Loading...
RECORDED CUP 24-9Document Number: A778122 Filed and/or Recorded on Oct 7 , 2024 8:52 AM Office of the County Recorder/Registrar of Titles Carver County, Minnesota Kaaren Lewis, County Recorder Deputy DL Document Recording Fees $ 46.00 Do(ument Total $ 46.00 Requesting Party: City of Chanhassen Pages: 4 This cover page has been added to this document by Carver County Land Records and is now an omcial part of this recorded document CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MTNNESOTA CONDITIONAL USE PERMIT #24-9 L @i!-Subject to the terms and conditions set forth herein and with the Conditional Use Permit recorded with Carvel County on _,2024, Document No _, the City of Chanhassen hereby grants: a) A condilional use permit for a contracting yard at l59l Park Road Z. bLg$a The permit for the plopefty situated in the Citl, of Chanhassen, Carvel County, Minnesota, and legally described as follows: Chanhassen Lakes Business Park, Blocl< 5, Lots 10 & 'l L 3. Conditions. The permit is issued subject to the following conditions: a) Equiprnent and supply storage must be screened or enclosed at all tirnes by fencing or vegetative screening. Screening shall comply with city code. b) Vchiclesiequipment shall be stored within an enclosed or screened area c) No unliccnsed or inoperable vehicle/equipment shall be stored on-premises. d) All chemicals shall bc stored in proper storage facilities, speoified by OSI{A regulations. e) The contractor shall be licensed, bonded, and insured. l) All pavement surfaces must be repaired and maintain a quality level ofcondition, free from 1:otholes and crumbling. g) The scope of the Contractors Yard may be increased if the amount ofpaved and screened area is increased, up to the allowed amount according to the zouing district, Industrial Office Park (OP). Increase in impervious surfaoe may require rnodifications and alteration to the stormwater mitigations on site. h) Two spruce trees, a n nimum of 4 feet tall at planting rneasured frorn finished grade, shall be planted along the driveway within the propefiy, along the NW corner ofthc space defined as contractor yard oD the site plan Exhibit C. i) It is the developer's responsibility to ensure that pemits are leceived from all other agencics with jurisdiction over the project (i.e. Carvcr County, RPBCWD, Board of Water and Soil Resources, MnDOI', etc.) prior to lhe comrnencement of construction activities. j) The applican! slrall complete a wetland delineation onsite to confirm if the depressional area is a jwisdictional wetland. Ifany area onsitc is determined to be ajurisdictional wetland then the applicant shall revise plans to meet all applicable city code regulations. The Wetland delineation shall be cornpleted wilhin 3 months after the apploval of the Conditional Use Permit. k) The applicant and theil Engineer shall work with city staff in amendiug the constmction plars, dated May 31,2024, and August 9, 2024 prepared by Moole Engineeri.ng Inc. to fully satisfy construction plan cornments and concerns within 6 months afiel the approval of the Conditional Use Permit. l) The appticant shall provide updated plans and models to demorstrate that the contractor''s yard site is meeting water quality standards. A permanent BMP to manage the runoff generated by the contuactor's yard is anticipated. These models shall be submitted as part of all future submitlals. m) The applicant shall create a stormwatsr management plan approved by staffto describe how the sile is lneeting city requirements inoluding water quality and erosion control. The stormwater management plan ircluding site imploveme nts shall be execuled within l2 months after the approval oIthe Conditional Use Permit, n) The developer shall enter into encroaclrmenl agleements for all existing and proposed improvemenls located in public easements. The encroachmenl agreements shall be recorded within 12 months after the approval ofthe Conditional Use Permit. 4. Termination of Pclrnit. The City uray revoke the pemril lbllowing a public hearing lbr violatiou of the tems of this permit iis ,!, ; 5. Lanse, If within one year of the issuance of this pennit the authorized corstuction has not becn substantially completed or the use commenced, fltis permit shall lapse, unlcss an exlension is granted in accordance with the Chanhassen Zoning Ordinance, 6. Criminal Penaltv. Violation of lhe terms of this conditional use permit is a criminal misdemeanor. Dated: Septernber 73, 2024 .,r) BY:€rt^ E'lise Ryan, Mayor NOT LIC Laurie Hokl<anen, City Manager STATE OF MINNESOTA COUNTY OF CARVER Thc forcgoing instrumcnt was acknowledged before me thisa[day of ].@!-, 2O?!Lby Elise Ryan, Mayor, and by Laurie Hokkanen, C'ity Manago, of the City of Chanliassen, a Minnesota municipaj corporation, on behalf of the corporation and pursuant to the authori ty granted by its City ss ) ( ) Councrl. JENNIFER ANN POTTER CITY OF CHANHASSEN *n' Vtutfi-eVW4aruf: