Loading...
CUP - Recorded0 CAMPBELL KNUTSON PROFESSIONAL + AS SO CI AT ON December 3, 2021 Elliott B. Knetsch Joel J.Jamnik Andrea McDowell Poehler Ms. Jean Steckling Soren M. Mattick City of Chanhassen David S. Kendall 7700 Market Boulevard Henry A. Schaeffer,III Alina Schwartz P.O. Box 147 Shana N. Conklin Chanhassen, MN 55317 James J. Monge,Ill Jerome M. Porter Re: Miscellaneous Recordings Leah C.M. Koch Meagan K.Kelley Benjamin J. Colburn Dear Ms. Steckling: Jared D. Shepherd Thomas J. Campbell* Please find enclosed, for the City's files,the following documents that have been Roger N.Knutson* erecorded with Carver County: Retired 1.Variance 2021-23 recorded October 25, 2021 as Document No. A735585; 2.Interim Use Permit#2021-03 recorded November 22, 2021 as Document No. A737491; 3.Variance 2021-20 recorded November 22, 2021 as Document No. A737490; and 4.Conditional Use Permit No. 1988-17 recorded November 22, 2021 as Document No. T222341. Thank you. Very truly yours, CAMPBELL KNUTSON Professional Association Jean on, L t Grand Oak Office Center I 860 Blue Gentian Road jmo Suite 290 Eagan,Minnesota 55121 Enclosures Main:651-452-5000 Fax:651-234-6237 www.ck-law.coin 200786v8 Document Number:T222341 Torrens Certificate: 35228.0 Filed and/or Recorded on Nov 22, 2021 8:26 AM Office of the County Recorder/Registrar of Titles Carver County, Minnesota Kaaren Lewis, Registrar of Titles Deputy DL Document Recording Fees 46.00 Document Total 46.00 Requesting Party: City of Chanhassen Pages: 4 This cover page has been added to this document by Carver County Land Records and is now an official part of this recorded document CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES CONDITIONAL USE PERMIT NO. 1988-17 Amended and Restated October 11, 2021 —Planning Case #2021-21 1. Permit. Subject to the terms and conditions set forth herein, the City of Chanhassen hereby grants an amended and restated Conditional Use Permit 1988-17, recorded December 1, 1998, as document number T59326, for screened outdoor storage in the Industrial Office Park (IOP) District which replaces Conditional Use Permit#1988-17 dated October 24, 1988. 2. Property. The permit is for the following described property("subject property") in the City of Chanhassen, Carver County, Minnesota: Lot 2, Block 3,Chanhassen Lakes Business Park 3. Conditions. The permit is issued subject to the following conditions: 1) A building permit must be obtained prior to constructing the fence. 2) A zoning permit must be obtained prior to expanding the outdoor storage area. 3) All items stored in the outdoor storage area must be totally screened by an opaque 8-foot fence and no stored items shall project over the fence. 4) Trash containers must be stored in a fully screened location, i.e. within the outdoor storage area or separate screened trash enclosure. 5) Landscaping must substantially conform to landscape plans submitted to the City on August 19, 2021. 6) Expanded outdoor storage area must substantially conform to the plans submitted to the City on August 19, 2021. 7) The Conditional Use Permit must meet any and all conditions of the site plan approval for Site Plan 88-16. 8) The two existing trees proposed to be protected during construction shall have protection fencing installed around the trees prior to any construction. 9) The applicant shall construct the proposed driveway in accordance with City Standards for commercial driveways and apply for a Driveway Permit from the Engineering Department. 10)The applicant shall obtain any and all Riley Purgatory Bluff Creek Watershed District RPBCWD) permits prior to construction activities. 11)The applicant shall confirm the increase of impervious surfaces as the numbers on the plan are not consistent with the HydroCAD analysis. 12)The applicant shall provide a geotechnical analysis including soil borings. 13)Rate control requirements are shown to be met for the 2-, 10-, and 100-year runoff rates per the HydroCAD modeling results provided. Rate control should be reconfirmed once the updates to the modeling have been completed. 14)The MSE3 rainfall distribution shall be used for HydroCAD modeling rather than the Type II distribution currently being used. 1 15)Rim of the 12" HDPE riser shall be modeled as a horizontal orifice rather than a vertical orifice. 16)The applicant shall show the 10-day snowmelt rate for future submittals. 17)The applicant shall provide an operation and maintenance plan that identifies the maintenance, inspection, and monitoring schedule and responsible party and shall be recorded prior to construction activities. 18)The bottom contour of the drainage swale is shown at a 932 and the invert of the 6" draintile below is at a 931.5 which would not provide any cover over the draintile. The applicant shall confirm elevations within the swale. 19)A detail for the outlet structure (Note 17 on the construction plans) shall be provided to confirm the HydroCAD modeling as it is not entirely clear how many pipes are coming in/leaving based on the information provided. a. Based on the information provided, it appears the HydroCAD model should be updated so Devices #2 (exfiltration), #4 (4" orifice), and #5 (12" rim) should be routed to Device#3 (12" culvert) for the outlet of the drainage swale. 20)The applicant shall add erosion control measures such as inlet protection, sediment control BMPs, and rock construction entrance to the plans to avoid migration of sediment off the construction site. 21)The applicant shall provide elevation and location of the emergency overflow spillway for the swale. 22)The drainage swale shall be reseeded with a wetland or stormwater pond seed mix rather than turf grass. 23)The property may not be subdivided nor the lot lines of the property be altered. 4. Termination of Permit. The City may revoke the permit following a public hearing for violation ofthe terms of this permit. 5. Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced,this permit shall lapse unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penalty. Violation of the terms ofthis Conditional Use Permit is a criminal misdemeanor. 2 Dated: October 11,2021 CITY OF CHANHASSEN t :at,,a Ryan,Mayor ' f .,. • ' ''a1 AND: 4ci 1,'UA Laurie Hokkanen,City Manager STATE OF MINNESOTA ) ss COUNTY OF CARVER ) The foregoing instrument was acknowledged before me thi_z day of(fir, 20: ,\ ,by Elise Ryan,Mayor, and by Laurie Hokkanen, City Manager, of the City of Chanhassen,a Minnesota municipal corporation,on behalf of the corporation and pursuant to the authority granted by its City Council. 44, 77\IY/7,e_z_u_ti-Z/i93. Y PU LIC g KIM T•MEUHIISSENPublic-MinnesotaNOtaryExposJan31,2025 s.. +N commissar DRAFTED BY: City of Chanhassen P. O. Box 147 7700 Market Boulevard Chanhassen,MN 55317 952)227-1100 3