` og o Z! / - CJ/ V TC c� l: e imino e C UzosZ ON Old Jll V10 3NN1n ION OOfOCZO'SZ ON Old dl S311d3dONd %03 VN7� I, i�z, SL bL� 9l J Ll 4L _ LZz — - _ - �L I £L OZ 8l6L �zl I Oz -I�L` Zl LL. 6l, LZ I— OL 0 1£Z Zz OOWLZO'SZ ON OW Z1nH1 NM W f / \ll /l-, �[[l1 o iol no % OZl,OLZA9Z ONHOd 9 Ibl'F E l "- H ibuno 6 6 \ SZl/ L SL 9Z' 1\19 7 9 bL Lz S S �L 8z e 6z b _ \ LL oL 02 J 6 LC LZ _z J F L L-- I e i6ano OOYLZZO'SZ ON 8lf SIOI VO 00£4'ZOSZ Jv Oid JT $1N3Y11531NI tllpollr CMNNVM 'Avid 3M NO NMOHS SV 'SIMI 101 yV3d eNV 53NI1 AVM 30 IMIS 9NINNNOV '03LVOIONI 3SMS3H10 SS3lNn 'HAOM NI 1333 01 ON138 ONV 'S3Nn 101 AUG 9NINKNOV 'aaVJ10Nl 3SM83HIO SS31Nn 'H GM NI 1331 S ON13e j 37VDS Ol AON f II II II 1333 SZ 8V38 AM S (IMUS) 305 AM 6 (Mvdv0 UNV MWH) Mrs AM SZ 1NON3 5t5VUl3S MnMINlc3 SWJVB135 OBVA 305 1333 O6 ONgnIJNI 101 83N80J 803 %1VMM 1V MUM 101 'NIM 1333 0 6 S8JV81m 08VA 306 ONQnIJNI )IJV8IZ 1V MUM IM 'NIN 1333 MI 101 ON80J 803 1 V&M 1V MOM 101'NIM AM S8 J V8IM 1V MOM Im'N1M I OOL'6 Y V IM 'NIN JS O 'st V 1011M NIMM V38V GWd 03SOd Nd '3'S 061'Sl V38V 101 MVN3 v 1333 90'I6 N1uM 101 MV83 v S38JY tt'OZ1 1V101 S383V KY H 10-ILM - 88Vd- 9380V CL'OZ O i 3 '3 V lomm - AIIM3 31:1Nt5 - Stl3M0- S383V L6'6 0 4 J 'e IOMM - 1N3 -I3 M MMn 53tpv li'9 0 A J 'B Y 133tl15 - SOV08 N05M58115 p35od SIO m dd- S38JV Z9'1 (S83M0 AS) 133N1S - OVOH A11, 03SOd08d- S380V K Lt SOV08 AINr= ONUSI%3- M'0'8 S380V 65'2Z AlIMV3 310N5- 101 S380V ILOZI SSOM 38JV/'n'a P'1 \` /0 v O'S lOS1llqMIn ONT3M0-UVOH WHWO-S5 ) A15N30 S101 Z8 All"A 310N5- V10ff-AS 101 10NANOJ SS3O3V e ioiino '3S 9FZ'Z ='Juva7Y 3s OI4z = 9 T001P 1PPOS 3S 06Z L = yom9alPpoS AS 9yl'Z = Aao6al 3S P", n -Ad—, 35 Yffi'1 = sa16—tO AS O Z 35 0517 = P�wuoO 35 9C9'I = IoryoloO 03MO11V SMN83dMl %00'9£ = 3S al = ayoadosaVJ 03SOd dd SMN83dMl Y9161 =JS 061'S1/3S 116Z Z�7 = iowaoae SMNtl3dMl AS 10 '3'S 116'Z —(MO8 Ol AVM3AlW Mv) 3S 5 ZIZ7 = II anVxWe 9c9 + "(1NI8d1003 ONlallne 391MAV) 3S WZZ 8 'elacauuq 'AlvnoO AwaO '1caM S2 l RB -H 1- 9q drysvavoy •ly uPNa,e la �aVa91 1d,..N aVl to ... t.M3 ayl Pua gcaM E2 a8vc8 YYON 911 di4suol gy uoIWPS to .aVaPB ]sar4iioN aVl to AaNan6 1saMVlnvS a41 �JSiU-,CTB'id✓S8d d� �dr\a o` E 3� N NaVW�� dew dnoo nios _ dnoao iios a, I d` h sosn _ dnoa ins `�:� '�' i.�i .'•. ;` ,+.� i - - N A UD voa NO n iV dnoao 110S a/Y,� ,.r. ` �.`.. I dnoao gibs .e dnoao dnoao dnoao I I nios nios / / — a/e- I {; \ l� A n d oao n i I os lod ( Icco I dnoao ` K.- ".�„ t •' � — nios � ,�.-'--d� �% . -► r 1 7-11-7 / I I 43NNVOS ZIS 966LZ ON iD3PO8d IS966LZ 31I3 OVO N 2IV WHON38 s"OIc/z 30VNIVW] 43SOdO8d �"—'= 30dNlb�la 9NIlSIX3 �_ 931YO 31v0 mx o � :z >cn I`o 0 .. x z '© H�0� cn a 9 N M .—.; V I a�3 1) m P N C cn ££yy \ Rrg� N -Iv99 c e4$S � m� �� O gC N o;v O z 00 y ;, y VJ LTJ 00 M x tv ox �pI Fz z 0N0 m z°b L N Z MM O a�J O Pa 10 C7 C oy M a -3 NILvf bti MYF: L'yil9=-^.313 03NIMN3130 m 01 03NIMX303801 3NIl M" O360doMd NO 3NI1 .LL93d Md (0) 9f0<-96Z-(159) HiMS 0 tN3.WIOM M/N Milli, 3.i1 J W9 (0) G6U-S.9-(IS9) NO1tl0 88 01VN wo t6 =A313 - IIYMI M33NOH (0) 6911-6z-(LS6) 30 306 'N - ! VM311MO 30 iS3N 310d (0) aal-m-(LSO tl Od 1$l 3^ 330d N!!'/$ 3"l,, '� , .;Y Iyc (N) 03N9-805-(Ll9) 5MR—HH01Mcro (0) Y599-O6B-(256) CC9.-S96jLI9) (W) t9.9�05�219) NI Va d a H dVal 1N WI A6Va d^xw Wd Ir 03rvIWtl3130 39 O1 1NGN31N183dOS KlaIi.NJO 03NIntl3130 38 01 3 Qii'NM3na3a 113iW.NOO Y3dW - 3109 -188 83J1330 530dN $31YC0"$Y 8 N110N-1TON :U33NMJN3 9NIIMSN09 110 N3SStlHNYH3 f0 A13 - 833NON3 1113111013300 SN" 01180d - 3WH3J lnld :Alp YlOS3NMM-3N NO1a0H NO - MJY8N31111N NO8 .3d013330 I _ _ I ffim§R!o 4F 1 IM aeerf9ex 1 ill m.NJ,r w nwnnxrw n 1 i;KIn W.� �-rrr "^" a..,_au.w.n..par.n. �.�,oeu�iml9a,••!W 3N1'T3M !1 swir - I 'W"l 9 T3S 833N2 N3 10TOW w 'TUN a S~ - 0.Y'/000`1 ANJ1 3 UVNM38d3N 133'oaa '0.1'1HN 'a 13NYf - a31ZYW 030 31[IVIP, 3nd38 uTOM I (— _rnanr_ ern e,v,wN,anq.mv,i� 'e tA1RGMTYSRSVII ._.._.._.ems `...`m'. (SNOLLY31d133dS 5.3MM3VJflwm Mad O311Y15NI 38 01) £ AN0031r0-13NNVle lOa1N00 NOIS083 -.9 Aeun VNf NnOxS 9xInOWNv nI1NMM 9oun1P leP NY,W we fir, w 6uundS a 533v 0 3nllvrv831W fO WAIMd v 'n33WI9 l 3N1 WOtlf '153003b AON nO1 tl 1403 3N1 3 1F1�b 10Stl ICNYFfLHI�l:klrl[0: G11NYR4:C/t�I:It:ILYi:�3Nl14e7 v.eM+ a �.r..wr,Nuw.n..n...T�rv-.arm...:..«•� [ w.frn s.awc�n x ay,µeaa �•,n4_swe _.rw� cn>erm�® .ae rsxe.•ea� whin. M31A 311JONd N01103S SS080 :µme nfnNl[nN >� OVA avid � �mqy. sr/,rrirxr4 ,- 6ma ,m eanu._u,rn nv .+�w:rvuq, vu N.m u�9uT,Rmee (xaalnnlsxo� ao p9r3s axaaaeaw Lx1 �9xvuw sua n.us naulnn anmma TaN wmNan 9lwvnoa a>u) MY[ Yel [ umu.�imw £ine.eymu�en asm s Ymu �.m as a.xaava •uuro±ewon•e x�uu,.�e xu,. msa ¢I w '0lteaw w ao 9 a L¢8sew atu 01muq sYst Lan: a.mLvu L✓o06as 'rve wwtml oueonw >olal I3NNVOS l0 9661Z _ 'ON iDXONd 09661Z all! OVO nn.vn ec %vr _. c1e 3rm3 a!x Q Ito n IN U .11v wrrcx o ir:3wmmry x, a nnn rvnro Ve m;VN time =A313 11M N l i x 30K_ "H vm3 lv] 11, LS 41 NlitlY1H N 1°'1 NI = WW 1 ISNOISLA:38 rv,;, oe: - n33 xl 3'noq. we NMVaO �z N R EQ °x� m p i 3 Z iii E' 1_ - — E3 F a r Y�M931 dr �r'115%3 T 3J"J3e NOLL, 110dd _•_u_•—•— a; �3 N v Fi7sN +tn I nl v.;N3a g3tld),I3 O1 :-]dii31 3vdad i__- aaai _ 'Sr: l!CI>3 fv01_ ldrA � 9 i3V 31 .l' 39 10 36ll 1 O-Wi ]a V •L' -\'�,'c,��4�`' (Aj, 3 v _p.1115f.;j ) 1) d3.1 ": UKPJji x lOMna/ 1 , ; _ ____. -_ J e 3ollro `J L / L� , r i I AA > I � I So KIM w 1 7'It lli 1 a a mmJ III i'�li � I�j a1-Ile,, �Ij SR�yl11 fy m WWI gm, �A Al • /r�j •l `e� ° • ra as VJAWI will e • • e e a s e .. eo ea ae i a • es ' . -•,-nee e e ° a as �e° e e° ° o ° a° e a ®e,a. ,,. a nee • se ° . s e e •e e ro z mx z b m r� 0 5�0 -3 x y�� No g�pb;z m s too txj y Uo z =a ro z 1991 WI = U.: x01V0 B OAVN L9'Cl6 =;.313 3NIl M/a 03SOdOdd W 3NI1 AlOcKOa .,. UU' Wl 0 %WS 0 11431MNNON M/a NOIV 401 7# N9 133A NI 3T.'% XPlva 9 61VN K_ n l5 = A313 — v a d d0 3YI I 335 "!I — / YM311a0 li3M 331tl r x3Mnd 1>i sr 3;Y3 wnv.s 3'.i:s a'a :J vre Sa3WO +9 03 003Y 3381 5M11-111 03;.JiY3a 33a1 0NLL'_1+3 331 oNLL,Ix3 =-v aec6i aa9nnx ennrwsnln v:xr 'nams smrc 9wz navnenr so /:•mow — slxl avrd 'aw=_lwnx ao nrts Sur �o svr, au �wxn iJLilUnb s_n A]NVI x8l3i:DW aYp v m i abW pn x:GNi,dIYa tJ3tlFl LX fli.T4t 1C 311 29 mtlYl3l' SYX unnaa w murax:Jas'xYu seu trio :n:r�9+ Ls9nu I ':.> 97 (SN3N O ") CMOYI3N S3Aai 1NVOUN'31S d0 ON 1OL31 %st S01 03AC''n3N 533tl1 1NVJIAINOIS 3O -ON 1V101 Fly M 03NVE S33d11NVJ13IN`JIS 30 ON lVinl bbs (831V369 ONV .9) S33a1 1NVDIAIWD1S 30 ON lVlnl VLVC 31G hd L- giber � r . ' Q Q q Q' Q �p c Q1 Q .Q Q Apo bo 0 10 6 orb D......9OEti� q, Y d Y g ( L A A /r.A�/ G /y e3/ y fua3 -2 -:A3'3 3rvll Nfy 0351iol HLnos a u0 r' .. ^.\:,tl mite d del 'zA We H'1dC 99 ' N 9CO,6 -,313 - lIV81 d33Mii 31, 30* -N dM3AISC 30 L3V. 3X,d H3u0d 1 1 Al3.1Vd H MIS 3MIdS d'8 It N0 111•dal"01 d95d may_ ]—rears :1^.a8 _IV S�*l '.� 11A1 M3LLS143 NNM d31VM. 03SOdOdd --1— I— JNIr31109'1NUSIr3 tl3V35 WNJ1S LNILSW3 —>--- tl3V3S WNGiS ^I350dOtld _ --.� N34,35 19111NV5 0NIL3u'3 3?aiafl5 11dHaSa 9Nu51x3 NnW83ttlM ?NI1SIX3 33a1dO5 313tlOA03 035OdOdd O ONVl13M 031d3F1O3] 91LLSIS3 Se i3381/3Nf1 3381 SHILel33 Q - ( 30d1df 1laHdSa 03cod 8 AAA9 ON w ,9C — — 3ON31 • F lvlslo3 3N 1I 31 ONOSIA3 UUM m TIIU[IC 3HIl 83VOd Od3Htl1\0 9Y.LSIx, ero -.-- :Pt t lr gii I n III -... 1 "3 ® 1^`\\ z III I el I: W/ rr,S:iX -\r-___'lr___�r__->�_..a� r_________-I •..��. It I Fl� 1 0 �q -- H 1011fp - \>V /i�d_� � � --u -B �i •, 'i o !, •. i� d10L00 0044 tl V't i - m _�•. � �-�11 --,i - 1-EI'-E1 (-'1i o, \\\ %v r az� .�.. >�/^\\\ \\\.a"� i l s , � �fr Ir !r Ir, (.: a-^•""� �-\ 0 \ 11 n 11 [t sl 11 11 I I I I 11 � s � .. v �/ / vv or vv,tea ,� � �+ � I 1 F 't • F _- _.. v �. -1\ �� �1 111 'J`— �l �-9:\\ L \�'/( \\\�,• �\'' a 9` � I I .1 r'1 •F •1 r \! d 3loarro \ �. ( \ -ice r' \ \\ 9 \\ / \\ ,�-•\\ \.� I ., \ ez �\ / ,✓ ^� \\ L �>\ I 'Fr'D; 1� kr'kr ��. ♦./• ... 5�,•&s _�!� 1`,1 j1�" III" 11 \ \ 6 \\ . / . >/ \\ \\ -d O. \ OLT'.ZO Sb4 _( 6 Cv S /�\// \ \\'�\\ 4 �;_�' 1 (� 1\_^11 J✓� i if--- _'�\" < J , /��\ 01 \\\ Jam/ •1 14 11Y1 �y 16°I oz It \ \ ':;\ \•U\ \ -'1 5 L�' 1 n� II /i' 1r� \v /'1 't 'E 'i '!'Y�i 'F '1 'i •6'�!'!'1 'E F -/i 52 II �.i \\ 9Z /) {t \ ` LZ 1 1 `� m, L Zl \\ ��/ •Y� tOl l \ '•\ \\ }, „' \ II i j' \� 11 1 E'!'t 'i •1 '4 '1 '� -k t�14'1 4 1 OlR '! 10 F'F ® 1 r r u 1� 1 � � 1 ,!� z � I F'k '1 'E' 'E, 1 1'!'k •1 •1 '1 'k ) 'F \ ♦ '�'N �: \\ 1, I T--=_ _� _s 1 1 7v�fi i \J 4 r 4 1 1 r br r 1 4 1 1 e e r�Y� • \ t\t \:\\ \ \= - I � n i '6 'F 'F 'r 1'1 'I '1 .1 •F'�i 11yt�E \ \\ •\\.\ £z \\ I�'� / I 1yp�r 111r Ir 11 F111 t1 E4F II�I�E \ \\ c:'�rn op�rl'1 � __�• f \ al I r r r 1 1 r 1 1 r ry P v loam \ \ \� ': \ \\ '• r) `\\ °. I I I I 11 I I it \\\ 91 \�\ ' ®� ®� P' y M1 E • ( ' E II OZ O IZ 11 I 11 \ i O ° II Id Lit O \\ \ 1l 11 a, II 94 \I \\ Y\, ° 1 \ \�)111 8 `.JI 11 11 II It \\ °® ,.NJI i'1 O lI.. 0, °O `\ j l 1 1• 1 O \ I I I I 1 O O °6rsxt}l0 \yr ° 1 O i, 1 °k 1{.jr -- n<.q y,LL�1.,:.'"" ,,gg�),,O O O O O O° I 1 ttA 1211 O O® - x -'O'O_ :T't{ — — O I IY, 1•II (mlxvdel _-_-___-- - - 1 n ux'Inzo - e Lon"o - - 1 I I ` 1 I I I I I I I 1 1 I I I I I `: Al ` 1 k.: [i a�laN,NA�N�Nf +3b4++=]HKShIL±31:NwN.r [a' iIC.0 r���{MiiWW 'j1NY YI�4 Y3pVS Sr01L- lllpY311N'1ntl15 1Nondu as �; 1 ..yy. y.�N 31adYaaa] 3ti'L 3um.m o, 5Tp aMm lN^.ntUs Ne ..-; , � .gNrt(lNgn 3laa:ara] Naee ,rpa� a - n3orn lWJo-tLLz as sit > .M�Yip1f1 a+a] meN3+m n3a xa a3prn 1Npwals sa : /, r. rr�� NYp ane c oa b3oV31 11YJIYWS 3d .r/, i Y+B„N�w(Nq PdYW 3IYL^ NNlanr X2Y tl3]b311X]Itlb15 99 L;'i: ..v�v �Vl✓NNOII t6Y YAW1Yd Oe vtl mtla of nxJa rw e9 1" .: w�. 3wd: x..x]n nry of nxa lva m LN ? aleaww _ 3]i�aai r. -le x sn f 531p140OW3M I 3NYN NMV1 3"N npnnW 'AIO A3N d IIIl13HJ5 INV Id - °'.• � ca:a1 e3tnrcl nbvuar>3e NUSYM3 f!^ lN] 4 � O NJ 3W \: ]3a sl a9 3tl yo IJ It],. za, re Srl r.ril ifUe3J 93b��V- WI9 'Ib, l l L. M T b dd rY I dl r , .Y W9- }S jk Y 4 -'f- -.� N , Ml1y x ]G- -,Tfr 1,t xr 3�.y. N n,�. 3...a ,y t n9 t t 53ION 'LOI JY WIq] ]U m AlllB6rp 31l VX3p3J3W SNV G s N', SInQDYK 1NN'11aNOp3] 53nL W SMVId 3NL]Itld31YO,6 f15V $1Y1a31vn 0311V15N1 fp $I�TAMY V11d3OOY 0. f0 3nlulwl, ATnf3tlY:1 031bJ01 3N 11YN5 5lntlla Q35pdJW TPI 'HYItl 9NLLNVltl 0 AMIN IN D 3lryrXllMVn 9N9'J1p NO, 3R6MM53tl 51 !Ol]YtlIN]J Y Yln x]pa !A NVIa T o31f03d, NJ M�YQxYN 030p3axs a33p r 3113]3a pl s33W H3Nltl35tlnN f] xJLLY WSSv NYJW3nY "S As A.N 203 OtivONV15 NY]ItlTY p m,avma�.Nen snOn0o30 pxr x3]tl%aN3 Tr O3 SVe max 1Yn a3eu IN.. S039 ONlI.ld 31{1 p N]urm u31n 3x1 NLM AldllO] 31rX5 1rlaLvn 3N\'1E nv f lh N]ln% SSVn 5Ne'ltl 3tltl]SpNVI 3N1 Hp mrfg345 SY T'ILLtln MJInW L IWN3 O1 .1. 1J311NIV A..l ttY'A""mww -NourlNlsNl 01 aJlae L]3lINkY 3N1'0 NOINI"r 3N1 Ol IM MN' 3b'r"O ION ao Nnn3a "MN' 3a OSONn 3,LL f] NOLLN3IIY 311 01131JN3U1330 353N1 OHltl9 TY16 A3Nl lvlaLvn 1M'la a3u3NM pNpaa]3a NOu53M ANb 530ra] ]e of ntiv 331NYyYM 'IYANafb LH3nN311aV153 lVItl31Y% lxrld IJ333Y Al31LLV]3N XY NI 3aY tl0/pXr ONOX3tl 3d OL pLOx SS31 N11 031Y5 pHV mLAM d 111']1N NJ M N]Uq,tlJ 316 a3N10 ANY Ep 'SN]UIONO0 I_'SNOLLJ3135 391 HS AIM 'ION tl0 ONAWdC 3N1 W WOM a3H13. V NO .N la 3x1 i3l]x3l]If3p /.HV 23lZuu a0l]veu N]] 3avOSpxn 3Nt 31 9 UNrof 3atl SON�YN SanNW JW,iAiN01S WIUNY S33W OMISlx3 3N3 Z ai.svwuauwrv. 'a3NYo 3N1 0l Ism rxoulOM ox Ir mpNoaa 3e 51tluv]ol IVONm1' 0l lglm Qm,sNI 01 $1X3NDA l— Ttl N1Y 3]M1dJJJv tl3,MO f0 31Yp 3Xl 1Y11L3 tlnA Tn] 3M 31tl15 tl3xaS oNI1N] AB oNtl !pl]YILLp] lYtl3Ni] 3X1 XL avpH3l v.. 3NJ IonOaXl ManYX 1M1E n3N 331NVXVNO TVK tlCl]VtlIHO] S ll..aa WJ SNGUV]Ol A1NUn TY A31aN Ol .11ALNm 31I.O 11 1 S310N 1 - - 058 £' 09 I - 09 l SN Z 0 Odd l -Z SHO- £ SHB [- wa-£ - SO £-- San 0 £ - WV 03d Y HO £ H53 Z DSO ' £ WOV z Sa z vd o HO 1, - OSS z ,. } Z. O"I L SHe 0 9 OS _l wed l l SH $ wed l sa £ W V 30 OSS Z n OCr O O' n .X Vd9 Vd 0I -- - _- - `. 6 �oo°O o . nl J33W Ceara 5 15 - :333 ;. M l Vl N H N 1 Nourls ls 3,Rxmum n- 1133a1s1 331 MIS 3a� lyM _ _ T ) MW a3soa9aa tt atz xour 9ir4aJlnu N3V 13S A110 vinAINIR t)NnONr_3 93HSIHL _ mnY 11gtlf JwsMl Iris 9L9) AVM9wm ¢amour _3Y:It - . - •T3Q3'£ m 0. 03N MJNR )UYI 31LL M•n39 Yaw 3NL 3+6rlxln �. xourn9[3 3OYMJ a3t<Gw DZ6 306 rnAtlYraM "M� aV 11 1011136U'.:'MK s °' nr9aaum3rwaw3n OM 'v M%VG tld ]AYN t9{LC - \ir3 „ rI rma0fs3mY/iGtll6 - M/a 0Oddd O 3Nn 31a360ad rAMrL na3vro3xM O�OZ63ND HLn05 ® 1NWIN0N M/d AMY dOl J Na /I i'dll) 03AS 1vHS tS a_ / ryill.a 3B 4tDI6 =A333 3a33ltl tl0 11VIG S O-OM RM O 11OVIS N ' --_- YI,OIrrM OW61p / , . 311 N lYMi�laO Y,L3M S1id I _UNIOG OTD35 13-113 36 IS0N 53?11 1:1 111 1;35 -Ot6/IJ a .Od 1SI tl 3JY3 HLftiS 4,1d, Na -I# Y19 g NEVRAgm 3la+TMn ,d 916 NJYM30 13110 Ol m. as. yn.. �•� Fmk m) 99W �.. lFi _ irJ1iA1 1 wv�n 11VAG Nou aWO 3(]Vdo-ens M&S v MrTRUI (mmlYn LJ3L39 m 3e oil oil III. a +mranw sms Ae auer1, �JYlmlrn 3�eLxGnn fo rwla9 lryp{M lYpplM T1pUY8 1J31E-MOM �- Mll]3MOJ 39rtm-9S ruure -, � nunYe � I I 13Mm oxmeq I I i T/a 91ZS [6-2 _ ,'Val �IYIO srwwnmle 30 uu 1J3iS-� Jlosml .93 MIS 3xn ll]Y'9La ONIOIIne MM0 8d CIZC Lfi-Z dmtl atlno ffit MYIaj5303a _0 1U 00~ s.A ..CY;�.•f.LiT �:seR: �tis�`•sC��r� � t y� �.9i1 L p_I Wp , pi xwu36aalm~ Ttlt]Idl1 mumm ALAJ -- L _ sYn,e a34,rw rn9x �-a a: ,v n xxora yr+a umf ., rTms au3°xM�_9wl�Nv+ti+ffi�sv ,I�nmr � aax Ijl? 41wLbJ Y(.� Sa6r� lYW YY0. a anYr 3u J. Ixlw Fu s4. n anarMdu y �m 3w r.ls�=o m Ola u'w 9s' . m ,M1. loll la 3X1 ,p rWC S yxT]LrA'�'W]gNLL"MIN3 3N1 a9 /.YGIJ]tl L 331}]3r .fry 'Po/DI/6a 1M9v M Na JNI 'T1M 11 93MP 49 03aNOxd 3Y3A sxrw !w No srmuvA3,3 armlw» ax+ +xd.aonr! oNusl,f 3X1 i 'SII3M-90fF81�5Q1333s n3w N3fa/9m+)swm MY sza .�!v 513aV15 ra A aTMC' 3(6 3x( a.JJ 3:4fYtl}MI ':,rMYX9 315 3N1 -e: rq:l](WL21m]'JNgY19 ,ln RJ:If S1lr£M rrJM SWl3] YAU.• wr uw x. 33m ns rYY3Jml,ro: 3ru rw nu:3 •JM c. -SS➢W t4f 932 fA1n [T(ey f. 103 •Srx l3,YaL 31 ]lYl J:9r:d 633N .]l 6011xirin] 3Ha I Y) II !1nHVMy 3. 4 lr a) > Y9 Y9Tr N3rffi.. amvi asl9r.f arx 3,aer :o v Murrarf GMd OxYY:J I®tlM1EWrB N. fJ 1Maf 1vrICLLv.V'q a„4 uliourM13ri!a'.e 'aiiaMf'=1aJt V 11/a4�v]'THrtlim 15 Lw1 C FWH I� I.vW Du d _ "Du4•PfYe30 AwY'JI:W4 T 'Wo ,. r�m..1 3S:�rxl »'H i • ,Y ]A 3M1Y 9NM+ -�4, aYfSx S3dA1 3SnDH 030NY010038 1491 \ri� �G 1 - t s a0 NO1103S a3l8WVa WO1S110 a N01103S N319MV8 2+3w 3Jerlms:� 3w 01 Slrnl'I 3Nl 3l1]a1 01 C. 1 wJu nJ 3x1 fl1 a3I O Yr 4910N OI Wl]4A Io vj f0 !11)19SM553N 3w 5111 'aydMtl 9c a3t]Iatic] 3s LOxxvs Lvx! avd orxv3re a3aavu Y xwlw aarf.xroJm 3a. sx[•LLlaxr Jos 3JMLIrSxn d Csr•Mlsq zre33s .W93fi 4lf SNyld 31LL Ol tl3i3tl) SNIv^1'i' ,laY.l 3JK MRMM 3Xl 3+ JN� 1N11 311M{fgMll ryYVp1 a3]YrO ]8•)L♦TN.�'�rB3N^rrpb31M1 aef 311 fL XLa30 3xl - 91J N]Wr1 3w t4l xJV3 rpr MCrK i9v.1 ^MJlxg t. QY1Mllv 39 TryrE Yi5 fC TXrxrY a3VJMl ♦ 'SNCLLYt311 MrfrOWnf rnT xuJm .al gf3v3 sss34olw ms 3Yaw mMYl1Y A 4f 59331 A16x}J •.WrUiC1S YS6 rtlWKT .'Sv3T' i!f OriaLIOJ N] S3.JaN1f YY SllrT JMNIr13! ]Y3W Y3Yv M'!: b]3NCrl3 )tlJBnJ3�--G3^ 3w ra 03xn3E 3+WA13G SY M? 'I.t6x3a :HtlWitlIS YSr A' v yC: ]wu.mm :uxawnr3 a3Jxwlmr wM lxfrldn3.3ri axnr), :w Ls3us r1.a r+f-¢31 X1M v!rvaa)vr m a3w]fx3a a Thx[ sxcura3da WRM.Wa13 TN T 3Za 39 Jnr6 YM'a3Vt 9Nwra'J 343 sN4LLWiY SXVId NI.rLLM 1]NvaM]Jtl xl a31 ]na!SNO, 39 TM1M Y)1&1 30ra MI4I9nB A fpLLtlPd3ad 3w fU: aM'1Ngf? tal is a Mlut 39 TT'HS st3.n 3i3N1 rAf SNrtl3%LL ^xl(ro•A 3U Q3JNam ]+ ..IbW nol]otla pw.Lhls n xfi » rrr:mxn r u rou]rarn) t•4.. Mrr '1NLXd. 3brLL5Y)r11Y1r\irpJ"L'tlW rlivONr15 S.IP_ 31ti .- uMu 3w!w]Im 39xw ww 3wn tw 39 sJCG JJr l♦.: 1hrS fmll 11L4l •JX.Wtd M T31ra1 _ " D 3TaYY6 3J 3]31334U add 311 W'(1R 443tl tF LL6rfYJ igl]JW b:aH 5 i3 kM fL MM n l MLL] '.. YM 1N3t W3] 1MLSCA M4A tlOt?'L`la dR9 S S,W Lxn L 13w3a w r 3w av fe sys J 1 3 J.�ralro] 3w 3aYv-mv un 9xlwne s uvn -r.al .a3�:'_ I 1333 [ a334 ALL Nuttl llJJ �x HNvtl a0 i l3n tlL 5r33a1" . xlx.W ) iq.r 3w 31 M,3 O1 3,IYt 39 Y1fi 6l ll 16. 1. i"rcm 3w fn Imu3wnm Moan ] m mxxe a' w Ln s 3e M] snu af)waugJ JA a xou uunn 1 L5 tl33NlxN3 $1K5 3Nl 31Y13xi 1h15 3SS'F81idfJ ^F•]9� �LL : tl33NYJN 3rU B '13l ril S „rK N 3 cl 933tl1 Sr3aI M ,1LLSNOJ 3W NNI aLSlf31vx1 SW939 a31110 IO'16M8 SdrlrLL 3i:LL 1T.Y 31G lY.` Tads] Ol xathlllH'r MIgYYr TU f0 •ll996N153tl 3w 51 U .. SMNlv]I9i9� U1Y SMId E3N wtY 3'Myq]]v M Y3M' QPSJILLSA ..11r(3g3HIG bLL 3Mrl�3r r•+- MN$ WIJrtlINA ]MT/p 3rLL tl33NYAli ]I: A9 Qll'a: ' d71 JtlLMJ :NVlY1C1 94 F6 a3,Cn3N R lTr6 cMJLLr.:•i^ iMJd a31LL !p !Qf QPM1J Se 431:)ga A al 3tlr rOMe ♦a 3111 f31 ANV SIpLLYa3da' YY. 9rrlaM •A1J,bIN' - ant Ae aT+rvLNlm 3e n.Xs sstn>rf nalroa w. ua3xuu 1N37ri'M uvam al b3om X: .a.ss- s3NnsY3x wnlm:: rmfioa3 xM1CalhlOY !.M Lx3N3un� .:r $rY:ur]IA]3dS lM SNr'Y1 a3w NO rMLMS ;b S3al6Y3n l0'al rN" rp50x3 TA NttL11Nn (WP 3W.aaa T„r6 aO1NlLLMq aNMM MLLJN 1T1r0 1 YMa nY12 OL lx3(r]T-iM S]LLnITf dM 3TN 1 'sY3w a3or,e a3r6:Mf M smum'e 3hs Trns _e (rl 3lLJr 3T1 11'lMx pM Ria iNOLL:nVLL61Kd=%aYNJ)1N3RWv9n3 Q:r IYda YAYlf310rRtl ! M'YUM1llSW)] L1Ma tl3!,n ROIS Y 53Ir`PYf iYfLLO 21v SNnYB �YLMAY]E AdvtlCar?LZ -a aY tt) FNMW31 3a:3a �+IY3 y3WYwM Wu�vMfsrAVJ rob Y JSIYg3a fiv 'dMLSI 9XM.JTg3 Yl NI 339Y3W m= mn SLJry:SxJ_ 39 T1rNS 5av+LL fr+3rrg3i AMaOAIL .£ S�Yc rnLrlruWaa'3]x33 nfJu 3ancwl Frn wlrr 'sxL•ur.uu3e.: oxr a,a)d 3s3w � as anh, s3ansY3n Umxoa xa:od3 rn '1r3a TYxu or I]a6.v 3w srmsx3nm Lx3N3sr3 awe 1aJ rn s1N3nxlrgw v«se Jh XLM wnaxux ri a3nrofa3a 3e Jnxs 31x3nnlaa Larw Mn 3:'}LL w arrf a3n,] sx wfu]nx1sM:J rn o s3wvucn r gwuisrm [u ��a frrun xu]3dsTa ;w< wM s3lnnn raxnmxvreJ r. X: KLLYAiO Sf.• MOLLY: MI ..fhi TIIr6 YJ J :WgYYJ � !y ZS. y'49-13311 T)i n 3dv omsn s3uu 3x. r9 .mea-.s IW sow) wu wa ne al aruf me n •)s:, auevrr• 3.Jlr s r.] 3af.n M3'JYI a3wq�rl5 n3L5.2 3Jl rC "Li J 3K.. yYlc y)fCl". 3q xrw a, se. m _ 3N1 n lneexoes3a 3.0 . 1 53 3v 0 .Val `J 33x1 OaNr V31+KOrr ST x]aJOb35rrO: 19r4 y]f Slmll Lf_3d5 tmY tMT6 W l) 1x3r11aYTf-: Y.Pa3N1Yn 3Hl Ow a3tr:YJl L MdM1 A4 lrtl NI AIiPtl JrNI'. 31 f11 SMYlg3 INf]3y 154n 31LL 3M' AJddY MIRY SNOaYJIJY".3a5 '. Via^ Y CITY OF CHANHASSEN RECEIVED FEB 1 5 2006 CHANHASSEN PLANNING DEPT Aco na�6._.,- - @ o o _-- y�n of 00 O O°o O / 600 oo O 0 0 co 00 0 00 I - - 1 o a cb 0 0 a .fig 0 0n / 0 t n° l 4\ a v \J z o^ o w s` w > W. .2 N p OVm =w �x Q'�woci zawy�� �=a E z� �+ C) o' F uo 0 a z x= a qR w a BENCHMARK I_ I``Ie — —r-- I IE II OUTLOT A "-Z // 14 % F, 20 of IF �. a V\ / \ 11 24 16 / I P �� s T 17 Ii 22a\ '6�\ 1911t18 01 I_ _ - — % t- " OUTLOT H WIC r'�'3 We �; 3j �, v� ` �L p 21 1�ja 14 all ener .` PImPFRFY 06CNL oN The 3onlLweat Quarter of LM NertMeet Quarter of Section 26. To —hip 116 Nertt% Wnte 23 WeN end the Faet HeV of the NorWeaem t Que'Ler of 9ectien V. Finnish, 116 NorM Range 23 WesL Carver County, Ylnnesota. y {YI IMxf- I"DOTPBNr 2(AVERAGE FOOTPRINT)675 iBerkMlre II - 2.212 ff S.F. (AW. DRVEWAY M ROW- 2.911 S.F O MPERNWS '.�V B,n.na.. z,z6z s 2911 SF./15.190 SF- 19.16% IMPERVIOUS PROPOSED C6eppMe },A}] g }S,DDi IMPERNWS ALLOYkO ComNe 1.8}6 ff n m Cmmrd 2150 ff N N Oms s 2.3110 g 6lmeoyee - 1,964 ff Nomptm k - 2448 SF Ho FeMk - 2.312 ff Legacy - Z126 W SaddlefoolI - 2,290 g Suddlehrook B - 2.410 V A§ AGE- 22}6 S.F. OUTLOT B 15 14 \ P,A j`23�`B` i ILOI f 24�� IF T� n s TR ad s. dm B r p 26%\ 25 �\ „a Q INN- 29'IP mx—t\ OUTLOT E OUTLOT G�i� �UTLOTryF�rl �V O( P 20 SCALE N FEET 0 Itq 300 Se tTT \ T (SO 1 nN - IDJ feet ACCESS CONTROL --I- SLIE DATA LOT -SINGLE FAMILY 81 LOTS DENSITY ( DWEL,INC UNITS \ 1.3 D.U./ACRE -CWHtt ROPD-MILD k / GROSS 120.74 ACRES LOT -SINGE FAMILY 2811 ACRES R.O.W. -E)QSTNG MFOOT ROW 4].38 ACRES PROPOSED CITY ROAD - STREET (BY OTHERS) 1.62 ACRES -PROPOSED SU89N40N ROADS - STREET A. B. C k D 8.21 ACES WTLOTS -NTURE OEYELOPNENT - WTLOT B. C k D 9.97 ACRES -OTHERS - SINGLE FAMILY - W &OT A. E. F k G 20.]} ACES -PARK - WTLOT N 4.]2 ACRES TOTAL 120.74 ACES 9NtlF FA9 LY REW RENFNT k DATA AVERAGE LOT WOTH 9LOS FEET AYIIUIY LOT AREA 15.190 BF. PROPOSED WHO AREA WTHIN OIILOT A IS." S.F. MIN. LOT AREA, 9.700 S.F. MN. LOT WOTN AT SETBACK 65 MET MN. LOT W N AT SETBACK FOR CORNER LOT 100 FEET MN. LOT W N AT SETBACK WCLUOING SIDE YARD SETBACKS SO FEET M. LOT 'MOTH AT SETBACK FOR COMER LOT INCLUNNG BID FEET SIDE YARD SETBACKS MNIMVM SETBACKS FRONT 5T SIDE (HWSE AND GARAGE) 5F ET SIDE (STREET) 5 FEET REAR 25 FEET II II II roT m scA E SONG 5 MET N MYTH, MESS OTHERWff INDICATED. AOJOIWG SIDE LOT LNES, AND BEING 10 FEET IN MDTH, UNLESS OTNERWff INDICATED. M.IONING RIGHT OF WAY LINES AND REAR LOT LINES, AS SHOWN ON HE TPUT. Ca O^ F w� 05ik� S W NS p1^ a $�gUg ZNA ran<� zp a w E- E, OR xm L1 WETLAND TABULATION WETLAND A 22,709 S.- WETLAND B 318,424 SI AETLAND H 2O.473 S.F. TOTAL WETLAND AREA ONSITE IN DEVELOPED AREA 361.605 SE 8.30 AC, TOTAL WETLAND IMPACT 20,473 SF./OA7 AC. (WETLAND IT)REQUIRED MITIGATION (NWC) 20,473 S.F./0.47 AC, REQUIRED MITIGATION (PVC) 20.473 S.F./0.47 AC. TOTAL REQUIRED MITIGATION 40,946 S.F./0.94 AC PROVIDED MITIGATION (NWC=75%) 33,830 SF./0.78 AC. PROVIDED MITIGATION (PVC=25%)) STORM WATER POND (OUTLOT A) I5.300 SE/0. 35 AC PROVIDEDMITIGATION (PVC=25%) 25' MITIGATION BUFFER 10.190 SF./0.23 AC. TOTAL PROVIDED MITIGATION (=100%) 59,320 SF /1.36 AC-17 #-J (l ^ ¢ERA 8655 9 - C 4( e i a i i T e6'M1� 4+. .5.0 1✓ 1 j +� 650 ' MITIGATION AREA 4 d i �7a 20L53F7, 3 °4 i , �++/ ax li� I INV J aI N ' f3 i� I 6E0 - - - coo eul ' OU i cuEr� lec Q { I bb m M J 0 �OND r /aLE afi - 4 j :� 100VR HWL Ui d } 4 aw , , , i otlsrxcrtuo ,I - 1 R c (wx) xo ja 4114 esncr A. 25' WncnnppNN IturFER ARFA Y 3yg )) ., 650 647 IN ) /m 4 C _ a)zo pru. a5 �� 09N i I �u/ A.G , I Bm0 MA K UNIT UNEo- If Boa. ) _ Q IpNG YIBnQc ❑ t FNE�� i lI s TLOT,A S O pp V R Y Nsmcl ao I 1 I I+ 2q % 1 `hlJ _ V 1 _ m t I i 4 LEGEND ------------ a - ti 4p o �7 ��28 j , 8 AVP 5 P A �b �6 C` �o31�a) 3 44 �ti 0 32eo. 4 2e24 203 00'9� 922.6 924.3 926 T G 9 W0 9 WO G 934. G STj G _ —3V2,3 ,� 29.6 3 - STREET C - ................ eoc o0 9w 904f G y 9tly 5P: qg0 � W a. g s+ao p IN ]9 09 MS ]e)) ]0)) U ' 6 R 29.6 931.6 G 933.3 0 935.3-I�- 5 R R R e IF 1 2 a s 32 STREET -(BY OTHERS ac -- --- --- - ----- - ---- —.� wn92 ¢v 6xxn PLAYGROUND TPC AREA DATE \ REVISIONS �.. 6nsrtm n CAD FILE 21996G PROJECT NO. 21996 G1 0 x z � m m m = O GZ CM °N i O 65 m O Al Z � SCANNED BENCHMARK - WF- DFr11 WE T cbo / / f �aITIGAlION AREA �' a r1 y 3 / 1 1 �_l}"1• ' 1 ©;/) ; " �; ;1 OUTLOT p , LEGEND PT IF ti`T_G ITCH aLI;C]IINC AI T TYPE EE _. _ A --'uuP,EacN F „ AJIigC--) �_ - _ ',I I VIEP IND rIT, -FEn I ATRt EF 1 _- NY.. -_-- .----- P EI'y 16 C NY o 9 (f ;� ' � '� 1�31� '� l/ 60 ♦A' e.s D A i 4O, CMISIM rWRAM... , ;. AEM10K (4Afl.) ew e73a x° WCTua W CT 1 ' .� .-nea. i a a i d .i PoP pWAApp SPILWAT ' 5.i i AL i i 1 . a - w' 9 n 9'ba E3ErBfi55 - �.•• '. t�iA Y' y Q' .°es �W' •W . •HW HW i q Mezzo ��'¢ 10 �A° � apci (f. 21 i'/��J 1 � , �. � � 'xpY � 6S0 iuxwc woos (YA%) � ]. !" •' 0 O G - a£6 _ RE �`✓ �� �. � { �° o' w w i / eso - - tEA:_Re.Rb23. / MI PGALLTEION AREA rHK . Sj9 ,,c, //y !/ . � � r :' 2083� ° 933.0 114 1 1 ,i - a:z ,�. ¢e ee. w 09 ypM1 o iv��d•" C+,2g 9 9332 1 i aO �iss's-e'° .� Pam♦__ t 5°. �G�P',�� ` 's 9{ZLO c 938A i 1 1 t Ep RE iA.G /`ate 1 1 1 1 BCOD GRADING TAT t1NE ( a� 90/ °'L .9.5�9 9'390 i p e G IF s 6 - i ,I • J -�.. ' 9� v a � ' SCE.. p 9q 51 o`z.z 2 a° - e :97Nh G v� y _ 1 .1 1 4 Q RREO s •; 3°e m o CVe5e— i 938.3 BUIIpxG MMAU u1 NNE - y Q-G 4 1 '4 1 '1 1 . r ; OUTLOT A %. b a OI Y P �p♦. " gA�� �% •� J UK (BC00 T MS1RICj I V i 1 1 1 1 J L , {g- • 1 1 1 f A 32 6 �- O1t1 m 4 °B 1 SCANNED I.N / / , , _____�`` •�. ., `i J. / `EAIM16 cE',INEr.,6r, �r "-/ I J F -U IiLfLwU FL. hh Dl O*••so ... 1 10 - Ci"PlL7T i_ _ Eaf 6 a•a \ E i` P r ` � � 1 -' ��treas+s++ �aeaNa� / cf6 _� i9�•� S 9 ---- �' 118 19 Ufa r 1 '• 9,6 20 E5a 17 926.2 - s32,1 21 0 (� 935.4 a 1000 2 2 e — /� ®O!�! / %`•f�`% 9�gT a1v 93 OZ c "RL01 G '`� q00 c RN, << ........... -15 V \l T 9g5B --3I] Js.i 941.6 G Rk. �. 23 neoo.o 14�Y..I�+. 9r6 ���,� G N - 242 _ _ __s J9.4 _ -. • C 9g1.fi f an sa: A, m q in a 1\ . n � `ti e 9907,y�*F dm m m 8 _^ V ry P> 5• Q � ., e 4,0 _ ° n 6 a t +' • m o � �� G �i a A> .m � m� � - � � W� m p t m Om S s s M V f0 JA4 m 26 25, � wan- 1 m 2 50 16 o Z•p m . .'.• i 9446 9i,a0 N 'y - BENCHMARK Fa-: a,� G a ,t 0od mod oe 6 20 9, ti9 A 2 c9 - 10 m 121 r, 15 a m Ws z a >.3 9\M : / rOb • 95i•' b' P Nth r RE r. �- 2 N H Za 93a 2w 8 w �_ 12 13 N N� a Ala. /a- �} 2 933.o m 14'. x �o a ca RLO s g2 _ o1^P a(LS s �yNOo wp LOT DRAWN 5 -- T E G 9wp'L9y1 me H'� 939 3e. i _ STREET C j 5. '�O U N LOT Tpc T N 2/3/06 G q05 t`f 29 Sy G 9�� i° y J4 35.a c 934.7 N� ea :..'� REVISIONS a,e B y3B c 93b.5 R P tr �0 szB� 6j ma 6ry 9 -�R 9357 6 9 B G a V 938.3 c 937.3 R �TwT 9 31 1 9 G " 70y. ]1,b R —jy? 15 \� si eqi 23A7 o � -- N� Mal J� vi2/ -_ f to Na•N� CAD FILE ti F 9 w '� 25% STREET D 'yp l �� t�v. 21996G 4 ? rT. x� �-- - ? - - j. eD a" o i o PONQ 66,, �]a �a 6 OLE 9200 ECT O 99 ,L -- �:e ,• ,Ly1 ,: e .i •,p�.. / m*- _ - �� # �I•» 520\ � .L�o`rss14 RO21996N 3 9 a oG iT c3 R P SCANNED I �� :333f 1 I �`t A• _ mrc P; 19 P s� R 26^ ) 291 931 ( }z 17 /12 B I 13 p n mA yp d V� PJ 933.0 8 o m 14, I AN RLO -- r I \ .B 1 3a _-- 52 '" { I gib• i I '. �� ]a \ UTW. E STREET ary-,.,�'Na W. POND y21 ]A �`1 1R.MWL ��190 -3e- l c 9}Z3 c 905 1{ _ up a.o I a I�aR An 0 93s.3 1 R I 1 - 1 15 i fill - � t ]59R 1.4 E� O_iefi, i- i 10 - 93rf - _.. gz' 2 STREET s ao ]6., PE 0 ox N I /- N4 N IL I•V VV { BASKSE AW �- pl• �� OURT ti �p '� h. • ) /[� UHL (I)COO •1 U ' -- OUTLOT H SOCCER FIELD i n •p r- -'9 � / / i i, gl � � x uxxc wu � uu. • � 1 . 1. i / r x � \ \ i-�eivaxaxcxr u"n,)\�� r LEGEND o V TJ� 9 -1��•�� \ O o i w � _._. ... a .., `' � _• (n hy �( 1 0 V c z d 9� ------------------------------- ew 9m.B tit. TO STORM S TO CONNECT 01H \ - `i0 STORM SEWER 9Y O1HQt5 � \ :Bar la /r 4 92 � Sa ♦ � 5` r.� : �. E- t w d O^ • t••' zzddH BENCHMARK Q-Ia a W a� UIx 920 %/ I OT > •.• ,, z� r zr n W F z a ix a / xm rfi a � w UI UI G 00 r / I I / ,� / r DRAWN BY TPC LINKff _ _ _.. DATE 2/3/06 // / REVISIONS 4 ri �L 0 p p00 tip .b D 0 b th pp 0 0 D ebb D J E Total upland area (excluding wetlands. bluffs, park) 61,33 cc. Total referestot on area (15.30— 7-20 cc) 5 0 SF Baseline canopy coveroge 11.7% or 7,20 cc. Required canopy coverage 324 trees LEGEND (one tree provides 1,089 SF of canopy) 0'- - - Minimum Canopy coverage allowed 25% or 15.30 ac. � Proposed tree TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 324+44=368 TREES _ preservation 10.2% or 6.28 cc . ®-- - Difference in canopy coverage 0.92 do, %i�%%/� e:„ ;FEE Z�,_ Multipli¢r I2 __ - : T ..L N: OF h 1 Ca..T TFE n c_ Jnt P,i'--: TCE _.s c -fc Total replacement 1,10 an or 47.916 SF xr of trees to be p1dated 44 trees Total reforestalian area (15.30- 7.20 aa.) Required canopy coverage (one tree proKdes 1,089 SF of canopy) TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 3 NSA— 1 2 AM 2 ABM 2 AM 5 BH 5 PFC 5 AM 4 HERE AN n 0u I{CS 5 AM)-3 BHS �.1 BO I . PLANT SCHEDULE I. IAIOSL.WE E6VlMCTW N YF 1 A,. uCUTI...S M INa , Ac�ME OFAA- —... "Y [. . LMEA "A. Ort Cut (♦5♦-MO]f ANG TO STNOM 0.µT 11X` 11015 x. THCRE Eu51NG 1RE£S µO/oN SMWMCA"T 9MIffi MASSHCE ME F. M STE.'NIEMER AIOWI ON K ..Me W NOT. n1EI }I. SE PMIECTED x"O SAyED VaE4 NOM TO RE REMOKO AID/W NE XI M MIEA TO RE OtAGEO. µY QUESTIONIEDMOM WIEMEF PUNT MA. L W4W ON NOT.V BE BKW11 10 THE ATlgligl OF THE LAIDSGPE ARODECT WWOI 10 W NNAL I NL PU"t NAT"'. 9WL NPLY MIT" M'TEST FOInOI 6 nE WEIYCNI S1MNV W TOM "Al AIEACAN ASEWAMWI 6 NAWSV L ♦. CdI aA.TEWIs RE W,NSeIL rG GOCNO MAMTENMACE OF NL XLRI YEM RFROI IIE d.1F OF ame R"EIAFPi S YOM ALA Vlw61p A- 14WSJON ONE CMEMM BE flgVtm AI No MUP,(Nµ CMT TO TIE OWNER. f. F ne WInSGVE O}IRACTOR NENC S µY OEF%IDIOES N ME V T ¢LECTE S. SOL —nOA4 G MY T 0. S. DON' .. MANOR XEWTELY KTECT PUNT MARRIK EST UECNENT, 9YRNVA4 IN WMANTEE. MEV 9OM BBN'C T %IYRCCNENI TO ME ATTENTIW OF ME UVIOSCME NKIPTF.1 P. TO NSTAyATG. ]. MMU04 WIENAI AS SKaFIED ON mE uxBSCME N MAGS WICK Ai NANTNO SEES A" TTWR w1 WTD eAAWNX ALL ENAGeEEN MD I "oe ORES M Noce. 1 G(d s1NEym NMCM00D ON ROIX "MLDI sWasew Iq P. B N.M., P\W Ml HbRL'Fp PUIITS 91ALL R UXATW CMEFILLY AS 9xYMI M INC PLWS . I., F ECEWTD: ONCE .1 SafpI. C 8.10 Oc or 324 trees 324r44-36B TREE BENCHMARK BM n: R.P SPINE ECu7H FAQ OF IST POMP. POE WEr OF OWVEHAY -N$ OF PIONEER TRNL - ELEV,= 910.34 NAVD 8B DATUM BM 12 T(W µUM R/W MONUMENT O 50U1 PPCPERTN UNE ON PROPOSED R14 UNE El£V.= 913.87 NAYD N DATUM Z $CN£ IN FEET 0 100 200 3GO I. -I)Ofeet FEr Ott. CPWDY NAME uTw MMAE S COT NOTES [S 'A CRtlUW SFW4 F�U LaW TO GATE BNS K N.CA N.LS 51.oC AwXRN YY✓ I nT NO TULL TOWN TO GATE NS B NOA., SRNCE /MANS, e' aT M NLL FORM TO GRACE PA 91 PAT.. ASX /V BX SW.VGT LFACER ASIA 10. AUTVMN S. MMtE /S. fie JTNe.T 4El£R BO IS SAW Mn Ow ARAWWWX 2I/2-M 1T .T T£.LN PX an.. aiM AWNMNWS,b' 2VY eB S..T UAAN ESc 4 .O nDM a+A. NN.yyar 1 1/' we a A. NNE G.e.IAE LNM.,W, 11;Y 96 s1R4c,T IFACER AN 14 .WA C. M.RL —SWm,Wes' 2 W SMAIGT LEADER NSTo LEO MAIENIALSGUYTL THE OF ER AACCPiµCE ANY ACM EC plSp@ ¢5 AM -µHie- EMIT SAEOHV.TG$ TAME PRECfIINCE OWF OM p1 o am. AIYRTAA2 TOTAL Ye SHAll RMT£ WPON90111TY CE ME CWIRACTDI. xOI Es.µ Location Map Peterson Property Planning Case No. 06-09 1600 Pioneer Trail City of Chanhassen @Cmmm Non4mnnable Item Item Folder Number L` Folder Name ?-o -- Job Nmubw Box Number OD .� c N fi 0 l�,,Art 441-1; .> S t/ 0"'90 GreenGuardian.com �ZO x Z`f b - qqlo TL /.7& c S i J,✓ i Your one -stop shop for waste reduction & recycling information in the Twin Cities. 0 xT a PHASE MAP 1 inch = 400 feet DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: I I I I 5- 1 I I 1-5 I I - — S — L L — - BEING 5 FEET IN WIDTH AND ADJOINING SIDE LOT LINES, AND 10 FEET IN WIDTH AND ADJOINING STREET LINES AND REAR LOT LINES, UNLESS OTHERWISE 3 INDICATED ON THE PLAT. PETERSON PROPERTY CHANHASSEN, MINNESOTA PRELIMINARY PLAT EXHIBITS • •1 D.R. HORTON, INC. - MINNESOTA 20860 KENBRIDGE COURT, SUITE 100, LAKEVILLE, MINNESOTA 55044 PHONE: (952) 985-7827 FAX: (952) 985-7400 I/l yA OIO -so '^I`'� aLUFF CREEK O �/ GOLF ASSOCIATION 1 r " �r •� / PID NO. 25.0260800 AVu"n- I I G&M LAURENT FAMILY LTD PARTERNSHIP ARTHUR N JOHNSON rcAV/ \ PID N0,/25.0'260600 f t - I PID NO. 25.0260610 I O.� I .J / \ \` Z _ C 'f \ U N zo I ' FOX PROPERTIES IP PID NO. 25.0230300 NDI MINNESOTA LLC 1 PID NO. 25.023230E \ WTLOT a 11, I I I ll I I I I I I I I Cf.Ax X 14 ___________ (naRR lrr, JJ I I I1 �1 V�11 I 1 00 0 1'1 y EMM _ �Vil 0 0 • po 1 I , *)4-m � 6J0 000 is 15 g7o n " o .cam F `\b.. ?'\ _-/a -�,-'•rp"t __ '_ -_ -�. ___ _ f to ``/ � '' 111 ,� `_, II \\ \ \� \ � \\\�\�\ .. .'/L _ - - �'Y'„`_ - 1 / n♦ 24 Ab , k i /22 / 2s \`\ I I $+. aX\ // . •_ o,' - _ --p• `,2 �. " r \ n\ ��� d /ram I �i� ill 20 �)� l , i'-\\ r L�"� \\ gL ,i \��\``�� �•"- \ -w�"'" _ ' 4Pi 2 \t•C: \`\�Ca \\fit, •:� //2 Y�.b O a.�.�... // � ,- >< � / �\ to \. .• :\ Q'Or / %' �-"\/ \\ \\\ \ r�N\ r----,r---1r II v�'__ " °'` .-.Nor— F.,rs =� \\ 9 \�/ P\\\ 2]\ \�> . f' \\ 1111 II II 14 1 28 1 \ y \ C 1 II t3 1 I �J \ �N\ , DEGLER \�..: 5.0221400 \� 0 OTE Vr `.'`, ,a G=l` \;• \ i I I II \ i / / `\\ \\ / / \`. � / ' \\ ,0 11 I r il.,l i 11 11 ) � >, / \\E '• ;1 _�._ _p / B II I �_______� / \\ \ ♦�\ �> / ^� g \\\�/ %--' i 13i• T, 51aEcro -../ \ / \s. OUTEOTF r---�r---Tf I �• III ry2 11 S \�V /� (/ gip'` T WTLOT A �' ���'� , / / '� •^ e"TLL I Ir �� \� �/ , WTtor n \\>�. s•; �/ _ ___-' I II II 11 \\ mlip 5 C.\•. � 1// I I I I I I J 1 \\ P.arwro \\ A&- AURORA IN VESTMEN TS LLC - -- P: • � `+f" "� "� :.. I .. _.,, '; r ..." dY. _ J �- ,I. Ai?no0�«✓t5T2E14TS LIC PID NO. 25$221300 L F_T. I, �, P 2 0P / I I I L L_�:1 J0119 KLINGE`HUTZ, / ) t•I _ PID NO 25.027040Q It PROJECT CONTACTS PROJECT REPRESENTATIVE: GREG FRAZIER - JAMES R. HILL, INC. (612)-508-6481 (M) PROJECT REPRESENTATIVE: TONY GODDARD - JAMES R. HILL, INC. (612)-965-4530 (M) PROJECT ENGINEER JOEL G. COOPER, P.E. - JAMES R. HILL, INC. (952)-890-6D44 (0) (612)-508-6480 (M) DEVELOPER: RON MULLENBACH - D.R. HORTON, INC.-MINNESOTA (952)-985-7827 (0) CITY: PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN (952)-227-1169 (0) CITY CONSULTING ENGINEER: KIMLEY-HORN & ASSOCIATES (651)-645-4197 (0) NPDES OFFICER: BRIAN COVE - MPCA (651)-296-7036 (0) CONTRACTOR REPRESENTATIVE: TO BE DETERMINED TO BE DETERMINED CONTRACTOR SUPERINTENDENT: TO BE DETERMINED TO BE DETERMINED iJOHN KLINGE HUT �ID NO. 25.D27040� o TITLE SHEET EXISTING CONDITIONS PRELIMINARY PLAT SITE INFORMATION EROSION & SEDIMENT CONTROL DETAILS PRELIMINARY GRADING, DRAINAGE, & EROSION CONTROL PLAN PRELIMINARY TREE PRESERVATION PLAN PRELIMINARY UTILITY PLAN PRELIMINI",RY LANDSCAPE PLAN DETAILS BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY — N. SIDE OF PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT 0 SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SITE AREA 5,259,434.4 S.F. OR 120.74 GROSS ACRES MINIMUM CITY SETBACKS FRONT 25 FEET SIDE (HOUSE) 5 FEET SIDE (GARAGE) 5 FEET SIDE (STREET) 20 FEET REAR 25 FEET Z � SCALE IN FEET 0 200 400 600 1 inch = 200 feet TS1 EXC1 PP1—PP2 SI1—SI2 ERD1 G1—G3 TP1—TP2 U1 L1 D1 CITY OF RECEIVEDSSEN MAR 0 12006 CHANHASSEN PLANNING DEPT Q' �► w N / m N {y m`i^ = o m W m 4 a-- LJ W o z Ind_LJ , LJ c rn rn `��D w 3 D..i Obi yj Co " \\ W LaJ � z 5 Q � s m m E T O r m O LinE O •— rn — — o S O0 n �3�s�N 'Y Z a � �o°° o do00 T N O N D U 0 9 d •t C- W TOD S U N O O rN w U ow� oI O O Un Ln W zW o z � z w O � o W J > W 1 r. 11 w Z I < J az � U2 0 • () Q o z< z W w z 0< Cn= = w z� V) Cn " E-1 0 O W E-4 M U W O U' O w Of m W W `1 N W o Cc ACc (N DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996TS PROJECT NO. 21996 TS1 FOX PROPERTIES LP Z I I I I C.S.A.H. NO. 14 (PIONEER TRAIL) PID NO. 25.0230 00 I AIA it 'O n 1 '1 •�/ y��y�.r /1� ( _ 1 1 / / / Nu. aW4- y - / , —_ /�/-�✓ I I J / / / I jJ I , 1 \ I \ `�.a" S�aWWVµ�l,J/, , I ! J 0 f � \ /A �l d/� 7 V�o, ` \\ d�� ;� y y_ y. _ ( / // // Q�i / i f l t// I II I ! / {/!I /� -- _ \\ v A\ \ \ ! `v VA' ONO /' ! i � 1 1 1 1 l\ \I\i �f�'a i) � l J ya,�� y \/ /j0� .III, \ \ \ \` \\ \\` kA v�vv v_ y� vvav����O01\\ - � JIY4 iL1Y. ill!IL +UYY- aWW iY4Y WIV i1NW N. 1fi iILLU[- Y!IV4 +yNlt Y1 9 ` Q \ �`�L OY LL�1fIIIIIIlIi,*9� I a/IYIY i1;Y. NII4 .III,. .LIYc a1,W. iWW. .JW. ...IY. NIY. ..{.I^,Y)h . ' .11, 1 .WI4 .WW. .WYc /,1 ! , t I I I I , ! I 1 / // / , �" , \ J `�• \ \ \ \\ `•` \ J Fy ay\\ ,` \`;, \ \ -- , t lJl/ Ill tlJ !l/ lflJ!/,///�',4:e"._,a, g If / �/ ,lC `yam` w Y 6 «•� / i /llll{ l / J!/i /! J/(/I//� I/f//JII J!/!f/ff /"'E I 1 \ \ y\ \ \\ \ N 1 \ �/ , I I/'//J/ 1lJ1 / lllllllll! I/ lj ;/JJ, ,,; I \ \\ P 11 �., \ 0�9y\�:.\\�\�;, \r__-1� I J \ I � I I, ' \ I �l.t� \ � \\ \ \•`a / �;y / O`� ��."' _. i/fffllJlff/lllt�il !f O.••:•. .'j / /-° / / / /// l; ////i/// i//If/ I !/ ! I / / — �/ / I I I 1 1 v . �;,vy�� Woo _ry16it A -- /'/// /// ff 1 /f/ //// �// // // J , 11 J f / / / \ l � '".J-� � — — \ _.. t � 1 , �- .,..\ \\ - � \\ •� ,\ \_. \ � (\\\ \\\\��`\\ / o awv. .wQ ""'. / ! / /saw - --_ _ - - - — _— -- —a6z/ / / / r / , f J / / I / % / f / / / f f f / / i r J; / / / / ' "� - - V A \ A '` \ A \I '; ( �� --1N y // / .�- --- --- _--- _-_ - - _ / jIt J /;J Iff l �; \4 \, \ \ ; 'n 11 " y� 1� �L_ m .` J ' / / /// / �e•z — — — _— _ _- — __ — _ _ _ // l i / / / J �/ . I l I I / / f , I_ / r r l \ 1 \ \ ` \ \' \ ` 1 / I h 1p'\ r `;\--_-- \, 1 'o\ / J Wy�y I I/I f'/ / ---. __---_\- "� \�\�. / ! ! Il" Q .wu. alwl. yawl¢ .wu. aum- i' . \ • j // "/ ,3 \ 1, `\ c� / �y. Illlil ''f/f/ \\\\---'//J/JIIIIIII( / ',\ \\\\\ \ m/ =_= ! I /_6,z-- - \ \ l /I JI/I IIIIII �JV,''/J/ \ so me \\\\\\\\ /� Il��li!//// - --- v�AVv VAAAV m 'u o £ " o I ` - r / ,\ v`.., \ V A A / / l i l i % / I I J , / / / T m •4d. a � e '°b 'c IS >' d � d � d � d i B $ + 1 I I �'I j 1. � �z" ! J l I I, °I \`` m y�r ���; .� 5\ �sY �'\\ \ "\\\ �. /�/ /j/ /Jff IJI/fl Ji/ ` / n\ \ \ ' \i'-_i *4.1 °i •s111 \ I I I ( I I I i r / \ \ -_ _-. `�' J , J/ /p \. / 9 1 _I I \ \ o ` \ \\\` \,< wu 1 / / / I I j9 _ \\\\\\\ _/ / /f/ ///////////f// I I -_J / % \\ \, " 11 0 I a1N14 al4Y. yaWl4 a4 ( , h \ \ \ ` It It $( II'\I,li1 ''+11iIIIIIIJ �•yti// _\ /�o- - - - , // \ I ^• I / J rl r✓I J i 7 I I I I 1 1 I i J / / / / \ \ \ \ _ _- _ /// ' i l i I — — \ \ '\ \ \ \ 1 \ I T / / _ — — �- __ _ _ \ �`- IJ / (� 4 _ �,`\, ' \\�:\H'` � �,`.,\��r\\ \—�: '9-/-- y--" =—/—�/ /-/' J// /s// �/ /! / /l Il/ l / ,l II /,/l/ /1I/ / // // // / I I III I I I I IIII III !, I. I IIII/ �III II / � / /•`_,az- ---- "_�� .�, --.��� 1 � - \\- -- -- --- ---- _ � // - `\. i\\ \a / / s l 'i. \ r, `..� ,. � \�- / / / / I I / / � I 1 \ t I I I I - - - - \ _ —-•6>�,',' I - - - '- _ l l l l , ! , f' / / /6,� C�� � � — j . , , / i� A ;� //I / - `* ����`:�`\ --_ j/', / a!/jf//� ff J / / /ili!'/ 1 f; / l I f �•^/ --\ \ /J /�° ,� I� \\ � �/ ,/ J/'/// /, fgB,x'1 q 1 � i � \ `� \ ��-`� �:•�-T — — , , %- 1�yu� ss�,=e y_`�ec ill \ /' / / / I ( ,' �. -'�- %'/ 7, , / I _ s NIAnI �I / n /1N- TI Ir- NIIAI / Ivvv I v v v NDI MNNESOTA LLC / PID NO. 25.0232300 -�IAI 'I / A (\F- TI II— N I I A I 'I / A vv I / `r ui CIE_ Ivvv I - -- It _ / 4 ___ __ ..-, l z 0 I - �..."°`...`r•-� -i- 1 -', - - _. _.. / ='Ch r. } I' -i \kURORA INVESTMENTS-LLCr' / / - VA PID N0 25.6221360 ' I ;; ; - -- - (C - ----------- --- I \ A RO nI -Y RAIfiS11LC'i;_.I, _- r_ PID 1\1 -__ II II II II ---._lo 1�.. ' I 1 I Ili '' �il JI II `I I a I I- I._'. I .�1?I I I li r - . T I �, yl 5 vC-}._.-rii�-q t-• _i: III 'Ir T-. n - - ' \'AI CIA ?-I ,I W1, W� I fV.V I.. /,L "U I^ - Ilr] _'^''. VI L_I -'I, �.' r, i f._ I H___-t'\..i, a II -n-' 11 • » �/ / ..' 42=+tom_- {� _- / a.r --- n a u YFY I-',—, ' _ �' _.. . �_ —.6 —L. I II n 1—� _ Z \ �' ^ z ` � y ii I — i r LEGEND EXISTING ASPHALT SURFACE -- -1 J )U------ EXISTING CONTOUR EXISTING GRAVEL SURFACE EXISTING DELINEATED WETLAND - -I EXISTING EXISTING WATERMAIN SANITARY SEWER EXISTING BUILDINGS < EXISTING STORM SEWER SOIL BORING - - - WETLAND DELINEATION ® EXISTING WELL EXISTING FENCE o EXISTING TELEPHONE PEDESTAL EXISTING TREE LINE/TREES BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT @ SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SCALE IN FEET 0 100 200 300 1 inch = 100 feet V V) M M N O _m --�� � �^ LLJ 2 N / ) m V K O]J a m w N N I L M w Z w N Q N _w z 3 i..i m IvwJ W w O W n Z cc z ¢ m m ^^ I�.L E O N C T b o — w E °c a 0 0 `0 2 cffi Z o 0�aoo ca�ov T� ry D� N ID C>, 1 C A S J oa au �gw OU J O 0 w w 0 � O N TN NVpU J.Sv 0) �It L 0 0 Lon n M a E-' co z z rx z z a L Q J J O O L d �� w Y � a=ZZz Q Li LiW U�V �z z v) ~♦ r 0zZ v�=� w� z� U O O w i� Ld W x m a Z w Y � F+a Ao 00 N DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996EXC PROJECT NO. 21996 EXC1 AURORA INVESTMENTS LLC PID NO. 25.0221300 GAYLE 0 & LOIS J DEGLER PID NO. 25.0221400 1325.36 S88008'10"E 1173.48 I � FOX PROPERTIES LP PID NO. 25.0230300 NDI MINNESOTA LLC PID NO. 25.0232300 IYi II�V IVL_-:V DLJ 111.11VIL v RIGHT OF ., PLAT' \ �J P r� J c� l l,I\ C-) r; Is A, / ,/ LIJ / 1327.16 S88036'18"E /aA'� i OUTLOT B I-12 J 2 \ / 19 I _ 99 S F / I / II J ' N N b° V) OUTLOT H I �13 UL L C21 5 v� / �� ��/ Ld �` \\ 17 2 2 ��53 3.7 N8po07 �� 3 69 A5 ,yam/ d coo 5�ryCD �I 14J , \\ 15\\ 16 \ �� / } o 14 ��- , ��� 23 �o I '�' N 1 y 2 00 z 25\\ J �J �zo -� 27 26 \\ 2� O Pam(\�0� �_� OU TLOT C o Q LL - - -� STREET '��29 \28 \\ \\ 59 '�8 N / 44662 S.F. 3 Q 1 > �3 0 \ G64 69° � o /� �� �✓ PNSP / ,-:--OPEN 40' a 0 � r � 2 � 3 4 ^z 357.75 - I` r BLUF�EEK O�6 I 0151 Cr C LINEE (800)- 20' KM I 114O LIMIT LINE JOHN KLINGELHUTZ �/ --- aB' ecaB auaBlrvc SEIHnU uMT uNL 0 f PID N0. 25.0270400 OUTLOT G �� '( �` �� '� i5 OUTLOT F N�5___ __ i LJ llB00 S.f. E 80'��---- < 300.00 00" v; 1'39" / ` ►`N 0`( - _ �=07 °30' _ 2°5 L - - - - - - �r� 1 188. 0 1 Ssti 'y`� / / l°00'17 iN R=2291 83 -;�8 W v -24°58,06 `C F-.D S\ p�3 356.69 N=� Li I__-- C BLUFF CREEK $%WY DSNCT 20BCOB ORMW LWII ONE OUTLOT A 785802 S.F. m Q' WOO BLIIL➢INC aEI LIMIT LINE 1 73.38 112.55 - L T21� 113 11 4 II 5o - E A 6/ w N _ �� 7 �1 L J WI 132� �8/ z Lea 2 J � L- � � / 31 \ � � L � � N � u 4� U/ %�28%���13//� \� 5� �/6 %U//27%/`\�`� 14i �\�Rs 2 \ 15 5� o i / 24 22\\ 2318 `��° ! - o �0� �10 jI 21 �J I L_-- 66.03 (0 �1� �11�r- 19 L__ Jo N F__ 20 �20 ^ n C-) J J 0 H M Z 04 w 04 0 > C4 Zo <z Of 0 d Q bi F� iri n JOHN KLINGELHUTZ \ PID NO. 25.0270400 ^I I A I1/\k AI IAlr\(\F v FJi \LJU vv VV\J\l LJ m0 0 co 0 ! / /=39°24'11" 275.09�- oo� o,`L",. <F, = N R=400.00 C.=269.70 hc0 '` �°� +1. �, 0 p S\ / us// I C. BRG.=N31 °48'30"E �1 ��ry�A `L pro (o Lo z L6 �CSAH NO. o;;� Cr 93.03-�o=02047'27" (PIONEER TRAIL) OUTLOT D i Q R=1909.85 714.11 /, rs HIGHWAY EASEMENT R BOOK 169, AGE 72 279 �' ° 109700 SF. 32 12.40/ 1 ' / / ! /N89°12'00"W o 480.51 - 1320.23 N89 09 11 W BLUFF CREEK / KLINGELHUTZ CONSTRUCTION CO GOLF ASSOCIATION PID N0, 25.0262120 PID NO. 25.0260800 / A AIN IN Ir-^(-'\TA f\r-�� A I -) 'TA Ar-N IT (-\r- T[) A N I. ��r-\I_)TA TIrlNI [)I7 I Imo' f-1 r- \AI A\7 ��I A T '1 r\ -1 / I V 1 1 1 v 1 v L_ ..: \J l i\ L/ L_ /-\ I\ I I V I L_ 1 v \J I\ /-\ V .� lJ l\/-\ 1 1 v 1\\ 7 F l I \J V v /-\ I L _i \ I lJ - I � Z I PROPERTY DESCRIPTION The Southwest Quarter of the Northwest Quarter of Section 26, Township 116 North, Range 23 West; and the East Half of the Northeast Quarter of Section 27, Township 116 North, Range 23 West, Carver County, Minnesota. SITE DATA LOT -SINGLE FAMILY 81 LOTS DENSITY ( DWELLING UNITS 1 1.3 D.U./ACRE (GROSS -COUNTY ROAD-OULOT B, C & DJ GROSS 120.74 ACRES LOT -SINGLE FAMILY 28.11 ACRES R.O. W. -EXISTING MnDOT ROW 47.38 ACRES -PROPOSED CITY ROAD - STREET (BY OTHERS) 1.62 ACRES -PROPOSED SUBSIVISION ROADS - STREET A, B, C & D 8.21 ACRES OUTLOTS -FUTURE DEVELOPMENT - OUTLOT B, C & D 9.97 ACRES -OTHERS - SINGLE FAMILY - OUTLOT A, E, F & G 20.73 ACRES -PARK - OUTLOT H 4.72 ACRES TOTAL 120.74 ACRES SINGLE FAMILY REQUIREMENT & DATA AVERAGE LOT WIDTH AVERAGE LOT AREA PROPOSED POND AREA WITHIN OUTLOT A MIN. LOT AREA MIN. LOT WIDTH AT SETBACK MIN. LOT WIDTH AT SETBACK FOR CORNER LOT MIN. LOT WIDTH AT SETBACK INCLUDING SIDE YARD SETBACKS MIN. LOT WIDTH AT SETBACK FOR CORNER LOT INCLUDING SIDE YARD SETBACKS MINIMUM SETBACKS FRONT 25 FEET SIDE (HOUSE AND GARAGE) 5 FEET SIDE (STREET) 5 FEET REAR 25 FEET N SCALE 'A FEET 0 150 300 450 1 inch = 150 feet \ A- ACCESS CONTROL 91.08 FEET 15,190 S.F. 15,300 S.F. 9,700 S.F. 85 FEET 100 FEET 90 FEET 90 FEET DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS.- 5 p JL_L_ NOT TO SCALE BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES AND REAR LOT LINES, AS SHOWN ON THE PLAT. n C) za rnn w c � i N N mom^ \ j� m N4 x Lai W_ E.., 1 tll 6 o In m co W EW � M O 7i z N 1 d V / E w Z � Cc Z m m J 0 0 Ln C a E f 1 O F+� 0 zz Q'i N Z z a w Q J J O 0 W W 1/��)•Z r1 I J Z a4 � o 0 p z z w ZN z Q O = .� Z < Z F- � a xw W xm a LLJ Z z Y ao • W A(N DRAWN BY PLM DATE 2/3/06 REVISIONS CAD FILE 21996pp PROJECT NO. 21996 PP1 C L0 0 N 0 0 0 z N 1n 6 c0 N B FF CREEK (9WR Y DISTRICT UNECi? 40 20' WW OR W LIMIT LINE lfl 40' BCW BUIUTNG SETBACK UMIT ONE 66 ` F 4 7 173.38 112.55 1 I _ s= S ---ry IN I0 �/ \ 3 M� 1 21^,4285 $.F. I I� 4 �� 5//(b / 20442 S F. I ^ 15516 S.F.$ F. 14976 S F. / 11 _-100.0----85.0-- ---85.D-85.0-- S 3 S.F. // 6 / 1 I1 (P 0. �. 23509 S.F 0 _ 363.41 STREET A :� 0 205.00 158.41 7 1 )� _ 12B.41 �9 `�'F 22666 5 F. OUTLOT A 30 30 40 1 \ q ��� vl 0 1 "z9a R 350D SF I N I 13000 S.F. I Z2 8 °N ro I W J N 14287 S.F. / \ L,0 _ 14156 S.F. 132 i N 130.00� N 2 I 31$. (� •7 {�. / `1Rv.14800 S.F. �` �\ 13565 S.F. W I 475 S.F. I V)I Q 11050 $.F. a9 L- �\\ 135.00 8 " 130.00 / �m 6 -0 C `\ 18 2 w� 30 30 - 21 29 \/ /66? 0 4 10 4 0.61 O ( 3 0 3 q \/ 14352 S.F. \ y 13246 S.F. 2 12576 S.F. q I p 12729 S.F., �Oa 0 1 m /(� �3-p d PROPERTY DESCRIPTION The Southwest Quarter of the Northwest Quarter of Section 26, Township 116 North, Range 23 West; and the East Half of the Northeast Quarter of Section 27, Township 116 North, Range 23 West, Carver County, Minnesota. W BUILDING FOOTPRINT 2,236 S.F (AVERAGE BUILDING FOOTPRINT). + 675 L0 Berkshire II = 2,212 SF S.F. (AVG. DRIVEWAY TO ROW)= 2,911 S.F. OF IMPERVIOUS N Braemar = 2,262 SF 2,911 S.F./15,190 S.F.= 19.16% IMPERVIOUS PROPOSED O Chesapeake = 2,437 SF = 35.00% IMPERVIOUS ALLOWED O In Colonial = 1,836 SF rn O Concord = 2,150 SF n 40 4, �' 4 .q / < 13181 S.F. �\ ,�� 1 2 I / \ Dover = 2,380 SF '7 Q �p 13973 S.F. \ \ // ` - 14699 S.F. N ,>` j lvs \ // Glenea les = 1,964 SF W I 5388 S.� S q`` / h� /,b ti�28" ��� A 13 F" g 'h w / 3/ ,\� \ �$ 5 sue, // �/ 13492 S.F. \ ° ,,1 �zss71 S.F. R \\ Hampton II = 2,448 SF 5 q •�,46,75.F./ �,� // ,�50� 0. 1 4 / \ Hancock = 2,312 SF O, 7 18166 S.F. 2 18802 S.F. *Sl /^ 6 �� //^y'T 27 ^�, \/� �a � /\ / 5335 S.F. BS0 99 sq / fig. \ \ rs Legacy = 2,126 SF / 14458 S.F. \\ p 6 \�sq o°a /�yo�� \ < ��ti° 1926023 E / ,0 yo o / 15 Saddlebrook = 2,290 SF > / B� ` 8.9J- \ `iP3, 16731 S.F. / \ \ 15353 S.F. / 7 / /� �j / 25 .q //bo \� Saddlebrook B = 2,410 SF v /N �6`0. 13923 S.F. 16397 S.E \ \ q AVERAGE= 2,236 S.F. 73 S.F. /"'V / 16 g �^ bti. 24'�� �P 17931 SF `�, 15082 S.F. // \ / / / �5. \Qp14674 S.F. \ Q /9 �r �y 11648 S.F. Q /66 \ �/ _ 223.73� a, r v 08 4 0\ / o \VP / ,1 r//�) 4 G O L ,\ 9 / n °1 16425 S.F. \ 11648 �q 1769,OJS.F./ \ ma's q I / , �, 22 "� 23 1 163.54 \ /00 `, �626 I `fl\ 16351 S.F. N \ 19553 S.F. \ �01W 61 ,310m 10 h �� 92z4 I 18 �\\ ° ��- 1327.16 S88036'18"E •�\ -`\� 411648 S.F. ', 4 13760 S.F. J e 21 r �� v _- 20 43 66.03 N hh ry - 19203 S.F, yJ 0°,� Tc 196.81 36.06 �I 6 19 130.0 L- 181.81 b 4I 11 L19067 S.F. 13057 ( O`,.STREETOMB N ns,os.F. 4 12099 SF. N I w I 30_ _30 p` 20 4 00 ` b`'0�r- y`'�- , 24.54 J o 0 OUTLOT B - --- \ .w N titi' 30 - 200.57 W o ns9n S.F. n 40 40 130.00 130.00 16351 S.F. u,v 3p d ^ W -85.0-_ 105.0-h 20 W 0 -11 ,�8444 S.F. 180 S.F.po 113199 S.F. Q17759 S.F. a NN m� m .. 310030 a12 1� 18LO --- _30 � � J a 176.10 v/ 215.14 OUTLOT H 130.13 13 L _ - J L N 21 25.75< N 01' _ N-- !f 60. 1 0 17404 S.F. b 205,645 S.F. 13 Q 30 30 0 1 , 51 n r CV (V •I i5B48 S.F. , " 176.15 / 9 12368 S.F. 1 p� .y J_- ` 353, � m �.02 lip 1 7 , " ee 30 30 y,0g ,5 7g N80°01 33 W I�/�43.46 �\ 148107 S.F. Ci 6.52 ��jj 11' b V / r 43.46 1 r \� \ 6' \ ,`°� / m 2 2 39 yytih 14 1 1 6 �\ / Ory ; 14361 S.F. �3 p T 's0 ' I 12844 S.F. ` 1 • ' � \ 8 � \ 13553 S.F. - m j _100.0- 15 13306 S.F. / 10 h� 18,7 w �� 23 3� 16256 S.F. ,69 W T'1 40 40 Tip 1 5 0 1 ^1 w 414 / A ,O 18594 S.F. 1 °i W�, `�GG \ 1, �8'� \\ N (n 1W 1 17716 S.F. 1 30 30 "'� O V / �9 24 �S, N w 701Io �,32.68 0\ g5\\ 14416 S.F. o ^ P w �/ 25o a'i S 46 8 14 4 W ,W cJ.� �)A50�- 73 132 • to / 2s. \\ 11900 S.F. O \ J Q 139.56 ,�758 W 000 �8526 0 TREES ,-^��' 4�, o,a/ o ` � �\ 119005E 0\\ l� P A 6�' ?% 62.01 o p �So 27 o o $ 00 a \4 1 y . g6 o 2 ^ �\ 8 D\\ 12148 s.F. \\ 5 69 21 0 O� Yn 120.64 y p 12399 S.F. 17912 S.F. 4� ) 00`, .i80 O` U` Z O �O\ \11176 S.F. %\ \ 03 0 C�� �� 00 12035 S.F. , - a a n3 - 175.1, 0 � 4 / � / I n519 S.F. I I� 22224 S.F. � 15972 S.F. 91.78 `a 8 135? 23 BLUFF CRC 1OV Y DISTRICT // r°�$ 20' BC W CRADMG OMIT LINE 40' BWD BUI DNC SETBACIt OMIT urvE SOU TLOT G U TLOT 54807 S.F. �� \ 37882 S.F. 8.24, � \ o OUTLOT E N 24248 $M1F3ry(9 ti \\Q Iw N 6�9 06 O�Q P N SCALE IN FEET 0 100 200 300 1 inch = 100 feet -A-A-A- ACCESS CONTROL SITE DATA LOT -SINGLE FAMILY 81 LOTS DENSITY ( DWELLING UNITS l 1.3 D.U./ACRE (GROSS -COUNTY ROAD-OULOT 8, C & DJ GROSS 120.74 ACRES LOT -SINGLE FAMILY 28.11 ACRES R.O.W. -EXISTING MnDOT ROW 47.38 ACRES -PROPOSED CITY ROAD - STREET (BY OTHERS) 1.62 ACRES -PROPOSED SUBSIVISION ROADS - STREET A, B, C & D 8.21 ACRES OU TLOTS -FUTURE DEVELOPMENT - OUTLOT B, C & D 9.97 ACRES -OTHERS - SINGLE FAMILY - OUTLOT A, E, F & G 20.73 ACRES -PARK - OUTLOT H 4.72 ACRES TOTAL 120.74 ACRES SINGLE FAMILY REQUIREMENT & DATA AVERAGE LOT WIDTH 91.08 FEET AVERAGE LOT AREA 15,190 S.F. PROPOSED POND AREA WITHIN OUTLOT A 15,300 S.F. MIN. LOT AREA 9,700 S.F. MIN. LOT WIDTH AT SETBACK 85 FEET MIN. LOT WIDTH AT SETBACK FOR CORNER LOT 100 FEET MIN, LOT WIDTH AT SETBACK INCLUDING SIDE YARD SETBACKS 90 FEET MIN. LOT WIDTH AT SETBACK FOR CORNER LOT INCLUDING 90 FEET SIDE YARD SETBACKS MINIMUM SETBACKS FRONT 25 FEET SIDE (HOUSE AND GARAGE) 5 FEET SIDE (STREET) 5 FEET REAR 25 FEET DRAINAGE AND UTILITY EASEMENTS , ARE SHOWN THUS: F--- 0 5--1 -1- 0 O NOT TO SCALE BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES AND REAR LOT LINES, AS SHOWN ON THE PLAT. '^ V' n n �2 c � i � Ck:� - my §n N O _J x N N 5 �p af O N W O W 1 I..LIInd o 00f Z N Z N CD ] w 3Z mwZ CIOO M O \N = Na'^'a ESE W O ZCIL o m Q It It 0 Lon Lo rL W ~ L� zfN 1 w Z �y w E z= w ^ �Lj w w Q a J w 1/0 ZLi I J a� Z •o Z �U0 O zN w z IFS OU) Z w via 2 z� � �y Fij U w � w C-� W ^ W a O w 0 w O xZ m w Y W O c0 • A04 W DRAWN BY PLM DATE 2/3/06 REVISIONS CAD FILE 21996pp2 PROJECT NO. 21996 PP2 0 01 PEWO'."` 0. PEMA i vlo"- -J 1 N, 'Z�N — -% - ��x �§\ K o Yba \ I � I 1 i -yy PEYCd l� PENCd s �1 PELCd , USGS MAP 1 inch = 600 feet /:/ ocu• '.. I / // - i -*. -��m PEW . PMCd 1 BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SOIL GROUP MAP inch — 200 feet e Cn n a z m h w p V O � � Z V' O x my \ lam Q m W N N µ n o M w o z GC z �� 3^ FO 3 W w ZWZ O O N O LL LL Wcc O Z � o Z z z Q � 6 m m E m ° Y O 4 a a n o ° c ° t o 0 3 d o a o o O ft 0 o a� TL N O� UI [O - � c J � 0 N O O �i It 0 Cu� a w o Ld z zz /W W Q O �"'� M J O � W .11:4W J A' f „4 Z I Y azoo�o z�w w �Z Z " ft N �y< U W z� O O F�j W 1--q U v ` O 0 w xm m a z w A� DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996SI PROJECT NO. 21996 S11 I I n/ Vr� 4 leiaiFFa aauU G \ } I 1 a F ! / I II '1"'� y jl I - I lillil11,i41,�l11 i �i) r I it r I lI ./ i /�/�,.. �.AA r Vs�� -i/ , , ! •' -� 1 a 2.80 Acres If i 0"— 17,82 cle ns' It's s _ now Ill t I_�,I pp A19 a � �rJ I " II I✓ I�� t J' EXISTING DRAINAGE r 3 �11 i�V i!Il1lir. � °�..- 11I BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY — N. SIDE OF PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM kl S f .,1 J PROPOSED DRAINAGE / / -7 (PRY (PIGfFII >IPAw•) h / I/ y c.i N M 0 u7 w . I O I 2 N / V / m Z ACT X m� O x Q m LL w W LLI O Z N O Of w p, , \ a ch: c w O Z 5 E 0 cc � 6 ^JQ1 E N C T p J � m a yp •- o c 0 n N 1.0 O 3 N s a'. Z v 0 d v 7 0 0 O 0 ca 0y0O T O N 0 E - O E y u 0 acvi .�, 00 N p T N Hu 0 OLo uo a E w Z o z N Z zz W O r Ow > ILL] � � N W z ' I Y a J P-4 Z z O • �V �z o I-�. FI w L w 0 a I- Z Z Lo u) a U W y 1�-� O ~ O W '�^ � E v` O 0 wa xm w O 0 W . A� o0 DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE E 21996SI PROJECTNO. 2996 S12 -NL u■ TEMPORARY EROSION & SEDIMENTATION CONTROL METHODS (THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION). S 1. TEMPORARY MULCH MnDOT TYPE I AT A RATE OF 2 TON /ACRE AND DISC ANCHORED. 2. HYDROSPREAD Meri TYPE 6 HYDRAULIC SOIL STABILIZER. a. HYDRAULIC SOIL STABILIZER : MnDOT TYPE 6 AT A RATE OF 350 LEIS/1000 GALLONS OF SLURRY. b. WATER : 675 GALIDNS/1000 GALLONS OF SLURRY. 3. TEMPORARY SEED & MULCH (SEASONAL) a. SEED : MnDOT SEED MIX N150 AT A RATE OF 40 LBS/ACRE. b. MULCH i MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. c. FERTILIZER : 10-10-20 AT A RATE OF 200 LBS/ACRE. 4. TEMPORARY SEED & MULCH (SPRING) ) a. SEED MnDOT SEED MIX 1y110 AT A RATE OF 100 LBS/ACRE. b. MULCH MnDO T TYPE 1 AT A RATE OF 2 TONS ACRE AND DISC ANCHORED. c. FERTILIZER : 10-10-20 AT A RATE OF 200 LHS/ACRE. 5. TEMPORARY SEED & MULCH (WINTER) a. SEED : Mel SEED MIX d100 AT A RATE OF 100 LBS/ACRE, b. MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. c. FERTILIZER : 10-10-20 AT A RATE OF 200 LBS ACRE. 6. HYDROSPREAD SEED, FERTILIZER, & MnDOT TYPE 6 HYDRAULIC SOH STABILIZER a. SEED : Mel SEED MIX #190 AT A RATE OF 10 LBS/1000 GALLONS OF SLURRY b. FERTILZER : 10-10-20 AT A RATE OF 50 LR3/1000 GALLONS OF SLURRY. c. HYDRAULIC S STABILIZER MnDOT TYPE 6 AT A RATE OF 350 1000 LBS U C IL 0 / GALLONS OF SLURRY. d. WATER : 875 GALIDNS/1000 GALLONS OF SLURRY. 7. TEMPORARY SEDIMENTATION BASINS WITH STANDPIPE OUTLET & EMERGENCY SPILLWAY SEE DETAIL). . ) 8. TEMPORARY SEDIMENTATION TRAP WITH SPILLWAY (SEE DETAIL). 9. ROCK CONSTRUCTION ENTRANCE (SEE DETAIL). 10. HORIZONTAL SLOPE GRADING (SEE DETAIL). 11. DITCH CHECKS MnDOT TYPE 3-12" BIOROLL WITH Mel CATEGORY 3 EROSION CONTROL BLANKET (SEE DETAIL). 12. EROSION CONTROL BLANKET MnDOT CATEGORY 3 (SEE DETAIL). 13. PERIMETER SILT FENCE (SEE DETAILS). 14. INLET PROTECTION (SEE DETAILS). PERMANENT EROSION & SEDIMENTATION CONTROL METHODS (THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION), 1. GENERAL SEED & MULCH (MIN, 6" TOPSOIL) e. SEED : MnDOT SEED MIX #250 AT A RATE OF 70 LBS/ACRE. b. FERTILIZER : 22-5-10 BOX FIN. 05 CL AT A RATE OF 350 IHS.ACRE. c. MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. 2. POND SEED & MULCH (MIN. 6" TOPSOIL). a. SEED : MnDOT SEED MIX p310 AT A RATE OF 82 LBS/ACRE. It. FERTILIZER : 18-1-B NATURAL BASE AT A RATE OF 120 LBS/ACRE. c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 3. WETLAND SEED & MULCH (MIN 1' HYDRIC TOPSOIL) a. SEED : MnDOT SEED MIX d326 AT A RATE OF 84 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE. a MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 4. UPLAND BUFFER SEED & MULCH (MIN. 6" TOPSOIL). a. SEED : MnDOT SEED MIX k328 AT A RATE OF 88 LBS/ACRE, b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE. c. MULCH : Moll TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 5. TEMPORARY COVER CROP FOR UPLAND BUFFERS & WETLAND MITIGATION a. SEED : MnDOT SEED MIX Q110 (SPRING) OR #100 (WINTER) AT A RATE OF 100 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE. c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 6. GENERAL NATIVE SEED & MULCH (MINIMUM 6" TOPSOIL) a. SEED : MnDOT SEED MIX #350 AT A RATE OF 84.5 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE. c. MULCH Mel TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 7. SOD NARRATIVE & NOTES 1. DESCRIPTION OF CONSTRUCTION ACTIVITY. THE PETERSON PROPERTY IS A SINGLE-FAMILY RESIDENTIAL DEVELOPMENT ENCOMPASSING 120.74 ACRES. THE CONSTRUCTION WILL INCLUDE MASS GRADING, UTILITY AND STREET INSTALLATION, AND STABILIZATION OF THESE AREAS. 2. PHASE CONSTRUCTION TO MINIMIZE SOIL LOSS. 3. ALL EROSION & SEDIMENT CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, TEMPORARY SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED. se. ROCK CONSTRUCTION ENTRANCES. b. SILT FENCE & TREE PROTECTION FENCE. c. EXISTING INLET PROTECTION. cL TEMPORARY CULVERTS. e. TEMPORARY SEDIMENTATION BASINS, TRAPS, AND OUTFALL FACILITIES. I. STORM WATER POND CONSTRUCTION. g. COMMON EXCAVATION AND EMBANKMENT, UTILITY INSTALLATION AND STREET CONSTRUCTION. h. TEMPORARY SEED AND/OR MULCH. I. HORIZONTAL SLOPE GRADING. j. DITCH CHECK, SILT FENCE, & EROSION CONTROL BLANKET. k PERMANENT SEED AND MULCH AND/OR SOD. 4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS AND IMPLEMENT ANY ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY. 5. ALL EROSION & SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 6. THE CONTRACTOR SHALL PROVIDE OR CONSTRUCT TEMPORARY STORM WATER DRAINAGE FACILITIES AS MAY BE REQUIRED TO ALLOW THE CONTRACTOR TO CONDUCT CONSTRUCTION OPERATIONS WITHIN THE MINDING AREAS AS SHOWN ON THE PLAN AND AT THE SAME TIME MAINTAIN STORM WATER DRAINAGE THROUGH THE SERIES OF AFFECTED STORM WATER PONDING AREAS. 7. DO NOT DISTURB ANY AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED. 8. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS, AND OTHER VEGETATIVE COVER TO HELP MIER RUNOFF. 9. COVER OR STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE (SEE TIMELINE PART IV 82-4 & g15). 10. TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL CLIMATE CHANGES OR WEATHER EVENTS. 11. DELAY CONSTRUCTION OF INFILTRATION MEASURES UNTIL THE END OF THE CONSTRUCTION PROJECT WREN UPSTREAM DRAINAGE AREAS HAVE BEEN STABILIZED. 12. DO NOT REMOVE TEMPORARY PERIMETER CONTROLS UNTIL AFTER ALL UPSTREAM AREAS ARE FINALLY STABILIZED. 13. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO KEEP PUBLIC STREETS, TRAVEL WAYS, PARKING LOTS AND TRAPS UTILIZED FOR INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT AND OTHER DEBRIS WHICH RESULTS FROM SAID CONSTRUCTION. COST FOR THIS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT. 14. ADEQUATE CONTROL OF DUST SHALL BE MAINTAINED BY THE CONTRACTOR; NO PAYMENT FOR DUST CONTROL WILL BE MADE. 15. ALL DISTURBED AREAS NOT SPECIFICALLY MENTIONED IN THE FOLLOWING NPDES REQUIREMENTS PART IV. B. MUST BE STABILIZED WITHIN ONE WEEK OF THE COMPLETED CONSTRUCTION OPERATION. PART IT. SUBMITTING THE APPIICATION B- APPLICA:nON,ANDDURATION W COVERAGE 5. Change of Coverage. For storm water discharges from construction projects where the owner or ratorchro es e.. on "sal developer sells ime.fthe ro rt to various o , as Pe t ,( (e.g., or Per Port P re Y hnmebuildea) the new owner of operator must submit a subdivision registration within 7 days ofassumin operational control oftbe site commeucin work on their portion of the site or of g oP g the legal I transfer= sale or closing on theprop".For instances where an owner or operator of an entire project changes after an application has been submitted under Part II the new owner or operator must submit an application fur permit transfer/modification within 7 days of assuming control ofthe see or commencing work on -site, or ofthe legal transfer, sale or closing on the property. Late submittals will not be rejected; however, the MPCA reserves the right to take enforcement for an un nnitted discharges or permit noncompliance for the new registered Y po B R Paparty that has assumed control ofthe site. For storm wafer discharges from construction activities where the owner or operator changes, the new owner or operator can implement the original SWPPP created for the project or develop and implement their own SWPPP. Permittee(a) shall ensure either directly or through coordination with other Permittee(s) unit their SWPPP meets all terms and conditions of This permit and that their activities do not render another parry's erosion preened" and sediment control Beat Management Practices C. TERMINATION OF COVERAGE 1. Permittee(s) wishing to terminate coverage under this permit mug submit a Notice of Termination (NOT) to the MPCA. Compliance with this permit is required until a NOT is submitted. lbe Permitta(s) authoriz tim to discharge under this N mit terminates m midnight ofthe day the NOT is signed. 2. All Permitter(s) must submit a NOT within thirty (30) days after one or more of the following conditions have been at: Final stabilization see Part IV.G. and definition in Appendix B has been achieved an all a. ) PPe portions ofthe site for which the Permidce is responsible (including the removal ofall ten measures such m silt force and if applicable, returnin agricultural land m its re- temporary aPP g>� P consWctiov agricultural use); b. Another owaerolimrmor (Peredidee) has assumed control according to Pan fIR.5 over all immediate site that have not been finally slabil essaL or c. For residential construction only, temporary erosion profession and down gradient perimeter control for individual lots has been completed and the residence bus been transferred to the homeowner. Additionally, the Familiar most distribute the MPCA's "bomeowaer nelsheet" to the homeowner to inform the homeowner of the need for, mid Mmfits of, final stabili=tion. 3. Permitfeen) that use an alternative method for the permanent storm water management system as described in Pan IIIC.5, are prohibited from terminating this permit until final stabilization has been achieved on site and either. a. The two years of monitoring dam has been submitted to the MPCA and the MPCA has dominated that the required treatment has been achieved. The Perm unit will be notified in writing within 30 days after the monitoring data has been submitted. If the Parallel has not heard from the MICA within 30 days after submritting the required dam, the Pcrmittee can submit a Notice ofTermimtioo. b. The Perminee can submit a Notice of Termnatioa, even if the timeframe is less than two years, if the MPCA detemrines that the alternative method is achieving the required treatment. During the monitoring and evaluation ofthe alternative method, the Parmidce is not responsible for other permit requirements that have been transferred as described in Pan H.B.5. PONSIBILITY THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS THE PROPOSED PERMANENT PONDS CITY OF CHANHASSEN WILL HAVE RESPONSIBILITY FOR LONG TERM OPERATION AND MAINTENANCE OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM. (CONTRACTOR) WILL HAVE RESPONSIBILITY FOR IMPLEMENTATION OF THE 9a`PPP BEFORE AND DURING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AS FOLLOWS: CONTRACTOR : BUSINESS NAME CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) THE CONTRACTOR SHALL FOLLOW THE IMPLEMENTATION SEQUENCE AS SHOWN ON THIS SHEET. CONTRACTOR SHALL ADHERE TO ALL THE REQUIREMENTS OF THE MINNESOTA POLLUTION CONTROL N.P.D.E.S. PERMIT. ALL BEST MANAGEMENT PRACTICES (BMP'S) SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS AND ESTIMATED DURATION OF USE. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS, DEVELOPMENT SUMMARY TOTAL PLATTED AREA NUMBER OF SINGLE FAMILY LOTS TOTAL DISTURBED AREA EXISTING IMPERVIOUS AREA PROPOSED IMPERVIOUS AREA ±120.74 AC. 82 EA ±35.68 AC. f2.91 AC. t12.31 AC. TYPICAL PROTECTION AROUND BACKYARD CB'S INSTALL IMMEDIATELY AFTER CB INSTALLATION) HEAVY DUTY SILT FENCE -FASTEN TO STAKES STEEL POST EACH CORNER -- �- REAR YARD STORM SEWER STRUCTURE REAR YARD CATCH BASIN INLET PROTECTION NOTE: PREMOLDED SEDIMENT CONTROL BARRIERS SUCH AS ROYAL'S INFRASAFE COVER OR EOUIVALENT ARE AN ACCEPTABLE ALTERNATIVE. 2%2"X18" MIN. WOOD STAKE -2' MAXIMUM SPACING �12" BIOROLL ^� WATER - FLOW CROSS SECTION PROFILE VIEW DITCH CHECK - MnDOT TYPE 3 MnDOT CATEGORY 3 EROSION CONTROL BLANKET -STAPLED & TRENCHED IN r-DITCH GRADE PART TH. STORM WATER DISCHARGE DESIGN REQUIREMENTS D. RECORD RETENTION The SWPPP all changes Ira i and ins limns and maintenance records must be kept m the site g t p during construction by the retention,w who has opermnnui control ofha[ portion ofthe site. The SW PPP can be kept in eillrer the field office ur in an an sin vehicle. All owners) must keep the SWPPP, along with the following additional mcunb, on file for three Years all" subrould ofthe NOT. outlined in Part D.C. This does nut include any records after submittal ofthe NOT. I. A other permits required for the Any P req PmJcot; 2. Records ofall inspection and maintenance conducted during construction (see Part IV. E. Inspections and Maiu m); 3. All permanent creation and maintenance agreements that have been implemented, including all right of way, contracts, conscious and other binding requirements regarding perpetual maintenance; and 4. All required calculations for design offs, temporary and parromemt storm water management systems. PARTIV. CONSTRUCTION ACTIVITY REQUIREMENTS A. STORM WATER POLLUTION PREVENTION PLAN The Permida a must implement the P and the requirements f () lmplen SWPPP o tits pert. The Best Management Practices (BMPs) identified in the SWPPP and in this permit must be installed in an appropriate and functional manner. B. EROSION PREVENTION PRACTICES 1. The Permfttce(s) must plan fur and implement appropriate construction phasing, vegetative buffer strips, horizontal slope grading, and other construction practices that minimize erosion, so that the inspection and maintenance requie me of Part N.E. are complied with. The location of areas not m be disturbed must be delineated (e.g. with flags, stakes, signs, silt from etc.) on the development site before work begins. 2. All exposed soil areas with a continuous positive slope within 200 lineal feet of a snrface water, oust have temporary erosnn protection or permanent cover for the exposed soil areas year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can remain open when the area Steeper than 3:1 7 days is not actively being wmtted,) 10:1 to 3:1 14 days Flader than UI I 2L days These meas include constructed storm water management pond side slopes, end any exposed soil areas with a positive slope to a storm water conveyance system, such its a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or true made systems that discharge to a surface water. Temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition conme/e stockpiles, sand stockpiles) are exempt from this requirement but must comply with Part IV.C.5. way• yer 4f�. �larw1 =s=j v NPDES REQUIREMENTS 3. The normal wetted perimeter crony temporary or permanent drainage ditch that drains water fiom a construction site, or diverts water around a site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge many surface water. Stabilization must be completed within 24 hours of connecting to a surface water. 4. Pipe outlets must be provided with temporary or permanent energy dissipation within 24 hours of connection to a surface water. C. SEDIMENT CONTROL PRACTICES 1. Sediment control practices must minimize sediment from entering surface waters, including curb and gutter systems and storm sewer inlets. a, Temporary or permanent drainage ditches and sediment basins that we designed as pan of a treatment system (e.g.. ditches with rock check dams) require sediment central practices only as appropriate for site conditions, b. Tithe down gradient treatment system is overloaded, additional upgradient sediment control practices mug be installed ' p sta ed to eliminate the overloading, and the SWPPP must be amended to identify these additional practices as required in Pan DLA , a through c. c. In order to maintain sham flow and minimize rills and/or gullies, there shall be no unbroken slope length of greaterlhan 75 fat for slopes with a grade of 3:1 or steeper. Sediment central practices must be established on al wet pr s I do gradient perimeters before any upgradient land disturbing activities begin. These practices shall remain in place until final stabilization has been established in accordance with Pan N.G. 3. The timing of the installation armistices control practices may be adjusted to accommodate short -tear activities such as clearing or grubbing or passage of vehicles. Any short -teen activity most be completed as quickly as possible and the sediment renal practices must be installed immediately after the activity is completed. However, sediment cenlrol practices must be installed before the next precipitation event even if the activity is not complete. 4. All storm drain inlets man be protected by appropriate HMPe during construction until all sources with potential for discharging to the inter have been stabilized. 5. Temporary soil stockpiles must have silt fence or other effective sediment contrah, and cannot be placed in surface waters, including seem water conveyances such as curb and gutter systems, or conduits and ditches. 6. Vehicle tracking of sediment form the construction site must be minimized by BMF. such m stone pads, concrete or steel rash racks, or equivalent systems. Street sweeping must be used if such BMPs ore not adequate to prevent sediment from being tacked onto the street (see Pan N.E.4.d.). 7. The Pennines must install temporary sedimentation basins as required in Pert TILB, of this permit. U. DPWATERING AND BASIN DRAINI 1. Impeaching or bash daining (e.g, plmped discharges, trench/ditch cuts for drainage) related to the construction activity that may have turbid or sediment laden discharge water must be discharged to a temporary or permanent sedimentation basin on the project ADDITIONAL ALTERNATIVE 6" ROCK LOG FILLED WITH 1 1/2" CLEAR ROCK CATCH BASIN INLET PROTECTION - FILTER AGGREGATE 2 EACH DUMP STRAP - 1" (25 men) REBAR FOR BAG REMOVAL FROM INLET SILTSACK EXPANSION RESTRAINT [1/4" (6 men) NYLON ROPE, 2" (51 ram) FLAT WASHERS] DUMP STRAP ADDITIONAL ALTERNATIVES' THE CONTRACTOR MAY REQUEST, FROM THE ENGINEER, APPROVAL OF ALTERNATIVE DEVICES. CATCH BASIN INLET PROTECTION - SEDIMENT FILTER SACK HEAVY DUTY SILT FENCE AT FLARED END SECTION TOP OF SILT FENCE TO BE LOWER THAN LOWEST ADJACENT OVERFLOW HEAVY DUTY SILT FENCE -FLOW FLARED END SECTION PROFILE PLAN FLARED END SECTION INLET PROTECTION Spacing on upper end •• is _,4" Overlap .• re I-1 3' Minimum level 6" 6" 1' Spacing on Staples Anchor slot I *MINIMUM ANCHORING SHOWN alternative Fold under 5"- EROSION CONTROL BLANKET -CATEGORY 3 (TO BE INSTALLED PER MANUFACTURE'S SPECIFICATIONS) 6' STEEL FENCEPOSTS 6'-8' SPACING BETWEEN POSTS POLYETHYLENE SNOWFENCING TREE PROTECTION FENCE PROJECT CONTACTS PROJECT REPRESENTATIVE PROJECT REPRESENTATIVE PROJECT ENGINEER DEVELOPER: CITY: CITY CONSULTING ENGINEER: NPDES OFFICER; CONTRACTOR REPRESENTATIVE: CONTRACTOR SUPERINTENDENT: L site whenever possible. If the water cannot be discharged to a sedimentation basin prior to enteringthe t treated with the to e surface water, r must be a appropriate HMPe, such that the discharge does not adversely affect the receiving water or downs Town landowners. The Permltiee(O must ensure for discharge points are adequately protected from erosion and scour. The discharge must be dispersed over natural rock riprap, sand bags, plastic sheeting or other accepted energy dissipation measures. Adequate sedimentation control measures are required for discharge water that contains suspended solids. 2. All water from devastating or basin draining activities must be discharged in a manner daM does riot Muse nuisance conditions. erosion in mention; charems (a on downdope Properties, or inundation in wetlands causing significant adverse impact to the warned. E. INSPECTIONS AND MAINTENANCE 1. The Permittee(s) (either the owner or operator, whoever is identified in the SWPPP) must routinely impact the construction site once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours. Z All inspections and maintenance conducted during construction must be recorded in writing and these records must be rerouted with the SWPPP in accordance with Part IILD. R i ce ,cords of each inspection and roaintenan activity shall include: a. Date and time of inspections; I. Name ofperson(s) conducting inspections; c. Findings ofinspections,including recommendations for corrective actions; d. Corrective actions taken (including dates times end completing ( ud rag party p rag maintenance activities); e. Data and amount of all rainfall events greater than P2 inch (0.5 inches) in 24 hours; end f Documentation of changes made to the SWPPP as required in Part III AA 3. Where parts ofthe construction site have undergone MM stabilization, but work remains an other parts of the sift, inspections ofthe stabilized areas may be reduced to once per month. Where work has been suspended due to frozen ground conditions, the required inspections and maintenance must take place as scon as ranoffoccurs at the site or prior to resuming cautruction, whichever comes first, 4. All erosion prevention and sediment control BMP. must be inspected to ensure integrity and effectiveness. All nonfunctional BMPs must be repaired, replaced, or supplemented with functional BMPs. The Fervidness) must investigate and comply with the following inspection and maintenance requirements: a. All silt fences most he repaired, replaced, or supplemented when they became nonfunctional or the sediment reaches 1/3 ofthe height of the fence. These repails must be made within 24 hours ofdiscovery, or as was es field conditions allow access, b. Temporary and permanent sedimentation basins must be drained and the sediment removed when the depth of sediment collected in the basin reaches 1/2 the storage volume. Drainage and removal must be completed within 72 hours effortlessly. or as soon as field conditions allow access (sae Pan IV.DJ. 6'm` a._fiarvlg Nate: Silt fence pet MMDOT specificafens, source 2000, machine sliced waxen monoflomml, 36'wide foslmed steel T-Pests with 3(501b) fens strength plastic zip ties per T-Post. (Machine sliced) EROSION CONTROL FENCE - TYPE 1 T Penis 24' 'a gourd Ties an tv, of LI ,cow e,l Note: Type 2 silt fence is the tame as fro, I with hoe titles installed as per M. Type 2 to be used to protect MI wetlands. s s ". ranee ,.,.....tee".,...,...... Zip Ties -",I w...eete I- ......w EROSION CONTROL FENCE - TYPE 2 CITY OF SILT ClUBA89E1 FENCE aNSED:r-ar. r-m.,-m.,a arz: 2-97 PUTS ao.: 5300 n NOTE Silt fence per MNOOT specifications. source 200, machine sliced woven monofiloment, 36" wide fastened to steel T-Posts with 3(501b) tensile strength plastic zip ties per T-Post.(machine sliced) SECTION AA }CITY OF OFF ROAD CB [ANU21 1 FILTER BARRIER tart: 2-01 poor his; 5302 c. Surface craters, including drainage ditches and conveyance systems, must be inspected for evidence ofsedireent being deposited by erosion. The Permilma s) at remove all deltas and sediment deposited in surfiwe waters, including drainage ways, each basins, and other drainage systems, and mobilize the areas where sedment removal results in exposed wit. "The relmvel end stabilization must take place within seven (7) days of discovery unless precluded by legal, regulatory, or physical access constrain6. The Permitter shall use all reasonable effores to obrain access. D'precluded, removal and stabilization must take place within seven (7) calendar days of obtaining access. The Pere iltee is metastable for contacting all local regional, state and fed , federal authorities and receivi ng n an applicable traits g Y aPP ce = prior to conducting any work. I. Construction site vehicle call locations must be inspected for evidence of off -site sediment tracking onto paved surfaces. Trucked sediment muss removed a all ff o-site red surfaces within 24 Forms of discovery, p w or if applicable, willwn a shorter time to comply with PertIV.C.b. e. The PermiH a are responsible for the o ,ter W Aeration and all erosion cramping) and permanent water quality management HMPa as well as all erosion pmeofioe and sediment ceultrat BMP i a for the duration ofthe conswctionwork at the silt. The Permitta(e) are responsible until another Permitter has assumed control according to Part ILB.S over all areas of the site that have not been final ly stabilized or the site has undergone renal stabilizathe d a g LL an NOT has been submitted to the MPCA. E If sediment escapes the exclamation site, off -site accumulations ofsedunent must be removed in a manna and at a frequency sufficient to minimize off -site impacts (e.g., fugitive sediment in streets could be washed into storm sewers b_v the next rain anther pose a safety hazard to users ofplrbNc streets). 5. All infiltration areas must be inspected to ensure that no sediment fiom ongoing construction a ithitim is reaching the infiltration area and these areas are protected from compaction due to construction equipment driving across the infiltration area. F. POLLUTION PRFVFNTWN MANAUEMEN1MEASURES The Permittee(s) shall implement the following pollution prevention management measures on the site: I. Solid Waste: Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements. 2. BazardmsMarma}s Oil, gawoline, parr and May hazardous substmcec mugbe properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must he provided to prevent vandalism. Sterage and disposal of hazardous waste must be in compliance with MPCA regulations. 3. External washing of trucks and other construction vehicles most be limited to a defined area ofthe see. Runoff must be contained and waste Properly disposed of. No engine degreasing is allowed on site. G. FINAL S'TABHIZATION The Potentia(e) must ensure final stabilization offer site. The Permitlee(s) must submit a NOT within 30 days after Mel stabilization is complete, or another owner/operator (Permit a) has assumed control according to Pat II.B.5 over all areas ofthe site that have not undergone Mal stabilization. Final stabilization can be achieved in one of the followingways: ner F eta II L RO�NOd POBvt�pk2 FILTER FABRIC O 6" MINIMUM DEPTH MiVV�6 1" - 2" WASHED ROCK1S 18' MINIMUM CUT OFF BERM TO MINIMIZE RUNOFF FROM fi." RMF r- s NOTE: FILTER FABRIC SHALL BE PLACED UNDER ROCK TO STOP MUD MIGRATION THROUGH ROCK. CrrY OF C$AN8ASSEN ROCK OOENTRN EON swam:, -as Far Naw sac ,:. 2_97 Tr =-. 5301 SEDIMENT TRAP AS MANUFACTURED BY WI MCO,LLC. SHAKOPEE, MN. „- w. MODEL#CG23 NOTE: Clean fine, medli ins, each ram event and replace d filter is dogmas with seal-L Remove dearis/sediment tram recalmals after each rain event. CITY eOeF�1g� CATCH BASIN C8Ax8ASSSIP SEDIMENT TRAP etvlsro: o"u' 1 -04 coon w.. 5302A GREG FRAZIER - JAMES R. HILL, INC. TONY GODDARD - JAMES R. HILL, INC. JOEL G. COOPER, P.E. - JAMES R. HILL, INC. RON MULLENBACH - D.R. HORTON, INC.-MINNESOTA PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN KIMLEY-HORN & ASSOCIATES BRIAN GOVE - MPCA TO BE DETERMINED TO BE DETERMINED (612)-508-6481 (M) (612)-965-4530 (M) (952)-890-6044 (0) (612)-508-6480 (M) (952)-985-7827 (0) (952)-227-1169 (0) (651)-645-4197 (0) (651)-296-7036 (0) TO BE DETERMINED TO BE DETERMINED 1. All and disturbing activities at the site have been completed and all soils must be stabilizedby a uniform ve getative cover with a density of 70 percent crania entire pervious surfac e a area or other equivalent means necessary to prevent soil failure under erosive conditions and; a. All drainage ditches, constructed to drain water fiom the site after construction is complete, must be stabilized to preclude erosion; b. All temporary synthetic, and structural erosion prevention and sediment Control BMPs such as silt fen ( ee) must be removed as part ofthe site final stabilization; and c. The Permittee(s) most clean out all sediment from conveyances and frmn temporary sedimentation basins that are to be used as permanent water quality management basins. Sedimeal must be stabilized to prevent it fiom being wished back into the basin, conveyances or drainageways discharging off -site or to surface waters. '1 he clinical of permanent basins must be sufficient to remin the basin to design capacity. 2. For maidenial construction only, final stabilization has been achieved when temporary erosion protection and down gradient perimeter control for individual lots has been completed and the residence has been transferred to the homeowner. Additionally, the Permitter must distribute the MI "homeowner faehhat" to the homeowner to inform the homeowner ofth, need for, and benefits oL Mal smbilizadoo. TEMPORARY SEDIMENTAnON BASIN WITH STAND PIPE Ol EMERGENCY SPILLWAY CREST 6.. p� (RIP RAP OR EROSION CONTROL BLANKET) s�T PERFORATED STANDPIPE 6' PVC PIPE 3 CY CL3 RIP RAP AN71SEEPACE COLLAR (TYP.) PERFORATED STANDPIPE STAND PIPE DETAIL EMERGENCY SPILLWAY 1"-2" WASHED ROCK CONE HEIGHT - 1/3 Z , NOTE„ A. ID PIPE MATERIAL i" HOLES SPACED SHOULD BE RIGID 8" TO 10' ON CENTER D = DIAMETER OF STANDPIPE EQUAL TO DIAMETER OF PIPE. MINIMUM SIZE - 1800 CU. FT. OF STORAGE VOLUME FOR EACH ACRE DRAINING TO THE BASIN TEMPORARY SEDIMENTATION BASIN TEMPORARY FENCE Al PLAN VIEW w r. now 0 nvl `U-0TExTILE IMRIC isms to MN, lwsi E G w D " a' MIN, 5' MAX. A -A w - 10' am., 20' Max, MINIMUM SIZE - 1800 CU. FT. OF STORAGE VOLUME FOR EACH ACRE DRAINING TO THE TRAP TEMPORARY SEDIMENT TRAP UNDISTURBED VEGETATION DIVERSION DOZER TREADS CREATE GROOVES PERPENDICULAR TO �Y SLOPE DIRECTION HORIZONTAL SLOPE GRADING BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT CAA SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM v ' M N z v m rri 3 N a v ' 1 I J v7 I +5 �000 2� CJ -< m N Q x It Q [17• �/N V / N Wj �4pp n I..I..I M cJace F I w W I O Z c N Z rn � n rra MD r\ rn Z 39 Lij �' caLIJ Zw opo z N _ D W OCcZ � o z 3 J m m E m C T O L o - LL] am E o o p 3 2 o a Q to m o Of a v a o °a 1 0 0 0 -Ito�a«aa T N O Q m oEwNa �cj N C> N N J U D aU 3:O D o in m J so 0 TN in N m -3 Z w _ m av owtn II w L� E' 4 -st 0 o Oto MD O r 1 F+i zZ O W Z w M Z a F_ F_J zw J �! Led Z ' 1 W J 1�1 a� Z � •o Or z W x 0 L <z O Z 'Z1= ..I w O w'^Eal VI N W [--1 w 06 O xCO o z Z W Y O • O Ica A0 00 N M r/ W DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996ERD PROJECT NO. 21996 ERD1 WETLAND TABULATION �, _w _� w_ � 'w_ /� �u_ _m_ �w_ � M � 0 LEGEND WETLAND A 22,708 S.F. JIL 11L /'L / -sr.- 11L L / 8 WETLAND B 318,424 S.F. 3Qx- / �\W/, l �,, ¢ PROPOSED TEMPORARY ROCK WETLAND H 2O,473 S.F. / ! 7 LI CONSTRUCTION ENTRANCE C� EXISTING ASPHALT SURFACE _N_ O _w_ gib_ _w_ ` I / _w_ mob_ _�b_ f _�Ir_ :1 TOTAL WETLAND AREA ONSITE IN DEVELOPED AREA 361,605 S.F. 8.30 AC. 11L 11L 1IL 1IL aIL 1LL AL $ PROPOSED DITCH BLOCKING / b e ( EXISTING CONCRETE SURFACE \ I � MnDOT TYPE 3 TO BE TIN 878.0 � t !a O - BW 874.0 a INSTALLED AFTER COMPLETION EXISTING GRAVEL SURFACE TOTAL WETLAND IMPACT 20,473 S.F./O.47 AC. / / // j, /�� r' °' OF GRADING) - L_ (WETLAND H) SIL SIL SIL SIL /L SIL alL SIL SIL r 5 REQUIRED MITIGATION (NWC) 20,473 S.F./0.47 AC. �� 5 �� �� PROPOSED TEMPORARY EXISTING BUILDING REQUIRED MITIGATION (PVC) 20,473 S.F./O.47 AC. / /, / 1 L__� SEDIMENTATION BASIN TOTAL REQUIRED MITIGATION 40,946 S.F./0.94 AC. ku_ _w_ w_ V_ ,I,_' /_w_ o_ J,_ _w_/ / i� / _ EXISTING DELINEATED WETLAND PROVIDED MITIGATION (NWC) 20,830 S.F./O.48 AC. / '.1/ W 877 /'* f' PROPOSED 10' AQUATIC SAFETY JIL 11L JIL 1L SIL JIL �'� _ � � 11L JIL 1L ( i \ PROVIDED MITIGATION PVC STORM WATER POND OUTLOT A 43 124 S.F. 0.99 AC. EXISTING WETLAND B ! 4' RETAINING WALLS MAX.) �. BENCH (10: 1 MAX SLOPES) (PVC) ( ) / uu< �uiiz ui</ �ui< �uu< �b< f J'p f ! \� __. ___ __..__.____._. _____ WETLAND DELINEATION NO WETLAND IMPACT --- PROVIDED MITIGATION (PVC) 25' MITIGATION BUFFER 10,190 S.F./O.23 AC. A-318,42a S.F. / / it \ PROPOSED WETLAND FILL AREA x EXISTING FENCE TOTAL PROVIDED MITIGATION 59,320 S.F./1.70 AC. - - _- U,_ w_ _- %:w_ _w_ �/G . � � I � \\ L___ SIL 11L 1U- JIL ' alL alL sIL SIL s PROPOSED SEED & MnDOT O EXISTING TREE LINE/TREES aUui<25' W�I,RPATION 6U,FFER AI ' 4\,w< �\W// <�W/ <„u/< yj rw 877.0 41 r 1 c� CATEGORY 3 EROSION CONTROL S.R. - - - - - BW 873.0 ���i ----- / SIL aIL / iIL a s.v, NORT�AMERICAN 11350 TRM „L, ,Y, - L -`°- 5:1 MA,6. SLOPE ,u_- L I6 11L ,Ir 11i _au / 11L �I ✓'�// // \ , � BLANKET i'-'.C%------------ EXISTING CONTOUR / /, 1'L( � �'/ Qt p PROPOSED TREE TURF REINFORCEMENT MAT �fj�5 1 / - -- -- -- -- --- ---' ----- „ - llt< ' 'm sw siz.o X�' �4>�,1 \: oJ. EXISTING WATERMAIN u 1 4 PROTECTION FENCE i••5 / oa/ e E) EXISTING SANITARY SEWER d,_ m_ 10 x20 ,SPILLWAY_?oemv / x J 11L aILr'l 11 1EV.=86�;5 650 6a.7 �- \ • rw 876.0 '�j� \ \ < < EXISTING STORM SEWER ' �'-- . BW 872.0 W�� ' , TAINING WALLS MAX. % / q,/ / EXISTING SOIL BORING / 8$ \ EXISTING WELL O�w_ /�°Ox / x / ���4 I \ \ � / / ` w / / � /' i �' ? 1000 PROPOSED CONTOUR /SIL JIL 11 sIL 11L 11L / X / 66.2 / 64.7 fv� TW 873.5 -- / >>�� TW 88 Cj / // /p / O • / 65.0 f -� '� ew a s.s �j / % o / / / / -< PROPOSED STORM SEWER f \ fE� V�� 'l �L>ll�� -� �Llll�< \.�, f \ \\ -� Ea• ,r,►•s-_ �b(• \ ! / ' �Q„ O� V� / ___________________________ 4..R/ / \ // f \ /� _ _ - �g�. \ \ n \ \ � // / -X:j� // °jv, ! o>�`o ! � -- PROPOSED DRAINTILE / _w_ Ji_ _w_ _tlr/ 65.0X / _r"„�aA` 6 \ -L� 'k ! r 1 PROPOSED RETAINING WALL ' Ali / / 11L SIL SIL 11L / MITIGATION AREA . _ - -- - - 7- B 9 \ / / e- 1'' ' f \ \ ^ \' +800.00 _ � �`� w a 5 \ •st �/ / / � / PROPOSED SPOT ELEVATION 0LE 865R - / g aas. 1 g h° 2%, / 10QYR WL $ -- c 9 'S �/ f / ' F \ \ PROPOSED TOP OF RETAINING /. _w_ / 64.2 LQ - ` _ - / 00 q� - $$ SB #1 \ �9 / qj(j' ; /,1 G�.� \ \ \ J TW 900.0 II,_ di_ I_ - - 90 0 o p \ f / / \ WALL ELEVATION OSIL 11L JIL �113 % 11L I / / _ ' - V Q I ..f I �7 �• O '\ \\q / ,a'h • - �1 �'$, _ _ _ \ \\ \ / / P. ��p`l G� // \ \ / / BW 900.0 WAOLLOELEDVATIIONOM OF RETAINING n � O ✓- -- \ �PROPOSED CONCRETE SURFACE �I _i_ _w_ -,I,- E.Yaw JIL E = o h O LO u< 3u/< emu �l < / -� 1 \ - - / / �F \ \ ti / PROPOSED ASPHALT SURFACE D� a BC,OD GRADING LIMIT L NE %- i `\ A,Q�- O-m_ _w_ -` �� rr/ i f i �� �� j- ^° -y \\t pOO rL' / •\ \ �i� \ �� �o aYo / 11L 11L SIL SIL\ aIL �\ - / ; ,; i ,� --- _.._Q`.�`L'''' o ;'/'^ o oj�^(r. ; '� r^10. // 0,1' \ \ / - 25 MITIGATION BUFFER �Ull�\lll� 3111i<\111i� 'I .�lJli< / f. - - � • - AREA 70.1' V.. ///,' /j/ ,' T� 00-f -- VV` V y 9 - p �i g�; ��j�C' J j J oltx °tiT �I 9V PROPOSED MITIGATION A d� ° 11L 11L SIL SIL �ILr 65. C . -yJZ- - 1 - _ _ �� 0 '/ \ �O / .y'1 G "PROPOSED SILT FENCE _y own 62 6_ ac �_ f R� I / / / / / /( �j� •. �/� \ \ ! I p�O / sa w «�wrra I \ _�o !� � � f / of \ , \ \ PROPOSED HEAVY-DUTY O 6�p f �`+� Q 1 \\ / \ \ /C -a(�'� \ SILT FENCE LO L INv: k PROPOSED SILT FENCE (TO BE r \ 0 G_ OD BUDDING SF�TBACK AIM T /INE-9ti-^�,, ��,Q' \ \ / J / 91 /' INSTALLED AFTER COMPLETION ( 1 J ! I/ •0 - �5� r. A V / / ,PE G,RADI G 1 AL jt- O 11L 11L SIL SIL O I I ! �i / \ \ \ \ V p0� 7( x pD \ / . / A �6 V A I 1 v I i I I I, I �" �•. �. D4.7 3 rr � >< 1 O Ull/� �Ull/< ��lil/< �>\-- \ " 'fa �� O�U TOOT l � I II �' I • � � 1�/ \ \ \'\ \ \ / / \\. � � / ,y1. ,�// \ \ R 11 1 A 5 / o I \ 1 ,: I \ 31, , O \ I �rn 11L JIL JIL I11L CO !x \� , \ X co t : fi + F CREEK OVERLAY DISTRICT � /\ � G � \ ui< wia u �ahI '..INE (BCOD) \I \ /' oN /N �? p' \ / t f / \ / I \ 1- � � I. \ I �. \ / N � \ / \ / 5' ( / • ' 0 j % \ �, 38.�1 O- i' \ L N/ 11L 11L 11L SILy - �iui< „\w�L ��ui>�6� „\�u,� • / # ,j ` L"[ , i I � 1 I , -- _ (N I \ � � 3 � 8�� \ \ `// � \ / J \ \\ \ O � /� �/ / �p'�� I gp`L t�2• 100' vG I afL /' lIL aIL j j G 40Ni A _ 5+00 \ 4 QO - 3 / w ° , / \,\ I I� 2 '.\ JIL 11L h SIL , .� l / _ 924 btl cv r / ,/ I \ i \< \\7/L /; om/� p \ \\ } k1• t v w a\w co `A t --I--- -- _m47 ao 00 c0 I,_ _ ,u- ,I, ti wlii� rn I - - - - - - nM \ 11L SIL SIL' 0� r'I �POND 2 ,< d- � `�' � oo °D � � I / I I / / °• \ \ \ �oLIE 86f .'5 / ^ I \ _w_ 100YR.HW� 8 1 t \ I1 I CD I Qr / I� I 3 N �� N 930.6 G. 932 3 \ � o ,�• /.� rn I / I°' d_ 29.6 NAO \ CK 26.7 S -*ET C � O � .`q � I - / / p.I I � N �' 2.00% 28.77 � , ` =d077 °� '�•\ - - - - �� / N fo`�' i o o ; , \ \ \ •. \ y ?' l Ji �' 0)) (I / 29.6 31.3 _ _ x- -- -- -- �I II �3� _5 111/ .-a• j3 1 . c�32 G933 3I 931.6 G R R PLAYGROUND --_ - - - -- 36. AR -7` / I I 1 34.8 2 _. ' r r do r f-- 7._1 > -r' j I - J I N 29.2 r; 32.9 s 0 I `Y / t - - - - - - \ EXISTING WETLAND H r o_ __-L-\_--/- -i - -- -/ _.,�._-L-__. -._- -_. ._. \ ------ --- -- - ------ -------- - ---- --- - y- ----_ -. --_-- 4 - ---- y WETLAND IMPACT BY OTHERS - = - ---f---=�f----J------>r ------ ----- - J --- -- - -'-- A=22.708 S.F. FILL 1 O _ / / T Y OTHERS -- - -- - - - - -- y +9� -r-- -- _ x- - ``__'� Il + G 33+00 2+0 3t#BB�a-- T 30+ 4 .6 - �. STREET B / f . - - - - - ----- 34 z • O __ _y _ - - -- - _ ----- =1+ = a - - _ = - - - __ ____ --_ -_-_ --_ - - _--- [f I ,. V / / - 1 `____/ __ Q / _ _____ _ ___ _ __ __ ____ ____ _____ _ _ ____ ________ _ I \ o =7/ --, - � - - ---/-� !---------�--` - ---- ------ ;< + BEGIN CONST. T Imo` i \ T / //� ELEV 943.62 0.00 - - - BEGIN CONST. / CD B N HMA K -- ELEv 23.17 ._ ,' E C R - - - , BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER _ _..__-___• -_ I ./ n i� = _' 1' ��`a : 1 - l u it I N POLE WEST OF DRIVEWAY - N. SIDE OF DATUM Z. -> ev_ - a y a -- PIONEER TRAIL - ELEV.= 910.34 D 88 f`� 7 _. _ \ : i Ilii ^ a{_ __-__'�,S ' L _ _ L----_ a• _ r : I 1 "...__• �r; I v''=-I+----__,r_..__. n i. J-----_ II BM #2: TOP ALUM R/W MONUMENT ® SOUTH SCALE IN FEET I 6 ` 1 i -- PROPERTY LINE ON PROPOSED R/W LINE. 0 50 100 150 `J O Ol V O I i O I �)c g ____ _____ V : I�\ - �� _, -- -1 I - I ✓ i _ _ ` --_ I - -_ - - � ELEV- 913.67 NAVD 88 DATUMLo � m 1 inch = 50 feet O �u� O �� I II_ III m N Nr M N � O g to w r N m JC � lai a m LL N M Cj:f In w <o W Z N om C7 cZio �� C w cc, N d N a N EW o t3 Z m a - W � O" wF F+i E f 1 VIO rx x a z z A,..a w LLLJ E-4 I Q N ULz P4 Oz wN z " U� O o W Z0 FLj W W 00 P40] az w� w Y o pa4 A DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G1 LEGEND ----- - - - - -- PROPOSED TEMPORARY ROCK CONSTRUCTION ENTRANCE EXISTING ASPHALT SURFACE h " PROPOSED DITCH BLOCKING EXISTING CONCRETE SURFACE (MnDOT TYPE 3 TO BE INSTALLED AFTER COMPLETION - OF GRADING) I _i EXISTING GRAVEL SURFACE " PROPOSED TEMPORARY 1 EXISTING BUILDING - / /',;/; ,:,;/,//'//,',/:�I^--.-�,A V OVA ..-,�•. '...� (. i , i --__ -- `�„ SEDIMENTATION NTATION BASIN PROPOSED 10' AQUATIC/SAFETY x� EXISTING DEL INEATED WETLAND BENCH (10: 1 MAX SLOPES) L_J PROPOSED WETLAND FILL AREA - r EXISTWETLANG FND ENCE EATION I I ,s I I\ } PROPOSED SEED & MnDOT EXISTING TREE LINE/TREES �\ \iiA CATEGORY 3 EROSION CONTROL 9£6 BLANKET ---------- ------------ EXISTING CONTOUR / /� NSNr %' / CA 0 PROPOSED TREE _- / (� %(�1{ / r I/1 �� / II I I I III \ PROTECTION FENCE EXISTING WATERMAIN /� /," /✓ ' /I/I/ �! I \ /18! �/t I ,I 1 I 1£6 l / � EXISTING � SANITARY SEWER19 EXISTING STORMSEWER 20 EXISTING SOIL BORINGI 1 2.1 1 1 1 21 ® EXISTING WELL 5 ;/// yT✓ ///A1�1 / \' 1 // sB #3 I I 4 I 93 tItsi+t� o� �` 1000 PROPOSED CONTOUR i i� I/ \ 1 f g�0 / A A\ / �2�.2 /1 _ i `h 3.6 1 22 / -< PROPOSED STORM SEWER I I RLQ 1 1 I \\ \---------------------------- PROPOSED DRAINTILE { /e g3oRLQ 93`36 //// PROPOSED RETAINING WALL •�( v� I I S140. A v +800.00 /� < "' 15 ! \ r p�\$ \ R�-�2/� t 93 - 9£6 _ _ JI "' 4 G Rjryp I \ PROPOSED SPOT ELEVATION /// ' ^ fit" \'' \ $Z$ - 31.7 36j _ �_ g41.8,, G 1 �1 / 23 \ \ TW 900.0 PROPOSED TOP OF RETAINING WALL ELEVATION i- _ -`J 4/= ew 900.0 WALL ELEVATION s s \ O6 ' 9 ?� vc y' / �°! G' PROPOSED CONCRETE SURFACE 34.07 5� 00 \ 3 / / \;, 4. 9 3ss3 \ k/.75 O0 PROPOSED AS --- - - -- 40.43 \ \ � 9 OSE PHALT SURFACE Tw 874.0 #2 h\ \ I/' gf m I _ \ \, \ // / 24\ 25' MITIGATION BUFFER I BW 873.5- I /' G Ao 21' I 9£B _ \\ \ ?0 6 c \ \ 00 \ \ PROPOSED MITIGATION AREA nj rn 0 L \ \ \ \ PROPOSED SILT FENCE TW8770 1, V \�� A \ . g � x � y o I O eF ��� \ BW 873 0 / �' / / / / 1� I / �3 rn I / rn 1 8 \ i, \ \\ 1 �,�,„,r PROPOSED HEAVY-DUTY SILT FENCE I l rn PO c6�°� 'oA \ \ `\ \ PROPOSED SILT FENCE (TO BE o* MM - - _ _ I `• I \ 1• �� INSTALLED AFTER COMPLETION I� \ \ \ SB #5 \ / OF GRADING) CDS rl a� o JIC117\ 1 dL 3uTw BW 874.0 /26 N `. ` SCALE IN FEET 1✓ 0 0) / w,Vh�• O r \ ( I .`.' /� \ 19 `'._ -I� \ \ G� cfl o' \ •�' �'. 0 50 100 150 l p ! / // / / I �O \ 1 inch = 50 feet W 877.0 � O ' / 28.5 g \ \ I ., \• V.. w873.o / \ \� / o/I oo / p I / 4'� ����i � �5° � v� 'moo ` ► ,%--� vv I 9 9 0 I - BENCHMARK 1 q/1 A5\\ \ ✓ o �ry I '/r I / / I y \ a \\ ' / \1 BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER SB #4 O ��\ /\ ci \ \ �w'� �' \ \ \ POLE WEST OF DRIVEWAY - N. SIDE OF \ PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH �� Q]'�p / `o> 000� V� ! I \�' 8 I I 20 / 'y 1 d -� I \ ��' •� 27 /� \ \ PROPERTY LINE ON PROPOSED R/W LINE. Di. CP ELEV.= 913.67 NAVD 88 DATUM / 2 �R, � /_ �i ://�� /CJ�.. \ l.. ,� / ��--30. il ` I 1 1 / �'/ i � 1 . N, O� % 1 �' � ��� / v�v i /� RE 29.1- _- �=,."'�-` I I I 1 � ,� � ( '�� � I e \ \ / � 934 � N ^' �' v! /� /v v 3 ,I/ 11 12010, h I 13 1 N I I v v v /� I / / // \ 1 0 932 \ \ 28 ✓ I I I 1 co >✓ , / / / 2 , , \ \ , , \ \ t y X , 933.0 R \\ I I \\ R T11 w \ �Y IOOOiyO / x\\ I \\ \ 1 1 O �- \\ j I \g $ 1 \g34 �' oGa' I \ \ ✓/ 5 �,•� �/ / / O i iG ,: i / "%5 j / / / / \\ \\ 930 �LO 11 1 938.0 G' 93�.7 \ I .G 9 1 ° 2 g I a \ \ I / • 32• o• � � � I } 0� 8 \ \ G34.7\,3��� � I I OUTLOT E \ \\ 35.5 „ Q \ TL51.73 \ �� I' \ ` J � \ 21.5 OPOND 921.5 \\\ \\ \ \ \ i O \\ \ - / 34.75 33.74 \ 32• \ w w \ 6 YR.HWL 9 \ 1 \ \ ^'000, 29 02.2 \ \ �a�•0 6 _ - 0�24 92� �9h 938.J3 G 937.3 I G 938--- / loor R I R \ 1 .� \ 1 \ \\ \ .002 14 9 c\ \ ,; / \ / / \ \ R II y I 1 1 5 s - 25.42 T 23.67• g�0 ,�• ��� Q'2a6I � 14 0 ;• -,v �� 5 R � ° ° n 4 \ \ \ I ^ M CD 20.0 \ \ / / h too' vc 1,25% STREET5+00 I - /, ,, l \ \ / O�' , O� 11 "5 G • g \ (39.67) OLE .. 37.17 6 5.9Z 34.61) 1 0 19.0 SB -POND - - -\ # 34.45 2 �924 L / % C %'/ ; q�/ \\ \ } R2e \ \ \ \` \ /! // N� I too l \. \ l^�) ,\ 41 r /I \ \ `` \ \ \\. ■ 2 16 �m n N ohm X \ m ck. �4p p A M • LLI L.LJ Z N zw c Obi W o ,.; SR W o z o cc Z a m m a) C E m C T O Ly a m Lj Qo ono a�000 0o K ca�oc� O E NyyCCJ O N C A y c J r y u2�nu 3:2 DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G2 o±Mn --- --_- Ico I \ \\ 3 SB �11 CDs quo41.97 777CCC rn 41 6� 00 All A.V1 N \ \ 6\ �t'5� \ , I , 16 44 9s `1 � 9°c�O �. � I• ; 1 � , 77 e 8 \ / SH #4 3 1 CP II II 9��i `I 1 15 °,, N 12934 1` I 13 "A� T_ 932 1 I 933.0 11` 14\► t w 1 R I II R 1 i Jtt I I RLO I I 9S $ I g34 1 1 G 938.0 I I G 936.7 , ----936 35.5 34.7 33.8, 13� \ 31 73 - 34-75 `3.74 \ \ , 3�2 - - - \ 934 PROPOSED TEMPORARY ROCK y\\ j CONSTRUCTION ENTRANCE' EXISTING ASPHALT SURFACE O D25 I 9 y \ \ "; PROPOSED DITCH BLOCKING Upy (MnDOT TYPE 3 TO BE EXISTING CONCRETE SURFACE 2 \ \ p I '� \ \\ °>„ pP";, INSTALLED AFTER COMPLETION 7 \ \ OF GRADING) ! EXISTING GRAVEL SURFACE _ d 1 \ i PROPOSED TEMPORARY t \ O2 \\ \ ®4\ (_-- SEDIMENTATION BASIN EXISTING BUILDING c1 to BENCH ��\ \ \\', PROPOSED 10 AQUATIC/SAFETY AQUATIC F �J / �"'° ~-'� EXISTING DELINEATED WETLAND N \ BENCH (10:1 MAX SLOPES) - ��� WETLAND DELINEATION \� O \\ \°�;a ] PROPOSED WETLAND FILL AREA - EXISTING FENCE OT (DXISINGREE LINE/ ETTTREES \\ \,°\ PROPOSED SEED & MnDOT CATEGORY 3 EROSION CONTROL BLANKET ------------1 00 EXISTING CONTOUR PROPOSED TREE r c� { N rn \ �9 �� PROTECTION FENCE EXISTING WATERMAIN \ a e EXISTING SANITARY SEWER ��/z { 27 1 \ �A �p < < EXISTING STORM SEWER �O EXISTING SOIL BORING \ �� \\ EXISTING WELL 1 \ ��a,, "+\° \ \ -•/a` 1000 PROPOSED CONTOUR < PROPOSED STORM SEWER 28 I \ , \\Ba; ret=_ss_ %---------------------- --- PROPOSED DRAINTILE / to �` \ \ \ \ \ \�,\\ PROPOSED RETAINING WALL I +800.00 PROPOSED SPOT ELEVATION I !w \ \ \ • \ PROPOSED TOP OF RETAINING woa- \ \�\< \ \\ \ \ \�\ TIN soo•o WALL ELEVATION 0 .. BW 900.0 WALL ELEVATION w ��, \ CONTRACTOR TO CONNECT \ \ 18•Od F� \ \ \ \ o I TO STORM SEWER (BY OTHERS \ � - � �1\ � / \�v�` \,\\ \ '� F. PROPOSED CONCRETE SURFACE 29 01) 4 \ � �� I \� ti \ \ \ PROPOSED ASPHALT SURFACE � '4'4 J OUTLOT E �� �' 'o;ti`� '25' MITIGATION BUFFER 1 O INv 21.5PON � 1 /� ti/1/ �/ °� •,d. �i do\,� OLEN921.5 k `\ ; / /// / ^/�,\ \° PROPOSED MITIGATION AREA \ 1 \ YR.HWL 9 1\ / / / / / \ °° ; PROPOSED SILT FENCE 4.7 )5 \ 3.0 G 93 \ \ N rn \-19v. t // 6 / / R� �1a \ I PROPOSED HEAVY-DUTY v _ _ SILT FENCE G g3'5'7 \ \ \w \� 0 `- �> ; , . _- - RE T--.-93 �L / y f 938 I I g38 1 1 \ 1 1 R \\ Y� \ \\N L-� S� goo//* l/ {1 INSTALLED AFTER COMPLETION 5 92 PROPOSED SILT FENCE TO BE 1 1 938.3 I I G 937.3 I G C 1 1 R II / ��jC��1 ii / r OF GRADING) 1 G \ P 1 I \ \ \ \ \\ 1 it �I I R ` 1\ is 1 14.z ti�6 \ \ w \ \ \ \ 1 R I � I \ I \ \ ! / � y'I ii/ / j 1{ 1 �j I_ 1 1 X'✓t V A ^ 25.67)- V 24.87 4- Z 11 1 I y 1 \ 35.2 v 11 1{ v� 15 \ s 25,92 23.67 1} 1 X 36.8 SALE IN FEET 0 50 �38 yi12 I 1_! 36. 1 T \ � .O { w \ Q �� O •.2867 ip�®ii ®® // / a°� / /% ` Co 50 v X �� �.. 194- 4- 1 inch = 50 feet • , � - 3, Al icy° ' ,� ov - i+w �� // // / /l //� // /j/' BENCHMARK �w �100' 3.o VC 31.92 \ n, % / /� / / BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER 100' MG 1.25e j \ 9 !/ POLE WEST OF DRIVEWAY - N. SIDE OF \ 5+00 STREET D37 \\\ a -� � .67) ! 4 0 RE. 1s.o Pr�ND 6. D�' : ,� / 36a2 1> SB #6 35.92 \ v 3 / 2.0 OLE 920.0 %/� // PIONEER TRAIL - ELEV.= 910.34 NAVO 88 DATUM \ 39.89 - to \ O Y .HW �.\ / � i a / / / ! / j / / 2 TOP ALUM R W MONUMENT ® SOUTH (3967) PROPERTY LINE ON PROPOSED R/W LINE. � INV. N� - rn \ / / ! ELEV.= 913.67 NAVD 88 DATUM \ LVT iw \ \ EXISTING WETLANID H \ - ! O - - - - ■ I TW ` \ \ WETLAND IMPACT i \ \ \ \ \ \ \\ A=20,473 S.F. FILL / A{W - _ - I _ 9!6 e>6 BASKET A C9y. \ \ LL BIN 916.., OURT 11?N W 9 4,0 r� i 914_ r 921.0 v y \ A v °' ° - - w 919.0 1 ew 9n.5 9 C EEK VERLAY DISTRICT { \ \ °� ° oY w918.5- BW9_0INE BCOD TW 1 t , - - - 2 6�8 J W 16.0 \}' TW915.5 OU TLOT \ - .�'av� _ iU'.- BW 911.5 5.99 \ _ G moo'' T � 915: � �\��� - - - � •� � � � - -� /'.- --- �. �/%� l /� / /�%�//�' � '/ __ 20 BCO ADING LIMIL LINE _OUTLOT H ' ! / , I _ �, ��?�v i Tw9o3.G ,/ ,-//,,,,_, /,, ,,,;,;�„/,_ IN,2 - Cl� SOCCER ,FIELD9 3: )U N D _ / / l ' i / / / / // I / ! ! f Z O \ \ RETAINING WALL /AX.: 0, { C LD NG SETS CK L MIS �E O 7 I \ TW 895.7� BW85.:v�/Jlt- LAND H ( r - G-' f% ACT BY OTHERS) L r �� -. FILL ,� I / _ _ _ _ _ _ _ _ _ g - - - , -: s: 895 5 I _ Q _ - TW l 70 S.Y NORTH A ERICAN -335 M BW 895.0 TURF REINFORCEMENT MAT) \ / ! I I I L_ �/ ! \ LJ"L_ r / \ \ V L- \ \ / / / �) / fv A I I\ I !V I F - T A f1 F - "� /1 � � Ti tv A �_- IV I � _ f - T F- / A v / �j I A � -1 r�' r� / V L- __-__- - - u u ,RADDD TMENT DDD m D i C i � _J D rii -DD D'D DDD n OR\ V L /l^1 M �Clf ZD g ; Lj2 N X m` \ X N 4 Ln Q f N p t o M w mew j t w N N � M Z 3 � COLL.1 M O S \ ,y_1cc O �, z 5 0 Q m m � E C T 0 r � ao oco a 0a-o 5 'a:E ou T 0 m o o m o of mvycCj m o 0 0 J L 0 O O O W a Qi u1 0 F wO (n W � xa zz aAa w H O o J w zzH z F-1 y iJ WdAH • o ZLN w 0 024 w� "R1 0g W Z0 pg N w W O W w xlz 0] a � Z LLJ Y w /'►J O a AC4 DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G3 V N M O � Z a O> h (ySJ � � I O N m LL 3 N M Lr- w W w O Z N ... rn N J M w 3z rnw _. cr) M S N = W ) u m iR( $gVf1I $ ^ m i r •� p lrt� 1r1�� pef / J s l 1 _. 'REES SAVED s Total upland area (excluding wetlands, bluffs, park) 61.33 cc. Total reforestation area (15.30— 7.20 cc.) 8.10 ac or 352,836 SF Baseline canopy coverage 11.7% or 7.20 cc. Required canopy coverage 324 trees EXISTING TREE SAVED (one tree provides 1,089 SF of canopy) o Minimum canopy coverage allowed 25% or 15.30 cc. EXISTING TREE REMOVED o TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 324+44=368 TREES o Proposed tree preservation 10.2% or 6.28 ac. � EXISTING TREE REMOVED BY OTHERS Difference in canopy coverage 0.92 cc. SITE DATA TREE CANOPY AREA SAVED (INCLUDES OUTLOT D) TOTAL NO. OF SIGNIFICANT TREES (6" AND GREATER) 692 Multiplier 1.2 TOTAL N0. OF SIGNIFICANT TREES SAVED 561 81% TREE CANOPY AREA REMOVED 3 a Total replacement 1.10 ac. or 47,916 SF TOTAL NO. OF SIGNIFICANT TREES REMOVED 105 15% TOTAL NO. OF SIGNIFICANT TREES REMOVED (BY OTHERS) 26 4% Total number of trees to be planted 44 trees a Puib o s I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA, DATED THIS 16TH DAY OF JANUARY , 2006. JAMES STURM, ASLA REGISTRATION NUMBER 18380 BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATU BM #2: TOP ALUM R/W MONUMENT @ SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913,67 NAVD 88 DATUM SCALE IN FEET 0 100 200 30U 1 inch = 100 feet a -1:4't E-4 o Ln Fes, 0 H r^. L1� l� zz O (n W r co V I J i Ar', ' 1:1 Z w x I Y a az z a .o Z W W O Q � Of U E4 O O E-� U W O MW xm a z W AN o W f� a DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996TP PROJECT NO. 21996 TP1 TRW hn R RF_ TRFFTYPP dAMFM REMOVE BY SAVE IMOVE'. OTHRS 11 I� :. : .:- mmllllllllllllll1111111111111.11111_IIIIIIIIIIIIII111111111111111111©= 1 1 IIIII� . . 1111111�1111111111111111--111111111111111111111-11111111111111111©I_ 1 1 IIIII��III •II�®IIIIIIIIIIIII111-1111111111111111--©- �m■�mmmmmm�©� m■m■�mmmmmm�©� �m■�mmmmmm�©� gym■ :.:.:- 0mmmmm�©� �m■�mmmmmm�©� m■��mmmmmm�©�_ �IIIII��IIIIII'�IIIIII� Ire ® • • 0------©- Ir ® • . IIIIIII�IIIIIIIIIIIIII'11111111111111111111111111111'Illlllllllllll1-_11111111111111111©-_ IIIIII�IIIIIII� • • IIIIIIII� IIIIIIII�IIIIIII�IIIIIIIIIIIIII,llllllllllllll'llllllllllllll1_-©IIIIIIIIIIII- IR m■��mmmmmm�©� �m■�®mmmmm©�� m■m■oommmmm©�� gym■ ... ... ommmmm©�� gym■ ... ... ommmmm©�� �m•oommmmm�©� gym■ _• _ •_- ®mmmmm�©� gym■ :.:._- ommmmm�©� gym• :.:.:- oommmm�©� gym■ :.:.:- o©mmmm�©� gym■ :.:.:- o©ommm�©� gym■ :.:.:- ommmmm�©� gym■ :.:.:- oommmm�©� gym■ :.:.:- oommmm�©� gym■ :.:._- ommmmm�©� gym• :.:._- ommmmm�©� , 1 IIIII� :. : .:- �IIIII_IIIIIIIIIIIIII'llllllllllllll, llllllllllllll1l_I-©IIIIIIIIIIIIII■ gym■ :.:.:- 000mmm�©� gym■ :.:.:- ommmmm�©� gym■ :.:.:- oommmm�©� gym■ :.:.:- ommmmm�©� gym■ :.:.:- mmmmmm�©� �m•�ommmmm�©� �m■�®mmmmm�©� 1 IIIIIIY�:1��1111111�111111111111111III_-IIIIIII-_11111111111111111©111111111111111111 1 ®��mmmm IIIIIII� - 1 1 :. : .:- IIIIIII�IIIIIIIIIIIIII'lllllllllllllll, llllllllllllll'llllllllllllll'llllllllllllll'llllllllllllllll'©IIIIIIIIIIIIIIIII' 1'1 IIIII� :. : •:- IIIIIIII�IIIIIIII�IIIIIIIIIIIIIIIIIIt IIIIIIIIIIIIII'llllllllllllll, llllllllllllll'©IIIIIIIIIIIIIIII'llllllllllllllllll' IIIIIII� • , 1 �IIIIII�IIIIIIIIIIIIII'llllllllllllll'llllllllllllll,llllllllllllll,llllllllllllll'©IIIIIIIIIIIIIIII'lllllllllllllllll' ��oommmmm©�� ® � 1 1 :. : .:- �IIIIIIIIIIIIII'llllllllllllll'llllllllllllll'llllllllllllll'llllllllllllll'©IIIIIIIIIIIIIIII'lllllllllllllllll' ® � Ir �©IIIIIIIIIIIIII, IIIIIIIIIIIIII, IIIIIIIIIIIIII'Illlllllllllll'Illlllllllllll,©IIIIIIIIIIIIIIII'Illllllllllllllll, �� _• _ •_- mmmmmm©�� ��ommmmmm©�� •11 :. : ._" IIIIIII�IIIIIIIIIIIIII'llllllllllllll'llllllllllllll'llllllllllllll'llllllllllllll'©IIIIIIIIIIIIIIII'lllllllllllllllll' ® •IIIII� _• - •_ �IIIIIIIIIIIIIIIIII'IIIIIIIIIIIIII,IIIIIIIIIIIIII, IIIIIIIIIIIIII, IIIIIIIIIIIIII'©1111111111111111111111111111111111, IIIIIII� :11 :. : .:- IIIIIII�IIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIII'llllllllllllllllll'I--©I—I— IIIIIII�IIIIIIII� •• - •_ �---IIIIIIIIIIIIIII'IIIIIIIIIIIIII'©I—I— IIIIIII�IIIIIIII� • • IIIIIII� IIIIIII�IIIIIIYT{�T� • • ©_____©__ IIIIIIII�IIIIIII� • • IIIIIIII� IIIII� :. : .:- IIIIIIII�IIIIIIIIIIIIII, 111111111111111'llllllllllllll1111111111111111—_©111111111111111111111111111111111111 !� }.�1 IIIIIIII�IIIIIIII� • • IIIIIIIII� 11 IIIIIIII� :. : .:- IIIIIIIII�IIIIIIIIIIIIIIIt 11111111111■I---©_IIIIIIIIIIIIIIIIII' 11 IIIIIII� _• _ •_- �—I—I---©_IIIIIIIIIIIIIIIIII' IIIIIIII�©11111111111111111111111111111111_II_©I-- ®��ommmmm©�� 1 1 IIIIIII� :. : .:- IIIIIIII�IIIIIIIIIIIIIIIII, IIIIIIIIIIIIIII'llllllllllllll'llllllllllllll, lllllllllllllll,©IIIIIIIIIIIIIIII'llllllllllllllllll, 1 , IIIIIII,� . : . :- IIIIIIIII�IIIIIIIIIIIIIII'Illllllllllllll'Illlllllllllll, llllllllllllll, llllllllllllll'©IIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIII' IIIIIIIII'� :11 . - .:- IIIIII�IIIIIIIIIIIIIIIII, IIIIIIIIIIIIIII'llllllllllllll'llllllllllllll, llllllllllllll'llllllllllllllll'©IIIIIIIIIIIIIIIIII' 1 , ® -®IIIIIIIII�IIIIIIIIIIIIIIII'Illllllllllllll'Illlllllllllll, llllllllllllll'Illllllllllllll'Illlllllllllllllll,©1111111111111111111 ,.1 IIIII`� .,::-•- IIIIIIII�IIIIIIIIIIIIII, IIIIIIIIIIIIII,IIIIIIIIIIIIII,IIIIIIIIIIIIII,IIIIIIIIIIIIII'llllllllllllllll'©IIIIIIIIIIIIIIIIII' 1 1 IIIII� :. : .� IIIIIIII�IIIIIIIIIIIIIIII'lllllllllllllll'lllllllllllllll'lllllllllllllll'llllllllllllll'llllllllllllllll,©IIIIIIIIIIIIIIIIII, ,:1 IIIIIII� :. : .� IIIIIII�IIIIIIIIIIIIII, IIIIIIIIIIIIIII'llllllllllllll, llllllllllllll, llllllllllllll'llllllllllllllll'llllllllllllllll'© ,1 ��IIIIIII�IIIIIIIIIIIIII'llllllllllllll,llllllllllllll'llllllllllllll'llllllllllllll'llllllllllllllll, llllllllllllllll,© ®� • • IIIIIIII�IIIIII�©— IIIIIIIII'�IIIIIII�®®IIIIIIIII� IIIIIII�IIIIIII� _ • • IIIIIIII� ®�oom�m�■m©�� 11 IIIIIII� :. : ._- �-I-I_IIII_IIIIIIIIIIIIII1©I-I- I. 11 IIIIIII� _. : .:- IIIIIIII�©IIIIIIIIIIIIIIII'lllllllllllllll'lllllllllllllllt llllllllllllll,©IIIIIIIIIIIIIIII'llllllllllllllllll, ®� • - • IIIIIIII� ®IIIIIII��IIIIIIII� IIIIIII•�IIIII��IIIIII�IIIIIIIIIIIII, IIIIIIIIIIIII'IIIIIIIIIIIII, IIIIIIIIIIIII, IIIIIIIIIIIII'©-- ®� • .. IIIII� Vim■ :.:.:- o��m��©�� V ^ w p N I � o w �� IndZ Z N M1 25 J IZZ.i O w z! IcaQ W J m fD N a Eo OLo z �••� Lo O rn E-I w zz w �yy z aa' w Q � J F J O ° Ell P4 ' N W ^ Y Z Q Z J z aozo w W OZ W ., N zo 0 U w xm a z Z w Y O IIF���111 A N a DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996TP PROJECT NO. 21996 TP 2 I \ 1 7. < r T OUTLOT B 'h - - - - - - - - 0 - / O O 0 0 ( - C4? CO CD - �. qD°x - 0 0 0 0 0 -- --I I - 0 y / -' 0- /� \C 111 I I I I I \1 0 0 0 8D0 / VA II II I 0 a Mw dM N ._ O0 � \ \ 1 1 18 I 19 I I 20 1 ( - - n - 0 0 ' \\\ \\ 17 1111 I II II II 21 MW .M4 •�cJ , \\ 16 \\ I I I I I I I I 22 /(j \ 0 lj/ yL tea. y 4 i \\\ 15 \\ ��� - - J� \\ / 23 '.uul. �uvE �..,,.,. L aQ- 4lc /,j -•W4- . aWva xaWYy .`xNl{Yc -aYVc yaWua x a.�/ yf•'' \\ \ 1 \\ ' / SSMH 11 SSMH 1. �.. �/ V0� �' . 14 I I \ \ \\�/ // INV. 90 9C 1.W I m I INV.RE SMH IS r\ 24� _\ . yauwo- INV- W 922.06 BL0=24.42' INV. 910.48 \ 23 H 18 Bin-29.94' I I \ SSMH 10 ]30 I / - SSMH 14 915.3 / I I 930. IN903 NV. p aww ,6w�a y9f6- .ws- .wur�- -•urc y„uw w!!•- s_x -v9lu. �M. .�- -�- yawu. �- �9: r \ \ / / BLo=12. 0- xt z.00' 17 24 19 I I I I I \ �1001 // / a�N114. -uuv.. aW1Y- g if1Wa aW4- a1NY�- iYWc j aC&- aWlk. ya9W.. ya94w.sN•� f�\\ 12 , / / RE.B8 906 Q M\ \ I I 22 I \ / INV 894.88 1 I \ \\�SMH 24QL RE 94\ II I 16 2\ \ (n INV. 929.66 \ \ 'A\\ 21 I I 20 //R11p\ ` L Oa-LL. aNW "uW4 �aWY- •r,•••••• ••+W �a a.Mklu6Wh. \ / ` \ \ � / INV.. 911.]9 26 1 0 \ \/ // SSMH B \ / R. \ - - - - - 1 �- - i /I II 1•, I i / i '\ /' / // / \ 6845' yy" o ✓ / - \\ /9 \ 1 II I I 13i 11 r I SEW 16 & 27 L VJo6] SMH ] INV. 912.58 p .68 1D�5.0221400 y� It- INV.8 1 I \ I I I 1I ISNVMH92236 9 2M934 2 \ 5 N22.25 5I\ =12ao�7 - LBLo=12.00� S9JH 27 I I I I I I I I 1I I I I I I C.S.A.H. NO. 14 (PIONEER TRAIL) \l1 I I nl rJ Ip I I I - 1I'}, � 1 1, 1 1 Y' 1 ✓' 1';; 1 V A I I 'o I S 1 111`;,1 \ ;,\ vl \ \ \o `:,A A! \ \ V `l.\ \\,V.� 20 \ Q \ I - I 28 I REM924 25 J V NV. 91]J9 \y V v \ n A \ I/ / 30O 6.55. VA \ TO STORM SEWER (BY OMERSt�\ � % II \ \ \ 1 29 \ 1\ \ \\ \ o `�I " `�\ ,¢,g I mua. ..,••. .1uu. .wu ,j, / / �\ SMH 28 \\ / - 19 - STRE T C - - - _ / /"i / '\ OU TLOT E \\ / S ' RE 899.43\ \ 29 6 / wv. aeH.O]\ \ „ 1 WlYc aY114 YYMc aLIYc yW4. _ I I/ \ \ > SSMH 5 \ \ \ / \ \ / 6 - - -- 30 0 / \ s H 29 \ \/ �11 BLO 98 957 \\ 3D \\ / / \ \\ IN 938A] ) / ' ` I p INV. 928.0] / / \ i (/ I 11 15 ✓ \� .\ \ \� 11 \,, �M 1 jI � 1,3 11 1 I 1411 1 1 RIBNElV➢ 9391L1820069T H � 46 � %31 M3 10 1'7, 5 INV. H].1] < \C.` Ire ` , \ I% t\ 0 - INV. 886.]] \ / \ \ 9 \ \\ ,� STREET D •Ole _ \ \ . OU TLOT F 4 5 1 A \ 4 vvv /� /�vvv 8 i\' 1vv �v � I - - - - - -J \ \ SSMH 22 ____-_RE 1 1 II 2 I 3 RE934.n % v 1�y / \\\ '' \ \ .• ' 1 \ \ INV. 922.]J / - \l\� a SSNH 19 SSMH 2 SSMH 21 \ BLD=1200' \ / NV.91- \'o OUTLOT A .Q I RE s2H.n R 99202 7 e BASKETBALL BLo-ss9' 3 INV. E/W 8B5.99 INV810 920-9 / / \ / COURT I �� wv 5 914.n I I I BLo=I z.ao LLo_40.�B' - J L - - - - - - - - - - - \ \/ SSMH 2n \ �^ /\ RE 925.40 r - - - - - - - -I - ' \ OU TLOT H INV. 914A - 0 2 I 4 O o --------- --\� \�\ \\\ 3 / / \ 5 \\ < 3 \ 0 r $ ` I I 1 1 4 \ \ \° 6'1 PLAYGROUND \ \\ 0 2 I 3 11 V A AREA vv g \ c \ • 't 1 1 Y QT Ea' \4 RE923.17 11 \\ -/ /.' a I 2 i' ; V N 0 35.00 J I � CD 0 STREET (BY OTHERS} _ q -T - _ J , _ - b/ - ``T ,S �l IVIII f)rI I I IV'E L / T / Ir �Tn nr N / 11 AUROF��\ INVESTMENTS LLC PID NO. 25.0221300 11 II II II II II 11 0 m ' _-..... -,.. _--- - _,..�««. .va _ �.�`� •QxJ_Js°�� - ,1 I` : �., r ( /lf TF)A NIC-- [)T TI%'\NI L)I/\I IT - r ly.. ___ a p/ VV/-\I J11 Ill --- �r In/n\/ )n-r �'I n rein IL ri °°A 1�1 E'TMENT-S I-L( I`I i I I F° u r ,_<�I 1 �I I�"III �_� % 1 II • 5 1 i � +� r �rt� -PIS' 2�.� 21 _.o I `_:. �.� -,. S -L_� I).. r�{I �it u I�� II�II I I I I YaJ ii v- i i ) I u / JOHN KLING � _.1 � X J-- -, LHUTZ r 3 .'_i ( :r t ] _-_-__ - PID �? NO. 25,0270400 r- i- A I11 jj � l �I, 11 .. A �U �1�� -. _i .J` -_ 1 II __ L- LEGEND OHP OHP- EXISTING OVERHEAD POWER LINE p EXISTING TELEPHONE PEDESTAL x x R EXISTING FENCE 35' WETLAND BUFFER V EXISTING TREE LINE/TREES EXISTING DELINEATED WETLAND EXISTING WATERMAIN EXISTING ASPHALT SURFACE EXISTING SANITARY SEWER EXISTING BUILDING -<< EXISTING STORM SEWER ® EXISTING WELL EXISTING GRAVEL SURFACE EXISTING CONCRETE SURFACE JOHN KLINGELHU IPID NO. 25.0270- V / n n CD zv mn N7 I N of N N MI S m X Op 4 (/) af 5 �p Na nK] p 1'] LLJ O Z � n _w CZ V U aNv 3 m W w z 0 nF5 � Na �a N >a L Z � � CCZI m � CL N E E o W - y ao on6o a O caw o� T o N 0 "' of - N a)cC7 O OU J � 0) N O O • NO-0) -j._c a vZ a� c m av owin It CD Ei O OLn u7 rr^� V/ Q Wo zz U1 a z12 w a Q F w J O o F-4 J w Z Z H a -� a�� •o 0VC) z �zw � CI 0 w Z z OS o W E-4 C_' 0w 0 0 W w xm a z W a NY 0 W AC4 4D 00 DRAWN BY TP C DATE 2/3/06 REVISIONS PROPOSED ASPHALT SURFACE BENCHMARK Z n BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER PROPOSED CONCRETE SURFACE POLE WEST OF DRIVEWAY - N. SIDE OF CAD FILE PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM SCALE IN FEET --< --- !-----<.- PROPOSED STORM SEWER 0 100 200 300 21996U PROPOSED WATER MAIN BM #2: TOP ALUM R/W MONUMENT 0 SOUTH PROPERTY LINE ON PROPOSED R/W LINE. PROJECT NO. PROPOSED SANITARY SEWER ELEV.= 913.67 NAVD 88 DATUM 1 inch = 100 feet 21996 ---«---<:- - ----« -- PROPOSED DRAINTILE U1 m0 P . EVERGREEN TREE DETAIL , o --_ __ _ '�- •rI '; - -.. G ' ®: Q o o _ �/ T G O O 00 0 �G G {O v 7F`Y o ✓'"'�: ✓'-� 1 7 _ f,_ 1T. �� 40 T G G O� ,i�� �r e, /,✓I � � Uzi ss G /,122 0 0 �. O O 0p0i�j�- J 0 0 0 8 19 PA 9 PA 12 ABM co o 0 O O o. I o/j��, I�" J� r l o O QD ,/ / 9 �� � � I 2% Q g¢ev r�_ C ' '� I� __s a � I I f� o G o O A — O <' 4 54 ABM � / ( , , i i tb 1 21. 71 r) 4_'�. " 1 ABM A B M 2 SSC 1 ABM 4 BHS 6 C HS 6 CS 2 ABM -. 3 3 RSC 6 C 2 R 2 S S C �� / C�„� 1 ABM 1 AB o a- / M F Y- 3 BHS 2 SSC -0 / / 1y , L. � ABM 10 ABM h S 10 BHS +. Ofl jail;' �,`�t !J11�``�'':li'Hlj,4'I 1I 1 I 2 C / 2 _ SSC /, it !l,/'�i, Jll1,flL�i ,j� � I�. 6 BHS 1� 12 �a�_���vc _ --_ ���/ 1/lr ,.J /✓j�l / Ji II;I �I, il�A4� 2 RSC T EARTH SAUCER WITH 4" SOIL FILL WITH 4" WOODCHIP MULCH TURN BACK BURLAP 1/3. PLANTING MIXTURE UNDISTURBED AND COMPACTED SOIL. !; y _ 7 , - I I 2 AM 5 BW 8 19 / / MIN / MIN. \\ DECIDUOUS TREE DETAIL 5 CS 5 AM 1 PFC 2 PFC 2 NS 5 PFC 5 AM 4 CS 3 BHS 1 BO 1 BO ,LII 1 B0 3 RSC" r1 1 f I i I _ J. , _ max'; ,.� CENTER TREE INHOLE -I -�5. I'fI- 1 I I I� I �(A �I! Y7'I III �II Iq !ra' �1 u N 0 TE S FASTEN TREE TO 14 GUAGE PLIABLE ZINC COATED WIRE AND 1/2" RUBBER HOSE SECURE FIRMLY AND NEATLY 1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY AT ALL ENDS. WITH THE GENERAL CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL (454-0002) PRIOR TO STAKING PLANT LOCATIONS. WRAP TREE WITH 4^WIDE TREE 2. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSINGS ARE FOUND WRAPPING MATERIAL TO FIRST ON SITE, WHETHER SHOWN ON THE DRAWING OR NOT, THEY SHALL BE BRANCHING PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED AND/OR ARE IN AN 4^ WOODCHIPMULCH AREA TO BE GRADED. ANY QUESTION REGARDING WHETHER PLANT MATERIAL SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO REMOVAL. PLANTING MIXTURE 3. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF UNDISTURBED AND COMPACTED SOIL. NURSERYMEN. 4. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE — SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 161 Total reforestation area (15.30— 7.20 ac.) Required canopy coverage (one tree provides 1,089 SF of canopy) TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 4 ABN! 8.10 ac or 352,836 SF 324 trees 324+44=368 TREES --,-9AEM Q l r, �n i -r 0 oAp BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER � C�Q') POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT @ SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ^D ELEV.= 913.67 NAVD 88 DATUM Ln M O M' Z a Of M N a � I.. f N n N m �a n T� m .i \ N W Q , N n c O M w W O w N c w Z ZW O M O / A N d � a Ei E w O L� Z s o J � m z oLn �' w a h p� w zLd z o z W aw 0 Q O v J i ^' EJ•y In W z U) q Q J az .o �V� zN z W L W O v�=rx z� �Uz o0 W I--1 Ly w W xm a w Y a �00 A� L CS — L1- SSC 1 1 BO SSCLk3 ABM 2 ABM 2 AM DRAWNBY I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT Z f ] HAF —! - WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION �- AND THAT AM A DULY REGISTERED LANDSCAPE ARCHITECT DATE UNDER THE LAWS OF THE STATE OF MINNESOTA, DATED THIS 3RD DAY OF FEBRUARY 2006. 2/3/06 SCALE IN FEET 0 100 200 300 REVISIONS _� 1 I`, I MEs sruRM, ASLa REGISTRATION NUMBER 18380 1 inch = 100 feet PLANT SCHEDULE 5. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 6. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT MATERIAL ESTABLISHMENT, SURVIVAL, OR GUARANTEE. THEY SHALL BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 7. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANTING BEDS WITH FIBER MAT WEED BARRIER. ALL EVERGREEN AND DECIDUOUS TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD OR ROCK MULCH SPECIFIED PER PLAN. B. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. KEY OTY. COMMOM NAME LATIN NAME SIZE ROOT NOTES CS 50 COLORADO SPRUCE Picea pungem 6' HT BB FULL FORM TO GRADE BHS 49 BLACK HILLS SPRUCE Piceademara Glm/ca' 5' HT BB FULL FORM TO GRADE NS 8 NORWAY SPRUCE Piceaabies 6' HT BB FULL FORM TO GRADE PA 91 PATMORE ASH FYanxus pennsylwx wPaimare' 2 1/2" BB STRAIGHT LEADER ABM 104 AUTUMN BLAZE MAPLE Acersfreenuxim!Veffersred' 2 1/2" BB STRAIGHT LEADER BO 15 BUR OAK Quercusnuicrocarpa 2 1/2" BB STRAIGHT LEADER RSC 15 RED SPLENDOR CRAB blahs7WSplendor' 2 1/2" BB STRAIGHT LEADER SSC 14 SPRING SNOW CRABAPPLE Malus'Spring Snow' 1 1/2" BB STRAIGHT LEADER PFC 8 PRAIRIE FIRE CRABAPPLE MIalus'Prairie FYre' 1 1/2" BB STRAIGHT LEADER AM 14 AMUR FLAME MAPLE Acerrnnala FTmsie' 1 1/2" BB STRAIGHT LEADER TOTAL 368 CAD FILE 21996L PROJECT NO. 21996 L1 GENERAL GRADING NOTES., 1. SPECIFICATIONS WHICH APPLY ARE THE MOST RECENT EDITIONS OF THE MUNICIPALITY IN WHICH THE WORK IS LOCATED AND THE MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION UNLESS MODIFIED HEREIN ON THESE CONTRACT DOCUMENTS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE THE "GOPHER STATE ONE CALL" EXCAVATION NOTICE SYSTEM AS REQUIRED UNDER MINNESOTA STATUTE CHAPTER 216D, 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION (PHONE 651-454-0002 IN THE TWIN CITIES METRO AREA OR TOLL FREE 1-800-252-1166). 3. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION. 4. ALL CONSTRUCTION AS CALLED FOR ON THESE CONTRACT DOCUMENTS SHALL BE PERFORMED IN ACCORDANCE WITH ALL OSHA REQUIREMENTS. 5. ALL LOT AND EASEMENT DIMENSIONS ARE SUBJECT TO FINAL PLAT. 6. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE FILTER FENCE,SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED. a. ROCK CONSTRUCTION ENTRANCES. b. FILTER FENCE. c. TEMPORARY CULVERTS. d. TEMPORARY SEDIMENTATION BASINS AND OUTFALL FACILITIES. e. STORM WATER POND CONSTRUCTION. I. COMMON EXCAVATION AND EMBANKMENT (GRADING CONSTRUCTION). g. SEED AND MULCH (SEE NOTE 14). h. STRAW BALE BARRIERS IN FINISHED GRADED AREAS. I. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER CONSTRUCTION. 7, GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS AND IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY. 8. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE GRADING CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, 9. IT IS THE RESPONSIBILITY OF THE GRADING CONTRACTOR TO DISPOSE OFF -SITE ALL TREES, STUMPS, BRUSH, OR OTHER DEBRIS THAT EXISTS WITHIN THE CONSTRUCTION AREAS. TREES TO REMAIN SHALL BE DESIGNATED BY THE ENGINEER. 10, THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT CERTIFICATION OF ALL CONTROLLED FILLS CAN BE FURNISHED TO THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. 11. DENSITY TESTS SHALL BE TAKEN TO EVALUATE THE COMPACTION WITHIN THE STREETS, TRAVEL WAYS OR PARKING LOTS. WITHIN THE UPPER 3 FEET OF STREET, TRAVEL WAYS OR PARKING LOT SUBGRADE, THE CONTRACTOR SHALL INSURE THAT ALL SOILS BE NOT MORE THAN ONE PERCENTAGE POINT OVER THE SOILS STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTION TO A MINIMUM OF 100% OF STANDARD PROCTOR DENSITY BE PROVIDED. IN AREAS BELOW THE UPPER THREE FEET OF SUBGRADE OF THE STREETS, TRAVEL WAYS OR PARKING LOTS, THE CONTRACTOR SHALL INSURE THAT ALL SOILS BE NOT MORE THAN THREE PERCENTAGE POINTS OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTION TO A MINIMUM OF 95% OF STANDARD PROCTOR DENSITY BE PROVIDED. THE GRADING TOLERANCE FOR THESE AREAS SHALL BE WITHIN 0.1't. 12. LOT GRADING AND/OR THE PREPARATION OF BUILDING PADS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE GRADING TOLERANCE SHALL BE 0.25't. ALL EARTHWORK OPERATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE HUD -FHA DATA SHEET 79C "LAND DEVELOPMENT WITH CONTROLLED EARTHWORK", PROVIDING FOR A MINIMUM OF 95% STANDARD DENSITY, OR AS OTHERWISE SPECIFIED BY THE GEO-TECHNICAL ENGINEER. 13. IN AREAS WHERE RETAINING WALLS ARE PROPOSED ON CONTROLLED FILL AREAS, A MINIMUM 95% STANDARD DENSITY NEEDS TO BE ATTAINED WHERE FILL THICKNESSES EXCEED 10' BELOW WALL FOUNDATION ELEVATIONS, A HIGHER MINIMUM OF 98% SHALL BE ATTAINED 14. BUILDING PADS SHOWN ON EACH LOT ARE TYPICAL ONLY. THE DEPTH OF THE PAD FROM FRONT TO BACK SHALL BE GRADED THROUGHOUT THE FULL WIDTH OF THE LOT OR AS NECESSARY TO ALLOW FOR CONSTRUCTION OF A BUILDING AT THE MINIMUM SIDE YARD SETBACKS. (REFER TO THE PLANS FOR SPECIFIC SETBACK DISTANCES.) IF UNSUITABLE SOIL CONDITIONS ARE ENCOUNTERED WITHIN A PROPOSED BUILDING PAD THAT CANNOT BE CORRECTED OR REMOVED, IT IS THE RESPSONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF THE CONDITIONS AND TO LOCATE THE LIMITS OF THE UNSUITABLE AREAS. 15. UNLESS OTHERWISE SPECIFICALLY NOTED, THE FOLLOWING SITE RE -VEGETATION TECHNIQUES SHALL BE IMPLEMENTED. ALL DISTURBED AREAS, EXCEPT STREETS, AND POND AREAS SHALL BE COVERED WITH A MINIMUM OF 6" TOPSOIL AND SHALL BE SEEDED WITH MITI #250 MIX AT 70LBS./ACRE. SEEDED AREAS SHALL BE MULCHED WITH MnDOT TYPE 1 AT 2 TONS/ACRE AND DISC ANCHORED. SEEDING AND MULCHING SHALL BE COMPLETED WITHIN 2 WEEKS AFTER EARTH MOVING OPERATIONS ARE COMPLETED. ALL SLOPES THAT EXCEED 3(H):1(V) SHALL BE SEEDED WITH A WOOD FIBER BLANKET. FERTILIZER SHALL BE 22-5-10 80% W.I.N., 0% CL OR EQUIVALENT AND APPLIED AT 350 POUNDS PER ACRE, FERTILIZER IS TO BE INCORPORATED INTO THE TOP 3 TO 4 INCHES BY DISCING OR SOME OTHER SUITABLE MEANS. WHEN SEEDING AFTER NOVEMBER 1, OR WHEN TEMPERATURES DO NOT EXCEED 40 DEGREES FAHRENHEIT, THE CONTRACTOR SHALL DORMANT SEED ALONG ALL DISTURBED AREAS. DORMANT SEED BED PREPARATION, SEEDING RATES, AND MULCH REQUIREMENTS SHALL BE THE SAME AS THOSE DESCRIBED IN THIS SECTION EXCEPT THAT NO SEED SHALL BE PLACED ON SNOW OR ICE WHICH IS GREATER THAN 2 INCHES IN DEPTH. ANY SEEDED AREAS WHICH DO NOT BECOME ESTABLISHED SHALL BE RE -SEEDED AT THE CONTRACTOR'S EXPENSE. 16. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP PUBLIC STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT AND OTHER DEBRIS WHICH RESULTS FROM SAID GRADING CONSTRUCTION. 17. THE SITE GRADING TOLERANCE FOR THE SITE SHOULD BE 0.1' FOR STREETS AND 0.25' FOR LANDSCAPED/OPEN AREAS. PECIFIC GRADIN 1. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS ON THE PLANS WERE PROVIDED BY JAMES R. HILL, INC. ON OR ABOUT 09/20/05. THE DEGREE OF ACCURACY OF THE EXISTING CONTOURS SHOWN ON THE PLAN IS EQUAL TO t ONE HALF THE CONTOUR INTERVAL. PROPOSED CONTOUR PROPERTY LINE SURFACE DRAINAGE / 916 LOT NUMBER 6 920 EXISTING CONTOUR I FINISHED GRADE ELEVATION SUGGESTED GARAGE SIDE o_ Lo PROPOSED DRIVEWAY (675 S,F.t) 0 FINISHED ELEVATION - 23$ N AT LOT CORNER STREET PAD ELEV. 60' GRADING GRADE C7 O ^B LOWEST F.A. ELEV. 0 x IYP. Foonxc RAMBLER SECTION (R� CUSTOM RAMBLER SECTION (CR) RECOMMENDED HOUSE TYPES MODIFIED LOT- FINISHED GRADE ELEVATION VARIES AT THE FRONT AND REAR OF HOUSE, LOT CAN ACCOMMODATE C R RAMBLER, SPLIT ENTRY OR TWO STORY HOME. USE LOWEST FLOOR ELEVATION PER GRADING PLAN. STANDARD LOT- FINISHED GRADE ELEVATION IS THE SAME AT THE FRONT AND REAR OF HOUSE. LOT CAN ACCOMMODATE R RAMBLER, SPLIT ENTRY OR TWO STORY HOME. LOWEST BASEMENT FLOOR ELEVATION MAY BE EITHER 8.0' OR 3.51 BELOW FINISHED GROUND LEVEL. WALKOUT LOT- FINISHED GRADE ELEVATION FOR REAR BASEMENT WALKOUT IS 8.0' LOWER THAN FINISHED GROUND R WO ELEVATION SHOW AT FRONT OF HOUSE. BASEMENT FLOOR ELEVATION IS 0.5' ABOVE REAR FINISHED GROUND ELEVATION SHOWN, CUSTOM WALKOUT LOT- FINISHED GRADE ELEVATION FOR REAR BASEMENT WALKOUT IS 8.0' LDWER THAN FINISHED HOUSE FLOOR (HF) C WO ELEVATION SHOW AT FRONT OF HOUSE. BASEMENT FLOOR ELEVATION IS 0.5' ABOVE REAR FINISHED GROUND ELEVATION SHOWN, DEEP WINDOW OR LOOKOUT LOT -THE FINISHED GRADE AT THE REAR OF THE HOUSE IS 5.0' BELOW GROUND AT THE FRONT OF THE HOUSE TO ACCOMMODATE FULL WINDOWS. WINDOW OPENINGS R LO ARE 0.5' ABOVE THE GROUND AT THE REAR OF THE HOUSE, DEEP WINDOW OR LOOKOUT LOT -THE FINISHED GRADE AT THE REAR OF THE HOUSE IS 5.0' BELOW HOUSE FLOOR ELEVATION (HF) AT THE FRONT OF THE HOUSE TO ACCOMMODATE FULL WINDOWS. WINDOW OPENINGS CLO ARE 0.5' ABOVE THE GROUND AT THE REAR OF THE HOUSE. NOTE: FOR ALL RECOMMENDED HOUSE TYPES, GARAGE FLOOR ELEVATION IS 0.3' ABOVE FINISHED GROUND ELEVATION SHOWN AT FRONT OF HOUSE. TOP OF BLOCK ELEVATIONS IS 0.7' ABOVE FINISHED GROUND ELEVATION SHOWN AT FRONT OF HOUSE. 920.0 RWO RECOMMENDED HOUSE TYPE - FINISHED GRADE ELEVATION TYPICAL FRONT YARD SETBACK 30' (HOUSE) 22f PROPOSED ROW C&G 26 8ii FINISHED IGRADE - � CENTERLINE 51 "'W-100' i STATION TYPICAL LOT 4" CONCRETE 4" SELECT GRANULAR 0.5• 5' Ky d a a o V C' 0.5, I 5' CONCRETE SIDEWALK SECTION (ALONG STREETS C. D. & E)STREETS C. D. & E) o C) u LOT BENCHING DETAIL A _-2i C,ta' 1 AT Ie HIGN/LOW PT FOR DRNRAGC I_ W' R. us / jAap n 25 Ik _ -- I' CM AHD WIU; n 2553350' va) ; I_ �\Mb G0.25 PRGLY .S. S' RAWS - :e50R'I]RG' ate le. I \vJ STANDARD CUL-DE-SAC Is CW./INO. BJ' RRD. A9' WAD. URBW an RAD. I RAD. RURAL an Rwa. W' RAp• Ro : 2'.Pai IMFIONAVEI WLOERM(RPn uEAWREa RI 6AIX IF O,Ftl. CITY OF TYPICAL CSANBASSEN CUL-DE-SAC cri III 2_97 TE No .. 5205 a1M 5' 3 1 t ;Arii N AN a R/W = Frv; I I IT I I - - I o I � I I 1 MH Gate calve Iacallm t on pro)ectian of I Property line. I R/W R/W xO E: All dead to be ode Beended mkllmam of one pipe long h beyond NOTE: gate valve d dined Woter main to be m with plug red back to morrib and vest ride lee. Of canter line. Unless nine`HER pose conflict with prOpOeed Sidewalk CITY OF TYPICAL CSANBASSEN INTERSECTION eLn. TILE NµE. 313-loor 1,ITE 2-97 ILI" 1001 PL CL PL 3030' 15.5' to Dack ISS' to Bab WANT, Course to be 1/2' Above Edge of Wirer `QoOa J.oE 2.oz ss 9 s OR 4" Topsoil. Seed 1 %2"-NNDOT 2}5p LVWE}50JOB @ umm w sod. Surmountoble TO_ek Cool - 23S7 2 -MNOOT 2350 LVNW350308 Cwcrete C.A. 12"-Class 5 Aggregate Box, 100E Crushed 24' MNDOT 31493B Sled ONEWIP, Barrow (See Note 7) NOES L Right of Woy Readied - 60', lawmys lre t 9 r 7.02L Z od 3. Mklimu oVxl grade distu 4. 4.0' p in disturbed areas. 5. 2 Rolla sod Os II sand eei orin9 shag be noosed me nest canavuclion 6. me wen ring of nt t weans placement of the bituminous bax. . hNowia 7. A teal roll mbgro.Nall by ins o a Not pa city inspector Ube has me mmwir toV .auks en e o y asrfthe au In (ne pmxnx of a rie se the oaditionm subgaae Correction based m the lest all. CITY OF TYPICAL RESClIAN8ASSSN NTIAL STREETSECTION 'FIS[O:2-RT. - I-o3 wrz: 2-97 ,-Os P`'AT "D" 5200 A. warrall of "RMANN AI -1 I n ��1/5• > A.0 a TA DOMEE SECTION - oe oo>a nower dada, oo A.-J, PLAN VIEW OF DIGONAL RAMP DOME SPACING aM5\k wTv� 5' _ a 4� AT CA 's Y --- r Is day m/n. m ..CD 6 t SECTION A -A Y B man""en`°man wA :lW. m EUM 5' a' ,o rtei- am n,n.arce 1 8 5' >' fie ft Y 4' O"inn 6 3 e' T a B ELEVATION OF RAMP 0' 9' 1/1 NCN PR.XATFA oropheD Ni PETER YAAASRTO Y 113. EH A A"MAN IS NOT WON ENWW, Rod TRIED PEDESTRIAN RAWS AW A AJE L.WpING SUKEN iNFY 1NE PEOESIRINI CROSSING $XALL PE Wi nIRWGX THE BEGAN AT STREET IEHL ® 5- TO 9- Is THE REWIRED OFFSET OF THE MUNCATEO OWE AREA FAW TIE FRONT FACE OF CURR O DA FEWLem TRUNCATESr1ALL eE 2' a' LAW ANOMECTCN OILTIAKL . suLL EXTEND THE FULL NW M (' D- TYP 1 Ow ME CLRB RAMP. IIRS Z BT ! a- RISEN (T,9.) WALKING SURFACE. D O AREA ST AILL RE A IIWlc0.m E1TE NT CRA.RHIIEON YELLOW) M. EENTREA TRUNCND ATEAREA GRALL COM AST YWal THE ADJACENT THE ADJACENT gOE Is A 0. CRmf. M ENTIRE 1RWCATED DOME AREA SHALL RE A DARK COLOR (RED. RIAIX. DARN DRAY, ON BIRCNT YELLDR/) MEN ME ApuCENT SDEWALK A A -NHITE ON LIGHT GRAY CEMENT C O SURFACE APPLIED TRUNCATED OWES ON STµFED CONCRETE MI NOT BE ALLOWED. ® TRUNCATE CGE AREA SHALL MEET ME CURRENT uNDOT STANDARDS FOR DETECTABLE WARNING SYSTEMS. CITY CE PEDESTRIAN CSANNASSSN CURB RAMP EYISEO'. 1-90.-OA +-OS RILE NdIE ]a] TE 2-97 TE NU 5215 PROPOSED BUILDING SITE EXISTING GRADE R/W 30' BUILDING SETBACK LINE r 6N TOPSOIL r6"rFINISHED GRADING GRADE 1 PIL C PL 30' 30' 18' to Face 18' to*Face weaI comae to be 1/2• 4� Above Edge of Gutter ` 3.0E Z.Oz 5' yyo+. We y y- yye 4" Topsoil, Seetl @ MYICM1 an $W. 2'-MNDOT 2350 MVWE350356 B-618 Concrete Curb 2'-NNDO7 2350 MVNW3503513 2 1/2•-MNOOT 2350 MVNW350358 12•-Gass 5 Aggegate Base, 100E Crushed 24- MNDOT 3149.28 SARI Granular Borrow (See Note 7) Tack Cod - 2357 TOak Coot - 2357 NOTES L Right -of -Way Required - 60'. 2 Maxtraum street grade 7.0] 3 M'nunum street grade 075X 4 4 O" TOpaol placed in disturbed mesa. 5 2 Rings zstl behind curb. 6. The bituminous wedeln, surface enter be placed the That conrrunban (Whom, placementwx or the bitumins base ME 7. A lest roll ar thepoepored w,bgode shot[ be performed by the caner in the presence e t it Cioapeclor. HIND CRY had the Outhority to reguim additional suNrade correction based an one teat roll. CITY OF TYPICAL/ C8ANUSS111 COMM INDUST STREET SECTION REN362-97 . 2-dl. 1-O] _a, WIE: 2-f17 J PYM iYS.: 52G1 PL VARIABLE %2" SLOFE PER FT. Tow/.RD ROADWAY TOPSOIL TYPICAL 3" ANODE 23W LVWE450308 6" CLASS 5 BASE (1 Wz CRUSHED) COMPACTED SUBGRADE PER SOIL ENGINEER NOTES: 1. Shoulders to be backfiled Oad restored with 3" of th, sAl and -vegotated with sod or seed / mulch. 2. The C.Hoacto, developer shell •upph a 2 tear 100E maintenance hand upon city acceptance. 3 This Oetor / pecifcationa ors mnimumn reaulremenls, addil'wnsl design ZIT th rAWNM0 depending an tinting sub -grade veil csntlilions. 4. Bituminous boos may not be constructed on u naitoble soil.. No wool. matei black door, ar organic Salle ollowal "I I OF BITUMINOUS CAANBASSEN TRAIL -``h�i¢o.-9e . - - 2 97 T Ha.. 215 FlLF MNE. J9J_5216 I /�/�7 7/ )~ SELECT �- SELECTBACKFIk ' N N BACKFILL UNSUITABLE L MATERIAL )) ANTH \ _ SUB -GRADE CORRECTION jA/- - LIMITS -NON -SELECT BACKFSUITABLEMATERIAL BOTTOM OF UNSUITABLE MATERIAL (TO BE VERIFIED BY SOILS ENGINEER PRIOR TO PLACEMENT OF SELECT MATERIAL.) BUILDING SITE & STREET SUB -GRADE CORRECTION DETAIL ALL 3:1 SLOPES MUST BE EITHER SEEDED & STABILIZED WITH WOOD FIBER BLANKET OR, IF SODDING, THE SOD SHALL BE STAKED (TYP.) AQUATIC BENCH 10' 10: 1 a o NOTE: AQUATIC BENCH OF THE POND SHALL BE SEEDED WITH THE MN DOT NO. 310 SEED >< MIXTURE. THE AREA BELOW E THE AQUATIC BENCH NEED NOT BE SEEDED. 0 r OLE FINISHED GROUND TYPICAL STORMWATER BASIN CROSS SECTION BNmnc le F .9.iSbM� t n r 16• " , r, Tap MIJ ... Matwul +ane 3 C er IT _ MD 8618 - Cmuele CLAN and Gutter 87 aT +K' Top BlNmnpm Yatefiol -Cote t- ncm We d Gutter . 141K MO E: A. Far Use Only Ann Probe brivewaye. ParMlp Let, a 1Wvla 26"R 12•R Ifi• rTro BiWmm,us Mat We SURMOUNTABLE TH _ _ CenvNe CURB anal Wlld 6• E'r w mmindud Bituminous Curb 5i1oce 6' Shoe Formed .H- CITY OF TYPICAL CURB C8CITY EN AND GUTTER RNS_a: 2-a7 IL 2-97 .TE No 5203 FILE NALLIC s_a20] PL NOTES: L TYPICAL 6• WICK CONCRETE SIDEWALK 2. USE 7 12" THICK FOR COMMERICAL DRIVEWAY CROSSING. 3. JOINT S ACING AT 5' INTERVALS. EXPANSION JOINT SPACING AT I00' INTERVALS AND WHEN ABUTTING EXISTING CONCRETE CIR STRUCTURE. CITY OF CONCRETE CBANBASSIN SIDEWALK RLRISLD.2-9e. 1 -GB T. 2 97 PLATE No: 5214 TILE RAND W L. 3 93 5214 BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SITE AREA 5,259,434.4 S.F. OR 120.74 GROSS ACRES MINIMUM CITY SETBACKS FRONT 25 FEET SIDE (HOUSE) 10 FEET SIDE (GARAGE) 5 FEET SIDE (STREET) 20 FEET REAR 25 FEET a V UA) n Z < CST 7 3 CHI, w L wooO M rn IQ N M n - N Is �ri As my �^ Q2 m x sidC of L. w w W O N z W G lT pl Q C TI N � ih Ci Uv�� z ; v OL W 4,W 0 rh O �Z W o r3 z Z 2 Z Ric GO n CL E GO O 5 DO DO o - w aoE000 a 0 O 3 DO Y Q 3 Z N S a v o a GO O a ,_ O O O 0_ L toO C a- 0 C) T 0.0 -O 0 to _ O E J` N y C 13 O y r, >. - C C J h �IS WO >. 0 J CD 0 0 w N 0 O ._ _T N OQ U J c U L a d N or OI p N O O w V l p EllO On Vl WO 0 ry N W z z z a Q ::�w J J O � O > wI �l Q Yf4WZ az = aoz6 O LAiz V) (n Ln E"'1 w W 1--I W F Oa = A Z) N V1 �Of z a " yw L�-1 0o Of EI M U W EBB-4 L O U 0 W xED 17] /1 w z w Y N W o0 . A04 W DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996E PROJECT NO. 21996 D1 WETLAND TABULATION WETLAND A 22,708 S.F. WETLAND B 318,424 S.F. WETLAND H 2O,473 S.F. a ' J r I J/ -1 9 J < I 9 TOTAL WETLAND AREA ONSITE IN DEVELOPED AREA 361,605 S.F. 8.30 AC. TW 878.0 TOTAL WETLAND IMPACT 20,473 S.F./D.47 AC. J I /J J J / J BW 8740 WETLAND H \ f4 1 7 �I A. REQUIRED MITIGATION (NWC) 20,473 S.F./O.47 AC. 4I�; ;II _ 1I a REQUIRED MITIGATION (PVC) 20,473 S.F./D.47 AC. �_ \ � TOTAL REQUIRED MITIGATION 40,946 S.F./O.94 AC. �4I 1 '4I 1 -4I 1 yl " yl r �' Fi �I �I 1 TW 877.0 PROVIDED MITIGATION NWC=75%) / 3i 71i �i �i �'/ f ( 33,830 S.F. 0.78 AC. �' �' �' �� BW 873.0 �r ( EXISTING WET d = � � � � - � 4 _N4' RETAINING WALLS (MAX.) �/s" LEGEND PROPOSED TEMPORARY ROCK CONSTRUCTION ENTRANCE 1 EXISTING ASPHALT SURFACE PROPOSED DITCH BLOCKING (MnDOT TYPE 3 TO BE _J O EXISTING CONCRETE SURFACE INSTALLED AFTER COMPLETIONPi OF GRADING) EXISTING GRAVEL SURFACE 5 PROPOSED TEMPORARY SEDIMENTATION EXISTING BUILDING BASIN / ! C PROPOSED 10' AQUATIC/SAFETY EXISTING DELINEATED WETLAND BENCH (10:1 MAX SLOPES) PROVIDED MITIGATION PVC=25%)) STORM WATER POND (OU ILOT A) 15,300 S.F./0.35 AC. LAND � !r fir/ / \\ F___ -- -- -----" ------ WETLAND DELINEATION NO WETLAND IMPACT i PROVIDED MITIGATION (PVC=25%) 25' MITIGATION BUFFER 10,190 S.F./Q.23 AC. A=318,424 S.F. -/ a - -I -4 / ! 1 PROPOSED WETLAND FILL AREA EXISTING FENCE TOTAL PROVIDED MITIGATION =100% yl �I �I 1 '� L_ 59,320 S.F. 1.36 AC. y �f1 EXISTING TREE LINE/TREES ( ) /� �I/ ; 41 / e�ii �• " PROPOSED SEED & MnDOT 25 MITIGATION BUFFER AREA - / rw 877.0 0, / o CATEGORY 3 EROSION CONTROL / 190 S.F. l / BW 573.0 % ------ / / / BLANKET --1. 00------------ EXISTING CONTOUR i 1i , \ il5 RIP RA 865I5 W �, 1 5 1MAX.L0 - �I _ 4I 1 1%/ \ \ \I ELEV;, AY - 1 I I�• : 1 �I /` Q PROPOSED TREE O -! -! � J � J � � J 1 -! J _:.,:. J J � J � J � J f TW 876.0 O" \ \�� p� ':,- '---_- .__- ii EXISTING AT -�--_` BW 872.0 �� 1 \; / PROTECTION FENCE E S NG W ERMAIN � • / EXISTING SANITARY SEWER 1 J 1 d / x \ \ \ •• r ,::'r'=°`k/ /.ay 7.5 \ ' / - �' �i / x 64.7 !TW 876.0 / �'�/ \ j < < EXISTING STORM SEWER 65.0 - / - RETAINING WALLS (MAX.) ✓ f \/ / / /�' / /� / Y j / W J. •/, / \ - / a8 0 / / EXISTING SOIL BORING -O EXISTING WELL ! _ Bw 873. • • ew s.s -1 X\ / Po/ / /o !/ / / !/000 PROPOSED CONTOUR / / x / / 64.7 Tw 8735 -< ` PROPOSED STORM SEWER O \_•• �• _ _ _ 9� \ / / f A/ °b, i / o / /----------------------------- PROPOSED DRAINTILE ,gyp ! / r / J J J �' \ �i 65.0 X \ \ / ••O_ •••i _ - ,a_••. $�`� \ \ a �/ / ` W �' may/ /v 1I 1 �I 1 �I 1 �I//� l / - _- _ \� X �// i ,9? / / / \' / / !i �j PROPOSED RETAINING WALL 0 3 �' �' �' MITIGATION AREA _ 8 9 \ / / OLE _ _ ��� - W 8 \ st 0 �/ / // \\ \ ' / i,7 //^\ \ +soo.00 PROPOSED SPOT ELEVATION gg 20 836 _ _ sss. g. 'y �/ / / v / i / v v / / / J J J J a x S ; Z _ �q,° _�°� / /i/ ,,' PROPOSED TOP OF RETAINING v 4 4 1 - �I ,� / 64.2 �� _ __ _ ��_ a / / f/ V�Q vvvv / Twsoo:o WALL ELEVATION / ,II ql / / -- 1� e" \ \ G ��/ /' ! / y / 0� / / x 1 / ewsoo.o PROPOSED BOTTOM OF RETAINING � WALL ELEVATION \ J 4 J 1 165.5 \ \ ��$ _ - -/- • - �O 7 - - - - - �� /i ,,(,'y // /' / / / x /, / / - T o O O 1 1 �I 1 �I �I I RE ///' aBIIa _I-� qoL_ p�5- - - 'i1 5 �`�"�l f / L ' !I o.5 r! 95 I PROPOSED CONCRETE SURFACE e_�` 9I gam ! I Q No L o O LO '' � \ �, � ' � / / - � -- A� \j _ �'� - J / O Gj� / \ \ `L/28 / / ,/ / // PROPOSED ASPHALT SURFACE -1 \ a \ . i2 BCAD/ GRADING LIMIT OE -T '7 - /'� - - _ Q," �b0 ( / 1 11� / / \ \ / quo - % / / S -- / I- - -7-- - - ' -- Y / pJ �• / / \ o 25' MITIGATION BUFFERo -A J J J O� �I J ! / / / �900-� - / 5 2. 9a' CjjF / 10 oL`O �/ �� PROPOSED MITIGATION AREA d m a 011 _ / r av ma'o 0 PROPOSED SILT FENCE ' ' '� •• � m a'v o w in / 4 -4 _1 J / • / ' R I / / / / I // / � � - - �p g� \ \ / f W / I .r ob \ ! \ j �I 1 �I I I / / / / / n (- -�°� 8 i f I o� / / / / �.,w«w ,PROPOSED HEAVY-DUTY / �,p I I - / \ SILT FENCE Lij O r i - - 4 4 1. • L \ / / 1 / i PROPOSED SILT FENCE TO BE \ 66 5 O vQD �~JIFDING S�TBACIC �.IM r LINE -sue- -- ` ., \ \.�. _ \ \ J / /, � '- / v • �h� 1 / ! / NSTALLED AFTER COMPLETION I 1 ! I J ��/ • A- - s �r• \ 6/ / i Sf GRADING 1 V 1 y 1 �I AI A �I I I ► I f I I I e \ /51 1 K O ��• I i I I I / I ( l :� . �/�• \ \. \ 04 7 ! _%r i G I \ �I �I ; ,O ! I I I I I t I t .I I I I '• � / V gam' -. �( Awl \� �` 0U LOT, I � 5 31 0 A CRtEK OVER AY DISTRICT T .. , \ / LINE (BCOD� \, y -4 41 i 7 '� \ \ t 40-- t- 3 66 • / I 00, /ice J I as J / / {/ I y'I I 1 I - U _. I \ \3� \816- '\ // / / \ bi /i % l i / g1�` 9n2 A2. d 1 IK '4I 1 /. / Q i i 1 \ - \ \.. r / / / / / / ,': ''\ ! / - / 1 ��/ 1 40. / \ . \ 1 g 00 P'. ) 1x I i 1 ! I { \ I �i L - - - -� - / f X Q- / / ' / / °4 g ; \z / \ \ _ f '�I / • / / 1 I I I %\ Q 4 -1 �I _"I^ / G �i ElI /JJ / I a I - \') I I \ - 924 - i / \ / / / c X \ J -4J • i �w ar ` �� 1 I I L1 - - - I- - - - on N� I 922.694.3 I / 9 V (d // �Oc 00 �rn '0000 ' RW0 y l 00YR. H WL 8 Q m \ N 930.6 G 932.3 a \ `�' , / • I �, / / 1 ' I 11 r_ � 31 � \ �'`� - • / ;� ',I I,, o � � I I - - - 32 -- 4 1%� v a/rG _ � ary . z � � �. � \ \ \ \:,l / / • . ' I / l m 1 I 1 ! Y o Ia 3 - _ \- � _ _� J_ - _ r / 3 � r .(t / n. _ \ \ ry e`F' � _ _ \\ \ � \ `y J� l i I _ 1 I f }a /Irn ao �. 29.6 J_jN =+ N LS REST a- _ \ J 26 R 28.77 '� -i0.77o ,oro l I I _ - cm / / f / rn � ( Ir' i2 ' -- - 29.6 -- -- --r 31.3_ -__ 9'� � G �. ��\, - -_✓// 7.6,K \ '': � �_\� - / ! L - - } •' -I- - - - N I 931.6 G 933.3 I I �:� R I R I I `- \ a4j'--os;' J PLAYGROUND.._ 1 1 11 35 AREA OAI �i _{ 1 vi \ L\I _..l l - - _ -- - i erg. / i \ _ I 1 i I �t r�-� T-< , II /1 f/ a ff al -- C�--zz ram- / `' 7 #r 71� _--_- - - _ - / /_/ - - -_- - - - - - - - - - - - - .' 1 , �`1' �� A\ EXISTING WETLAND H m o a A - �- t t 7- < - �- ��_� �_- __ _ - - -- - -- ---- 0-__ -- - - f -- - - _ -- - -- - --- -- __-- - ' - _ _- -- Y " : Y . \. OTHERS) m \_ _ _ _ _ ___ _- WETLAND IMPACT (BY �__/ - - s =_ __ /f=== �___ /__ _ - -�'- 7�= / l i �/ /, - 7� A=22,7081 S.F. FILL �r �__ ,__ _ I , / r i f / �/ f l l , STRE "/f� (BY THERS v_ - - _ 1 ---- r - �x = - /� -x_ _ -- __{__ _ -- �/ 3'4 oz . +'o. 0 3a+oo - _ z+oo ---- = sis`eb 30 o A 1 ---------------------- - -- ____�___ _ _ _ _ - - - - b -y T-�- ---/- - Ia.l` / - _ ``o+ /f BEGIN CONST, - i / _. - i // LEV 943.62 i / 7 f I ..� \ BEGIN CONST. a = _ - E+ D0.00 l - 902 _ :, / J _ / _ I_- 0+00.00 _ - -9°h \\,\` �� D -/ '' - ELEV 923.17 - - aC� -- - - - \ /; p CIAA BENCHMARK �, _ I _ - - -c_ 7 cl - V r -_-.' Jam` Lr 1 ' __".-- I r ( ! X. . __... sue,. , �-.- _- BM R.R. SPIKE SOUTH FACE OF 1ST POWER - ,_-_aja- _. __._ ._a _ T - >,..._.__._ _ �,D_E ✓ (`�-____ 18 .',,I I h,, i ^,..\�. .-: _ -�==�I =� b It./ ' ---z' i" ''i ii ,'� l I �ii=.I•_.fy' -f--_ _ Pi POLE WEST OF DRIVEWAY - N. SIDE OF r _ �� 9 - m k - -K - a. - L_- k (� `I a I_ PIONEER TRAIL -ELEV.= 910.34 NAVD 8$ DATUM Z a __ J 1 , i h R __ /_ -/, = -- --_ - ,`°xr kt = i NHA�SEN PC NG VOarn �EB 1 D0 q _ ' f i \ / v V i I r T 1f I -- GIi _ PINN BM #2: TOP ALUM R/W MONUMENT @ SOUTH SCALE IN FEE 9 3 PROPERTY LINE ON PROPOSED R W LINE. 0 50 100 150 i " -- - - i©... _Ij ii - . ELEV.- 913.67 NAVD 88 DATUM O o �, R. HNC 11:lz 1 inch = 50 feet ' I `,y; \ i -!h R ''i q- t U II° II(nL' 77�1 _ ■ N M � O T ■� o � i N N 4 m �4OO �� W Ind LLJ o Z N Z _o W xZ N+6 cn W o Y1 Z o ccZ Q 5 � m m r� cti H O Z E4 wo ZZ z 04 z w a z A � � W H � J xozd 0 ED z x�� ZV) •` �- O Z 01 w� �0 ZF- O w ZO NLd E-+ 19 0 w w xm aZ W w Y /y O W c0 .0 a qN DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G1 i IFS Z BENCHMARK PROPOSED TEMPORARY ROCK EXISTING ASPHALT SURFACE SCALE IN FEET BM.#1: R.R. SPIKE SOUTH FACE OF 1ST POWER CONSTRUCTION ENTRANCE 0 50 100 150 POLE WEST OF DRIVEWAY N. SIDE OF PROPOSED DITCH BLOCKING PIONEER TRAIL - ELEV. 910.34 NAVD 88 DATUM (MnDOT TYPE 3 TO BE EXISTING CONCRETE SURFACE 1 inch = 50 feet BM- 2: TOP ALUM R W MONUMENT @ SOUTH INSTALLED AFTER COMPLETION # PROPERTY LINE ON PROPOSED R/W LINE. OF GRADING) EXISTING GRAVEL SURFACE ELEV.= 913.67 NAVD 88 DATUM -- /!/! PROPOSED TEMPORARY EXISTING BUILDING SEDIMENTATION BASIN - / PPROPOSEDO10' AQUATIC/SAFETY EXISTING DELINEATED WETLAND 4�LL --- - / N 1MAXSLOPES) / / / / / J / I 1 MA WETLAND DELINEATION J/ 06 / f// / /�/ '/„ � $6a I PROPOSED WETLAND FILL AREA EXISTING FENCE - / r / 02 ! /// /�� i",� 1 6•-�-� -._ �.- PROPOSED SEED & MnDOT EXISTING TREE LINE/TREES ///, / ' • �_ Q -- / CATEGORY 3 EROSION CONTROL _----------------------- / o ,� \'\ i/ BLANKET it I U EXISTING CONTOUR ,. -• / PROPOSED TREE PROTECTION FENCE I s , �y , �y � _,, ��� i � , , - - � � EXISTING WATERMAIN X II `/ �I / / 64.s I •_ = _ = ,/ { ® EXISTING SANITARY SEWER 01°, �./ / / I J J i ! -< < EXISTING STORM SEWER / ITIGATION AREA / / / / �- '-� / ; � EXISTING SOIL BORING OLEE 864.8, 13,000 S.F. , / , /j / / / / • / ® EXISTING WELL 1161��� 1000 PROPOSED CONTOUR I 64,5 x I -< PROPOSED STORM SEWER ( 65. a ✓ I // / / / / / / /I 1 i` --------------------------- -- PROPOSED D INTILE PROPOSED RETAINING WALL / / / / / I / f / / / ,I 1 •1 j A� �8 +800.00PROPOSED SPOT ELEVATION a_j\ `• J o \ TW 900.0 PROPOSED TOP OF RETAINING •8 \ / l / / , l l I f / 1) WALL ELEVATION �IJ / J EXISTING WETLAND a a " 1 / / 1 / I • god / (\ ew soo.o 1 / /$7.7 �I , , NO WETLAND IMPACT , JI , _ 7 _ 1 / / / �/ A=318,424 S;F, 1Q \ WALL ELEVATION PROPOSED CONCRETE SURFACE \71 :4 / / � / �� �� � �! ! i; , 1 / ' � �ti \ \ Fi PROPOSED ASPHALT SURFACE I L 1 TW 874.0 r �� ,% SB # J I J J 2 \ \ \ 25' MITIGATION BUFFER /� /� � W y 1 �) JI 7 I , J , , , -9 , 1 , ` BW 873.5 ° r / 11 fj // //�I % I �I - - - :^ - `,I 7 \ �� �,w l G to 1 i PROPOSED MITIGATION AREA J J J J J 4 , / '� • 76. W i 1 \ 4 J 49�' PROPOSED SILT FENCE 3.0 I / / /'i 1�,6 i .....,r.......r•.�.. SILT HEAVY-DUTY ew 87 PROPOSED J/�-4 J � 4 L �J r i 4 ) J \ j / /r ` / �ti �`°' g FENCE I % yI 4 4 4 4 yl �I 4 I 4 �I �I �) $ ° (' I I I ; / PROPOSED SILT FENCE (TO BE - - I I I J.0 INSTALLED AFTER COMPLETION gel.OF GRADING) r I / �1 Q /��W / I i l o ,4 4 4 a _I -1 _I , IDS}41.97 / - / O \ 41.33G / / �\ / J ! J a / J /; 4 4 � a � -\ /� 4 a J ' 4 / S\ trj• � o,��i /00, Al , 4I , �I ! 7 , �I 7 , 1 , / , ' z^ yi F111 �I 1 y , �I I TW 877.0 i / / G ^ 1 / �.. i �' �j�/I �� -4' RErtAINI_NG WALLS (MAX.) 8W 873.0 \ \ / ��/� I I _ _ i EXISTING�WETLAND B� NO WETLAND IMPACT / e / J J/ J a 2 94 J a � A=318,424 S.F. 4,a _2I- -- 5, MITIGATpoNEA1,/ \I \B••• I - / d, TW 877.0 1 \/ l/ , ��� / 1 Anj/ / / ✓ / �/ l /I/d ° yti j I p�1 o/ I SB e/ 4EA , / 10'190 S.F. / BW 873.0 a a 4 a ;1 � X�, , , , p ELEV;;=865.5 �A 5' RIP RAP SPLLWAY �I 936 . BW 872.0 21 J ax sl1j �I c r J III ;'I 00 I I 65.0 RETAINING WALLS MAX.) / BW 872.0 / �✓ / / / / /LL (�? / ! i / �Z6 ow J/.• w - � '�..Y '�71`''") I, / /' + •®_ •S•i-� TW 88 i \,\/ / �'�J�J/ 1 // /j // \ - �j/EQ --- ---29.1 W ml�, 711 / x X 64.7 os3 /� ----- ' �� J J J �-\ ' §5.0>t' \ �-- i•i•i•••_`_-- - - �92" \ \ � �\\ � //// 1 ��. i / / / / ; f / /ir / / \ I Q � 932 0. � �I � y � 7 �I � \I 1 �I / 1 i � _ � - _ _ ..rr1��'./� ram. 9ro \ k. � �( i / / / / / / \ / / / l / \ \ 1 I - - - - �/ MITIGOA� IION AREA - --fib W e \ \ a� �% / C/ / / / 2 1 /^\ \ / // 933.0 _ rt 4 a ,. � / X 20 83 � .�2, � _ - 0� sB #i \ �°�� - - � /, .,'�_ ,/ /!' GF \\ i \ ® 32 -- p,U�'I \ 4 8$ . I ,- 64.2 ,°6°o`v R10 - - - - r i / / / / \ �o• 1 (n J ss.s � ,ag - /- -. -- -7 � � r ' �'� � RLp I F J J 0 �I 938.0 -1 =I' �I I R , / - pry? - - - i0� �i , l l / 11 / / \\\ \ / 3a 2 1 I - \ �j I �� �� J � �I *' � � ' / ; � � - T t_-_ � _ � - o;a _� \ ,� - 6 ° ! �'� � � � / / � ; ' / U / 9 i - \ xis GI \ 0 C D GRADING�oL/28 // / // /0� Rq�� / 35.5 1J --I J J \ a . \ �9,, El rc od -902 1 / 0 - r I / / / / / ' / �f � � � •,r.. 8� � � - - �O i \ $ i 6'1� ' ( 938 /I 1I 6.Q I I I, _g•, y� p�'� rn/ 1 �� \ / / / l! V �i�7c� i ��" 38.3 I / / / n I/ • - �' - - i I / v o�`1� G 9 LLIINV. ( ,} -911-� v A \ J / �• 6� \ / i 68.5 0, CQD BUILDING SETBACjC AIM T SINE I . ���' \ V. / l / i 9� l // I 1 41 I1''1'1 ' 1 1 / 1I 1/ j,�•gva- - �v ,. 13 \ j �I I � I a ,� � ' I � I i A i I 1 l I i I I I I • - �_ ". / � � \ g0� ,,, � �l g� � /� f �/ \\ � 1 1 1 a a �, < ,� `�/� \ \ I I II 1 (I : \ 5 �' _ o,'`O/ , � \ \ \ i / / , `\\ / / / � ,5 / •s�. /� ; \ � 1 I I R 1� 1 < �� 1, 1 , 1�1I v•, / v �,N 31 EC dVEISTRI� \0) f10 \I I\ LINE BCOn G \ 10 o p /� 3 \ !s\\ \/\ // `\\- N \ 4, 1 \ _ / / 0 ,I= , -g66, • / / l `v `il I 1 \ I = 1N- I \ \ \�� \32 \8�s \ , �'� /' // % t\/\ / �' V / / / / Ow W / / _ q924 I_ / 3 / / /I I I `1 I V I % \ / ,///./\//i�� r/ ! Mom./D /��f VA. \� i+✓ 1`� ,n I I 1 \ c� O < O> M ■T� N m i �o W 41 7 ,:z C5 U n n� \gamma Wcc o Y3 Z � o m E O � TO � r m O y p c p d to 3 p, O O Y y `• j o 0 0 d N 0a.0O�mop - t 6 L) d o a m o aE!�dm�ci .-cc E.,J U I� O 2 U J:2 0 S N O O u_T 5�" N U a s a� dv o+a v - y ao own o o DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G2 PROPOSED TEMPORARY ROCK CONSTRUCTION ENTRANCE PROPOSED DITCH BLOCKING (MnDOT TYPE 3 TO BE INSTALLED AFTER COMPLETION OF GRADING) / PROPOSED TEMPORARY SEDIMEN TION BASIN // / -- _-_ \ \_ / � � � \ \ 1 _ _ PROPOSED 10' AQUATIC SAFETY BENCH (10:1 MAX SLOPES) PROPOSED WETLAND FILL AREA I I I I \ ••\ PROPOSED SEED & MnDOT w CATEGORY 3 EROSION CONTROL )� } / // 1/ / l --- --� �= i • I �Fs 9C6 I \ •�\ BLANKET /t PROPOSED TREE !i�•'�.'�/ j I �,� � I ' I I I II \ •••� \ �� - PROTECTION FENCE / / // t,,/ /!l I/T • r ' ,t - ,/ ' ,r I 19 I I I ! / 92 1 1 1 1 \ / �••• \ \ i r I I' �� 2 0 v / / \ 1 7i , / I I 932.1 I I I 1 21 ' �t!•f� \ /, a 6 8'2'g35 4 1 1 / // / //rr i/ Y-'' • ' 11,61 �� �\ \/ •Z / i 1 p. 933.6 / 22 / / / ( i I I r' y'� !••� I ! l I / \ \ RLO -c I I � c 1 ! \ R \ 933 / / 1 .01 / , f' / 1•q I 1 �/ 1 �93 I I I a \ �0 6 / / i ox\ \ \ \ \ s3 926 _ I a40,4 p 31. 36.1 _ G / / \t• 9 23\ \ \ \ \ j40 / 'I /I/ ®•� 0,49 rt nt \�50' VC \ 6 5.90 - (42.30 IFS EXISTING ASPHALT SURFACE „ EXISTING CONCRETE SURFACE EXISTING GRAVEL SURFACE t'•` EXISTING BUILDING EXISTING DELINEATED WETLAND WETLAND DELINEATION EXISTING FENCE 0 EXISTING TREE LINE/TREES -------------; EXISTING CONTOUR EXISTING WATERMAIN E) EXISTING SANITARY SEWER <0 < EXISTING STORM SEWER EXISTING SOIL BORING ® EXISTING WELL 1000 PROPOSED CONTOUR -<0 < PROPOSED STORM SEWER ---------------------- PROPOSED DRAINTILE PROPOSED RETAINING WALL +800.00 PROPOSED SPOT ELEVATION Tw 900.o PROPOSED TOP OF RETAINING WALL ELEVATION Bw 900.0 WALL ELEVATION PROPOSED CONCRETE SURFACE o T= m *�,.>s RO 9 / p 3 ov o Z PROPOSED ASPHALT SURFACE 40.4/ 3 \ \ \ 3 \ o a o m o o li � ol , No B # 2 25' MITIGATION BUFFER a B N ; 0TW874s go t0 t �`� / G \ '`c✓ t \ 2�' �t W 1 y 9�8 \ boo s c l \ PROPOSED MITIGATION AREA PROPOSED SILT FENCE L \ Tw - \--- 2 877.0 . °zg 1 8\\Iv\ �\ PROPOSED HEAVY-DUTY BW 873.0 SILT FENCE PROPOSED SILT FENCE (TO BE �,/ I ,• B 8 �C�'I �, i .jF- � o m M ,- ovM -_ __ � I I \ \ � � 3i. �('� INSTALLED AFTER COMPLETION JC ��OF GRADING) U�r �\ \\ �� _// �I I � I �I � ! v ! I I � I\� �?? / / / '�` /� ' ' I I a^, / �4i°s7 !� I � \ � I� v , ccd \ \ V A � A 'c,►O � 7 Tw e78.o • ! ^y ,1 I / \r° I v -y% I .r I I a, \ \ \ BW 874.0 • I / / i y �,l /.� l %, \ \ / ¢J N / `� \ SP W, ��� \ 41.33G / \ I - �� \ X / OD ` \ N SCALE IN FEET �Oy�,019��', 26m \ �� 0 50 100 50 'W8770 ;�'� �� 8.5 �,A / // \ Iw87.o ®• /' \; \\ l of a/1 ooM / , 0' / I / / �\ 1 4 .�� I Nir �, ,Z •• / \ �/ 1 in� / �� `�I \ \ \� f� `. -1 \ 1 inch = 50 feet I �•, \\ / ' / , , ,' / r I 22 / /� s4 s 9a�5•p \�`\ , � 16 �\\ � \ �� , \ �\ \ \ \\ BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE � • , �lI � ..• i ! �� l I / / / I /� \ � N � ' \ \\ \\ EST E O PIONEERTRAIL DRIVEWAY 910.341DNA OF88 DATUM 0 ,. \ ��,+ 1 1 \ 1 � 2 \ BM #2: TOP ALUM R/W MONUMENT @ SOUTH I I I I I� I �� / I II 1 1 c0��� \ vv \ \\ PROPERTY 913.67 NOAVD 8POSED DATUM LINE. , 7.5 t)37 �°•►/ �; �✓;o / , / / // , � � , , I /( / gZ6 6 ' � JAI L 1 1 t � ---- - w 1 I f i -' / \\, \ \� \��, 6\ LPI - _ qE - IX - o r ' !��� X 1 gI I �� ��\ \\ \ / , /// 7.0 - - 29.1\ ----- 934 I I 1 -- I N ^ ' �' 2U1 3 12 h I 13- \ 93 2 I I t I ! I \ v I - II 1 11 I a I ^ Za 2 , `\ 1 4j I 1 I \ o�w oo \ \ �' •� \ R \ I I \ R . \ 1 1 l L, v,- g34 --- 9 Y \ 1 I \ !� -9 8.0 G -936J \ I i G\ 9 \ - 1 a---)- 4 t I� tp 29 NN \� 0\• / / / / g / / \ I 3$.a I - - - - 936- I 01% 1 30. �; _ 9' _ '� 5.� _ �`v 11 `►� I OUTLOT E 34.7 33. ,3 4� O J �\ v 21.5 POND OLE 921.5 \ \\ / 34.76 .` \ \ 32.2-4 \ \� \ YR.HWL 9 \\ \ \ �NV. \00T Via, RE 938 I I \ \ \ 1 \ 1 \ �� 2+U 928! 'goy j ��� I 1 1 1 c 937.3 I c 93� 1 11 y v vv v v v� v�v �__ 926� I ,�o,• / 01�• I , I � 938.!3 1 \ R A� R � G I�i4.2 • X V 24 67 7_735.2 { \ 1 r / / R` �' \\ \ It 1`�x' 36Xs 36.0 - 14 - - _ \ / \ 1 5 / / \ / / / / a�6 / s \s_ \\ �3y9�' 40 94 40 - - - ---93� X •Y ��' / \ C - - 31 I 9 4 « ire \ // \ A2. \ \ \ 19+A 20.0 " s \ / , / \ / �bti / ; // h/ °� \ 9g 100• vG g TREET D \ 61 a \_ ° J 14 \ \ ,. - NV. r/ ! / / / X \ / l l �� 7 38a2 �..? -- 37i�A. $gA 6 5.9 A 3445 I� i I I 0 R �y V 19.0 POND �, A. ,I I I I ., 2.o LE � 9 I .py�/'' II /; /. ��, ; � • \ •, • , , ' , % , � � , �,. �,, � � I � , 9.0_ t . \ \ . \ a \10 /� w� A V .�41 �V �\ DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996C PROJECT NO. 21996 G3 w '`C I V I(.. \ \ v� ' \ / 'G� !/� `\ \ 'er,°a]i.LNSL \ \ '"r, PROPOSED TEMPORARY ROCK / O+MM I�` I \ \ 31' ge\ / �` \ \ ®;, �p'" - CONSTRUCTION ENTRANCE EXISTING ASPHALT SURFACE _ \ I OD \ \ \, \ G� \ \ O ,.,y25 I "9 y \ "ar PROPOSED DITCH BLOCKING �� \\ \ °., a'"\ (MnDOT TYPE 3 TO BE EXISTING CONCRETE SURFACE CDs �p \\ \ \ p i I w '- \ , - INSTALLED AFTER COMPLETION - o^, / ° 141.97 I° I I I \ iP '' \ „ `°> EXISTING GRAVEL SURFACE q3 I \ I � \ w.., w ' � ' \ �� \ \ OF GRADNG) I i / I rn F_ PROPOSED TEMPORARY EXISTING BUILDING °)� I \\ C, \ \✓,' ! \ O \ \ ®,, SEDIMENTATION BASIN L _ °' N ! N \\ \ PROPOSED 10' AQUATIC SAFETY y w 26 `, � � \ \; / �� � EXISTING DELINEATED WETLAND C' O1 \ i > \ BENCH (10:1 MAX SLOPES) �•8 / / \ 1 rn\ \ G� \ a,\ f WETLAND DELINEATION \�\�\, \\ \\�;, l PROPOSED WETLAND FILL AREA EXISTING FENCE I / O g4 s gka� Q \ \ 1• qI 1 6 *0% � y7 \ I � '� \\ \° - PROPOSED SEED & MnDOT EXISTING TREE LINE/TREES CATEGORY 3 EROSION CONTROL 00 ____________ EXISTING CONTOUR BLANKET 10 se 4 � 0 �� �� � � � �: °' �✓ ' I N \ \ q \ \� PROPOSED TREE 3 0� �6 p� 3 \ �� " I 1 a� rn \\ �� \\ PROTECTION FENCE' EXISTING WATERMAIN 9 ,Ld `��', I 27 \ \ EXISTING SANITARY SEWER 68 �/ li 20\\ \ < < EXISTING STORM SEWER \ �� �'> \\ \ 'gym;, \ EXISTING SOIL BORING n ;1 15 EXISTING WELL +\�\� \ 1000 PROPOSED CONTOUR 30. 3 • y ® ,/ II 1 11 / / D w I Np I I \\ ��.°o \ / -< PROPOSED STORM SEWER S \ 29.1 ti _.._ 1 1 / I N N <'� 281 I 1 � ar _=�---------- --- PROPOSED DRAINTILE \ \ \\ PROPOSED RETAINING WALL (� 934 --- 12 h \ w I / I do\ 1 \\ \ \\ \ J \ \, \ \ . \ \ \\ aoo.00 PROPOSED SPOT ELEVATION /JI 1 932 1 1 II II 1 a I I I h `�� I � ., � . \� � \ \ \ � \ \ \ A '� I" I 933.0 I PROPOSED TOP OF RETAINING I� 1 1 wu +� 1 I �p v� � v V v v vA \ Vv TW 900.0 WALL ELEVATION y a,,�� vVA V� vA \ \ 1 1 \ I \ I I. \ b \\ \ BW 900.0 I I 1 1 �+ I °; .• _ ,.,,,..- \ �a :. \\ \\ \ \_ WALL ELEVATION I I I I I w 1 ...,.. R_ \ ! _ J wl<Lg 1 I `� \ TO STAG OR TORC(BY OTHERS \r\ \ $' F\ \\ \\ \ 1 1 11 \'�_ I J \ 8 1 934 -- I \ \ PROPOSED CONCRETE SURFACE 1 I LO I I G 936.7 I I G I �__-I- a 29 �\ \ \ \ \\ 2 1 1 _936 T 1.o�. - 30. ��� ; \ tJ� h '1 PROPOSED ASPHALT SURFACE 34.7 33.8- , ,3��Q \ \ 1,T� J OU TLOT E 'ti`� M \\ \1 25' MITIGATION BUFFER l 21 5 \S REST \1 � . POND s. 1v! PROPOSED MITIGATION AREA OLE 921.5 / ' I f, \ , V 934 l-` V A V 6 YR.HWL / PROPOSED SILT FENCE 15 / \ 33.0 7 \ �p c� \I NV 33.8 _ _ G 934 \ : \ \ N b' \ 19_ 4 \._ , ' // / 6 / R� o,�p!/ PROPOSED HEAVY-DUTY 35.7 _-----------� - 936 G 93c,�% A\ l Aw\� V` A�J c3� �oA�-i s - ��1J313�V/ //' //' �1Y'� �o oR� °P ! /{ l �Yl, aw+i►+r SILT FENCE 938 I 1 I \ \ 1 1�� A A AV w� °j ' // vPROPOSED SILT FENCE (TO BE ! G g36. 1 I \ \ \ \ \\N O 92 / Sd oo yo/ �� ! t INSTALLED AFTER COMPLETION \ 1 938.3 I I G 937.3 f 1 1, R I ,�\ L---� # x 1 � I I I �.; I V � 1 1 � I \ � \ - /• � / �� 5 �r�// / / t / / OF GRADING) 1 12+ 1.3 z561)4'6 _ 1a / tit / �� ��./ ZMEOW 1 \ �i.2 \ \ I 1 \ \ cf,•a. r 15 _ w \ I I SCALE IN FEET 50 100 150 1� . -- - - - - inch - 50 feet 40 - - - - �; .. , T_- �a - .-; - -338 - 9 RI /o • ��••�� ao / / ! lJ 1 - f t / �// //// ; BENCHMARK Y t kT / ^' \ \ \ 9+A0 �' ! \ --� \�, NV•- r,c'�- ._-- /� / � ,�// BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER \ \ 100 V� y J _T \ g \ / 4 6 - _ _ o / i POLE WEST OF DRIVEWAY - N. SIDE OF A I 5+00 7. #6 5.9 \ 19.( POND 6. / // ; �." / RED OLE 92D.0 / '<// PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM (39 67)} _ 92 9 y` �- ! / BM #2: TOP ALUM R/W MONUMENT ®SOUTH %/ PROPERTY LINE. ON PROPOSED R W LINE. \ - / rn \ tiA / ' f ! • �; % ELEV.= 913.67 NAVD 88 DATUM \ \ If EXISTING WETLAN H \ -- - - ' i it I•- - I , 6 Z - 1 ' ' / / // // _ i \ WETLAND IMPACT - - - - - i / o Z \ \ \ \ \ \ A=20,473 S.F. FILL Lijj / f - 6 6 ---_-I.W \ \\ \ A910 SKT ALL \ s _ _ y RT - - - \� TW9210 *'Ik � ---BW917.5o W 919.0 \ • .G EEK VERLAY DISTRIC a,N w916.s LINE BCOD TW 9110\ of �ry� BW90,0 \ ) vy_- --- i i�i 1 11�\\( / / /j//x x'' �' � p� ---Tw 1 - _ �D \ O 3� - 16.o iw9ts.5 •j OU z°s �%_8, I� c�� • t /`y -, TL T � - wBW si�.oA 20�BCODI GLIMI LINE-- V L 3G N-- -OUTLCST H D3.0 / / I l / SOCCER FIELD / / / / o / / / / / / / 21 RETAINING WALLS MAX. D C L NG SET89CK L MI I E 9, TW 89 . / r - - - - 89 0�i/J// / 4t 899.7 J/ r' LAND H LACT (BY OTHERS) / BW 8 51/ v u ._ _7_ FILL ' - ., - Q --. _- / - 70 S.Y, NORTH A ERICAN - S M BW 895.0 ' ( / TURF REINFORCEMENT MAT) %.. / - ^ _ r - `T)T) A V I � I l I � - A N r LJ L� T I V I L- I ,� ���- "i ^ �. _ 1 / , I�i ,, ._ n ` I a ' -_ I �I I� III , �ninv/ -�I n D `7/"v V I I__! _-Y- �I I i ,� D__e ly EN ,D i1 .D'' �I ,� D �a_ 1I IV n LL 2 � O � N La T 613 \CJ N x o; 4 Lo Lr- LL.I W WCd 3 rn Co w Z w Z5 n x ^ x N � a cn w Z s � Cc Z m m J L rn o _ w ; D .�.. woo°� car o� w O� J O N O N O O W Qi 0 ") � a w0 xa zLLI Q J w0 J 000 C5 rY W W Z E- Y Q, Z 1�70'10 Fj• wo Zv Q-' r•--i F o Z z wV) " V� 0 0 W Z0 U �� ww oK m a Z W /y Y W o ^ A OD DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996G PROJECT NO. 21996 G4 V / \ 1 I 9 • k r , I r J 1 -T� / X 1 1 \. i , j - A \� �1 I i - P / l i 1\ G I Ia , , x 1 I K 1 1 / , 3, A I 1 2 f �3 I 1 I � 1 I i — s S I / '1 1 g 4 3 R 6 /I R t : \R a i -; I. ,1. 1 n� \ i 1 Y 1 I I , a I JJ - I; I x 1 r, I, i r I -- ' 1 > a 1. l 6 .x I y I / I r �+�. 433.., 1 iG \ J - _ R R R Y I , , , _f / /-7 -7 / �v41 o � C I r j 1 1 r 1 I r I' ✓1F} III I 'llrl tw _ ) '�. \�\� l '.1 '� ` ,r1��-.Y',I:i , R7�.:ai,lP+l' J� \9`s"• 5 ��I,`'1',, _ p~L ,. ., r.,.I'UNAEI-Ei/'q-Vill lit, S t Jj - , ' ✓ t \� � �I l / 1. I � f' J< 1 'L,_ lcnll y I - ��\!' \ 'i �\\_ _ r\i 5, 5��' s ��.\ (`(• \ m '4' < 3 :: Fr/ �/ i. y'- , •'` ` \ i 9�" .' L" `i r lam\ \ \ Y ( \ O { 1 r � G 1- o; � "\• •\\ V r - 1 ; v,\ t \ p 1 I ' I _ 1 �11 \ 1 A j1 � '- � _ i 2 I I 1 , t 1 r "29.s a / > i _ , Y — — �-. "_--`` `-. i - \) /,: \+� ` \i c1TCT /. \ „ ._ - 1V,J x: Fl \, 4 `'/ �� /l/ .:" ,.,;,a <�1 0. :,. ,,1, 11�1 "� -_i-"' ' \, ,... •-..\ -_-_ _„\ � \1:, �.\ i. 1 ,,�.nL - ._.y_ '_>;�� \ - .._--._- f / % i / 1 � t � i \ =I l 1 1 \ I •k / / 1" I ;1 t / � g , \ I x � ; r / I - 1 I y I \ / :rl \ / U Fi r / , 1 1 f . 1 1 J J ( r , / I I r I I _ I R �, l .' , / f y, \`,. ?,. „ ,. y . u Ins- ',f / / ( / ! • :: / , , / .o�, � ,t. , Y ` _ / - J 1 �1 .f 47, li \ n I / / / I / \ / i r . . {, 1 . / 1 ------''-------`�—'-_-;' STRF6if -- \ -_ �. - -,. ,._... _ -_ -_. ; , - � t., ` -,- _ _ /`� , r ..--_,�:' .I - ;'fit >i.. �_ ', �/,- -- � - ,y �-,`�1-�`. /'.">: _ / I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPOWAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION 77 AN THAT I AM A DULY REGISTERED LANDSCAPE ARCHITECT D UL UNDER THE F OF MINNESOTA DATED THIS E LAWS 0. THE STATE E }° __ .� '7 t r•: — — �y\ - iv : 16TH JANUARY /<: ! P � �t _ � _ � =�---, �- -- � I 1 r- ❑ `- � �._ -, � 1 _ � ' V' �- Y DAY OF 2006. s — , =4 �i 1 I � � ✓ '_,,. � -.� I. ,, „ „��.,!'-� T", N'--` --Z� ' 9•"� _.� I / ��$la"m - � __. __ _/ I! I �y' - t � ,i',,— ill I I' I I •, / \ 1 i r III B t � �'' _ -� ', � �., (, 1 �-4__ - r� ry '-b. ,`-..,_ a. _ �,.t� ;{ :I I , >>�,r-':_ LI1� - — l c ,1 -.'1�• 1 - j - : �,I I � JAMES STURM, A5LA ll`\ -r-r- ,,.�-�"':i I REGISTRATION NUMBER 18380 / 1 1 I II:'�1" "; _•-.,'1 xl L. _ :1,.,,'�. .-_, �,� = J, / .t ./ii i'I - - ::1 \. '' I -sl •/ � �'1 I-�--"�Iu IL r- Y \ `-'�S'_�,- _ .{ BENCHMARK — ,, �" •- I I'V lV I / � �.� 'r ! , � . � I V I�:_I, f I ✓I1, .. �_ { _ � � I I s �`�?.' : w I �I BM 1: R.R. SPIKE SOUTH FACE OF 1ST POWER {. tt POLE WEST OF DRIVEWAY — N. SIDE OF j P f _ yla l y - t I_: I ='': v✓ - ..-" -�- : �1u ,- v I n1".i -_ ;- -, _� _.:,' I -- " a � r !. � '' / , --- ��,=� 31 I, I'�n _ e DATUM / I A'` �' � PIONEER TRAIL ELEV. 910.34 NAVD 88 DA U ����,� �� P BM #2: TOP ALUM R/W MONUMENT ® SOUTH Totol upland area (excluding wetlands, bluffs, park) 61.33 ac. Total reforestation area (15.30— 7.20 ac.) 8.10 ac or 352,836 SF PROPERTY LINE ON PROPOSED R/W LINE. LEGEND ELEV:= 913.67 NAVD 88 DATUM Q Baseline canopy coverage 11.7% or 7.20 cc. Required canopy coverage 324 trees EXISTING TREE SAVED 11 (one tree provides 1,089 SF of canopy) y Minimum canopy coverage allowed 25% or 15.30 cc. 0 EXISTING TREE REMOVED LO TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 324+44=368 TREES Z Proposed tree preservation 10.2% or 6.28 cc. EXISTING TREE REMOVED BY OTHERS Difference in canopy coverage 0.92 ac. SITE DATA ® TREE CANOPY AREA SAVED (INCLUDES OUTLOT D) SCALE IN FEET TOTAL NO. OF SIGNIFICANT TREES (6" AND GREATER) 692 0 100 200 300 RwqMultiplier 1'2 TOTAL NO. OF SIGNIFICANT TREES SAVED 561 81% TREE CANOPY AREA REMOVED Total replacement 1.10 cc. or 47,916 SF TOTAL NO. OF SIGNIFICANT TREES REMOVED 105 15% Total number of trees to be planted 44 trees TOTAL NO. OF SIGNIFICANT TREES REMOVED (BY OTHERS) 26 4% 1 inch = 100 feet ■ > <iF �� ohILLJ X \ ^ of 4 W �� W W O Z N � � n V♦ W rz�W h a W o 0 Z 5 � CC Z 1 m m 1 DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996TP PROJECT NO. 21996 TP1 u■ Total reforestation area (15.30— 7.20 ac.) 8.10 cc or 352,836 SF Required canopy coverage 324 trees (one tree provides 1,089 SF of canopy) TOTAL NUMBER OF TREES TO BE PLANTED IN DEVELOPMENT 324+44=368 TREES a ..- Q O O / CSC � C.)_ '� � � �'�`r OO� Q Sv O J I fly. x L7 / 0,/'`(/i I \r I / \ �•. / ii1- ' -io D T''; 1�li; l \O5.- d r- _ _- / '___! i h..M NO 'h4 Cyo ( iONEERTRAIL ' J s O ' lz ' y�N I •`� _ � _- 4 Ifs '�rc� _ - tA�I 9 � A ..• �,V 't\A� l Q 1,v { A' 001 „,.� 3% s' /i ��.. .•,yam I ./ II _ -�y.. 'V 1A��� V A V �"4 �` }\�� / m r � yNb I ©/o ® , aS!I r l �� y , �f/`I / `II�.': PIA , YZ�) -, � , iI PA v1;iv - vv C�� v w�� I I � , : 1 o•S' t^t �' 1' r +-,—�\�, '\ j yv , mm OQ O O O g l fl �_ �' / ,. �:. , /i/ 9/ ,\ \\�� ,e 119�� \�\ t N126c O O � ,3� l/l I � � / �Y,. •5 (1cP_ \/gyp,, „ /' : •- Q./� _ 1/C. ✓A/ N�f� o r \\ / O Q ' ter.,', V - / - a ,• •A :,. '- / ,. � r / ,; o„ ;, ._;... .- -.y \ ., s-.-, n ., /� 'e , : `k-. / -. // � l / ,9-- o l �\28 1 Q / UO A 4 BM 33 / `wYVAi. - '., \ 1 , e•,.'. � i ,..�»>+.., _ — ! 4 ABM` a J{/-{�^ 4 r .///,- 3 B H \ d / f , s — Q r - g� y yt= JRS/� I� �g/9 I I , , / . f ., - 7"_ '-_ � -. �\ . / �C•..� I�-..;�. ,(/ram ° ..: �'' ....\ >- � - ,i - � � -.. _ t--- _ / � , ,,_. ; !i / 1 ABM ABM SSC 1 ABM -- - ,.. 1 1 :: ,•,,. ,I : I ,I,I,I ;: ,�•//-' C_ S R S G4 4 BHS 6 SQ _ _ _ �- n - ___`-�' � I "f• :,"_: e, r _1Z-`.�`-- — -- �%r�,• ; , I I II \ , i \'' � ,• � l /. !/7" '! ..• '�' .a^�" �=- -%`-' ;- Sri . / ,la' :'' . / .' , 2 ABTA / - ;1.. '. n. � _ i r/ : C:,Sa�i, p`,1E,d r\- \\ � `I -, � //, _�,. \\ .a \'�.\� / � '' �/ / `...: ✓ / / - j 3 RSC , - I 1 1. � \ - -_ 1 .. -:._, !;• ; , .�, ._ �� � � ;, � 9 ABM'. 1 >zCS , y :, , a ,,,_ ! y/- 2 RS - 1 ABM / FF,, \ I^ IDa. .ac\ .� >f t,. .J'_"- �c�T I f - \ `,.. f 1 ABM _ \ I'; I � I Ili , . - / / t ii:... ,/ , O� , /, / / I, I ITS '. I .. -' \' / ;' , �, _y. i .,.... _.:: ,✓ r \ L'--,,-..: "'C\�.. / i/ 1 \\ ,. ;, ,/ 1 1� 1 � 7 ,1 /, I/ \ .- ?'�r r. -. :[ i p �,: , :3 �-�11' ''r '� -- �•'o ' / //�,/ 2 ,,,.x / r �: t,t - 1 (, y.: 1 h �. j r 10 ABM c Q I.. -,,, ?.Hw �..,. � ij� , !:Iy CJ {; iZM10. ,. 1 ABM 22 us SSC � , .. , : �.' ;•. _ x� :, � I �.•. I, � I -�- -„ I rf _..-- __ - /•:, � 1 RSC � 5 �, , 6 BHS y. -: .. . .. - � , ro ,/ .i R // ;rl v �- I: '>�..� '- -\ .• �_- l a.. I Y � _� /v, - y/ I'uf r r - -- 'r. 2 RSC —� i 2 BC � ILUI N t BENCHMARK ABM BM 1: R.R. SPIKE SOUTH FACE OF 1ST POWER 2 BHS //,.,r # o T /: 3 CS i% C O, - - POLE WEST OF DRIVEWAY - N. SIDE OF �` 6 CS - -r / /'' r , PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM \ L' 3 BUS : �t S C ;, 1 SSC //�1' \' �% BM #2: TOP ALUM R W MONUMENT @SOUTH X , / 6 CS 3 NS ,x / PROPERTY LINE ON PROPOSED R/W LINE. ELEV. 913.67 NAVD 88 DATUM \ Z..,J I -- - - - , / r f._ —: k / :' �_� 12 ^ �1 SSC Flr�_ 1 see / A 3 NS ----�I `-� -}t--� -; p :=1 -1 -1--. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT 2 A M 2 AM 5 BHS 5 PFC 5 AM 4 CS `;,' I J'" '.. I I � " -` _ _. WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION Z EVERGREEN TREE DETAIL EARTH SAUCER WITH 4" SOIL FILL WITH 4" WOODCHIP MULCH. TURN BACK BURLAP 113 PLANTING MIXTURE UNDISTURBED AND COMPACTED SOIL. DECIDUOUS TREE DETAIL I r' r,4 L , I LL' 1 -- '^-�-- CENTER TREE IN HOLPY �u S FASTEN TREE TO 14 GUAGE PLIABLE ZINC COATED WIRE AND 1/2" RUBBER HOSE. SECURE FIRMLY AND NEATLY AT ALL ENDS WRAP TREE WITH 4" WIDE TREE WRAPPING MATERIAL TO FIRST BRANCHING 4" WOODCHIP MULCH [:PLANTING MIXTURE UNDISTURBED AND COMPACTED SOIL. 5 CS 5 AM 3 BHS 1 BO PF"C 2 NS 1 Qa 1 BO 3 RSC NOTES 1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL (454-0002) PRIOR TO STAKING PLANT LOCATIONS. 2. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSINGS ARE FOUND ON SITE, WHETHER SHOWN ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED AND/OR ARE IN AN AREA TO BE GRADED. ANY QUESTION REGARDING WHETHER PLANT MATERIAL SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO REMOVAL. 3. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. 4. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. AND THAT I AM A DULY REGISTERED LANDSCAPE ARCHITECT LAWS 0 THE OF DATED THIS UNDER DTHEDAY OFF STFEBRUARYNN SO 006AT m� u E E ill• _ , i) SCALE IN FEET 0 100 200 300 Ems' I -� --1 I I ! � I - - � 1 I =1� I I i' i, I r� s.1' ' /N�'✓o - +- 8 II.{�i +1. -- I.� I --`I I.•_ L-'-j ,-i-_ - �" r n MES STURM: ASLA .�''\ 11'; , �"- -� i❑_ " —I-- �� I ---i i 'i REGISTRATION NUMBER 18380 1 inch 100 feet II' �I' III' i�'� �;" �` II )� `✓"--:i:.- % T;:/ I' yr-: PLANT SCHEDULE 5. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 6. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT MATERIAL ESTABLISHMENT, SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 7. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANTING BEDS WITH FIBER MAT WEED BARRIER. ALL EVERGREEN AND DECIDUOUS TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD OR ROCK MULCH SPECIFIED PER PLAN. 8. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. KEY QTY. COMMOM NAME LATIN NAME SIZE ROOT NOTES CS 50 COLORADD SPRUCE Piceapungens 6' HT BB FULL FORM TO GRADE BHS 49 BLACK HILLS SPRUCE Mcea densam 'G/auca' 6' HT BB FULL FORM TO GRADE NS 8 NORWAY SPRUCE Piewabies 6' HT BB FULL FORM TO GRADE PA 91 PATMORE ASH FrarinuspennsyAmmica Pannore' 2 1/2" BB STRAIGHT LEADER ABM 104 AUTUMN BLAZE MAPLE AeerxfteemanilVe,Qersred' 2 1/2" BB STRAIGHT LEADER BO 15 BUR OAK Quercur mwrowrpa 2 1/2" BB STRAIGHT LEADER RSC 15 RED SPLENDOR CRAB MaluxAedSplendor' 2 1/2" BB STRAIGHT LEADER SSC 14 SPRING SNOW CRABAPPLE Malus Spring Snow' 1 1/2" BE STRAIGHT LEADER PFC 8 PRAIRIE FIRE CRABAPPLE Malus Pmna Fire' 1 1/2" 88 STRAIGHT LEADER AM 14 AMUR FLAME MAPLE Amrgln La Flame' 1 1/2" BB STRAIGHT LEADER TOTAL 368 M O N M N DO n Xm = m � N 33 N v b w O < �2 V W ti/ Uv �v t^ Z � / N Eu Li.J o ti! Z � o < m 0- E-4� V 0 N w a o w zz z� z w Q J Q 0 J Y N w LU w Z V ! A I J ra z z��o O O y F-I w (� w z ~ w 0]- Q Z Z) VI �¢ zof of �j o 00 aLLI W xm Ld a W w Y N a N .DO A o DRAWN BY HAF DATE 2/3/06 -MMMSOP►�'1 CAD FILE 21996L PROJECT NO. 21996 L1 C,, SITE MAP NO SCALE PHASE MAP 1 Inch = 400 feet DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS I I I I 5­1 I I-5 I I l --1--J L--�-- BEING 5 FEET IN WIDTH AND ADJOINING SIDE LOT LINES, AND 10 FEET IN WIDTH AND ADJOINING STREET LINES AND REAR LOT LINES, UNLESS OTHERWISE INDICATED ON THE PLAT. PETERSON PROPERTY CHANHASSEN, MINNESOTA PRELIMINARY PLAT EXHIBITS FOR D.R. HORTON, INC. 20860 KENBRIDGE COURT, SUITE 100, FOX PROPERTIES LP PID NO. 25.0230300 PHONE: (952) 985-7827 "4r I U u> T \c1 A � C-) - O \ d ci UJ I / / 1 � NDI MINNESOTA LLC \ \ PID NO, 25.0232300 PROJECT CONTACTS PROJECT REPRESENTATIVE: PROJECT REPRESENTATIVE: PROJECT ENGINEER DEVELOPER: Cl TY: CITY CONSULTING ENGINEER: NPDES OFFICER: CONTRACTOR REPRESENTATIVE: CONTRACTOR SUPERINTENDENT - MINNESOTA LAKEVILLE, MINNESOTA 55044 FAX: (952) 985-7400 ' I ' / .I .0 .:It _ is c. I LJ irlyj / /r G&M LAURENT FAMIL'F LTD PARTERNSHIP PID NO..,25, 0260600 ' GREG FRAZIER - JAMES R. HILL, INC. TONY GODDARD - JAMES R. HILL, INC. JOEL G. COOPER, P.E. - JAMES R. HILL, INC. RON MULLENBACH D.R. HORTON, INC.-MINNESOTA PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN KIMLEY-HORN & ASSOCIATES BRIAN COVE - MPCA TO BE DETERMINED TO BE DETERMINED BLUFF CREEK ` GOLF ASSOCIATION (j \ PID NO. 25,0260800 ARTHUR N JOHNSON PID N0. 25.026p610 f I / JCFF�KLINGELHUTZ \ PID NO. 25„027040b I � / (612)-508-6481 (M) (612)-965-4530 (M) (952)-890-6044 (0) (612)-508-6480 (M) (952)-985-7827 (0) (952)-227-1169 (0) (651)-645-4197 (0) (651)-296-7036 (0) TO BE DETERMINED TO BE DETERMINED O O �. U N D N z o Z O N U �o Ja \ z Y I \ \l _J LJ_ LI_ IJ_ C� <r F- u_ O / LI_ 0 F- t � LIJ a jl C TITLE SHEET EXISTING CONDITIONS PRELIMINARY PLAT SITE INFORMATION EROSION & SEDIMENT CONTROL DETAILS PRELIMINARY GRADING, DRAINAGE, & EROSION CONTROL PLAN PRELIMINARY TREE PRESERVATION PLAN PRELIMINARY UTILITY PLAN PRELIMINARY LANDSCAPE PLAN DETAILS BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM TS1 EXC1 PP1—PP2 SI1—SI2 ERD1 G1 TP1—TP2 U1 L1 D1 SITE AREA 5,259,434.4 S.F. OR 120.74 GROSS ACRES \ CITY OF MINIMUM CITY SETBACKS RE FRONT 25 FEET FEB 0 3 2006 _ SIDE (HOUSE) 5 FEET CHAN �� � \ SIDE (GARAGE) 5 FEET � JOHN KUNGELHUT SIDE (STREET) 20 FEET PID N0. 25.027040 REAR 25 FEET II c� 1 hliV EV Z n FEB 0 3 2006 now JAMES R. HILL INC. SCALE IN FEET 0 200 400 600 1 inch = 200 feet ov VOID v I M I.L � O � w o � i � ::D N m 3 K m m LL �� w Z W o N c rn w rn _LJ o V♦ � c W cc < Q m m o_ °maZdN0 [�_o lo c .494,'I- 0 O O Lo Lo t•/'1 V/ Q wo Z 0 w z �y zz W aw Q 1. OO r , F+y J w 'r', A W I Y Q IIg 0.4 Z "ofv 8 zLiw z Q wz 0.4t' Lu O0 Co Z _ w z F+-1 u E-4 0 of O W N W U w w xm a z w Y N W O 00 . A04 0 N DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996TS PROJECT NO. 21996 TS1 NII A/ / n nr- TI Ir- N I I Al 1 / n INUV 7- FOX PROPERTIES LP PID NO 25 0230300 -------------- I FKX 414111k /JIID oo If /iI �J0 1 /�r(J // 4 1 �'\ �fl � 1I I11 I 11 lIi,1;`n1r,l,"111V 1 \ A 1 \ \\ \ / 1 1 I / (D L' It ,A I I' 11 \ 1 / J I1'F'C91�1�r''''�' /aj ,/ / I 11j�(Qyzl\VA1\VIIII\I\\\IIIIII / I \v\VAA Av \\ 0\Q 'i If 1/ / 1I 1 1 1 \ 1 I \ \ i I l//I ////// //�� 1 1 11 1 IIII 1 11 I 1 \ \ \ \ \\ `\ \\'"\ \ \ / 1 (III I JII ti \ \ �`,. ,I , , 1 O 1 /1 k0 1 1 1 1 I I I l / /° °M1ry / / / 1 I 1 1 I \ ! I \ \ \ \ \ \ 0 0, \ `\\\ \' l l ) ! I II l 1/ 1 �l r / \ s \ IN \ \ � � . i� it �J ,J r/°F.� \\\\\ \�\ L - { 1 i i i I I I I r/ /J 1 I II I \ \ \ \ '\\\ \/ I,I�, l-// j Cj©�i;�;�;Il/rlrlJ/Jl/ll/I/J / /JJ `\>�/a/�\'q—\/`:!+>,�/ :=.\ „;'_;;/,�`,\'�e,:`+%r`;`Y ;\ ,// o;\1/' %�,\/ ';/\/ /+�\ //\//�/\C,�/°+\//.1ii'n'\' .,/.,/;/1/1.\"'i ; \+%.°\/.i"./•'!"+\/ 1;�Ja\,;-`, i /'!�„ \+',I g / I \;\+I� ;( lA/;7 /;+ „ 1IIII `rI\%\+ '"+'+YV\,''/,;,`',\/ i";/`/+ij,_ ++/";/ ,i\l'\``;/\I�_,�i\.//,- ;;'1,KI/;,'„;%:/++/IIi% `;iI,a .�I1/_IQ':,I:-y/'/ / IrIA;//1 :�'/,-I;1,�,':i�' \ \!+�,/\+��'—! \//\;I/ `\a,//� \\I.`�/� `;\\. j+,/ +j A+`i, -/v\1 `_\\/`\/1�/I.++ }`; ,!.',/+o\/__\-��''\�,1" �4 /'.,I.. t\:°'� .\/ \\,, I,/ ;\/'^\ 1\I.-\�\\ ;+m/ao° :�a\ \,\/\�-/ /\ i'� '\\0/Nv/__ _\!/\/ /� �-\/ ,! a �\��..� \� /�\'/ \\I� //�\ '`/\o I.\� \ / , - / I/ ,\ \ / //\���o�,`I,+��1�-`I f1/;��,1���y�/�f\� ?�//��a,n_o'\�-_\ .��_ \�\�-//- CO� aa,�,/!j ,_f` ,-\ ��/ �-•�°. _-</ /�C,�, _-I/ /_ _ _h-ji O _/ ��/:��'-;/I, �\ 1' ���, �- -__// _ J � � -/ / '�= 4Ir1+ 1 1 1�/r1l•lIf/ >I1II/_/ l/ i/l�(1//II1/Il/// l�l�I/1l/I/I/IjI-\1i- \l// // 7 _{1 /I \ / l\r//!Ir_lI/_ /° \ +(// /�11I �I/ // \Ir J/1 1 / \�IJ✓J/\I�lI/I/\/'II((V-� J////I�\\I`/I1°l/(I JII' //J i\� \II/i/I II/llITI1II/1 1— -r'/- 4'-A1 \1 /j !I/l_Ill/II-`I/I 1- _/'•/ J //Jl-V+JI/I/ //lI �— 6/ /'/ /•////J-_/IJI IISI / 'IJr-°/l// ^ i_i I- IJ � `/J/J—/ I��/v// /�_I �i-1I_' //II /!rt /i-- I Io / �II/'I\1--I//_I J/lIl /-inI-Lh/' /; -I JIJ/ I/l \rM/,�n//J///- :/J/II/ ulI , + II I '„//Y /I I /\/"/l/`ll JiI /J `/ �„J /+ I/ Tc- \ 'j . I \/ \ -( \ -.'/\r\\—__ l Il /\\ /- - -. !\\/ (I \ / /.\/ \I / I --/ �/// \./I (`\ /-/\//_�\\_ \ _/!v\ \ \% -\-—\\ \I \-/\�-\— \\JI\ �-/:\ ,\ \ %\\�! ��C// C�1-Q IN�,}(\��,I\I`\ /-- ,\-,j1O�O\ / -\.,\1\\ 1 -- \- - / \�✓-!\�I\ .\ "l - - -\/\ ,/\\-T_I ; �sR/ \I_♦ \/ \I$ /i / F� � x ' "1. y � `L 1 1 1/-1 1 �1 1�1 1/1 Jr o'1 1 1 1 ll/ i ;/,i�F^�/. •� �o +\X i/l \\ - _---_---- n1 1 1 , ' ----- If -\ 1- _ p1 %=_________ n7 oz — _-__`= � ;\.1 11 /@ /QI ;\ 1 1 1\i//k 14 A,iq�t+j'�A 1 1 1 ;J// 1 /\l' I ) I I A V\\ 1 1 1 ---- L , - - - _ \ \jli B /1l/ /%_- 0%I-i lJr�j \ r�/ Z,/ // k, / _' ____--_ 1 \\ t / / r�T '' TM£GT C rR T \1\UR RA INVESV PtCPID N.,2 622L36q'--- � r? RgRA I1 V �lj.mi `J . , i`J '\\ I 1/ - , I , ; , �rI � 1 / / I � 11 \A/ _ 1 , _e/ h I— _ 'Y,r" / / 1 J f - �)_ I� -_ _--_ _ —_ ___ n n II YF _>, -.. I _ _ - L 1 1 I 1 1 h _ ' ,. �, :'�- �.: 1 !r I r r / Q/ , �� y L_ I —1 / i L /I 1 I .I . — ;ice _— '_ III } I , — --, F I' I I---- 'I' ' 1 1 Z � /� / _ —J'�— _ N r' . Ij 1 ' II11, II _ / -i./ - I; I _, II n u / ;'"..IJ❑ — _ �\ _. i I, ''___ I .i. ../.. I _ �I J1 / i c I _ , o t :,' " If LEGEND / NDI MINNESOTA LLC PID NO. 25.0232300 EXISTING ASPHALT SURFACE EXISTING GRAVEL SURFACE 1� a - - - - ----- WETLAND DELINEATION x EXISTING FENCE `D EXISTING TREE LINE/TREES EXISTING DELINEATED WETLAND EXISTING BUILDINGS ^IAI 1 / n /\r- TI Ir- NIIAI 1 / n F-/,', h T 'I h C.S.A.H. NO. 14 (PIONEER TRAIL) s. I I ;; I� I• i ------1000------ EXISTING CONTOUR II EXISTING WATERMAIN EXISTING SANITARY SEWER EXISTING STORM SEWER SOIL BORING ® EXISTING WELL o EXISTING TELEPHONE PEDESTAL BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT @ SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SCALE IN FEET 0 100 200 300 1 inch = 100 feet c� �N n N p n w M v D W W O = N Z U' CoO M \ N d n 1 E W Z � Cam E rn ° a W w °oEo5`0. a O N Z y 3 o a ` ° o O ¢ L m O.O w t0 � O E w y y`) 06 O U 0 C T` C C O J 2 V O m O =1 T 0 a w Z o z f�V o z� w a Q J J O O Ld w Y a z z � z o a w [if o z z�f N1— Z W /n o M =z w z� U � O W xLd 0 w W o xm 0 m a z Z LLJ Y O W . A 00 N N DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996EXC PROJECT NO. 21996 EXC1 mi AURORA INVESTMENTS LLC PID NO. 25.0221300 0 J J CD (/) 0 H M Z N W N �o (n cq zo az 0- a 0 J J 0 � M z� W N 0 wUj � C4 zo Q z oa Q GAYLE 0 & LOIS J DEGLER PID NO. 25.0221400 1325.36 S88°08'10"E If 1173.48 I � ro BLUFF CRAIX GMAT ASMICT IIII XI BCW GRP NG LWIT LINE I OUTLOT A 01 Q Woo BUIMING SE184GK LIMIT LINE, 785802 SF. 3 in O 0) N O O z N 111 t` N JOHN KLINGELHUTZ PID NO. 25.0270400 / L FL b'- CJ t C� CF-o Fr U1 o� FOX PROPERTIES LP PID NO. 25.0230300 �-._-•!�T/ Ir - '�o/1->TA Ti(lN -\ iVl 1\, aI•,vI•111 uL� /l1 I IVIIi" Vf 11 a1 l ulu R1 "Ir4T 11,1,S'f PLAT 10-19 \ �J \ l \ \11 C 173.38 112.55 1 3.32 << 1 112 II 3 II 4 II 5 EET A7 �J C NDI MINNESOTA LLC C q 1132 \ �/ �/ \\ PID N0. 25.0232300 /> > _F 2-1 1 �31 'N 9 c-) /� /29 3] 1-) U V) Cq Li 28 6 27%/` /, 26/1 �� 15 L/ I 7 25 A, 22 \ 23\ ` 18 _ 1327.16 S88°36'18"E0 21 L741.26 / 519.81S 11 7 - / - - - 19 20 �i� �� - = J N OUTLOT B o �12 1 2 // 19 �� 18 C20 Gp 00 179917 S.F In OUTLOT Hnas I 13 VL �= C21 �� Li Li ss.r. 5 1-- L 13 � 2 2 353.7 o W _ 6 d �gti I 2 0o 0 15 / o J 0 14 W o V! N 1 � L_ , 25�24 �\ J CO ��2 00 J o wa - \ \� -�27�26\\ ,��p� z� OUTLOT C o STREET \�29 28 \\ \\ i 0 569°21 p8 \ 'O ' Q \ P ry / 44662 S.F. g� 2 30�� A / 0 OPEN 40' a r � 3 5 �(\ N O \ / ^W r S>4 5, 33.E �IN BLUFF CREEK,GR4sUrS )Y\ '4 oisRicr LINE zo• B LIMIT uM:(BCW-_--- - 9 l O3,la.fi.8 bBCBILLING SEMI LIMIT LINE UTLOT G 223 A5`g, rOTLOT F R\R E80300.00 6-07°3'0009 W �- --- „ ,�52'06 356.69N=24SR=282913 5N l - - 'CC - JOHN KLINGELHUTZ \ PID NO. 25.0270400 7 ^I I A F\/\IAI IA//\/1 F'\ ` f l/-\ LJ \,J v v V V LJ L/ LJ/ 3s\\ ��o /� i28 R0--��-------- zo /, o Ln R=400.00 iC,=269.70c` 0-A,, '��'�l°��Q o O k / 73,/ / C.BRG.=N31°46'30°E ,L'l°j �`� G °h� In z N '-� `C-S.A.H. NO. 14 0=02°47'27" - (PIONEER TRAIL) �, R=1909.85 ;� >rs �°�6 OUTLOT D i as 714.11 i� rs `✓ HIGHWAY EASEMENT PER BOOK 169, AGE 279 �`\1°\ 09700 sF .72 If 1322.40//' 'ZN89012'00"W -� �- 4so.s1 -� - 1320.23 N89°0911 W KLINGELHUTZ CONSTRUCTION CO GOBLAF CREEK / PID N0. 25.0262120 TION PID NO. 25.0260800 / / A A IN Ir_-^r1TA F\F_ -iiA E)TA AF_ -A IT (-\F- T I_) A N I:��� r-1 L) T' A T I/1 N 1 [)I/\I IT IrI F- 1A/A\/ -)I AT 1 r-\ I I V 1 I 1 N 1 V I\ I I V I L_ 1 V 1 I/-\ I I V 1 V I\ 1\ 7 F] I L/ I V V r\ I I L_/-\ I I lJ L I I I I PROPERTY DESCRIPTION The Southwest Quarter of the Northwest Quarter of Section 26, Township 116 North, Range 23 West; and the East Half of the Northeast Quarter of Section 27, Township 116 North, Range 23 West, Carver County, Minnesota. SITE DATA LOT -SINGLE FAMILY 82 LOTS DENSITY ( DWELLING UNITS i 1.3 D.UJACRE `GROSS -COUNTY ROAD-OULOT B, C & DJ GROSS PROPERTY DESCRIPTION The Southwest Quarter of the Northwest Quarter of Section 26, Township 116 North, Range 23 West; and the East Half of the Northeast Quarter of Section 27, Township 116 North, Range 23 West, Carver County, Minnesota. SITE DATA LOT -SINGLE FAMILY 82 LOTS DENSITY ( DWELLING UNITS i 1.3 D.UJACRE `GROSS -COUNTY ROAD-OULOT B, C & DJ GROSS 120.74 ACRES LOT -SINGLE FAMILY 28.59 ACRES R.O. W. -EXISTING COUNTY ROADS 47.38 ACRES -PROPOSED CITY ROAD - STREET (BY OTHERS) 1.62 ACRES -PROPOSED SUBSIVISION ROADS - STREET A, B, C & D 8.21 ACRES OUTLOTS -FUTURE DEVELOPMENT - OUTLOT B, C & D 9.97 ACRES -OTHERS - SINGLE FAMILY - OUTLOT A, E, F & G 20.73 ACRES -PARK - OUTLOT H 4.24 ACRES TOTAL 120.74 ACRES SINGLE FAMILY REQUIREMENT & DATA AVERAGE LOT WIDTH 91.08 FEET AVERAGE LOT AREA 15,190 S.F. PROPOSED POND AREA WITHIN OUTLOT A 15,300 S.F. MIN. LOT AREA 9,700 S.F. MIN. LOT WIDTH AT SETBACK 85 FEET MIN, LOT WIDTH AT SETBACK FOR CORNER LOT 100 FEET MIN, LOT WIDTH AT SETBACK INCLUDING SIDE YARD SETBACKS 90 FEET MIN. LOT WIDTH AT SETBACK FOR CORNER LOT INCLUDING 90 FEET SIDE YARD SETBACKS MINIMUM SETBACKS FRONT 25 FEET SIDE (HOUSE AND GARAGE) 5 FEET SIDE (STREET) 5 FEET REAR 25 FEET SCALE IN FEET 0 150 300 450 1 inch = 150 feet A- ACCESS CONTROL DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: •--5 o � o _ _-1 L_�_ NOT TO SCALE BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES AND REAR LOT LINES, AS SHOWN ON THE PLAT. V � o i m 4 m L` N y 3 � W o N 1 ao 1 W Z N & Z N � M co W O M O EZ� cc :z I W ��m .11:40 E-4 -t 0 O Lo Lo rn F- E1 wo zz 0 w E'4 Z K a Q :21W J 0 a w /0 ' 14 Z z a� �V •o o z w Q z� LLz ~ 04 Ij O= w � (n c m z, �o< v w O w a �Ey wLLJ o wm a Z w Y o • A04 0 DRAWN BY PLM DATE 2/3/06 REVISIONS CAD FILE 21996pp PROJECT NO. 21996 PP1 C in 0 N 0 O Z N LO 0 n to 04 u■ BWFF C EEE WR Y DISTRICT Cn 20' BC00 MADTIG UNIT LINE 40 40' BCCD WILLING SETBACK UNIT USE _ 203.66 F = 7 73.38 112.55 � _ M 1 I� 3 4 I I� 20442 S F. I 155,165S.F. I 14285 S F I f 14976 S.F. // ^ // 1' 10753 SF _-100.0-- __85.0--'\45. 6 / ^ J a / �M 1 111 23509 S F � O _ 363.41 STREET A ,� .0. I I w 205. 00 158.41 I / J1 0 2g 0 _ 3 89 `\� 22566 S.F. / 0 U TL 0 T A 40 r 30 30 ya /$o, I k• 785802 S.F. 1 v 1 ii 13500 SF, q I I 13000 S.F. h � /1V N CO 32 ``` `\$ 14287 S.F. \ �a L- 56 S.F / Q \\ 4_ F- 135.00 w N 130.00 -� Bo. 1$ `,00 30$9� o \ 2 om �r I� 2 �I 3119 \ g 11475 S.F. I • I // `�14800 S.F. �\ 13565 S.F. ml Q 11050 S.F. D,4800 8'y ^� �l 90 i 35.00 2, 2b . 2 28130.00 -� / 6'L'I �s �6 1 Oo \� O 3 �� 30- -30 - ,1 Z a F�� /6 30 'q \ \ 13246 S.F. 5� !A o Q \ C 14352 S.F.- b 12676 S.F. Q _+I �12729 SE, n� � r) /0.29 ^' //k���29 q i(.S '�31se S.F. 142.53 lro \3 ` PROPERTY DESCRIPTION The Southwest Quarter of the Northwest Quarter of Section 26, Township 116 North, Range 23 West; and the East Half of the Northeast Quarter of Section 27, Township 116 North, Range 23 West, Carver County, Minnesota. :0:103:iitem <y.GL•iIX:W0917 BUILDING FOOTPRINT Ld 2,236 S.F (AVERAGE BUILDING FOOTPRINT). + 675 LO Berkshire II = 2,212 SF S.F. (AVG. DRIVEWAY TO ROW)= 2,911 S.F. OF IMPERVIOUS N Braemar = 2,262 SF 2,911 S.F./15,190 S.F.= 19.16% IMPERVIOUS PROPOSED 0 O Chesapeake = 2,437 SF = 35.00% IMPERVIOUS ALLOWED O V) Colonial = 1,836 SF n O Concord = 2,150 SF N N Dover = 2,380 SF 40 m� 4 .q 1 2 < 13181 S... �\ \ 12 16 q N 'p�13973 S.F.' / \ `�9 \ 14699 S.F. Genea es = 1,964 5F Lti l I 5388 S.F Q 2 850. ��3 13 g /W/ / % SBs'`. /^ , ,3492 S.F..��SS�n s.F. �L° \\ Hampton I 2,448 $F. Ix Ine/ %� �s \ ,46,7 s.F. / / < // `�50, ~;" 14 \ / �� q off. ya 7 Hancock = 2,312 SF 5 x� /^ �j\ �\ //h'7 2 / Mi \7i .\ 16166 S.F. / �1� v / 18802 S.F. 6 1 V 7 \ / 15335 S.F./ 8.50. ) 1 14458 S.F. V 26 \�Sa O �O \8SQ 19028 S.F. / \pJ �]0 7 �$� 15353 S.F. /�(j, 7Ila �' \ , �\ 13923 S.F. / ��/\ \/ // ^ / 25 3 , 'i� / .0. 1! `L Opp 6 397 S.F. \/ s0. 11173 S.F. \6'9&s0. g k ' " "v '�� g �g15082 ,0 '\0s11648 S.F. �66 •^/' \ V 2 U i 9� g �. ,\ `\ `Pi. n690 S.F. / \\ \ \ 8�11648 S.F. ``, 2t / �626 9\ ,63 �s � 1�10m � N\ N 10 J �I 21 - N\-�4n648 S.F. `, 4 13760 S.F- \ ` 1 f 19203 S.F. �d 1l� 130 00 138.06 11' 11 n�-_ J 11610 S.F A ' I 4 12099 S.F. q , 3a.57 j + 20`U 5 q. _ __ _ ,>� �� 3_0_ _30_ PI\ iO 40 } 40 130.00 \ 16351 S.F. r- 130.00 *g I 12�h 1-12q � N 11180 S.F.Q100 113199 S.F. /p• L- s 30_ 30 ^ ^� 130.13 :P 178.10 v/ - OUTLOT H N W 13 N3o 13 k s\y\ esa / Legacy = 2,126 SF � 15 Y\ Saddlebrook = 2,290 SF �s16731 S.F. o \\\\ Saddlebrook B = 2,410 SF AVERAGE= 2,236 S.F. 16 `��' ,7931 S.F. / \19 14674 S.F. q / q \ %,8619 I I w 23.73 I IN 1155 O I 4 J \ Q 6' 4 16425 S.F. � J \ \ 0 22 23 I g3.54 61 19553 S.F. �\ 18 ° 1327.16 S88036'18"E 20 43 66.03 ` 7 196.61 00 19 w °j 19067 S.F. N so,.STREETcB _- _l o o OUTLOT B b v ryyh 3� 30 24154 200.57 N ON 179917 S.F. ' 85.0 - "105. 0- - _ _ cp h 2 0 19 I� 18' ; 18444 S.F a l N N 3927 S.F. Ln 17159 S.F. J �� C11 I I^ I 30 30 _� . I 215.14 J L 71 N 21 25.75� O ; 17404 S.F. k _ ^ 1 184746 S.F. 4 30 �' 15848 5 F, 1 y 1 76 J 5 ! 1 DO 12368 S.F. , 1 `,6 p� } /_, 3.7$ N LtJ N 3. h a 3p_ y 0 '7 35 N80 -� N N 02 3 t, 1 7 ' ¢ 30 ! �� 6h o, 07 33 W 14807 S.F C� 1 156.52 '\ oG3k� F- r 4314 I ,� / m 22 �339`j� � 16 436, S F. / 5� l I 12844 S.F. \ 8 \ 13553 S.F. 4 15 L\ �50, 13 14 �\ 3306 S.F. 37Sq 3\ 141.90 40 40 �I03 58 77 1 I w �9 - - I s 15 a 1 I �szs6 SF ��h to ,,. 18594 S.F. ^0 v T a 105.7" 1� N 1 \[p �f ' 17716 S.F. 3a 3° '^ ° ` _ / �y 24 6 No 10 _ 132 ` � 2 5 \\ 14416 S F. \\ / I N 20964 S.F. .w Wp a 46 .70 y 9 0 / g5'� 68 w I� a5° o V to ,2s 26\\ „900 S.F. 139.56 TRE� `1'S8s �0 ,4°°° `pro -;- - 11900 S.F.�o0 \ y0.', -�I 62.01 c ao �, tea,- _55 27 0 0\ 8500 G 2 A o, 56 �, o 2 \ 2 8 \\ 12148 s. F o�\\ 69 2 0 O\ V' 0\ 120.64 , ,i100a 1 p 12299 S.F 7912 S.F. 4 ^ O` tie°i O`Nam\ \71176 S.F. �\ \ 12035 S.F. ii �\-� O� 0_�-65.0--y-.,00p-0 \ -_ 9. w\ I //6 3 � �4 -- 5 �, -- / , 7s., 7 \�O • O 22224 S.F. I IN 11519 S.F. I IM 15972 S.F. OUTLOT E _ 24248 5. 65 8J4 �\� P� 91.78 2 , S 5 22 / 25.35 �'°„ v ;', SLUIF CRINE (°ec�0D1 Y DISTRICT Ile ° O� P �n 0$ zoficoD GRADING BNE n' ° 40' BCUO BUILDINGG S LINE LINK LINE Tj k OUTIL G i °°/bUTLOT F 54807 S.F. TO' 37882 S.F. (b8.24 � Q� G °,�,� T SCALE IN FEET 0 100 200 300 1 inch = 100 feet �- ACCESS CONTROL SITE DATA LOT -SINGLE FAMILY 82 LOTS DENSITY ( DWELLING UNITS 1 1.3 D.U,/ACRE (GROSS -COUNTY ROAD-OULOT B, C & D) GROSS 120.74 ACRES LOT -SINGLE FAMILY 28.59 ACRES R.O.W. -EXISTING COUNTY ROADS 47.38 ACRES -PROPOSED CITY ROAD - STREET (BY OTHERS) 1.62 ACRES -PROPOSED SUBSIVISION ROADS - STREET A, B, C & D - 8.21 ACRES OUTLOTS -FUTURE DEVELOPMENT - OUTLOT B, C & D - 9.97 ACRES -OTHERS - SINGLE FAMILY - OUTLOT A, .E, F & G -20.73 ACRES -PARK - OUTLOT H 4.24 ACRES TOTAL 120.74 ACRES SINGLE FAMILY REQUIREMENT & DATA AVERAGE LOT WIDTH 91.08 FEET AVERAGE LOT AREA 15,190 S.F. PROPOSED POND AREA WITHIN OUTLOT A 15,300 S.F. MIN. LOT AREA 9,700 S.F. MIN. LOT WIDTH AT SETBACK 85 FEET MIN. LOT WIDTH AT SETBACK FOR CORNER LOT 100 FEET MIN. LOT WIDTH AT SETBACK INCLUDING SIDE YARD SETBACKS 90 FEET MIN. LOT WIDTH AT SETBACK FOR CORNER LOT INCLUDING 90 FEET SIDE YARD SETBACKS MINIMUM SETBACKS FRONT 25 FEET SIDE (HOUSE AND GARAGE) 5 FEET SIDE (STREET) 5 FEET REAR 25 FEET DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS., -1 F_ - 0 5 �I o �5 II I � II - - 1 - - J L NOT TO SCALE BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES AND REAR LOT LINES, AS SHOWN ON THE PLAT. N n 27 G m�� (n \ o m X 1� CIS��LLpp N O N I f H W O Z orn WT �N Z n _LJ Z3Z rn L:.i 5X� o N E W o` Z O C m It L 0 0 Lo Lo rr^^ V/ F_ w ZN o w Z E-' z_ W PLOw Q _1 O 134 W LLI Z I Y a� 0 •o U J O ZN z w � w z z O= Q .N a z /y�Cr W w a0040LLI c) 0 E-, w x a Z W Y N W o 00 . AN W DRAWN BY PLM DATE 2/3/06 REVISIONS CAD FILE 21996pp2 PROJECT NO. 21996 PP2 N W USGS MAP 1 inch = 600 feet B/D SOIL ( J a I GROUP I Cn Qf o oI o�I / T � „B/Dlr I SOIL f 4:j GROUP ; 4'1 , D SOIL - / �Gar� � 1 41 IVI, j, 4 41 49 9 3 "' 7� Ig 1'1 11(y:3 tom.>ii,`f a; to of L ?ems s," ye aF� a `yi S� y. y ifif� p1 b B SOIL GROUP G �( 1kv, l �, / •3� 1-�t �fij/ ! - B D bfI BENCHMARK a BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER N POLE WEST OF DRIVEWAY — N. SIDE OF a PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM 0 19 BM #2: TOP ALUM R/W MONUMENT ® SOUTH 0 PROPERTY LINE ON PROPOSED R/W LINE. N ELEV.= 913.67 NAVD 88 DATUM n■ B 5;SOI �a :4 [fill "B" SOIL GROUP I i I ) I I I I I I ( I I /"B/D„ SOIL S GROUP ale I I e t tis( e, - I ;ROUP4 a • 110- a q 114 ifp!�' `13 SOIL GROUP i.-, V/�l/1� y ) M N LL M � n X O] m 4 W �� W W o ZN � -Iin �m �m z 3 E:.i obi Co�� //�� i.i z 5 0 cc z _ m m E m C T p w e m p E o o . p o c o a �3vwo 0 Z 3 a y p a v a�oQo 00 T ry O p N O _OEmN`y cG7 N O y C >. Z C a C J n u on au 0 J O U N 00 O L W N Na O+p �i It It F 0� O W w zz O z z w aQ111-4 O ::4J O o J w Z am x •o zNw z w O0V� 0z O a z 1-4 Z a U r, Fes+~�//��i z O � OU w I�r)�• 0 E-+ �/S ^ O o w xm a Z w Y /y W O A� DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996SI PROJECT NO. 21996 SI1 IF \` + 1 1 1 ,t \ J t ' I \ 1 ,1 t it l 1 1 1 4 1 1 i I I I 1 I 1 i 1 I 1 I I ( I I 1 I I 1 i I I I 1 I I I i I I I I I f ! \ I 1 I � 1 J ! dy ' 7 1 1 I V 1 \'1 � I I 4 CS.AX. NO IN 4:) / / O 1 1 (FFNr TMQ /Ir/ / ✓_ / \ I W Y 7T7 1 i 9ll1fit) \ c i �Y r , 'If, %�,' a,'a _ a !, J /- //r�lJ// Illy rill I/// �/ A 411 Y, s C � /i / ✓ { 1j li'I I(II I illJ,l —w VA \ \ r o i,dg �`\\ V`,'�=�N�4 I )t 1 11 l I \ \ i I /rlllll,ll rg/,(/ II(I I J j 9, A \ VA��4 -��� ♦ �a JJJ,rl1/Jlll,'f/ �///,_1 � r/ / \ �-\��\�\�•� \ �� � .e � � `2, /oa'i rrlrl l I//II//// lllJl(/ 10� `,� 1,' Y, 1//� /l.//l///./rill IIII (III(/////!/ A��v i / r I � � \ 4 41'-�`/!//l,`ll!/� l/JI/JII}r;lllrll� 01- jI / IlI _ / r 'II/�',�/IAA IA Iry I y' vv v vA\v\y A\VGA , td! � — _— � �// �`1.'1,' /////%/ === = ai� i(/ il/�Il�rl/�/ q^�,;,� r Kq. 7 �` q\ \\\�\1,\`�\ I \ \ \ / I�i1 %/° 1 �/1�117/ /(�/// f/ j /1`/lr///l ( ( / vvv v VA vA y I /��/���/ 1 �,Y=�J.is //•J;111)Av�iAv\VA\IIVA �wv�w��/j//�/I////U/I/I//////// , I ���\VA\� �'+'��;� �hi< �i�11 //Z1 v—__ �+/ l /I /IIII ��,^:'w,; ///110III,1Jr` �/(//��,�1 l/� 1 % I IX ; /t/ I;! II// //% f // /Jrl(IIIIIII)I11111/l, � Il\\'�)11\ tp A, rt /„ = =� � �""V rill /, _ _ - s g� '•-. � � — — — �/ �/� �.�/ r/il( ! r I Z/ �F'�. �� f/t�i/y/r' l ,; .. _ _ 1 p f - \ I \ \ F \ 1Afiv,, 1 �, J-- —�— !fly - - r 'L- m ', 1 I 1 / _ .-i I Yr - 1 I 'l. I I I r r i 0 � I >1Y, — Y I - I III i � A 6 'IV 1`J �} I 'i,_•%,� %//' =�� i.',/I J/! ;—:�._�I_ - - .'�-li��i Nw EXISTING DRAINAGE I E /DyA/ 1 i C p 0 0 0 YWO CaiO A, m 7 v dy / T /•� r, ,,4 p E .m c c ` ! 0 0, N W vkpl V �� .SA.N. NO u p / I 1 BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT 0 SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM i / I r 1 -174PY 1 r / / PROPOSED DRAINAGE H� 0 C) Ln u7 W a W zz o � w z z� I--1 a H Lj J WZ � J W 1/:'� Z_ � I �' J W z F+i O 0V �z o 0 zN W W z O= 0.4 n �vNy)a O W Z� O O lyl W E-1 i--� [-4 0 LLI O 0 w xm a Z W Y ry W o o . A 00 o IN DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996SI PROJECT NO. 21996 SI2 u■ TEMPORARY EROSION & SEDIMENTATION CONTROL METHODS (THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION). 1. TEMPORARY MULCH MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. 2. HYDROSPREAD MnDOT TYPE 6 HYDRAULIC SOIL STABILIZER. a. HYDRAULIC SOH. STABILIZER : MnDOT TYPE 8 AT A RATE OF 360 LBS/1000 GALLONS OF SLURRY. b. WATER 876 GALLA NS 1000 GALLONS OF SLURRY. 3. TEMPORARY SEED & MULCH (SEASONAL) a. SEED : MnDOT SEED MIX #160 AT A RATE OF 40 LBS/ACRE. b. MULCH : Mel TYPE 1 AT A RATE OF 2 TONS/ACRE AND D6C ANCHORED. c. FERTILIZER : 10-10-20 AT A RATE OF 200 LBS/ACRE. 4. TEMPORARY SEED & MULCH (SPRING) a. SEED : MnDOT SEED MIX g110 AT A RATE OF 100 LBS/ACRE. La. MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. c. FERTILIZER : 10-10-20 AT A RATE OF 200 LBS/ACRE. TEMPORARY SEED & MULCH WINTER 5 a ( SEED ; Mri SEED MIX#100 T A RATE OF 100 LBS/ACRE. b. MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. c. FERTILIZER ; 10-10-20 AT A RATE OF 200 LBS/ACRE. 6. HYDROSPREAD SEED, FERTILIZER, & MMOT TYPE 6 HYDRAULIC SOIL STABILIZER a. SEED : MnDOT SEED MIX #INl AT A RATE OF 10 LBS/1000 GALLONS OF SLURRY. b. FERTILZER : 10-10-20 AT A RATE OF 50 LBS/1000 GALLONS OF SLURRY. c. HYDRAULIC SOIL STAHILIZER : MnDOT TYPE 6 AT A RATE OF 350 LBS/LOGO GALLONS OF SLURRY. ALLOKS Y. d. WATER 875 C 1000 GALLONS OF SLURRY. / 7. TEMPORARY SEDIMENTATION BASINS WITH STANDPIPE OUTLET & EMERGENCY SPILLWAY (SEE DETAIL). WITH SPILLWAY SEE DETAIL. 6. TEMPORARY SEDIMENTATION TRAP ( ) 9. ROCK CONSTRUCTION ENTRANCE (SEE DETAIL). 10. HORIZONTAL SLOPE GRADING (SEE DETAIL). 11, DITCH CHECKS MBDOT TYPE 3-12' BIOROLL WITH Mail CATEGORY 3 EROSION CONTROL BLANKET (SEE DETAIL). 12. EROSION CONTROL BLANKET MrIDOT CATEGORY 3 (SEE DETAIL). 13. PERIMETER SILT FENCE (SEE DETAILS). 14. INLET PROTECTION (SEE DETAILS). PERMANENT EROSION & SEDIMENTATION CONTROL METHODS (THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION). 1. GENERAL SEED & MULCH (MIN. 6" TOPSOIL) a. SEED : MIIDOT SEED MIX p250 AT A RATE OF 70 LBS/ACRE. b. FERTILIZER : 22-5-10 60% W.LN. OR CL AT A RATE OF 350 LBS.ACRE. c. MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED. 2. POND SEED At MULCH (MIN. 6" TOPSOIL). a. SEED : MnDOT SEED MIX p310 AT A RATE OF 82 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE. c. MULCH : MnDUT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 3. WETLAND SEED & MULCH (MIN I' HYDRIC TOPSOIL) a. SEED : Mri SEED MIX d325 AT A RATE OF 84 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE. c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 4. UPLAND BUFFER SEED & MULCH (MIN. 6" TOPSOIL). a. SEED : MnDOT SEED MIX #328 AT A RATE OF 88 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF L50 LBS/ACRE. c. MULCH : MuDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 5. TEMPORARY COVER CROP FOR UPLAND BUFFERS & WETLAND MITIGATION a SEED : MnDOT SEED MIX I LIO (SPRING) OR #100 (WINTER) AT A RATE OF 100 LBS/ACRE. b. FERTILIZER 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE. a MULCH ; MnIXT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 6. GENERAL NATIVE SEED & MULCH (MINIMUM 0" TOPSOIL) a SEED : MnDOT SEED MIX p360 AT A RATE OF 84.5 LBS/ACRE. b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE. c. MULCH MoDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED. 7. SOD NARRATIVE & NOTES 1. DESCRIPTION OF CONSTRUCTION ACTIVITY. THE PEfERSON PROPERTY IS A SINGLE-FAMILY RESIDENTIAL DEVELOPMENT ENCOMPASSING 120.74 ACRES. THE CONSTRUCTION WILL INCLUDE MASS GRADING, UTILITY AND STREET INSTALLATION, AND STABILIZATION OF THESE AREAS. 2. PHASE CONSTRUCTION TO MINIMIZE SOIL LOSS, 3. ALL EROSION & SEDIMENT CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, TEMPORARY SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL HE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED. a. ROCK CONSTRUCTION ENTRANCES. b. SILT FENCE & TREE PROTECTION FENCE. a. EXISTING INLET PROTECTION. d. TEMPORARY CULVERTS. e. TEMPORARY SEDIMENTATION BASINS, TRAPS. AND OUTFALL FACILITIES. f STORM WATER POND CONSTRUCTION. g. COMMON EXCAVATION AND EMBANKMENT, UTILITY INSTALLATION AND STREET CONSTRUCTION. h. TEMPORARY SEED AND/OR MULCH. 1. HORIZONTAL SLOPE GRADING. I. DITCH CHECK, SILT FENCE, & EROSION CONTROL BLANKET. k PERMANENT SEED AND MULCH AND/OR SOD. 4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS AND IMPLEMENT ANY ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY. 5. ALL EROSION & SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 6. THE CONTRACTOR SHALL PROVIDE OR CONSTRUCT TEMPORARY STORM WATER DRAINAGE FACILITIES AS MAY BE REQUIRED TO ALLOW THE CONTRACTOR TO CONDUCT CONSTRUCTION OPERATIONS WITHIN THE PONDING AREAS AS SHOWN ON THE PLAN AND AT THE SAME TIME MAINTAIN STORM WATER DRAINAGE THROUGH THE SERIES OF AFFECTED STORM WATER FORDING AREAS. 7. DO NOT DISTURB ANY AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED. 8. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS, AND OTHER VEGETATIVE COVER TO HELP FILTER RUNOFF. 9. COVER OR STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE (SEE TIMELINE : PART IV B2-4 & g16). 10. TIME CONSTRUCTION ACTIVITIES TO LOOT IMPACT FROM SEASONAL CLIMATE CHANGES OR WEATHER EVENTS. 11. DELAY CONSTRUCTION OF INFILTRATION MEASURES UNTIL THE END OF THE CONSTRUCTION PROJECT WHEN UPSTREAM DRAINAGE AREAS HAVE BEEN STABILIZED. 12. DO NOT REMOVE TEMPORARY PERIMETER CONTROLS UNTIL AFTER ALL UPSTREAM AREAS ARE FINALLY STABILIZED. 13. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO KEEP PUBLIC STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT AND OTHER DEBRIS WHICH RESULTS FROM SAID CONSTRUCTION. COST FOR THIS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT. 14. ADEQUATE CONTROL OF DUST SHALL BE MAINTAINED BY THE CONTRACTOR NO PAYMENT FOR DUST CONTROL WILL BE MADE. 16. ALL DISTURBED AREAS NOT SPECIFICALLY MENTIONED IN THE FOLLOWING KPDES REQUIREMENTS PART N. B. MUST BE STABILIZED WITHIN ONE WEEK OF THE COMPLETED CONSTRUCTION OPERATION. PART IL SUBMITTING T'IM APPICATION B. APPLICATION AND DURATION OF COVERAGE es from construction ro ects where the owner or 5. Change of Coverage. For storm water discharges p ) is ions ofthe r In various openmr changes, (es, an original developer sal poet property erty homebuilders) the Irew owner or operator must submit a subdivision registration within 7 days assuming operational control of site Comm encin work on their portion of the site or of of B B� For msonces where an owner or opinions, of le transfer, ale or dsign on the property, he s Pe FA1 B P PeD'� an entire project changes after an application has been submitted under Part Il the new owner or operaor must submit an application fen permiturandmlmodification within 7 days of assuming control of the site or commencing work on -she, or ofthe legal transfer, sale or closing on the wever, the MPCA reserves the right to fake . Late submittals will net be re ected� ho rore property. 1 enforcement for any unpennitad discharges or permit noncompliance for the new registered party that has assumed control of the site. Fur atom water discharges from commuction activities where the owner or operator changes, the new owner or operator can implement the original SWPPP created for the project or develop and implement their own SWPPP. PermBteen) shall ensure either directly or through coordination with other Pandiftee(s) that their SWPPP meets all terms and conditions of this permit and that their activities do not render another parry's erosion Prevention, and eedimenl control Bat Management Practice 111Ps ) ." B C. TERMINATION OFCOVERAGE 1. Pamitree(a) wishing to temsirwte coverage under this permit most submit a Notice of Termination (N(TP) in the MpCA. Compliance with this pennh is required until a NOT is submi6ed. The Pereai niez ) authorization to discharge under this permit tenninams a midnight oft he day the NOT is signed. 2. All Permittx(e) must submit a NOT within thirty (30) days after one m more ofthe following conditions have been met: a. Find stabilization (see Pont IV.G. and definition in Appendix B ) has been achieved on all portions ofthe site for which the Permitter is responsible (including the removal of all temporary measures such as silt fence, and if applicable, renaming ag iculmral land m its pre - construction agricultural use); If Another owner/operator (Perati6ee) has assumed control according m Part B.B.S over all areas of the site then have not been finally stabilized; or a For residential construction only, temporary erosion protection and down gradient perimeter central for individual lots has been completed and the residence has been transferred to the homeowner. Additionally, the Families, most distribute the MPCA's "homeowner flmode st" an the homeowner to interval the homeowner of the need for, mid benefits of, final stahiNzation. 3. Passittessm) thri usean alternative method for the permanent storm water maagement system an described in Peat UI.C.5, are prohibited from terminal this permit until find stabilization has been achieved on site aril either. a The two years ofmonit rring data has been submitted an the MPCA and the MPCA has determined that the required fragment has been achieved The Permitme will be notified in writing within 30 days after the monitoring data has been submitted. If the Perevinee has not heard from the MPCA within 30 days after mbmilatg the required data, the Permitted can submit a Notice of Termination. b. The PermiOce can submit a Notice of Termination, even if the timefrmue is less Nan two years, if the MPCA dot«mines that the alternative method is achieving the required treatment. During the monitoring and evaluation ofthe alternative method, the Permitfee is not responsible for other permit requirements that have been transferred as described in Part ILB.S. RESPONSIBILITY REQUIREMENTS THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS THE PROPOSED PERMANENT PONDS CITY OF CHANHASSEN WILL HAVE RESPONSIBILITY FOR LONG TERM OPERATION AND MAINTENANCE OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM (CONTRACTOR) WILL HAVE RESPONSIBILITY FOR IMPLEMENTATION OF THE SWPPP BEFORE AND DURING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AS FOLLOWS: CONTRACTOR BUSINESS NAME CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) CONTACT PERSON TELEPHONE (INCLUDE AREA CODE) THE CONTRACTOR SHALL FOLLOW THE IMPLEMENTATION SEQUENCE AS SHOWN ON THIS SHEET. CONTRACTOR SHALL ADHERE TO ALL THE REQUIREMENTS OF THE MINNESOTA POLLUTION CONTROL N.P.D.E.S. PERMIT. ALL BEST MANAGEMENT PRACTICES (BMP'S) SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS AND ESTIMATED DURATION OF USE. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. DEVELOPMENT SL ARY TOTAL PLATTED AREA NUMBER OF SINGLE FAMILY LOTS TOTAL DISTURBED AREA EXISTING IMPERVIOUS AREA PROPOSED IMPERVIOUS AREA t120.74 AC. 82 EA. t35.68 AC. 12.91 AC. t12.31 AC. TYPICAL PROTECTION AROUND BACKYARD CB'S INSTALL IMMEDIATELY AFTER CB INSTALLATION) HEAVY DUTY SILT FENCE -FASTEN TO STAKES STEEL POST EACH CORNER U L7 - -REAR YARD STORM SEWER STRUCTURE REAR YARD CATCH BASIN INLET PROTECTION NOTE: PREMOLDED SEDIMENT CONTROL BARRIERS SUCH AS ROYAL'S INFRASAFE COVER OR EQUIVALENT ARE AN ACCEPTABLE ALTERNATIVE, 2"X2"X18" MIN. WOOD STAKE -2' MAXIMUM SPACING �12" BIOROLL N Ismi LIN 1 FLOW CROSS SECTION PROFILE VIEW DITCH CHECK - MnDOT TYPE 3 MnDOT CATEGORY 3 EROSION CONTROL BLANKET -STAPLED & TRENCHED IN /-DITCH GRADE PART IR STORM WATER DISCHARGE DESIGN REQUIREMENTS D. BECORD RETENTION The SWPPPAI changes to it, and inspections mid maintenance records must be kept in the site during construction by the Permittee who has operational control effort portion of the site. The SWPPP can be kept in either the field office or in an nn sin vehicle. e s m st ken PP along with the following additional on file for three Aarsaf u the records, K) P 8 g i in. This does "include an records oiler ears after submittal ofthe NOT as outl nod PontPart II.C. s uhminal ofthe NOT. L Any other permits required far the Project 2. Records ofall inspection and maintenance conducted during construction (see Part IV.E. Inspections and Maimmdugce): 3. All permanent operation and maintenance agreements the have been implemented, including all right of way, amounts, covenants and other binding requirements regarding papsomal maintenacee; and 4. All required calculations for design ofthe mmporary and permanent amrm water mmagement systems. PART NACTIVITY . CONSTRUCTION REQ UIREMENTS 0 A. STORM WATER POLLUTION PREVENTION PLAN The Permiffief must implement the SWPPP and the requirements of this part. The Best Management Practices (BMPs) identified in the SWPPP and in this permit most be installed in an appropriate ro riate and functional manner. B. EROSION PREVENTION PRACTICES 1. The Permittee(s) must plan for and implement appropriate construction phasing, vegetative buffer strips, horizontal slope grading, and other construction practices that minimize erosion, so that the inspection and maintenance require run of Part N.E. are complied with. The location offences not to be disturbed must be delineated (e.g. with flags, sakes, signs, silt fence etc.) on the development site before work begins. 2. All exposed soil areas with a continuous positive slope within 200 lineal feet of a surface water, must have temporary erosion protection or Permanrnt cover for the exposed soil areas year round, according to the following table of slopes and time frames: Tote of Sloce Time (Maximum time an area can remain open when the aura Steeper than 3:1 7 days is not actively being worked.) 10:1 to 3:1 14 days Flaffer Nat 10:1 21 days These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or patmanen[ drainage ditch or other natural or man made systems that discharge to a surface water. Temporary stockpiles without significant silt, clay m organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, send stockpiles) are exempt from this requirement but must comply with Part IV.C.5. a s •a r- +/ ,A F s S�C NPDES REQUIREMENTS 3. Then normal wetted edmete of an temporary permanent drainage ' that drains o p r y po ary or p ag ditch am water from a construction site, or diverts water wound a site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge to any surface water. Stabilization must be completed within 24 hours of connecting to a surface water. 4. Pipe outlets tougher provided with temporary or permanent energy dissipation within 24 hours of connection to a surface water. C. SEDIMENT CONTROL PRACTICES 1. Sediment natural practices must minimize sediment from entering surface waters, including curb and gutter systems and storm sewer inlets. a. Temporary or permanent drainage ditches and xdiment basins that are designed as art are treatment stem e.. ditches with mek check dams require sediment P only = central practices ono as appropriate for site conditions. P Y b. B the dawn gradient medical system is overloaded, additional upgradieut sediment central practices must be installed to eliminate the overloading, and the SWPPP most be amended to identify these additional practices as requited in Part III.A.4, a through c. c. In order to maintain sheet flow and minimize rills and/or gullies, there shall be no unbroken slope length of greater than 75 feet for slopes with a grade of 3:1 or steeper. 2. Sediment control practices must be established on all down gradient ermeters before P 6 P any upgmdient land disturbing activities begin. These practices shall remain in place until final stabiff rtion has been established in accordance with Part IV.G. 3. The timing of the installation of sediment central practices may be adjusted to accommodate short -tern activities such as claming or grabbing, or passage ofvehicles. Any short-term activity on be completed as quickly as possible and the sediment control practices most be installed immediately after the activity is completed. However, sediment coutol practices must be installed before the next precipitation event even if the activity is not complete. 4. All storm drain inlets moat he protected by appropriate Ell during construction until all sources with potential for discharging to the inlet have been stabilized. 5. Temporary soil stockpiles must have silt fence or other effective sediment coutmb, and cannot be placed in surface waters, including storm water conveyances such as curb and gutter systems, or conduits and ditches. 6. Vehicle backing of sediment from the construction site must be minimized by BMPs such as stone pads, concrete or steel wash mcks, or equivalent systems. Street sweeping must be used Wench BMPs are not adequate in prevent sediment form being tracked onto the street (see Part N.E.4.d.). 7. The Permittee most install temporary sedimentation basins as required in Part ITS. of this permit, D. DEWATERING AND BASIN DRAUdING 1. Denouncing m basin draining (e.g., pumped discharges, trench/ditch cuts for drainage) related to the construction activity that may have turbid or sediment laden discharge water must be discharged to a temporary or permanent sedimentation basin on the project ADDITIONAL ALTERNATIVE: 5" ROCK LOG FILLED WITH 1 1/2" CLEAR ROCK CATCH BASIN INLET PROTECTION - FILTER AGGREGATE 2 EACH DUMP STRAP 1" (25 rum) REBAR FOR BAG REMOVAL FROM INLET SILTSACK EXPANSION RESTRAINT [1/4' (6 rum) NYLON ROPE, 2" (51 mm) FLAT WASHERS] DUMP STRAP ADDITIONAL ALTERNATIVES: THE CONTRACTOR MAY REQUEST, FROM THE ENGINEER, APPROVAL OF ALTERNATIVE DEVICES. CATCH BASIN INLET PROTECTION - SEDIMENT FILTER SACK HEAVY DUTY SILT FENCE AT FLARED END SECTION TOP OF SILT FENCE TO BE LOWER THAN LOWEST ADJACENT OVERFLOW HEAVY DUTY SILT FENCE - 0 -FLOW FLARED END SECTION PROFILE PLAN FLARED END SECTION INLET PROTECTION Spacing on upper end as Overlap I -I 3' Minimum level 1' Spacing on Staples Anchor slot *MINIMUM ANCHORING SHOWN alternative Fold under 6"- EROSION CONTROL BLANKET-CA�GORY 3 (TO BE INSTALLED PER MANUFACTURE'S SPECIFICATIONS) STEEL FENCEPOSTS -8' SPACING BETWEEN POSTS POLYETHYLENE SNOWFENCING TREE PROTECTION FENCE PROJECTCONTACTS PROJECT REPRESENTATIVE PROJECT REPRESENTATIVE PROJECT ENGINEER DEVELOPER: CITY: CITY CONSULTING ENGINEER: NPDES OFFICER: CONTRACTOR REPRESENTATIVE: CONTRACTOR SUPERINTENDENT: L- site discharged re a sedimentation basin prior whenever possible. Ifthe water canna[ be P g P c. Surfacewaten including drainage and conveyance stem con an s most be B B eY Y to entering the surface water, it must be treated with the appropriate HMPs, such that the inspected for evidence of sediment being deposited by erosion, The Permittee(e) discharge does not adversely affect the receiving water or downstream landowners. The must remove all deltas and sediment deposited in surface waters, including drainage t are adequately protected from erosion and Permitlec a must ensure Na[ discharge oats U se P 9 YP w catch re ways, h beset and other drainage stems and stabilise the areas where Y. s, g systems, row. use na[umi rock ri r send b plastic s The discharge m be disposed over age, P B Pe P sediment removal results in exposed soil The removal and stabilization p stab on must take sheetia or other accepted ens dissipation measures . Adequate sedimentation control qu g M p t&Yg lace within en ] days ofdi cove unless I d then sev s ss rec u ed b le re regulatory, or P () Y rY P Y gal. measures are required for discharge water that contains suspended solids. water o physical access constraints, The Permitted, shall use all reasonable efforts to obtain access. If precluded, removal and stabilization must take place within seven (7) 2. All water from domineering or basin draining activities must be discharged in a meaner calendardays of obtaining access. The Permitted, is responsible for contacting all ion in receiving channels or on downsln Uri mlcesnot tense nuismew condition, ems rqg oRIstate local regional, and fede authorities rem author and receiving any applicable permits, properties, or inundation is wetlands causing significant adverse impact to the wetland. prior to conducting any work. E. INSPECTIONS AND MAINTENANCE d. Construction site vehicle exit locations must be inspected for evidence of off -site sediment trucking onto paved surfaces. Tracked sediment must be removed from all 1. r whoever is identified in the SWPPP The Permit[ee(a) (either the owner or operator, ) off -site paved surfaces wi of ' p ed Nm 24 hours discovery, or ifapplicebla within a must routinely inspect the construction site once every deven (7) days during active shorter time to comply with Part N.C.6. construction w' 24 Re all event greater than 0.5 inches in 24 hours. g and rNm hoarse after e. The Permittee(e) me responsible for the operation and maintenance of temporary and 2. All inspections and maintenance conducted during construction most be recorded in permanent water quality management 11IMP9, as well as all erosion prevention and writing and Need, records must be retained with the SWPPP in accordance with Part sediment central BMN, for the duration afthe cangmclion work in the site. The DID, Records of each inspection and maintenance activity shall include: Permittee(s) are responsible until another Permitee has assumed control according to Part II.B.5 over all auras of flu site that have not been finally stabilized or the site a. Date and time of inspections; has undergone flmd stabilization, and a NOT has been submitted to the MPCA. b. Name of persons) conducting inspections; E If sediment escapes the construction site, off -site accumulations of.who ent must be removed in a manner and at a frequency, sufficient to minimize off -site impacts (e.g, c. Findings in deendarions for corrective actions' Ft gs ofiospection, eluding recom fugitive sediment in streets could be washed into smrm sewers the next rain smaller g by We a fiefeY hazard to users ofidublic showed. d. Corrective actions taken (including data, times, and pmry completing maintenance activities); 5. All infiltration areas most be inspected to ensure the no sediment from ongoing construction activities is reaching the infiltration area and these areas are protected from e. Data and amount of all rainfall events greater then 12 inch (0.5 inches) in 24 hours; compaction due to construction equipment driving across the infiltration area. and F. POLLUT10N PREVENTION MANAGEMENT MEASURES f Documentation of changes made to the SWPPP as required in Part 111 A.4. The Permitee(s) shall implement the following pollution prevention management measures 3. Where parts ofthe construcion site have undergone fend mobilization, but work on the site: remains on other pans of the site, inspections ofthe stabilized areas may be reduced to once per month. Where work has been suspended due to frozen ground conditions, the I. Solid Waste: Collected sediment, asphalt and concrete millings, floating debris, paper, required inspections and maintenance must take place as soon as mnoffoccurs at the site plastic, fabric, construction and demolition debris and other wastes must be disposed of or prior to regarding construction, whichever comes first. property and must comply with MPCA disposal requirements. 4. All erosion prevention and sediment control BMPs most be inspected to ensure 2. Bezardons Materials Oil, texcYne, palm and anyhazmdws svbgmlcesmusl be pmpeny integrity and effectiveness. All nonfunctional BMPs must be repaired, replaced, or stored, including secondary containment, to prevent spills, leaks or other discharge. supplemented with functional BMP3. The Permittee(a) mug investigate and comply Restricted access to storage mess must be provided in prevent vandalism. Storage and with the following inspection and maintenance requirements: disposal of hazardous waste must be in compliance with MPCA regulations. a. All silt fences must he repaired, replaced, or supplemented when they become 3. External washing of tricks and other construction vehicles most be limited to a defined nonfunctional or die sediment reaches 1/3 ofthe height of the fence. These repehs area ofthe site. Ramifying be contained and waste properly disposed of. No engine at be made within 24 hours of discovery.. or as soon as field conditions allow degree ding is allowed on she. access. b. Temporary and permanent sedimentation basins must be drained and the sediment G. FINAL STABRIZATION removed when the depth of sediment collected in the basin reaches 12 the storage The Permittee(e) must ensure final stabilization ofthe site. The Pandittee(m) must submit a volume. Drainage and removal must be completed within 72 hours of i ixovery, or NOT within 30 days after final stabilization is complete, or mother owner/openmr as soon as field conditions allow access (see Part N.D.). (Permitted) has assumed control according m Part II.B.5 over all areas ofthe site that have not undergone final stabilization Final stabilization can be achieved in one ofthe fi lowingways: fiw °asav;iny i Sled T Ports 24' n q.d Note Zia Ties Sol fence pa MNDOT specifications, source 20DO machine sliced wows monoflomenl, 36"side fostered to steel T-Posts with 3(501b) tensile strength plastic zip ties per T-Post. (Machine sliced) sirs owln el .1ar.nriebmm. EROSION CONTROL FENCE - IYPE 1 Nate. Type 2 all fence is the mine as type I with hay tides Insisted as per detail Type 2 to be used to Protect all wetlands. - N m...._ sawn Y�,,,w.�-4 Zip Ties - - �;:r.`'�,..,,,,, ew EROSION CONTROL FENCE - TYPE 2 CITY OF SILT CBANUS881 FENCE 2-97 HArz ro': 5300 FIX WJ.E: N] a. svls7fl� Silt fence per MND07 specifications, source 200, machine sliced woven fronofilhment, 36" wide fastened to steel T-Posts with 3(501b) tensile strength plastic zip lies per T-Posl(machine sliced) FILTERED WATER SECTION AA Ia� CITY . eOFH �I OFF ROAD C MAN8A9S8N FILTER BARRIER :m-w rum 2-01 wAm m.: 5302 snD F a]N I L- / 1yOrD ?'A e� FILTER FABRIC / V 6" MINIMUM DEPhf �S M pz'yG 1" - 2" WASHED ROCK M/ 18' MINIMUM CUT OFF BERM TO MINIMIZE RUNOFF FROM SITE NOTE: FILTER FABRIC SHALL BE PLACED UNDER ROCKI TO STOP MUD MIGRATION THROUGH ROCK. ROCK C8ANSASSEN °ON TRANCE N ansror-as rr. 2-97 rs no 5301 tar wae.w> xw SEDIMENT TRAP AS MANUFACTURED BY WIMCO,LLC.SHAKOPEE, MN. avrvmsum.uaam �.um MODEL#CG23 NOTE: Clean filter media after each ram event and replace if filter is clogged with sediment. Remwe debris/sediment roam receptode after each .in arse. CITY OF CATCH BASIN CSANBASSEN SEDIMENT TRAP scram core 1-04 rurz w.: 5302A GREG FRAZIER - JAMES R. HILL, INC. TONY GODDARD - JAMES R. HILL, INC. JOEL G. COOPER, P.E. - JAMES R. HILL, INC. RON MULLENBACH - D.R. HORTON, INC.-MINNESOTA PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY of CHANHASSEN KIMLEY-HORN & ASSOCIATES BRIAN COVE - MPCA TO BE DETERMINED TO BE DETERMINED 1. All soil disturbing activities at the site have been completed and all soils must be stabMud by a uniform perennial vegetative cover with a density of 70 percent over the entire pervious surface area or other equivalent means necessary to prevent soil failure order erosive conditions and; a. All drainage ditche constructed to m e ag s, drain water 6o the site afl r construction is complete, must be stabilised to preclude erosion; b. All temporary synthetic, and structural ermian preventing and sediment control BMPs (such as silt fence) must be removed as part ofthe site final stabilization; and c. The Permittes(s) most clean out all sediment from conveyances and from temporary sedimentation basins that are to be used quality as permanent water q ty management basins. Sediment must be stabilized to prevent it from being washed back into the basin, conveyances or dminamways discharging off site or to surface waters. The cleanout of permanent basins must be sufficient io remm the basin to design capacity. 2. For residential only, construction as b achieved c 5, fi gal stabilization h been x e ed when temporary erosion protection and down diem err 1 for individual p gradient perimeter contra al lots has been completed and the residence has been transferred t e homeowner. Additionally, p ferre nthomewnerthe Permitted, must distribute the MPCA "homcewmer facedown" to the homeowner to inform the homeowner ofthe used for, and benefits of, final stabilization. TEMPORARY SEDIMENIARON BASINWITH STAND PIPE OUTLET EMERGENCY SPILLWAY CREST Bn Pvc (RIP RAP OR EROSION CONTROL BLANKET) !�T PERFORATED STANDPIPE 6" PVC PIPE 3 CY CL3 RIP RAP ANTISEEPAGE COLLAR (TYP.) STAND PIPE DETAIL RFORATED STANDPIPE /i EMERGENCY SPILLWAY 1"-2" WASHED ROCK CONE HEIGHT - 1/3 Z T •' y0 PIPE MATERIAL 1" HOLES SPACED SHOULD BE RIGID B" TO 10" ON CENTER D = DIAMETER OF STANDPIPE EQUAL TO DIAMETER OF PIPE. MINIMUM SIZE - 1800 CU. FT. OF STORAGE VOLUME FOR EACH ACRE DRAINING TO THE BASIN TEMPORARY SEDIMENTATION BASIN TEMPORARY FENCE- . x A Lf DRAW4CE MY s - zw PLAN VIEW 'tow I' TO 1' WASHED ROCK a IYI `M-MMAX FABRIC Nona to MIN. RENFRSE 11 m D - J' cox.. a' 1M%. A -A w - 10' uw„ W MAIL MINIMUM SIZE - 1800 CU. FT. OF STORAGE VOLUME FOR EACH ACRE DRAINING TO THE TRAP TEMPORARY SEDIMENT TRAP UNDISTURBED VEGETATION DIVERSION DOZER TREADS CREATE GROOVES PERPENDICULAR TO SLOPE DIRECTION HORIZONTAL SLOPE GRADING v) ^ M C) .i C) " as era No n b I SanM� INm z rn data I- N M 03 on o m N Q tar � as tat CP) 25 W cTb v z 1 Uj Z of 0 os N rn ^ VC75 v I` Z 3 W a' W L:i rra \ N C_ N a C G EWX w O Li � Z w< J E rn 0 m C a 0 - W Ow nmE 0. o c o a L ;U""ru asOf Z O a 0 0 O IX r 0 CG_ T L m 0 .a int0 „ 0 E yen 'm o O ; C >. � C C J n U On A "Dda -aO V NCO N� a+ Tc W du ��.�a ai L y a'v Owrn o 1.1•Q5�J1,1, r4 E w d O A 0� rA a H E-4 a W Hj o W fy O FBI Z W a Q F z z U `1 O 0 0 0 _J W ' 14 LIJ Z 0 1 a • �Vo O Zz z W zo LL ~� LLJ H OZ w 0-1 N �yco W O W '^ E.) O U W (/1 M W w O O Of CO a Z Z W Y O �! % O c A04 00 N W DRAWN BY TPC DATE 2/3/06 REVISIONS (612)-508-6481 (M) (612)-965-4530 (M) BENCHMARK (952)-890-6044 (0) (612)-508-6480 (M) BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER (952)-985-7827 (0) POLE WEST OF DRIVEWAY - N. SIDE OF CAD FILE PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM (ss2)-227-11s9 (o) 21996ERD (651)-645-4197 (0) BM #2: TOP ALUM R/W MONUMENT ® SOUTH (651)-296-7036 (0) PROPERTY LINE ON PROPOSED R/W LINE. PROJECT NO. TO BE DETERMINED ELEV.= 913.67 NAVD 88 DATUM 21996 TO BE DETERMINED ERD1 PROPOSED TEMPORARY ROCK EXISTING ASPHALT SURFACE CONSTRUCTION ENTRANCE ! /� (M DOT ETDYPET3HTOLBEKING k' / �1 <� � � EXISTING CONCRETE SURFACE INSTALLED AFTER 'COMPLETION EXISTING GRAVEL SURFACE Q o OI < 1 ,/�, NDI MINNESOTA LLC OF GRADING) j / T PROPOSED TEMPORARY r PID N0. 25.0232300 SEDIMENTATION BASIN EXISTING BUILDING �� PROPOSED 10' AQUATIC/SAFETY EXISTING DELINEATED WETLAND � N 9 / / / BENCH (10:1 MAX SLOPES) � � � � /� //� � � / � /!/� - - - - WETLAND DELINEATION LLJ � N / /� �� / / / !, / / /�� w - PROPOSED WETLAND FILL AREA - N EXISTING FENCE 7 0 / i 9 /� / / - PROPOSED SEED & MnDOT i EXISTING TREE LINE/TREES 2 O //� / �� /�� CATEGORY 3 EROSION CONTROL z BLANKET ---'1 70Ci------------ EXISTING CONTOUR X 0 � � OUTLOT B '� � y i n < < ----- ` 1 PROPOSED TREE EXISTING WATERMAIN - I I \ TP TP TP-TPiP PROTECTION FENCE ® E) EXISTING SANITARY SEWER <, < EXISTING STORM SEWER %�/ / - ' - ` `\ EXISTING WELL / ` - EXISTING SOIL BORING _°ss ' O 1000 PROPOSED CONTOUR i / /\© <� PROPOSED STORM SEWER - _-__ _ ,*r �� Y-------------------------- k _�/F ;; - ROPOSED DRAINTILE �/ '// ; /1 P ,;PROPOSED RETAINING WALL ©%/ i I!'�i ! + r'r-i O 11 11 \\ l4 1 - --- > / /J !// / 1 / I I '+ J ! \ �11 $ 1 rs I 1 \ \ \ \ f 1 1 'it \ \ 800.00 \; rl,/ -- r ' 1' /' PROPOSED SPOT ELEVATION / / / --- / / %/ "ry'"/ rl!/f /T) i' / 92/ 1 I 120 1 I I \ \ 1 ^. r / , I i , i 17- 21 W. " a PROPOSED TOP OF RETAINING fill O / f / ICE YI 1 Y r 932.1 1 \ ` 1 \ \ Irx \ \-: C.S.A.H. NO. 14 1+"' \ \ TW 900.0 WALL ELEVATION V = N 0:� 2 � O � Z T \ o m � a � m r+ W I LLJ O Z Wr Z 2ao �n o M� N W o 0 Z Cc Z J m CL ,. / (.'S• ,/r r / / rs / ', -_. / / //r! ,,,..(� , . I \f l / 1 ,. 1 2� T \ 1\:.�, (PIONEER TRAIL) 1 r r 7 /' r/ ' / i 4 4 I,\ / :. / r r N l/,jr{n I,t' I I/ •. y\ / 2 \ I s •La I / r \ 1 \ \ r r r /, / / ! 1 '' 9 9. 1 / I / t I ' / ! ! r' 'RL s o. \ \ \ T \ •' \ BW 900.0 PROPOSED BOTTOM OF RETAINING E rn ff 110 LJ WALL ELEVATION N s ago 114, 1 I 8 ! 1 I /' %/ / / \ r 1r 93 ,.7 J 3fi.1 - e \ 941,y\ C / 1 / \ \ \\ C O ..- /I/; i �1 �I )11 � - 11 -_q_' I A� i ,' ,i { i /(; G \ 3 _ /. s \ PROPOSED CONCRETE SURFACE a,,, o wa 23 ''\'\' ! -9 �/ \i 1fti''9 ICI zq. �/ � LZ� / f '\\ \ \ R01 340] d F ASPHALT SURFACE a+ o 4 1 4 � .4" 1 � 1 1 +'' �" �i �' � � '� 1 \ 1\ �ql� \�1 1 } r __ -�_ \ ` � a e o \ PROPOSED 1 { 1 1 i ,/ ", i I OUTLET a �hl \ fir( `y 1 , I a � r-_ \ \ \` / \ \ ,. , .... ,_. r, .. 1 t 1 t '� 1 '" ` PROPOSED SILT FENCE Y L Y .`_� °" .n O N [O IF I I 1 1 1 1 e / / G ' \,o-1R f J w '�I o \ \ \ 5 \ \ \ 2` a �' \ ,\' \\ \ \:. \\ \ \ C W n / Q dQ # , \� ,ls� P \ \ :. PROPOSED HEAVY-DUTY 1 s d q 4 it \ 1 I / / / 0' I ' Y m 1 1 \ \ \ \ f \»- / { °' W 'O \ no 1i 4 1 \\ �, F dd 3{.\t8 i SILT FENCE s 4 / 4' 1 I �" � � d � � i � � 9\` � � r `\ t♦ I / ! \•r , I /1'I 51 I� I ; I 1'3A .. W B m \\ \\ \ \ \\ \ \ r � \ 4 /,. { { 1 { q ! i` J, 1 -'-1-- _ .__--___ ;sw.5oia \ g , / / , / �,+�,•` / M1 14 /K Iro I Q\ `\ `o +' TC N 1 y ,� m � \\ ` `� PROPOSED SILT FENCE (TO BE u /�//�,h') i �13i d3 , . J �! ; '. I , ' l / fi'i / I f ! (l m I I m `- \ \ I \ \ \ ` se �� \, \ \ u a .. .. //i .i AI i +1 i i .i .i l'i 'i ' i 1 IG r/ �4: I Fo I ,`�i _ nn - - I \ 9 G''y \\ :�d `\ _..- m av Ow Vl •` b o.I , •- _, Im \ \ \ \ , , \ ? Py \\\ INSTALLED AFTER COMPLETION 4 /, T'I ,' 3 3 d i 4 i a 1` -! '• rr I l ( ➢1`41 r 1 I I ry o,� I /l 8 \\ J^ �\ `\O \ y�p \\`\ `e. "`•`,\ ) OF GRADING 1 4 1 ; ; i , I' y: ,/ : , -..I ., 1 / s / / r n _ / ei°9S2 I \ j'\ I ` ` ♦\ ` \ { { {' J/ • I i K % fig. '' r yi 1 ,' o 4 4 1 { 4 q . i ! I / tl ,�., r r 11. / Im' v' ` I t< a \ ` y9 Z `\\ \`•\, \ \\\\ \ ' 1 1 1 1 1 / I/;1 d a A y 1 r i �. l l/\ \\ r ! ro �'�- //,// . ^ / I � /�'- � /r /i '/ 1'r � Ji �.., / / i l� 1 I °' / N / I l - - r ?' ` / � \ o• P \ \ \\,, r, NIA.1 / ro J , / a nl �°C Q" \ ^ \ �� . \ \\\ \i;,• i / ; . 4RE�AWINa WALLS iYA%.) ! � I / :! M• r / / / / '1 / / 9 s 9Ng. .\ I `16 •�,\� \ \ �� \ \ \\ " � ify\ i d { i { +! / i 4 i 1 1 � / 1 / / / / .N G , / 4q.g `I'(J \ //'f \ \ \ ♦. `•,"'� \\ \\ /r / i i � (� (��I 1g,r I Rf/b /a 1 1 \ � J � �,�` �< \ N \ 1 , \ T \ � �t� •i'>\ \ \\ i ,i'%� '...�'Ij `("Pj, 71' M �I- } •yti / J. y/ryl /1 ��l j / !1 r//': / I I .,\\V \c\ `sC. 1`��'� ! \\ \ \ 1 \`\�;. 1:� `\ r //' Ci 1 � ! I . 4 1 d/ \ i 1 1 1 - 1 i i r i • V3 [��\J�� '- __ .- /n BM.O �$ / / 1 O 1 ` 1 /� :i 21 1 i � I a� I f `\ : i� `\ \\•` \\\ % !i: '/r // { Tr _ ..YI__ "�IYYJII / / rr 1 i i i is// - 'r -ate... ,,. �! /'�oq / ✓. l /, /`/// /y \ ! / ,1 1 / I r \ 8Z6 - / / ty- ! / / /! !/ / /�r�/ `-- � I I 1 I 1 ! ! I � i \ : e \ \ \ \ ;t•. • \ \ Y'.. / o / I/(y �", i t IEdRINIG wuu fYA%) / \/ r f - / / _ _ ✓ , ,t { { { 4 1. '/ / / {' r %' I _ 1 , ' ' \� 1 1 ul ! `s / 1 `4.r 1 1 /' O� \:3' ii' n s ��� : �' \ \ /Q• J / - / / yG/ / / r / I --3 r- / 11___ + 1 13 -''r/ \ \I ! (1 "I \ \ \\ \ \ \' ` ` `\`\ \\ `\ `\\ i\ \\`\\\`.,. '�/ EG 29.1 934 1 V N " 4 m 281 I \ \ \ \ \ - , I i \ \ \ \ \ \ \ LL! k'9 � 1 � s , /0 /i' '/'r \ Im 1 N m \ / \ \ �\ \ \\\\,\` '\` \ \\\\\\,\ "`\ •. \ // / � L� i i % "/ / ` •••••••••••• _ w \' § - 0/° \ y i d / / / / I /� I \\ \ 1 O 1 1 --t 1 1 1 1� 11 � � `.\ \ ♦ . `\ \ .. \ \ \ \ \ `�•, ` \ \ \ ,\ / �, / ` , BWiF pyp'�/,Y g5lidcT _ _ \ \ \ / I \ J\\\\„ \ \ \ \ \ \ - •w ``��•h'` \\\ \\ \\�i \ \\\ r � � � '-I r uNE Ko9) _ _ - \ r / / / / / ^ / / 933.0 \ I ` 1 1 . �1� I \ \ ' � \ ♦ \ \ \ \ -/'' .Wl .' ?5 % / // .2 ! 1 R 14 l 1 ah \�` \ .. �' y' �\ ♦coNi2aGlOft To c9NNEcr `TO STORM SEVER By OTHERS f i �_1- • cll eq \ /„y/r / ' / •F'�_ e. / / / I ! / r \ / O I / 11 ,-RLe ` \ ♦ \ \\\\' � � //� h \\ \ �� 1 _ I ' -- ! 9 O / 938.0 \ 4 4 -- / 4 r ! g3g.z .t 1 s3s (n O - ' / $ G / \ 4d / /'-NS5 -' T f -_ _ _ _ \ / / / •� I r / ! / r - 55.5 / _ "(,.1J \� J \ \ \ awy" / \ \ NVs O L() POND \ \ � N 7, ,' A 1 1 1 r 1 ii r/ ! i./ / r- �- r s. - • 7 ! I l // / < 9 1 ' 7 G \ \ 1\ 'i B/�/ r ti- ag �, / I 1 9 r/ / G / 1 \ d . a i ` I I /, % .. v `< � � e G ao 3z. n A °p �, \\ \ \\ a.�� w / z - q ; ;, � � / - I �1 1 •` \ , ,��\•� 1 , Y'( r \ \\ \ 6/ r / A r / 9t� 1 n I \ \ 1` 1� \ 1 1 \ \ \ \ \ o ,: \ aoW ! •vr` / ,' / / 1 / / , - \ III I j ( r I/ r w \` G � r R +``p \ ! I / 1,[r/ , / / r,A � I 941 1 I I I ����R \ 11 \ \ 1 1 \\\ \\ h/C y ., .\7` `T4 r, r r /, �M1 / ' //! / 1\ ! / ! \\\•, \ d ! 9 \ _ I 1 I I I l h I I I I +1 / -a`N- J - \ \ O \ r .•Y/ ! / c I 1 1 I \ 1 1� \ 1 w: \ c6 \ \ \ \ \ %' N/ '` 1 \ - . / / r' ,' l \ a- \\ /'� ICI+ii11111�iii / 1 4 1 4 \ ..III \ \ I 1' t y Q < : IPlwljldt\k/1 i 5 �` ,,31` I -I d :• .:III !III \ \ y 1}. 1 \ \ - I / / / r cj 1 \ \ q 8-• -_ t 1 1 \ -.1 v U \ .X 1 a i y/I -<,-- , I ! ,d� , / ' / 'i 9 9\\\ \`�O Z I N � . •�, ,(,l1 11 ! A \ 1 i JY a �\• \ / +\ / / 1 J I �. / / I a. .� 4 •! .y i R / a. ,1\a�l i�\II - �- JR \ am al J i /', ' is i � \ s.mL-` .\ \ \ �� i 15 -_/ •� / I �` 67.G / 1 r. I I 1 ! I I •�' _ , r r / / X / / Q� I / / b +Q• I \ .^ / SrAa 1 SY i A a I 1 d / 1 v 1 \ ! / - \ I 922, 0.! S / / d Se.Na) \ \ C -_` i < \� \ \ v Q • r / / /� r\ \ \ - 4G / / / / 1 Jr/ / r / // / , _ � � �� \ _'-- _ _ r \ , ( / / / / / 4] / ' / , / e. \ \ \ ♦ ` \ ' 1 m jp /��+ 1 X Py,. • ) [ r \ z K ! r I . \ , � \ r r / I io / 1 � ra` / l / .• r i., / ! / leg - of \ _ §. / \ i / N I /, G , / y > \ \. \ /. _ , / / m _ _ Y ! \ Y t: I 1'A A �� I I\ ♦ �2a / r9`�i : / / 1 A \ \ r // \ e\ -... - - l / r / , \ \/ r / / / / � / / a O \ � � \ \. - \ \\ `,vsnAxo rucAcr 1 \ \` / r/ / '. , I / R � < / 1 U OT V, A-u.ffi7 S.F.ru \ \---__' 'N /1 • _ , I ILI I ' I_L-- a I `922.6`� I ` !J\'4`3� I \ \ \ ♦\`�\\` \'\\ � / / f 11 1 / /!/'/r 1 I I � / ND 2 0 \\ fi ! l \ YV0.� 1 RWO /ci / / 1 \ \ . _ 'f- Y , • - __ e< �i . / I/l/ /i/ / / t j = 8fi .5 wI '\ 'y 1 I\ 1 1 . / n r Y RIYO- i G I __43Z.i / , `G \ ` o- \ `\ - - m • \ ' / I/ / / ,r _- [+�.'�� H 901 1 1 I n n Iry 930.8 �0. •' 93Y.3 '/ / / /,/ \ ` - / a •P , � \ *. 1 _ !' mw s as y�, �� r J /II ///„/ // //,// -- J- \\ \ l { / ! 1 4 1 :\ , 1 / V -30-` I \-�._nc \� _____/ / Sd• \ 9g� t z^d-� � 1\ ♦ \ w \ / /' ' P wa,. ,0„'�' / � 1 ''"'rN ! / - , \ m i 2➢.6 / a \ \ \ \ \ '\ \ �^ --- _ - __ _ FJt 41N rPoC `�,\ -.. ` �; 1 I I 1 1IJ )(r I I : I- JJm- 8 __ - / I \ + � ` \ \ /I \ _ � -• AWm o� - - -- ___ � i 1l1 \ / ! / n'/ / \\•, 1 a' I / ° � 1-1_ ," � . / /,E ` ��",� - - s - " \ / 1 1 I `\ '\ \ \ � 1 � � ,� _ - ''N __ �nE\ ao �-- \` \ �1 : \ a\;, _ `\ ' 6•` II / I I I r I I" � • / z«n xe.n _ `.w ry -_� , `''S S0. - � 1 1 \ k I/ u�' _ >'�\` �^� - � ,rr l l / /rf// �/ it �/ 2 / /PU/T LVT H � - � /?i /•. � �94r� vim, , a --^... /: i 'i r• , I f 1 ' 11' I - - - / /;; ` \ ' 1 r r ' /gt `„ '� I /u ! �J. /• o / - Z - - / DRAWN BY i� r / i� r/N/H/ / 1 ! / / / I 7. SOCCER \.\>• - !/ ! / I 1 �I I R 9.z R n rl ` - PLAYGROUND_ _ / , / r ! / / a��,,, +' AR A r,r -r / / /r,/� //////r r /r I>'r € q LE IN -.<•Y+).. c� -'-L-r -' J i / /l / I / �1 I1, / ,' 1 ».� w.r w ` - __ / / / / , // // /�/fI //r//ru� r '/r' / SC ET TPC / ! "` 0 100 A FEET 300 - - _- _. - v ' .-\ \ - :+.. -- - _ / r / l A / I/ / / / r ' - -. -}_•-,- -- .: - \ \ *'.:.; - \ % / i r / / i • r / I I 9 / , /+ � �i' ,'°�$A _ - �'. � - S9 / , j DATE ' •-. �` ...- / � -. - - _'-�3 - _ _ , - m:l , / ! 1 I ,' I . /: ��,, __ _ „ �_/ � .,� 1 i r / '; 1 inch = 100 feet 2/3/06 " A+ � 1 \ \ 1 � �-=--c -� ���7;-z'= <. /�_ :♦ - 9. - s---r _ _f___ �=-%.' - _ it i. a 1 I O ilrr(j Ij' > (n0 I V LJ CN J un LC) V >- D z O 14 z I - Q- r f \ / r r- r u N N Y YA , A N I N 1_ ; �, )T� A BENCHMARK REVISIONS ,rv� `•..-4 __:_ ___. _\ - _ -_ ___ =i ;\. -r •h! -ate' ____.-_. /.. �- - _. \._\ \ \ \-.\��\. / r IVI II'vlvL_��v IT-\t dJ'L_i r\II\.-I IIVI k-I/N!II I I/ ,.I BM 1: R.R. SPIKE SOUTH FACE OF 1ST POWER _ �_�___- C ._--_-___-'____ _'�___�_'•_-=`+L'32 :c ., 9EaN ttWsr! .-. ___. .. _ ... :. `; )•.I`: "i \ __'_ --� _- �- :. `� ¢_;. .. i' v ./ \f/I _a /, y•t- - 1 r i (-\:( T�),a t\I:y i�) �[, I I : 'I" ­` I Il\1 I - • ,_ � . \ �' �` .- .; .. � ^���^ "-� sil_. .--_•.-- _. - ` \; - I I I 1 r I I I�� \I Y„ /VI!\ I I Iri,`.`I�\v r I\I\I-n I ; �`. POLE WEST OF DRIVEWAY N. SIDE OF I r f r�r:.. '` ' PIONEER TRAIL - ELEV.- 910.34 NAVD 88 DATUMI a G I ( L-_;-, I I BM 2: TOP ALUM R W MONUMENT ®SOUTH R'1,1 : v / PROPERTY LINE ON PROPOSED RAW LINE. i __ _ 1 � III 0 �I i- I 1 D�.{�' ',,, I- _ ,� ''V _ e $ I ,' r 1 , � I _ ELEV.= 913.67 NAVD 88 DATUM ,� O ' I I r_ �, s� r I � .,,1_ - � - I --- - a , '',I '� !I y ; I'-+1-•'' I I , -- ,'Xs �/ I-> / � i� _ �; 2 -- - - / mlf _ ❑ _ 7� III `I �'_: - 1� T I I tiU I I -"� I N ! I �- a I� 1 cN I I11 / v I%r 9 , I 'r I _ Z 1/ I I ' ;' I r I__ - •-.:> w �. � �.1_ _ � _ � I - _ - a _..� -. r 11 I { r i • I � ,�r� ; -/ , �! I I I, 1 .' r=•=_ .. _ - T i'V' v , 1 ,. � WIII ._/ _- -_.__' i _I -I _ 7 + ,; � V Ulll ill l I r' I I -... "� -J J . lt' 0 / N r H 1__ a I l Z Lf� 0 - a/{ t-••- I I I I I 1441.-rr -, I s �I ! -T' r � I I L``�/ '. -1 )Ilona; /, `/ if L� I- �- _-- - II � r" ,� •\ ur CAD FILE r- I J:l O - - ( lr I^ _t 21996G 1 l - I C - l - - 7TI - II I - S / z , t q , I l r r ,a p r Jf l ` I e ' r I / � O �< PROJECT NO. I >z a 1 , Cl- <_ � ., Y -- • r :r�'� ;, I L;_ 7 - �' � _II ' �- O o 21996 f y_ I ; T i , - ,�. -,-_ \', - I ' 1 �:: _, Hai _ .. ��__•`'_ •'r `\ _ �_ J q \ / LI I Ik /A,// i ry " " - n IF bly _ .Bd° •/; B�,/' // / / - # � ._� % �°�` Via'` '� , \T 110�=I II l` in OUTLOT n - ; iI � _ �� a '1 , I 7'' / / � � � Ali �>i :. I ^' • ^ I +..- rn`Y' I �hPF' \ , r, a � x J I h'i 1 Vu {�'/ / / 3 h - I I yJ+ VY tI V 0 F' :a a i ram, ,�c kggpu gain. cISTRICi- - .�• �` /1 i � �/ - • — a � / 1 ! z i I' O i ro / l -0 a % i /l r d l / \ 9 N ! \ / a J y u \ Iy LiJ rr C l s - �1 l i / F? F R a- I / v A 0 c a/ e I . 1 I 1 N V / / 1 I' I s1 / 6 • 1 \, 1 o I I 3 , 1 II I I l T n/ 0 a \ R a / I \ � fv 1' I I I l 1 4 1 \ f a l 1\I r I i / 1 1 f'i I s 1 / , i i i \ w i 1 l / rn 7 I - , I 1 I 1 n \ yr/ U � ror k I 1 : I .I \` it I 1 T/ / -7 / If \ JI -o- s3z., 3�L—�:22 RLO biz• JR(_ I a' /I r P> rn K >r 4 ;s l:. f \ P� t ' O 1\ oA J A 5' 1 �I O 1 _ _ z,d 1 A %12 13 I d W i •I �9rn 3 14 3J - 1 1 I ) — I 6 _ 3 - 1 1 I G O G E . 19- '4. i4 3 0. t �IJ _ g 93 .. e: 3 8. I I I' I' i 1. 9 1 ,I L � 1 I 1 >II I 1 1 \ I � T _ ' � r - E I , i f - G - S w� i y 6 I 9 R fa V I k` - 1 i I m� i n\ 'x S a A" G uc --- vL a :`' ^ ' sue°• / /j�\ _ a 5 JkT 7 _3 3' , I I \ \I , J i t ( u L J i u 1 1 J_ 1 Li3T FI , \ u r' w - /,,..._C 41t_.I7 - • -/ 1� yg 1I\ S / b 3. I� - 3 ! 1- y 1 " \ - __ \ \, _, .•-.-_'T-L _ __ ._;C ° � �STRE (BY NFRS - -- - / / 1 rt' - \ J , - r 1 i / / C - / I I - 1> I I ( 4 I � • I _�I. l 1 t 1. 1 � . i I, I 1, / - f�I ! I 1j �- j�i \ I ry r IQ I, - I �I \' — \ I I Ia7 1 / I I 1 I — � I 1 a � \1 i \ , , / , /, , , ♦ : - r,+'. IL'I 4�� I � — ' _ \�' ❑ �.ly i I — %I I I -� 1 �», ( I III -_, .\\\\ I I I t• /, / , / / b 1 u. I l ._->•. e" ,I- II I' I - _ i 1 o Ill,.\,\\' ✓) I /;./; / s F SITE DATA LEGEND o TOTAL NO. OF SIGNIFICANT TREES (6" AND GREATER) 692 EXISTING TREE SAVED TOTAL NO. OF SIGNIFICANT TREES SAVED 561 81% �'"� o 0 EXISTING TREE REMOVED TOTAL N0. OF SIGNIFICANT TREES REMOVED 105 15% O EXISTING TREE REMOVED BY OTHERS o TOTAL NO. OF SIGNIFICANT TREES REMOVED (BY OTHERS) 26 4% n D 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT N WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED LANDSCAPE ARCHITECT I UNDER THE LAWS OF THE STATE OF MINNESOTA, DATED THIS 167H DAY OF JANUARY 2006, 3 v JAMES STURM, ASLA REGISTRATION NUMBER 18380 I I ! I e 1 4 ;V ti 1 C.S A N0. 14 t _ (PIONEER TRAIL) \ „� \ `\ V, o T \ n A J r A 9 \ a+ 28 A A \ / � A II r I n� < f T T OUL.O E \I J'3241 \ i \ d , 4 L \ N. \ � I P .L h — 5 u r x / f a _ 1 , f 1-- ,f tJAI a �ju / E_ j 1 I \ I +% I / J i � K r - �J , ; a / / 1 ) / h r / , r W � I s I i tr 9 .dL.: L_ l / — f.. s, • �J i -R y l ' an NR i 6 I !� I I � R - f I (i I I Il I I i / I I / 1 T , TN' 1 - � I , , I I ri- I l / I ,f I I III V Y"i \ �i I 1 r , 1 ! I , f I 1 , "t I pl _ r' I I 1 , r 1f rJ / I i i i I !; I j, I I t 1' 1� BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY — N. SIDE OF PIONEER TRAIL — ELEV.= 91D.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM Z � SCALE IN FEET 0 100 200 300 1 inch = 100 feet N M ,N _ Lr) \ N l ` mle V) �lppi N p W to r7 Cr0 W W Z =� z� 04�p � c� 52 Z 3COW O 1..L W O a .44 It zIt HU2 O O 7 r^• O �4 rr V^^ / Q H 0 � F zW z- w z Z w a Q w J O� H 0 W yj J - w �1 W Z Z I Y Q J z w woz�2 W z Q W u W r Ox Z = W x w z I� U E-4 O O W � E-4w OLr W x a z z W • Y O A O N w x a DRAWN BY TPC DATE 2/3/06 REVISIONS CAD FILE 21996TP PROJECT NO. 21996 TP1 �11 • I� -• _'_- IIIIII�®1111111111111111111_IIIIIIIIIIIIII,IIIIIIIIIIIIII, IIIIIIIIIIII■©IIIIII_ 11 I� :. : ._- 1111111�11111111111111111111111111111111111111111111111111111111111,111111111111111-©IIIIIIIIIIIIIIII. 11 IIIII� :. : .:- 11111111�11111111111111111111111111111111111111111111111111111111111'llllllllllllll, lllllllllllllll.©IIIIIIIIIIIIIIIII, 1 1 IIlll��lll 'Il�llllll�llllllllllllll111111111111111111111111111111'Illlllllllllll111111111111111111 ©IIIIIIIIIIIIIIIII, • _ • IIIIII:I�IIIIIII� !�11T:� IIIIIIIYY�IIIIIIILYY�®IIIIIII�� 'yT� _©_ m■m■�mmmmmm�©� m■m■�mmmmmm�©� m■m■�mmmmmm�©� �m■�mmmmmm�©� m■m•�mmmmmm�©� 1I1 ® • : .:- 11111111�11111111111111111111111111111111111_IIIIIIIIIIIIII1111__©- 1I IIIII� :. : .:- 1111111�11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ©111111111111111111 II/ IIIII� :. : .:- IIIIIII�IIIIIIIIIIIIII, 11111111111111111111111111111111111111111111111111111111111111111111111111111 ©IIIIIIIIIIIIIIIII, II1 ® • • IIIIII�I_IIIIIIIIIIIIII111111111111111111111111--_IIIIII_©III- II 'lllll�lllllll� • _ • IIIIII� �-11111111111111111111111-IIIIIIIIIIIIII,IIIIIII--©- 1I: 1 1 �. : .:- 111111�11111111111111111111111111111111111111111111111111111111111111111111111111, 111111_©- 1 , 1��111111�11111111111111111111111-11111111111111111111111111111111111111111111,11111111111111.©IIIIIIIIIIIIIIIII, m■�ommmmmm�©� m■m■�ommmmm©�� IC IIIIII��®111111111111111111111111111111111111111111111111111111111111-©II-- m■m■�ommmmm©�� m■m■ ... ... ommmmm©�� IK ���-11111111111111111111111111111'Illllllll-11111111111111,11111111111111111©IIIIIIIIIIIIIII. IK' ® • • m gym■ _• _'_- ommmmm�©� gym■ _• _ •_- oommmm�©� gym■ :.:.:• oommmm�©� gym■ _• _ •_- ommmmm�©� gym■ :.:.:- ommmmm�©� 1.1 IIIIIII� :. : .:- 11111111�111111111111111111111111111111111111_IIIIIIIIIIIIII11--©IIIIIIIIIIIIIIIII, gym• :.:.:- oommmm�©� gym■ :.:.:- ommmmm�©� gym• _• _ •_- mmmmmm�©� ,:1 IIIIII� ::. : .:- 111111�11111111111111111111111111111111111111111111111111111111111'llllllllllllll111111111111111111©— 1:< IIIIII� :. : .:- mllllllllllllll111111111111■11111111111111,11111111111111111111111111111111111111111111111©111111111111111111 gym• _• _ •_- mmmmmm�©� �m•�ommmmm�©�. �m■�mmmmmm�©�� m•m•�mmmmmm�©� �m■�mmmmmm�©� 0m■�m©mmmm�©� 11 m■�ommmmm�©� m■m•�mmmmmm�©� m■m•�®mmmmm�©� IIIIIII� � 11 :. : .:- IIIIIII�IIIIIIIIIIIIII'llllllllllllll111111111111111111111111111111111111111111111111111111111111111 ©IIIIIIIIIIIIIIIII' 1:1 : , 1 :. : .:- IIIIII�IIIIIIIIIIIIII'llllllllllllll111111111111111111111111111111111111111111111111111111111111111 ©111111111111111111 gym■ :.:._- ommmmm�©� gym• _• _ •__- ommmmm�©� gym■ :.:._- oommmm©�� gym■ :.:.:- o©ommm©�� IIIIIII� � 1 1 �1111111�11111111111111111111111111111111111111111111III_IIIIIIIIII.©IIIIII_IIIIIIIIIIIIIIIII, ��oommmmm©�� ��oommmmm©�� ��ommmmmm©�� ® 1 1 :. : .:• m----IIIIIIIIIIIIII,©-- ® •�oommmmm©�� �� :.:.:• mmmmmm©�� �� _• _ •_- 0mmmmm©�� 111111�11111111111111--IIIIIIIIIIIII'-©I-- ���mmmmmm©�� ®!� IIIIIII{�IIIIIII� '�T����IIIIIIIIIII■11111111111111111111111111■__IIIIIIII-©II—IIIIIIIIIIIIIIIII, . • • IIIIIII� ©__ IIIIIII�IIIIIII� . • • IIIIII'� IIIIIII�IIIIIII� •• - •_ IIIIIII�IIIIIIIIIIIIII, IIIIIIIIIIIIII,IIIIIIIIIIIIII, IIIIIIIIIIIIII,111111111111111©111111111111111111111111111111111111 IIIIIII�IIIIIII� • • IIIIIII� 11 IIIIIII� :. : ._- IIIIIIII�IIIIIIIIIIIIIII'111111111111111,11111111111111,11111111111111,111111111111111©111111111111111111111111111111111111 �� _• _ •= ommmmm©�� ®� • _ • IIIIII� �� =• _ •= ommmmm©�� �� _• _ •= mmmmmm©�� 11 IIIIIII� :. : .� IIIIII�IIIIIIIIIIIIIII,11111111111111111111111111111111111111111111111111111111111,©111111111111111111111111111111111111 1• IIIIII� _• _ •� 111111�11111111111111111111111111111111111111111111,111111111111111111111111111111©111111111111111111111111111111111111 11 � _• _ •= ommmmm©�� 11: IIIIIII� :.. : ._- IIIIII�©111111111111111111111111111111111111111111111111111111111111©11111111111111111111111111111111111' 11 IIIIIII� :. : .:- 111111�111111111111111111111111111111111111111111111111111111111111111111111111111©11111111111111111111111111111111111, � 1 IIIIIII� :.. : . :- 111111�111111111111111111111111111111111111111111111111111111111111111111111111111©11111111111111111111111111111111111' ��� _• _ •= ommmmm©�� 1. IIIIIII� . - .-- IIIIIIII�IIIIIIIIIIIIIII'11111111111111111111111111111111111111111111111111_©1111111111111111111111111111111111 IIIIIII" :11 :. : ._- IIIIII�IIIIII_11111111111111111111111111111111111111111111,11111111111111111111111111111111 ©1111111111111111111 1 1 I��1111111�11111111111111,11111111111111111111111111111111_IIII_11111111111111111 ©IIIIIIIIIIIIIIIIII1 ��oommmmm�©� 1 1 IIIIIII� . 1: :•.• IIIIII�IIIIIIIIIIIIIII'11111111111111,11111111111111,11111111111111,1111111111111,11111111111111111©IIIIIIIIIIIIIIII, ��oommmmm�©� 1 1 IIIIIII� :. C .:- 111111�1111111111111111111111111111111111111111111111111111111111111, 11111111111111111111111111111111©1111111111111111111 IIIIII� 1 1 :. : .C- IIIIIIII�IIIIIIIIIIIIIII'IIII_IIIIIIIIIIIIII11111_---© 1:1 ® • _ • IIIIIIII�IIIIIIIIIIIIIII'11111111111111,11111111111111111111111111111,1111111111111111111111111111111111111111111111111© �� _• _ •= mommmm©�� 1 � 1 IIIIII��IIIIIIi�llllllllllllll1111111111111111111111111111111111111111111111,111111111111111©111111111111111111111111111111111111 ��oommmmm©�� ��ommmmmm©�� 1 1 IIIIIIIY��IIIIII�IIIIIIIIII.-IIIIIIIIIIIIII, IIIIIIIIIIIIII,--11111111111111111© ��oommmmm��© ��oommmmm��© ��oommmmm��© ��oommmmm�©� ®�oommmmm�©� ®�oommmmm�©� ®moo©mmmm�©� ® : : 1 1 �IIIII�IIIIIII�©111111111111111111111111111111111111111111111©111111111111111111111111111111111111 ��oommmmm��© ®�oommmmm��© ��oommmmm��© �®T�• ��_—IIIIIIIIIIIIII,IIIIIIIIIII■IIIIIIIIIII■IIIIIIIIIII■©IIIIIIIII--_ ®IIIIIIII��IIIIII� ©__ ®Illlllli� • • IIIIIIII� �� :.: •:• ommmmm©�� IIIIIII�IIIIII��mllllllllllllll111111111111111,11111111111111,111111111111111111111111111111©1111111111111111111111111111111111, IIIIIII'K{•'�IIIIIIIi.:1���lllllll�llllllllllllll,lllllll-IIIIII_—_©—_IIIIIIIIIIIIIIIIII1 IIIIIII�II��®�� �� _• _ •_- ommmmm©�� ®�oommmmm©�� ®®®IIIIII� �� _• _ •_- ommmmm©�� �� _ • _ • _- ommmmm©�� ���ommm�■m©�� ��ommmm■�m©�� IIIIIIIK '' � :. 1= •_- �I---IIIIIIIII.III_©—_ 11 � :. : .:- IIIIIIII�©IIIIIIIIIIIIIII'llllllllllllll1-IIIIIIIIIIIIII'©11111111111111111111111111111111111' �� _• _ •_- ommmmm©�� �® -• - •- ommmmm©�� I�II� -• - •_ IIIIIIII��IIIIIIIIIII■IIIIIIIIIII■IIIIIIIIIIII♦I_©IIIIIIIIIIIII■IIIIIIIIIIIIII■ ®IIIIIII� . • • ®IIIIIIli4i� �IIIIIIII� IIIIIIIIIIIIII,IIIIIIIIIIIIII, IIIIIIIIIIIIII,IIIIIIIIIIIIII, 111111111111111©—_ __ ���■�omm�mm©�� ��ommmmmm©�� �� •�, ®mmmmm©�� ®®©IIIIIII� ��mmmmmmm©�� ��ommmmmm©�� �� _• _ •_- ommmmm©�� ��mmmmmmm©�� �� • - .-- ommmmm©�� ®�ommmmmm©�� �� _• _ •_- oommmm©�� �� _• _ •_- ommmmm©�� ��oommmmm©�� ��oommmmm©�� 1- - ��ommmmmm©�� 11 �oommmmm©�� �� :.: •:• ommmmm©�� ��oommmmm©�� ®�ommmmmm©�� ��ommmmm©�� ® ::11 :• : •:• 111111�11111111111111,11111111111111111111111111111, 111111111111111, 111111111111111©IIIIIIIIIIIIIIII,IIIIIIIIIIIIIIIIII' o��ommmmm©�� ��oommmmm©�� ��ommmmmm©�� ��oommmmm©�� �� •_• - mmmmmm©�� �� • _ •_- ommmmm©�� ®� • - •-- ommmmm©�� �� _• _ •_• mommmm©�� �� ;• _ •_• oommmm©�� �� • 1- .-- ommmmm©�� �� _• _ •_• ommmmm©�� IIIIIII`�� • • gym■ :.:.:- oo����©�� ®� • • IIIII� gym• .... �®����©�� gym■ :.:.:- o�����©�� � cn h o �1�27 27 1..l� N o� m lr m 4 o ck� w <o l z Z Z F^ CA)W z 38 Iv I f f N \ N 1 � d w 0 Co z � o CL DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996TP PROJECT NO. 21996 TP 2 �d T J q OUTLOT B I) O 0�6 c�0 O Rb° ,4, 0 0 0 O o O �' 0 O o �', oo 0.� / \< \\ 11 18 I I 19 II 20 // /� ---�,� n 4 1 1 1 0 0 VA V A 17 11 I I I I I I 21 22 /(* \ 0 ID II ' 4 1 (�` < \ \ 16 \\ 11 JL --JL II 11 / O \ q. i _ + J i'd/x 1 Qjj .' OUTLOT A ©� yl, i i i `i ' i 1 \ �\ 14 \ \\ / / / / / ssaH 11 m SSMH 12 — -- � \ / � I I II 7'� RE 92459 INV. 934.06 — \ 'I 3� 4 """AAAI 3Y { Al i I I It I , \ >\/ BLD_ C .5w 1 w I INV W/92206fi4 REM940.42 r \ 24 41 �� 41 x1 1 4 �1 4 i4 1 \ \ I o 1 OLD=24.4z' INV, 910.48 I I \\ \ \ J• / / / / I I 23 I s N 18 I I I I I I I 1 I I I I I I I I C.S.A.H. NO. 14 (PIONEER TRAIL) 7 I J I I gl f(/AI III I I 1 iiI 4/1 Iii I I A 0 II n I e I 1 \\c\v\0" \\ \ V, \ \ (Va• o \ \p \ \ o` 33•• , , i3 , , 39 , , , �j(��'} , , , 1 13 \;,1V 0 / INV. 903.73 I I i — — — — I I INv. 910.99 \ (p/ O \ �'y \ \ \ E V 9 �S \ 1\ \N \ c / I - W o 17 \ 25 y10 9 \\ ;\\ \ \ \ \ n N E o o a / 1 1 (3) 4 1 d ; l \\� / , \\\ \ 24 I i I I\ 19 12 , SSMH 9 \ I 22 Oi� i i A i;' J\ \\ / RE 99sa I - ""� VA / B1D=12.00' VA I I / / A SSMH 24 \ V I \ / +� BELVo9=941z..625 29H4 1 4 qH� � H / J I A JJ e a / \\ \\ \\ I / / 21 I I // \/ / / \ � � , i , � � � \ \ \ / / I I 20 / / / ftE 9J4.J0 '! Q f / #- i 1 'f -" '-�- - -' /\ \ \.\ / < \ \ \ i/ / I I / / �� BLD=22.5P c� 9 1 �' / \\ \\ / \ 26 1 1 t5 RE 9 \ 2RRE11935. I I RE 939435 5II1 III J1 1 11L SNBSL— Mo-H 9te1-26 27 13 14 D& 61S J DEGLER �117\ 10 12 01 d JJ i 1 SMH 25I 5.0221400 < 54H 26 5 9 INV. 23.25 B so .o.j INV, 5s8' '11 / / \ U o 0 c2 27 \ Qly� \\a°\ \ a \ / / / // o L •� o 3 d °3 0 W Ul O V / \\`O\ �\ `•_e='='c ' //'pry \ J I h\ 7 O BID=6RE 924.25 L 55'0 CONTRACTOR (qBN TO STORM SEWER (BY OTHERS) \ 29Ln ssMH 4 / \ \ / RE 899.43 29 \/ \ RE 937.28 V 9 — z / / >\ 6 �/ `\ INV. II.M' \\ \ INv. 9zs.z6 _ 1 \ \ / �\ \ � / \ 7 \eLo-,zoo' — _ � —1 I 1 1,1 1 A H A j 1 \\ — •, \ / / e — — — �'J 1 1 RE 905.52 \ \ / \ \ 95Mn 29 30 \ \ f 1 / / \ / \ IRE '928.07 / / \, \ INV. 887.5) \ \ 1 \\ �-_-' 1 � i � 9 � q � i � I \ � \ eEo=n9s' \ 30 \ / / \ � 1 I ,T--, I I 1 1 1 15 `" / I I \ \ / `\ \ \/ \BLo-,zo0• 1 I \ \ > \ \ I I I I 1 1 14 5MH I \ a \ / .----r \"°.\ \1 \ � � � Hi - \ � /\ \ / \ 13 1 I RE '� / 1 \ / \ \\ �\ \ 6 \ , / 11 11 � �2�'•., ``<a o I I 5 ��. R / INV.HW7.17 \ \\ 31 \\\/ \ \ INV. 926.z\\I 10 913.17 \ \ / / \ \ RE 938 26 d \ I B 10 0T BLD-26.00' 1 I -J _ J Imo ,f L _ / c RH 9zo.7s 32 \\ ( \ \ s \/ / \ \ 9 \ \ \ \At ,1a " d `�\\ 1 I+I�git `i I L--=----�\//.'.i STREETD a \„ I H 22 --- — - 1 r_ 1 1 II 2 I \BLDM-7/2 COURT RE 92!1 E93477J7 SSMH NV.SMH 2 SSMH 21 i OUTLOT A o I - BLD W8 3 85.99 1V92 . .77 OLD-12.00' A 20 \1001/\\\\ \� , OUTLOT H NVTv I M991�10 ,\ CJ _11.00, IX 0 L--------J I 11 \\ 5 OUTLOT F \\ \ 11 5 /1 1 4 ' OO ---- O ®U TJ�O G Co 00 3 4\ 6 .a Q r — — — — — — — 1 g 1 I 1 1 4 \ \ \\ \ 1 PLAYGROUND I I \ \\ \ I 2 I I 3 1 1�AREA RE 923.17 2 885.,J i t l<" .I I \\ / \\ -- yI ----. J �� I AUROk�\ INVESTMENTS LLC PID NO. 25,0221300 11 II I I II I I II 11 LEGEND r''I I � I I , , 1 I I 4 r / A I N I� r-^ /1 T A I � / VIII VIVL_\./IlI\ I 1 LJ L_i /IVI L_IVI /( !1r TF)A NI.^��n L)T TI/lNl H L)I/\IT ' JOHN KLINGELHU /\r- 1A/n\/ ill nT q /\ /l �\JI VV/-1I L-^ I I U 20 ,PID N0. 25.0270Z JOHN KLINGELHUTZ PID NO, 2r27040� OHP----�OHP- EXISTING OVERHEAD POWER LINE EXISTING FENCE m EXISTING TELEPHONE PEDESTAL BENCHMARK Z n 35' WETLAND BUFFER PROPOSED ASPHALT SURFACE EXISTING TREE LINE/TREES j O EXISTING DELINEATED WETLAND PROPOSED CONCRETE SURFACE BM #1. POLESPIKE WEST OOFUTH FACE DRIVEWAYOF N.TSIIDEWOF CAD FILE EXISTING WATERMAIN EXISTING ASPHALT SURFACE PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM SCALE IN FEET --<-�—<— PROPOSED STORM SEWER 0 100 200 300 21996U ate= EXISTING SANITARY SEWER \ ,\ BM #2: TOP ALUM R/W MONUMENT ® SOUTH \ �, EXISTING BUILDING —I I I PROPOSED WATER MAIN —< Q< EXISTING STORM SEWER PROPERTY LINE ON PROPOSED R/W LINE. 1 inch = 100 feet PROJECT NO. i ® EXISTING WELL EXISTING GRAVEL SURFACE PROPOSED SANITARY SEWER ELEV.= 913.67 NAVD 88 DATUM 21996 o---«---«-«--«-- PROPOSED DRAINTILE .0ill ' EXISTING CONCRETE SURFACE n V I l I / I 1 'JUTLOT B I I .it - __— -_—__ _ / / / / ' � ' O aa;-� - ' �V � ' I / /� r'/l ' \ \ i� \\ ` --iZ_ -- / l,��y �. � � . l,i \ e tiM�-_'+rL` . -• - - / O /)A/I1Jl �i � r , l l/ 1 `- 17 1 � / / // 1 � } / r � � / r; 19 I 1, l _ 0 v ..;, ' I / i / / ��//..�{ L ' 93?.1 1 3 II \ 21 ', \ i / / I '.; ^+ , d � •�, i �` / /10 r l 1 I i� i' / / ' \s l ` \ / %�/ "! /4\ /" 94 iq -^3 _� ,� .� .' ;T - /x/�'r �� l �� / // / v'� y A2'' I�i / ,5-- — 4 •e ,�A +><"',•� e� / , � I UTLOT r / / 1 j( c �„ / / � a/./1 ;IN •�� s , 33� y a1 � 2yV i- 1v I i �, �°;�I_' .r .! � a • M 18V �V A � \ t- I I , f It � ®� � 0 / M _ © � � I �i � "� 'L d � %i , • "„ d � � f d .a -r oas (un') cy '� t _x , , i � � A 4 i; il "a /T 4 ♦ � �/ l 1J �/ i - ",1 ""7� r � I/ I � �9,j �,� 9„,, n Vy 3t. V "q'� "� I /-� " �.� ' % A �" - �-_ ____ � �- � � �� 13� �`�:ii .Zo it / / A��� � I I _ I i �%� /. , I n 0 �y '/ al_VIF 41E1 4FR r-, , x I y r — N` / • ! 1'ii ` T i v / L — i \ 3" `� - e�. 1� _ � �. Y / , s (Rt•O I -I 936 0 _V ' � � >z H . er;. '• — ',\; .• \!',,; } 1 ..-_I � � � L:�. ,� . , i ate— t- �- -w l �2 ! -- _ -y _- - ,>r F \ / L ./. �? ',. \,,: i _ - ,, � � j i � / i, fL ,F •! /'�{E• �Q �,'C Y / Cuy.! /I `., /�� r "L / /� 9 _ _ _ 'j�iEF. �. 1,. - l/ e 1 / k / C, l i / / • d J. d i A --- r c 37.5 \ \ \\ 1 , I i/ / 1 1 1 / \ ` \ Nj / \ F' I s 4 B I li ,V II ✓_' \\i SI q, r IIII I, LoT\\A\ II III 1 C` , \\ �31) �/ / �I` Q / ash A IVi E; 1 \ x 7 N, . I � \ •c � \ ''ST'r; T Ifl \ 8 \ / e• e i C ( 1 I i \ � I / I Ir � - I BM A AB } 1 1 — q 3 93U 6 \ } I ' I I I I I I I I I i I I i. I I I �'t IIII I I II I` i it i I, 11 111 1 r C.S.A.H. N0. (PIONEER TRAIL) % AV A 1, `f'.,7� 01 \\ \ 6: A r v k , l / OUTLOT ,a It I I i S i - T _ / J / If �i�-/ 6,5 ,fir �—\�', '\ �, ;�/ , , , .-'/�-...✓ /';,;/ �; I \` %��\ I / I 1 r m , 1 i 1 / r �\ \, > �'« } '< I I � �� - q�2 s _ ti �. �LI � � �-;; - �� N ,�'sFo �,__ � -l• ,r,1 a I r , ,� I \ '. � \ 'I j 1 I j -.., _ _ - `A " � - '' `• ' -`�"` BHS � \ - h,rc -� ••.. � - - ._ � � J rr /o -.;/, I �, �, __ _ _ — I I '/`1 "., I a ;✓ -., j .. I i �iW- ._,ry _:_ ._ _-.c..•y Qom' /rr \ \ � - 'dam - _ ,,.. �iar-6aca..i_ -_" '. .illcti(;� �./ %%< ` , TLOT1-_ ,1 ABM — \`'.�\`\1114 1. BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER / % ' \' . Q POLE WEST OF DRIVEWAY - N. SIDE OF - r — i „�..�es �Ir 1_0 v;P, _ _ ! / I 92T. o yv, 'F r.,' PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM rL, / ,:r ! f -.' q \ _ / /,;. / / `./ - : BM #2: TOP ALUM R/W MONUMENT ® SOUTH i / / / 3 o yy I I� // / / / / / u 1 / I i / � /, ,,� .v� ��° .� �� /�\ aF_ PROPERTY LINE ON PROPOSED R/W LINE. %i \ \ •\ — //I_/ / I - / 2 ABM ELEV.= 913.67 NAVD 88 DATUM /_ // j i i 1 V A V %—' , �— / _> E- Y H RS ✓Y �.— — —z+ \b 1 'fi — a a:; l 1 / _ I - / ' - i - � I I 1 _ _ — - - / — _ _. _ I/ I �� -/ _ _ - _ v A err c - •' F /_ / } r v —r—nas L-_ _A_ _ r, * ne � � r �' - - -' • / / %--'—"— "''�""� -� � �� I'� _- �' I I \ I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT • 1 J WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION MINNOW AND THAT I: AM A DULY REGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA, DATED THIS ' /' } i x�•. ' _ I _ _ px v 1 - -k __ — - a - -- = 16TH DAY OF JANUARY 2006. ( / // " `• ; j I j it /i /'// / j 1 Or VR S ��l - Z' g �$I�- - r .. — -_ { �. - ' - i d }', r,l Y I I 10SCALE IN FEET 300 f � II`a � � DAMES STURM, ASLA • -} - .� I � - ❑ I '1 I --i REGISTRATION NUMBER 18330 ' 1 Inch - 100 feet I If r wl( f ' Y J — \ . CENTER TREE yr. PI ANT SCMEDU`LE s 4 FASTEN TREE TO 14 GUAOE PLIABLE N OTES t \ c ZINC COATED WIRE AND 1/2' RUBBER 1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY 5. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR \ HOSE SECURE FIRMLY AND NEATLY YEAR FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO AT ALL ENDS WITH THE GENERAL CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. / (454-0002) PRIOR TO STAKING PLANT LOCATIONS. 6. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT WRAP TREE WITH 4"WIDE TREE 2, WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSINGS ARE FOUND SELECTIONS, SOIL CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT N ♦'r WRAPPING MATERIAL TO FIRST ON SITE, WHETHER SHOWN THE DRAWING OR NOT, THEY SHALL BE NEGATIVELY AFFECT PLANT MATERIAL ESTABLISHMENT, SURVIVAL, OR GUARANTEE. p ' I EARTH SAUCER WITH 4" SOIL � \ \ BRANCHING PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED AND/OR ARE IN AN LE THEY SHALL BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE LD _ w FILL WITH 4" WOODCHIP MULCH. / 4" WOODCHIP MULCH AREA TO BE GRADED. ANY QUESTION REGARDING WHETHER PLANT MATERIAL ARCHITECT PRIOR TO INSTALLATION. O SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE 01 �: TURNBACK BURLAP va. LANDSCAPE ARCHITECT PRIOR TO REMOVAL. 7. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL I2 PLANTING MIXTURE PLANTING BEDS WITH FIBER MAT WEED BARRIER. ALL EVERGREEN AND DECIDUOUS N MIN: ti'MIN 3. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD OR ROCK MULCH SPECIFIED PER PLANTING MIXTURE ;;, AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF PLAN. N e•Mna UNDISTURBED AND COMPACTED SOIL e., UNDISTURBED AND COMPACTED SOIL. NURSERYMEN. B. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS - 4. CONTRACTOR 15 RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY SHOWN ON THE PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER DECIDUOUS TREE DETAIL VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE NOTES. 3 EVERGREEN TREE DETAIL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. KEY QTY. I COMMOM NAME LATIN NAME SIZE/ROOT NOTES CS 31 COLORADO SPRUCE Piceapungem 6' HT BB FULL FORM TO GRADE BHS 30 BLACK HILLS SPRUCE Piceadesata'Glmica' 6' HT BB FULL FORM TO GRADE NS 2 NORWAY SPRUCE Piceaabies 6• HT BB FULL FORM TO GRADE PA 46 PATMORE ASH FYaxdnopennsyhmadcaPabnore' 2 1/2" BB STRAIGHT LEADER ABM 45 AUTUMN BLAZE MAPLE Acerxfreemmui Jeffersred' 2 1/2" BB STRAIGHT LEADER BO 3 BUR OAK Quercusmacraavpa 2 1/2" BB STRAIGHT LEADER RSC 14 RED SPLENDOR CRAB Mahm RedSplendar' 2 1/2" BB STRAIGHT LEADER SSC 8 SPRING SNOW CRABAPPLE Males spring sow, 1 1/2" BB STRAIGHT LEADER PFC 10 PRAIRIE FIRE CRABAPPLE Malar'Prairie F7re' 1 1/2" BB STRAIGHT LEADER AM 10 AMUR FLAME MAPLE Acer ginnala Timms' 1 1/2" BB STRAIGHT LEADER ESH 12 ENDLESS SUMMER HYDRANGEA HydrangeamacrophyllaE"esssmuner' #2 CONT. VRS 10 VANHOUTTE RENAISSANCE SPIREA Spireawnhouttelrenida we #2 CONT. n LLJ w> pI s , m =rn — N m M a pj 4 O V M w W wIndZ N Co w ZW O N �i L�J o Z 5 cc m m Q a OL- z H0 It 0 w a a zz w z= aw Q J Ld O~v �y W 0 W z V1 A I W a J a� Z •o v 0 z W V) 0 W z� I�1 OQ z � �a z~ 0 tJ LLI O r , F+i W Y w A� DRAWN BY HAF DATE 2/3/06 REVISIONS CAD FILE 21996L PROJECT NO. 21996 L1 GENERAL GRADING NOTES: 1. SPECIFICATIONS WHICH APPLY ARE THE MOST RECENT EDITIONS OF THE MUNICIPALITY IN WHICH THE WORK IS LOCATED AND THE MINNESOTA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR HIGHWAY CONSTRUCTION UNLESS MODIFIED HEREIN ON THESE CONTRACT DOCUMENTS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE THE "GOPHER STATE ONE CALL" EXCAVATION NOTICE SYSTEM AS REQUIRED UNDER MINNESOTA STATUTE CHAPTER 216D, 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION (PHONE 651-454-0002 IN THE TWIN CITIES METRO AREA OR TOLL FREE 1-800-252-1166). 3. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION, 4. ALL CONSTRUCTION AS CALLED FOR ON THESE CONTRACT DOCUMENTS SHALL BE PERFORMED IN ACCORDANCE WITH ALL OSHA REQUIREMENTS. 5. ALL LOT AND EASEMENT DIMENSIONS ARE SUBJECT TO FINAL PLAT. 6. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE FILTER FENCE,SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED. a. ROCK CONSTRUCTION ENTRANCES. b. FILTER FENCE. c. TEMPORARY CULVERTS. d. TEMPORARY SEDIMENTATION BASINS AND OUTFALL FACILITIES. e. STORM WATER POND CONSTRUCTION. f. COMMON EXCAVATION AND EMBANKMENT (GRADING CONSTRUCTION). g. SEED AND MULCH (SEE NOTE 14). h. STRAW BALE BARRIERS IN FINISHED GRADED AREAS. 1. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER CONSTRUCTION. 7, GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS AND IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY. 8. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE GRADING CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, 9, IT IS THE RESPONSIBILITY OF THE GRADING CONTRACTOR TO DISPOSE OFF -SITE ALL TREES, STUMPS, BRUSH, OR OTHER DEBRIS THAT EXISTS WITHIN THE CONSTRUCTION AREAS. TREES TO REMAIN SHALL BE DESIGNATED BY THE ENGINEER. 10, THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT CERTIFICATION OF ALL CONTROLLED FILLS CAN BE FURNISHED TO THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. 11. DENSITY TESTS SHALL BE TAKEN TO EVALUATE THE COMPACTION WITHIN THE STREETS, TRAVEL WAYS OR PARKING LOTS. WITHIN THE UPPER 3 FEET OF STREET, TRAVEL WAYS OR PARKING LOT SUBGRADE, THE CONTRACTOR SHALL INSURE THAT ALL SOILS BE NOT MORE THAN ONE PERCENTAGE POINT OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTION TO A MINIMUM OF 100% OF STANDARD PROCTOR DENSITY BE PROVIDED. IN AREAS BELOW THE UPPER THREE FEET OF SUBGRADE OF THE STREETS, TRAVEL WAYS OR PARKING LOTS, THE CONTRACTOR SHALL INSURE THAT ALL SOILS BE NOT MORE THAN THREE PERCENTAGE POINTS OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTION TO A MINIMUM OF 95% OF STANDARD PROCTOR DENSITY BE PROVIDED. THE GRADING TOLERANCE FOR THESE AREAS SHALL BE WITHIN 0.1't. 12. LOT GRADING AND/OR THE PREPARATION OF BUILDING PADS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE GRADING TOLERANCE SHALL BE 0.25't. ALL EARTHWORK OPERATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE HUD -FHA DATA SHEET 79C "LAND DEVELOPMENT WITH CONTROLLED EARTHWORK'', PROVIDING FOR A MINIMUM OF 95% STANDARD DENSITY, OR AS OTHERWISE SPECIFIED BY THE CEO -TECHNICAL ENGINEER. 13.IN AREAS WHERE RETAINING WALLS ARE PROPOSED ON CONTROLLED FILL AREAS, A MINIMUM 95% STANDARD DENSITY NEEDS TO BE ATTAINED WHERE FILL THICKNESSES EXCEED 10' BELOW WALL FOUNDATION ELEVATIONS, A HIGHER MINIMUM OF 98% SHALL BE ATTAINED 14. BUILDING PADS SHOWN ON EACH LOT ARE TYPICAL ONLY. THE DEPTH OF THE PAD FROM FRONT TO BACK SHALL BE GRADED THROUGHOUT THE FULL WIDTH OF THE LOT OR AS NECESSARY TO ALLOW FOR CONSTRUCTION OF A BUILDING AT THE MINIMUM SIDE YARD SETBACKS. (REFER TO THE PLANS FOR SPECIFIC SETBACK DISTANCES.) IF UNSUITABLE SOIL CONDITIONS ARE ENCOUNTERED WITHIN A PROPOSED BUILDING PAD THAT CANNOT BE CORRECTED OR REMOVED, IT IS THE RESPSONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF THE CONDITIONS AND TO LOCATE THE LIMITS OF THE UNSUITABLE AREAS. 15. UNLESS OTHERWISE SPECIFICALLY NOTED, THE FOLLOWING SITE RE -VEGETATION TECHNIQUES SHALL BE IMPLEMENTED. ALL DISTURBED AREAS, EXCEPT STREETS, AND POND AREAS SHALL BE COVERED WITH A MINIMUM OF 6" TOPSOIL AND SHALL BE SEEDED WITH Mri #250 MIX AT 70LBS./ACRE. SEEDED AREAS SHALL BE MULCHED WITH MnDOT TYPE 1 AT 2 TONS/ACRE AND DISC ANCHORED. SEEDING AND MULCHING SHALL BE COMPLETED WITHIN 2 WEEKS AFTER EARTH MOVING OPERATIONS ARE COMPLETED. ALL SLOPES THAT EXCEED 3(H):1(V) SHALL BE SEEDED WITH A WOOD FIBER BLANKET. FERTILIZER SHALL BE 22-5-10 80% W.I.N., 0% CL OR EQUIVALENT AND APPLIED AT 350 POUNDS PER ACRE. FERTILIZER IS TO BE INCORPORATED INTO THE TOP 3 TO 4 INCHES BY DISCING OR SOME OTHER SUITABLE MEANS. WHEN SEEDING AFTER NOVEMBER 1, OR WHEN TEMPERATURES DO NOT EXCEED 40 DEGREES FAHRENHEIT, THE CONTRACTOR SHALL DORMANT SEED ALONG ALL DISTURBED AREAS. DORMANT SEED BED PREPARATION, SEEDING RATES, AND MULCH REQUIREMENTS SHALL BE THE SAME AS THOSE DESCRIBED IN THIS SECTION EXCEPT THAT NO SEED SHALL BE PLACED ON SNOW OR ICE WHICH IS GREATER THAN 2 INCHES IN DEPTH. ANY SEEDED AREAS WHICH DO NOT BECOME ESTABLISHED SHALL BE RE -SEEDED AT THE CONTRACTOR'S EXPENSE. 16. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP PUBLIC STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT AND OTHER DEBRIS WHICH RESULTS FROM SAID GRADING CONSTRUCTION. 17, THE SITE GRADING TOLERANCE FOR THE SITE SHOULD BE 0.1' FOR STREETS AND 0.25' FOR LANDSCAPED/OPEN AREAS. SPECIFIC GRADING NOTES: 1. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS ON THE PLANS WERE PROVIDED BY JAMES R. HILL, INC. ON OR ABOUT 09/20/05. THE DEGREE OF ACCURACY OF THE EXISTING CONTOURS SHOWN ON THE PLAN IS EQUAL TO t ONE HALF THE CONTOUR INTERVAL. PROPOSED CONTOUR PROPERTY LINE SURFACE DRAINAGE SUGGESTED GARAGE SIDE PROPOSED DRIVEWAY (675 S.F, FINISHED ELEVATION AT LOT CORNER LOT NUMBER 916 6 920 }}} EXISTING CONTOUR 920, O FINISHED GRADE ELEVATION RWO STREET 60, CRAMNG CRABS bin " 1O LOWEST ITR. DUEV. Ul I TYP. FOOTAG RAMBLER SECTION (R) CUSTOM RAMBLER SECTION (CR) RECOMMENDED HOUSE TYPES MODIFIED LOT- FINISHED GRADE ELEVATION VARIES AT THE FRONT AND REAR OF HOUSE. LOT CAN ACCOMMODATE CR RAMBLER, SPLIT ENTRY OR TWO STORY HOME. USE LOWEST FLOOR ELEVATION PER GRADING PLAN. STANDARD LOT- FINISHED GRADE ELEVATION IS THE SAME AT THE FRONT AND REAR OF HOUSE, LOT CAN ACCOMMODATE R RAMBLER, SPLIT ENTRY OR TWO STORY HOME. LOWEST BASEMENT FLOOR ELEVATION MAY BE EITHER 8.0' OR 3.5' BELOW FINISHED GROUND LEVEL. WALKOUT LOT- FINISHED GRADE ELEVATION FOR REAR BASEMENT WALKOUT IS 8.0' LOWER THAN FINISHED GROUND RWO ELEVATION SHOW AT FRONT OF HOUSE. BASEMENT FLOOR ELEVATION IS 0.5' ABOVE REAR FINISHED GROUND ELEVATION SHOWN. CUSTOM WALKOUT LOT- FINISHED GRADE ELEVATION FOR REAR BASEMENT WALKOUT IS 6.0' LOWER THAN FINISHED HOUSE FLOOR (HF) CWO ELEVATION SHOW AT FRONT OF HOUSE, BASEMENT FLOOR ELEVATION IS 0,5' ABOVE REAR FINISHED GROUND ELEVATION SHOWN. DEEP WINDOW OR LOOKOUT LOT- THE FINISHED GRADE AT THE REAR OF THE HOUSE IS 5.0' BELOW GROUND AT THE FRONT OF R LO THE AREO 5HTOACCOMMODATE WINDOWS. OPENINGS ABOVETHEGROUND AT THE REAR OF THE HOUSE. DEEP WINDOW OR LOOKOUT LOT- THE FINISHED GRADE AT THE REAR OF THE HOUSE IS 5.0' BELOW HOUSE FLOOR ELEVATION (HE) AT THE FRONT OF THE HOUSE TO ACCOMMODATE FULL WINDOWS. WINDOW OPENINGS CLO ARE 0.5' ABOVE THE GROUND AT THE REAR OF THE HOUSE. NOTE: FOR ALL RECOMMENDED HOUSE TYPES, GARAGE FLOOR ELEVATION IS 0.3' ABOVE FINISHED GROUND ELEVATION SHOWN AT FRONT OF HOUSE. TOP OF BLOCK ELEVATIONS IS I ABOVE FINISHED GROUND ELEVATION SHOWN AT FRONT OF HOUSE, RECOMMENDED HOUSE TYPE FINISHED GRADE ELEVATION _ TYPICAL FRONT YARD SETBACK 30' (HOUSE) 1- PROPOSED ROW C&G -' FINISHED it GRADE 2 6CENTERLINE 51 3 "qL-100' IL STATION D TYPICAL LOT 4" CONCRETE 4" SELECT GRANULAR 5' a 4 a d e d- a a 4 dAs 5' CONCRETE SIDEWALK SECTION (ALONG STREETS C. OF & E) LOT BENCHING DETAIL r N p, In "/ In li , I+I UFEU EoW Pi. IF, 11,RAGE B0 RA- \ I� WRB rxob ainme .55251yIn In IA EWo 6625 MmIM ASY RAOYS - Nu.m'/]m `� Jpb 9P� U. I I STANDARD CUL-DE-SAC CON W I we 4B RAo. Wes. SB Rom, RURAL 45,5 AO 0• I ALL DISTANCE FOR STREET5 AM MEASURED To BACK I Cress All P. PLUS IF WAKWLDEP L Seoul (RURAL) CITY OF TYPICAL CHANHASSEN CUL-DE-SAC REVISED : DATE. 2_97 Pure xp: 5205 Fly IC 52s `o U ININ tGt (HYDT) o R/W = R/W I I 1 I I 1O• 1 I I I I I b I - I I I MN Gate va. location I an pro)NEARS, of I1 1 1 --- -- -- ----- --- property lire. I I R/W R/W NOTE: All deadndv [aee e,t.m.d . minimom of na pipe length baym,d NOTE: ,.Is Ynlve and doted Victor main to be an with plug tied back to north and veal yids lee. of center lira. Uwe" hydronb pass consicl with proposed BiWwok. CITY OF TYPICAL CHANHASSEN INTERSECTION REVISED FILE Nine. 3e3 1 a.Fr 2-97 Tr xa.. TOOT PL 0. PL 30' da' 15.5' to Back 15.5' la Back Wear Course to be 1/2• 9�a Abow Edge of ON 5 j 3.0E 2.0E 4° 9 We Y toA' 5: 1 e Tapepil, Seed 1 %2 -MNo 2350 LvvE350308 5 L k Mulch w Sod. Su.mountaae rock Coat - 2357 2•-MNDOT 2350 LVNW35030B Concrete taro 12'-Goss 5 Aggregate Bose, 10DE Crushed 24" All 3149.20 Select Granular Borrow (See Note 7) NOTES 1. Right -of -Way Retuned 2. unarm. street 8rado ZOX 3. Minimum street grade 0.75X 4. AA" Topsoi INoced in disturbed plane. 5. 2 Rats and behind curb. 6. IF. Ali minors Yearing Radom shWI be placed the nest cpnaWctim season fdlpeing placement of the bituminous bow. 7. A test rdl of the prepared subgmee shall be performed by the cower in the presence of o ally inspector. The city had the wthnity to reoube motional suegrah connection boats on the lest rdl. CITY OF TYPICAL CHANHASSEN STREETRESIDENTIAL ON EMSEo:-s2 .:-o1, 1-03 aTL: 2-9 I'AlE '10.: 52DD Full r0 MAIIN AF� ull TO rALx Fry �p w..a I T7r-, ne' ANS DOME SECTION --- 000.0 00 - m _ Usirw Arse.. I law, A J 000000 11 PLAN VIEW OF Dill NA L RAMP , us.� DOME SPACING axa • urvl� 0 \\� Is Is F U, 1 SECTION A -A he nenm- due Fr.ncWi 06. g• 4• 5. 7' 6' 6' 3" is Y B e ELEVATION OF RAMP O' 9' WCN PNEPR D JOINT FACER RATEPoM. M91ro M 2u. ® MIEX A YF.'A. IS Not WDE ENCLARR Fm 7Xe PEDESon. RAMPS AND A WI.W M7N 14 D' THEN. 1 PECESddAM CNSWR Sup. BE OJT .. TIE all AT $]MEET AEKL. ® 6' TO 0' IS THE REWIRED OFFSET I THE IRUNCATL o AREA FROM THE FRONT FAIT OF ce ® ADAREWM TRUNCATED ARM _'-ARE. A SNNl 6E 2- Y MIN. IN DIRECT W Ci 1RAIEL AND SNALL DARK CdlR (FRED* PlAce. DARN INAY. OR Randall YuLCTI WREN ME Ao.MQEVAA,t NT 61DIS A YTS' Eir UDNT GRAY CEAEHT COLOR. O SURFACE APPRiO WUNCAIFO Od1ES OR STAMPED CCMCRETE WLL NOT BE ILLOXEp. ® TRUNCATED OCYE AREA SNALL MEET ME LUX 1 ..CUT STANDARDS 1. INTECTUAR. YMNWG SYSTBAS, CITY OF PEDESTRIAN CHANHASSEN CURB RAMP REVIBED.I-dBI-D..L wTe 2-97 LIFE ME, 5215 nl£ NAME 1S3 5215 Aw PROPOSED BUILDING SITE EXISTING GRADE R/W 30' - BUILDING SETBACK LINE r 6" TOPSOIL I -FINISHED GRADING GRADE I PL a PL 30' 1 30' 18' to Face la' to Pore wear Causes to le 1/2' Ale, Edge of Gutter A 9� �e 3.020E 5. M° E Xg A• Top.. I. Seed B Mulch or Sod 2'-MNDOT 23M MVNE35U35B B-618 Concrete Cure 2'-Aull 2350 MVNW35C35B 2 1/2--MNDDT 2350 MVNW350358 12'-aces 5 Aggregate Base. 100E Crushed 24' MNDOT 3149.28 Select Granular Borror (See Not. 7) Tort, Coal - 2357 Tack Coat - 2357 NOTES L Right -of -Way Rewired - 60. 2. Masimum street grade TOX 3. Minimum street grade (I 4. a o• Td soil placed in disturbed mere. 5. 2 Rdb sod behind curt, 6. The bituminous ing Surface shall be placed the nest construction Reason fallowing placement of the bituminous base. 7, A test roll of the Proposed wbgmde shall be performed by flee owner in the presence at a city inspector. the city has the authority to reauke odditiond subgrade correction based on the test told. CITY OF TYPICAL CHANHASSEN EET STRSECTTIIONT 1s ,2-97 . 2-DI. 1-03 al Still Sure 2- 97 PLAT MI 5201 PL VARIABLE MINIMUM 11' 12' VARIES 10. 1/2• ROPE PER FT. TOWARD ROADWAY CURB TOPSOIL TYPICAL• 3 MNDOT 2350 LVWE45o30B fi• CLASS 5 BASE (100E CRUSHED) COMPACTED SUBGRADE PER SOL ENGNEER NOTES 1. Shoulders to be bor:kNled and rtared with 3' of INI add -w�laed lwith :ad or seed / WuMh. 2 The contractor or de ill Shall gply o 2 Xor, 1 WE moiriNmenCe bond upon ciy acceptance. dotal/ 3. m1, d/ specifications we nimumn regJlremenla. addnianal design may be reauked depending o s®ling sub -grade soil conditions. 4. Bituminous vote may not be croswcled on unsuitable eats. No waste malalm, black dirt, or organic Ross Blared. CITY OF BITUMINOUS REv6ED..1-da.2_G,. ,_CHANHASSEN .LA.E ND TRAIL -.,U-a 2-97 5216 FILE NWE Ja 216 i / FJ-� 777,7Tc 77 �-SELECT -�( �-- SELBACKFlLL ( ' \ BACKFILL / UNSUITABLE 1 MATERIAL -) _ SUB -GRADE CORRECTION _ LIMITS / NON -SELECT BACKFILL MATERIAL SUITABLE �( MATERIAL I BOTTOM OF UNSUITABLE MATERIAL (TO BE VERIFIED BY SOILS ENGINEER PRIOR TO PLACEMENT OF SELECT MATERIAL.) BUILDING SITE & STREET SUB -GRADE CORRECTION DETAIL ALL 3:1 SLOPES MUST BE EITHER SEEDED & STABILIZED WITH WOOD FIBER BLANKET OR, IF SODDING, THE SOD SHALL BE STAKED (TYP.) AQUATIC BENCH 10' a o NOTE: AQUATIC BENCH OF THE POND SHALL BE SEEDED WITH THE MN DOT NO. 310 SEED >e MIXTURE. THE AREA BELOW THE AQUATIC BENCH NEED NOT BE SEEDED. 0 OLE FINISHED GROUND 10: 1 TYPICAL STORMWATER BASIN CROSS SECTION 6• Wsmnce�to£ Variable 1/2•r I I }I Top Bllumnwa MudeMl 1/2•r bps erM _ Ai • Uhl B618 - Concrete Cure and W Itv B•• I�B,'�Iyy. � ]1-11/2"r Top BIIYMnou9 "Cher" o MnDOT 86112 CSKA a Orb . Quit., r -�. NOTE' - �f For Us. Only with Pr to Orbsouss Pal roux or Medlms 21 IYR IS- 66•R r- Top BlNKI Materitl ` SURMOUNTABLE E Cmael. Curb mN Wtla Y e¢amiaaYa Bituminous Curb 6• Shoe Formed CITY OF TYPICAL CURB CHANHASSEN AND GUTTER a.2-97 DATE. 2_97 PLATE RD 5203 FAME: JBS ST5] PL NAMABLE Y HYDRANT WENS BOX °• 6• VMffS ) SEE PLANS) 1/4• SLOPE PER T. TO ROADWAY CURB CRETE SEE NOTES 1 & 3 t" Claud 5 Bane NOTES' 1. TYPICAL 6' THICK CONCRETE SIDEWALK. 2. USE 7 1/2" THICK FOR COMMERICAL DRIVEWAY CROSSING. 3. JOINT SPACING AT 5' INTERVALS. EXPANSION JOINT SPRUNG AT 100' INTERVALS AND WHEN ABUTTING EMSTNG CONCRETE OR STRUCTURE. CITY OF CONCRETE C3AM1111 SIDEWALK L: z-gar I-p3 ogle 2-97 %°TIE "d 5214 C. 39S le BENCHMARK BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER POLE WEST OF DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM BM #2: TOP ALUM R/W MONUMENT ® SOUTH PROPERTY LINE ON PROPOSED R/W LINE. ELEV.= 913.67 NAVD 88 DATUM SITE AREA 5,259,434.4 S.F. OR 120.74 GROSS ACRES MINIMUM CITY SETBACKS FRONT 25 FEET SIDE (HOUSE) 10 FEET SIDE (GARAGE) 5 FEET SIDE (STREET) 20 FEET REAR 25 FEET n M � / LL O will tT M UE, will n !.. 'n N 5E Opp Z fT S X oIs N m L� co in N VI W Iyl o Z N Z o rn M, Q <^ _ ^ CV 7 O, V U �. Z 3MAE Km4i (-JwJ w O C"!8 \ n IN!It d N I y E Lj Z <III m In Q E I0 a a LLJ E O � 41 .,,, .... n a a C 0 a LEE; U w y NOf ado ? v O_ O d O O O 0 O K «:°,ai0J N 0 - flu [0 _ O E 0 0 y 2 C3In O C >. J n N U �� 20 3�O n V 0 °1 0 a O _T O L Ail It 0 O O �' � a F- zw O N W N w z= z aw J F_ F O J > W '�.Wr', !4 W �r//�� i ( Y z - 0 J 0 z W N Al �Wz� IM.4 W H O= rw' 1�1 w N Z� /UN1a W O O O W EI 0' (.5 0 C)0 w xM ID] a Ld W 4 Y W DO A(N DRAWN BY TP C DATE 2/3/06 REVISIONS CAD FILE 21996D PROJECT NO. 21996 D1 Graham Environmental Services, Inc. Wetland Replacement Plan CITY OF CHANHASSEN Wetland Conservation Act RECEIVED ' Section 404 Clean Water Act FEB 2 3 2006 Peterson Property CHANHASSEN PLANNING DEPT Prepared for: D.R. Horton, Inc. Chanhassen, Minnesota Property Looking East February 22, 2006 GES Project No. 2006.012 Name and Address of Local Government Unit: City of Chanhassen. 7700 Market Boulevard P.O. Box 147, Chanhassen, MN 55317 Name of Applicant: Plowshares Development Project Name: Pioneer Pass (Peterson Parcel) Application Number: Type of Application (check one): Date of Decision: May 26, 2006 ❑ Exemption Decision ❑ No Loss Decision ® Replacement Plan Decision ❑ Banking Plan Decision ❑ Wetland Type/Boundary Decision Check One: ® Approved ❑ Approved with conditions ❑ Denied Summary of Project/Decision (indicate exemption number per MN Rule 9420.0122, if applicable):Proiect includes creation of .48 acres of Type 1 NWC and 1.22 acres of PVC to allow the filling .47 acres of Type 1 wetland for the construction of a 81 single family homes. See Attached Findings and Conclusions for details of decision. List of Addressees: Landowner: DR Horton, Inc. 20860 Kenbridge Court, Suite 100 Lakeville, MN 55044 Members of Technical Evaluation Panel: Greg Graczyk, Carver Soil and Water Conservation District Brad Wozney, Board of Water and Soil Resources Watershed District or Watershed Management Organization (If Applicable): Bob Obermeyer, Riley -Purgatory -Bluff Creek Watershed District Department of Natural Resources Regional Office (ste office): -Page I of 2 DR Horton Notice of Decision052506 8/19/05 NW Region: PIE Region: Central Region: So Tice uthem Region: Regional Director Reg. Env. Assess. Ecol. DNR TEP Representative (if different than above) Julie Ekman, Area Hydrologist Corp of Engineers Project Manager @ Department of the Army, Corps of Engineers, St. Paul District ATTN: CO-R, 190 Fifth Street East St. Paul, MN 55101-1638 Individual members of the public who requested a copy, summary only Scott Krych, GES You are hereby notified that the decision of the Local Government Unit on the above - referenced application was made on the date stated above. A copy of the Local Government Unit's Findings and Conclusions is attached. Pursuant to Minn. R. 8420.0250 any appeal of the decision must be commenced by mailing a petition for appeal to the Minnesota Board of Water and Soil Resources within thirty (30) calendar days of the date of the mailing of this Notice. NOTE: Approval of Wetland Replacement Plan Applications involving the use of wetland banking credits is conditional upon withdrawal of the appropriate credits from the state wetland bank. No wetland impacts may commence until the applicant receives a copy of the fully signed and executed "Application for Withdrawal of Wetland Credits," signed by the BWSR wetland bank administrator certifying that the wetland bank credits have been debited. THIS DECISION ONLY APPLIES TO the Minnesota Wetland Conservation Act. Additional approvals or permitsfrom local, state, andfederal agencies may be required. Check with all appropriate authorities before commencing work in or near wetlands. LOCAL GOVERNMENT UNIT --72zd� ��� 05/26/06 Signature Date Don Asleson, Natural Resources Technician Name and Title - Page 2 of 2 DR Horton Notice of Decision052506 8/19/05 FINDINGS AND CONCLUSIONS City of Chanhassen 7700 Market Boulevard • P.O. Box 147 • Chanhassen, MN 55317 Name of Applicant: City of Chanhassen. Project Location: Pioneer Pass (Peterson Parcel) (NW 1/4 Section 26 and NE'/4 Section 27, Township 116N, R23W) Type of Application (check one): ❑ Delineation Decision ❑ Exemption Decision ❑ No Loss Decision Replacement Plan Decision ❑ Banking Plan Decision Date of Decision: May 26, 2006 Findings and Conclusions The City of Chanhassen, LGU, has made a replacement plan decision approving the wetland Impacts associated with the Pioneer Pass development in the Chanhassen 2005 MUSA area. Impacts are limited to filling of type 1 wetland basin I (.47 acres). Replacement wetland will be created on site with .48 acres of New Wetland Credit and 1.22 acres of Public Value Credit. The applicant considered the no -build option as well as the total avoidance option in sequencing discussions, however both were dismissed as infeasible. Wetland I is considered a severly degraded basin due to a high level of disturbance and fam ing activities that have historically occurred around and through the basin. The basin is also predominately fed by surface water which will be cut off during the development of the site. CITY OF CHANHASSEN By: Title: Natural Resource Technician Date: 5/26/2006 Name and Address of Local Government Unit: City of Chanhassen 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Name of Applicant: D.R. Horton Inc Application Number: Type of Application (check one): Date of Application: February 20, 2006 ❑ Exemption Decision ❑ No Loss Decision ❑ Wetland Boundary and Type Determination ® Replacement Plan Decision ❑ Banking Plan Decision Location of Project: NW and NE 1/4 Section 26&27 Township 116N Range 23W . Summary of Project: The applicant proposes fill .47 acres (20,473 square feet) of Type 1 wetland for the purpose of a housing development. Mitigation proposed includes .48 Acres of Type 1 New Wetland Credit and 1.22 Acres of Public Value Credit. See enclosed wetland replacement plan. You are hereby notified that the above -referenced application was made to the Local Government Unit on the date stated above. A copy of the application is attached. Comments will be accepted on this application until March 21. 2006 decision on this matter will be made March 27, 2006. Contact Don Asleson, Natural Resources Technician at 952-227-1106 for details or changes to decision -making schedule. • • ; �tul ►• AI Signature City of Chanhassen. Natural Resources Technician Title Landowner: D.R. Horton, Inc. -Minnesota 20860 Kenbridge Ct., Suite 100, Lakeville, MN 55044 List of Addressees: Members of Technical Evaluation Panel: February 28, 2006 Date Mr. Brad Wozney, Minnesota Board of Water and Soil Resources Mr. Greg Graczyk, Carver Soil and Water Conservation District Watershed District or Watershed Management Organizations: Riley -Purgatory Bluff Creek Watershed District Department of Natural Resources Regional Office Reg. Env. Assess. Ecol. Page 1 of 2 DR Horton_Degler > 10,000 2/3/06 Div. Ecol. Services 1200 Warner Road St. Paul, MN 55106 DNR TEP Representative Ms. Julie Ekman, Area Hydrologist DNR Wetlands Coordinator Ecological Services Station 500 Layfayette Road, Box 25 St. Paul, MN 55155 Mr. Joe Yanta Corp of Engineers Project Manager @ Department of the Army, Corps of Engineers, St. Paul District ATTN: CO-R, 190 Fifth Street East St. Paul, MN 55101-1638 Others who have requested a copy: Scott Krych 1119 Horshoe Lane, New Prague, MN 56071 Page 2 of 2 DR Horton_Degler > 10,000 2/3/06 930 930 920 920 910 910 900 WWOW 900 890 -- "-"— 890 880 -_ " ING WE 880 870 -- --- ---- --- --- - GRADEw 670 860 660 850 850 1840 840 W 1W CITY OF CHANHASSEN RECEIVED FEB 0 3 2006 CHANHASSEN PUNNING DEPT cTw GTw 1TW ItW D?JD SECTION A -A 3:1`J `-D95TNG GRADE SECTION B-B 93o a U p"'wsc z�` 920 O 02 [s7 U DRANK BY 'PC DATE O1/25/06 REVISIONS k i z SWMP FEE WORKSHEET DATE February 22, 2006 PLANNING CASE PROJECT Peterson Property Site Area in Acres 120.74 Right of Way CM 212) -47.38 Right of Way (North -South Collector) -1.62 Future Development -9.97 Outlots A. E, F & G -20.73 City Park -4.24 Assessable area 36.8 ZONING CLASSIFICATION RLM WATER QUALFrY WATER QUANTITY FEES Rate per Acre Acres Total $ 1,600.00 36.8 $ 58,880.00 Rate per Acre Acres Total $ 2,900.00 36.8 $ 106,720.00 CREDITS FFEM UNIT QUANTITY 50% UNIT TOTAL PRICE Storm water pond acre 0.5 $ 1,600.00 $ Outlet structure each $ 2,500.00 S SWMP FEE $ 165,600.00 SWMP CREDITS $ - TOTAL SWMP FEE $ 165,600.00 ' NA-026620-03B (V.2.02 for MS WORD) 1029/04 Minnesota Local/State/Federal Application Forms for Water[wetland Projects USE THIS APPLICATION FOR ANY PROJECT AFFECTING A LAKE, RIVER, STREAM OR WETLAND, INCLUDING: Local Government Unit Approval Pursuant to Minnesota Wetlands Conservation Act (WCA) Minnesota Department of Natural Resources (DNR) Permit to Work in Public Waters Department of the Army Permit (33 CFR 325) Note: The U.S. Army Corps of Engineers (COE) will forward application forms to the Minnesota Pollution Control Agency (MPCA) for ' processing if state water quality certification is required from the MPCA. You do not need to send this application to the MPCA. This application packet includes : Part 1: The BASIC APPLICATION and the COE APPLICATION to be filled out by all applicants (see Instructions). PART 11: The REPLACEMENT PLAN SUPPLEMENT to be completed onlyfor projects that impact wetlands and require a replacement plan for wetland mitigation. If you're not sure whether your project requires a replacement plan, call your Local ' Government Unit (LGU) or Soil and Water Conservation District (S WCD) office for guidance. Do not proceed with your project until you have received all required approvals from your LGU, the DNR and the COE. If you wish to confirm the status of your application at any time, contact the agencies directly (see Instructions, page 2). Proceeding with work before all required authorizations are obtained may result in fines or other penalties, and may include a requirement to restore the project site to original condition. If you have questions or need assistance with filling our these forms, contact your local SWCD office, your LOU, your Area DNR Waters office, or your COE field office (see Instructions, page 2). ' If you believe that your project may be subject to watershed district, local zoning, or any other local regulations besides those of your LOU, contact those office(s) directly. If you are a Federal Farm Program participant and your project affects a wetland or water body on agricultural land, your eligibility for USDA benefits may be affected. Contact a Natural Resources Conservation Service office for further information. tA QUICK LOOK AT THE PROJECT APPLICATION PROCESS Electronic files: Forms can be downloaded and filled out using Microsoft Word. Your input will be restricted to fill-in fields where users can enter text or cbmk ' boxes. These areas appear gray on the screen, but not on the printed document Send copies of these completed application forms to your LGU, your Area DNR Waters office, and your COE regulatory office. ' Any of the agencies may make initial contact with you to: a) inform you that it has nojurisdiction over your project; b) request additional information needed; or c) inform you of applicable fees. When your application is considered complete and appropriate fees have been received (if requested) it will be distributed for appropriate review. Following agencies' reviews, you will be informed if it has been approved, approved with changes or conditions, withdrawn, or denied For information about state laws, rules and regulations that direct this process go to the web site www.revisor.leg.state.mn.us. For informationon U.S. Army Corps of Engineers regulations go to the web site www.mvp.ui;wc.army.mil. Instructions for Part I HELP 1: Every applicant must fill out Section 1. The applicant is the person, agency, company, corporation, or other organization that owns, leases, or holds other legal rights to the land where the project is located Indicate names of multiple applicants on a separate sheet. ' HELP IA: Fill out Section IA only if you have designated an authorized agent. An authorized agent may be an attorney, builder, consultant, contractor, engineer, or any other person or organization designated by the applicant to represent him/her in this process. An agent is not required HELP 5: Purpose, description and dimensions of project: State briefly (in a sentence or two) what you propose to do and why it is needed. Also, describe whether your project will involve any of the following: Construction of structures, filling, draining, dewatering, removing, excavating or repair. - Construction of an access path, bridge, culvert, dam, ditch, dock, driveway, ripmp, road, sand blanket, shore protection, or tile line. ' _ Construction of any structures on fill, piles or a Float -supported platform. If so, describe. Dredging or discharging (placing fill material) into a wetland or other water body (including the temporary placement of material). If so, explain the specific purpose of the placement of the material (such as erosion control) and indicate how it will be done (such as with a backhoe or dragline). If dredged material is to be discharged on an upland site, identify the location of the site. ' Minnesota Local/State/Fedewl Application Forms fur Water/Wetland Projects Instructions, Page 1 Include an overhead view drawing showing the work to be undertaken and its relative location on the property. Show items such as property boundaries or lot dimensions; location and extent of shoreline, wetlands and water; location and dimensions and footprint of the proposed project, structure or activity (include length, width, elevation and other measurements as appropriate); points of reference such as existing homes, structures, docks or landscape features; indication of north; and location of spoil and disposal sites (if applicable). Hand drawn, computer generated or professionally prepared drawings are acceptable, as long as they contain all necessary information clearly, accurately, and in adequate detail. Please include specific dimensions whenever possible. You may also include photos, if you wish. HELP 7: For information regarding adjacent landowners, contact the tax assessor where the project is to be developed. HELP 8: If any part of the work has already been completed, describe the area already developed. Include a description of structures completed; any dredged or fill material already discharged (including type of material and volume in cubic yards); acres or square feet filled (if a wetland or other waterbody); and whether the work was done under an existing permit (if so identify the authorization, if possible). HELP 9: Other permits, reviews or approval related to the project may include the following: conditional use permit; plat approval; zoning variance; National Pollutant Discharge Elimination System permit; state disposal system permit (includes dredged material disposal); watershed district/watershed management organization permit (stormwater, erosion, floodplain); environmental assessment worksheet/envbonmental impact statement; hazardous waste site; feedlot permit; groundwater appropriation permit; or county/township driveway/road permit. Are you aware of any archeological or cultural resource determinations or surveys completed concerning the project or replacement site by the State Historic Preservation Office (SHPO) or others? If yes, please explain on a separate sheet or attach a copy of any determinations or surveys. Final Checklists (Part 1) ® Have you completed all of Part I (Page 1), plus the Federal application (Page 2)? ® Did you (and your agent, if applicable) sign Section 10 on page 1? ® Have you signed the Application for the Department of the Army Permit (Page 2) to seek Federal authorization of your project? ® Have you included the necessary attachments for Part I? Attachments must include: ® Site Locator Map (Section 3) ® Type of Project (Section 4) (if additional space was needed) ® Overhead View of Project (Section 5 and HELP 5) ® Project Purpose, Description and Dimensions (Section 5) (if additional space was needed) Attachments may also include: ® Applicant Contact Information (HELP 1) (if additional space was needed) ® Project Location (Section 3) (if additional space was needed) ® Project Alternatives (Section 6) (if additional space was needed) ® Photographs ❑ Adjoining Property Owners (Section 7) (if additional space was needed) ❑ Work Already Completed Section (Section 8) (if you answered YES) ❑ State Historic Preservation Office determination or survey Submitting Your Application Make three copies of the entire application and all attachments. Keep the original, and mail a complete copy of your application to each of the local, state, and Federal entities listed below. Be sure to include Part 1 and all attachments with each application. LOCAL: Send to the appropriate Local Government Unit (LGU). If necessary, contact your county Soil and Water Conservation District (SWCD) office or visit the Board of Water and Soil Resources (BWSR) web site (www.bwsr.state.mn.us) to determine the appropriate LGU. STATE: Send to your Area DNR Waters office, attention Area Hydrologist. If necessary, contact your county Soil and Water Conservation District (SWCD) office or visit the DNR website (www.dm.state.mn.us) to locate the Area Hydrologist for your location, or contact a Regional DNR office: NW Region: NE Region: Central Region: Southern Region: 2115 Birchmont Beach Road N.E. 1201 East Highway 2 1200 Warner Road 261 Highway 15 South Bemidji, MN 56601 Grand Rapids, MN 55744 St. Paul, MN 55106 New Ulm, MN 56073 Phone: 218-755-3973 Phone: 218-327-4416 Phone: 651-772-7910 Phone: 507359-6053 FEDERAL: Send to the appropriate U.S. Army Corps of Engineers regulatory field office: Brainerd: U.S. COE, Regulatory Branch 10867 E. Gull Lake Drive N. W Brainerd, MN 56401-9051 Phone: 218-829-8402 St. Paul: U.S. COE, Regulatory Branch Army Corps of Engineers Centre 190 5' Street East St. Paul, MN 55101-9051 Phone: 651-290-5375 La Crescent; U.S. COE, Regulatory Branch 1114 South Oak Street La Crescent, MN 55947-1338 Phone: 507-895-8059 Two Harbors: U.S. COE, Regulatory Branch 1554 Highway 2, Suite 2 Two Harbors, MN 55161 Phone: 218-834-6630 WEB SITES: BWSR: www.bwsr.state.mn.us U.S. ACOE: www.mvp.usace.army.mil DNR: www.dm.state.mn.us MPCA: www.pca.state.mn.us Minnesota Local/State/Federal Application Farms for Water/Wetland Projects Instructions, Page 2 NA-02662M3B (V.2.02 for MS WORD) 1029/09 Minnesota Local/State/Federal Application Form for Water/Wetland Projects For Internal Use Only A liption No. _ Field Office Code Date Initial Anolieation Received Date initial Aoolication Deemed Comolete PART I: BASIC APPLICATION "See KELP' directs you to important additional information and assistance in Instructions. Pagel. I. LANDOWNER/APPLICANT CONTACT INFORMATION (See Help 1) Name: DR Horton, Inc. - Minnesota Phone: 952-985-7827 Complete mailing address: 20860 Kenbridge Ct. , Suite 100, Lakeville, MN 55044 IA. AUTHORIZED AGENT (See Help (A) (Only ifapplicable; an agent is not required) Name: Scott Krych Phone: 952-758-9721 Complete mailing address: 1119 Horshoe Lane, New Prague, MN 56071 2. NAME, TYPE AND SIZE OF PUBLIC WATERS or WETLANDS IMPACTED (Attach Additional Project Area sheets if needed) Name or I.D. # of Waters impacted (if applicable, if known): See Attachments (Cheek all that apply): []Lake []River ®Wetland type ® 1 ❑ IL ❑ 2 ❑ 3 ❑4 ❑ 5 ❑ 6 ❑ 7 ❑ 8 Indicate size of entire lake or wetland (check one): ® Less than 10 acres (indicate size: Attached) ❑ 10 to 40 acres ❑ Greater than 40 acres 3. PROJECT LOCATION (Information can be found on property tax statement, property title or title insurance): Project street address: Fire #: City (if applicable): Chanhassen 'A Section: NW&NE Section: 26 & 27 Township #: 116N Range #: 23W County: Carver Lot #: Block: Subdivision: Watershed (name or #) Bluff Creek WD .Attach a simple site locator map. If needed, include on the map written directions to the site from a known location or landmark, and provide distances from known locations. Label the sheet SITE LOCATOR MAP. 4. TYPE OF PROJECT: Describe the type of proposed work. Attach TYPE OF PROJECT sheet if needed. See Attachments 5. PROJECT PURPOSE, DESCRIPTION AND DIMENSIONS: Describe what you plan to do and why it is needed, how you plan to construct the project with dimensions (length, width, depth), area of impact, and when you propose to construct the project. This is the most important part of your application. See HELP 5 before completing this section; we What To Include on Plans (Instructions, page 1). Attach PROJECT DESCRIPTION sheet. See Attachments Footprint of project: 0.47 acres or 20,473 square feet drained, filled or excavated. 6. PROJECT ALTERNATIVES: What alternatives to this proposed project have you considered that would avoid or minimize impacts to wetlands or waters? List at least TWO additional alternatives to your project in Scction 5 that avoid wetlands (one of which may be "no build' or "do nothing"), and explain why you chose to pursue the option described in this application over these alternatives. Attach PROJECT ALTERNATIVES sheet if needed. See Attachments 7. ADJOINING PROPERTY OWNERS: For projects that impact more than 10,000 square feet of water or wetlands, list the complete mailing addresses of adjacent property owners on an attached separate sheet. (See HELP 7) 8. PORTION OF WORK COMPLETED: Is any portion of the work in wetland or water areas already completed? ❑ Yes ®No. If yes, describe the completed work on a separate sheet of paper labeled WORK ALREADY COMPLETED. (See HELP 8) 9. STATUS OF OTHER APPROVALS: List any other permits, reviews or approvals related to this proposed project that are either pending or have already been approved or denied on a separate attached sheet. See HELP 9. 10. 1 am applying for state and local authorization to conduct the work described in this application. I am familiar with the information contained in this application. To the best of my knowledge and belief, all information in Part I is true, complete, and accurate. I possess the authority to undertake the work described, or 1 am acting as the duly authorized agent of the applicant. Signature ofapplicant (Landowner) P 2-1.1-D 4 Dale Signature of agent (if applicable) Date This bloc: most be signed by the person who desires to undertake the proposed activity and has the necessary property rights to do so. If only the Agent has signed, Please attach a separate sheet signed by the landowner, giving necessary authoriratim to the Agent. Minnesota Local/State/Federal Application Forms for Water/Wetland Projects „e Pumw moo m to Ims colkGton of mramanan u estwazed ro average 10 hours per response, although the maturity of applications should requrre 5 hoursor less. This includes The time for reviewing instructions, searching exivmg data sources, gathering and maintaining the data needed, mid canpletmg and reviewing the collection of information. Send cmnmems regarding this burden estimate or any ou or aspect of this collection of information, including suggestions far reducing Iho burden, to Department of Defense. Washington lieadquauc s Smice Directorate of Information Operations and Report, 1215 Jefferson Davis Highway. Sunc 1204. Arlington, VA 22202-4302; and to the Office of Management and Budget, Paperwork Reduction Project (0710-M3), Washington, DC 20503. Respondents should be aware that rotwnhsmaruling any oiler provisiort of law, no peson shall be Subject to any penally for failing to compiv with a collecum, of information if it does oat display a currently valid OMB control number Please DO NOT RETURN you form to either of these addresses. CmnPkted applumbous must be submitted to the District engineer havingjunsdiction over the location of the proposed activity. PRIVACY ACT STATEMENT: Amboraies: Rivers and Harbors Act, Section 10, 33 USC 403, Clean water Act. Section 404, 33 USC 1344, Manne Protection. Research and Sanctuanes Act, 33 USC 1413, Seaton 103. principal purpose: Information provided on this form will be used in evaluating the application for a permit. Routine user This mformaion may be seared with the Department of ludice and odic, Federal, vale, and local govemmem agencies. Submisvon of requested infomwim is voluntary; bowevu, if Information is MKONI” the permit I' f I laccoalumed naucan aricinnotbe' seed ITEMS 1 THROUGH 4 TO BE FILLED IN BY THE CORPS L APPLICATION NO. 1 2. FIELD OFFICE CODE 1 3. DATE RECEIVED 1 4. DATE APPLICATION COMPLETED YOU DO NOT NEED TO COMPLETE ITEMS 6-10 and 12-25 in the SHADED AREAS. All applicants must complete non -shaded items 5 and 26. If an agent is used, also complete items 8 and 11. This optional Federal form is valid for use onl_P_when included as part of this entire state application packet. 5. APPLICANT'S NAME DR Horton, Inc. b. APPLICANT'S ADDRESS E. AUTHORIZED AGENT'S NAME AND TITLE (an agent is not required) 9. AGENT'S ADDRESS 7. _APPLICANT'S PHONE NO 10. AGENT'S PHONE NO. t— 11. STATEMENT OF AUTHORIZATION (tfapplimble: complete only of authorinng an agent) I hereby authonze to act on my behalf as my agent in the processing of this application and to famish, upon request, supplemental information to support of this permit application. APPLICANT-S SIGNATURE: _ i( LGCGf�+��"'lt-e-� DATE- ez-17-1r1(`- 12, PROJECT NAME OR TITLE (see instructions) 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) 15. LOCATION OF PROJECT 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (sce instructions) 17, DIRECTIONS TO THE SITE 18: NATURE OF ACTIVITY 19. PROJECT PURPOSE 20. REASON(S) FOR DISCHARGE 21. TYPES OF MATERIAL BEING DISCHARGED AND THE AMOUNT OF EACH TYPE IN CUBIC YARDS 22. SURFACE AREA IN ACRES OF WETLANDS OR OTHER WATERS FILLED 23. IS ANY PORTION OF THE WORK ALREADY COMPLETE? YES NO _ IF YES, DESCRIBE COMPLETED WORK. 24. ADDRESSES OF ADJOINING PROPERTY OWNERS, 25. LIST OF OTHER CERTIFICATIONS OR APPROVALSIDENIALS RECEIVED FROM OTHER FEDERAL, STATE OR LOCAL AGENCIES FOR WORK DESCRIBED IN THIS APPLICATION. 26. Application is hereby made for a permit or permits to authorize the work described in this application. 1 certify that the information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. r3�wtureofapplicant Date Signature of agent (if my) Date "Ibe application mast be signed by the person who desires to undertake the proposed activity (applicant), or it nary be signed by a duly authored agent if the statement in Block 11 has been filled out and signed. IS U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any depamtenl or agency of the United States knowingly and willfully falsifies, conceals, or covers up with any trick, scheme, or disguises a material fact or makes my false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fisted not more than SI0,000 or imprisoned not more than five years or both. E'NG FORM 4345, Jul 97 EDITION OF FEB 94 IS OBSOLETE. (Proponent: CECW-OR) Minnesota Locat'State/Federal Application Forms fin W'atcri Wetland Projects Page 2 FOR LGU USE ONLY: Determination for Part 1: ❑ No WCA Jurisdiction ❑ Exempt: No. _ (per MN Rule 8420.0122) ❑ No Loss: _ (A,B,...G, per MN Rule 8420.0220) ❑ Replacement required — applicant most complete Part D COMPLETE THE SECTION BELOW ONLY IF REPLACEMENT IS NOT REQUIRED: Application is (check one): Approved ❑Approved with conditions (conditions attached) ❑ Denied Comments/Findings: LGU official signature Nameand Tide For Agricultural and Drainage exemptions (MN Rule 8420.0122 Subps. 1 and 2B), LGU has received proof of recording of restrictions (per MN Rule 8420.0115): Caunq.where recorded Dale Document # assigned by recorder LGUoflicial signature Date Minnesota Local/State/Fedeml Application Forms for Watcr/Wctland Projects Page 3 Instructions For Part II Complete those portions of Part 11: Replacement Plan Supplement for which information is readily available (such as location, existing land use, size ' of impact area, etc.) A person certified in wetland delineation must determine items pertaining to specific wetland impacts (wetland type, predominant vegetation, watershed name, etc.) Contact the local and and water conservation district (SWCD) office for further information on obtaining such items. What to Include on Plans Detailed overhead views of replacement site(s) (Part 11), as well as profile view(s) of replacement site(s) (Part II), may be either hand drawn, computer generated or professionally prepared, as long as they contain all necessary information clearly, accurately, and in adequate detail. Please include specific dimensions whenever possible. You may also include photos, if you wish. Overhead views of Part 11 replacement site(s) should include the following items that pertain to your project: Property boundaries and/or lot dimensions. Location and extent of shoreline, wetlands and water. ' Location and dimensions of proposed project, structure or activity. Include length, width, elevation and other measurements as appropriate. Points of reference (such as existing homes, structures, docks or landscape features). Location of inlet and outlet structures. Indication of north. ' Location of spoil and disposal sites (if applicable). Areas of wetland and upland plants established. Profile views (side or cross -sectional views) should include the following items that pertain to your project: Location and dimensions of proposed project, structure or activity. Include elevation, depth, soil profile, side slope and other measurements as appropriate. Proposed water level elevation. ' Final Checklists Part II: Replacement Plan Supplement ' ❑ Have you completed all of Part II (pages 3-5)? ❑ Did you (or your agent) sign Section 19 on page 5? ❑ Have you included the necessary attachments for Part II? .Attachments must include: ❑ If the project includes any wetland banking (complete or partial), include Application for Withdrawal of Wetland Credits Form (Section 14) ® If the project includes any project -specific replacements (complete or partial), include: Description of Replacement Wetland(s) Construction (Section 15) ' Copy of vegetation management plan (Section 15) Scale drawing of overhead view or replacement wetland (Section 18) Scale drawing of profile view of replacement wetland (Section 18) Attachments may also include: ' ® Additional description of Wetland Impact Charts (Section 11) (if additional space was needed) ® Additional Description of Replacement Wetlands charts (Section 17) (if additional space was needed) ® Additional soils information for created replacement wetland(s) (Section 18) (if available) Note: To deposit surplus wetland credits in the State Wetland Bank, submit a Wetland Banking Application directly to your LGU (Section 16). Preparing Your Application for Mailing ® To apply for both state and Federal authorization, your application must include Part 1 (Page 1), the Federal application (Page 2), and attachments as indicated on Final Checklistfor Part I (Instructions, Page 2). ® Your application must also include Part II (Pages 3-5) and additional attachments as indicated on Final Checklist for Part if (above). ❑ Make three copies of the entire application and all attachments. Keep the original, and mail the three copies to the appropriate local, state, and Federal agencies (see Instructions for Part I for addresses). Minnesota I.ocal/State/Fedend Application Forms for Water/Wetland Projects Instructions Page 3 PART 11: REPLACEMENT PLAN SUPPLEMENT For assistance in completing Part ll, contact your Local Government Unit or a professional consultant 11. DESCRIPTION OF WETLAND IMPACTS: Complete the chart below: ])Use one row of boxes (breach wetland impact; 2) If your project has more than one wetland impact, reference your overhead view (part of Section 5) to this chart by identifying and labeling "first impact" and "second impact" on your overhead view; 3) If you are identifying only one wetland type within a given wetland impact area, use the first dotted line and leave the others blank; 4) If you have chosen to identify more than one wetland type within a given wetland impact area, use the extra dotted lines to indicate each wetland type, and identify predominant vegetation and size of impacted area for each separate wetland type within that impact area; 5) If you do not have access to some of this information, call your LGU or SWCD office for assistance. (Photocopy chart for more impacts, if needed.) DESCRIPTION OF WETLAND IMPACTS Wetland impact (as noted on overhead view) Watershed name or number (if known) County, Section, Township, Range Wetland type' Predominant vegetation in impacted wetland area Size of area impacted (in acres or square feet) Existing land use in project area (check all that apply) Minnesota See Attached Type 1 smarlweed, 0.47 acre ® Housing River report cocklbur ❑ Commercial First (Shakopee ------------------ --------------- ❑ Industrial impact ) #33 ❑ Parks/recreation areas ❑ Highways and ------------------- -------------------------------- associated rights -of -way ❑ Forested ❑ Farmsteads/agricultural ❑ Vacant lands ❑ Public and semi-public (schools/gov't facilities) Second [I Airports — -- — -- — ----- -----------_' -- " — _------------ Extractive (gravel impact pits/quarries) ❑ Other: 'If you are identifying only one wetland type within a given wetland impact area, use the first dotted line and leave the others blank. If you have chosen to identify more than one wetland type within a given wetland impact area, use the extra dotted lines to indicate each separate wetland type, and identify predominant vegetation and size of impacted area for each separate wetland type with that impact arm. TOTALS OF AREA(S) IMPACTED FOR EACH WETLAND TYPE ON CHART (indicate acres ® or squarefeet ❑) Type: 1: 0.47 IL: _2: 3: _ 4:_ 5:_ 6: 7: 8: _ R:_ 12. SPECIAL CONSIDERATIONS: Are you aware of any special considerations that apply to either the impact site(s) or the replacement site(s)? ❑ Yes ®No (Examples: the presence of endangered species, special fish and wildlife resources, sensitive surface waters, or waste disposal site.) If YES, list and describe briefly. 13. SHORELAND IMPACT ZONE: Please identify each wetland impact site noted in Section 15 that is within 1000 feet of a lake or 300 feet of a river. Minnesota Local/State/Federal Application Forms for WaterMetland Projects Page 4 ' 14. HOW PROPOSED REPLACEMENT WILL BE ACCOMPLISHED: Indicate how proposed replacement will be accomplished(check only one box below and continue as indicated): ❑A. Wetland banking only Complete Application for Withdrawal of Wetland Credits Form and include with your application. Copies of this form are available from your LGU, or download a copy from www.bwsr.state.mn.us Skip to Section 19, page 6 (You do not need to complete Sections 15-I8). t ® B. Project -specific replacement only Continue with Section 15 below. ❑ C. A Combination of wetland banking and project -specific replacement Complete Application for Withdrawal of Iferiand Credits Form and include with your application. Copies of this form are available from your LGU, or ' download a copy from www.bwsnstate.mn.us Continue with Section 15 below. 15. DESCRIPTION OF REPLACEMENT WETLAND(S) CONSTRUCTION (Complete this section only if you marked Box B or Box C in Section ' 14 above): Describe in detail how replacement wetlands) will be constructed If several methods will be used, describe each method. Details should include the following: 1) type of construction (such as excavated in upland, restored by the break, restored by ditch block or revegetated); 2) type, size and specifications of outlet structures; 3) elevations relative in Mean Sea Level or established benchmarks or key features (such as sill, emergency overflow or structure height); 4) what best management practices will be implemented to prevent erosions or site degradation; 5) proposed timetable for starting and ' ending the project; and 6) a vegetation management plan. Write this description on a separate sheet of paper labeled DESCRIP770NOFREPLACEMENT WETLAND CONSTRUCT/ON. See Attached Narrative 16. SURPLUS WETLAND CREDITS: If using project -specific replacement (Box B or Box C in Section 14 above), will the replacement result in any ' surplus wetland credits that you wish to have deposited in the State Wetland Bank for future use? ❑ Yes ® No. If yes, submit a Weiland Banking Application directly to your LGU. Copies are available from your LGU, or download a copy from www.bwscstate.mn.us 17. DESCRIPTION OF REPLACEMENT WETLANDS: Complete the char below: 1) Use one row of boxes for each wetland replacement site; 2) If your project has more that one wetland replacement site, reference your overhead view (pan of Section 5) to this chart by identifying and labeling "first replacement site" and "second replacement site" on your overhead view; 3) if you are identifying only one wetland type within a given replacement site, use the first doned line(s) and leave the others blank; 4) If you have chosen to identify more than one wetland type in a given replacement site, use the extra dotted lines to indicate each separate wetland type, and identify type(s) of replacement credits and `restored or created" for each separate wetland type with that replacement site; 5) If you do not have access to some of the information, or if you do not know your replacement ratio, call your LGU or SWCD office for assistance. Photocopy chart for more wetland replacements, ifneeded.) DESCRIPTION OF REPLACEMENT WETLANDS Identify Watershed County Section, Wetland Type(s) of replacement credits Restored Wetland name or Township, Type' (in acres or square feet) or replacement number created? site (if known) Range New Wetland Public Value Indicate (as noted on Credits (NWC) Credits (PVC) R or C overhead view) Name of 33 Carver S2_3, 1 0.48 acre 1.22 acres C First T116,1123 ---------- ----------- --------------------------- --------- replacement site---------- ------------------------------------------ ------------- Name of Second---------- ------------------ ----------------------- - replacement site---------- --------------------- ---------------------- ----------- 'Circular 39 wetland types: Indicmel, I L, 2, 3, 4, 5, 6, 7, 8, R, or U. If you are 0.48 acre 1.22 acres identifying only one wetland type within a given wetland impact area, use the first TOTAL N W C TOTAL PV C dotted line and leave the others blank. If you have chosen to identify more than one wetland type within a given wetland impact area, use the extra dotted lines to indicate REQUIRED REPLACEMENT RATIO: each separate wetland type, and identify predominant vegetation and size of impacted for (fjknown) 2.1 area each separate wetland type within that impact area. Minnesota Local/State/Fedeml Applicator Forms for Water/Wedand Projects Page 5 '18 ADDITIONAL INFORMAI ION REQUIRED FOR PROJECT SPECIF IC REPLACEMENI (Required only ifyou mar lied Box B or Box C in Section 14): For projects involving at least some project-specBk replacement, include the following additional information ® hvo drawings to scale of the replacement wetland Include both overhead view and profile (side view or cross -sectional view) See Wha ro Include" Plan (hastructions, Page 3) for a detailed description of what should be included in these drawings Without drawings, your application will be considered incomplete LYIF-_r eated replacement wetlands, include additional soils information (if available) that indicates the capability of the site toproduce and maintainwetland stirs p��,, � Note 1: For replacement wetlancand on pipeline easements, you need to recefvent of your project form both the easement holder and the Minnesota Department of Public Safety's Office of Pipeline Safety Before start of construction, the owner of any utilities most be notified The landowner or contractor is responsible for giving this notice by calling "Gopher State One -Calf' at 652-454-0002 (Twin Cities Metro Area) or 1-800-252-1166 (stuffier locations) Note 2: For extensive of complex projects supplementary information may be requested at a later dated from me or more of the responding agencies Such information may include (but not be limited to) the following: topographic map, water table map soil borings depth soundings, aerial photographs, environmental assessment and/or engineering reports 19 SIGNED AFFIRMATION: ' FOR PROJECIS INVOLVING REPLACEMENT BY WEILAND BANKING ONLY Io the best of my knowledge and belief, all information in Part If is true, complete and accurate; and I affirm that the wetland losses will be replaced via withdrawal from an account in the State Wetland Bank FOR PROJECTS INVOLVING EITHER PROJECISPECIFIC REPLACEMENI ONI Y OR A COMBINAIION OF WE ILAND BANKING AND PROJECISPECIFIC REPL ACEMENT: Patt A: Ihereplacementwetland laffirmthmthereplacementwedandwasnot: 'Previously restored or created under a prior approved replacement plan or permit; AND Drained or filled tinder an exemption during the previous 10 years; AND Restated with financial assistance from public conservation programs; AND Restored using private funds, other than landowner funds, unless the funds are paid back with interest to the individual or organization that fronded the restorationand the individual or organization notifies the local government unit in writing that the restated wetland may be considered for replacement Part B: Additional assurances (check all that apply): ® the wetland will be replaced before or concurrent with the actual draining or filling of a wetland ❑ An irrevocable bank letter of credit performance bond, or other acceptable security has been provided to guarantee successful completion of the wetland replacement ❑ The wetland losses will be replaced via withdrawal from an account in the State Wetland Bank Part C Fur projects involving any project -specific replacement: Within 30 days of either receiving approval of this application or beginning work on the project, 1 will record the Declaration of Restrictions and Covenants on the deed for the property on which the replacement wetland(s) will be located; and I will at the same time submit proof of such recording to the LOU ' To the best of my knowledge and belief; all information in Part B is tore, complete and accurate; and I affirm all statements in Part A and C, as well as checked assmamce(s) in PartB Signature or oppllgrnl a agenl Dag ' FOR t GU USE ONI Y Replacement plan is (check one): ❑ Approved ❑Approved with conditions (conditions attached) ❑ Denied LGL official ugnwlure lm I GU has tective evidcnte of tiflt and proof of mending of Declaration of Restrictions and Cmenams for Replaccmenl Nctland Cain uhe,e recce Aed Dam Uas unnw �rvt;n¢dh rt. tr✓u a: ? lintcwa I c:al State I tdtral \pphcaticn I .nns bIr it, met Actiand Najcus Pane 6 ./i'7 iNv�iv�(--1 JINV(,y =ry -din iAi)_r i1n _Iln 7 N I K I lAl �- �. s r _ wieecDT +l�i>7 I ✓ 1/rk / i%/ +� ! / _ --- _ ITV . 0 ' �rX rrne mF°4u 3000S /ClNn, (MU a ffb a/o J :- / %$ / / 11 i � - _ ���'•� 10-uno ___ � - ♦1 . _ n Y _ ♦ N J 41 Z FO1V0 W OAVN le CIO f A d ( /' J i%. / i rl r Ayr / r�' ((&('j�CO,y� 3Nfl M/tl 03SOd0n, NO 3NW Al v3 i $�$O � � NlipS 9 1N3FfINDF M/tl FnIY d01 :ZI Fe I�I rv-1Y0 N OIYN K'016 INliL tl33ww xmry 1J 306 N-AY/A3Vtl0 f]l9M SAd rvl � oO N3NOd Ist 30 3JYi HLI DM "tl'e .10 FE d >E4/ aw as - w14 l ! y �� � •f ocl wl os a I,.. w 3Na p F9 C�J ( a y �p NOLL37dN00 V313Y0 a'!xv1sNl /' lya'�♦ �1' 3B Ol 30N33 1115 035 dONd 30N3311IS J M-MUH 0 OdONd sga5 . 30N33 11IS Q3 OIJ08d tl3NV NOLLYOLLIW Q350dO8d ` 3� 44 N3eene NOLLVOIIIW ,SZ 30M3are 11MHdsY a3sodoaa /"LU r =` : •$ weans 3083NoO msodoad � QN � susuo Ae mvas mws m ' ^ 1 S t \ d\ lMH'NA 14 rl lZ6 3l0 '\V 4 ". \ONOdV, f A pej \� 6 1 I tm • NOUVA313 IIVM - V.y 10314Z0 Ol ip10YXLNOJ onm .e \b NOLLVA77l3 IIVM e1 ONINIVI3N 30 d01 Q3SOdONd NOLIVA313 lOdS MSOd08d mam♦ IIVM ONINIVI38 (MOdONd r I 31LLNNNO O3SOdONd _-_____ _____ s a3M3S MO1S O3SOdONd o • >— 8MIN03 MS0d0dd 000L ; : ♦ . 113M ONLLSIX3 ONINOe lIOS ONLLSIX3 > ` N3M3S W801S ONLLSIX3—®- - - 1 �\ 1 z 83M35 AHVIINVS ONLLSI%3--o---->-- Z Y m /!mo�w N1tlWN3LVM ONLLSI%3 MN3e MLLO310Nd 33fL 03SOdONd \ ` •Y NnO1NOO ONLLSw3 __.___ - - 13~6 $� ].. lON1NO0 NO 0N3 £ AN0031V0 \\ Rii FF Z S3W3Nn 33& ONLLSIX3 Q 100°W 8 0335 0350dONd \ \ 1 3"g G) MN33 ON,LLSI%3--�---- --�- V3W 1113. ONYIAM 03SO C)Hd a,,Z NOLLV3Nn30 ONV LL30A - \\ \ °+ y�' F (^ • ONVIL3M 03LV3Nn30 ONLLSO(3 (s/ouv XVW L M OHO u33(S3O -S XV ,OI 0350dONd \\ N"G NOILVIN3W103S Ap t ONIO1N78 9NLLSI%3 ANVNOdKU 03SW08d I j ♦ 0 F6 �_@ c 30VJHnS 13AVNO ONLLSI%3 (OMI NNO 30 N0LL37dW 3 8313V 03MVISNI � ♦ �\ ♦\ y` 3JY3Nf15 313NONOO ONLL51%3 30 Ol f 1d 1 100VW) ♦ \ .; y ONIX0019 H3110 03SOdONd : s� 30V3Nf1511YHd$Y ONLLSIX3 30NVNLN3 NOLL3nNLSN00 N XOON ANV?JOd W31 03SOdONd F, :.., •?:�� \� ` 4 133a1S ems" ♦� L � I I o'cc6 ZL ? \ 6 -04 �� �iiU�liNl d0Ol Z3 um Alq n F PA L3cw Aia /„ 1jj�� \\ lam N0 -ON tlDAVld 1,� B r ! \ I N NOLL3377dW00 a3LJ D311Y15N1 38 013 30N3J 111S 03S01MJ1 , 6 \ 30N33111s A1n0-MV3H UMOdOHd 33N3 111S 03SOdO8d V38Y NOUVOIAN 03SOdO8d m.una NouYOLLIW ,SZ ♦ yU - "8 33r3arls 11rNdsr a3sodoad M�6 '�/ 30VJHnS 313aD1NpODI1 03SOdOWNddA . P IINr13N AO NOI, mSO ad A313 ONINIr13a 3DNd01 333SOdO8d NOUVA313 10d 0 OdDad oc q, TYM ONINIV138 03SOdOdd • ,! ' 3luNroaO 03SOdDad ---------- - ------ 83US N001S 03SOdoad—% ------- *� NnO1NOD 03SOdD8d OOOt / 113M ONLLSIX3 ONINDa 110S ONUSI%3 83M3S N801S ONLLSK3 —1 >— dW3S Aatll INVS ONLLSOl3 - - e — NItlWa31tlM ONLL$I%3 -- 3DN3d NOLLD310ad 33a1 03D31OHd Nn01NOO ONUSIX3- ,_,. -- - -- 13MNVIa IMUN03 NOIJgOf AN003LYD S33al/3NIl 3381 DNLLSIX3 O 100°N 8 0335 D3 WONd 33N3 ONUSN(3 --�- V3W 131J ONY313M O35 Nd NOLLY3Nn30 ONr'LL3M 3,V 113M 031Y3NI130 ONLLSNf3 (53d015 XYW IIDN39 A13JYS/OLLYnOV ,Oi D3m SDdDad OMOVna ONLLSIX3 NISV9 NOLLVlN3N103S AUV8OdN31 03SOdOad 1DrJafiS l3AtlaO ONLLSI%3 r—, (ONO"D JO L� NOLL3ldW3 H3LJV 0311VISNI 30tliaf6 3L32pNOD ONLLSIX3 3a 01 £ 3dA1 100NN) ONIXJOIa H0110 03SOdOdd 33YJan5 11YHdSY ONLLSIX3 "*+` - 33Nra1N3 NOLLo0alsNOo A008 Aar800131 03SOdOW I�la=aw1 MOiY0 90 Q VN 49f16 -A313 .1 C01 0S 0 '3N11 M/N 03S0dOHdN0 3NIl A S3d ed 13L N nr9s r MS a 1N3MnNOW M/a NOW dol z/ Rd l WIUVOW WVN KM-A313-l&N33NOId II — JJ 3 'N - X`a`WNO 1J 1S3 3l d M 0d 1S, d0 DtlJ MOOS 3MId Y 8 : V AS 4 -- \ _ B 9NH >i1001� L ON ¢ h k k h FFJ O�I F- Ul O ocn AN i 4k k 4 ` N 3'10 h k h h h Q ILLYOLLIW . F.) , ' O ITI (_, V \ ('OOr NO snnr3r , i N` _ Lx __ 00 ,vv0 r / _- ' p a3i�l�le r�r9un ,9e ON �O Mlfi9 v iFF,Fp r-✓ Y k 'h ; I h -Ik k rk N I inn 9Nm[a a. Ir SL9B AT345(%/� 'Dtl OL'L/'J'S OZ£.6s NouvO m 034A08d 1Y101 'OV fZ0/3S 061b1 a3JJns NOLLYOWW ,SZ (DAd) douvouIW 030NOad ov 660/3S iZ ffD (V 10-UM) ONOd 831VM Na01S (DAd NOUVOUIN 030NOad 3r 9Y0/'J-S Of8'OZ (OMN NOLLVOLLIN 030NOad DY Y6'0/'J'S 9k6'0k NouvDu 1 amnom 1V101 '3tl L1'0/ J S fL4'OZ (0Ad) NOILVOLLIN 03NMOM 3r LYO/'JS VL*'OZ (0MN Nouvou IW 03a1n03a (H ONYIL3M) 'or Lk10/"J's fLstOZ 10VOIRI ONY43M 1tl101 DY Of'a/'J'S 909'M V39V 03d013A30 NI 3USNO VMV DNY10M 3Y101 '3'S VLf'OZ H ONY UYA 'J'S *WSLf a ONV113M 'J'S 9047Z V ONV113M NOLLylnevl ONVlL31A 1 1 1 1 IIa Graham Environmental Services, Inc. r Wetland Replacement Plan Wetland Conservation Act Section 404 Clean Water Act Peterson Property City of Chanhassen, Minnesota Applicant: D.R. Horton, Inc. February 22, 2006 ' Introduction and Background S1095 Westland Drive Soring Valley, WI 54767 Phone: 715-778-5730 / 888-279-2070 Fax: 715-778-5867 / 888-279-2069 ' The proposed project is located in portions of the NW '/4, Section 26 and NE '/4 of Section 27, T116N, R23W, Carver County, Minnesota. Pioneer Trail crosses the southern portion of the property and croplands, forested slopes, forested ' tributaries and individual farms border the west, north and eastern portions of the property (Figure 1). According to the U.S.G.S. Shakopee Quadrangle (Figure 2), elevations change significantly from the Bluff Creek floodplain and other tributaries to the highest elevations located at the center of the site. Seven wetlands are located throughout the site with cropland, old pasture, fencerows, wooded slopes and an abandoned home located on the upland areas. On ' October 14, 2005, GES evaluated the site for jurisdictional wetlands and found seven on the site. A subsequent review of Farm Service Agency aerial photographs and consultation with city staff on the site identified an eighth wetland that was flagged with city staff on January 12, 2006. The approximate site and wetland boundaries are shown on a 2003 aerial photograph in Figure 3. ' The project involves constructing a single-family residential subdivision and associated infrastructure. A total of 81 detached single-family residential units, 3 storm water ponds, 22.75 acres of open space (parks, wetland mitigation and ' bluff creek overlay (protection area)), and one (1) wetland mitigation area are planned on the Peterson Property. Parcel access would be from Pioneer Trail (County Route 14). rfhis road is located on the southern border of the property. ' One main north/south collector (Street D) is proposed that would connect to a secondmainr c411Prtnr Street lnrated west of the Peterson Property that is being planned and constructed by the City of Chanhassen. WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 2 On -Site Wetlands Seven jurisdictional wetlands totaling 10.94 acres were delineated on October 14, and an eighth wetland was delineated and reviewed by the City of Chanhassen on January 12, 2006. A detailed description of each wetland can be found in the Wetland Delineation Report in Appendix A. Brief descriptions of each wetland impacted by the proposed project are included below with jurisdictional details provided in the delineation report (Appendix A). Section 404 Jurisdiction Wetlands A, D, E, F, G, H and I on the Peterson Property are part of a tributary system that feeds both "navigable waters" and interstate waters as they empty into two different branches of Bluff Creek, a tributary to the Minnesota River. Therefore, the Corps of Engineers will have direct regulatory jurisdiction on any wetlands connected to Bluff Creek and to the creek itself under Section 404 of the Clean Water Act. The Corps considers impacts to these wetlands as well as any other wetlands as part of its public interest review. DNR Protected Waters Jurisdiction The Minnesota DNR Protected Waters Inventory (Figure 4) does not map any protected waters or wetlands on the site. Project Need and Purpose The purpose of the project is to provide residential housing in a highly desirable residential sector of the Twin Cities housing market. A need for additional residential options continues to exist in this market. The site is currently zoned for agricultural use but is proposed to be re -zoned for low/medium density single family residential by the City of Chanhassen. Summary of Proposed Impacts A total of 20,473 square feet (0.47 acre) of wetland is proposed to be filled by the project. Proposed impacts will affect all of Wetland I. WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 3 Sequencing Avoidance and Minimization Avoidance Alternatives The applicant has tried to avoid and minimize wetland impacts on the project site to the extent practicable. The applicant considered two alternatives that would totally avoid wetland impacts. These alternatives are: No Action Alternative One alternative is the no action alternative, which would result in the project site remaining undeveloped. This alternative is considered infeasible because it would defeat reasonable investment backed expectations of the current landowners and would not fulfill the project purpose. Leaving the site undeveloped would also be inconsistent with the City of Chanhassen's adopted comprehensive plan, feasibility study for public street and utility improvements, and Alternative Urban Areawide Review in support of development of the Peterson Property and adjacent properties. ® Total Avoidance Build Alternative The applicant weighed several factors in their site selection process. A willing seller was one reason for choosing this site; however, additional factors included: price, proximity to major roads, availability of utility services, natural amenities, and proposed zoning by the City of Chanhassen. In addition to these considerations the applicant also pursued total avoidance of wetland impacts by considering alternative sites which could serve the project purpose. Several property owners near the Peterson Property were approached by the applicant to sell their property but were unwilling to sell, had sold to other developers, wanted more than the land was worth, or for a variety of reasons, a transaction could not be worked out. The total avoidance alternative would avoid wetland impacts; however, this alternative would not accomplish the project purpose and would leave large upland portions of the site undeveloped. Given the degraded nature of Wetland I and presence of sub -surface tiling (which eliminates a significant source of wetland hydrology) it is unreasonable to expect this parcel would not be developed. Wetland I's functions are limited. This wetland is also partially drained, is overgrown with annual pioneering and invasive species that limit their value as a source of wildlife habitat or its aesthetic value. WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 4 Specific Wetland Impacts and Justification Minimization Impacts to Wetland I are practically impossible to avoid given the site topography and the requirement to provide a road connection to other road alignments west of the Peterson Property and to the proposed Highway 212/312 improvements. The proposed road grade for Street D is designed to meet minimum curve radii and horizontal alignments to align with a round -about that will connect roads that run north -south and east -west along the western property boundary. The north - south and east -west roads were approved by the City of Chanhassen. The wetland impact of 0.47 acre represents less than five percent of the on -site wetlands. The primary purpose of the proposed wetland impacts is street construction that will be designed to provide access for emergency vehicles and to provide a safe driving environment. Sequencing Flexibility As described below, the applicant has considered the possibility of developing ' the project site in a manner that totally avoids the filling of Wetland I. However, given the high level of disturbance, the history of farming, and alterations that have taken place within Wetland I, the applicant is requesting the application of the sequencing flexibility provisions contained in the WCA Rules (Minn. Rules 8420.0520 Subp. 7(a) B). According to these rules; "[fjlexibility in application of the sequencing steps may be applied, subject to the conditions in item A, as determined by the local government unit if: ' (1) the wetland to be impacted has been degraded to the point where replacement of it would result in a certain gain in function and public value; (2) preservation of a wetland would result in severe degradation of the wetland's ability to function and provide public values, for ' example, because of surrounding land uses and the wetland's ability to function and provide public values cannot reasonably be maintained through other land use controls or mechanisms; The U.S. Army Corps of Engineers has similar sequencing flexibility guidance, set forth in Regulatory Guidance Letter 93-2 Guidance on Flexibility of the ' 404(b)(1) Guidelines and Mitigation Banking (RGL 93-2) which states that the degree of scrutiny of project alternatives should be commensurate with the severity of the project impact and that different wetlands have varying functions 1 ' WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 t February 22, 2006 Page 5 ' and values. This guidance provides that "...for projects that would cause only minor or negligible impacts, a detailed analysis of project alternatives should not be conducted". This document further states that minor impacts have one, and frequently more, of the following characteristics: (1) they occur in wetlands which ' perform limited functions, (2) they are small in size (less than one acre), (3) they have little potential for secondary or cumulative impacts, and/or (4) only cause temporary impacts (less than one year). ' Due to the invasive nature of the plant communities that occur in Wetland I and the wetland's small size, the applicant submits that sequencing flexibility ' appropriately applies to the proposed impacts. All of the affected wetland is dominated by invasive annuals such as barnyard grass, cocklebur, and Pennsylvania smartweed and retains little of its ecological integrity. ' MNRAM Functional Assessment Methods ' We have attempted to provide a general abiotic assessment of Wetland I that includes the geomorphic setting (i.e. presence of inlets or outlets) and a description of the water source based upon soil types and position within the ' landscape. The applicant has utilized a methodology that is pre -approved under the WCA. A functional assessment for Wetland I (identified as wetland 27-116-23-26-001-1 in the MNRAM Wetland Functions Summary Assessment) was conducted using Version 3.0 of the Minnesota Routine Assessment Methodology (MNRAM) for Evaluating Wetland Functions written by the Minnesota Board of Water and Soil Resources in April 2004. This methodology is pre -approved by the Minnesota Board of Water and Soil Resources to determine public values of wetlands under ' the jurisdiction of local regulators administering the Wetland Conservation Act. A summary of the wetland functions for the wetland (pre- and post- development) is included in Appendix B. Based on the results of this analysis, the applicant ' submits that the proposed replacement wetland (identified as wetland 27-116-23- 26-000-M in the MNRAM Wetland Functions Summary Assessment) will result in a certain gain in function and public value over the affected wetland. ' Wetland I Wetland I is an isolated depression that receives wetland hydrology via surface water runoff and is dominated by invasive annual species. This wetland currently ' provides limited wildlife habitat because aerial photographs indicate it was farmed every year since 1979. Its dominance by invasive annuals does not add to the species diversity of plant communities within this region and its small size, ' along with its tiled and ditched condition, limit its function for storm water storage. --)�,AII of Wetland I is proposed to be impacted by grading for the construction of a main collector street (Street D) that will serve single family residential homes WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 6 throughout the site and will provide a connection to approved projects to the west of the Peterson Property. Minimization and avoidance rationale for Wetland I include the following design alternatives: 1. Public health and safety is better served by constructing a through street rather than by two cul-de-sacs that would avoid impacts to Wetland I. A through street improves access to emergency vehicles by allowing two points of entry and eliminating the necessity of designing cul-de-sacs that allow turning radii for large emergency vehicles. Cul-de-sacs would still impact portions of Wetland I and would divert surface water from the wetland resulting in further degradation over time. 2. It is environmentally preferable to fill Wetland I for a through street and house lots and replace its limited functions in an area that will be monitored, maintained as wetland and protected with a conservation easement elsewhere on -site. The proposed alignment of the street will bisect Wetland I leaving two very small slivers of wetland. These remaining wetland areas if left alone will have approximately 100 percent of the contributing surface water runoff diverted by impervious surfaces and into storm water drains. Therefore, greater wetland function will be provided in the created mitigation area than by allowing existing wetland slivers to remain in areas that may not have wetland hydrology once the project is constructed. 3. By avoiding fill to Wetland A and developing uplands adjacent to the wetland (which would not be regulated), the proposed development would still alter contributing hydrology sources by changing the grading on adjacent upland areas and further reduce the function of the wetland over time. The loss of function over time, the isolated nature of the wetland, and the small size of Wetland I make replacement the environmentally preferable option for this basin. Alternative Sites Alternative sites for the proposed project were not explored in depth since none were available and this site will accomplish the project purpose. Rectification of Impact No temporary wetland impacts are proposed which could be rectified after project completion. Reduction or Elimination of Impacts Over Time ' Standard erosion control measures will be used during construction of the project. Once disturbed areas are revegetated, erosion and sedimentation should not be a problem given the relatively flat topography of the site. WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 7 Replacement of Unavoidable Impacts The unavoidable wetland impact of 20,473 square feet (0.47 acres) will be replaced through the implementation of the on -site compensatory mitigation plan outlined below. Compensatory Mitigation Plan The Wetland Conservation Act requires replacement of drained, filled, or in some cases, excavated wetlands at a minimum ratio of 2:1. This equates to a total mitigation requirement for the project of 40,946 square feet or 0.94 acre for the regulable impacts. New Wetland Credit (NWC) is being generated by the applicant through the creation of mitigation wetlands at one location adjacent to the Bluff Creek floodplain. Mitigation wetlands will be created in areas adjacent to Bluff Creek on the north-western portion of the property (see Grading Plan). The total NWC proposed for the site is 20,830 square feet (0.48 acre) which meets requirements under current regulatory programs. The remaining wetland mitigation credits are being generated through the use of upland buffers (10,190 square feet or 0.23 acres), and storm water ponds (43,124 square feet or 0.99 acres) as Public Value Credit. The WCA rules allow Public Value Credit for 100 percent of the normal pool area for storm water ponds in cities with approved storm water management plans. Public Value Credit is needed to comply with WCA regulations on this site. The City of Chanhassen has an approved storm water management plan and the applicant is proposing to construct three storm water ponds on the Peterson Property. The presence of an approved storm water management plan at the City of Chanhassen will allow the applicant to utilize the 43,124 square feet (0.99 acres) of storm water ponding as Public Value Credit. This on -site mitigation plan replaces the wetland fill areas as close to the impact sites as possible. The applicant will be providing mitigation credits exceeding regulatory requirements. A total of 74,144 square feet (1.70 acres) of mitigation credits will be created for 20,473 square feet (0.47 acre) of impact, which is slightly more than a 3.6:1 ratio of restored/created wetland vs. impacted wetland. The WCA requires a 2:1 replacement ratio. New Wetland Credit New Wetland Credit will be generated by the project through the creation of mitigation wetland. The mitigation site will be constructed at one location adjacent to Bluff Creek by excavating to existing groundwater levels and to topographic elevations consistent with delineated wetlands nearby. New wetland areas from the normal water level to one foot above the normal water level will be seeded with a wet meadow seed mix developed and approved by the Minnesota Board of Water and Soil Resources (see Appendix C). The mitigation area lies WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 22, 2006 Page 8 within areas mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes (see Figure 5, Appendix A, Delineation Report) on the Carver County Soil Survey. The Vegetation Management Plan is attached in Appendix C as required by the WCA and the COE. The proposed mitigation plan is designed to produce a temporarily flooded wetland type or Circular 39 Type 1 seasonally flooded basin (Peterson Mitigation and Cross Sections) measuring 20,830 square feet (0.48 acre). The new wetland areas will be allowed to re -vegetate below the normal water line and will be planted in a native upland buffer seed mix from the projected wetland boundary to the proposed upland buffer boundary. The mitigation wetlands are expected to generate a mosaic of open water and emergent vegetation. The existing vegetation in adjacent wetlands is comprised of reed canary grass monotypes and mitigation areas will be managed to maintain native grasses and forbs. The mitigation area will be excavated from upland areas that are currently dominated by smooth brome. A permanent conservation easement will be placed over the mitigation areas. Monitoring The mitigation monitoring requirements outlined in the Wetland Conservation Act will be followed. These requirements (per Minn. Rule 8420.0620) are as follows: 1) Description of the project location, size, current wetland type (Cowardin classification), and desired wetland type (goal). 2) A comparison of the as -built specifications versus the design specifications (first annual monitoring report only) and a rationale for significant changes. 3) Hydrology measurements: seasonal water level elevations or areal coverage measurements during the period April through October. 4) A map of plant communities within the boundaries of the replacement site, including hydrologic indicators observed. 5) Color photographs of the project area taken any time during the growing season. Annual mitigation monitoring reports will be prepared and submitted to the City of Chanhassen and copies provided to the U.S. Army Corps of Engineers as required in their respective permits and approvals. f4113 V 10 Approximate Site Location Lae 7r, L L Blvd r b A IL EYAXI�reek Go" ialeer ASwastion f N 16.mlae Park lot — A, A T e G Figure 1. Site Map Peterson Property E Chanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2006.012 Figure 2. U.S.G.S. Shakopee 'G Quadrangle Peterson Property SChanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2006.012 1 \ Figure 3. Area Reviewed for G Jurisdictional Wetlands ' Peterson Property Chanhassen, Minnesota ' Graham Environmental Services. GES Project No. 2006.012 �G ES Graham Environmental Services, Inc. Figure 4. DNR Protected Waters Map Peterson Property Chanhassen, Minnesota GES Project No. 2006.012 Z d0 L 133HS 966LZ 'ON 103POHd 11P1966LZ 31W 0VO SNOISYGH 90/£ L/Z 31VO ssa AIR NMVaO 8 til x t-9 yC11�1 p g V1 oz x x'm� .001 F; 9 ax'''d Y= %.a tri z 1NlvG 99 MYN 49T16 -A313 '3W M/a 03SOdOad NO 3Nn AIWAWUd HLms ■ lic; wmn M/a nn1Y d01 :Z/ ne mn1YO 9E Q VN ff'OL6 -A313 - VYal 833N01d JO 30C 'N - AVA3 W 30 1S3 310d a3MOd IS dD 33VJ WI105 3aMS "aa :L/ ne 5ONWIMM 1"1 OS = 4014 1 001 OS 0 133J NI 31VOS '90OZ '*1 8380100 1nOBV 80 NO 'JNI 'S33In83S 1V1N3nNONIAN3 MHV83 AB 031V3Nn3a SONVl13M nv ('I, "SNOIlS3nO 031V138 8333n8 ONVIdn 80 NOIIVOLLIn ONV113M ANV 803 03LOV1NOO 38 MONS '0N1 'S30NN3S lVlN3nNO8NN3 INVHVN7 30 HOANX HODS ('£ V38V SIHL NI OV3NdS3N 38 01 03811`103N SI 110Sd01 31HOAH 30 ,S'0 30 nnnlNln V 3H3V 83d SONnOd 0'99 30 3LVN V IV Xln 033S 9Z0 100-A HLIM 03033S 38 IIVHS : V38V 8333n9 ONVIdn ('Z V3NV SIM NI OV3NdS3N 38 01 038I1"1038 SI 110Sd01 0180A1-1 .40 ('NIn) ,01 '03033S 38 ION C33N 3-10 31-11 MO138 V38V 3H1 "1N3nlV381 N3H18n3 ON 033N am IIOS 031318VOS O1NI TIV3 OlnOHS 033S '1N3nd1nO3 ONIG33S TTOINVH03n 31VNn33V HIM 80 ONVH A8 1SV30VON8 O33S ONV ON1033S 01 NOWd (03)V8) 031JISVOS AIi Hon 38 OlL10Hs 1105 3NJV 83d SONnOd Y9 30 3LVN V 1V XIM 033S Ml IOOun HL1M 03033S 38 01 SI 310 3AOBV AIIVOLLN3n ,9'0 Ol 310 :V3NV NOLLVOLLIn ONVl13M ('1 T ,� •� •: �I' I '' I i I i i i i i I I I i) I I -TIT- ((O C) -!•y— /L /3Nd 1 m bVbl1 S� J�INI668 Obb 0 •� �� m� �n I1i.kOO /rlr -rlr b 9 �9 0 —_ _ _ _ i•� "'��� / i t / / / / l I I I I �� Nb�d ��-�im-�- min N _ — -- ,i-- / / / / / / / / J I I i • 1. (0008) 3NI i • 5_ • _ . -��0 g69 / t�l�ls�d�iria�n/o /N ,0 j f l a • m m o — �— Nil livid 9NI&W 00 8 a — • _ 898 / i % / / ` ` ` �/iiL�jm\c min T va"-m- - 'Ni -TIT- i -TIr Oi�.O x X / m� / -7/-nt - -7irmc �Yn 'SA-3 ��0 V:] lW N O Il V O l I W / / �r nr nr rir L'49 / Z / X / -r1r -nr-rtrrir 'Yc �iTT�� '�lTl L_99 099 / i T- 71T- rir nr rdT +i +f:, `----�0— - - \c —7/iTR\c �iTS�c-/TT{\-F s ae••teM� '� 5-5g8=-n313nT- TIT- TIT - Id -T 71T- �r - 17 �i1T- Tir TI / -1,b'M1lIdS OZX,OL -m- -m- -m- m m �T-3901S -Rvri L:g m nl lomms A v0n335(Io w9l3)ssdIgNa3a9 Q® � 3'$ 0-T6' l'0� -m- �\c-m- WIT T\\- (1tlW I.N3W308-O-J_N3a Janl� _3mv30 Nuvsum � �� WaOS£-0 NVOIa tlHl1.'S aZa33ane Nuvoum.sz �m-lN ba 13av,e 71r -TIT- Ir TII i lr oaa3 1T- nTn71r Ilr rfr lTmT A1ncsJlwroaoad v 's bZ4*$L£=tl ✓ Bl)f��/T '�/7TS\c/1R\c >�/ n71OM1mcJS90 3N CO O33 LIS AIM-nv3N 6008a 8 ONVI13M ONIISIX3 30N31M 03sodaa -Or/-rlr -rir -rlr -nr -r1r -TIT -r 1 LLtl LLI V 1 a 3j NV d Tf 3JYmns LWN Y me wMx,Nwb..�mw w I, 3JY9L 313 03SOd0ad �, vaam.x am.>,o.iou,[MMa.,.c [.0 ,ow+ avw tx 3,3LOn Na1YnLade 113 O0 bd oo"o0Y} \ � c 7/m\r \c 7/ ,NM 'JNINN13b e3511dOtld �EH,w gro�aMa vwarw„T,YrMm. anx Y,szn® .mE a3M36 nNO15 O350d0ad—. - a— / air°, „Yyy, .E. xm.wx w. w.m.wmm� alw is a 0d0ad peel wwtl viwE .vm w v� sw w Mmoo w .n as -rlr -rlr -rfr Tfr' -TIT "Lil owlSix3- — ^.Ce L- — - _T_ _T_ S33a1/3NIl 33a1 'JNILSIv3 33x31 ONa51X3 NOeV3m30 a 113,1 -TIT- Tlr -nT- -TIT" 'TIT- -TIT m -m- m m -m- -m- 1: \c �/- �f�Fi{�F 3jIT�\c �li�i(�' �/Tft� y �. �mr •� Appendix Wetland Delineation Report k. -, '44tso log �aejo i Ali pp!lr Graham Environmental Services, Inc. S1095 Westland Drive li )6 Soring Valley, WI 54767 Phone: 715-778-5730 / 888-279-2070 Fax: 715-778-5867 / 888-279-2069 Wetland Delineation Report Peterson Site Prepared for: DR Horton Chanhassen, Minnesota December 6, 2005 Background Graham Environmental Services, Inc. (GES) has completed the site evaluation for jurisdictional wetlands on a parcel located in portions of the NW Y., Section 26 and NE Y. of Section 27, T116N, R23W, Carver County, Minnesota. Pioneer Trail crosses the southern portion of the property and croplands, forested slopes, forested tributaries and individual farms border the west, north and eastern portions of the property (Figure 1). According to the U.S.G.S. Shakopee Quadrangle (Figure 2), elevations change significantly from the Bluff Creek floodplain and other tributaries to the highest elevations located at the center of the site. Seven wetlands are located throughout the site with cropland, old pasture, fencerows, wooded slopes and an abandoned home located on the upland areas. On October 14, 2005, GES evaluated the site for jurisdictional wetlands and found seven on the site. The approximate site and wetland boundaries are shown on a 2003 aerial photograph in Figure 3. Methodologies The site was assessed for wetlands using the on -site methods contained in the "Routine Determinations" section of the U.S. Army Corps of Engineers "Wetlands Delineation Manuaf' (Technical Report Y-87-1, 1987). This is the methodology currently used by both the U.S. Army Corps of Engineers for implementation of Section 404 of the Clean Water Act and by local government units administering the Minnesota Wetland Conservation Act. GES classified the wetlands under the U.S. Fish and Wildlife Service (FWS) Cowardin system and Circular 39 methodologies. Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 2 of 8 Results Wetland A Wetland A is located along the western boundary of the property. This wetland is an isolated depression along the fenceline that defines the edge of the Peterson site with an adjacent farm field. Past farming activities have elevated sediment and nutrient levels accumulating within the wetland. This wetland is predominantly a reed canary grass monotype with annual weed species located at the transition between the reed canary grass monotype and cropped upland areas. Upland plant communities are comprised of soybeans and corn. Dominant wetland vegetation includes: reed canary grass (Phalaris arundinacea) with other species occurring as subdominants. The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) maps this area as a ditched seasonally flooded palustrine emergent wetland (PEM1Cd). GES would classify this wetland as a ditched temporarily flooded palustrine emergent wetland (PEM1Ad) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. This wetland receives significant runoff from adjacent cropland and much of the soil profile was obscured by accumulated overwash sediments. Soils in Wetland A are described as 30 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam with bright mottles (10YR 4/6) to 30 inches. The Carver County Soil Survey (Figure 6) map soils in the vicinity of Wetland A as Hamel soils (WM). The colors and textures of soils observed along basin transacts are consistent with Hamel loams. Upland soil profiles exhibited mixed silt loams with dark brown matrix colors (10YR 3/2) for 6 inches over gray -brown loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny loams (KC2) on 6 to 12 percent slopes. Free water was present at the surface in sample points at the wetland center and were present within 8 inches of the soil surface at transitional soil pits. It is also important to note that the evaluation took place after rainfall events of over 5 inches had occurred ten days prior to the evaluation. The wetland hydrology parameter in this wetland was met by documenting one primary indicator (surface water) at the wetland center and by two secondary indicators (FAC neutral vegetation) and using professional judgment at the transition between wetland and upland. No free water or evidence of saturation were observed at upland locations. Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 3 of 8 The jurisdictional boundary was established at the change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by crops. Wetland B Wetland B is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the northeastern portion of the site. Upland areas adjacent this wetland are comprised of old field plant communities on slopes that face south and east and by croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, American elm (Ulmus americana), spotted jewelweed (Impatiens capensis), and the presence of plant species that are often associated with disturbed ground such as sandbar willow (Salix exigua), black willow (Salix nigra), giant goldenrod (Solidago gigantea), and yellow foxtail (Setaria glauca). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) maps only the most northwestern corner of the site. GES would classify a larger area as a seasonally flooded palustrine emergent/forested wetland (PEM/FO1C) or as Circular 39 Type 3/7 inland shallow marsh/wooded swamp. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland B are described as 13 inches of dark brown (Munsell matrix color 10YR 3/2) silty loam followed by black (10YR 2/1) loams to 24 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland B as Hamel loams (HM) or Houghton and Muskego soils (MK). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited mixed sandy loams with dark brown matrix colors (10YR 3/2) for 6 inches over bright yellow clay loam (10YR 4/3). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by pioneering grasses, forbs or crops. Wetland C Wetland C is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. The natural outlet has been blocked by the construction of a driveway at the western edge of the wetland and has probably been made wetter by the construction of roads and driveways next to the wetland. The center of the wetland was entirely open water at the time of the delineation and Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 4 of 8 was characterized by concentric rings of annual hydrophytic vegetation at the wetland/upland transition. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, green ash (Fraxinus pennsylvanica), switch grass (Panicum virgatum), and the presence of plant species that are often associated with disturbed ground such as giant ragweed (Ambrosia trifida), black willow, Iamb's quarters (Chenopodium album), and water smartweed (Polygonum amphibium). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify a this area as a seasonally flooded palustrine emergent wetland (PEMC) or as Circular 39 Type 3 inland shallow marsh. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland C are described as 14 inches of dark ' brown (Munsell matrix color 10YR 2/1) silty loam followed by black (10YR 2/1) loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland C as Glencoe clay loams (GL). The colors ' and textures of soils observed along basin transects are consistent with a variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited mixed silty clay loams with dark brown matrix colors (10YR 4/3) for 12 inches over bright yellow clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by crops. Wetland D Wetland D is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. A natural connection to Wetland C has been blocked by the construction of a driveway at the eastern edge of the wetland. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, switch grass, and the presence of plant species that are often associated with disturbed ground such as giant ragweed, Iamb's quarters, and cocklbur (Xanthium strumarium). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded ' Peterson Property Wetland Delineation Report GES Project No. 2005.133 ' December 6, 2005 Page 5 of 8 palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. ' Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland D are described as 6 inches of dark ' brown (Munsell matrix color 10YR 4/2) silty loam followed by black (10YR 2/1) clay loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland D as Cordova -Webster complex (CW). The colors and textures of soils observed along basin transects are ' consistent with a variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited clay loams with brown matrix colors (10YR 4/2) for 14 inches over gray -brown ' clay loam (10YR 4/1). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. ' This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from ' predominantly hydrophytic herbaceous species to a plant community dominated by crops. Wetland E Wetland E is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the eastern portion of the site. Upland areas adjacent this wetland are comprised of old field plant communities on slopes that face north and by croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass with subdominants including Joe-pye weed (Eupatorium maculatum), stinging nettle (Urtica dioica), redtop (Agrostis alba), and lady's thumb (Polygonum persicaria). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland E are described as 14 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam followed by dark brown (10YR 3/1) loams to 30 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland E as Klossner muck (PM) or Hamel soils (HM). The colors and textures of soils observed along basin Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 6 of 8 transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited mixed silt loams with dark brown matrix colors (10YR 3/1) for 34 inches. Upland soils are mapped as Lester -Kilkenny soils (KC2) on 6 to 12 percent slopes. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by pioneering grasses, (orbs or crops. Wetland F Wetland F is located along a tributary floodplain that flows to the Minnesota River and in minor topographic ravines that were created by down -cutting at drain tile outlets. This wetland occupies a small portion of the southwestern corner of the site. Upland areas adjacent this wetland are comprised of sugar maple forest on steep slopes on either side of the tributary. Dominant wetland vegetation is scarce within the bottom of the ravine but includes: duckweed (Lemna minor). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a seasonally flooded palustrine emergent wetland (PEM1C) or as Circular 39 Type 3 inland fresh marsh. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland F are described as 32 inches of accumulated sediments that are dark brown (Munsell matrix color 10YR 3/1). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland F as Lester -Kilkenny foams (KF). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited silt loams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) on 12 to 18 percent slopes. The jurisdictional boundary was established at an abrupt rise in topography. ' Wetland G Wetland G is located along the Bluff Creek floodplain and is surrounded by high quality sugar maple forest at the southeastern portion of the site. Dominant wetland vegetation includes: reed canary grass and wood nettle (Laportea canadensis) with subdominants including eastern cottonwood (Populus deltoides), white snakeroot (Eupatorium rugosum), box elder (Acer negundo), and black willow. The National Wetlands Inventory for Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 7 of 8 Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a seasonally flooded palustrine emergent wetland (PEM1 C) or as Circular 39 Type 3 inland fresh marsh. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland G are described as 12 inches of accumulated sediments that are dark brown (Munsell matrix color 10YR 411) followed by 8 inches of black loam (N3/0). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland G as Lester - Kilkenny loams (KF). The colors and textures of soils observed along basin transects are consistent with floodplain soils in depositional areas of riverine systems. Upland soil profiles exhibited silt loams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) on 12 to 18 percent slopes. The jurisdictional boundary was established at an abrupt rise in topography. Regulatory Jurisdiction Minnesota DNR Protected Waters The Minnesota DNR Protected Waters Inventory (Figure 7) does not map any protected waters or wetlands on the site. Minnesota Wetland Conservation Act The jurisdictional wetlands that were identified on the subject parcel are subject to the Wetland Conservation Act Rules Chapter 8420. Federal Regulatory Jurisdiction The enclosed wetland delineation data forms indicated whether wetlands are isolated or not for purposes of U.S. Army Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. This determination is made by GES in the field at the time of the delineation and is essentially our best guess based on the portion of the particular wetland we observe. In some cases, only a small portion of the wetland edge is evaluated. If no inlets or outlets are observed in the evaluated area, and none are evident on U.S.G.S. topographic maps or aerial photos, we are inclined to Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 8, 2005 Page 8 of 8 determine the wetland is isolated. However, since the entire wetland is sometimes not assessed, it is possible that inlets and/or outlets do exist and that the wetland has a surface connection to a federal "navigable" water and, thus, falls within the jurisdiction of Section 404. Therefore, a determination by GES of whether a particular wetland is isolated or not should not be considered a final determination with regard to Corps jurisdiction. Concurrence with our findings should be obtained from the U.S. Army Corps of Engineers, Carver County, and the City of Chanhassen before any earthwork is undertaken on the site. Additional information regarding the vegetation, soils and hydrology of the wetlands are included in Appendix A. Ground photos of all the areas evaluated for jurisdictional criteria are included in Figures 7-10. The information contained herein represents my findings during wetland delineation activities conducted on October 14, 2005 at the referenced site. Graham Environmental Services, Inc. Scott Krych Professional Wetland Scientist No. 000303 Enclosures i) -`i Date 4, 'NG Figure P Site Map �Peterson Site SChanhassen, Minnesota 04 Graham Environmental Services, hic. GES Project No. 2005.133 13 :t4 Approximate Site Location t' .•r � 1 �' C6Atm9F�t�''1. ES Graham Environmental Services, Inc. t c 1 _ v �Ameu�msVr��on - — _ A -V¢ Figure 2. U.S.G.S. Shakopee Quadrangle Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 ' Figure 3. Area Reviewed for �G Jurisdictional Wetlands Peterson Site Chanhassen, Minnesota ' Graham Environmental Servir\IRG GES Project No. 2005.133 Q��G ES Graham Environmental Services, Inc. '=b Figure 4. National Wetlands Inventory Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 _ tit � �,,� ty.5•_ - j _ Y i IUK KC2 L I S �i. TB iB KD2 _ KF % KD2 KD ' r �G ES40*4 Graham Environmental Services, Inc. Figure 7. Ground Photos — Wetlands A and B Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 x V,;�NG ES Graham Environmemal Services, Inc. Figure 9. Ground Photos — Wetlands E and F Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 -A ING ES G ham EnvironmentalServices, Inc. Figure 10. Ground Photos — Wetland G Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 Appendix A DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: A Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 80 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Bamyard grass Echinochloa crusgalli H 5 FACW Switch grass Panicum virgatum H 10 FAC+ Prickly wild gooseberry Ribes cynosbati S 5 UPL Box elder Acernegundo T 10 FACW- Dominant Plant S ecies: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Corn Zea mays H 90 UPL Giant ragweed Ambrosia tnfida H 5 FAC+ Virginia creeper Parthenocissus quinquefolia H 5 FAC- Common milkweed Asclepias syriace H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: A it UKVLUk2T — Transect 1, rit l riag NO. Al Field Observations: Wetland H drology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in.) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transact 1) NA (in-) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: o (in.) Drainage Patterns in SOILS Soil Profile: WETLAND Pit 1, Transect 1 20 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-30 COW 10YR 3/2 10YR 4/6 20 % Silty loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 25 feet from flagged boundary) 0-6 Cow 10YR 3/2 NA I NA I Silt loam 7-19 A 10YR 4/2 NA I NA I Silt loam Hydric Soil Indicators: Histosol Concretions Histic EpiDedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric; Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks FVt I LAIVU Ur I CKMINA X Yes Wetland Hydrology Present? X Yes Hydric Soils Present? X Yes No I wetland? No No a X Yes No IIRemarks: Tiled basin that was inundated after an 8" rainfall event. II Photo Aspect West Number of Flags: 16 X Isolated Non -Isolated. Describe connection: Ditch flows north of the site in a county ditch. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: B Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Giant ragweed Ambrosia tnfida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 75 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Riverbank grape Vitis riparia H 5 FACW- Swamp milkweed Asclepias incamata H <5 OBL Elderberry Sambucus canadensis S 5 FACW- Box elder Acernegundo T 10 FACW- American elm Ulmus americana T 25 FACW- Dominant Plant Species: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Smooth brome Bromus inermis H 20 UPL Giant ragweed Ambrosia trifida H j 5 FAC+ Virginia creeper Parthenocissus quinquetolia H 5 FAC- Common milkweed Asclepias syriace H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL Kentucky bluegrass Poe pratensis H 20 FAC- Canada goldenrod Solidago canadensis H 20 FACU Corn Zea mays H 40 UPL Prickly ash Xanthoxy/um americanum S 20 UPL Cocklebur Xanthium strumadum H 5 FAC Field nut sedge Cyperus esculentus H 5 FAC+ Yellow foxtail Setaria glauca H 5 FAC Bristly foxtail Setaria verticellata H 5 FACU ' OBL - Obligate. Occurs with an estimated 99% probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an ' indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 ✓Vetland ID: B 1ruKUll — I ransect 1, pit 1 Field Observations: Depth of Surface Water: NA (in.) Depth to Free Water in Pit: (Transect 1) 2 (in.) Depth to Saturated Soil: o (in.) SOILS Flag No. bib Wetland Primary Indicators: Inundated X Saturated in Upper 12 Inches _ Water Marks _ Drift Lines _ Sediment Deposits Drainage Patterns in Wetlands drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transact 1 20 feet from flagged bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-13 COW 10YR 3/2 10YR 4/6 20% Silty loam 14-24 A 10YR 2/1 10YR 4/4 10% Loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 25 feet from flagged boundary) 0-6 A 10YR 3/2 1 NA I NA I Silty clay loam 7-19 B 10YR 4/3 I NA I NA I Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic EDiDedon High Organic Content in Surface Layer in Sand Soils Sufdic Odor Organic Streakingin Sand Soils A uic Moisture Regime Listed on Local Hydric Soils List ReducingConditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks IYC I LArvu Ur- 1 tKIVIIP Hydrophytic Vegetation Pres Wetland Hydrology Present? Hydric Soils Present? point within a X Yes No I wetland? X Yes No X Yes No X Yes No Photo Aspect: South Number of Flags: 60 _Isolated X Non -Isolated. Describe connection: Creek flows north of the site. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: C Transect ID: 1 VEGETATION Dominant Plant S cies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 20 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Box elder Acer negundo T 10 FACW- Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Switch grass Panicum virgatum H 30 FAC+ Dominant Plant S cies: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Prickly wild gooseberry Ribes cynosbati S 10 UPL Box elder Acer negundo T 25 FACW- Wild black currant Ribes americanum S 10 FACW Giant ragweed Ambrosia trifida H 10 FAC+ Smooth brome Bromus inermis H 10 UPL Smooth sumac Rhus glabra S 10 UPL Yellow foxtail Setaria glauca H 10 FAC Riverbank grape Vitis riparia H 5 FACW- Common buckthorn Rhamnus cathartica S 5 FACU Elderberry Sambucuscanadensis S 5 FACW- OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: C ITUMULUUT — lransect 1, rlt l 1-12121 NO. Glr Field Observations: Wetland H drology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in.) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) NA (in-) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: 0 (in.) Drainage Patterns in SOILS Soil Profile: WETLAND Pit 1 Transact 1 10 feet from fie ed bounda Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-14 COW 10YR 2/1 10YR 416 10% Silty loam 15-20 A 10YR2/1 0Y4 1R/6 10% Loam 11 Soil Profile: UPLAND (Pit 2, Transect 1) ( 35 feet from flagged boundary) 0-12 1B, 10YR 4/3 NA NA Silty clay loam 14-19 1 B, 10YR 4/2 NA NA Clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks Nr 1 LANU Lit I tKMINA I IUN Hydrophytic Vegetation Present? Is this sampling X Yes No wetland? Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Remarks: Photo Aspect: East Number of Flags: 17 X Isolated Non -Isolated. Describe connection: a X Yes No DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: D Transect U. 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 75 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Broad-leaved cattail Typha latifolia H 10 OBL Canada thistle Cirsium arvense H 5 UPL Canada goldenrod Solidago canadensis H 10 FACU Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Bristly foxtail Setaria verticillata H 10 FACU Dominant Plant Species: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Bristly foxtail Setaria verticillata H 10 FACU Lamb's quarters Chenopodium album H 5 FAC- Rough amaranth Amaranthus retroflexus H 5 FACU+ Cocklebur Xanthium strumarium H 10 FAC Corn Zea mays H 75 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPI, — Obligate Upland. Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Netland ID: D TTUKULUUT — I ransect 1, vit 1 Field Observations: Depth of Surface Water: NA (in.) Depth to Free Water in Pit: (Transact 1) NA (in.) Depth to Saturated Soil: NA (in.) SOILS Wetland H drology Indicators Primary Indicators: Secondary Indicators Oxidized Root Channels in Upper 12 Inundated Inches _ Saturated in Upper 12Inches Water -Stained Leaves _ Water Marks Local Soil Survey Data _ Drift Lines X FAG -Neutral Test _ _ Sediment Deposits X Other (Explain in Remarks) Drainace Patterns in Soil Profile: WETLAND Pit 1, Transact 1 15 feet from flaaaed bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-6 COW 10YR 4/2 Silty loam 7-20 A 10YR 2/1 10YR 4/6 10% Clay loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 20 feet from flagged boundary) 0-14 A 10YR 4/2 NA NA Sandy loam 15-25 B 10YR 4, tOYR 4/4 5% Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic E i don High Organic Content in Surface Layer in Sand Soils Sulfidic Odor Organic Streaking in Sand Soils A uic Moisture Regime Listed on Local H dric Soils List Reducing Conditions Listed on National H dric Soils List Gle ed or Low-Chroma Colors X Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? Yes X No Hydric Soils Present? X Yes No Remarks: This area is located in a road ditch and receives runoff from adjacent Professional judgment was used to establish the wetland boundary. Photo Aspect: West Number of Flags: 16 X Isolated Non -Isolated. Describe connection. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: E Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Box elder Acer negundo T 5 FACW- Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Black willow Salix nigra T <5 OBL Wild cucumber Echinocystis lobata H <5 FACW- Canada moonseed Menispermum canadense H <5 FAC+ Woolgrass Scirpus cyperinus H <5 OBL Green bulrush Scirpus atrovirens H <5 OBL Joe-pye weed Eupatorium maculatum H <5 OBL Redtop Agrostis alba H <5 FACW Lady's thumb Polygonum persicaria H <5 FAC- Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Kentucky bluegrass Poa pratensis H 30 FAC- American elm Ulmus americana T 5 FACW Common buckthorn Rhamnus cathartica S 5 FACU Smooth brome Bromus inermis H 10 UPL Common milkweed Asclepias syriaca H <5 UPL Canada goldenrod Solidago canadensis H 10 FACU ' OBL — Obligate. Occurs with an estimated 99%probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99%probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: E IYUKULUUY — I ransect 1, pit 1 Field Observations: Depth of Surface Water: Depth to Free Water in Pit: (Transect 1) NA (in.) Depth to Saturated Soil: NA (in.) SOILS Wetland Primary Indicators: X Inundated _ Saturated in Upper 12 Inches _ Water Marks _ Drift Lines _ Sediment Deposits Drainage Patterns in Wetlands drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves Local Soil Survey Data X FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Wit 1 Transact 1 75 feet from flagged bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-14 COW 10YR 3/1 10YR 3/4 20% Silty loam 15-30 A 10YR 3/1 Clay loam Soil Profile: UPLAND (Pit 2, Transact 1) ( 10 feet from flagged boundary) 0-34 A 10YR 3/1 NA NA Loam Hydric Soil Indicators: Histosol Concretions Histic E i don High Organic Content in Surface Layer in Sand Soils Suffidic Odor Organic Streaking in Sand Soils A uic Moisture Regime Listed on Local H ddc Soils List Reducing Conditions Listed on National H do Soils List X Gle ed or Low-Chroma Colors X Other (Explain in Remarks ME 1 LAIVU UC 1 CKrVIINA I IUN Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Photo Aspect: East Number of Flags: 41 _Isolated X Non -Isolated. Describe connection: Ditch drains to a tributary of the Minnesota River. QI7 DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: F Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 80 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Box elder Acernegundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Duckweed Lemna minor H 5 OBL Dominant Plant Species: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocafpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hornbeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 10 FACU Common buckthorn Rhamnus cathartica S 10 FACU Hepatica Hepatica acudloba H 5 UPL Virginia waterleaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum arnericanum S 25 UPL ' OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99%probability in wetlands; FAC — Facultative. Occurs an estimated 34-66%probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: F I T UMULUU T— I ransect l Ylt 7 riag No. 1-4 Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in-) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) NA (in.) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: o (in.) Drainage Patterns in SOILS Soil Profile: WETLAND Wit 1, Transact 11120 feet from flaaaed bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-32 COW 1 10YR 3/1 10YR 416 20% Silty loam Soil Profile: UPLAND (Pit 2, Transact 1) (25 feet from flagged boundary) 0-5 Cow 10YR 3/2 NA NA Silt loam 6-24 A 10YR 4/2 NA NA Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface La er in Sand Soils Sulfidic Odor Organic Streakingin Sand Soils A uic Moisture Regime Listed on Local H ric Soils List ReducingConditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks JETLAND DETERMINATION Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Remarks: Photo Aspect: North Number of Flags: 61 _Isolated X Non -Isolated. Describe connection: This is the floodplain of a tributary to the Minnesota River. No DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: G Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 5 FACW+ Wood nettle Laportea canadensis H 20 FACW Box elder Acer negundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Eastern cottonwood Populus deltoides T 20 FAC+ White snakeroot Eupatonum rugosum H 5 UPL Black willow Salixnigra T 5 OBL Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocarpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hombeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 5 FACU Common buckthorn Rhamnus cathartica S 5 FACU Hepatica Hepatica acutfloba H 5 UPL Virginia waterleaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum amencanum S 25 UPL White snakeroot Eupatonum rugosum H 5 UPL American elm Ulmus amen cane T 10 FACW- Quaking aspen Populus tremuloides T 5 FAC+ ' OBI, — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an ' indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. r Page 2 Wetland ID: G T URViT - I ra Field Observations: Depth of Surface Water: Depth to Free Water in Pit: (Transact 1) Depth to Saturated Soil: SOILS Primary Indicators 24 (in.) X Inundated Saturated in Upper 12 Inches Water Marks NA (in.) Drift Lines X Sediment Deposits 0 (in.) Drainage Patterns in drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data X FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND fPIt 1, Transact 1 20 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-12 COW 10YR 41 10YR Silt loam 13-20 Soil Profile: UPLAND (Pit 2, Transect 1) ( 25 feet from flagged boundary) 0-5 Cow 10YR 3/2I NA NA Silt loam 6-24 A 10YR 4/2 I NA NA Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic E i edon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Str alking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List ReducingConditions Listed on National H ric Soils List X Gle ed or Low-Chroma Colors I Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No CowardinClassification: PEM1C Remarks: Photo Aspect: South Number of Flags: 11 _Isolated X Non -isolated. Describe connection: This is the floodplain of a tributary that flows to the Minnesota River. ' S1095 Westland Drive Graham Environmental Services, Inc. Spring Valley, WI 54767 Phone: 715-778-5730 / 888-279-2070 Fax: 715-778-5867 / 888-279-2069 ' Memorandum 1 TO: Lori Haak FROM: Scott Krych, Mike Graham — GES, Inc. DATE: December 30, 2005 SUBJECT: Wetland Delineation for D.R. Horton Project, Chanhassen, Minnesota ' As you know, Graham Environmental Services, Inc. (GES) conducted a delineation of wetlands at the above -referenced site (Figure 1) on October 15, 2005. We have provided your office with a copy of our delineation report. Subsequently, the City has indicated that they believe that a depressional area not delineated by GES (Figure 2), ' but delineated previously by Pinnacle Engineering and surveyed by RLK in 2001 (Figure 3), is jurisdictional wetland. The depressional area in question will be called "Area 1" throughout the remainder of this memorandum. Area 1 is located on the northern half of the site southeast of Wetland A, as identified in the GES report. This area occupies a depression that is ' tiled, ditched, and was planted in crops every year since 1985 according to Farm Service Agency (FSA) slides. Sloping cropland borders this depression on all sides. Area 1 is served by an 8-inch drain tile that was actively removing water from the area ' during our delineation activities. The drain tile outlet is located at the southwestern portion of the site in an area that was delineated as Wetland F. ' To further investigate Area 1, GES reviewed all available aerial photographs for the site at the Carver County FSA offices on December 15, 2005. Photographs were available for the years 1985-1994 and 2000. We also reviewed an aerial photograph for 2003 ' from another source as part of our analysis.' Carver County FSA aerial photographs flown annually during the months of June, July, or August were also evaluated to review the site for crop stress due to wetness, inclusion of non -cropped areas within ' cropland, different planting dates, surface water, areas drowned out by accumulated water, areas not planted due to moisture, etc.2 We've summarized our findings below. GES followed guidelines for reviewing FSA aerial photographs established in the August 1994 "State of Minnesota Interagency Cooperative Agreement for Implementation of the Federal Wetland Delineation Memorandum of Agreement" (MOA) between the Natural Resource Conservation Service, the U.S. Army Corps of Engineers, the U.S. Environmental Protection Agency, and the U.S. Fish and Wildlife Service. ' 'GES followed the Off -Site Procedures Use of Rainfall Data with ASCS Slides to Determine Hvdrology section of the MOA to evaluate the aerial photographs. These procedures require the use of rainfall spreadsheets from the NOAA weather station nearest to the site. This methodology is especially helpful in evaluating whether or not wetland hydrology exists in cropland areas that are planted or plowed. ' .II�AIII y ' Ms. Lori Haak D.R. Horton Site December 30, 2005 ' Page 2 of 4 ' Hydrology Rainfall data is used to identify whether a specific area has received normal precipitation for an individual year or to establish climatic context for a specific region. Rainfall totals are a way to assess short-term fluctuations in ground and surface water t levels that are important to note when evaluating wetland parameters. Areas that have received above normal rainfall may exhibit wetland hydrology when they would normally be dry. Conversely, areas that receive less than normal precipitation may not exhibit wetland hydrology when they normally would. The climatic context is a longer term evaluation of rainfall totals and may indicate growing season drought, pluvial, or normal periods and are also important to note when evaluating wetland parameters. ' Both rainfall and climactic data are important in areas that are farmed, tiled, ditched or that have numerous temporarily flooded wetlands. Both types of rainfall data are used when conducting on- and off -site evaluations on farmland. The Chaska recording station is the nearest station to the site providing rainfall data. The average annual precipitation for this area according to data from this station is 30.31 inches. Table 1 lists the average monthly rainfall for this area and the departure from normal during the four months prior to our site visit in October. Table 1 onth I Average Monthly T 2005 Recorded Rainfall (inches) Monthly Rainfall (inchembillilik I Departure from Normal (inches) June 4.16 7.26 +3.10 Jul 4.41 2.20 -2.21 Au ust 4.34 4.73 +0.39 September 2.97 9.85 +6.88 October 1 2.14 5.01 +2.87 An data reported from Station 1465, Chaska, Minnesota. A plus (+) sign indicates above average amounts, a minus (-) sign indicates below average amounts. The climatic conditions for this area of the state were 125 percent of normal for the year through October, 110 percent of normal for the year through September, and 100 percent of normal for the year through August. For the southern one-half of Minnesota, the 2005 growing season ended on a very wet note. All-time high monthly rainfall records were set in some communities. For many locations in central and southern Minnesota, September precipitation totals topped seven inches. Rainfall in some locations exceeded ten inches for the month (Minnesota Climatology Working Group Home Page, October 2005). FSA aerial photographs show that there were secondary indicators of crop stress in ' Area 1 in the years 1993, 1994, and 2000. All three of these years were considered wetter than average or drier than average and would not be included in the analysis under MOA procedures. No signatures were present in years which fell within the Ms. Lori Haak D.R. Horton Site December 30, 2005 ' Page 3 of 4 normal precipitation range according to the MOA methodology. The MOA that prescribes how FSA reviews should be conducted requires a summary of the slide review and climate analysis. It also states "That if the number of wet signatures in normal years is > 50 percent, the site will be considered to have wetland hydrology." Since signatures meeting MOA criteria are present in only three of the available 12 ' years (25 percent), the wetland hydrology threshold described in the MOA was not met in Area 1. Vegetation The plant community in Area 1 is dominated by soybeans (Glycine max), pinkweed (Polygonum pensylvanicum, FACW+), barnyard grass (Echinochloa crusgalli, FACW) ' and cocklebur (Xanthium strumarium, FAC) (see attached data sheet for more comprehensive information). Although the vegetation meets wetland criteria per the 1987 Corps of Engineers Wetlands Delineation Manual (1987 Manual), it should be ' noted that these species are all annuals and reflect above -normal precipitation that was present in this area during critical germination periods during the 2005 growing season. Hydric Soils The soils in Area 1 exhibit up to 25 inches of accumulated sediments (eroded deposits) over the original soil surface. The accumulated sediments are dark brown (10YR 3/2) ' silt loams over dark gray/brown (10YR 412) silt loam. Soils exhibited bright (10YR 4/6) mottles to within six inches of the soil surface, but may be oxidation due to farming practices, crop residue, and some water level fluctuation. No inundation or saturation was observed within 16 inches of the soil surface for the soil profiles examined within the depression. ' Conclusion Based on the conditions outlined above and within our delineation report, Area 1 is considered an "atypical situation" as defined in the 1987 Manual due to the effects of ' human activities. This area exhibited a plant community that is dominated by annual weed species some of which are considered hydrophytic and others as upland species. Due to the orientation of the plant species identified in this area, the plant community is ' considered FAC neutral or hydrophytic. Hamel soils are transitional, occurring in sloping areas where shallow depressions or drainages occur on the landscape. These soils were generally created in areas where surface sediments accumulate due to surface runoff. Hamel soils meet the technical definition of hydric soils when there are ' no hydrologic modifications. However, the hydrology that formed these soils historically has been altered by the presence of drain tiles and a shallow surface drain. Area 1 did not exhibit any primary indicators of hydrology or the required two secondary indicators ' (only FAC neutral plant community was present) to be called jurisdictional wetland. It is noteworthy that other similar basins on the site exhibited primary wetland indicators after significant rainfall events in October and as defined by the 1987 Manual. In summary, it is our opinion that Area 1 is not technically a jurisdictional wetland. Ms. Lori Haak D.R. Horton Site December 30, 2005 Page 4 of 4 Regardless, the developer has indicated a desire to acquiesce to calling a portion of Area 1 jurisdictional wetland and mitigating for the impacts if we can agree to its size. ' The most recent City correspondence included a hand -sketch of a suggested wetland boundary including approximately two acres. The Pinnacle Engineering delineation and RLK survey completed in 2001 identifies through technical methods a 0.26 acre wetland. Subsequently, this wetland boundary was included on the recently approved concept plan on the property. If the City concurs with the 0.26 acre boundary as the jurisdictional wetland of Area 1, we are prepared to submit a Wetland Replacement ' Plan (WRP) on behalf of the developer, which includes 2:1 mitigation per the Wetland Conservation Act (WCA) for the 0.26 acre area. The mitigation plan would include the possibility of on -site New Wetland Credit (NWC) as well as Public Value Credits on the ' site through the construction of storm water ponds. If NWC on the site proves infeasible, we would appreciate discussing with you the potential of restoring adequate wetland area within another area in the City. We are also in contact with Houston Engineering, who are working on a WRP for the wetland impact of the East-West Collector, regarding the possibility of a joint mitigation effort. ' We would appreciate an opportunity to discuss these issues with you after you have had a chance to review this memorandum. Thank you. Cc: Ron Mullenbach, D.R. Horton, Inc. — Minnesota Joel Cooper, James R. Hill, Inc. Randy Smith, James R. Hill, Inc. �G ES Gnrhmn Environnrentrtl Services, hrc. Figure 1. GES Delineation Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 �G ES Graham Environmental Services, Inc. Figure 2. Chanhassen Area 1 Boundaries Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 ��, 'G Figure 3. Pinnacle Area 1 Boundaries Peterson Site i E S Chanhassen, Minnesota Graham Environmental Services, Gu: GES Project No. 2005.133 DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: Upland Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Barnyard grass Echinochloa crusgalli H 20 FACW Pinkweed Polygonum pensylvanicum H 40 FACW+ Cocklbur Xanthium strumarium H 30 FAC Rough amaranth Amaranthus retroflexus H 10 FACU+ Shepard's purse Capsella bursa-pastoris H <5 FAC- Field pennycress Thlaspi arvense H <5 UPL Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Beans Gycine max H 90 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99%probability in wetlands; FAC— Facultative. Occurs an estimated 34-66%probability in wetlands; UPL—Obligate Upland. Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. t Page 2 Netland ID: Upland I T UMULUUT — I ransect 1, Ylt 1 t-iag NO. NA Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 NA (in-) Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) 14 (in.) Drift Lines X FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: 14 (in.) Drainage Patterns in SOILS Soil Profile: WETLAND Pit 1, Transact 11 INA feet from flancied bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munseli Contrast Moist 0-25 COW 10YR 3/2 10YR 4/6 20% Silty loam Soil Profile: UPLAND (Pit 2, Transect 1) (25 feet from flagged boundary) 0-5 Cow 10YR 3/2 NA NA S" loam 6-19 A 10YR 4/2 NA NA Silt loam Hydric Soil Indicators: Histosol Concretions Histic E i edon High Organic Content in Surface Layer in Sandy Soils Sufdic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks rVt I LAND Ut I tKMINA I IUN Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? Yes X No Wetland Hydrology Present? Yes X No Hydric Soils Present? X Yes No Cowardin Classification: Upland Remarks: Tiled basin that was dry after an 8" rainfall event. Photo Aspect: None Number of Flags: NA Isolated Non -Isolated. Describe connection. ' Appendix B MNRAM Functional Assessments Wetland Functional Assessment Summary Peterson Property Downstream Wetland Dya logir Flood Water Water Shoreline Wetland ID llydrngeomorphologv Regime Storage Quality Quality Protection 02-031-23.02.011-K DepressionallFlow-through (apparent inlet and outlet), Depressional Flow -through (apparent Moderate Moderate High High Not Applicable inlet and outlet) 27-116.23-26-000-M Floodplaln (outside waterbody banks) Moderate Moderate Moderate Moderate Moderate 27-116-23-26-001-1 DepresslonallTributary (outlet but no perennial inlet or drainage entering from upstream Low Moderate Low Low Not Applicable subwalershed) Tuesday, February 21, 2006 .. Page I of I Wetland Functional Assessment Summary Peterson Property 1 ' Aesthetics. Ground- Wetland Weiland 8tormwnrer Amphibian Recreation, Water Restoration .Stormwater Treatmem Wetland ID Wildlife Habitat Fishery Habitat Habitat Education Commercial interaction Potential .Sensitivity Needs 02-031-23-02-011-K Moderate Not Applicable Not Applicable Moderate Not Applicable Combination Low High High Discharge, Recharge 27-116-23.2"00-M Moderate Moderate Not Applicable Moderate Not Applicable Combination Moderate Moderate Moderate Discharge, Recharge 27-110-23.26-001-1 Moderate Not Applicable Not Applicable Low High Recharge Moderate Moderate Low Tuesday, Februory 21, 2006 Page I of 1 1 Appendix C Vegetation Management Plan 1 Vegetation Management Plan ' The Rushes Blaine, Minnesota ' I. Site Preparation (for areas above the water line) A. Site Preparation shall consist of the following: i. Preparation of the seedbed in a manner that prepares ' the project site for seed. After final grading has been completed, the site will be cultivated with a light disking and dragging. ' ii. Install seed according to specifications after seedbed is prepared. ' II. Seed Specifications A. Use native grass seed: fresh, clean, dry new -crop seed complying with the Association of Official Seed Analysists' "Rules for Testing ' Seeds" for purity and germination tolerances. B. Seed mixes shall be blended by the Contractor using the specified species and ratios. Seed mix species and ratios shall be ' guaranteed by the contractor to be true to specifications as required. The contractor shall supply and plant native seed as pure live seed (PLS). See planting plan for planting schedule. All seed shall have the proper stratification and/or scarification to break ' dormancy for spring planting. No treatment required for seed used in summer and fall plantings. III. Seeding Protocol (includes Wetland and Upland Buffer Areas) A. Fall seeding shall occur between mid October and mid November. Given the small size of the wetland and buffer areas, seed may be hand -broadcast over the site at the rates and with the species mix identified. After seeding, the site will be dragged and cultipacked to ensure good seed to soil contact. IV. Cover Crop A. For a fall planting, use a cover crop of winter what at a rate of 20 pounds per acre. V. Maintenance A. Year One: Mow, using a flail type mower, to a height of 5 to 8 inches, just over the height of the emerging prairie plants before weeds go to seed. Assume three mowings in the first season. B. Year Two: Spot mow and spray invasive weed species as necessary. C. Year Three: Spot mow and spray invasive weed species as necessary. D. Year Four: Conduct prescribed burn. E. Year Five: Spot mow and spray invasive weed species as necessary. Table 1. Minnesota DOT Herbaceous Seed Mix for Wetland Areas at and 1 foot Above the Normal Water Level Mixture 25A Modified (25B) - Prairie Sedge Meadow Common Name Botanical Name % of Mix Bluestem, big Andropogon gerardi 5.0 Canada anemone Anemone canadensis 0.1 Marsh milkweed Asclepias incarnata 0.5 New England aster Aster novae-angliae 0.6 Swamp aster Aster puniceus 0.6 Fringed brome Bromus ciliata 5.0 Blue -joint grass Calamagrostis canadensis 0.1 Bottlebrush sedge Carex comosa 1.0 Tussock sedge Carex stricta 0.5 Fox sedge Carex vulpinoidea 0.4 Showy tic -trefoil Desmodium canadense 0.4 Wheat grass, slender Elymus trachycaulus 6.0 Virginia wild -rye Elymus virginicus 6.0 Joe-pye weed Eupatorium maculatum 0.4 Boneset Eupatorium perfoliatum 0.3 Reed manna grass Glycena grandis 0.3 Fowl manna grass Glyceria striate 0.2 Early sunflower Heliopsis helianthoides 0.7 Blue -flag iris Iris virginica-shrevii 0.5 Common rush Juncus effusus 0.2 Meadow blazingstar Liatris ligulistylis 0.4 Tall blazingstar LiaMs pycnostachya 0.4 Great blue lobelia Lobelia siphilitica 0.1 Rye grass, annual Lolium italicum 10.0 Monkey flower Mimulus ringens 0.1 Wild Bergamot Monarda fistulosa 0.6 ReGreen NA 42.0 Switch grass Panicum virgatum 1.0 Fowl bluegrass Poa palustris 5.0 Black-eyed Susan's Rudbeckia hirta 0.6 Green bulrush Scirpus atrovirens 0.3 Wool grass Scirpus cyperinus 0.3 Soft -stem bulrush Scirpus vallidus 1.0 Grass -leaved goldenrod Indian grass Prairie cord grass ' Blue vervain Ironweed Culver's root Golden Alexander's Solidago graminifolia 0.2 Sorghastrum nutans 6.0 Spartina pectinata 2.0 Verbena hastata 0.5 Veronia fasciculata 0.2 Veronicastrum virginianum 0.1 Zizea aurea 0.4 Rate: 30 Ibs/acre (33 kg/ha). ' Description: Native sedge/prairie meadow mix. Reaches a height of 36 to 48 inches. Developed for use on hydric soils and for wetland restoration. Installation Note: Sedges, meadow grasses, and meadow (orbs ' are best installed by broadcast method, separate from main grass mix, in early spring or fall if possible. Many of theses species require ore-aermination treatments. After seeding, the site will be lightly dragged and cultipacked to ensure good seed to soil contact. The seed mix specified above is per the "Mn/DOT Seeding Manual 2000", published by the Minnesota Department of Transportation. The graded upland areas above the NWL of Mitigation Area #2 will be seeded with the Mn/DOT seed mix specified in Table 2: Table 2. Minnesota DOT Herbaceous Seed Mix for Upland Buffer at Mitigation Area #2 Mixture 15A Modified (1513) — Mesic Tall Grass Prairie Common Name Botanical Name % of Mix Bluestem, big Andropogon gerardi 5.0 Grama, sideoats Bouteloua curtipendula 10.0 Wild rye, Canadian Elymus canadensis 5.0 Wheat grass, slender Elymus trachycaulus 5.0 Rye grass, annual Lolium italicum 10.0 ReGreen NA 34.0 Forbs (Table F-1, F-2, or F-3) NA 5.0 Switch grass Panicum virgatum 2.0 Bluestem, little Schizachyrium 12.0 scopanum Indian grass Sorghastrum nutans 12.0 Total: 100.0 Rate: 30 Ibs/acre (33 kg/ha). Description: Native mix. Reaches a height of 36 to 48 inches. Excellent for use on all soil types. For use in oak savanna and prairie regions of the state. As stated in Table 2, one of the following three forb mixes must be used to comprise five percent of the seed mix: Table F-1 (NW Forbs) Common Name Botanical Name Onion, prairie Allium stellatum Aster, heath Aster encoides Aster, smooth -blue Asterlaevis Milkvetch, Canada Astraga/us canadensis Prairie clover, white Dalea candidum Prairie clover, purple Dalea purpureum Tick -trefoil. showy Desmodium canadense Coneflower, narrow -leaved Echinacea angustifolia Ox-eye, common Heliopsis helianthoides Bushclover, round -headed Lespedeza capitata Blazingstar, rough Liatris aspera Blazingstar, tall Liatris pycnostachya Bergamot, wild Monarda fistulosa Penstemon, showy Penstemon grandiflorum Coneflower, columnar Ratibida columnifera Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago rigida Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, golden Zizia aurea Rate: As specified in the seed mix tabulation. All species shall be provided in equal weights. Substitutions should not be allowed. Description: Native forbs to be added to native grass mixtures in NW Minnesota. Table F-2 Aster, smooth -blue Milkvetch, Canada Partridge pea Prairie clover, white Prairie clover, purple Tick -trefoil. showy Coneflower, narrow -leaved Ox-eye, common Blazingstar, rough Blazingstar, tall Bergamot, wild Penstemon, showy Coneflower, columnar Coneflower, grey -headed Name Aster laevis Astragalus canadensis Chamaecrista fasiculata Dalea candidum Dalea purpureum Desmodium canadense Echinacea angustifolia Heliopsis helianthoides Liatris aspera Liatris pycnostachya Monarda fistulosa Penstemon grandiflorum Ratibida columnifera Ratibida pinnata Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago rigida Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, qolden Zizia aurea species shall be provided in equal weights. Substitutions should not be allowed. Description: Native (orbs to be added to native grass Table F-3 (SE Forbs) Common Name Botanical Name Milkweed, butterfly Asclepias tuberosa Aster, heath Aster ericoides Aster, smooth -blue Aster laevis Milkvetch, Canada Astragalus canadensis Partridge pea Chamaecrista fasiculata Prairie clover, white Dalea candidum Prairie clover, purple Dalea purpureum Tick -trefoil. showy Desmodium canadense Ox-eye, common Heliopsis helianthoides Blazingstar, rough Liatris aspera Blazingstar, tall Liatris pycnostachya Bergamot, wild Monarda fistulosa Penstemon, showy Penstemon grandiflorum Coneflower, grey -headed Ratibida pinnata Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago rigida Spiderwort, Ohio Tradescantia ohiensis Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, golden Zizia aurea Rate: As specified in the seed mix tabulation. All species shall be provided in equal weights. Substitutions should not be allowed. Description: Native forbs to be added to native grass mixtures in SE Minnesota. After seeding, the site will be lightly dragged and cultipacked to ensure good seed to soil contact. The seed mix specified above is per the "Mn/DOT Seeding ' Manual 2000", published by the Minnesota Department of Transportation. A small portion of the upland buffer area on the west side of the site will be composed of existing upland hardwoods that would remain undisturbed. ' A permanent conservation easement will be placed over the mitigation wetland and buffer areas in accordance with Wetland Conservation Act rules. Asieson, Don From: Mark Wilson [mwilson @ barr.com] Sent: Friday, March 17, 2006 1:02 PM To: Asleson, Don Cc: Haak, Lori; Mark Wilson; Brad Wozney; Bob Obermeyer Subject: Peterson Property Wetland Replacement Plan Hi Don, On behalf of the Riley -Purgatory Bluff -Creek Watershed District (District), I have reviewed the proposed Peterson Property Wetland Replacement Plan (WRP). While, the District is not an official member of the TEP, the District can provide comments for projects within the District's watershed boundary. The WRP requests sequencing flexibility to fill Wetland I. However, it is not clear if the applicant has made a good faith effort to avoid and minimize wetland impacts to Wetland I, which may represent an excellent opportunity for wetland restoration. Is it feasible to move the development entrance road, Street D, to to the south, in an attempt to avoid wetland impacts and then route treated stormwater to the wetland? The other issues I have are minor. Thanks for the opportunity to comment! 0 Mark Wilson Wetland Biologist Barr Engineering Company Engineers for the Riley -Purgatory -Bluff Creek Watershed District 4700 West 77th Street Minneapolis, MN 55435 Phone:952-832-2610 Fax:952-832-2601 mwilson@barr.com 3/17/2006 Asleson, Don From: ( Graczyk, Greg - Waconia, MN [greg.graczyk@mn.nacdnet.net] Sent: Tuesday, March 07, 2006 10:49 AM To: Asleson, Don Cc: Brad.Wozney@bwsr.state.mn.us Subject: Peterson Property Don, Just took a quick peek at the Peterson Property Wetland replacement plan. First big thing that I see is that wetland I is being impacted and it says (by others). This wetland is on this property and it appears that the grading for this project is going to impact portions of this wetland. In particular, lot # 5. Is the new road a part of 312 or what. Just want to make sure that we have some sort of documentation on how Wetland I is going to be replaced. Second, the consultant should be made well aware that we are going to hold them to the highest standards for the mitigation area actually turning out to be something. In other words ... the seed mixture planting is going to be growing very well. Give me a shout if you get a chance. Greg 1 WWI www.grahamenvironmental.com Wetland Replacement Plan Wetland Conservation Act Section 404 Clean Water Act Peterson Property Prepared for: D.R. Horton, Inc. Chanhassen, Minnesota Property Looking East February 20, 2006 GES Project No. 2006.012 ' NA-026620-03B (V.2.02 for MS WORD) 1029/04 ' Minnesota Local/State/Federal Application Forms for Water/Wetland Projects USE THIS APPLICATION FOR ANY PROJECT AFFECTING A LAKE, RIVER, STREAM OR WETLAND, ' INCLUDING: Local Govemmerrt Unit Approval Pursuant to Minnesota Wetlands Conservation Act (WCA) Minnesota Department of Natural Resources (DNR) Permit to Work in Public Waters Department of the Army Permit (33 CFR 325) Note: The U.S. Army Corps of Engineers (COE) will forward application forms to the Minnesota Pollution Control Agency (MPCA) for processing if state water quality certification is required from the MPCA. You do not need to send this application to the MPCA. This application packet includes : Part 1: The BASIC APPLICATION and the COE APPLICATION to be filled out by all applicants (see Instructions). ' PART II: The REPLACEMENT PLAN SUPPLEMENT to be completed only for projects that impact wetlands and require a replacement plan for wetland mitigation. If you're not sure whether your project requires a replacement plan, call your Local Government Unit (LGU) or Soil and Water Conservation District (SWCD) office for guidance. ' Do not proceed with your project until you have received all required approvals from you LGU, the DNR and the COE. If you wish to confirm the status of your application at any time, contact the agencies directly (see Instructions, page 2). Proceeding with work before all required authorizations arc obtained may resuk in fines or other penalties, and may include a requirement to restore the project site to original condition. If you have questions or need assistance with filling out these forms, contact your local SWCD office, your LGU, your Area DNR Waters office, or your COE field office (see Instructions, page 2). ' If you believe that your project may be subject to watershed district, local zoning, or any other local regulations besides those of your LOU, contact those office(s) directly. If you are a Federal Farm Program participant and your project affects a wetland or water body on agricultural land your eligibility for USDA benefits maybe affected Contact a Natural Resources Conservation Service office for further information. ' A QUICK LOOK AT THE PROJECT APPLICATION PROCESS Electronic files: Forms can be downloaded and filled out using Microsoft Word. Your input will be restricted to fill-in fields where users can enter text or check boxes. These areas appear gray on the screen, bra not on the printed document. ' Send copies of these completed application forms to your LGU, your Area DNR Waters office, and your COE regulatory office. Arry of the agencies may make initial contact with you to: a) inform you that it has no jurisdiction ova your project; b) request additional information needed; or c) inform you of applicable fees. When your application is considered complete and appropriate fees have been received (if requested) it will be distributed for appropriate review. Following agencies' reviews, you will be informed if it has been approved, approved with changes or conditions, withdmwn, or denied. ' For information about state laws, rules and regulations that direct this process go to the web site www.revisor.leg.state.mn.us. For information on U.S. Array Corps of Engineers regulations go to the web site www.mvp.usace.army.mil. Instructions for Part I ' HELP 1: Every applicant must fill out Section 1. The applicant is the person, agency, company, corporation, or other organization that owns, leases, or holds other legal rights to the land where the project is located. Indicate names of multiple applicants on a separate sheet. ' HELP IA: Fill out Section IA only if you have designated an authorized agent. An authorized agent may be an attorney, builder, consultant, contractor, engineer, or any other person or organization designated by the applicant to represent him/her in this process. An agent is not required. HELP 5: Purpose, description and dimensions of project: State briefly (in a sentence or two) what you propose to do and why it is needed. Also, describe whether your project will involve any of the following: ' - Construction of structures, filling, draining, dewatering, removing, excavating or repair. - Construction of an access path, bridge, culvert, dam, ditch, dock, driveway, ripmp, road, sand blanket, shore protection, or file line. - Construction of any structures on fill, piles or a float -supported platform. If so, describe. - Dredging or discharging (placing fill material) into a wetland or other water body (including the temporary placement of material). If so, ' explain the specific purpose of the placement of the material (such as erosion control) and indicate law it will be done (such as with a backhoe or dmgline). If dredged material is to be discharged on an upland site, identify the location of the site. ' Minnesota Local/State/Federal Application Forms for Water/Wetland Projects Instructions, Page I Include an overhead view drawing showing the work to be undertaken and its relative location on the property. Show items such as ' property boundaries or lot dimensions; location and extent of shoreline, wetlands and water, location and dimensions and footprint of the proposed project, structure or activity (include length, width, elevation and other measurements w appropriate); points of reference such as existing homes, structures, docks or landscape features; indication of north; and location of spoil and disposal sites (if applicable). Hand drawn, computer generated or professionally prepared drawings are acceptable, as long as they contain all necessary information clearly, accurately, ' and in adequate detail. Please include specific dimensions whenever possible. You may also include photos, if you wish. HELP 7: For information regarding adjacent landowners, contact the tax assessor where the project is to be developed ' HELP 8: If any part of the work has already been completed, describe the area already developed. Include a description of structures completed; any dredged or fill material already discharged (including type of material and volume in cubic yards); acres or square feet filled (if a wetland or other waterbody); and whether the work was done under an existing permit (if so identify the authorization, if possible). ' HELP 9: Other permits, reviews or approval related to the project may include the following: conditional use permit; plat approval; zoning variance; National Pollutant Discharge Elimination System permit; state disposal system permit (includes dredged material disposal); watershed distract/watershed management organization permit (stormwater, erosion, floodplain); environmental assessment worksheet/environ acrdal impact statement; hazardous waste site; feedlot permit; groundwater appropriation permit; or county/township ' driveway/road permit. Are you aware of any archeological or cultural resource determinations or surveys completed concerning the project or replacement site by the State Historic Preservation Office (SHPO) or others? If yes, please explain on a separate sheet or attach a copy of any determinations or surveys. ' Final Checklists (Part IJ ® Have you completed all of Part 1 (Page 1), plus the Federal application (Page 2)? ® Did you (and your agent, if applicable) sign Section 10 on page 1? ® Have you signed the Application for the Department of the Army Permit (Page 2) to seek Federal authorization of your project? ' ® Have you included the necessary attachments for Part I? Attachments mast include: ® Site Locator Map (Section 3) ® Type of Project (Section 4) (if additional space was needed) t ® Overhead View of Project (Section 5 and HELP 5) ® Project Purpose, Description and Dimensions (Section 5) (if additional space was needed) Attachments may also include: ® Applicant Contact Information (HELP 1) (if additional space was needed) ' ® Project Location (Section 3) (if additional space was needed) ® Project Alternatives (Section 6) (if additional space was needed) ® Photographs ❑ Adjoining Property Owners (Section 7) (if additional space was needed) ' ❑ Work Already Completed Section (Section 8) (if you answered YES) ❑ State Historic Preservation Office determination or survey Submitting Your Application ' Make three copies of the entire application and all attachments. Keep the original, and mail a complete copy of your application to each of the local, smte. and Federal entities listed below. Be sure to include Part I and all attachments with each application. LOCAL: Send to the appropriate Local Government Unit (LGU). If necessary, contact your county Soil and Water Conservation District (SWCD) ' office or visit the Board of Water and Soil Resources (BWSR) web site (www.bwsr.state.mn.us) to determine the appropriate LGU. STATE: Send to your Area DNR Waters office, attention Area Hydrologist. If necessary, contact your county Soil and Water Conservation District (SWCD) office or visit the DNR website (www.dm.state.mn.us) to locate the Area Hydrologist for your location, or contact a Regional DNR office: NW Region: NE Region: Central Region: Southern Region: 2115 Birchmom Beach Road N.E. 1201 East Highway 2 1200 Warner Road 261 Highway 15 South Bemidji, MN 56601 Grand Rapids, MN 55744 St. Paul, MN 55106 New Ulm, MN 56073 Phone: 218-755-3973 Phone: 218-327-4416 Phone: 651-772-7910 Phone: 507 359-6053 ' FEDERAL: Send to the appropriate U.S. Army Corps of Engineers regulatory field office: Brainerd: St. Paul: La Crescent: Two Harbors: ' U.S. COE, Regulatory Branch U.S. COE, Regulatory Branch U.S. COE, Regulatory Branch U.S. COE, Regulatory Branch 10867 E. Gull Lake Drive N.W. Army Corps of Engineers Centre 1114 South Oak Street 1554 Highway 2, Suite 2 Brainerd, MN 56401-9051 190 5t° Street East La Crescent, MN 55947-1338 Two Harbors, MN 55161 Phone: 218$29-8402 St. Paul, MN 55101-9051 Phone: 507-895-8059 Phone: 218-834.6630 ' Phone: 651-290-5375 WEB SITES: BWSR: www.bwn.sta e.mn.us U.S. ALOE: www.mvp.usece.army.mil DNIL w der stste.mnus MPCA: www.pca.state.mn us Mimasda LocaUSWeFederal Application Forms for Water/Wedarrd Projects Instructions, Page 2 ' NA-026620-03B (V.2.02 for MS WORD) I029/04 Minnesota Local/State/Federal Application Form for Water/Wetland Projects ' For Internal Use Only Application No. Field Office Code Date Initial Application Received Date initial Application Deemed Complete PART I: BASIC APPLICATION ' "See HELP" directs you to important additional information and assistance in Instructions, Page 1. L LANDOWNER/APPLICANT CONTACT INFORMATION (See Help I) Name: DR Horton, Inc. - Minnesota Phone: 952-985-7827 Complete mailing address: 20860 Kenbridge Ct. , Suite 100, Lakeville, MN 55044 ~ IA. AUTHORIZED AGENT (See Help IA) (Only if applicable; an agent is not required) 'Name: Scott Krych Phone: 952-758-9721 Complete mailing address: 1119 Horshoe Lane, New Prague, MN 56071 2, NAME, TYPE AND SIZE OF PUBLIC WATERS or WETLANDS IMPACTED (Attach Additional Project Area sheets if needed) ' Name or I.D. # of Waters Impacted (if applicable; if known): See Attachments (Check all that apply): ❑Lake ❑River ®Wetland type ® I ❑ I L ❑ 2 ❑ 3 ❑4 ❑ 5 ❑ 6 ❑ 7 ❑ 8 Indicate size of entire lake or wetland (check one): ® Less than 10 acres (indicate size: Attached) ❑ 10 to 40 acres ❑ Greater than 40 acres 3. PROJECT LOCATION (Information can be found on property tax statement, property title or title insurance): ' Project street address: Fire #: City (if applicable): Chanhassen 'A Section: NWBNE Section: 26 & 27 Township #: 116N Range #: 23W County: Carver Lot #: Block: Subdivision: Watershed (name or #) Bluff Creek WD ' Attach a simple site locator map. If needed, include on the map written directions to the site from a known location or landmark, and provide distances from known locations. Label the sheet SITE LOCATOR MAP. 4. TYPE OF PROJECT: Describe the type of proposed work. Attach TYPE OF PROJECT sheet if needed. ' See Attachments 5. PROJECT PURPOSE, DESCRIPTION AND DIMENSIONS: Describe what you plan to do and why it is needed, how you plan to construct the project with dimensions (length, width, depth), area of impact, and when you propose to construct the project. This is the ' most important part of your application. See HELP 5 before completing this section; see What To Include on Plans (Instructions, Page 4 Attach PROJECT DESCRIPTION sheet. See Attachments Footprint of project: 0.47 acres or 20,473 square feet drained, filled or excavated ' 6. PROJECT ALTERNATIVES: What alternatives to this proposed project have you considered that would avoid or minimize impacts to wetlands or waters? List at least TWO additional alternatives to your project in Section 5 that avoid wetlands (one of which may be "no build" or "do nothing"), and explain why you chose to pursue the option described in this application over these alternatives. Attach 'PROJECT ALTERNATIVES sheet if needed. See Attachments 7. ADJOINING PROPERTY OWNERS: For projects that impact more than 10,000 square feet of water or wetlands, list the complete mailing addresses of adjacent property owners on an attached separate sheet (See HELP 7) S. PORTION OF WORK COMPLETED: Is any portion of the work in wetland or water areas already completed? ❑ Yes ®No. If ' yes, describe the completed work on a separate sheet of paper labeled WORK ALREADY COMPLETED. (See HELP 8) 9. STATUS OF OTHER APPROVALS: List any other permits, reviews or approvals related to this proposed project that are either pending or have already been approved or denied on a separate attached sheet. See HELP 9. ' 10. 1 am applying for state and local authorization to conduct the work described in this application. I am familiar with the information contained in this application. To the best of my knowledge and belief, all information in Part I is true, complete, and accurate. I possess the �authority to undertake the work dlewribed, or I am acting as the duly authorized agent of the applicant. 492-/7-0/4 Signature of applicant (Landowner) Date Signature of agent (if applicable) Date ' This block most be signed by the person who desires to undertake the proposed activity and has the necessary property rights to do so. If only the Agent bas signed please attach a separate sheet signed by the landowner, giving necessary authorization to the Agent. ' Minnesota Local/State/Federal Application Forms for Water/Wetland Projects t ne punle Dole" for vns collection of information is estimated to average 10 hours per response, although the majority of applications should require 5 hours or less. This mctuaes the time for reviewing instructions, searching existing data sources, gathering and maintaining the dam needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing (his burden, to Department of Defense, Washington Headquarters Service Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202>302; and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Washington, DC 20503. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject 10 any penalty for fading to comply with a collection of information Sit does not display a currently valid OMB control number. Please DO NOT RETURN yom form to either of these addresses. Completed applications most be submitted to the District engineer havingjurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT: Authorities: Rivers and Harbors Act, Section 10, 33 USC 403, Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research and Sanctuaries Act, 33 USC 1413, Section 103, Principal purpose: Information provided on this form will be used in evaluating the application for a permit. Routine uses: This information may be shared with die Department of Justice and other Federal, state, and local government agencies. Submission of requested information is voluntary; however, if information is not prov ded the Permit applicati.. cannot be evaluated nor can a Permit be issued. ITEMS I THROUGH 4 TO BE FILLED IN BY THE CORPS I. APPLICATION NO. 1 2. FIELD OFFICE CODE 1 3. DATE RECEIVED 1 4. DATE APPLICATION COMPLETED YOU DO NOT NEED TO COMPLETE ITEMS 6-10 and 12-25 in the SHADED AREAS. All applicants must complete non -shaded items 5 and 26. If an agent is used, also complete items 8 and 11. 'this optional Federal form is valid for use only when included as nart of this entire state anolication packet. 5. APPLICANT'S NAME DR Horton, Inc. 8. AUTHORIZED AGENT'S NAME AND TITLE (an agent is not required) 6. APPLICANT'S ADDRESS i 9. AGENTS ADDRESS 7. APPLICANT'S PHONE NO. 1 10. AGENT'S PHONE NO. 11. STATEMENT OF AUTHORIZATION (fapplicable; complete only ifauthorizingan agent) I hereby authorize to act on my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application./ APPLICANTS SIGNATURE: '..GLL:-�/-fr.-e—� DATE- 12. PROJECT NAME OR TITLE (see instructions) 13, NAME OF WATERBODY, IF KNOWN (if applicable) I4. PROJECT STREET ADDRESS (if applicable) 15, LOCA"LION OF PROJECT 16, OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) 17. DIRECTIONS TO THE SITE 18. NATURE OF ACTIVITY 19. PROJECT PURPOSE 20. REASON(S) FOR DISCHARGE 2IA YPES OF MATERIAL BEING DISCHARGED AND THE AMOUNT OF EACH TYPE IN CUBIC YARDS 22. SORFACE AREA IN ACRES OF WETLANDS OR OTHER IXATFRS FILLED 23, IS ANY PORTION OF THE WORK ALREADY COMPLETE? YES NO IF YES, DESCRIBE COMPLETED WORK. 24. ADDRESSES OF ADJOINING PROPERTY OWNERS, 25. LIST OF OTHER CERTIFICATIONS OR APPROVALS/DENIALS RECEIVED FROM OTHER FEDERAL, STATE OR LOCAL AGENCIES FOR WORK DESCRIBED IN THIS APPLICATION. 26. Application is hereby made for a permit or permits to authorize the work described in this application. I certify that the information in this application is complete and accurate. I further certify that 1 possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. t-� yye"� 0.2-S 06 Signature of applicant Date Signature of agent (if any) Date The application most be signed by the person who desires to undertake the proposed activity (applicant), or it may be signed by a duly authorized agent if ' the statement in Block I I has been filled out and signed 18 U.S.C. Section 1001 provides that: Whoever, in any manner within thejurisdiction of any department or agency of the United Slates knowingly and willfully falsifies, conceals, or covers up with any trick scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be feed not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, Jul 97 EDITION OF FEB 941S OBSOLETE. (Proponent: CECW-OR) ' Minnesota Local/State/Federal Application Forms for Water/Wetland Projects Page 2 FOR LGU USE ONLY: Determination for Part I: ❑ No WCA )unsdictan ❑ Exempt: No. _ (per MN Rule 8420.0122) ❑ No Loss: _ (A,B,...G, per MN Rule 8420.0220) ❑ Replacement required — applicant must complete Part II COMPLETE THE SECTION BELOW ONLY IF PLACEMENT IS NOT RE UIRED: Application is (check one): ❑ Approved Approved with conditions (conditions attached) ❑ Denied Comments/Findings: LGUofctal signature Date .k'ame and Title For Agricultural and Drainage e%emptions INIS Rule 8420.0122 Subps. t and 2B), LGU has received proof of recording of moriedons (per MN Rule 84211.0115) County where recorded Dan Document # assigned bt recorder LGU official signature Date Minnesota Local/State/Federal Application Forms for Water/Wetland Projects Page 3 Instructions For Part II Complete those portions of Part B: Replacement Plan Supplement for which information is readily available (such as location, existing land use, size of impact area, etc.) A person certified in wetland delineation must determine items pertaining to specific wetland impacts (wetland type, predominant vegetation, watershed name, etc.) Contact the local soil and water conservation district (SWCD) office for further information on obtaining such items. What to Include on Plans Derided overhead views of replacement site(s) (Part II), as well as profile view(s) of replacement site(s) (Part U), may be either hand drawn, computer generated or professionally prepared, as long as they contain all necessary information clearly, accurately, and in adequate detail. Please include specific dimensions whenever possible. You may also include photos, if you wish. Overhead views of Part 11 replacement site(s) should include the following items that pertain to your project: Property boundaries and/or lot dimensions. Location and extent of shoreline, wetlands and water. Location and dimensions of proposed project, structure or activity. Include length, width, elevation and other measurements as appropriate. Points of reference (such as existing homes, structures, docks or landscape features). Location of inlet and outlet structures. Indication of north Location of spoil and disposal sites (if applicable). Areas of wetland and upland plants established Profile views (side or cross -sectional views) should include the following items that pertain to your project: Location and dimensions of proposed project, structure or activity. Include elevation, depth, soil profile, side slope and other measurements as appropriate. Proposed water level elevation Final Checklists Part II: Replacement Plan Supplement ❑ Have you completed all of Part II (pages 3-5)? ❑ Did you (or your agent) sign Section 19 on page 5? ❑ Have you included the necessary attachments for Part H? Attachments must include: ❑ If the project includes any wetland banking (complete or partial), include Application for Withdrawal of Wetland Credits Form (Section 14) ® If the project includes any project -specific replacements (complete or partial), include: Description of Replacement Wetland(s) Construction (Section IS) Copy of vegetation management plan (Section 15) Scale drawing of overhead view or replacement wetland (Section 19) Scale drawing of profile view of replacement wetland (Section 18) Attachments may also include: ® Additional description of Wetland Impact Charts (Section 11) (if additional space was needed) ® Additional Description of Replacement Wetlands charts (Section 17) (if additional space was needed) ® Additional soils information for created replacement wetland(s) (Section 18) (if available) Note: To deposit surplus wetland credits in the State Wetland Bank, submit a Wetland Banking Application directly to your LGU (Section 16). Preparing Your Application for Mailing ® To apply for both state and Federal authorization, your application must include Part I (Page 1), the Federal application (Page 2), and attachments as indicated on Final Checklist for Part I (Instructions, Page 2). ® Your application must Stan include Part H (Pages 3-5) and additional attachments as indicated on Final Checklist for Part 11 (above). ❑ Make three copies of the entire application and all attachments. Keep the original, and mail the three copies to the appropriate local, state, and Federal agencies (see Instructions for Part I for addresses). Minnesota Local/State/Federal Application Fors for Water/Wedand Projects Instructions Page 3 PART II: REPLACEMENT PLAN SUPPLEMENT For ass srmice in canpieting Part /L, contact your Local Government Unit or a profe o zal consultam 11. DESCRIPTION OF WETLAND ]IMPACTS: Complete the chart below: 1) Use one row of boxes for each wetland impact; 2) If your project has more than one wetland impact, reference your overhead view (part of Section 5) to this chart by identifying and labeling "first impact" and "second impact" on your overhead view; 3) If you are identifying only one wedand type within a given wetland impact area, use the fast dotted line and leave the others blank; 4) If you have chosen to identify more than one wetland type within a given wetland impact area use the extra dolled lines to indicate each wetland type, and identify predominant vegetation and size of impacted area for each separate wetland type within that impact area; 5) If you do not have access to some of this information, call your LGU or SWCD office for assistance. (P/mtocopi chanfor more impacts. ifneeded) DESCRIPTION OF WETLAND IMPACTS Wetland impact (as noted on overhead view) Watershed name or number (if known) County, Section, Township, Range Wetland type' Predominant vegetation in impacted wetland area Size of area impacted (in acres or square feet) Existing land use in project area (check all that apply) Minnesota See Attached Type 1 smartweed, 0.47 acre M Housing River report codcibur ❑ Commercial First (Shakopee ------------------- ------------------ --------------- ❑ Industrial impact ) #33 ❑ Parksirecreation areas ❑ Highways and ------------------- ---------------------------------- associated rights -of -way ❑ Forested ❑ Farmsteads/agricultural ❑ Vacant lands ❑ Public and semi-public (schools/gov't facilities) El Airports Second ---------------- ---------------- --------------- ❑ Extractive (gravel impact pits/quarries) ❑ Other: 'If you are identifying only one wetland type within a given wetland impact area, use the first dotted line and leave the others blank. If you have chosen to identify more than one wetland type within a given wetland impact area, use the extra dotted lines to indicate each separate wetland type, and identify predominant vegetation and size of impacted area for each separate wetland type with that impact area. TOTALS OF AREA(S) D1IPACTED FOR EACH WETLAND TYPE ON CHART (i"cate acres ® or square deer ❑ ) Type: 1:0.47 IL:_2:_ 3:_ 4:_ 5:_ 6:_ 7: _ 8: R:_ 12. SPECIAL CONSIDERATIONS: Are you aware of any special considerations that apply to either the impact sites s) or the replacement site(s)? ❑ Yes ® No (Examples: the presence of endangered species, special fish and wildlife resources, sensitive surface waters, or waste disposal site.) If YTS, list and describe briefly. 13. SHORELAND IMPACT ZONE: Please identify each weland impact site rioted in Section 15 that is within 1000 feet of a lake or 300 foet of a river. Minnesota Local/3tatefFederal Application Forms for Water/Wetland Projects Page 4 14. HOW PROPOSED REPLACEMENT WELL BE ACCOMPLISHED: Indicate how proposed replacement will be accomplished (check only one box below and continue as indicated): ❑ A. Wetland banking only Complete Applicaion for withdrawal of Weiland Cm&u Form and include with your application. Copies of this form are available from your LGU, or download a copy from www.bwsr.state.mn.us Skip to Section 19, page 6 (You do not need to complete Sections 15-18). ® B. Project -specific replacement only Continue with Section 15 below. ❑ C. A Combination of wetland banking and project -specific replacement Complete Application for Wandr al of Wedand Credits Form and include with your application. Copies of this form are available from your LGU, or download a copy from www.bwsr.state.mn.w Continue with Section IS below. IS DESCRIPTION OF REPLACEMENT WETLAND(S) CONSTRUCTION (Complete this section only if you marked Boa B or Box C in Section 14 above): Describe in detail how replacement wetland(s) will be constructed. If several methods will be used, describe each method. Details should include the following: 1) type of constnxxim (such as excavated in upland, restored by the break, restored by ditch block or revegetated); 2) type, size and specifications of outlet structures; 3) elevations relative to Mean Sea Level or established benchmarks or key features (such as sill, emergency overflow or structure height); 4) what best management practices will be implemented to prevent erosions or site degradation; 5) proposed timetable for starting and ending the project; and 6) a vegetation management plan. Write this description on a separate sheet of paper labeled DESCRIPTION OFREPLACEAINT WETLAND CONSTRUCTION. See Attached Narrative 16. SURPLUS WETLAND CREDITS: If using project -specific replacement (Box B or Box C in Section 14 above), will the replacement result in any surplus wetland credits that you wish to have deposited in the State Wetland Bank for future use.) ❑ Yes ® No. If yes, submit a Welland Banking .Application directly to your LGU. Copies are available from your LGU, or download a copy from www.bwsr.statemaus 17. DESCRIPTION OF REPLACEMENT WETLANDS: Complete the chart below: 1) Use one row of boxes for each wetland replacement site; 2) If your project has more that one wetland replacement site, reference you overhead view (part of Section 5) to this chart by identifying and labeling `Yost replacement site- and -second replacement site' on your overhead view; 3) If you are identifying only one wetland type within a given replacement site, use the first dotted line(s) and leave the others blank; 4) If you have chosen to identify more than one wetland type in a given replacement site, use the extra dotted lines to indicate each separate wetland type, and identify type(s) of replacement credits and "restored or created- for each separate wetland type with that replacement site; 5) If you do not have access to some of the information, or if you do not know your replacement ratio, call your LGU or SWCD office for assistance. Phoroaopy diwlfar more wetland replacements, ifneeded) DESCRIPTION OF REPLACEMENT WETLANDS Identify Watershed County Section, Wetland Type(s) of replacement credits Restored Wetland name or Township, Type' (in acres or square feet) or replacement number created? site (if known) Range New Wetland Public Value Indicate (as noted on Credits (NWC) Credits (PVC) R or C overhead view) Name of 33 Carver S2_3. 1 0.48 acre 1.22 acres C First T118,R23 ---------- — ------ ----------------------- ------------ replacement site---------- ---------------------- ----------------------- ----------- Name of Second--------- --------------------- ----------------------- ------------- replacement site----------- ---------------------- ----------------------- ------------ 'Circular 39 wetland type: Indicatel, I L, 2, 3, 4, 5, 6, 7, 8, E, orU. If you are 0.48 acre 1.22 acres identifying only one wetland type within a given wetland impact area, use the first TOTAL. N AAY TOTAL PVC dotted line and leave the others blank. If you have chosen to identify more than one wetland type within a given wetland impact area, use the extra dotted lines to indicate REQUIRED REPLACEMENT RATIO: each separate wetland type, and identify predominant vegetation and size of impacted (if known) 2.1 area for each separate wetland type within that impact area. I Minnesota local/State/Federal Application Forms for Water/Wetland Projects Page 5 18 ADDITIONAL INFORAIAIION REQUIRED FOR PROJECISPECIFIC REPLACEMENI (Required only if you marked Box Hof Box C in Section 14): For projects involviug at least some project•specl0e replacement, include the following additional information ® Iwo drawings to scale of the replacement wetland Include both overhead view and profile (side view or cross -sectional view) See What to Include on Plmrs (rnstre ctiom, Page 3) for a detailed description ofwhashould be included in these drawings Without drawings, your application will be considered incomplete ❑ For erected replacement wetlands, include additional soils information (f available) that indicates the capability of the site to produce fad maintainwetland characteristics Note 1: For replacemeat wetlands located on pipeline easements, you need to receive endorsement of your project font both the casement holds and the Minnesota Departratat of Public Safety's Office of Pipeline Safety Before start of construction, the owner of any utifitres must be notified The landowner or contractor is responsible for giving this notice by calling "Gopher Slate One -Cuff " at 652-454-0002 (f win Cities Metro Area) or 1-800 252-1166 (al( other locations) Note 2: For extensive at complex projects supplementary information may be requested at a later dated from one car more of the responding agencies Such information may include (but not be limited to) the following: topographic map, water table map soil borings depth soundings, aerial photographs, envimomental assessment and/or engineering reports 19 SIGNED AFFIRMATION: FOR PROTECTS INVOLVING REPLACEMENT BY WEILAND BANKING ONLY Io the best of my knowledge and belief, all information in Part 11 is we, complete and accurate; and I affinn that the wetland losses will be replaced via withdrawal from an account in the State Wetland Bank FOR PROJECTS INVOLVING EITHER PRQIECISPECIFIC REPLACEMENT ONI Y OR A COMBINAI ION OF WE ILAND BANKING AND PROJECISPECIFIC REPLACEMENT: Pat A: Ibereplacementwetlared Iaffrm that the replacement wedand was not. Previously restored or created under a prior approved replacement plan or permit; AND Drained or filled under an exemption during the previous 10 years, AND Restored with financial assistance from public conservation programs; AND Restored using private funds, other than landowner fords, unless the firods are paid back with interest to the individual or organization that funded the restoration-.. and the individual or organization notifies the local government unit in writing that the restored wetland may be considered for replacement Pa t B: Additional assurances (check all that apply): ® The wetland will be replaced before or concurrent with the actual draining or filling of a wetland ❑ An irrevocable bank letter of credit performance bond, or other acceptable security has been provided to guaamee successful completion of the wetland reptacernent ❑ The wetland losses will be replaced via withdrawal from an account in the State Wetland Bank ' Pat t C For pmjmts involving any ptoject specific teplacemenk Within 30 days of either receiving approval of this application or begiming work on the project, I will record the Declaration of Restrictions ad Covenants on the deed for the property on which the replacement wetlaad(s) will be located; and I will at dse same time submit proof of such recording to the LOU ' To the best of my knowledge and belief, all mfmmation in Part R is one, complete and accurate; and I affirm all statements in Part A and C, as well as checked assurance(s) in Part B • 01l6 -D ' Signotvre ar npplioW or agent " Date FOR 1 GU USE ONl Y ' Replacement plan is (check one): ❑ Approved ❑Approved with conditions (conditions attached) ❑ Denied LGl ofcm/ ognmxlx Date I GU has receive r. okra of fide and proof of tecetding of Deulaation of Restrictions and Cosenarus for Reptfsement Netand Counn uhoc recorded Dare, Oorunan! mnglredh Ic. n.nl J: ? luur:sc to L ccel Static I cdcral 1pp.'lcaicn I -rntr fir 4 atct \\ eland Projccit Pane 6 i I� I 1r �R is � J I d W 00 \M �$R$ H A .$ aFA -041 zTR 3 in naA A � 4 "II I y P, Wake ��Fa q F n An�b PETEEsON PROPERTY r I%laws R. HUB, Inc. F jv PREILINARY GRADING. DRAINAGE RNMM / R alm / 9RWM & EROSION CONTROL PLAN v D.R. HORTON. INC. — MI NNESOTA A 7..8 8AAA F Flli . �4Y4��4 � a F 5s — f � e O 4 Otyq� � P USE--- MN S 1IVA IF: 1�1'11 i. } Irr1iJy^I�n'� E. i >g - } &o ado � < � 8•$ $$$�$$^:6x6 ;; "g sex Ease 11---" " �' 4 G Yo �sYaF xaY F=�AR £ F 8 ag a � ; S PETARY G PROPERTY ®� MMMRS S R. Hill, Inc. PRELIMINARY CNADD7C. DRAINAGE, T 17M86/ A EROSION CONTROL PLANS L. - D.R. HORTON. INC. — MINNESOTA Wetland Replacement Plan Wetland Conservation Act Section 404 Clean Water Act Peterson Property City of Chanhassen, Minnesota Applicant: D.R. Horton, Inc. February 20, 2006 Introduction and Background The proposed project is located in portions of the NW'/4, Section 26 and NE'/< of Section 27, T116N, R23W, Carver County, Minnesota. Pioneer Trail crosses the southern portion of the property and croplands, forested slopes, forested tributaries and individual farms border the west, north and eastern portions of the property (Figure 1). According to the U.S.G.S. Shakopee Quadrangle (Figure 2), elevations change significantly from the Bluff Creek floodplain and other tributaries to the highest elevations located at the center of the site. Seven wetlands are located throughout the site with cropland, old pasture, fencerows, wooded slopes and an abandoned home located on the upland areas. On October 14, 2005, GES evaluated the site for jurisdictional wetlands and found seven on the site. A subsequent review of Farm Service Agency aerial photographs and consultation with city staff on the site identified an eighth wetland that was flagged with city staff on January 12, 2006. The approximate site and wetland boundaries are shown on a 2003 aerial photograph in Figure 3. The project involves constructing a single-family residential subdivision and associated infrastructure. A total of 81 detached single-family residential units, storm water ponds, 22.75 acres of open space (parks, wetland mitigation and bluff creek overlay (protection area)), and one (1) wetland mitigation area are ' planned on the Peterson Property. Parcel access would be from Pioneer Trail (County Route 14). This road is located on the southern border of the property. One main north/south collector (Street D) is proposed that would connect to a t second major collector street located west of the Peterson Property that is being planned and constructed by the City of Chanhassen. WCA/CWA Wetland Application t D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 2 ' On -Site Wetlands t Seven jurisdictional wetlands totaling 10.94 acres were delineated on October 14, and an eighth wetland was delineated and reviewed by the City of Chanhassen on January 12, 2006. A detailed description of each wetland can ' be found in the Wetland Delineation Report in Appendix A. Brief descriptions of each wetland impacted by the proposed project are included below with jurisdictional details provided in the delineation report (Appendix A). ' Section 404 Jurisdiction Wetlands A, D, E, F, G, H and I on the Peterson Property are part of a tributary system that feeds both "navigable waters" and interstate waters as they empty into two different branches of Bluff Creek, a tributary to the Minnesota River. Therefore, the Corps of Engineers will have direct regulatory jurisdiction on any wetlands connected to Bluff Creek and to the creek itself under Section 404 of the Clean Water Act. The Corps considers impacts to these wetlands as well as ' any other wetlands as part of its public interest review. DNR Protected Waters Jurisdiction tThe Minnesota DNR Protected Waters Inventory (Figure 4) does not map any protected waters or wetlands on the site. Project Need and Purpose t The purpose of the project is to provide residential housing in a highly desirable residential sector of the Twin Cities housing market. A need for additional residential options continues to exist in this market. The site is currently zoned ' for agricultural use but is proposed to be re -zoned for low/medium density single family residential by the City of Chanhassen. Summary of Proposed Impacts A total of 20,473 square feet (0.47 acre) of wetland is proposed to be filled by the project. Proposed impacts will affect all of Wetland I. WCA/CWA Wetland Application ' D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 3 ' Sequencing ' Avoidance and Minimization Avoidance Alternatives ' The applicant has tried to avoid and minimize wetland impacts on the project site to the extent practicable. The applicant considered two alternatives that would totally avoid wetland impacts. These alternatives are: No Action Alternative One alternative is the no action alternative, which would result in the project site remaining undeveloped. This alternative is considered infeasible because it would defeat reasonable investment backed expectations of the current landowners and would not fulfill the project purpose. Leaving the site undeveloped would also be inconsistent with the City of Chanhassen's adopted comprehensive plan, feasibility study for public street and utility improvements, and Alternative Urban Areawide Review in support of development of the Peterson Property and adjacent properties. Total Avoidance Build Alternative The applicant weighed several factors in their site selection process. A willing seller was one reason for choosing this site; however, additional factors included: price, proximity to major roads, availability of utility services, natural amenities, and proposed zoning by the City of Chanhassen. In addition to these considerations the applicant also pursued total avoidance of wetland impacts by considering alternative sites which could serve the project purpose. Several property owners near the Peterson Property were approached by the applicant to sell their property but were unwilling to sell, had sold to other developers, wanted more than the land was worth, or for a variety of reasons, a transaction could not be worked out. The total avoidance alternative would avoid wetland impacts; however, this alternative would not accomplish the project purpose and would leave large upland portions of the site undeveloped. Given the degraded nature of Wetland I and presence of sub -surface tiling (which eliminates a significant source of wetland hydrology) it is unreasonable to expect this parcel would not be developed. Wetland I's functions are limited. This wetland is also partially drained, is overgrown with annual pioneering and invasive species that limit their value as a source of wildlife habitat or its aesthetic value. 1 WCA/CWA Wetland Application ' D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 4 Specific Wetland Impacts and Justification Minimization Impacts to Wetland I are practically impossible to avoid given the site topography and the requirement to provide a road connection to other road alignments west of the Peterson Property and to the proposed Highway 212/312 improvements. The proposed road grade for Street D is designed to meet minimum curve radii and horizontal alignments to align with a round -about that will connect roads that run north -south and east -west along the western property boundary. The north - south and east -west roads were approved by the City of Chanhassen. The wetland impact of 0.47 acre represents less than five percent of the on -site wetlands. The primary purpose of the proposed wetland impacts is street construction that will be designed to provide access for emergency vehicles and to provide a safe driving environment. Sequencing Flexibility As described below, the applicant has considered the possibility of developing the project site in a manner that totally avoids the filling of Wetland I. However, given the high level of disturbance, the history of farming, and alterations that have taken place within Wetland I, the applicant is requesting the application of the sequencing flexibility provisions contained in the WCA Rules (Minn. Rules 8420.0520 Subp. 7(a) B). According to these rules, "[fjlexibility in application of the sequencing steps may be applied, subject to the conditions in item A, as determined by the local government unit if: (1) the wetland to be impacted has been degraded to the point where replacement of it would result in a certain gain in function and public value; (2) preservation of a wetland would result in severe degradation of the wetland's ability to function and provide public values, for example, because of surrounding land uses and the wetland's ability to function and provide public values cannot reasonably be maintained through other land use controls or mechanisms; The U.S. Army Corps of Engineers has similar sequencing flexibility guidance, set forth in Regulatory Guidance Letter 93-2 Guidance on Flexibility of the 404(b)(1) Guidelines and Mitigation Banking (RGL 93-2) which states that the degree of scrutiny of project alternatives should be commensurate with the severity of the project impact and that different wetlands have varying functions 1 WCA/CWA Wetland Application t D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 5 ' and values. This guidance provides that "...for projects that would cause only minor or negligible impacts, a detailed analysis of project alternatives should not be conducted". This document further states that minor impacts have one, and frequently more, of the following characteristics: (1) they occur in wetlands which perform limited functions, (2) they are small in size (less than one acre), (3) they ' have little potential for secondary or cumulative impacts, and/or (4) only cause temporary impacts (less than one year). ' Due to the invasive nature of the plant communities that occur in Wetland I and the wetland's small size, the applicant submits that sequencing flexibility appropriately applies to the proposed impacts. All of the affected wetland is ' dominated by invasive annuals such as barnyard grass, cocklebur, and Pennsylvania smartweed and retains little of its ecological integrity. MNRAM Functional Assessment Methods We have attempted to provide a general abiotic assessment of Wetland I that includes the geomorphic setting (i.e. presence of inlets or outlets) and a description of the water source based upon soil types and position within the landscape. The applicant has utilized a methodology that is pre -approved under the WCA. A functional assessment for Wetland I (identified as wetland 27-116-23-26-001-1 in the MNRAM Wetland Functions Summary Assessment) was conducted using Version 3.0 of the Minnesota Routine Assessment Methodology (MNRAM) for Evaluating Wetland Functions written by the Minnesota Board of Water and Soil Resources in April 2004. This methodology is pre -approved by the Minnesota Board of Water and Soil Resources to determine public values of wetlands under the jurisdiction of local regulators administering the Wetland Conservation Act. A summary of the wetland functions for the wetland (pre- and post- development) is included in Appendix B. Based on the results of this analysis, the applicant submits that the proposed replacement wetland (identified as wetland 27-116-23- 26-000-M in the MNRAM Wetland Functions Summary Assessment) will result in a certain gain in function and public value over the affected wetland. t Wetland I Wetland I is an isolated depression that receives wetland hydrology via surface water runoff and is dominated by invasive annual species. This wetland currently ' provides limited wildlife habitat because aerial photographs indicate it was farmed every year since 1979. Its dominance by invasive annuals does not add to the species diversity of plant communities within this region and its small size, ' along with its tiled and ditched condition, limit its function for storm water storage. All of Wetland I is proposed to be impacted by grading for the construction of a main collector street (Street D) that will serve single family residential homes 1 WCA/CWA Wetland Application ! D.R. Horton - Peterson Property GES Project No. 2006.012 February 20, 2006 Page 6 ! throughout the site and will provide a connection to approved projects to the west of the Peterson Property. Minimization and avoidance rationale for Wetland I ! include the following design alternatives: 1. Public health and safety is better served by constructing a through street rather than by two cul-de-sacs that would avoid impacts to Wetland I. A ! through street improves access to emergency vehicles by allowing two points of entry and eliminating the necessity of designing cul-de-sacs that allow turning radii for large emergency vehicles. Cul-de-sacs would still ! impact portions of Wetland I and would divert surface water from the wetland resulting in further degradation over time. 2. It is environmentally preferable to fill Wetland I for a through street and ! house lots and replace its limited functions in an area that will be monitored, maintained as wetland and protected with a conservation easement elsewhere on -site. The proposed alignment of the street will ! bisect Wetland I leaving two very small slivers of wetland. These remaining wetland areas if left alone will have approximately 100 percent of the contributing surface water runoff diverted by impervious surfaces ! and into storm water drains. Therefore, greater wetland function will be provided in the created mitigation area than by allowing existing wetland slivers to remain in areas that may not have wetland hydrology once the ! project is constructed. 3. By avoiding fill to Wetland A and developing uplands adjacent to the wetland (which would not be regulated), the proposed development would ! still alter contributing hydrology sources by changing the grading on adjacent upland areas and further reduce the function of the wetland over time. The loss of function over time, the isolated nature of the wetland, ! and the small size of Wetland I make replacement the environmentally preferable option for this basin. ! Alternative Sites Alternative sites for the proposed project were not explored in depth since none were available and this site will accomplish the project purpose ! Rectification of Impact No temporary wetland impacts are proposed which could be rectified after project ! completion. Reduction or Elimination of Impacts Over Time ! Standard erosion control measures will be used during construction of the project. Once disturbed areas are revegetated, erosion and sedimentation should not be a problem given the relatively flat topography of the site. ! ! ! WCA/CWA Wetland Application ' D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 7 Replacement of Unavoidable Impacts ' The unavoidable wetland impact of 20,473 square feet (0.47 acres) will be replaced through the implementation of the on -site compensatory mitigation plan outlined below. Compensatory Mitigation Plan t The Wetland Conservation Act requires replacement of drained, filled, or in some cases, excavated wetlands at a minimum ratio of 2:1. This equates to a total mitigation requirement for the project of 40,946 square feet or 0.94 acre for the ' regulable impacts. New Wetland Credit (NWC) is being generated by the applicant through the creation of mitigation wetlands at one location adjacent to the Bluff Creek floodplain. Mitigation wetlands will be created in areas adjacent ' to Bluff Creek on the north-western portion of the property (see Grading Plan). The total NWC proposed for the site is 20,830 square feet (0.48 acre) which meets requirements under current regulatory programs. The remaining wetland mitigation credits are being generated through the use of upland buffers (10,190 square feet or 0.23 acres), and storm water ponds (43,124 square feet or 0.99 acres) as Public Value Credit. The WCA rules allow Public Value Credit for 100 percent of the normal pool area for storm water ponds in cities with approved storm water management plans. Public Value Credit is needed to comply with WCA regulations on this site. The City of Chanhassen has an approved storm water management plan and the applicant is proposing to construct three storm water ponds on the Peterson Property. The presence of an approved storm water management plan at the City of Chanhassen will allow the applicant to utilize the 43,124 square feet (0.99 acres) of storm water ponding as Public Value Credit. This on -site mitigation plan replaces the wetland fill areas as close to the impact sites as possible. The applicant will be providing mitigation credits exceeding regulatory requirements. A total of 74,144 square feet (1,70 acres) of mitigation credits will be created for 20,473 square feet (0.47 acre) of impact, which is slightly more than a 3.6:1 ratio of restored/created wetland vs. impacted wetland. The WCA requires a 2:1 replacement ratio. New Wetland Credit New Wetland Credit will be generated by the project through the creation of mitigation wetland. The mitigation site will be constructed at one location adjacent to Bluff Creek by excavating to existing groundwater levels and to topographic elevations consistent with delineated wetlands nearby. New wetland areas from the normal water level to one foot above the normal water level will be seeded with a wet meadow seed mix developed and approved by the Minnesota Board of Water and Soil Resources (see Appendix C). The mitigation area lies 1 WCA/CWA Wetland Application D.R. Horton — Peterson Property GES Project No. 2006.012 February 20, 2006 Page 8 within areas mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes (see Figure 5, Appendix A, Delineation Report) on the Carver County Soil Survey. The Vegetation Management Plan is attached in Appendix C as required by the WCA and the COE. The proposed mitigation plan is designed to produce a temporarily flooded wetland type or Circular 39 Type 1 seasonally flooded basin (Peterson Mitigation and Cross Sections) measuring 20,830 square feet (0.48 acre). The new wetland areas will be allowed to re -vegetate below the normal water line and will be planted in a native upland buffer seed mix from the projected wetland boundary to the proposed upland buffer boundary. The mitigation wetlands are expected to generate a mosaic of open water and emergent vegetation. The existing vegetation in adjacent wetlands is comprised of reed canary grass monotypes and mitigation areas will be managed to maintain native grasses and forbs. The mitigation area will be excavated from upland areas that are currently dominated by smooth brome. A permanent conservation easement will be placed over the mitigation areas. Monitoring The mitigation monitoring requirements outlined in the Wetland Conservation Act will be followed. These requirements (per Minn. Rule 8420.0620) are as follows: 1) Description of the project location, size, current wetland type (Cowardin classification), and desired wetland type (goal). 2) A comparison of the as -built specifications versus the design specifications (first annual monitoring report only) and a rationale for significant changes. 3) Hydrology measurements: seasonal water level elevations or areal coverage measurements during the period April through October. 4) A map of plant communities within the boundaries of the replacement site, including hydrologic indicators observed. 5) Color photographs of the project area taken any time during the growing season. Annual mitigation monitoring reports will be prepared and submitted to the City of Chanhassen and copies provided to the U.S. Army Corps of Engineers as required in their respective permits and approvals. 5 Aqb oa ,ChW,,ewsl W 78th EA coucar Blvd Yctoria 9 W o u 13 R 41 a 19 o Marsh �1 a P%kApproximate m Ma°rsPAath aimT RLaickee $ Site Location Pv er �y L � � � I.Yrrbn BNtl Rlq Late �taze�kle RrleyLake HaZekkte Nabor91 Gdt Ckk p n 101 1 0 [Yr811 Prairie aa1etYSC� 17 / BkiH Creek PioneerJDnebw Park Aswclllon Itrltldkoerk Rd $ 4 , Frl'll4iCp'A Rice Lake 11 � Chaska cornneeviyCeri V' 212AV 4t 12 Riv.ersi .e Perk ...........: ...............: ers W m 9 PSi Sst AveE MO 101- yl o 1¢ Ave_ ` e* T'-�a ..... ..... .., .vlAve to Ave W' A 3rd • e N� W Ave �1akc N 1m z _ Chaska EAp1 5k - �� WithAve W 101h Ave E n 1Q ^z' C 15 17 r Lions V01110 c lmam •ewoac .aaa a! c.lir 1a .!eea' Park v"%G ►'E Figure 1. Site Map Peterson Property S\ Chanhassen, Minnesota Graham Environmental Services, hu.. GES Project No. 2006.012 � �'_ •`, , ` sect.. - � ✓� _ _ { t or loot APProximate 1 �.' r _. Site Location s r i _ 4 -- .. i Copgnd {L`:!YEE!:ia.y-1�gNc•..n2� _. �G ES4404 Guitars Envirumnental Services, Inc. Figure 2. U.S.G.S. Shakopee Quadrangle Peterson Property Chanhassen, Minnesota GES Project No. 2006.012 �G ES Graham Environmental Services, Inc. Figure 3. Area Reviewed for Jurisdictional Wetlands Peterson Property Chanhassen, Minnesota GES Project No. 2006.012 ES Graham Environmental Services, Inc. Figure 4. DNR Protected Waters Map Peterson Property Chanhassen, Minnesota GES Project No. 2006.012 w m H ut9-4WIE56)-nJ ..mttJ1256)}lMt a3dy(]�Hi111'1 ,�a�e x� HOMOH Zi'0 o SNDUAWC S1H3N9ff3 SiLiHIH 0 my HOIAOMM H m so auuaaoaa HOSHaaa -1 iwmb£ LtiKhS 'Jg5 $_ a g�SY:�� zvi ',aso>f I i �_� �gl` �g�k�. �al Y:. �� � ' 11 • ll I I I ' 11 I � 11 1/� i 1 4-,4 4 I't as Ilijli111 \ I < 0 1 1 ly 111 «4 I 1 I 11 1 1 1 I %04 J J !fJ S N+ \O \\ OO Ikl� 1 rcz l�f1 �� <� W t f zI _ �I i kit �'.•.d 9 y y /1 / a 0 g1 i'.e'� I 4e��l;a 111� � 1 2 ? 1 �\ 1.14 hi- �« wars ;�ii' 1 Ek�l 1 1 1 1\ 1 1 _ -4- 1 �. =1 4 i A- 4 1 1 1 1 4, 1 1 wAae:Zn onnz ai Z - -P IJw9efi iZ N .W-OY(N) Tl n0'OY�i�3.1tl M vmSZNM Z LL uix w a..wa ui ws t. a w mz '�!R NULUOR 'am m g r a n W3%" SMW MWU U P®Y NOLL1• •Oui `11H •a SOMr L N x�a(xa xostrssna �a o In o In o U) o to 00 00 00 00 00 00 ro Oo O p 'I i 0 II � j � O O a331118 a0LLIn ,SZ 30 Q V31N aOLLVOLL i0 39M - I W a v SQ O 7 � O L a + Oo M a U W I o I � I I o I f u I I I Wd6£Z0 900Z/4l/Z - oMP'1IW9661Z Appendix Wetland Delineation Report Wetland Delineation Report Peterson Site Prepared for: DR Horton Chanhassen, Minnesota December 6, 2005 Background Graham Environmental Services, Inc. (GES) has completed the site evaluation for jurisdictional wetlands on a parcel located in portions of the NW'/<, Section 26 and NE'/<of Section 27, T116N, R23W, Carver County, Minnesota. Pioneer Trail crosses the southern portion of the property and croplands, forested slopes, forested tributaries and individual farms border the west, north and eastern portions of the property (Figure 1). According to the U.S.G.S. Shakopee Quadrangle (Figure 2), elevations change significantly from the Bluff Creek floodplain and other tributaries to the highest elevations located at the center of the site. Seven wetlands are located throughout the site with cropland, old pasture, fencerows, wooded slopes and an abandoned home located on the upland areas. On October 14, 2005, GES evaluated the site for jurisdictional wetlands and found seven on the site. The approximate site and wetland boundaries are shown on a 2003 aerial photograph in Figure 3. Methodologies The site was assessed for wetlands using the on -site methods contained in the "Routine Determinations" section of the U.S. Army Corps of Engineers "Wetlands Delineation Manuaf' (Technical Report Y-87-1, 1987). This is the methodology currently used by both the U.S. Army Corps of Engineers for implementation of Section 404 of the Clean Water Act and by local government units administering the Minnesota Wetland Conservation Act. GES classified the wetlands under the U.S. Fish and Wildlife Service (FWS) Cowardin system and Circular 39 methodologies. 1 Peterson Property ' Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 2 of 8 Results ' Wetland A Wetland A is located along the western boundary of the property. This ' wetland is an isolated depression along the fenceline that defines the edge of the Peterson site with an adjacent farm field. Past farming activities have elevated sediment and nutrient levels accumulating within ' the wetland. This wetland is predominantly a reed canary grass monotype with annual weed species located at the transition between the reed canary grass monotype and cropped upland areas. Upland plant ' communities are comprised of soybeans and corn. Dominant wetland vegetation includes: reed canary grass (Phalaris arundinacea) with other species occurring as subdominants. The National Wetlands Inventory for ' Shakopee, Minnesota (Figure 4) maps this area as a ditched seasonally flooded palustrine emergent wetland (PEM1Cd). GES would classify this wetland as a ditched temporarily flooded palustrine emergent wetland ' (PEM1Ad) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland ' edge and examining the profiles' texture, color, and redoximorphic characteristics. This wetland receives significant runoff from adjacent cropland and much of the soil profile was obscured by accumulated overwash sediments. Soils in Wetland A are described as 30 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam with bright mottles (10YR 4/6) to 30 inches. The Carver County Soil Survey (Figure 6) map soils in the vicinity of Wetland A as Hamel soils (WM). The colors and textures of soils observed along basin transects are consistent with Hamel loams. Upland soil profiles exhibited mixed silt loams with dark brown ' matrix colors (10YR 3/2) for 6 inches over gray -brown loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny loams (KC2) on 6 to 12 percent slopes. ' Free water was present at the surface in sample points at the wetland center and were present within 8 inches of the soil surface at transitional soil pits. It is also important to note that the evaluation took place after rainfall events of over 5 inches had occurred ten days prior to the evaluation. The wetland hydrology parameter in this wetland was met by documenting one primary indicator (surface water) at the wetland center and by two secondary indicators (FAC neutral vegetation) and using professional judgment at the transition between wetland and upland. ' No free water or evidence of saturation were observed at upland locations. 1 Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 3 of 8 The jurisdictional boundary was established at the change in vegetation from predominantly hydrophytic herbaceous species to a plant community ' dominated by crops. Wetland B t Wetland B is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the northeastern portion of the site. Upland ' areas adjacent this wetland are comprised of old field plant communities on slopes that face south and east and by croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: ' reed canary grass, American elm (Ulmus americana), spotted jewelweed (Impatiens capensis), and the presence of plant species that are often associated with disturbed ground such as sandbar willow (Salix exigua), ' black willow (Salix nigra), giant goldenrod (Solidago gigantea), and yellow foxtail (Setaria glauca). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) maps only the most northwestern corner of the site. ' GES would classify a larger area as a seasonally flooded palustrine emergent/forested wetland (PEM/FO1 C) or as Circular 39 Type 3/7 inland shallow marsh/wooded swamp. ' Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic t characteristics. Soils in Wetland B are described as 13 inches of dark brown (Munsell matrix color 10YR 3/2) silty loam followed by black (10YR 2/1) loams to 24 inches. The Carver County Soil Survey (Figure 5) map ' soils in the vicinity of Wetland B as Hamel loams (HIM) or Houghton and Muskego soils (MK). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited mixed sandy loams with dark brown matrix colors (10YR 3/2) for 6 inches over bright yellow clay loam (10YR 4/3). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by pioneering grasses, forbs or crops. Wetland C ' Wetland C is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. The natural outlet has been blocked by the construction of a driveway at ' the western edge of the wetland and has probably been made wetter by the construction of roads and driveways next to the wetland. The center of the wetland was entirely open water at the time of the delineation and 1 Peterson Property ' Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 4 of 8 twas characterized by concentric rings of annual hydrophytic vegetation at the wetland/upland transition. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, green ash (Fraxinus pennsylvanica), switch grass (Panicum virgatum), and the presence of plant species that are often associated with disturbed ground such as giant ragweed (Ambrosia trifida), black willow, Iamb's quarters (Chenopodium album), and water smartweed (Polygonum amphibium). t The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify a this area as a seasonally flooded palustrine emergent wetland (PEMC) or as ' Circular 39 Type 3 inland shallow marsh. Soils were evaluated by digging soil pits perpendicular to the wetland ' edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland C are described as 14 inches of dark brown (Munsell matrix color 10YR 2/1) silty loam followed by black (10YR ' 211) loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland C as Glencoe clay foams (GL). The colors and textures of soils observed along basin transects are consistent with a ' variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited mixed silty clay loams with dark brown matrix colors (10YR 4/3) for 12 inches over bright yellow ' clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from ' predominantly hydrophytic herbaceous species to a plant community dominated by crops. ' Wetland D Wetland D is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. A natural connection to Wetland C has been blocked by the construction of a driveway at the eastern edge of the wetland. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, switch grass, and the presence of plant species that are often associated with disturbed ground such as giant ragweed, Iamb's quarters, ' and cocklbur (Xanthium strumarium). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded 1 Peterson Property ' Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 5 of 8 palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland D are described as 6 inches of dark brown (Munsell matrix color 10YR 4/2) silty loam followed by black (10YR 2/1) clay loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland D as Cordova -Webster complex (CW). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited clay loams with brown matrix colors (10YR 4/2) for 14 inches over gray -brown clay loam (10YR 4/1). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by crops. Wetland E Wetland E is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the eastern portion of the site. Upland areas adjacent this wetland are comprised of old field plant communities on slopes that face north and by croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass with subdominants including Joe-pye weed (Eupatorium maculatum), stinging nettle (Urtica dioica), redtop (Agrostis alba), and lady's thumb (Polygonum persicaria). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland E are described as 14 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam followed by dark brown (10YR 3/1) loams to 30 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland E as Klossner muck (PM) or Hamel soils (HM). The colors and textures of soils observed along basin i Peterson Property i Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 6 of 8 itransects are consistent with a variant of Hamel soils. Upland soil profiles exhibited mixed silt loams with dark brown matrix colors (10YR 3/1) for 34 i inches. Upland soils are mapped as Lester -Kilkenny soils (KC2) on 6 to 12 percent slopes. i The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by pioneering grasses, forbs or crops. Wetland F Wetland F is located along a tributary floodplain that flows to the Minnesota River and in minor topographic ravines that were created by down -cutting at drain tile outlets. This wetland occupies a small portion of the southwestern corner of the site. Upland areas adjacent this wetland are comprised of sugar maple forest on steep slopes on either side of the tributary. Dominant wetland vegetation is scarce within the bottom of the ravine but includes: duckweed (Lemna minor). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a seasonally flooded palustrine emergent wetland (PEM1 C) or as Circular 39 Type 3 inland fresh marsh. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland F are described as 32 inches of accumulated sediments that are dark brown (Munsell matrix color 10YR 3/1). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland F as Lester -Kilkenny loams (KF). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited silt loams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) on 12 to 18 percent slopes. The jurisdictional boundary was established at an abrupt rise in topography. Wetland G Wetland G is located along the Bluff Creek floodplain and is surrounded by high quality sugar maple forest at the southeastern portion of the site. Dominant wetland vegetation includes: reed canary grass and wood nettle (Laportea canadensis) with subdominants including eastern cottonwood (Populus deltoides), white snakeroot (Eupatorium rugosum), box elder (Acer negundo), and black willow. The National Wetlands Inventory for Peterson Property ' Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 7 of 8 Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a seasonally flooded palustrine emergent wetland (PEM1 C) or as Circular 39 Type 3 inland fresh marsh. ' Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland G are described as 12 inches of ' accumulated sediments that are dark brown (Munsell matrix color 10YR 4/1) followed by 8 inches of black loam (N3/0). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland G as Lester - Kilkenny loams (KF). The colors and textures of soils observed along basin transects are consistent with floodplain soils in depositional areas of riverine systems. Upland soil profiles exhibited silt foams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) on 12 to 18 percent slopes. ' The jurisdictional boundary was established at an abrupt rise in topography. Regulatory Jurisdiction ' Minnesota DNR Protected Waters The Minnesota DNR Protected Waters Inventory (Figure 7) does not map any protected waters or wetlands on the site. ' Minnesota Wetland Conservation Act The jurisdictional wetlands that were identified on the subject parcel are subject to the Wetland Conservation Act Rules Chapter 8420. Federal Regulatory Jurisdiction ' The enclosed wetland delineation data forms indicated whether wetlands are isolated or not for purposes of U.S. Army Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. This determination is made by GES in the field at the time of the delineation and is essentially our best guess based on the portion of the particular wetland we observe. In some cases, only a small portion of the wetland edge is evaluated. If no inlets or outlets are observed in the evaluated area, and none are evident on U.S.G.S. topographic maps or aerial photos, we are inclined to 1 Peterson Property ' Wetland Delineation Report GES Project No. 2005.133 December 6, 2005 Page 8 of 8 ' determine the wetland is isolated. However, since the entire wetland is sometimes not assessed, it is possible that inlets and/or outlets do exist ' and that the wetland has a surface connection to a federal "navigable" water and, thus, falls within the jurisdiction of Section 404. Therefore, a determination by GES of whether a particular wetland is isolated or not ' should not be considered a final determination with regard to Corps jurisdiction. t Concurrence with our findings should be obtained from the U.S. Army Corps of Engineers, Carver County, and the City of Chanhassen before any earthwork is undertaken on the site. Additional information regarding the vegetation, soils and hydrology of the wetlands are included in Appendix A. Ground photos of all the areas evaluated for jurisdictional criteria are included in Figures 7-10. The information contained herein represents my findings during wetland delineation activities conducted on October 14, 2005 at the referenced site. Graham Environmental Services, Inc. Scott Krych Professional Wetland Scientist No. 000303 Enclosures Date Victoria �p�a St W 13 �ri 41 10 m x =� o to m t u a ��y a ��xHelelljle _ _ f&OkM Na io".4 Guff CFD 5 —.Vrty�q` oaa - Est duller Ewaof pNp "sPn'101 L Marsh P4tk Approximate fthena, s Site Location aXe Pa 0earpath T le LY W Blvd @ Lylren Elva :'*ey Lake c v ftibytahe A a lel 1 Eden Prairie 17 _ �oneertca� BW1f Creek °JuWhan Pioneer Park B Cdf Hunaedmerk Rd ( Associffiron 17'Tf5 o Flyil)4GrT'_ Rrce Lake L = Engler 212 41 11 RMersltle Park o p of Ave W 1d Ave E - c W Ave E S 16 $ v ...- ...., 3d Ave dM1 f u y;vP NN Shakopee � u,1 Im z-. Pve m Chaska_, E4a, 51 rD 1Uth Ave W 10th Ave E N 147 W t�5i o Ta 1] Lions V01 Park '%G Figure 1. Site Map EPeterson Site S\ Chanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005 133 Approximate Site Locationor r �� � I Figure 2. U.S.G.S. Shakopee I'sG Quadrangle �` QPeterson Site SChanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005.133 \ Figure 3. Area Reviewed for G Jurisdictional Wetlands EPeterson Site S\ Chanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005.133 ' \� Figure 4. National Wetlands Inventory ' Peterson Site S\ Chanhassen, Minnesota ' Grahrnn Enniromttenurl Servieec, Inc. GES Project No. 2005.133 GL 1 - —�� HK Lam_ ___ __- •..( _ _ KC2 ~2' - KC2 - •) .d TB l �TB 2 K92 _ _- '� �"yam — f y , Kb2 �J�• r 4 ` KF - ` - i e I KO y _ 1 Q-%O� NG ES Graham Environmental Services, hrc. Figure 6. DNR Protected Waters Map Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 Q:-J G ES Graham Environmental Services, Inc. J 4 R Wetland A looking west. Figure 7. Ground Photos - Wetlands A and B Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 �. Ii NG ES Graham Ennn-onnzental Se viee�, Gn. Figure 8. Ground Photos — Wetlands C and D Peterson Site Chanhassen, Minnesota GES Project No. 2005 133 . • tt Cb v Y i tiKyy 1 .. ����,/�/► �Y r i. Y. -Hr 1V • -L" Wetland G looking south. Figure 10. Ground Photos - Wetland �G G EPeterson site SChanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005.133 DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator. SAK State: MN Wetland ID: A Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum %Areal Covera a Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 80 FACW+ Giant ragweed Ambrosia tnfida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Bamyard grass Echinochloa crusgalli H 5 FACW Switch grass Panicum virgatum H 10 FAC+ Prickly wild gooseberry Ribes cynosbati S 5 UPL Box elder JAcernegundo T 10 FACW- Dominant Plant Species: Upland Stratum %Areal Covera a Indicator Status Common Name Scientific Name Com Zea mays H 90 UPL Giant ragweed Ambrosia trifida H 5 FAC+ Virginia creeper Parthenocissus quinquefolia H 5 FAC- Common milkweed Asclepias syriare H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL ' OBL - Obligate. Occurs with an estimated 99%probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-990/a probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: A IYUKUL.UUY — I ransect lyit l Hag NO. Al Field Observations: Wetland drology Indicators Primary Indicators: 7 Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in.) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) NA (in.) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: 0 (in.) Drainage Patterns in Wetlands SOILS Soil Profile: WETLAND Pit 1, Transact 1 20 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-30 COW 10YR 3/2 tOYR 4/6 20% Silty loam 11 Soil Profile: UPLAND (Pit 2, Transeet 1) ( 25 feet from flagged boundary) 0-6 1 Cow I 10YR 3/2 I NA I NA I Silt loam 7-19 1 A I 10YR4/2 1 NA I NA I Silt loam Hydric Soil Indicators: Histosol Concretions Hisfic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other Ex sin in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? X Yes Wetland Hydrology Present? X Yes Hydric Soils Present? X Yes Cowardin Classification: PEMA Remarks: Tiled basin that was inundt Photo Aspect: West Number of Flags: 16 X Isolated Is this sampling point within a No wetland? No No an 8" rainfall event. X Yes No Non -Isolated. Describe connection. Ditch flows north of the site in a county ditch. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: Applicant: Peterson Property Chanhassen County: Delineator. SAK State: Wetland ID: B Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Giant ragweed Ambrosia triida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 75 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Riverbank grape Vdis riparia H 5 FACW- Swamp milkweed Asclepias incamata H <5 OBL Elderberry Sambucus canadensis S 5 FACW- Box elder Acer negundo T 10 FACW- American elm Ulmus americana T 25 FACW- Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Smooth brome Bromus inermis H 20 UPL Giant ragweed Ambrosia trifida H 5 FAC+ Virginia creeper Parthenocissus quinquefolia H 5 FAC- Common milkweed Asclepias syn.aca H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL Kentucky bluegrass Poa pratensis H 20 FAC- Canada goldenrod Solidago canadensis H 20 FACU Com Zea mays H 40 UPL Prickly ash Xanthoxylum americanum S 20 UPL Cocklebur Xanthium strumanum H 5 FAC Field nut sedge Cyperus esculentus H 5 FAC+ Yellow (oxtail Setaria glauca H 5 FAC Bristly (oxtail Setaria verticellata H 5 FACU OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL— Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: B IYUKULUUY — I ransect 1 pit I Flag No. bib Field Observations: Wetland drology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 NA (in.) Inundated Inches X Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) 2 (in-) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: 0 (in.) Drainage Patterns in SOILS Soil Profile: WETLAND Pit 1, Transact 1 20 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-13 COW 10YR 3/2 10YR 4/6 20% Silty loam 14-24 A 10YR 211 10YR 4/4 10% Loam Soil Profile: UPLAND (Pit 2, Transect 1) (25 feet from flagged boundary) 0-6 1 A 10YR 3/2 NA NA Silty day loam 7-19 1 B 10YR 4/3 NA NA Silty day loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Re ime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks WETLAND DETERMINATION Hydrophyhc Vegetation Present? X Yes Wetland Hydrology Present? X Yes Hydric Soils Present? X Yes Cowardin Classification: PEMC Remarks: Is this sampling point within a No wetland? No No Photo Aspect: South Number of Flags: 60 Isolated X Non -Isolated. Describe connection: Creek flows north of the site. X Yes No I DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: C Transect ID: 1 VEGETATION Dominant Plant Species: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 20 FAC W+ Giant ragweed Ambrosia trrtda H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Uncca dioice H <5 FAC+ Box elder Acernegundo T 10 FACW- Black willow Salix migra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroilexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Switch grass Panicum virgatum H 30 FAC+ Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Prickly wild gooseberry Ribes cynosbati S 10 UPL Box elder Acernegundo T 25 FACW- Wild black currant Ribes americanum S 10 FACW Giant ragweed Ambrosia trifida H 10 FAC+ Smooth brome Bromus inermis H 10 UPL Smooth sumac Rhusglabra S 10 UPL Yellow (oxtail Selena g/auce H 10 FAC Riverbank grape Vitis npana H 5 FACW- Common buckthorn Rhamnus cathartfca S 5 FACU Elderberry Sambucus canadensis S 5 FACW- OBL - Obligate. Occurs with an estimated 99%probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: C 1YUKOLOGY — Transect 1, Pit 1 Flag NO. U11 Field Observations: Wetland Primary Indicators: Depth of Surface Water. 12 (in-) X Inundated Saturated in Upper 12 Inches Depth to Free Water in Water Marks Pit: (Transect 1) NA (in.) Drift Lines Sediment Deposits Depth to Saturated Soil: 0 (in.) Drainage Patterns in SOILS drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data _ FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transect 1 10 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-14 COW 10YR 2/1 10YR 4/6 10% Siltv loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 35 feet from flagged boundary) 0-12 1B, I 10YR 4/3 I NA I NA I Silty clay loam 14-19 1 Bs I 10YR 412 I NA I NA I Clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks FYC 1 LANU Ur- I tKMIIYA Wetland Hydrology Present? Hydric Soils Present? Photo Aspect. East Number of Flags 17 X Isolated Is this sampling point within a X Yes No wetland? X Yes No X Yes No Non -Isolated. Describe connection X Yes No DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator. SAK State: MN Wetland ID: D TransectID: 1 VFGFTOTInN Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 75 FACW+ Giant ragweed Ambrosia tfida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Broad-leaved cattail Typha latifolia H 10 OBL Canada thistle Cirsium arvense H 5 UPL Canada goldenrod Solidago canadensis H 10 FACU Rough amaranth Amaranthus retmflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Bristly foxtail Setaria verticillata H 10 FACU Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Bristly foxtail Setaria verticillata H 10 FACU Lamb's quarters Chenopodium album H 5 FAC- Rough amaranth Amaranthus retroflexus H 5 FACU+ Cocklebur Xanthium strumarium H 10 FAC Corn Zea mays H 75 UPL OBL - Obligate. Occurs with an estimated 99% probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. r Page 2 Wetland ID: D IIf UKULUUY — I ransect 7, vit 7 Hag NO. IJs Field Observations: Wetland drology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 NA (in.) Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit (Transact 1) NA (in.) Drift Lines X FAC-Neutral Test Depth to Saturated Soil: NA (in.) Sediment Deposits Drainage Patterns in X Other (Explain in Remarks) SOILS Soil Profile: WETLAND Pit 1, Transact 1 16 feet from flagged bounds Depth (inches) Hormon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-6 COW 10YR 4/2 Silty loam 7-20 A 10YR 2/1 10YR 4/6 10% Clay loam Soil Profile: UPLAND (Pit 2, Transact 1) ( 20 feet from flagged boundary) 0-14 A 10YR 412 NA I NA Sandy loam 15-25 B 10YR 4/1 10YR 4/4 5% Silty day loam Hydric Soil Indicators: Histosol Concretions Hisfic E i on High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Re ime Listed on Local H dric Soils List Reducing Conditions Listed on National H dric Soils List GI ed or Low -Chrome Colors Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? Yes X No Hydric Soils Present? X Yes No II Remarks: This area is located in a road ditch and receives runoff from adjacent croplands and roads. p IN Professional judgment was used to establish the wetland boundary. II Photo Aspect: West Number of Flags: 16 X Isolated Non -Isolated. Describe connection: DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator. SAK State: MN Wetland ID: E Transect ID: 1 VFGFTOTIAN Dominant Plant S ies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Box elder Acernegundo T 5 FACW- Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Black willow Salix nigra T <5 OBL Wild cucumber Echinocystis lobata H <5 FACW- Canada moonseed Menispermum canadense H <5 FAC+ Woolgrass Scirpus cypenbus H <5 OBL Green bulrush Scirpus atrovirens H <5 OBL Joe-pye weed Eupatorium maculatum H <5 OBL Redtop Agrostis al H <5 FACW Lady's thumb Polygonum persicaria H <5 FAC- Dominant Plant S ecies: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Kentucky bluegrass Poa pratensis H 30 FAC- American elm Ulmus americana T 5 FACW Common buckthorn Rhamnus cathartica S 5 FACU Smooth brome Bmmus inermis H 10 UPL Common milkweed Asclepias syriaca H <5 UPL Canada goldenrod Solidago canadensis H 10 FACU OBL — Obligate. Occurs with an estimated 99°/n probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: E IYUKULUGY — 1 ransect 1, pit 1 Field Observations: Depth of Surface Water: 6 (in.) Depth to Free Water in Pit (Transect 1) NA (in.) Depth to Saturated Soil: NA (in.) SOILS Wetland Primary Indicators: X Inundated _ Saturated in Upper 12 Inches _ Water Marks _ Drift Lines _ Sediment Deposits Drainage Patterns in mdary Indicators Oxidized Root Channels in Upper 12 Inches Water -Stained Leaves Local Soil Survey Data FAG -Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transact 1 75 feet from flag ad bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-14 COW 10YR 3/1 10YR 3;4 20% Silty loam 15-30 A 10YR 3/1 Clay loam 11 Soil Profile: UPLAND (Pit 2, Transact 1) ( 10 feet from flagged boundary) 0-34 AI 10YR 3/1 1 NA I NA Loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gleyed or Low-Chroma Colors X Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Photo Aspect Eas: Number of Flags 41 _Isolated X Non -Isolated. Describe connection: Ditch drains to a tributary of the Minnesota River. Project: Applicant: Delineator: Wetland ID 2005.133 VEGETATION Peterson SAK F DATA FORM ROUTINE WETLAND DELINEATION Chanhassen Transect ID: _ Date: 10/14/2005 _ County: Carver State: MN 1 Dominant Plant S ies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Pha/aris arundinacea H 80 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Box elder Acernegundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Duckweed Lemna minor H 5 OBL Dominant Plant S ecies: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocarpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hombeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 10 FACU Common buckthorn Rhamnus cathartica S 10 FACU Hepatica Hepatica acutiloba H 5 UPL Virginia waterleaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum americanum S 25 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-660% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: F ITUKULUUT — Depth of Surface Water Depth to Free Water in Pit: (Transect 1) Depth to Saturated Soil: SOILS !CL 1, 191 1 rlag IYO. r4 Wetland Primary Indicators: 12 (in.) X Inundated Saturated in Upper 12 Inches Water Marks NA (in.) Drift Lines Sediment Deposits o (in.) Drainage Patterns in ,drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data _ FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transect 1 20 feet from flagged boundary) Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-32 COW 10YR 3/1 10YR 4/6 20% Silty loam Soil Profile: UPLAND (Pit 2, Transect 1) (26 feet from flagged boundary) 0-5 1 Cow 1 10YR 3/2 1 NA I NA I Sift loam 6-24 1 A I 10YR 4/2 I NA I NA I Sifty day loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed On National Hydric Soils List X Gle ed or Low-Chroma Colors I Other (Explain in Remarks FTC 1 LAIYU UC I CKMINA Hydrophytic Vegetation Present' Wetland Hydrology Present? Hydric Soils Present? v� Is this sampling point within a X Yes No wetland? X Yes No X Yes No X Yes No Photo Aspect Nortr Number of Flags 61 Isolated X Non -Isolated. Describe connection: This is the floodplain of a tributary to the Minnesota River. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator. SAK State: MN Wetland ID: G Transect ID: 1 VEGETATIt7N Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 5 FACW+ Wood nettle Laportea canadensis H 20 FACW Box elder Acernegundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Eastern cottonwood Populus deltoides T 20 FAC+ White snakeroot Eupatorium rugosum H 5 UPL Black willow Salix nigra T 5 OBL Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocarpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hornbeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 5 FACU Common buckthorn Rhamnus cathartica S 5 FACU Hepatica Hepatica acutiloba H 5 UPL Virginia waterieaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum americanum S 25 UPL White snakeroot Eupatorium rugosum H 5 UPL American elm Ulmus amen.cana T 10 FACW- Quaking aspen Populus tremuloides T 5 FAC+ ' OBL - Obligate. Occurs with an estimated 99% probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. r Page 2 Wetland ID: G ITUKULUGT — I ransect T, Ylt i rlag NO. raO Field Observations: Wetland Primary Indicators: Depth of Surface Water Depth to Free Water in Pit: (Transect 1) Depth to Saturated Soil. SOILS 24 (in.) X Inundated Saturated in Upper 12 Inches Water Marks NA (in.) Drift Lines X Sediment Deposits 0 (in) Drainage Patterns in Wetlands drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data X FAG -Neutral Test Other (Explain in Remarks) Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-12 COW 10YR 41 10YR 4/6 20% Silt loam 13-20 A N3/0 Sandy loam (alluvium) Soil Profile: UPLAND (Pit 2, Transact 1) 125 feet from flagged boundary) 0-5 Cow I 10YR 3/2 1 NA I NA I Silt loam 6-24 1 A I 10YR 4/2 I NA I NA I Silty day loam Hydric Soil Indicators: Histosol I Concretions Histic Epipedon HighOrganic Content in Surface Layer in San Soils Sulfidic Odor akin in San Soils A uic Moisture Regime cal Hydric Soils List Reducing Conditions tional Hydric Soils List X GI ed or Low-Chroma Colors in Remarks "AIWE� IRM01110-1111PL' Hydrophytic Vegetation Present? I Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Remarks: Photo Aspect South Number of Flags: 11 _Isolated X Non -Isolated. Describe connection: This is the floodplain of a tributary that flows to the Minnesota River Memorandum TO: Lori Haak FROM: Scott Krych, Mike Graham — GES, Inc. DATE: December 30, 2005 SUBJECT: Wetland Delineation for D.R. Horton Project, Chanhassen, Minnesota As you know, Graham Environmental Services, Inc. (GES) conducted a delineation of wetlands at the above -referenced site (Figure 1) on October 15, 2005. We have provided your office with a copy of our delineation report. Subsequently, the City has indicated that they believe that a depressional area not delineated by GES (Figure 2), but delineated previously by Pinnacle Engineering and surveyed by RLK in 2001 (Figure 3), is jurisdictional wetland. The depressional area in question will be called "Area 1" throughout the remainder of this memorandum. Area 1 is located on the northern half of the site southeast of Wetland A, as identified in the GES report. This area occupies a depression that is tiled, ditched, and was planted in crops every year since 1985 according to Farm Service Agency (FSA) slides. Sloping cropland borders this depression on all sides. Area 1 is served by an 8-inch drain tile that was actively removing water from the area during our delineation activities. The drain tile outlet is located at the southwestern portion of the site in an area that was delineated as Wetland F. To further investigate Area 1, GES reviewed all available aerial photographs for the site at the Carver County FSA offices on December 15, 2005. Photographs were available for the years 1985-1994 and 2000. We also reviewed an aerial photograph for 2003 from another source as part of our analysis.' Carver County FSA aerial photographs flown annually during the months of June, July, or August were also evaluated to review the site for crop stress due to wetness, inclusion of non -cropped areas within cropland, different planting dates, surface water, areas drowned out by accumulated water, areas not planted due to moisture, etc.2 We've summarized our findings below. ' ' GES followed guidelines for reviewing FSA aerial photographs established in the August 1994 "State of Minnesota Interagency Cooperative Agreement for Implementation of the Federal Wetland Delineation Memorandum of Agreement"(MOA) between the Natural Resource Conservation Service, the U.S. Army Corps of Engineers, the U.S. Environmental Protection Agency, and the U.S. Fish and Wildlife Service. 2 GES followed the Off -Site Procedures Use of Rainfall Data with ASCS Slides to Determine Hydrology section of the MOA to evaluate the aerial photographs. These procedures require the use of rainfall spreadsheets from the NOAA weather station nearest to the site. This methodology is especially helpful in evaluating whether or not wetland hydrology exists in cropland areas that are planted or plowed. Ms. Lori Haak D.R. Horton Site December 30, 2005 Page 2 of 4 Hydrology Rainfall data is used to identify whether a specific area has received normal precipitation for an individual year or to establish climatic context for a specific region. Rainfall totals are a way to assess short-term fluctuations in ground and surface water levels that are important to note when evaluating wetland parameters. Areas that have received above normal rainfall may exhibit wetland hydrology when they would normally be dry. Conversely, areas that receive less than normal precipitation may not exhibit wetland hydrology when they normally would. The climatic context is a longer term evaluation of rainfall totals and may indicate growing season drought, pluvial, or normal periods and are also important to note when evaluating wetland parameters. Both rainfall and climactic data are important in areas that are farmed, tiled, ditched or that have numerous temporarily flooded wetlands. Both types of rainfall data are used when conducting on- and off -site evaluations on farmland. The Chaska recording station is the nearest station to the site providing rainfall data. The average annual precipitation for this area according to data from this station is 30.31 inches. Table 1 lists the average monthly rainfall for this area and the departure from normal during the four months prior to our site visit in October. Table 1 Month Average Monthly Rainfall (inches) 2005 Recorded Monthly Rainfall inches Departure from Normal (inches) June 4.16 7.26 +3.10 July 4.41 2.20 -2.21 August 4.34 4.73 +0.39 September 2.97 9.85 +6.88 October 2.14 5.01 1 +2.87 All data reported from Station 1465, Chaska, Minnesota. A plus (+) sign indicates above average amounts, a minus (-) sign indicates below average amounts. The climatic conditions for this area of the state were 125 percent of normal for the year through October, 110 percent of normal for the year through September, and 100 percent of normal for the year through August. For the southern one-half of Minnesota, the 2005 growing season ended on a very wet note. All-time high monthly rainfall records were set in some communities. For many locations in central and southern Minnesota, September precipitation totals topped seven inches. Rainfall in some locations exceeded ten inches for the month (Minnesota Climatology Working Group Home Page, October 2005). FSA aerial photographs show that there were secondary indicators of crop stress in Area 1 in the years 1993, 1994, and 2000. All three of these years were considered wetter than average or drier than average and would not be included in the analysis under MOA procedures. No signatures were present in years which fell within the Ms. Lori Haak D.R. Horton Site December 30. 2005 Page 3 of 4 normal precipitation range according to the MOA methodology. The MOA that prescribes how FSA reviews should be conducted requires a summary of the slide review and climate analysis. It also states "That if the number of wet signatures in normal years is > 50 percent, the site will be considered to have wetland hydrology." Since signatures meeting MOA criteria are present in only three of the available 12 years (25 percent), the wetland hydrology threshold described in the MOA was not met in Area 1. Vegetation The plant community in Area 1 is dominated by soybeans (Glycine max), pinkweed (Polygonum pensylvanicum, FACW+), barnyard grass (Echinochloa crusgalli, FACW) and cocklebur (Xanthium strumarium, FAC) (see attached data sheet for more ' comprehensive information). Although the vegetation meets wetland criteria per the 1987 Corps of Engineers Wetlands Delineation Manual (1987 Manual), it should be noted that these species are all annuals and reflect above -normal precipitation that was ' present in this area during critical germination periods during the 2005 growing season. Hydric Soils The soils in Area 1 exhibit up to 25 inches of accumulated sediments (eroded deposits) over the original soil surface. The accumulated sediments are dark brown (10YR 3/2) silt Ioams over dark gray/brown (10YR 4/2) silt loam. Soils exhibited bright (10YR 4/6) mottles to within six inches of the soil surface, but may be oxidation due to farming practices, crop residue, and some water level fluctuation. No inundation or saturation was observed within 16 inches of the soil surface for the soil profiles examined within ' the depression. Conclusion Based on the conditions outlined above and within our delineation report, Area 1 is considered an "atypical situation" as defined in the 1987 Manual due to the effects of human activities. This area exhibited a plant community that is dominated by annual ' weed species some of which are considered hydrophytic and others as upland species. Due to the orientation of the plant species identified in this area, the plant community is considered FAC neutral or hydrophytic. Hamel soils are transitional, occurring in ' sloping areas where shallow depressions or drainages occur on the landscape. These soils were generally created in areas where surface sediments accumulate due to surface runoff. Hamel soils meet the technical definition of hydric soils when there are no hydrologic modifications. However, the hydrology that formed these soils historically has been altered by the presence of drain tiles and a shallow surface drain. Area 1 did not exhibit any primary indicators of hydrology or the required two secondary indicators (only FAC neutral plant community was present) to be called jurisdictional wetland. It is noteworthy that other similar basins on the site exhibited primary wetland indicators after significant rainfall events in October and as defined by the 1987 Manual. In summary, it is our opinion that Area 1 is not technically a jurisdictional wetland. 1 Ms. Lori Haak D.R. Horton Site December 30, 2005 Page 4 of 4 Regardless, the developer has indicated a desire to acquiesce to calling a portion of Area 1 jurisdictional wetland and mitigating for the impacts if we can agree to its size. The most recent City correspondence included a hand -sketch of a suggested wetland boundary including approximately two acres. The Pinnacle Engineering delineation and RLK survey completed in 2001 identifies through technical methods a 0.26 acre wetland. Subsequently, this wetland boundary was included on the recently approved concept plan on the property. If the City concurs with the 0.26 acre boundary as the jurisdictional wetland of Area 1, we are prepared to submit a Wetland Replacement Plan (WRP) on behalf of the developer, which includes 2:1 mitigation per the Wetland Conservation Act (WCA) for the 0.26 acre area. The mitigation plan would include the possibility of on -site New Wetland Credit (NWC) as well as Public Value Credits on the site through the construction of storm water ponds. If NWC on the site proves infeasible, we would appreciate discussing with you the potential of restoring adequate wetland area within another area in the City. We are also in contact with Houston Engineering, who are working on a WRP for the wetland impact of the East-West Collector, regarding the possibility of a joint mitigation effort. We would appreciate an opportunity to discuss these issues with you after you have ' had a chance to review this memorandum. Thank you. Cc: Ron Mullenbach, D.R. Horton, Inc. — Minnesota Joel Cooper, James R. Hill, Inc. Randy Smith, James R. Hill, Inc. Q% 'G ES WS Graham Environmental Services, Inc. Figure 1. GES Delineation Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 Figure 2. Chanhassen Area 1 �G Boundaries Peterson Site ' ESS Chanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005.133 Figure 3. Pinnacle Area 1 Boundaries EPeterson Site SChanhassen, Minnesota Graham Environmental Services, Inc. GES Project No. 2005.133 DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: Upland Transect ID: 1 VFGFTATION Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Barnyard grass Echinochloa crusgalli H 20 FACW Pinkweed Polygonum pensylvantcum H 40 FACW+ Coddbur Xanthium strumarium H 30 FAC Rough amaranth Amaranthus retroflexus H 10 FACU+ Shepard's purse Capsella bursa-pastoris H <5 FAC- Field pennycress Thlaspi arvense H <5 UPL Dominant Plant S ecies: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Beans Gycine max H 90 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPI, — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: Upland ITUKULUUT — I ransect 1, YIT 9 i-iag Imo. IYA Field Observations: Wetland Primary Indicators: Depth of Surface Water NA (in.) Inundated Saturated in Upper 12 Inches Depth to Free Water in Water Marks Pit: (Transect 1) 14 (in.) Drift Lines Sediment Deposits Depth to Saturated Soil: 14 (in.) Drainage Patterns in SOILS drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data X FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transact 1 NA feet from flagged boundary) Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-25 COW 10YR 3/2 1 10YR 4/6 1 20% 1 Silty loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 25 feet from flagged boundary) 0-5 COW 10YR 3/2 1 NA I NA I Sift loam 6-19 A 10YR 4/2 1 NA I NA I Sift loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon Hi h Orqanic Content in Surface Layer in San Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks WE 1 L kr4U Ut I tKMIIYA I IUN Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? Yes X No Wetland Hydrology Present? Yes X No Hydric Soils Present? X Yes No Cowardin Classification: Upland Remarks: Tiled basin that was dry after an 8" rainfall event. Photo Aspect None Number of Flags NA Isolated Non -Isolated. Describe connection. Appendix B MNRAM Functional Assessments Wetland Functional Assessment Summary Peterson Property Downstream Weiland Hydrologic Flood Wafer Water Shoreline Welland ID Hydrogeomorphologv Regime Storage Qua/iV Quality Protection 02-031-23-02-011-K Depressional/Flow-through (apparent inlet and outlet), Depresslonal/Flow-through (apparent Moderate Moderate High High Not Applicable inlet and outlet) 27-118-23-28-000-M Floodplaln (outside waterbody banks) Moderate Moderate Moderate Moderate Moderate 27-116-23-28-001-1 DepressionaVfributery (outlet but no perennial inlet or drainage entering from upstream Low Moderate Low Low Not Applicable subwatershed) Tuesday, February 11, 2006 Page I of I Wetland Functional Assessment Summary Peterson Property Additional Information Aesthetics, Ground- Wetland Wetland Stonmvater Amphibian Recreation, Water Restoration Stormwater Treatment Wetland to WildWe Habitat Fishery Habitat Habitat Education Commercial Interaction Potential Sensitivity Needs 02-031-23-02-011-K Modersts Not Applicable Not Applicable Moderate Not Applicable Combination Low High High Discharge, Recharge 27-116.23.2&000-M Moderate Moderate Not Applicable Moderate Not Applicable Combination Moderate Moderate Moderate Discharge, Recharge 27-116-23-25-001.1 Moderate Not Applicable Net Applicable Low High Recharge Moderate Moderate Law Tuesday, February 21, 2006 Page I of Appendix Vegetation Management Vegetation Management Plan The Rushes Blaine, Minnesota Site Preparation (for areas above the water line) A. Site Preparation shall consist of the following: i. Preparation of the seedbed in a manner that prepares the project site for seed. After final grading has been completed, the site will be cultivated with a light disking and dragging. Install seed according to specifications after seedbed is prepared. Seed Specifications A. Use native grass seed: fresh, clean, dry new -crop seed complying with the Association of Official Seed Analysists' "Rules for Testing Seeds" for purity and germination tolerances. B. Seed mixes shall be blended by the Contractor using the specified species and ratios. Seed mix species and ratios shall be guaranteed by the contractor to be true to specifications as required. The contractor shall supply and plant native seed as pure live seed (PLS). See planting plan for planting schedule. All seed shall have the proper stratification and/or scarification to break dormancy for spring planting. No treatment required for seed used in summer and fall plantings. III. Seeding Protocol (includes Wetland and Upland Buffer Areas) A. Fall seeding shall occur between mid October and mid November. Given the small size of the wetland and buffer areas, seed may be hand -broadcast over the site at the rates and with the species mix identified. After seeding, the site will be dragged and cultipacked to ensure good seed to soil contact. IV. Cover Crop A. For a fall planting, use a cover crop of winter what at a rate of 20 pounds per acre. V. Maintenance A. Year One: Mow, using a flail type mower, to a height of 5 to 8 inches, just over the height of the emerging prairie plants before weeds go to seed. Assume three mowings in the first season. B. Year Two: Spot mow and spray invasive weed species as necessary. C. Year Three: Spot mow and spray invasive weed species as necessary. D. Year Four: Conduct prescribed burn. E. Year Five: Spot mow and spray invasive weed species as necessary. Table 1. Minnesota DOT Herbaceous Seed Mix for Wetland Areas at and 1 foot Above the Normal Water Level Mixture 25A Modified (25B) - Prairie Sedge Meadow Common Name Botanical Name %of Mix Bluestem. big Andropogon gerardi 5.0 Canada anemone Anemone canadensis 0.1 Marsh milkweed Asclepias incamata 0.5 New England aster Aster novae-angliae 0.6 Swamp aster Aster puniceus 0.6 Fringed brome Bromus ciliata 5.0 Blue -joint grass Calamagrostis canadensis 0.1 Bottlebrush sedge Carex comosa 1.0 Tussock sedge Carex stricta 0.5 Fox sedge Carex vulpinoidea 0A Showy tic -trefoil Desmodium canadense 0.4 Wheat grass, slender Elymus trachycaulus 6.0 Virginia wild -rye Elymus virginicus 6.0 Joe-pye weed Eupatonum maculatum 0.4 Boneset Eupatonum perfoliatum 0.3 Reed manna grass Glycena grandis 0.3 Fowl manna grass Glycena striata 0.2 Early sunflower Heliopsis helianthoides U Blue -flag iris Ins virginica-shrevii 0.5 Common rush Juncus effusus 0.2 Meadow blazingstar Liatris ligulistylis 0.4 Tall blazingstar Liatris pycnostachya 0.4 Great blue lobelia Lobelia siphilitica 0.1 Rye grass, annual Lolium italicum 10.0 Monkey flower Mimulus nngens 0.1 Wild Bergamot Monarda fistulosa 0.6 ReGreen NA 42.0 Switch grass Panicum virgatum 1.0 Fowl bluegrass Poa palustris 5.0 Black-eyed Susan's Rudbeckia hirta 0.6 Green bulrush Scirpus atrovirens 0.3 Wool grass Scirpus cypennus 0.3 Soft -stem bulrush Scirpus vallidus 1.0 Grass -leaved goldenrod Solidago graminifolia 0.2 Indian grass Sorghastrum nutans 6.0 Prairie cord grass Spartina pectinata 2.0 Blue vervain Verbena hastata 0.5 Ironweed Veronia fasciculata 0.2 Culver's root Veronicastrum virginianum 0.1 Golden Alexander's Zizea aurea 0.4 Total: 100.0 Description: Native sedge/prairie meadow mix. Reaches a height of 36 to 48 inches. Developed for use on hydric soils and for wetland restoration. Installation Note: Sedges, meadow grasses, and meadow forbs are best installed by broadcast method, separate from main grass mix, in early spring or fall if possible. Many of theses species require After seeding, the site will be lightly dragged and cultipacked to ensure good ' seed to soil contact. The seed mix specified above is per the "Mn/DOT Seeding Manual 2000", published by the Minnesota Department of Transportation. The graded upland areas above the NWL of Mitigation Area #2 will be seeded with the Mn/DOT seed mix specified in Table 2: Table 2. Minnesota DOT Herbaceous Seed Mix for Upland Buffer at Mitigation Area #2 Mixture 15A Modified (15B) — Mesic Tall Grass Prairie Common Name Botanical Name %of Mix Bluestem, big Andropogon gerardi 5.0 Grama, sideoats Bouteloua curtipendula 10.0 Wild rye.. Canadian Etymus canadensis 5.0 Wheat grass, slender Elymus trachycautus 5.0 Rye grass, annual Lolium italicum 10.0 ReGreen NA 34.0 Forbs (Table F-1, F-2, or F-3) NA 5.0 Switch grass Panicum virgatum 2.0 Bluestem, little Schizachyrium 12.0 scopanum Indian grass Sorghastrum nutans 12.0 Total: 100.0 Rate: 30 Ibs/acre (33 kg/ha). Description: Native mix. Reaches a height of 36 to 48 inches. Excellent for use on all soil types. For use in oak savanna and prairie regions of the state. As stated in Table 2, one of the following three forb mixes must be used to comprise five percent of the seed mix: Table F-1(NW Forbs) Common Name Botanical Name Onion, prairie Allium stellatum Aster, heath Asterericoides Aster, smooth -blue Asterlaevis Milkvetch, Canada Astragalus canadensis Prairie clover, white Dales candidum Prairie clover, purple Dales purpureum Tick -trefoil. showy Desmodium canadense Coneflower, narrow -leaved Echinacea angustifolia Ox-eye, common Heliopsis helianthoides Bushclover, round -headed Lespedeza capitata Blazingstar, rough Liatris aspera Blazingstar, tall Liatris pycnostachya Bergamot, wild Monarda fistulosa Penstemon, showy Penstemon grandiflorum Coneflower, columnar Ratibida columnifera Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago ngida Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, golden Lzis aurea Rate: As specified in the seed mix tabulation. All species shall be provided in equal weights. Substitutions should not be allowed. Description: Native forbs to be added to native grass mixtures in NW Minnesota. Common Name Botanical Name I Aster, smooth -blue Milkvetch, Canada Partridge pea Prairie clover, white Prairie clover, purple Tick -trefoil. showy Coneflower, narrow -leaved Ox-eye, common Blazingstar, rough Blazingstar, tall Bergamot, wild Penstemon, showy Coneflower, columnar Coneflower, grey -headed Asclepias tuberosa Aster laevis Astragalus canadensis Chamaecrista fasiculata Dalea candidum Dalea purpureum Desmodium canadense Echinacea angustffolia Heliopsis helianthoides Liatris aspera Liatris pycnostachya Monarda fistulosa Penstemon grandiflorum Ratibida columnifera Ratibida pinnata Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago hgida Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, golden Zizia aurea Rate: As specified in the seed mix tabulation. All species shall be provided in equal weights. Substitutions should not be allowed. Description: Native forbs to be added to native grass mixtures in SW Minnesota. Table F3 (SE Forbs) Common Name Botanical Name Milkweed, butterfly Asclepias tuberosa Aster, heath Asterehcoides Aster, smooth -blue Aster laevis Milkvetch, Canada Astraga/us canadensis Partridge pea Chamaecrista fasiculata Prairie clover, white Dalea candidum Prairie clover, purple Dalea purpureum Tick -trefoil. showy Desmodium canadense Ox-eye, common Heliopsis helianthoides Blazingstar, rough Liatris aspera Blazingstar, tall Liatris pycnostachya Bergamot, wild Monarda fistulosa Penstemon, showy Penstemon grandiflorum Coneflower, grey -headed Ratibida pinnata Black-eyed Susan Rudbeckia hirta Goldenrod, stiff Solidago rigida Spiderwort, Ohio Tradescantia ohiensis Vervain, blue Verbena hastata Vervain, hoary Verbena stricta Alexanders, golden Zizia aurea Rate: As specified in the seed mix tabulation. All species shall be provided in equal weights. Substitutions should not be allowed Description: Native forbs to be added to native grass mixtures in SE Minnesota. After seeding, the site will be lightly dragged and cultipacked to ensure good seed to soil contact. The seed mix specified above is per the "Mn/DOT Seeding Manual 2000", published by the Minnesota Department of Transportation. A 1 small portion of the upland buffer area on the west side of the site will be composed of existing upland hardwoods that would remain undisturbed. ' A permanent conservation easement will be placed over the mitigation wetland and buffer areas in accordance with Wetland Conservation Act rules. ka Cr4h4m r u Graham Environmental Services, Inc. P.O. Box 189 Ellsworth, Wisconsin 54011 TO: Lori Haak FROM: Scott Krych DATE: December 8, 2005 SUBJECT: Peterson Site Dear Lori: Memorandum DEC 0 9 2005 CITY OF CHANHASSEN Enclosed is one copy of the wetland delineation reports for the Peterson Site. Please review the report and let me know if you have any questions. Thank you, Phone: 715-647-5110 / 888-279-2070 Fax: 715-647-5209 / 888-279-2069 Graham Environmental Services, Inc. P.O. Box 189 Ellsworth, Wisconsin 54011 Wetland Delineation Report Peterson Site Prepared for: DR Horton Chanhassen, Minnesota December 8, 2005 Background Graham Environmental Services, Inc. (GES) has completed the site evaluation for jurisdictional wetlands on a parcel located in portions of the NW'/<, Section 26 and NE %of Section 27, T116N, R23W, Carver County, Minnesota. Pioneer Trail crosses the southern portion of the property and croplands, forested slopes, forested tributaries and individual farms border the west, north and eastern portions of the property (Figure 1). According to the U.S.G.S. Shakopee Quadrangle (Figure 2), elevations change significantly from the Bluff Creek floodplain and other tributaries to the highest elevations located at the center of the site. Seven wetlands are located throughout the site with cropland, old pasture, fencerows, wooded slopes and an abandoned home located on the upland areas. On October 14, 2005, GES evaluated the site for jurisdictional wetlands and found seven on the site. The approximate site and wetland boundaries are shown on a 2003 aerial photograph in Figure 3. Methodologies The site was assessed for wetlands using the on -site methods contained in the "Routine Determinations" section of the U.S. Army Corps of Engineers "Wetlands Delineation Manuar' (Technical Report Y-87-1, 1987). This is the methodology currently used by both the U.S. Army Corps of Engineers for implementation of Section 404 of the Clean Water Act and by local government units administering the Minnesota Wetland Conservation Act. GES classified the wetlands under the U.S. Fish and Wildlife Service (FWS) Cowardin system and Circular 39 methodologies. ' Phone: 715-647-5110 / 888-279-2070 Fax: 715-647-5209 / 888-279-2069 Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 8, 2005 Page 2 of 8 Results Wetland A Wetland A is located along the western boundary of the property. This wetland is an isolated depression along the fenceline that defines the edge of the Peterson site with an adjacent farm field. Past farming activities have elevated sediment and nutrient levels accumulating within the wetland. This wetland is predominantly a reed canary grass monotype with annual weed species located at the transition between the reed canary grass monotype and cropped upland areas. Upland plant communities are comprised of soybeans and corn. Dominant wetland vegetation includes: reed canary grass (Phalaris arundinacea) with other species occurring as subdominants. The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) maps this area as a ditched seasonally flooded palustrine emergent wetland (PEM1Cd). GES would classify this wetland as a ditched temporarily flooded palustrine emergent wetland (PEM1Ad) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. This wetland receives significant runoff from adjacent cropland and much of the soil profile was obscured by accumulated overwash sediments. Soils in Wetland A are described as 30 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam with bright mottles (10YR 4/6) to 30 inches. The Carver County Soil Survey (Figure 6) map soils in the vicinity of Wetland A as Hamel soils (WM). The colors and textures of soils observed along basin transects are consistent with Hamel loams. Upland soil profiles exhibited mixed silt loams with dark brown matrix colors (10YR 3/2) for 6 inches over gray -brown loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny loams (KC2) on 6 to 12 percent slopes. Free water was present at the surface in sample points at the wetland center and were present within 8 inches of the soil surface at transitional soil pits. It is also important to note that the evaluation took place after rainfall events of over 5 inches had occurred ten days prior to the evaluation. The wetland hydrology parameter in this wetland was met by documenting one primary indicator (surface water) at the wetland center and by two secondary indicators (FAC neutral vegetation) and using professional judgment at the transition between wetland and upland. No free water or evidence of saturation were observed at upland locations. t Peterson Property Wetland Delineation Report GES Project No. 2005.133 ' December 8, 2005 Page 3 of 8 The jurisdictional boundary was established at the change in vegetation ' from predominantly hydrophytic herbaceous species to a plant community dominated by crops. ' Wetland B Wetland B is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the northeastern portion of the site. Upland areas adjacent this wetland are comprised of old field plant communities on slopes that face south and east and by croplands planted to corn ' during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, American elm (Ulmus americana), spotted jewelweed (Impatiens capensis), and the presence of plant species that are often associated with disturbed ground such as sandbar willow (Salix exigua), black willow (Salix nigra), giant goldenrod (Solidago gigantea), and yellow foxtail (Setaria glauca). The National Wetlands Inventory for Shakopee, t Minnesota (Figure 4) maps only the most northwestern corner of the site. GES would classify a larger area as a seasonally flooded palustrine emergent/forested wetland (PEM/F01 C) or as Circular 39 Type 3/7 inland ' shallow marsh/wooded swamp. Soils were evaluated by digging soil pits perpendicular to the wetland ' edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland B are described as 13 inches of dark brown (Munsell matrix color 10YR 3/2) silty loam followed by black (10YR ' 2/1) loams to 24 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland B as Hamel loams (HM) or Houghton and Muskego soils (MK). The colors and textures of soils observed along ' basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited mixed sandy loams with dark brown matrix colors (10YR 3/2) for 6 inches over bright yellow clay loam (10YR 4/3). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. ' The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species ' to a plant community dominated by pioneering grasses, (orbs or crops. Wetland C ' Wetland C is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. The natural outlet has been blocked by the construction of a driveway at ' the western edge of the wetland and has probably been made wetter by the construction of roads and driveways next to the wetland. The center of the wetland was entirely open water at the time of the delineation and ' Peterson Property Wetland Delineation Report GES Project No. 2005.133 t December 8, 2005 Page 4 of 8 was characterized by concentric rings of annual hydrophytic vegetation at ' the wetland/upland transition. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass, green ash ' (Fraxinus pennsylvanica), switch grass (Panicum virgatum), and the presence of plant species that are often associated with disturbed ground such as giant ragweed (Ambrosia trifida), black willow, Iamb's quarters ' (Chenopodium album), and water smartweed (Polygonum amphibium). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify a this ' area as a seasonally flooded palustrine emergent wetland (PEMC) or as Circular 39 Type 3 inland shallow marsh. ' Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland C are described as 14 inches of dark ' brown (Munsell matrix color 10YR 2/1) silty loam followed by black (10YR 2/1) loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland C as Glencoe clay loams (GL). The colors ' and textures of soils observed along basin transects are consistent with a variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited mixed silty clay loams with dark brown matrix colors (10YR 4/3) for 12 inches over bright yellow clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. ' This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by crops. ' Wetland D Wetland D is located adjacent to Pioneer Trail on the southern portion of the site. It is also located at the base of significant slopes to the north. A ' natural connection to Wetland C has been blocked by the construction of a driveway at the eastern edge of the wetland. Upland areas adjacent this wetland are comprised of croplands planted to corn during the 2005 ' growing season. Dominant wetland vegetation includes: reed canary grass, switch grass, and the presence of plant species that are often associated with disturbed ground such as giant ragweed, Iamb's quarters, ' and cocklbur (Xanthium strumarium). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 8, 2005 Page 5 of 8 palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland D are described as 6 inches of dark brown (Munsell matrix color 10YR 4/2) silty loam followed by black (10YR 2/1) clay loams to 20 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland D as Cordova -Webster complex (CW). The colors and textures of soils observed along basin transects are consistent with a variant of Hamel soils or of an accumulation of eroded sediments from surrounding uplands. Upland soil profiles exhibited clay loams with brown matrix colors (10YR 4/2) for 14 inches over gray -brown clay loam (10YR 4/1). Upland soils are mapped as Lester -Kilkenny soils (KE2) on 18 to 25 percent slopes. This wetland is an isolated depression that appears to be reliant upon surface runoff to maintain wetland hydrology. The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species to a plant community dominated by crops. Wetland E Wetland E is located along the Bluff Creek floodplain and in minor topographic ravines that focus overland flow to lower elevations on the site. This wetland occupies the eastern portion of the site. Upland areas adjacent this wetland are comprised of old field plant communities on slopes that face north and by croplands planted to corn during the 2005 growing season. Dominant wetland vegetation includes: reed canary grass with subdominants including Joe-pye weed (Eupatorium maculatum), stinging nettle (Urtica dioica), redtop (Agrostis alba), and lady's thumb (Polygonum persicaria). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a temporarily flooded palustrine emergent wetland (PEMA) or as Circular 39 Type 2 inland fresh meadow. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland E are described as 14 inches of dark brown (Munsell matrix color 10YR 3/1) silty loam followed by dark brown (10YR 3/1) loams to 30 inches. The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland E as Klossner muck (PM) or Hamel soils (HM). The colors and textures of soils observed along basin Peterson Property Wetland Delineation Report GES Project No. 2005.133 ' December 8, 2005 Page 6 of 8 transects are consistent with a variant of Hamel soils. Upland soil profiles ' exhibited mixed silt loams with dark brown matrix colors (10YR 3/1) for 34 inches. Upland soils are mapped as Lester -Kilkenny soils (KC2) on 6 to 12 percent slopes. ' The jurisdictional boundary was established at a rise in topography and a change in vegetation from predominantly hydrophytic herbaceous species ' to a plant community dominated by pioneering grasses, forbs or crops. Wetland F ' Wetland F is located along a tributary floodplain that flows to the Minnesota River and in minor topographic ravines that were created by down -cutting at drain tile outlets. This wetland occupies a small portion of ' the southwestern corner of the site. Upland areas adjacent this wetland are comprised of sugar maple forest on steep slopes on either side of the tributary. Dominant wetland vegetation is scarce within the bottom of the ravine but includes: duckweed (Lemna minor). The National Wetlands Inventory for Shakopee, Minnesota (Figure 4) does not map any wetlands on this portion of the site. GES would classify this area as a seasonally ' flooded palustrine emergent wetland (PEM1C) or as Circular 39 Type 3 inland fresh marsh. ' Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland F are described as 32 inches of ' accumulated sediments that are dark brown (Munsell matrix color 10YR 3/1). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland F as Lester -Kilkenny loams (KF). The colors and textures of soils ' observed along basin transects are consistent with a variant of Hamel soils. Upland soil profiles exhibited silt loams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) ' on 12 to 18 percent slopes. The jurisdictional boundary was established at an abrupt rise in topography. Wetland G ' Wetland G is located along the Bluff Creek floodplain and is surrounded by high quality sugar maple forest at the southeastern portion of the site. Dominant wetland vegetation includes: reed canary grass and wood nettle ' (Laportea canadensis) with subdominants including eastern cottonwood (Populus deltoides), white snakeroot (Eupatorium rugosum), box elder (Acernegundo), and black willow. The National Wetlands Inventory for Peterson Property Wetland Delineation Report GES Project No. 2005.133 December 8, 2005 Page 7 of 8 Shakopee, Minnesota (Figure 4) does not map any wetlands on this ' portion of the site. GES would classify this area as a seasonally flooded palustrine emergent wetland (PEM1C) or as Circular 39 Type 3 inland fresh marsh. Soils were evaluated by digging soil pits perpendicular to the wetland edge and examining the profiles' texture, color, and redoximorphic characteristics. Soils in Wetland G are described as 12 inches of accumulated sediments that are dark brown (Munsell matrix color 10YR 4/1) followed by 8 inches of black loam (N3/0). The Carver County Soil Survey (Figure 5) map soils in the vicinity of Wetland G as Lester - Kilkenny loams (KF). The colors and textures of soils observed along basin transects are consistent with floodplain soils in depositional areas of riverine systems. Upland soil profiles exhibited silt loams with dark brown matrix colors (10YR 3/2) for 5 inches followed by 18 inches of gray -brown clay loam (10YR 4/2). Upland soils are mapped as Lester -Kilkenny soils (KD2) on 12 to 18 percent slopes. The jurisdictional boundary was established at an abrupt rise in topography. Regulatory Jurisdiction Minnesota DNR Protected Waters The Minnesota DNR Protected Waters Inventory (Figure 7) does not map any protected waters or wetlands on the site. Minnesota Wetland Conservation Act The jurisdictional wetlands that were identified on the subject parcel are subject to the Wetland Conservation Act Rules Chapter 8420. Federal Regulatory Jurisdiction The enclosed wetland delineation data forms indicated whether wetlands are isolated or not for purposes of U.S. Army Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. This determination is made by GES in the field at the time of the delineation and is essentially our best guess based on the portion of the particular wetland we observe. In some cases, only a small portion of the wetland edge is evaluated. If no inlets or outlets are observed in the evaluated area, and none are evident on U.S.G.S. topographic maps or aerial photos, we are inclined to t Peterson Property Wetland Delineation Report GES Project No. 2005.133 ' December 8, 2005 Page 8 of 8 determine the wetland is isolated. However, since the entire wetland is ' sometimes not assessed, it is possible that inlets and/or outlets do exist and that the wetland has a surface connection to a federal "navigable' water and, thus, falls within the jurisdiction of Section 404. Therefore, a ' determination by GES of whether a particular wetland is isolated or not should not be considered a final determination with regard to Corps jurisdiction. ' Concurrence with our findings should be obtained from the U.S. Army Corps of Engineers, Carver County, and the City of Chanhassen before ' any earthwork is undertaken on the site. Additional information regarding the vegetation, soils and hydrology of the ' wetlands are included in Appendix A. Ground photos of all the areas evaluated for jurisdictional criteria are included in Figures 7-10. The information contained herein represents my findings during wetland delineation activities conducted on October 14, 2005 at the referenced site. Graham Environmental Services, Inc. Scott Krych Professional Wetland Scientist No. 000303 Enclosures a�— - -CCC) Date 4 �G XE S44104 Graham Environmental Services, Inc. Figure 1. Site Map Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 9 � � F � i i L .,; Approximate Site Location' u Y. C0.,HI y a y (,-% �G ES Graham Environmental Services, Inc. Figure 2. U.S.G.S. Shakopee Quadrangle Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 ' Figure 3. Area Reviewed for �G Jurisdictional Wetlands ' Peterson Site SChanhassen, Minnesota ' Graham Environmental Services, Inc. GES Project No. 2005.133 ' Figure 4. National Wetlands 114%G Inventory ' Peterson Site SChanhassen, Minnesota % ' Graham Environmental Services, Inc. GES Project No. 2005.133 �r —iffP- b[ PM �5 r KF KC? KC2 _ f - - / KB 2 KD I v - �Q:� G ES Graham Environmental Services, Inc. Figure 7. Ground Photos — Wetlands A and B Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 A s Al utX 1 J k l� 1 4, I -to. I%%G ES Graham Environmental So-viees, hu. Wetland D looking south. Figure 8. Ground Photos — Wetlands C and D Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 / d @ 2 �Q�G ES Graham Environmental Services, Inc. Figure 10. Ground Photos — Wetland G Peterson Site Chanhassen, Minnesota GES Project No. 2005.133 Appendix A DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: A Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 80 FACW+ Giant ragweed Ambrosia triBda H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 5 FACW Switch grass Panicum virgatum H 1 10 FAC+ Prickly wild gooseberry Ribes cynosbati S 5 UPL Box elder Acernegundo T 10 FACW- Dominant Plant S cies: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Corn Zea mays H 90 UPL Giant ragweed Ambrosia trifida H 5 FAC+ Virginia creeper Parthenocissus quinquefolia H 5 FAC- Common milkweed Asclepias syriace H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL OBL — Obligate. Occurs with an estimated 99%probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: A IT UKULV" T - I ranseci 1, rl[ 7 riag NO. Al Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in.) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transact 1) NA (in-) Drift Lines FAG -Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: o (in.) Drainage Patterns in Wetlands SOILS Soil Profile: WETLAND Pit 1, Transact 1 20 feet from flaccied bounds Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-30 COW 10YR 3/2 10YR 4/6 20% Silty loam Soil Profile: UPLAND (Pit 2, Transact 1) (25 feet from flagged boundary) 0-6 Cow 10VR 312I NA I NA Silt loam 11 7-19 1 A 10YR 412 I NA I NA Sift loam Hydric Soil Indicators: Histosol Concretions Histic E i edon High Organic Content in Surface Layer in Sandy Soils Suffidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other Ex lain in Remarks rVt I LAND Ut I tKMINA I IUN Hydrophytic Vegetation Present? X Yes Wetland Hydrology Present? X Yes Hydric Soils Present? X Yes Cowardin Classification: PEMA Remarks: Tiled basin that was inundl Photo Aspect: West Number of Flags: 16 X Isolated within a No I wetland? No No after an 8" rainfall event. X Yes No II Non -Isolated. Describe connection: Ditch flows north of the site in a county ditch. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: B Transact ID: 1 VEGETATION Dominant Plant S cies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Spotted jewelweed Impatiens capensis H <5 FACW Black willow Salix nigra T 5 OBL Green ash Fraxinus pennsylvanica T 75 FACW Rough amaranth Amaranthus retrofiexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Riverbank grape Vids riparia H 5 FACW- Swamp milkweed Asclepias incarnate H <5 OBL Elderberry Sambucus canadensis S 5 FACW- Box elder Acernegundo T 10 FACW- American elm Ulmus americana T 25 FACW- Dominant Plant Species: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Smooth brome Bromus inermis H 20 UPL Giant ragweed Ambrosia trlfida H 5 FAC+ Virginia creeper Parthenocissus quinquefolia H 5 FAC- Common milkweed Asc/epias syriace H 5 UPL Prickly wild gooseberry Ribes cynosbati S 5 UPL Kentucky bluegrass Poa pratensis H 20 FAC- Canada goldenrod Solidago canadensis H 20 FACU Corn Zee mays H 40 UPL Prickly ash Xanthoxylum americanum S 20 UPL Cocklebur Xanthium strumariurn H 5 FAC Field nut sedge Cyperus esculentus H 5 FAC+ Yellow foxtail Setaria glauca H 5 FAC Bristly (oxtail Setaria verticellata H 5 FACU OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99%probability in wetlands; FAC — Facultative. Occurs an estimated 34-66%probability in wetlands; UPL — Obligate Upland - Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: B ITUKULUUY — I ransect 1, pit 1 i-iag No. t31S Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 NA (in.) Inundated Inches X Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transact 1) 2 (in.) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: o (in.) Drainage Patterns in Wetlands SOILS sal Protlle: WETLAND Pit 1 Transect 1 20 feet from flagged bounds Depth Horizon Matrix Color Mottle Mottle I Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-13 COW 10YR 312 10YR 4/6 20% Silty loam 14-24 A 10YR 2/1 10YR 4/4 10% Loam Soil Profile: UPLAND (Pk 2, Transect 1) ( 25 feet from flagged boundary) 0-6 A 10YR 3/2 NA NA Silty clay loam 7-19 B1 10YR 4/3 NA I NA I Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local H dric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks IyC I LAND Ut I tKMINA I IUN Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Cowardin Classification: PEMC Remarks: Photo Aspect: South Number of Flags: 60 `Isolated X Non -Isolated. Describe connection: Creek flows north of the site. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: C Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 20 FACW+ Giant ragweed Ambrosia tnfida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Box elder Acernegundo T 10 FACW- Black willow Salixnigra T 5 OBL Green ash Fraxinus pennsylvanica T 15 FACW Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Switch grass Panicum virgatum H 30 FAC+ Dominant Plant S ecies: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Prickly wild gooseberry Ribes cynosbati S 10 UPL Box elder Acernegundo T 25 FACW- Wild black currant Ribes americanum S 10 FACW Giant ragweed Ambrosia trifida H 10 FAC+ Smooth brome Bromus inermis H 10 UPL Smooth sumac Rhus glabra S 10 UPL Yellow foxtail Setaria glauca H 10 FAC Riverbank grape Vitis riparia H 5 FACW- Common buckthorn Rhamnus cathartica S 5 FACU Elderberry Sambucus canadensis S 5 FACW- ' OBL - Obligate. Occurs with an estimated 99% probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99%probability in wetlands; FAC - Facultative. Occurs an estimated 34-66%probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. 1 r Page 2 Wetland ID: C ruMULUUY — I ransect T rlt T "ag NO. t.1i / Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 12 (in.) X Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) NA (in.) Drift Lines FAC-Neutral Test Sediment Deposits Other (Explain in Remarks) Depth to Saturated Soil: 0 (in.) Drainage Patterns in SOILS Depth Horizon Matrix Color Mottle Mottle Texture, Concretions, Structure, etc. (inches) (Munsell Moist) Colors Abundance/ (Munsell Contrast Moist 0-14 COW 10YR 2/1 10YR 4/6 12% Silly loam 15-20 A 10YR 2/1 tOYR 416 10% Loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 35 feet from flagged boundary) 0-12 1B, I 10YR 4/3 NA NA Silty clay loam 14-19 1 B2 1 10YR 4/2 NA NA Clay loam Hydric Soil Indicators: Histosol I Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? X Yes Wetland Hydrology Present? X Yes Hydric Soils Present? X Yes IRemarks: Is this sampling point within a No wetland? No No Photo Aspect: East Number of Flags: 17 X Isolated Non -Isolated. Describe connection. X Yes No DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: D Transect ID: 1 VEGETATION Dominant Plant S cies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 75 FACW+ Giant ragweed Ambrosia tnfida H 10 FAC+ Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Urtica dioica H <5 FAC+ Broad-leaved cattail Typha laflfolia H 10 OBL Canada thistle Cirsium arvense H 5 UPL Canada goldenrod Solidago canadensis H 10 FACU Rough amaranth Amaranthus retroflexus H 5 FACU+ Lamb's quarters Chenopodium album H 5 FAC- Barnyard grass Echinochloa crusgalli H 10 FACW Bristly (oxtail Setaria verticillata H 10 FACU Dominant Plant Species: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Bristly foxtail Setaria verticillata H 10 FACU Lamb's quarters Chenopodium album H 5 FAC- Rough amaranth Amaranthus retroflexus H 5 FACU+ Cocklebur Xanthium strumarium H 10 FAC Corn Zea mays H 75 UPL OBL - Obligate. Occurs with an estimated 99% probability in wetlands; FACW - Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC - Facultative. Occurs an estimated 34-66% probability in wetlands; UPL - Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI - No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Vetland ID: D [YUKUL.UUY — I ransect 1, pit i Flag NO. Us Field Observations: Wetland Hydrology Indicators Primary Indicators: Secondary Indicators Depth of Surface Water: Oxidized Root Channels in Upper 12 NA (in.) Inundated Inches Saturated in Upper 12 Inches Water -Stained Leaves Depth to Free Water in Water Marks Local Soil Survey Data Pit: (Transect 1) NA (in_) Drift Lines X FAC-Neutral Test Sediment Deposits X Other (Explain in Remarks) Depth to Saturated Soil: NA (in.) Drainage Patterns in SOILS Depth (inches) Horizon Matrix color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-6 COW 10YR 4l2 Silly loam 7-20 A 10YR 2/1 10YR 416 10% Clay loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 20 feet from flagged boundary) 0-14 A 10YR 4/2 NA NA I Sandy loam 15-25 B 10YR 4/1 1 IOYR 4/4 5% 1 Silty clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gle ed or Low-Chroma Colors X Other Ex lain in Remarks VVC I LAIVU Ut I tKM11VA I IUIV Hydrophylic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? _ Yes X No Hydric Soils Present? X Yes No Cowardin Classification: PEM1A Remarks: This area is located in a road ditch and receives runoff from adjacent croplands and roads. Professional judgment was used to establish the wetland boundary. Photo Aspect: West Number of Flags: 16 X Isolated Non -Isolated. Describe connection: DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: E Transect ID: 1 VEGETATION Dominant Plant S cies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 90 FACW+ Box elder Acer negundo T 5 FACW- Water knotweed Polygonum amphibium H 5 OBL Stinging nettle Uncca dioira H <5 FAC+ Black willow Salix nigra T <5 OBL Wild cucumber Echinocystis lobata H <5 FACW- Canada moonseed Menispermum canadense H <5 FAC+ Woolgrass Scirpus cyperinus H <5 OBL Green bulrush Scirpus atrovirens H <5 OBL Joe-pye weed Eupatorium maculatum H <5 OBL Redtop Agrostis alba H <5 FACW Lady's thumb Polygonum persicaria H <5 FAC- Dominant Plant Species: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Kentucky bluegrass Poa pratensis H 30 FAC- American elm Ulmus amencana T 5 FACW Common buckthorn Rhamnus cathartica S 5 FACU Smooth brome Bromus inermis H 10 UPL Common milkweed Asclepias syriace H <5 UPL Canada goldenrod Solidago canadensis H 10 FACU 1 OBL — Obligate. Occurs with an estimated 99%probability in wetlands; FACW — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99%probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. 1 Page 2 Wetland ID: E IT UKULUUT — I ransect 1, pit 1 Field Observations: Depth of Surface Water: Depth to Free Water in Pit: (Transect 1) NA (in.) Depth to Saturated Soil: NA (in.) SOILS Flan No. Lzi Wetland H Primary Indicators: X_ Inundated _ Saturated in Upper 12 Inches _ Water Marks Drift Lines _ Sediment Deposits Drainage Patterns in Wetlands rdrology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data X FAC-Neutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transect 1 75 feet from flaqued bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-14 COW 10YR 3/1 10YR 3/4 20% Silty loam 15-30 A 10YR 3/1 Clay loam Soil Profile: UPLAND (Pit 2, Transect 1) ( 10 feet from flagged boundary) 0-34 A 10YR 3/1 NA NA Loam Hydric Soil Indicators: Histosol Concretions Histic E i don High Organic Content in Surface Layer in Sand Soils Sulfidic Odor Organic Streaking in Sand Soils A uic Moisture Regime Listed on Local H dric Soils List Reducing Conditions Listed on National H ric Soils List X Gle ed or Low-Chroma Colors X Other (Explain in Remarks PVC I LAND UM I CKMINA I IUN Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No X Yes No Photo Aspect: East Number of Flags: 41 _Isolated X Non -Isolated. Describe connection: Ditch drains to a tributary of the Minnesota River. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: F Transect ID: 1 VEGETATION Dominant Plant S ecies: Wetland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 80 FACW+ Giant ragweed Ambrosia trifida H 10 FAC+ Box elder Acernegundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Duckweed Lemna minor H 5 OBL Dominant Plant S ecies: Upland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocarpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hornbeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 10 FACU Common buckthorn Rhamnus cathartica S 10 FACU Hepatica Hepatica acutiloba H 5 UPL Virginia waterleaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum amencanum S 25 UPL OBL — Obligate. Occurs with an estimated 99% probability in wetlands; FAC W — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No Indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Netland ID: F HYDROLOGY — Tra Field Observations: Depth of Surface Water: Depth to Free Water in Pit: (Transact 1) Depth to Saturated Soil: ct 1, Pit 1 Flag No. F4 Wetland Primary Indicators: 12 (in.) X Inundated Saturated in Upper 12 Inches Water Marks NA (in.) Drift Lines Sediment Deposits 0 (in.) Drainage Patterns in drology Indicators Secondary Indicators Oxidized Root Channels in Upper 12 _ Inches _ Water -Stained Leaves _ Local Soil Survey Data _ FAGNeutral Test Other (Explain in Remarks) Soil Profile: WETLAND Pit 1, Transact 1 20 feet from flagged bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-32 COW 10YR 3/1 10YR 4/6 20% Silty loam Soil Profile: UPLAND (Pit 2, Transect 1) 125 feet from flagged boundary) 0-5 Cow 10YR 312 NA NA Silt loam 6-24 A 10YR 4/2 NA NA Silty clay loam Hydric Soil Indicators: Histosol Concrettons Histic E i edon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils A uic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks WETLAND DETERMINATION Hydrophytic Vegetation Present? I Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Photo Aspect: North Number of Flags: 61 Isolated X Non -Isolated. Describe connection: This is the floodplain of a tributary to the Minnesota River. DATA FORM ROUTINE WETLAND DELINEATION Project: 2005.133 Date: 10/14/2005 Applicant: Peterson Property Chanhassen County: Carver Delineator: SAK State: MN Wetland ID: G Transect ID: 1 VEGETATION Dominant Plant S cies: Wetland Stratum %Areal Coverage Indicator Status Common Name Scientific Name Reed canary grass Phalaris arundinacea H 5 FACW+ Wood nettle Laportea canadensis H 20 FACW Box elder Acer negundo T 10 FACW- Stinging nettle Urtica dioica H <5 FAC+ Eastern cottonwood Populus deltoides T 20 FAC+ White snakeroot Eupatorium rugosum H 5 UPL Black willow Salix nigra T 5 OBL Dominant Plant S ecies: Upland Stratum % Areal Coverage Indicator Status Common Name Scientific Name Sugar maple Acersaccharum T 25 FACU Bur oak Quercus macrocarpa T 20 FAC- Virginia creeper Parthenocissus quinquefolia H 5 FAC- Hop hornbeam Ostrya virginiana T 15 FACU- Prickly wild gooseberry Ribes cynosbati S 5 UPL Sasparilla Aralia nudicaulis H 5 FACU Common buckthorn Rhamnus cathartics S 5 FACU Hepatica Hepatica acutiloba H 5 UPL Virginia waterleaf Hydrophyllum virginiana H 5 FAC Prickly ash Xanthoxylum americanum S 25 UPL White snakeroot Eupatorium rugosum H 5 UPL American elm Ulmus americana T 10 FACW- Quaking aspen Populus tremuloides T 5 FAC+ OBI, — Obligate. Occurs with an estimated 99% probability in wetlands; FAC W — Facultative Wetland. Occurs with an estimated 67-99% probability in wetlands; FAC — Facultative. Occurs an estimated 34-66% probability in wetlands; UPL — Obligate Upland. Occurs with an estimated 99% probability in non -wetlands. NI — No indicator. Insufficient information available to establish an indicator. Positive or negative signs indicate a tendency toward higher (+) or lower (-) frequency of occurrence within a category. Page 2 Wetland ID: G IYUKULUGY — I ransect 1, pit 1 Field Observations: Depth of Surface Water: 24 lin.l Depth to Free Water in Pit: (Transact 1) NA (in.) Depth to Saturated Soil: 0 (in.) SOILS Wetland H drology Indicators Primary Indicators: Secondary Indicators Oxidized Root Channels in Upper 12 X_ Inundated Inches _ Saturated in Upper 12 Inches Water -Stained Leaves Water Marks Local Soil Survey Data _ Drift Lines X FAC-Neutral Test X Sediment Deposits Other (Explain in Remarks) Drainage Patterns in Wetlands Soil Profile: WETLAND Pit 1, Transect 1 20 feet from flag ed bounds Depth (inches) Horizon Matrix Color (Munsell Moist) Mottle Colors (Munsell Moist Mottle Abundance/ Contrast Texture, Concretions, Structure, etc. 0-12 COW 10YR 41 10YR 4/6 20% Silt loam 13-20 A N3/0 Sandy loam (alluvium) Soil Profile: UPLAND (Pit 2, Transect 1) ( 25 feet from flagged boundary) 0-5 Cow 1OYR 312 NA NA Silt loam 6-24 A 1OYR 4/2 NA NA Silly clay loam Hydric Soil Indicators: Histosol Concretions Histic E i don High Organic Content in Surface Layer in Sand Soils Su�dic Odor Organic Streaking in Sand Soils A uic Moisture Regime Listed on Local H dric Soils List Reducing Conditions Listed on National H ric Soils List X Gle ed or Low-Chroma Colors Other (Explain in Remarks h9�lAe1� Ll.l�ra:�,rdl`J_tir[•]. Hydrophytic Vegetation Present? Is this sampling point within a X Yes No wetland? X Yes No Wetland Hydrology Present? X Yes No Hydric Soils Present? X Yes No Cowardin Class cation: PEM1C Remarks: Photo Aspect: South Number of Flags: 11 _Isolated X Non -Isolated. Describe connection: This is the floodplain of a tributary that flows to the Minnesota River.