Loading...
Erosion Control Plan - 6651 Galpin Blvd, Excelsior, MNMade For: Mr. Peter Grubish Timberline Homes 7900 International Drive Bloomington, MN 55425 SEQUENCE OF EROSION CONTROL CONSTRUCTION ACTIVITIES: 1. Installation of silt fence or bio-rolls prior to any construction activity. 2. Installation of rock construction entrance prior to any construction activity. 3. The site shall be re -vegetated within 48 hours of final grading. 4. Install landscaping as per landscape plan. EROSION CONTROL MEASURES: All best management practices (BMPs) determined by the Engineer to be effective are available to use on the site. BPMs anticipated to be used on the Project include the following: - Silt Fence - Temporary Rock Construction Site Entrance Pad - Concrete Mixing/Washout Basins shall be taken offsite - Final Landscaping with Seed, Fertilizer, Topsoil or Sod - Street Sweeping INSPECTION AND MAINTENANCE The Contractor is responsible for providing, maintaining and removing all Erosion Control BMPs, as set forth above, which includes all materials, equipment and labor. Owner is responsible for providing, maintaining and removing all erosion control BMPs, as set forth above, which includes all materials, equipment and labor. Owner is responsible for having the Contractor install, maintain and remove the BMPs as set forth above. SCHEDULE OF MAJOR EROSION CONTROL BMPs ANTICIPATED DATE Perimeter Silt Fence and Bio-Roll & Inlet Protection Topsoil Stripping -----------_ Rock Construction Entrance Building "Dried -In" ------------ Permanent Turf Establishment ------------ Removal of Temporary BMPs GENERAL NOTES: 1. No concrete washout on -site. 2. Perform dewatering activities into temporary dewatering basin. Do not dewater into sanitary sewer service or into curb & gutter. 3. Stabilize lawn area immediately after mass grading activities are complete with sod or disc anchored MnDOT type 1 mulch (This work will need to be completed before the main structure is erected). Sod or seed buffer areas as soon as construction activities allow. During winter construction, spread mulch and spray with water to freeze to ground. Seed and disc anchor new mulch in spring or sod. 4. Do not stockpile granular materials within street right-of-way. 5. Protect downstream street catch basins from sediment. 6. A hazardous material spill kit must always be available on -site. TEMPORARY ROCK CONSTRUCTION SITE ENTRANCE PAD, HATCHED. SEE DETAIL 1 0 Z SCALE 1 INCH = 20 FT. I:iG�•`7C•`Z�1�:3��iQl�• � � CONTROL PLAN EXISTING LAKE AND LAND SURVEYING, INC. --- --------- 5,.2______________ HOUSE 1200 Centre Pointe Curve, Suite 375 1FR MEY Mendota Heights, Minnesota 55120 FFF=1024.2 Phone: 651- 776- 6211 1031.54 / N 1030.40 / ' '\� 1031.12 /\ I S87°26'26"E 1031.49 ti \ \ ;' �''1p1$ i ,\p16 46 3.41 o 1029.95 ' �'' O t0 t9 \3 / % I 1012.91X �0 1 O to to t0 \ \ ; 00 06 n 'I ' X 1022.6,6,'1 N CD 1024.51 // x1oo8.2aX J N \ , / CORNER IN SWAMP1030.61 , i / i I X 1020.71I ; I WELL I i '� `\ ; 1 i I UOf , , ' X 1016.98 U , Z / `, I ` I I X 1619.08 OV 10 1024.38 `\ �- �-_ i j 'I 'tI 1013.80 X 1020.76 ` 'I_ ~i '--�_ 1008.07 1030.36 / 1029.64 ' ` I 1027.08 X`. 1022.94 y / / n / , ` 1024.06 X O ` \ '� X 1016.93 ', I I I ', \ G \ / a I ,I . , 1018.93 , x I I 6 1030.35 o i 1025.60 `` ` 1014.30 , ° 1030.56 �/ i' i ' - 1024.17 `. ` X I `, 'I `, I, I �, `, ; ', \\ � \ \ i i 0 $ 029.77 / I ' 1024.94 \ ' ` 'I , \ 1008.54I, ```, \ \ x``� \ I 1 \ \ WIDTH OF DRAINAGE AND / I SHED i \ i , I i I I I , \ ` ``� I I \ I \ w , \ \ UTILITY EASEMENT (TYPICAL) %' E I 11 X1017.29 , `, \ `, ,� `` a ' i 1025.24 ' i-\ �\ V1 I i �` ` X 1015.35 LL } � X1017.15 \ \ \ I 0 3 Cif K\ � \ ' O 1 WOOD '% 1016.54 I `, `, \ �� ��` Q',` �� `\ ` `� \ �- V, I ; DECK I x lot4i76 1 \ " U- m I EXISTING 1 1 0 09.86 r- I w O O HOUSE I i '� ` 1010.69 1X `�� `O. O _J t' O O I G _LJ% Ur 1 STORY , o I CNNI FRAME ', z \. LL.I m , p ` 1025.37 FFF=1026.8 ', WO=1018.2 I i �1 \ ` N [L ,'NANDTOOL WASHOUT AND 1025.16 CANTILEVERED LL -� CONTAINMENT AREA FIRST FLOOR X 1016.59 1012.7a ` I I CHIMNEY ' 1015.88 x 1015.23 , X I� Q (SEE DETAIL ON SHEET 2) /' \ NOTES: lo2s.72 \, ; SOME CONTOURS GEN�RATED FROM :AERIAL ` 20"MAPLE I - I x 1024.62 X I / I TOPOGRAPHY AND NOTE FOR CONSTROCTION \\\ O `Ltts' 1024.72 I x` I `, ' s WATER SHUT-OFF 1024.29X 1'� 1023.54X ' / '' ,''' i 1012.19 i I 1027.74 ' 'I I / , X ' O N / 1018.22 i ' WOOD,'FENCE X 1015.22 I ' i X 1014.78 i 1 \ = WELL, 1 1017.18 SEPTIC TANK I 1027.41 O I _ _ - -� X / I ' UNDERGROUND) 1023.59 / X 1017.72 1023.85 1016.25 x �102 15"SPRUCE% I 1010.81 463.41 I X 102 42 X1009.23 +- ~__�__ i I 26 STABILIZED ` y - T_ N87° 26 1/�/ \ y STOCKPILE/ o //�' ���� i ,=.4 ` tOt2.w,' ; I -----�-- -- -- --�-- I _ I M-CV- /1 19.3X,e- 6�),",N�I '_' AO`� 1010.12 /'V X 1022.81 1022.36 355119 101 '� - 1024.73 N ' x 1009.5 22.5 23.5 D '--------- �-/ --- ----- --------------- ii 3 I 6ji' I N -_--'� X 1b0E?)4- �'tQo6 ------------i I , ,,- , N / GARAGE ' --365.9------------- N% ---4s.s--------'- SLAB=1022.17--------------------------------------- I ' X ` r / X 1010.82 ' X 1006.69 i i \ I 1 I ' � 2.0 -- .- 2 I \ I I x 1 21.7s l !� I M o PROPOSED x 1008.67 ---'' ___----' I--------1'I ' _ �' WALKOUT � -''------- 1 I I - - - - - - - - - - - - - - - - -- 1',------------- t ' I 6"SPRUCE __ '/ N i' _-- 1 i i i i I i I i 11 --- o RAMBLER o 1022.42,• - - 28.0 �- O \ O FFE-1022.94 �� ` I I , I 1 N x 1021.4 TOF-1022.50 0 \ O 3 I' "SPRUCE 0'ti L SLAB-1011.21 '' o, BLOCK 11 V I O I X 1004.96 G / •10.5 $ O I 8"S R14.0 / x 1• %, I 1 /� lonso o -10p ' I 1020 N ( 1006.08 4-- \ I Q i' I X 1019.44 ' O ' 0,9 W 0•Z 1, 21,g cn �O• , 10 .07 LU p ' I ' 3% X 1002.79 Z 8 RUCE 018 p 1023.86 0•ZE Y I / ' F ' ' 1013.4 m I / x , x------------------------------- 1016 1 ,' //8"SPR CE 367.9-------- ------7-/I --------------` c------ 11' -------x 1017.73 1020.34 X r ___X 1001.49 '6-SPRUCE / / 1008x3s1 3.1 i ` ,_ _____ ---X 3.89 � --------L02.721012 ------1--- \ -------------- 1012.791 / I ; 8' PRUCE ; `/ a ,",$ ' x 1001.09 1016 46 X i ' / / ` i I 4.09 11 VVV��_ o / 3 1018.08 i l i ,�- - X 1001.44 1007.08 1 O ---� X_ I 1002.07X,'' / /10"MAPLE ; - - - _ _ _ 350.00 \ `, o / ; X 1015.83 ; i l ' i ' 6"ELM ,'� i ' - o ' ' X ' ' ` \` I o / 1018.35 ' i 1012.51 i i �Qi '18"BOX 8"BOX 000.74 i _ _ _ ` `` \ ` `` ` ``ttlAlii'' _ � \ �` `� `, 6 ;x 1007.8211 007.82 , X 100N87°26'26" 463.41 to 3.32 1 O CC)c0 rh N O 00 t0 a- ; \ N O O CD O p O O O p O p / x 999.09 SILT FENCE OR BIO-ROLLS 3 o �0 '� SEE DETAIL - --- CPICP AREAS: TOTAL EXISTING LOT AREA: 108,901 SQ. FT. OR 2.50 ACRES PROPOSED LOT AREA PARCEL A: 48,658 SQ. FT. OR 1.12 ACRES PROPOSED LOT AREA PARCEL B: 60,243 SQ. FT. OR 1.38 ACRES Current Legal Description: (Warranty Deed) Lot 2, Block 1, LAKE LUCY HIGHLANDS, Hennepin County, Minnesota. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Professional Engineer under the laws of the state of Minnesota. June 13, 2025 James L. Grams Professional Engineer Minnesota Registration No. 49623 Proposed Legal Description Parcel A The north 105 feet of Lot 2, Block 1, LAKE LUCY HIGHLANDS, Carver County, Minnesota. Proposed Legal Description Parcel B That part of Lot 2, Block 1, LAKE LUCY HIGHLANDS, Carver County, Minnesota lying south of the north 105 feet thereof. 5 WIRE MESH REINFORCEMENT (OPTIONAL) ENGINEERING FABRIC METAL OR WOOD POST OR STAKE FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOIL DIREC11O FLOOF RUNS 6 INCH MINIMUM -NATURAL MIN CONSTRUCTION OF SILT FENCE GEOTEC BELOW 1 1 I O O Lf") N 13 0 ' ,982 TEMPORARY ROCK CONSTRUCTION SITE ENTRANCE PAD SITE ADDRESS: 6651 GALPIN BOULEVARD, EXCELSIOR, MN