Loading...
PC SUM 2009 03 03 CHANHASSEN PLANNING COMMISSION REGULAR MEETING SUMMARY MINUTES MARCH 3, 2009 Chairman Papke called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Kurt Papke, Kevin Dillon, Debbie Larson, Mark Undestad, and Dan Keefe MEMBERS ABSENT: Kathleen Thomas. Denny Laufenburger was in the audience. STAFF PRESENT: Bob Generous, Senior Planner PUBLIC PRESENT: Mary Ann Smalley 8815 Lake Riley Drive Denny Laufenburger 8673 Chanhassen Hills Drive Jennifer Thorp 1050 Lake Susan Drive PUBLIC HEARING: WESTWOOD COMMUNITY CHURCH EXPANSION: REQUEST FOR A CONDITIONAL USE PERMIT FOR MULTIPLE PRINCIPLE STRUCTURES ON ONE LOT AND SITE PLAN REVIEW FOR A 51,000 SQUARE FOOT BUILDING EXPANSION ON PROPERTY ZONED OI, OFFICE AND INSTITUTIONAL DISTRICT, LOCATED AT 3121 WESTWOOD DRIVE. APPLICANT: CUNNINGHAM GROUP ARCHITECTURE, P.A., OWNER: WESTWOOD COMMUNITY CHURCH, PLANNING CASE 09-03. Bob Generous presented the staff report on this item. Commissioner Keefe asked for clarification of the Conditional Use Permit designation and trail connections. Commissioner Larson asked for clarification of the phasing plan. Commissioner Dillon asked about a master plan. Charlie Stoffel with Cuningham Group Architecture, Minneapolis showed revisions made to the plan since meeting with city staff regarding phasing and building materials. Commission members asked the applicant to address the building layout, and the timeline for building and utility construction. Chairman Papke opened the public hearing. No one spoke and the public hearing was closed. Larson moved, Undestad seconded that the Chanhassen Planning Commission recommends that the City Council approves a Conditional Use Permit to permit two buildings on one parcel, subject to the following conditions: 1.The site development shall comply with the requirements of the approved site plan #09-03. All voted in favor and the motion carried unanimously with a vote of 5 to 0. Planning Commission Summary - March 3, 2009 Larson moved, Undestad seconded that the Chanhassen Planning Commission recommends that the City Council approves Site Plan Planning Case #09-03 for a 51,000 square-foot, two-story multi-purpose building, plans prepared by Cuningham Group Architecture, P.A. and Westwood Professional Services, Inc., dated January 30, 2009, subject to the following conditions: 1.The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 2.Windows shall be added to the northwest elevation in the multi-purpose area. Class III 3.In addition to the fire sprinkler system required by the building and fire codes, fire department standpipes shall be added to the building in locations approved by the Chanhassen Fire Marshal. 4.The applicant shall contact Chanhassen Fire Marshal for location of yellow curbing to be painted and locations of “No Parking Fire Lane” signs. 5.Buildings are required to have automatic fire extinguishing systems. 6.Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 7.Retaining walls (new and additions to existing) over four feet high must be designed by a professional engineer registered in the State of Minnesota and a permit must be obtained prior to construction. 8.Inlet protection is provided for all proposed stormwater inlets until such a time as final stabilization is achieved. 9.The rock construction entrance be expanded to 75 feet per City code or, if this is not practical to do so, the applicant must show why this is not practical and maximize the rock construction entrance to the greatest length practical. 10.Silt fence north of Pond B be extended to the northwest to the 990 contour. 11.City details shall be included in the plan set for all erosion control best management practices and storm sewer structures. 12.One of the three inlets into Pond B must be eliminated. It is preferable that the most easterly inlet be eliminated so that maintenance can occur as efficiently as possible. 13.Pond maintenance access should be shown on the plan. 14.The applicant shall determine if any additional permissions are required and apply for and obtain these permits from the appropriate regulatory agencies (e.g., Minnesota Pollution 2 Planning Commission Summary - March 3, 2009 Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. 15.Surface drainage from the top of the wall should be directed to the proposed catch basin, or else a drain tile system shall be installed to convey the runoff to the storm sewer. 16.If on-site earthwork quantities do not balance and materials need to be imported or exported from the site, the developer will need to supply the City with a detailed haul route for review and approval by staff. 17.Any material exported to another location in Chanhassen may require a grading or interim use permit. All voted in favor and the motion carried unanimously with a vote of 5 to 0. APPROVAL OF MINUTES: Commissioner Larson noted the verbatim and summary minutes of the Planning Commission meeting dated February 17, 2009 as presented. COMMISSION PRESENTATIONS: None. Chairman Papke adjourned the Planning Commission meeting at 7:16 p.m. Submitted by Kate Aanenson Community Development Director Prepared by Nann Opheim 3