RECORDED CUP 24-9Document Number: A778122
Filed and/or Recorded on
Oct 7 , 2024 8:52 AM
Office of the County Recorder/Registrar of Titles
Carver County, Minnesota
Kaaren Lewis, County Recorder
Deputy DL
Document Recording Fees $ 46.00
Do(ument Total $ 46.00
Requesting Party: City of Chanhassen
Pages: 4
This cover page has been added to this document by Carver County Land Records
and is now an omcial part of this recorded document
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MTNNESOTA
CONDITIONAL USE PERMIT #24-9
L @i!-Subject to the terms and conditions set forth herein and with the Conditional
Use Permit recorded with Carvel County on _,2024, Document No
_, the City of Chanhassen hereby grants:
a) A condilional use permit for a contracting yard at l59l Park Road
Z. bLg$a The permit for the plopefty situated in the Citl, of Chanhassen, Carvel County,
Minnesota, and legally described as follows:
Chanhassen Lakes Business Park, Blocl< 5, Lots 10 & 'l L
3. Conditions. The permit is issued subject to the following conditions:
a) Equiprnent and supply storage must be screened or enclosed at all tirnes by
fencing or vegetative screening. Screening shall comply with city code.
b) Vchiclesiequipment shall be stored within an enclosed or screened area
c) No unliccnsed or inoperable vehicle/equipment shall be stored on-premises.
d) All chemicals shall bc stored in proper storage facilities, speoified by OSI{A
regulations.
e) The contractor shall be licensed, bonded, and insured.
l) All pavement surfaces must be repaired and maintain a quality level ofcondition,
free from 1:otholes and crumbling.
g) The scope of the Contractors Yard may be increased if the amount ofpaved and
screened area is increased, up to the allowed amount according to the zouing
district, Industrial Office Park (OP). Increase in impervious surfaoe may require
rnodifications and alteration to the stormwater mitigations on site.
h) Two spruce trees, a n nimum of 4 feet tall at planting rneasured frorn finished
grade, shall be planted along the driveway within the propefiy, along the NW
corner ofthc space defined as contractor yard oD the site plan Exhibit C.
i) It is the developer's responsibility to ensure that pemits are leceived from all
other agencics with jurisdiction over the project (i.e. Carvcr County, RPBCWD,
Board of Water and Soil Resources, MnDOI', etc.) prior to lhe comrnencement of
construction activities.
j) The applican! slrall complete a wetland delineation onsite to confirm if the
depressional area is a jwisdictional wetland. Ifany area onsitc is determined to be
ajurisdictional wetland then the applicant shall revise plans to meet all applicable
city code regulations. The Wetland delineation shall be cornpleted wilhin 3
months after the apploval of the Conditional Use Permit.
k) The applicant and theil Engineer shall work with city staff in amendiug the
constmction plars, dated May 31,2024, and August 9, 2024 prepared by Moole
Engineeri.ng Inc. to fully satisfy construction plan cornments and concerns within
6 months afiel the approval of the Conditional Use Permit.
l) The appticant shall provide updated plans and models to demorstrate that the
contractor''s yard site is meeting water quality standards. A permanent BMP to
manage the runoff generated by the contuactor's yard is anticipated. These models
shall be submitted as part of all future submitlals.
m) The applicant shall create a stormwatsr management plan approved by staffto
describe how the sile is lneeting city requirements inoluding water quality and
erosion control. The stormwater management plan ircluding site imploveme nts
shall be execuled within l2 months after the approval oIthe Conditional Use
Permit,
n) The developer shall enter into encroaclrmenl agleements for all existing and
proposed improvemenls located in public easements. The encroachmenl
agreements shall be recorded within 12 months after the approval ofthe
Conditional Use Permit.
4. Termination of Pclrnit. The City uray revoke the pemril lbllowing a public hearing lbr
violatiou of the tems of this permit
iis
,!,
;
5. Lanse, If within one year of the issuance of this pennit the authorized corstuction has
not becn substantially completed or the use commenced, fltis permit shall lapse, unlcss an
exlension is granted in accordance with the Chanhassen Zoning Ordinance,
6. Criminal Penaltv. Violation of lhe terms of this conditional use permit is a criminal
misdemeanor.
Dated: Septernber 73, 2024
.,r)
BY:€rt^
E'lise Ryan, Mayor
NOT LIC
Laurie Hokl<anen, City Manager
STATE OF MINNESOTA
COUNTY OF CARVER
Thc forcgoing instrumcnt was acknowledged before me thisa[day of ].@!-, 2O?!Lby
Elise Ryan, Mayor, and by Laurie Hokkanen, C'ity Manago, of the City of Chanliassen, a Minnesota
municipaj corporation, on behalf of the corporation and pursuant to the authori ty granted by its City
ss
)
(
)
Councrl.
JENNIFER ANN POTTER
CITY OF CHANHASSEN
*n' Vtutfi-eVW4aruf: