Loading...
Site Plan 05-07-2015 OLDI I I, 11 I I ,I I I I 1' 0 I U 30' �' m i � I SETBACK I, BUILDABLE AREA OF SITE IF ALL SETBACKS ARE ENFORCED - 387 S.F.) LAKE M/NNEWASHTA M/ SITE OF PREVIOUS FUEL-'---. OIL TANK - OHW E INTERPO PROPOSED GARAGE - 621 S.F. FOOTPRINT, SLAB ELEVATION 947.3 HEIGHT: 16-3" AT MID -SLOPE OF MAIN GABLE 19'-3" AT MID -SLOPE OF DORMER 21'-8" AT PEAK I i I i I ' I I EXISTING IMPERVIOUS SURFACE (PER SURVEY): 7191 S.F. SETBACK TOTAL LOT AREA = 32025 S.F. NEW GARAGE: 621 S.F. j NEW DRIVE: 185 S.F. EXISTI TOTAL IMPERVIOUS PROPOSED = 7997 S.F. (24.97%) i BITUMI US DRIVE 1 I j I I, I LAKE FROM SURVEY MINNEWASHTA 0 5 10 20 40 "=L w OSITE PLAN ,•l = 30B -g" north E 612.220.6190 MACKEYMALIN.COM W " V D W 1— Z Z y�w W a V d/ Vz W 0_ ,W^ p V 10 M PROIER PHASE Schematic Design PROJECT NUMBER: ISSUE DATE: ISSUE DATE DRAWN 9Y.- PM Y:PM SITE SITE PLAN