1 Site Plan 18780 W. 78th StreeCITY OF
P.C. DATE: March 4, 2003
C.C. DATE: March 24, 2003
REVIEW DEADLINE: April 4, 2003
CASE: 03-1 Site Plan
BY: A1-Jaff
STAFF REPORT
Z
<l:
PROPOSAL:
LOCATION:
APPLICANT:
Site Plan Review for a 45,200 square foot Office Warehouse
addition with a h~rd surface coverage variance
North of Hwy. 5, West of Dell Road and South of 77th Street, Lots
1 and 2, Block 1, Park One Third Addition
Opus Northwest L.L.C.
10350 Bren Road West
Minnetonka, MN 55343
(952) 656-zHdd
B anta Direct Marketing
18780 West 78th Street
Chanhassen, MN 55317
(952) 937-3908
I.O
PRESENT ZONING:
Industrial Office Park
2020 LAND USE PLAN: Office/Industrial ACREAGE: 13.36 Acres
SUMMARY'OF REQUEST: Site Plan Review for a 45,200 square foot office
warehouse addition with a hard surface coverage variance.
Notice of this public hearing has been mailed to all property owners within 500 feet.
LEVEL OF CITY DISCRETION 1N DECISION-MAKING:
The City's discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements. If it meets these standards, the City must
then approve the site plan. This is a quasi-judicial decision.
The City's discretion in approving or denying a variance is limited to whether or not the proposed
project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high
level of discretion with a vmSance because the burden of proof is on the applicant to show that they
meet the standards in the ordinance.
~ 77th St
Highway 5
Banta Direct Marketing
March 4, 2003
Page 2
BACKGROUND
On June 19, 1978, the City Council approved a Planned Industrial Development Plan #78-5 PUD,
which included a subdivision that resulted in dividing 701,656 square feet into Lot 1, Block 1, Park
One (444,734 square feet), and Outlot B (256,922 square feet). Lot 1 became the site for the Press
Building which was approved as a permitted use in the Planned Industrial Development Plan
concurrently with the subdivision.
On July 11, 1994, the City Council approved the final plat to replat Lot 1, Block 1, and Outlot B,
Park One 2nd Addition into Lots 1, 2, and 3, Park One Third Addition.
The City Council also approved Site Plan Review #94-1 for a 38,059 square foot expansion for
Banta on Lot 1, Block 1, Park One Third Addition (Lot 1 has an area of 11.89 acres). The existing
surface coverage on the site (prior to the expansion) was 79.5%. After the addition, the hard surface
coverage was reduced to 76.5%. The ordinance permits a maximum of 70% hard surface coverage
how ever, since the applicant reduced a non-conforming situation, a variance was not required.
On October 22, 2001, the City Council approved Site Plan Review #01-12 for a 20,785
square foot office building, Dell Professional Building (Health Partners), on a 2.12 acres.
On November 26, 2001, Health Partners requested to reduce the size of the building to 15,852
square feet on 1.75 acres. Staff responded "This change is considered minor and can be
accommodated/approved administratively with the understanding that the materials, architectural
design and integrity of the building must be maintained. Also, all site plan approval conditions and
ordinance requirements pertaining to hard surface coverage, setbacks, etc., must be met." Health
Partners purchased 1.75 acres only.
Banta Direct Marketing
March 4, 2003
Page 3
PROPOSAIdSUMMARY
The applicant is proposing to expand a warehouse/press room for Banta Direct Marketing. The site
is bordered by 77th Street West along the north, Hwy. 5 to the south, 187th Avenue West to the
west, and Dell Road to the east. Banta is in ownership of both Lots 1 and 2, Block 1, Park One
Third Addition. The total site area for both lots is 13.36 acres. The property is zoned Industrial
Office Park District. The site is visible directly from Highway 5 and has full access from 77th
Street West and 187th Avenue West. Access along Dell Road is restricted to fight-in/right-out only
and will be constructed when Health Partners construct their building.
The site plan is well developed and consistent with how the city anticipated the site to develop. The
expansion will utilize scored concrete panels, an identical material to that used on the existing
building. The facade of the building addition incorporates windows, pronounced entrances, and
architectural treatment that allows the addition to blend in with the existing building.
One of the advantages of this addition is the fact that it will reduce the number of parking spaces
visible from Highway 5, and move it to the northeast comer of the site. Parking for vehicles is
located on the east, west, and north side of the building. Vehicles will be screened by berms and
landscaping materials from Dell Road where the parking is proposed to be relocated.
As part of this application, the applicant is requesting a hard surface coverage variance. The current
hard surface coverage on Lot 1 is 76.5%. The applicant is adding Lot 2 to the overall site. Lot 2
will house parking spaces. The overall hard surface coverage for both Lots I and 2 is 75.8%. The
total number of parking spaces required for the site is 281 spaces (this number includes the major
manufacturing shift and overlap between shifts). The applicant is proposing a total of 306 parking
spaces. If the applicant eliminates the most easterly row of parking, the most easterly drive aisle
will no longer be needed. This will reduce the overall hard surface coverage for the site to 74.1%.
The actual hard surface coverage on Lot 2 with 306 parking spaces is 68%. This coverage is
reduced to 52% when the total number of parking spaces is reduced to 281 spaces. The need for the
hard surface coverage variance stems from the fact that staff is requiring the applicant to combine
Lot 2 with Lot 1 under a single Parcel Identification Number. If the applicant built the parking lot
on Lot 2 without combining it with Lot 1 (Off-premises parking lots are a permitted use in the lOP
district), the variance would not be required. It is staffs condition that is creating the hardship;
therefore, we are recommending approval of the variance.
Staff regards the project as a reasonable use of the land. The overall design will reduce the amount
of parking facing Highway 5. Staff is recommending approval of the site plan with a hard surface
coverage variance, with conditions.
Banta Direct Marketing
March 4, 2003
Page 4
GENERAL SITE PLAN/ARCHITECTURE
The existing Banta building is situated parallel to and north of Hwy. 5. The site is bordered by 77th
Street West along the north, Hwy. 5 to the south, 187th Avenue West to the west, and Dell Road to
the east. Access to the Banta building is gained off of 77th Street West and 187th Avenue West.
The proposed expansion of 45,200 square feet will be located to the southeast of the existing
building. Parking will be located to the east, west and south of the building. The proposed addition
will be built over an existing parking lot. The parking lot will be relocated to the northeast comer of
the site. Existing trees along the east portion of the building will be relocated to the area along Dell
Road to screen the parking lot with mature trees.
There are no direct views of the existing loading docks since it is screened by the existing building
from Highway 5 and Dell Road, and berm with landscaping from West 77th Street.
The majority of the parking lot is currently visible from Hwy. 5. The proposed addition will
relocate the parking lot to the northeast comer of the site and provide screening from Hwy. 5. The
applicant is incorporating a berm with landscaping along Dell Road to fully screen the parking lot.
Banta building, including the proposed addition, is located 30 feet from the north, 100 feet from the
east, 120 from the south, and 275 feet from the east property line.
Materials used on the Banta addition will be identical to the existing building's scored concrete
panels with textured stucco to match the existing building. They include windows, pronounced
entrances, and architectural relief. Staff worked closely with the applicant on this issue. The intent
was to incorporate the current design standards while allowing the addition to blend in with the
existing building. This has been achieved.
There are no changes intended for the trash enclosure, loading docks, or signage. Any roof top
equipment should be screened.
This development falls within the Highway Corridor Overlay and must comply with the district's
design standards in addition to the Industrial Office Park Standards and the city's new design
standards. The purpose of the overlay district is to promote high-quality architectural and site
design through improved development standards with the corridor. The design standards should
create a unified, harmonious and high quality visual environment. The building meets all the
requirements of the design standards, which include:
1. A defined entrance accentuated by a projecting canopy.
2. The building provides articulation through the use of staggered canopies, parapets on the
roof, different materials and colors, landscaping, windows, and columns.
3. All materials used on the building are durable and permitted.
4. The colors on the building are harmonious.
5. All elevations that can be viewed by the public have been designed to include windows
and/or doors to minimize expanses of blank walls.
Banta Direct Marketing
March 4, 2003
Page 5
6. An outdoor seating area for employees is located along the west portion of the site.
7. Trash enclosure is screened from views.
8. The majority of the parking lot is being moved to the northeast comer of the site; with
will further screen the parking lot.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1)
Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that
may be adopted;
(2) Consistency with this division;
(3)
Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
(4)
Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5)
Creation of functional and harmonious design for structures and site features, with
special attention to the following:
ao
An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors, and general
community;
b. The amount and location of open space and landscaping;
Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
do
Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
Banta Direct Marketing
March 4, 2003
Page 6
(6)
Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: The proposed development is consistent with the City's Highway 5 corridor
design requirements, the comprehensive plan, the zoning ordinance, and the site plan
review requirements with the incorporation of staff's conditions and approval of the hard
surface coverage variance. The site design is compatible with the surrounding
development. It is functional and harmonious with the approved development for this
area.
WETLANDS
There are no wetlands on the site.
GRADING~ DRAINAGE & EROSION CONTROL
Minimal grading will be required for this project to elevate the proposed building addition pad to
930 and parking lot. A maximum slope of 3:1 is allowed on the berms along the north and east
sides of the proposed parking lot. The plans do not propose erosion control fencing around the
perimeter of the site. Type II silt fence must be used and extended along the east and north side
of the proposed parking lot. The applicant should be aware that any off-site grading will require
an easement from the appropriate property owner.
The plans show the building area draining towards the existing catch basin in the parking area
along the east side of the building. The new parking lot drains toward the northeast comer to a
proposed catch basin. All of the storm water from the proposed addition will flow to an existing
pond north of the site at the southwest comer of Quattro Drive and Dell Road. This pond is sized
sufficiently to accommodate the additional drainage. The applicant will need to submit storm
sewer design calculations.
UTILITIES
The plans for the new building addition show a proposed water service connecting to an existing
water service on the neighboring Dell Professional Building property. Currently, the Dell
property has not been developed and, as such, no utility improvements have been installed.
Furthermore, the water line on the Dell property is meant to be a private water service. If the
applicant intends to use the water line, then the line will be considered a public watermain since
it serves more than one lot. Public watermains are City owned and maintained and are required
to be placed within a 20-foot wide public easement. Detailed plans and specifications will be
required for the public watermain. The applicant will also be required to supply a financial
security to guarantee the installation of the public watermain. In order to construct the public
Banta Direct Marketing
March 4, 2003
Page 7
watermain, the applicant can either petition the City to do the work as part of a public
improvement project or the applicant can construct the project themselves.
The nearest sanitary sewer line is located north of the site in West 77th Street. There is an
existing 33-foot drainage and utility easement on the west side of Lot 2 for the sanitary service to
Lot 3. The City will coordinate with the applicant to extend the sanitary service to Lot 3 prior to
the paving of Lot 2. The applicant is proposing to connect to the 6-inch sewer service which is
planned to be a private service for the Dell Building on Lot 3 only. Since two separate lots
cannot use the same service, the applicant will need to extend their own service. Installation of
the private utilities for the site will require permits and inspections through the City's Building
Department.
The property is subject to sanitary sewer and water hookup charges. The 2003 trunk utility
hookup charges are $1,440 per unit for sanitary sewer and $1,876 per unit for water. The 2003
SAC charge is $1,275 per unit. These charges are collected prior to the building permit issuance
and are based on the number of SAC units for the new building addition. Any public watermain
will require a Minnesota Department of Health permit.
STREETS/ACCESS/PARKING
The plans propose utilizing the existing drive aisle along the east side of Lot 2 that has full
access onto West 77th Street. This access will be shared with Lot 3 to the south and will require
a cross-access easement agreement. The minimum drive aisle width permitted by ordinance in
an office district is 26 feet. The plans show a 24-foot drive aisle. The drive aisle width must be
revised to meet ordinance requirements. The applicant needs to show a sidewalk to the new door
at the southeast comer.
To facilitate parking during construction, the new parking area on Lot 2 should be installed prior
to the new building addition being started. Staff realizes that the applicant intends to begin
construction in winter. Paving the parking during the winter months is not an option. Therefore,
we recommend the subsurface improvements i.e. sand, gravel, crushed rock be installed at a
minimum, as a temporary improvement. Asphalt must be installed before a Certificate of
Occupancy will be issued.
The parking ordinance for manufacturing requires one parking space per employee on the major
shift (160 spaces which includes overlap parking spaces during shift change) and 4.5 parking spaces
per 1,000 square feet of office space (the building contains 27,000 square feet of office space which
translates to 121 spaces). The total number of parking spaces required is 281 spaces. The applicant
is providing 306. Staff is recommending the total number of parking spaces be reduced to 281.
This action will reduce the hard surface coverage on the site.
Banta Direct Marketing
March 4, 2003
Page 8
LANDSCAPING
Minimum requirements for landscaping include 7,644 sq. ft. of landscaped area around the
parking lot, 31 trees for the parking lot, and buffer yard plantings along the north, south and east
property lines. The applicant's proposed as compared to the requirements for landscape area and
parking lot trees is shown in the following table.
Vehicular use landscape area
Trees/vehicular use area
Hwy. 5
buffer yard C - 170'
15' width
East property line
buffer yard C - 250' and
buffer yard B - 385'
North property line
1 tree per 30'
Required
7,644 sq. ft.
31 canopy trees
5 canopy trees
10 understory trees
12 shrubs
11 canopy tree
22 understory trees
32 shrubs
8 canopy trees
Proposed
>7,644 sq. ft.
35 canopy trees
5 canopy
12 understory
27 shrubs
10 canopy trees
21 understory
59 shrubs
8 canopy trees
The applicant meets minimum requirements for all plantings except the buffer yard requirements
along the east property line.
LIGHTING
Lighting locations have been illustrated on the plans. Only shielded fixtures are allowed with a
maximum height of 30 feet. The ordinance requires no more than V2 foot candles of light at the
property line. The Photometric Plan shows that the proposed lighting complies with this
requirement with the exception of the south portion of Lot 2. This area contains a shared access
with the property located to the south of the subject site, and should be illuminated for safety
reasons.
SIGNAGE
None proposed.
Signage must comply with the sign ordinance.
Banta Direct Marketing
March 4, 2003
Page 9
COMPLIANCE TABLE - lOP DISTRICT
Ordinance Banta
Building Height 4 stories 1 story
Building Setback N-30' E-30' N-30' E-315'
S-30' W-30' S-155' W-75'
Parking stalls 281 stalls 306 stalls
Parking Setback
N-25' E-25' N-28' E-28'
S-25' W-25' S-25' W-30'
Hard surface
Coverage
70% 74.1%
Lot Area
1 acre 13.36 acres
VARIANCE FINDINGS
As part of this application, the applicant is requesting a hard surface coverage variance. The current
hard surface coverage on Lot 1 is 76.5%. The applicant is adding Lot 2 to the overall site. Lot 2
will house parking spaces. The overall hard surface coverage for both Lots 1 and 2 is 75.8%. The
total number of parking spaces required for the site is 281 spaces (this number includes the major
manufacturing shift and overlap between shifts). The applicant is proposing a total of 306 parking
spaces. If the applicant eliminates the most easterly row of parking, the most easterly drive aisle
will no longer be needed. This will reduce the overall hard surface coverage for the site to 74.1%.
The actual hard surface coverage on Lot 2 with 306 parking spaces is 68%. This coverage is
reduced to 52% when the total number of parking spaces is reduced to 281 spaces. The ordinance
allows a maximum of 70% hard surface coverage.
The Planning Commission shall not grant a variance unless they find the following facts:
ao
That the literal enforcement of this chapter would cause an undue hardship. Undue hardship
means that the property cannot be put to reasonable use because of its size, physical
surroundings, shape or topography. Reasonable use includes a use made by a majority of
comparable property within 500 feet of it. The intent of this provision is not to allow a
proliferation of variances, but to recognize that there are pre-existing standards in this
neighborhood. Variances that blend with these pre-existing standards without departing
downward from them meet these criteria.
Finding: The need for the hard surface coverage variance stems from the fact that staff is
requiring the applicant to combine Lot 2 with Lot 1 under a single Parcel Identification
Banta Direct Marketing
March 4, 2003
Page 10
Number. If the applicant built the parking lot on Lot 2 without combining it with Lot 1
(Off-premises parking lots are a permitted use in the IOP district), the variance would not be
required. It is staff's condition that is creating the hardship. The condition to combine the
lots under a single PID it is to ensure it is not sold separately.
bo
The conditions upon which a petition for a variance is based are not applicable, generally, to
other property within the same zoning classification.
Finding: The conditions upon which this variance is based are applicable to properties in
the lOP zoning district
The purpose of the variation is not based upon a desire to increase the value or income
potential of the parcel of land.
Finding: The proposed variation will improve a nonconforming hard surface coverage and
allow it to become more in compliance with staff's recommendation.
d. The alleged difficulty or hardship is not a self-created hardship.
Finding: The applicant submitted an application that meets ordinance requirements. Staff
is requiring the applicant to combine the lots which is creating an overall nonconforming
hard surface coverage.
eo
The granting of the variance will not be detrimental to the public welfare or injurious to
other land or improvements in the neighborhood in which the parcel is located.
Finding: Approval of the variances as recommended by staff will improve a
nonconforming situation.
The proposed variation will not impair an adequate supply of light and air to adjacent
property or substantially increase the congestion of the public streets or increase the danger
of fire or endanger the public safety or substantially diminish or impair property values
within the neighborhood.
Finding: The proposed variation will not impair an adequate supply of light and air to
adjacent property or substantially increase the congestion of the public streets with staff's
recommendation.
Based upon these findings, staff is recommending approval of this variance with conditions.
Banta Direct Marketing
March 4, 2003
Page 11
STAFF RECOMMENDATION
Staff recommends that the Planning Commission adopt the following motion:
"The Planning Commission recommends approval of Site Plan Review ~03-1 with a variance to
allow a 74.1% hard surface coverage, as shown on the site plan dated received February 3, 2003,
subject to the following conditions:
1. Applicant shall increase landscape plantings in east buffer yard to meet minimum
requirements. A revised landscape plan shall be submitted before final approval.
o
Fire Marshal conditions:
a. A PIV (Post Indicator Valve) will be required on the new tenant water service coming in
to the building.
b. Fire lane signs and yellow curbing will be required. Contact Chanhassen Fire Marshal
for exact location of signs and curbs to be painted.
c. Submit radius turn dimensions to City Engineer and Chanhassen Fire Marshal for review
and approval.
Building Official Conditions:
a. The addition is required to have an automatic fire extinguishing system.
b. The plans must be prepared and signed by design professionals licensed in the State of
Minnesota.
c. Detailed occupancy and building area related code requirements cannot be reviewed until
further information is provided. It is evident that the proposed addition will create
exiting and high pile storage issues in the existing building that must be examined.
d. The owner and or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
4. The applicant shall combine Lots 1 and 2, Block 1, Park One Third Addition, under a single
Parcel Identification Number.
5. Submit storm sewer sizing design for a 10-year, 24-hour storm event.
6. Increase the minimum drive aisle width to 26 feet.
7. A cross-access easement agreement is required over the shared portion of the driveway
access.
8. Add the latest City standard detail plate nos. 1002, 1004, 2101, 2109, 2202, 2203, 3101,
5203, 5215, 5301 and 5300.
Banta Direct Marketing
March 4, 2003
Page 12
9. Show a minimum rock construction entrance of 75 feet in length per City Detail Plate No.
5301.
10. Show the proposed watermain and sewer pipe, class, slope, and length.
11. A Type II silt fence must be used and removed when construction is completed.
12. Any off-site grading will require temporary easements.
13. Grades shall not exceed 3:1.
14. Add a benchmark to the plans and a legend.
15. On the sanitary and water plan, revise the existing watermain to proposed.
16. Provide the City with a copy of the Watershed District and Minnesota Department of Health
permits for the site.
17. Submit storm sewer sizing calculations.
18. Show all existing and proposed easements.
19. Add a storm sewer schedule.
20. Add a note "Any connection to existing manholes shall be core drilled."
21. The property is subject to sanitary sewer and water hookup charges. The 2003 trunk utility
hookup charges are $1,440 per unit for sanitary sewer and $1,876 per unit for water. The
2003 SAC charge is $1,275 per unit. These charges are collected prior to the building permit
issuance and are based on the number of SAC units for the new building addition. Any
public watermain will require a Minnesota Department of Health permit.
22. In the storm sewer plan, revise the proposed manhole no. 2 invert elevation to match the flow
direction.
23. The applicant needs to show the sidewalk to the new entrance door at the southeast comer.
24. If the applicant intends to use the water line, then the line will be considered a public
watermain since it serves more than one lot. Public watermains are City owned and
maintained and are required to be placed within a 20-foot wide public easement. Detailed
plans and specifications will be required for the public watermain. The applicant will also be
required to supply a financial security to guarantee the installation of the public watermain.
Banta Direct Marketing
March 4, 2003
Page 13
25. The applicant needs to extend their own sanitary service.
26. Show proposed grading around the building addition.
27. The City will coordinate with the applicant to extend the sanitary service to Lot 3 prior to the
paving of Lot 2.
28. To facilitate parking during construction, the new parking area on Lot 2 should be installed
prior to the new building addition being started. Paving the parking during the winter months
is not an option. Therefore, we recommend the subsurface improvements i.e. sand, gravel,
crushed rock be installed at a minimum, as a temporary improvement. Asphalt must be
installed before a Certificate of Occupancy will be issued.
29. Park and trail dedication fees to be collected per city ordinance.
30. All roof top equipment shall be screened from views.
31. The applicant shall enter into a site plan development contract with the city and provide the
necessary financial securities. The applicant shall provide staff with a detailed cost estimate of
landscaping to be used in calculating the required financial guarantees. These guarantees must
be posted prior to building permit issuance.
32. The most easterly row of parking and aisle shall be removed."
ATTACHMENTS
2.
3.
4.
Application, narrative, and public heating notice.
Memo from Mak Sweidan, dated February 26, 2003.
Memo from Mark Littfin, dated February 13, 2003.
Plans dated February 3, 2003.
CITYOF
CITY OF CHANHASSEN
7700 MARKET BOULEVARD
CHANHASSEN, MN 55317
(952) 227-1100
DEVELOPMENT REVIEW APPLICATION
APPLICANT:
ADDRESS:
Opus Northwest L.L.C.
10350 Bren Road West
TELEPHONE (Day time)
Minnetonka, MN 55343
(952) 656-4444
OWNER: Banta Direct Marketing
ADDRESS: 18780 W. 78th Street
Chanhassen, MN 55317
TELEPHONE: (952) 937-3908
__ Comprehensive Plan Amendment
Conditional Use Permit
Interim Use Permit
__ Non-conforming Use Permit
__ Planned Unit Development*
__ Rezoning
__ Sign Permits
X Sign Plan Review
Site Plan Review*
Subdivision*
__ Temporary Sales Permit
Vacation of ROW/Easements
Variance
Wetland Alteration Permit
__ Zoning Appeal
Zoning Ordinance Amendment
__ Notification Sign
X
__ Escrow for Filing Fees/Attorney Cost**
($50 CUPISPRIVACNARANAPIMetes
and Bounds, $400 Minor SUB)
TOTALFEE$
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Building material samples must be submitted with site plan reviews.
*Twenty-six full size folded copies of the plans must be submitted, including an 81/~'' X 11" reduced copy of
transparency for each plan sheet.
** Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME Banta Direct Marketing
LOCATION 18780 W. 78th Street, Chanhassen, MN 55317
LEGAL DESCRIPTION Lot 1 & 2~ Block 1, Park One Second Addition
TOTAL
ACREAGE 13.36
WETLANDS PRESENT YES
PRESENT ZONING HC/BCO
REQUESTED
ZONING HC/BCO
X NO
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST Addition to an existing facility
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Depadment to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A wdtten
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the applicant.
Application Received on
Date
Date
Fee Paid Receipt No.
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
OPUS
THE OPUS GROUP
A R C H I T E C T S
CONTRACTORS
D E V E L 0 P E R S
OPUS NORTHWEST, L.L.C.
A member of Ti~e Opus G~vup
10350 Bren Road West
Minnetonka, MN 55343
Phone 952-656-4444
Fax 952-656-4529
www. opuscorp.com
January 27, 2003
Sharmin A1-Jaff
Senior Planner
City of Chanhassen
7700 Market Blvd.
Chanhassen, MN 55317
BANTA DIRECT MARKETING GROUP
18780 W. 78tI~ STREET
Dear Sharmin:
Enclosed, please find a completed development review application for site plan approval
for an addition of approximately 45,200 sq. ft. to the existing Banta Direct Marketing
Group facility.
As you know, Banta has been a long-standing corporate citizen of the City of
Chanhassen. During the site plan review process for the last addition in 1994, The City
of Chanhassen approved plans which indicated a future press room addition of
approximately 14,760 sq. ft. and an impervious surface ratio of 76.8%. In order to meet
Banta's needs, the plant must be expanded to accommodate two additional presses and
associated bindery equipment. This necessitates the now proposed addition of 45,200
sq. ft. Banta has requested Opus design and construct this facility on a fast-track basis in
order to have all equipment operational by August 15, 2003. Therefore, we would
appreciate your help in obtaining city approvals at the earliest possible date.
Attached, please find a spreadsheet prepared by Banta's human resources department
which indicates a total employee count for the expanded facility of approximately 408
over 3 shifts. The maximum number of employees anticipated at any one time is
approximately 224 during the afternoon shift change. Based on this information, we have
provided 306 parking spaces in our site planning. Please note that technological
advances have reduced the employee count since the approval in 1994.
OPUS.
OF LC R E AT [ V E
$ O U T I O N S
THE OPUS GROUP: A]lcntowu ° Atlanta ° Austin ° Chicago · Columbus · Dallas ° Denver ° Detroit · Fort Lauderdale · Houston ° Indianapolis · Kansas City · Los Angeles · Milwaukee
Mhmeapolis · Orange County · Orlando · Pensacola · Philadelphia ° Phoenix ° Portland · Sacramento · San Francisco ° San Jose ° Seattle · St. Louis ° Tampa ° Washington, D.C.
The proposed site plan indicates a 76% impervious surface ratio that is slightly less than
the previously approved ratio of 76.8%. This is possible due to the fact that Banta did not
sell the entire easterly parcel that was shown on the 1994 approval.
The exterior elevations indicate a design consistent with the existing facility. The south
Hwy. 5 frontage has been designed to look like office space despite its manufacturing
use. The east elevation utilizes precast concrete with accents to match the existing along
with an employee entrance to break up the faqade. Significant landscaping has been
included along with relocating a number of large existing trees. Rooftop equipment will
be located 50 feet behind a two-foot high parapet.
Banta would like to continue its operations on the present site. We believe the proposed
addition will be an asset to both Banta and the City of Chanhassen.
Thank you for your consideration in reviewing this project. If you have any questions or
require any further information, please contact me at (952) 656-4457.
Sincerely,
OPUS NORTHWEST L.L.C.
David F. Bangasser
Senior Project Manager
Xc~
Mark Jeffson - Banta Direct Marketing
John Olin - Banta Direct Marketing
Chuck Weber - Banta Direct Marketing
City of Chanhassen
7700 Market Blvd., P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
Date: February 5, 2003
To: Development Plan Referral Agencies
From: Planning Department
By: Sharmeen A1-Jaff, Senior Planner
Subject:
Request for Site Plan approval for a 45,200 sq. ft. addition with variances on property zoned IOP,
Industrial Office Park and located at northwest comer of Dell Road and Hwy. 5, Opus Northwest
IJLC, Banta Direct Marketing Group.
Planning Case:
2003-1 Site Plan
The above described application for approval of a land development proposal was filed with the Chanhassen Planning
Department on February 3, 2003.
In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City
· Council.
This application is scheduled for consideration by the Chanhassen Planning Commission on Tuesday, March 4, 2003 at 7:00
p.m. in the Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than
February 24. You may also appear at the Planning Commission meeting if you so desire. Your cooperation and assistance
is greatly appreciated.
ity Departments
City Engineer
b. City Attorney
:/~,~City Park Director
~d) Fire Marshal
i'~. Building Official
?~) Water Resources Coordinator
.)Forester
8. Telephone Company
(US West or Sprint)
9. Electric Company
(NSP or MN Valley)
10. Mediacom Cable System
2. Watershed District Engineer
11. U. S. Fish and Wildlife
3. Soil Conservation Service
4. MN Dept. of Transportation
5. U.S. Army Corps of Engineers
12.
Carver County
a. Engineer
b. Environmental Services
Other £-5ty of Eden
Prairie
6. Minnegasco
7. MN Dept. of Natural Resources
NOTICE OF PUBLIC HEARING
CHANHASSEN PLANNING COMMISSION MEETING
TUESDAY, MARCH 4, 2003 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
7700 MARKET BLVD.
PROPOSAL:
Site Plan Review
for an Addition
APPLICANT:
LOCATION:
Opus Northwest LLC
18400 West 77th Street
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Opus
Northwest LLC, is requesting Site Plan approval for a 45,200 sq. ft. addition with variances on property
zoned lOP, Industrial Office Park and located at northwest corner of Dell Road and Hwy. 5, Banta
Direct Marketing Group.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the project.
Questions and Comments: if you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Sharmeen at 227-1134. If you choose to submit written comments, it is helpful to have one
copy to the department in advance of the meeting. Staff will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on February 20, 2003.
Smooth Feed SheetsTM Use template }:or 5160®
Hall Properties International
5559 Bristol Lane
Minnetonka, MN 55343
Elftmann Family
7600 Quattro Drive
Chanhassen, MN 55317
Waytek
P. O. Box 690
Chanhassen, MN 55317
CSM Investors
2575 University Ave. W, #150
St. Paul, MN 55114
Lyman Lumber
P. O. Box 40
Excelsior, MN 55331
Group Health Plan
Attn: Deb Lawrence
P. O. Box 1309
Bloomington, MN 55425
Carmen Crespo
18399 Cattail Ct
Eden Prairie, MN 55346
Vincent Hurwitz
18245 Coneflower Lane
Eden Prairie, MN 55346
Patricia Wagner
18250 Coneflower Lane
Eden Prairie, MN 55346
Laura Benson
18397 Cattail Ct
· Eden Prairie, MN 553346
Nancy Olmstead
18395 Cattail Ct
Eden Prairie, MN 55346
Julie Mills
18393 Cattail Ct
Eden Prairie, MN 55346
Karen Zanter
18400 Cattail Ct.
Eden Prairie, MN 553346
PJ&MKLong
18398 Cattail Ct.
Eden Prairie, MN 553346
Alice Ehresman
18396 Cattail Ct.
Eden Prairie, MN 553346
R L & C A Boothy
18387 Cattail Ct.
Eden Prairie, MN 553346
Frances Jensen
c/o Gordon Jensen
7400 Bush Lake Drive
Bloomington, MN 55438
Linda Martignetti
18388 Cattail Ct.
Eden Prairie, MN 553346
Address Labels
5~60®
MEMORANDUM
CITYOF
CHANHASSEN
7700 Market Boulevard
PO Box I47
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952~227.1180
Fax: 952.227.1190
TO:
FROM:
D ATE:
SUB J:
Sharmeen A1-Jaff, Senior Planner
Mak Sweidan, Engineer4/~
February 26, 2003
Site Plan Review for Banta Direct Marketing Group Building Expansion
Land Use Review File No. 03-02
Upon review of the plans prepared by OPUS Architects & Engineers, Inc. dated February
3, 2003, I offer the following comments and recommendations:
GRADING~ DRAINAGE & EROSION CONTROL
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recrealion Cenler
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Sile
vc,,c,v, ci.chanhassen.rnn.us
Minimal grading will be required for this project to elevate the proposed building
addition pad to 930 and parking lot. A maximum slope of 3:l is allowed on the berms
along the north and east sides of the proposed parking lot. The plans do not propose
erosion control fencing around the perimeter of the site. Type II silt fence must be used
and extended along the east and north side of the proposed parking lot. The applicant
should be aware that any off-site grading will require an easement from the appropriate
property owner.
The plans show the building area draining towards the existing catch basin in the parking
area along the east side of the building. The new parking lot drains toward the northeast
comer to a proposed catch basin. All of the storm water from the proposed addition will
flow to an existing pond north of the site at the southwest comer of Quattro Drive and
Dell Road. This pond is sized' sufficiently to accommodate the additional drainage. The
applicant will need to submit storm sewer design calculations.
UTILITIES
The plans for the new building addition show a proposed water service connecting to an
existing water service on the neighboring Dell Professional Building property.
Cun'ently, the Dell property has not been developed and, as such, no utility
improvements have been installed. Furthermore, the water line on the Dell property is
meant to be a private ~vater service. If the applicant intends to use the water line, then
the line will be considered a public watermain since it serves more than one lot. Public
watermains are City owned and maintained and are required to be placed within a 20-
foot wide public easement. Detailed plans and specifications will be required for the
public watermain. The applicant will also be required to supply a financial security to
guarantee the installation of the public watermain. In order to construct the public
watermain, the applicant can either petition the City to do the work as part of a public
improvement project or the applicant can construct the project themselves.
The nearest sanitary sewer line is located north of the site in West 77th Street. There is
an existing 33-foot drainage and utility easement on the west side of Lot 2 for the
sanitary service to Lot 3. The City will coordinate with the applicant to extend the
sanitary service to Lot 3 prior to the paving of Lot 2. The applicant is proposing to
connect to the 6-inch sewer service which is planned to be a private service for the Dell
The City of Chanhassen · A growing cornrnunily with clean lakes, quality schools, a charming downtown, lhriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Shameen A1-Jaff
February 26, 2003
Page 2
Building on Lot 3 only. Since two separate lots cannot use the same service, the
applicant will need to extend their own service. Installation of the private utilities for the
site will require permits and inspections through the City's Building Department.
The property is subject to sanitary sewer and water hookup charges. The 2003 trunk
utility hookup charges are $1,440 per unit for sanitary sewer and $1,876 per unit for
water. The 2003 SAC charge is $1,275 per unit. These charges are collected prior to the
building permit issuance and are based on the number of SAC units for the new building
addition. Any public watermain will require a Minnesota Department of Health permit.
STREETS
The plans propose on utilizing the existing drive aisle in the east side of Lot 2 that has
full access onto West 77th Street. This access will be shared with Lot 3 to the south and
will require a cross-access easement agreement. The minimum drive aisle width
permitted by ordinance in an office district is 26 feet. The plans show a 24-foot drive
aisle. The drive aisle width must be revised to meet ordinance requirements. The
applicant needs to show a sidewalk to the new door at the southeast comer.
To facilitate parking during construction, the new parking area on Lot 2 should be
installed prior to the new building addition being started.
RECOMMENDED CONDITIONS OF APPROVAL
1. Submit storm sewer sizing design for a 10-year, 24-hour storm event.
2. Increase the minimum drive aisle width to 26 feet.
3. A cross-access easement agreement is required over the shared portion of the
driveway access.
4. Add the latest City standard detail plate nos. 1002, 1004, 2101, 2109, 2202,
2203, 3101, 5203, 5215, 5301 and 5300.
5. Show a minimum rock construction entrance of 75 feet in length per City Detail
Plate No. 5301.
6. Show the proposed watermain and sewer pipe, class, slope, and length.
7. Silt fence type II must be used and removed when construction is completed.
8. Any off-site grading will require temporary easements.
9. Maximum grading side slope of 3:1 is required.
10. Add a benchmark to the plans and a legend.
11. On the sanitary and water plan, revise the existing watermain to proposed.
Shameen A1-Jaff
February 26, 2003
Page 3
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Provide the City with a copy of the Watershed District and Minnesota
Department of Health permits for the site.
Submit storm sewer sizing calculations.
Show all existing and proposed easements.
Add a storm sewer schedule.
Add a note "Any connection to existing manholes shall be core drilled".
The property is subject to sanitary sewer and water hookup charges. The 2003
trunk utility hookup charges are $1,440 per unit for sanitary sewer and $1,876
per unit for water. The 2003 SAC charge is $1,275 per unit. These charges are
collected prior to the building permit issuance and are based on the number of
SAC units for the new building addition. Any public watermain will require a
Minnesota Department of Health permit.
In the storm sewer plan, revise the proposed manhole no. 2 invert elevation to
match the flow direction.
The applicant needs to show the sidewalk to the new door at the southeast
comer.
If the applicant intends to use the water line, then the line will be considered a
public watermain since it serves more than one lot. Public watermains are City
owned and maintained and are required to be placed within a 20-foot wide public
easement. Detailed plans and specifications will be required for the public
watem~ain. The applicant will also be required to supply a financial security to
guarantee the installation of the public watermain.
The applicant needs to extend their own sanitary service.
Show proposed grading around the building addition.
The City will coordinate with the applicant to extend the sanitary service to Lot
3 prior to the paving of Lot 2.
To facilitate parking during construction, the new parking area on Lot 2 should
be installed prior to the new building addition being started.
jms
c:
Teresa Burgess, Director of Public Works/City Engineer
Matt Saam, Assistant City Engineer
g:\eog\projects\banta\building expansion plan review, doc
CITYOF
CI SElq
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1119
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recrealion Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www. ci.chanhassen.mn.us
MEMORANDUM
TO:
Sharmin A1 Jaff, Senior Planner
FROM:
Mark Littfin, Fire Marshal
DATE:
February 13, 2003
SUB J:
Request for site plan approval for a 45,200 square foot addition with
variances on property zoned IOP, Industrial Office Park, and located
at the northwest comer of Dell Road and Highway 5, Opus Northwest
LLC, Banta Direct Marketing Group.
Planning Case: 2003-1 Site Plan
I have reviewed the site plan for the above project. In order to comply with the
Chanhassen Fire Department/Fire Prevention Division I have the following fire code or
city ordinance/policy requirements. The site plan is based on the available information
submitted at this time. If additional plans or changes are submitted, the appropriate
code or policy items will be addressed.
1. A PIV (Post Indicator Valve) will be required on the new tenant water service
coming in to the building.
2. Fire lane signs and yellow curbing will be required. Contact Chanhassen Fire
Marshal for exact location of signs and curbs to be painted.
3. Submit radiUs turn dimensions to City Engineer and Chanhassen Fire Marshal
for review and approval.
g 5safety\ml\plrevbanta
The City of Chanhassen * A growing comrnunily with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gmat place to live, work, and play.