Loading...
09-23-24 CC packet itemCity Council Item September 23, 2024 Item Approve a Conditional Use Permit for a Contracting Yard at 1591 Park Road. File No.Planning Case #24-09 Item No: D.10 Agenda Section CONSENT AGENDA Prepared By Rachel Arsenault, Associate Planner Reviewed By Eric Maass SUGGESTED ACTION "The Chanhassen City Council approves the requested conditional use permit for a contracting yard subject to the conditions of approval and adoption of the Findings of Fact and Recommendation." Motion Type Simple Majority Vote of members present Strategic Priority Development & Redevelopment SUMMARY The property owner is requesting approval of a conditional use permit for the operation of a contracting yard on the property located at 1591 Park Road. BACKGROUND Historically, this property was the public works building for the City of Chanhassen. The property is currently being rented to two businesses, one of which is using a portion of the site as a contractor's yard. A contractor's yard is a Conditional Use within the property's zoning district, and as a result, the owner is pursuing a conditional use permit to bring the current tenant operations into conformance. DISCUSSION The Planning Commission held a public hearing on September 17th. The meeting minutes for the September 17th Planning Commission meeting were not yet available as of the publishing of this 227 meeting packet and as a result a summary of the comments are provided below: - No public comment received during the public hearing. BUDGET RECOMMENDATION The Planning Commission recommends approval of the requested conditional use permit for a contracting yard subject to the conditions of approval and adoption of the Findings of Fact and Recommendation. ATTACHMENTS Land Use Application Narrative Land Use Application CUP Civil Design Plan Set Staff Report - Planning Staff Report - Water Resources 1591 Park Road Inspection Report CUP 24-09 Findings of Fact Conditional Use Permit 24-09 228 STATEMENT OF COMPLIANCE Our request for a Contracting Yard Conditional Use Permit (CUP) is submitted to be in compliance of the 5 CUP standards as noted in Section 20-289 of the city zoning code and the 12 general standards for a CUP. Beniek Property Services, Inc (BPS), is an outdoor maintenance company. We are deeply rooted in the community. Brian Beniek, the president, and owner was born and raised in Chanhassen. As the business he created has grown over the decades he’s rented several properties throughout Chanhassen. Since 2003 we have been operating out of rented space from B&C Land Company, LLC, located at 8229 Upland Cir., Chanhassen MN 55317-You may refer to CUP #03-07, Contractor’s Yard. For the last 12 years Beniek Property Services (BPS) has used the site as an extension of its current operation. BPS intends to continue to use the outdoor storage space at 1591 Park Rd for overflow storage. We currently store off - season equipment such as lawn trailers and pushers for payloaders – most of this equipment sits behind and west side of the southeast building. We are using the hoop shed located on the south of the property to store salt for our winter operations. On the southwest area of the property, we are storing landscape materials including mulch, black dirt, rock/boulders, etc. in bunkers on site. We also use this space for the staging of brush piles and tree stumps until the pile can be chipped and items can be hauled off site for disposal. Employee traffic in and out of the space is minimal. On average there may be 2 to 3 vehicles throughout the day, picking up or dropping off supplies or equipment. BPS is designated just over an acre of land for the Contractor Yard CUP. The contractor yard is located in the southwest portion of the property and extends east to encompass the hoop building and a portion of the southeast building as our tenant space. (See attached Exhibits). A shared cross-access driving agreement will be created to provide access to Park Road. There are no proposed changes to the current site or buildings. The area of the proposed contractor yard has been operating as a storage facility since 2006, going back to the city utilizing the site for its public works operations. There is an existing stormwater pond in the southwest corner of the property outside of the designated contractor yard area. Erosion control fencing has been installed to prevent soil from the contractor yard from entering the pond and until a more permanent solution is developed with the property owner. The site is naturally screened from public view due to its location and separation from other uses. The contractor yard operates in the south portion of the site behind the main building , which screens the operation from Park Road. To the south the yard abuts a railroad with the closest building approximately 325 feet from the site. The building faces away from the yard with the closest public street being approximately 700 feet to the south. The contractor yard lies approximately 150 feet from Audubon Road to the west. The yard is separated from public views of vehicles using Audubon Road by existing trees and a topographical change that restricts direct views of the yard. The east side of the contractor yard is approximately 120 feet from the east lot line. The east lot abuts the side yard of an industrial site that has minimal views toward the yard and is screened by an opaque covered chain link fence plus several trees along the southeast corner of the property. This space has been very important to us in operating our business as well as the community. We serve many local businesses as well as several local hospitals and clinics and multiple public and school transportation depots. We look forward to continuing operations from this site to best support our customers and surrounding communities. Beniek Property Services. 229 230 231 2331708.09.24_LBTGCONTRACTORS YARD EXHIBIT1591 PARK ROADCHANHASSEN, MINNESOTAPROJECT No.DATE:REVISED:DRAFTER:REVIEWER:engineering, inc.mooreNWES30Scale in Feet0FILE LOCATION: R:\Projects\23000\23300\23317\CIVIL\PRESENTATION\23317_ProposedConditions.dwg LEGENDAREAS:KEYNOTES232 PROJECT No. DATE: REVISED: DRAFTER: REVIEWER: 23317 06.17.24 _ LFB ### EXISTING CONDITIONS 1591 PARK ROAD CHANHASSEN, MINNESOTA engineering, inc. mooreFILE LOCATION: R:\Projects\23000\23300\23317\CIVIL\PRESENTATION\23317_ExistingConditions.dwgN W E S Scale in Feet 0 40 LEGEND AREAS: 233 2331708.09.24_LBTGDRAINAGE EXHIBIT1591 PARK ROADCHANHASSEN, MINNESOTAPROJECT No.DATE:REVISED:DRAFTER:REVIEWER:engineering, inc.mooreNWES30Scale in Feet0FILE LOCATION: R:\Projects\23000\23300\23317\CIVIL\PRESENTATION\23317_ProposedConditions.dwg LEGENDKEYNOTES234 Applicaon: Condional Use Permit for Contractors Yard to be lo cated at 1591 Park Road Planning Commission Review Date: September 17, 2024 City Council Review Date: September 23, 2024 60 Day Acon Deadline: October 7, 2024 Case #: 24-09 Project Address: 1591 Park Road Draed By: Rachel Arsenault Staff Report Date: September 11, 2024 Summary of Request: The property owner is requesng a condional use pe rmit for a contracng yard to be permi,ed on the property loca ted at 1591 Park Road. LOCATION: 1591 Park Road PROPOSED MOTION: “The Chanhassen Planning Commission recommends approval of the requested conditional use permit for a contracting yard subject to the conditions of approval and adoption of the Findings of Fact and Recommendation.” 235 OWNER: Tiger Investors LLC ZONING DISTRICT: Industrial Office Park (IOP) 2040 LAND USE: Office Industrial ACREAGE: 5.27 Acres LEVEL OF CITY DISCRETION IN DECISION MAKING: The city has limited discretion in approving or denying Conditional Use Permits, based on whether or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the city finds that all the applicable conditional use permit standards are met, the permit must be approved. This is a quasi-judicial decision. Noce of this public hearing has been mailed to all property owners within a quarter mile. APPLICABLE REGULATIONS: Chapter 20, Article 20-IV Conditional Uses Chapter 20 Article 20-XXII "IOP" Industrial Office Park BACKGROUND Historically this property was the public works building for the city of Chanhassen. The property currently has a landscaping company as a tenant which uses the property in part as a Contractors Yard. The Property Owner and landscaping company were made aware that a Condional Use Permit (CUP) is required in order to operate a contractor’s yard at the property. As a result, the property owner is pursuing a condional use permit to bring the property into compliance. EXISTING CONDITIONS: The property currently has two tenants: automove r epair and a landscaping contractor business. The property currently has two buildings constructed on it as well as a hoop house for salt storage, and concrete storage bins for organizaon of various landscaping materials. SITE PLAN: The Applicant is proposing to repave the area proposed to be ulized as a contractor’s yard as the pavement is currently in poor condion. In addi on, the paved area will be confined with curbing to properly direct the stormwater. The southwest poron of the property is proposed to be remediated back into pervious ground cover and landscaped which will reduce the amount of stormwater generated and required to be treated by the site. 236 CONDITIONAL USE PERMIT CODE: Sec 20-232 General Issuance Standards The planning commission shall recommend a condiona l use permit and the council shall issue such condional use permits only if it finds that such use at the proposed locaon: a) Will not be detrimental to or endanger the public health, safety, comfort, convenience, or general welfare of the neighborhood or the city. b) Will be consistent with the objecves of the city's comprehensive plan and this chapter. c) Will be designed, constructed, operated, and maintained so to be compable in appearance with the exisng or intended character o f the general vicinity and will not change the essenal character of that area. d) Will not be hazardous or disturbing to exisng or p lanned neighboring uses. e) Will be served adequately by essenal public facili es and services, including streets, police and fire protecon, drainage structures, refuse disposal, water and sewer systems, and schools; or will be served adequately by such facilies and services provided by the persons or agencies responsible for the establishment of the proposed use. f) Will not create excessive requirements for public facilies and services and will not be detrimental to the economic welfare of the community. g) Will not involve uses, acvies, processes, materia ls, equipment, and condions of operaon that will be detrimental to any persons, p roperty, or the general welfare due to excessive producon of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. h) Will have vehicular approaches to the property which do not create traffic congeson or interfere with traffic or surrounding public thoroughfares. i) Will not result in the destrucon, loss or damage o f solar access, natural, scenic or historic features of major significance. j) Will be aesthecally compable with the area. k) Will not depreciate surrounding property values. l) Will meet standards prescribed for certain uses as provided in this arcle. (Ord. No. 80, Art. III, § 2(3-2-3), 12-15-86; Ord. No. 377, § 23, 5-24-04) The proposed contracng yard complies with the stan dards required for contracng yards in City Code. Sec 20-289 Contracng Yard 1. Equipment and supply storage must be screened or enclosed. Screening shall comply with buffer yard D and F4 fencing as specified in this chapter. 2. Vehicles/equipment shall be stored within an enclosed or screened area. 3. No unlicensed or inoperable vehicle/equipment shall be stored on-premises. 237 4. All chemicals shall be stored in proper storage facilies, specified by OSHA regulaons. 5. The contractor shall be licensed, bonded and insured. (Ord. No. 377, § 27, 5-24-04) LANDSCAPING This property requires year-round screening, accomplished through a fence or coniferous trees. The southern property line is sufficiently screened from view with thick tree planngs, the east property line is screened using fencing, and the north is screened by the building and addional landscaping. The west property line contains a hole in the screening beginning 130 feet south of the NW property corner, spanning 75 feet long towards the SW property corner. This area is composed of trees with canopies that begin roughly 6 feet in the air, leaving a gap of visibility to the property. This screening should be improved by adding two spruce trees inside the property along the driveway to the contractor’s yard. STAFF RECOMMENDATION: Staff finds the proposal conforms to the general issuance standards. Staff recommends approval of the requested condional use permit for a contra cng yard subject to the condions of approval and adopon of the Findings of Fact and Re commendaon. CONDITIONS: a) Equipment and supply storage must be screened or enclosed at all mes by fencing or vegetave screening. Screening shall com ply with city code. b) Vehicles/equipment shall be stored within an enclosed or screened area. c) No unlicensed or inoperable vehicle/equipment shall be stored on-premises. d) All chemicals shall be stored in proper storage facilies, specified by OSHA regulaons. e) The contractor shall be licensed, bonded and insured. f) All pavement surfaces must be repaired and maintain a quality level of condion, free from potholes and crumbling. g) The scope of the Contractors Yard may be increased if the amount of paved and screened area is increased, up to the allowed amount according to the zoning district, Industrial Office Park (IOP). Increase in impervious surface may require modificaons and alteraon to the stormw ater migaons on site. h) Two spruce trees, a minimum of 4 feet tall at plan ng measured from finished grade, shall be planted along the driveway within the property, along the NW corner of the space defined as contractor yard on the site plan Exhibit C. 238 Memorandum To: Rachel Arsenault, Associate Planner From: Joe Seidl, Water Resources Engineer CC: Charles Howley, Public Works Director/City Engineer George Bender, Assistant City Engineer Charlie Burke, Public Works Operations Manager Date: 09/06/2024 Re: 1591 Park Road Conditional Use Permit Project Overview The property owner seeks a conditional use permit to establish a contracting yard at 1591 Park Road. Contractor yards typically store construction and landscaping materials and equipment. These materials may include dirt, sand, construction debris, salt, fuel, and raw building materials such as lumber and concrete blocks. Equipment might include trucks and construction vehicles like skid steers, excavators, and bulldozers. Due to the nature of these materials and equipment, contractor yards have a higher risk of pollutant transport, especially because materials like dirt and salt can be easily eroded by wind and water. Historically, this property served as a public works building for the City of Chanhassen and had a similar use. The applicant has provided supporting documents for the conditional use permit request, which were reviewed by the Water Resources Department. These documents include: · Overall Site Plan (Moore Engineering Inc., dated 5/31/24) · Contractor Yard Site Plan (Moore Engineering Inc., dated 5/31/24) · Stormwater Memo (Moore Engineering Inc., dated 8/9/24) · Contractor’s Yard Exhibit (Moore Engineering Inc., dated 8/9/24) · Drainage Plan Exhibit (Moore Engineering Inc., dated 8/9/24) 239 Documented Water Resources Issues In May 2023, City staff visited the site in response to complaints about its condition. The site exhibited numerous erosion and sediment control issues, including missing best management practices (BMPs) like perimeter controls, insufficient buffer areas, large areas of disturbed soil, and uncovered stockpiles. These issues led to sediment and pollutants entering the onsite wetland/stormwater pond and potentially impacting downstream City infrastructure and local water resources. The site also showed failing stormwater infrastructure, exacerbating sediment and erosion problems. The Erosion and Sediment Control Inspection Report of May 5, 2023, details the site’s past condition and is included as a reference to this memo. Spring 2023 – Photo of Stockpile and Depressional Area 240 Spring 2023 – Photo of Contractor’s Yard Since 2023, the owner has addressed some of the onsite issues by removing stockpiles and installing silt fence and other Erosion and Sediment Control BMPs. However, disturbed soils and failing stormwater infrastructure remain onsite. Wetlands A small depression in the southwest corner of the property appears to have wetland characteristics, with wetland vegetation observed during staff inspections conducted in 2023. This area is classified as a wetland on the City’s GIS inventory. Aerial photographs from 1969 and subsequent observations indicate the presence of standing water in this depression since the late 1980s/early 1990s. 241 A review of older site plans from the 1980’s indicates the presence of a depression/channel that was modified with the development of the site. It is possible that the intent of the modifications was to create a stormwater management feature, however more detailed review is required to make an official Wetland Conservation Act decision. It is recommended that the applicant conduct a wetland delineation to confirm whether this depression is a jurisdictional wetland. If classified as such, the site should comply with Article 20-6 Wetland Protection of the City Code, which includes establishing buffer areas and potentially wetland restoration. If the area is classified as a stormwater management feature, then the applicant could use this area to manage the runoff generated by the site. Drainage The site primarily drains to the southwest into the onsite wetland/stormwater pond. From there, stormwater flows southwest through a railroad ditch system into a City maintained wet pond before discharging into Bluff Creek. The northern part of the site drains into the City storm sewer along Park Road, with stormwater eventually reaching Riley Creek. There is limited onsite stormwater infrastructure including pipes and catch basins which appear to be private as they act to drain private property, are not contained in easements, and do not benefit the public. The proposed plans will not significant alter the existing drainage patterns. Some existing impervious surfaces will be removed and revegetated, and new stormwater infrastructure, including bituminous curbs and stabilized curb cuts, are proposed to help manage runoff. The Contractor Site Plan includes temporary BMPs like hay bales and silt fences for interim site management. A new bituminous drive lane was added in 2023 without permits. No new permanent BMPs for stormwater management are currently proposed. Erosion Control The exact area of disturbance is unclear but appears to exceed 5,000 square feet. If the disturbance is over one acre, the project will require a General Permit Authorization to Discharge Stormwater Associated with Construction Activity (NPDES Construction Permit). The project must comply with Section 19-145 of the City Code regarding Erosion and Sediment Control. Given the disturbance size and sediment transport concerns, the applicant should submit an Erosion and Sediment Control Plan adhering to City regulations. All erosion control measures must be installed and inspected by City staff before site grading/construction begins. If disturbance exceeds one acre, a Stormwater Pollution Prevention Plan (SWPPP) should be included in the next submittal. 242 The site is within the Riley Purgatory Bluff Creek Watershed District (RPBCWD). The district requires an erosion and sediment control permit if the site grades 50 cubic yards or more of earth or disturbs 5,000 square feet or more of area. The applicant should confirm whether these thresholds are met and secure all necessary permits, including after-the-fact permits. Stormwater Management The City's Code Section 20-232 outlines General Issuance Standards for Conditional Use Permits. Relevant standards include: Sec 20-232 General Issuance Standards The planning commission shall recommend a conditional use permit and the council shall issue such conditional use permits only if it finds that such use at the proposed location: a. Will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. b. Will be consistent with the objectives of the city's comprehensive plan and this chapter. e. Will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. City Code requires that site be in compliance with the objectives of Chanhassen’s Comprehensive Plan. The Local Stormwater Management Plan (LSWMP) is part of the city’s Compressive Plan. The first three goals of the LSWMP are: Goal 1. Promote abstraction through infiltration, reuse and other methods where practicable to do so to provide flood protection, ground water recharge and improved water quality. Goal 2. Achieve water quality standards in lakes, streams, and wetlands consistent with their designated uses and established classifications. Goal 3. Protect and rehabilitate wetlands to maintain or improve their function and value. When not properly managed, a contractor’s yard increases pollution risks to downstream water resources and can increase maintenance needs on downstream stormwater infrastructure. This would not align with the goals of the LSWMP and as a result a contractor’s yard requires proper stormwater management facilities in order to meet the goals of the City’s LSWMP. The onsite wetland/stormwater pond is in disrepair and there have been documented erosion and sediment control issues that have very likely impacted local water quality. To comply with City Code and 243 the LSWMP, it is recommended that the applicant develop a comprehensive stormwater management plan, including: · Paved surfaces for maintenance · Develop and implement an Erosion and Sediment Control Plan · Permanent private stormwater management facilities meeting water quality standards · Assessment and repair of existing stormwater infrastructure · Covered storage facilities · Schedule of regular maintenance activities as needed to manage the contractor’s yard (practices to contain sediment, fuel, and other runoff associated with contracting yards) · Execution of an Operations and Maintenance Agreement to ensure the functionality of the private stormwater infrastructure onsite. The project is also subject to RPBCWD rules and regulations. The applicant should confirm any applicable rules and obtain necessary permits as part of the Conditional Use Permit. WATER RESOURCES CONDITIONS: 1. It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, RPBCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. 2. The applicant shall complete a wetland delineation onsite to confirm if the depressional area is a jurisdictional wetland. If any area onsite is determined to be a jurisdictional wetland then the applicant shall revise plans to meet all applicable city code regulations. The Wetland delineation shall be completed within 3 months after the approval of the Conditional Use Permit. 3. The applicant and their Engineer shall work with City staff in amending the construction plans, dated May 31, 2024, and August 9, 2024 prepared by Moore Engineering Inc. to fully satisfy construction plan comments and concerns within 6 months after the approval of the Conditional Use Permit. 4. The applicant shall provide updated plans and models to demonstrate that the contractor’s yard site is meeting water quality standards. A permanent BMP to manage the runoff generated by the contractor’s yard is anticipated. These models shall be submitted as part of all future submittals. 5. The applicant shall create a storm water management plan approved by staff to describe how the site is meeting city requirements including water quality and erosion control. The stormwater management plan including site improvements shall be executed within 12 months after the approval of the Conditional Use Permit. 244 6. The developer shall enter into encroachment agreements for all existing and proposed improvements located in public easements. The encroachment agreements shall be recorded within 12 months after the approval of the Conditional Use Permit. 245 Construction ESC Inspection Form Date & Time of Inspection: 05/05/2023 Weather Conditions:Partly Cloudy Reason for Inspection:Compliant Check 24 Hour Precipitation:in. Project Name:1591 Park Rd Project Number R-0000000-00089 NPDES Permit #:Owner/Permittee:Roadrunner Truck Repair Inc MN State Duty Officer: 651.649.5451 or 800.422.0798 Contractor/Permittee:. Site Contact 1:Site Contact 2: In attendance:RP General Site Activities: No current activity on site. Some trucking going in and out. Inspection Findings: 1.Exit BMPs/Adjacent Roadway Noncompliant 2.Construction Phasing N/A 3.Buffer Zones Noncompliant 4.Concrete Washout N/A 5.Dewatering/Bypass Pumping N/A 6.Polymer/Flocculent Application N/A 7.Ditch Checks N/A 8.Grading/Earthwork Noncompliant 9.Dust Control/ Wind Erosion N/A 10 . Inlet Protection Noncompliant 11 . ESC BMP Maintenance N/A 12 . Outlet Control Structure (24 hrs.) N/A 13 . Inclement Weather Ready Noncompliant 14 . Perimeter Sediment Controls Noncompliant 15 . Redundant Perimeter Controls Noncompliant 16 . Turbidity Curtain/Fence N/A 17 . Soil Stockpile Protection Noncompliant 18 . Offsite Discharges Noncompliant 19 . Directional Drilling N/A 20 . Stabilization Measures/24 Hour Noncompliant 21 . Secondary/Hazard Containment N/A 22 . Stabilization Measures/7 Day Noncompliant 23 . Waste/Trash Containment Noncompliant 24 . Stabilization Measures/14 Day N/A Items that need maintenance: 246 Status: Open Correct By: 05/10/2023 Location: Rear yard Details: Storm basin in SW corner not being protected. Stockpiles must have robust erosion control installed between exposed soil and basin area. All debris and equipment must be removed from basin area. Immediate action must be taken. Code 19-145 Status: Open Correct By: 05/10/2023 Location: Outlet pipe from storm basin Details: Outlet pipe failure. Exiting south end of pond. pipe sections disconnected erosion around structure is significant. Energy dissipation must be installed and pipe structure repaired to function properly. Code 19- 145 and engineering specs Status: Open Correct By: 05/10/2023 Location: Storm basin illicit discharge Details: Illicit discharge into basin area. Identify, report, and clean up illicit discharge of orange/yellow material leaching into pond. A plan must be implemented to remove spill. This will be reported to the MPCA as an illicit discharge. City code 19-128 Status: Open Correct By: 05/10/2023 Location: Stockpiles Details: Large soil stockpiles must be fully stabilized and fully contained by physical barrier. Exposed soils cannot remain open onsite. The height of these piles makes them highly susceptible to washing. Create a plan for removal or protection City code 19- 145 Status: Open Correct By: 05/19/2023 Location: Submit a plan for Sitewide erosion and sediment control Details: Submit a plan showing location of BMPs that will be installed and a timeline for installation. City will review, plan must be approved and site work completed within directed timeline. Plan must show all stockpiles and areas of exposed soil. Code 19- 145 Status: Open Correct By: 05/10/2023 Location: Park Rd Details: Street sweeping required. Entrance area is tracking sediment and gravel out into right-of-way. Street sweeping must be done to maintain access area. Code 19-145 Inspector Signature: 05/05/2023 247 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND DECISION IN RE: Application of Tiger Investors LLC for a Conditional Use Permit (CUP). On September 17, 2024, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Tiger Investors LLC for a contracting yard conditional use permit. The Planning Commission conducted a public hearing on the proposed conditional use permit, preceded by published and mailed notice. FINDINGS OF FACT 1. Permit. On August 8, 2024, the city received a completed land use application for the property legally described as Lot 10 & 11, Block 5, Chanhassen Lakes Business Park (“Property”), requesting a conditional use permit for a contracting yard on the Property. 2. Property. The Property is currently zoned Industrial Office Park (IOP). The Property is guided by the 2040 Land Use Plan for Office Industrial Use. Contracting yards are considered a Conditional Use within the Industrial Office Park (IOP) zoning district. 3. Conditions. The permit is issued subject to the following conditions: a) Equipment and supply storage must be screened or enclosed at all times by fencing or vegetative screening. Screening shall comply with city code. b) Vehicles/equipment shall be stored within an enclosed or screened area. c) No unlicensed or inoperable vehicle/equipment shall be stored on-premises. d) All chemicals shall be stored in proper storage facilities, specified by OSHA regulations. e) The contractor shall be licensed, bonded, and insured. f) All pavement surfaces must be repaired and maintain a quality level of condition, free from potholes and crumbling. g) The scope of the Contractors Yard may be increased if the amount of paved and screened area is increased, up to the allowed amount according to the zoning district, Industrial Office Park (IOP). Increase in impervious surface may require modifications and alteration to the stormwater mitigations on site. 248 h) Two spruce trees, a minimum of 4 feet tall at planting measured from finished grade, shall be planted along the driveway within the property, along the NW corner of the space defined as contractor yard on the site plan Exhibit C. i) It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, RPBCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. j) The applicant shall complete a wetland delineation onsite to confirm if the depressional area is a jurisdictional wetland. If any area onsite is determined to be a jurisdictional wetland then the applicant shall revise plans to meet all applicable city code regulations. The Wetland delineation shall be completed within 3 months after the approval of the Conditional Use Permit. k) The applicant and their Engineer shall work with city staff in amending the construction plans, dated May 31, 2024, and August 9, 2024 prepared by Moore Engineering Inc. to fully satisfy construction plan comments and concerns within 6 months after the approval of the Conditional Use Permit. l) The applicant shall provide updated plans and models to demonstrate that the contractor’s yard site is meeting water quality standards. A permanent BMP to manage the runoff generated by the contractor’s yard is anticipated. These models shall be submitted as part of all future submittals. m) The applicant shall create a stormwater management plan approved by staff to describe how the site is meeting city requirements including water quality and erosion control. The stormwater management plan including site improvements shall be executed within 12 months after the approval of the Conditional Use Permit. n) The developer shall enter into encroachment agreements for all existing and proposed improvements located in public easements. The encroachment agreements shall be recorded within 12 months after the approval of the Conditional Use Permit. 4. Termination of Permit. The city may revoke the permit following a public hearing for violation of the terms of this permit. The city may institute any proper action or proceeding at law or at equity to prevent violations of the within property, to restrain or abate violations of the within permit, or to prevent use or occupancy of the Subject Property. 5. Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced, this permit shall lapse, unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal misdemeanor. 249 DECISION The City Council approves the proposed conditional use permit based on the findings of fact included herein, and subject to the conditions of the staff report. ADOPTED by the Chanhassen City Council this _____ day of _____________, 202_. CHANHASSEN CITY COUNCIL BY:___________________________________ Its Mayor BY:_ __________________________________ Its City Manager 250 EXHIBIT A PARCEL A LEGAL DESCRIPTION Chanhassen Lakes Business Park, Block 5, Lot 11. 251 EXHIBIT B PARCEL B LEGAL DESCRIPTION Chanhassen Lakes Business Park, Block 5, Lot 10. 252 EXHIBIT C 253 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA CONDITIONAL USE PERMIT #24-9 1. Permit. Subject to the terms and conditions set forth herein and with the Conditional Use Permit recorded with Carver County on ____________, __, 2024, Document No. _____, the City of Chanhassen hereby grants: a) A conditional use permit for a contracting yard at 1591 Park Road. 2. Property. The permit for the property situated in the City of Chanhassen, Carver County, Minnesota, and legally described as follows: Chanhassen Lakes Business Park, Block 5, Lots 10 & 11. 3. Conditions. The permit is issued subject to the following conditions: a) Equipment and supply storage must be screened or enclosed at all times by fencing or vegetative screening. Screening shall comply with city code. b) Vehicles/equipment shall be stored within an enclosed or screened area. c) No unlicensed or inoperable vehicle/equipment shall be stored on-premises. d) All chemicals shall be stored in proper storage facilities, specified by OSHA regulations. e) The contractor shall be licensed, bonded, and insured. f) All pavement surfaces must be repaired and maintain a quality level of condition, free from potholes and crumbling. g) The scope of the Contractors Yard may be increased if the amount of paved and screened area is increased, up to the allowed amount according to the zoning district, Industrial Office Park (IOP). Increase in impervious surface may require modifications and alteration to the stormwater mitigations on site. 254 h) Two spruce trees, a minimum of 4 feet tall at planting measured from finished grade, shall be planted along the driveway within the property, along the NW corner of the space defined as contractor yard on the site plan Exhibit C. i) It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, RPBCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. j) The applicant shall complete a wetland delineation onsite to confirm if the depressional area is a jurisdictional wetland. If any area onsite is determined to be a jurisdictional wetland then the applicant shall revise plans to meet all applicable city code regulations. The Wetland delineation shall be completed within 3 months after the approval of the Conditional Use Permit. k) The applicant and their Engineer shall work with city staff in amending the construction plans, dated May 31, 2024, and August 9, 2024 prepared by Moore Engineering Inc. to fully satisfy construction plan comments and concerns within 6 months after the approval of the Conditional Use Permit. l) The applicant shall provide updated plans and models to demonstrate that the contractor’s yard site is meeting water quality standards. A permanent BMP to manage the runoff generated by the contractor’s yard is anticipated. These models shall be submitted as part of all future submittals. m) The applicant shall create a stormwater management plan approved by staff to describe how the site is meeting city requirements including water quality and erosion control. The stormwater management plan including site improvements shall be executed within 12 months after the approval of the Conditional Use Permit. n) The developer shall enter into encroachment agreements for all existing and proposed improvements located in public easements. The encroachment agreements shall be recorded within 12 months after the approval of the Conditional Use Permit. 4. Termination of Permit. The City may revoke the permit following a public hearing for violation of the terms of this permit. 255 5. Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced, this permit shall lapse, unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal misdemeanor. Dated: September 23, 2024 CITY OF CHANHASSEN BY: ___________________________ Elise Ryan, Mayor AND: ___________________________ Laurie Hokkanen, City Manager STATE OF MINNESOTA ) ( ss COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this day of , 20___, by Elise Ryan, Mayor, and by Laurie Hokkanen, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. __________________________________ NOTARY PUBLIC 256