Loading...
1. The ArborsMEMORANDUM TO: Planning Commission CITY OF FROM: Bob Generous, Senior Planner C1uMNSE 7700 Market Boulevard DATE: January 16, 2007 O PO Box 147 SUBJ: The Arbors Chanhassen, MN 55317 Planning Case 07-02 Administration Phone:952,227.1100 BACKGROUND Fax: 952.227.1110 Building Inspections On January 2, 2007, the Planning Commission held a public hearing for the Phone:952.227.1180 proposed development of the site. As part of the hearing, questions were raised Fax: 952.227.1190 regarding the continuing operations of the Minnesota Landscape Arboretum. The Engineering item was tabled to permit staff to investigate this issue. Staff has contacted both the Phone: 952.227.1160 Minnesota Landscape Arboretum and the developer to try to address these issues. Fax: 952.227.1170 Staff informed both parties of what staff is proposing. The Minnesota Landscape Finance Arboretum has advised staff that they are preparing a letter with their comments and Phone: 952.227.1140 recommendations. However, we have not received the letter as of the preparation of Fax: 952.227.1110 the Planning packet. We will forward the letter once it is received. Park & Recreation Phone: 952.227.1120 The Planning Commission minutes for January 2, 2007 are item #2 of the January Fax: 952.227.1110 16, 2007 Planning Commission agenda package. Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 DISCUSSION Fax: 952.227.1404 Issue: Storm Water Planning & Natural Resources Phone: 952.227.1130 The majority of the storm water for the streets serving this development will be Fax: 952.227.1110 collected and piped to the storm water pond located in Outlot C. This pond is designed with two feet of freeboard above the 100-year storm elevation, which Public Works 1591 Park Road provides additional water storage capacity. The pond provides water quality Phone:952,227.1300 treatment prior to discharge to Lake Minnewashta. The portion of the street Fax:952.227.1310 extension for West 781h Street east of the site is designed to be collected in the Senior center storm water pond located on the Westwood Community Church campus. Phone: 952.227.1125 Fax:952,227.1110 Issue: Electric Fence Web Site www.ci.chanhassen.mn.us The fence on the Arboretum property is 15 to 21 feet from the property line adjacent to the development. The developer shall be required as part of their covenants to disclose that an electric fence is used on the Arboretum property. The developer shall also install signage on Lots 4 and 5, Block 2, and Outlots B and C warning of the electrical fence on the Minnesota Landscape Arboretum property. The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Planning Commission The Arbors — Planning Case 07-02 January 16, 2007 Page 2 of 2 The Minnesota Landscape Arboretum is proposing that the developer install an eight -foot fence along the property line. If the Arboretum believes there is a nuisance issue due to their electric fence, staff believes it is the responsibility of the Arboretum to address it, not the developer. If this fence was installed adjacent to the project, it's 846-foot length would allow passage on either end, therefore, defeating the purpose of a fence. The developer is proposing that it be up to the individual property owner to decide if they would like to install a fence, and would prepare compliance standards for fencing within the association documents. The presumption is that individuals will purchase these properties adjacent to the Arboretum for their view of the Arboretum site. City code permits fences in residential districts up to 61/2 feet in height. A conditional use permit is required for fencing in excess of 61/2 feet. Issue: Spraying In response to the concerns regarding the spray routine in the U of M's apple orchard, the City Forester offers that it should not be a concern. Spraying treatment costs time and money, both of which are in the best interest of the University to minimize. Therefore, spraying is timed to be done at the optimum time and as efficiently as possible. Spraying is done on days with no or very little wind to avoid chemical drift and only the appropriate chemicals are used to treat the specific problems. The spray treatment routine is a very regimented and controlled process. Staff recommends that as part of the full disclosure requirement of the developer that spraying operations be disclosed. Issue: Agricultural Operations Minnesota Statutes section 561.19 states that "agricultural operations (are) not a nuisance". This determination provides some protection to the continued operation of the Arboretum provided they follow generally accepted agricultural practices and comply with federal, state and county laws and regulations. RECOMMENDATION Staff recommends adoption of the motions as specified on page 13 - 18 in the staff report dated January 2, 2007, revised January 16, 2007, approving the proposed development with the added conditions that the developer provide full disclosure in both their sales materials and within the association covenants about the Minnesota Landscape Arboretum location, research operations, and agricultural operations including the spraying of trees; and the developer shall install signage on Lots 4 and 5, Block 2, and Outlots B and C warning of the electrical fence on the Minnesota Landscape Arboretum property. ATTACHMENTS 1. Planning Commission Staff Report Dated January 2, 2007, revised January 16, 2007. 2. Minnesota Statutes Section 561.19. 3. Letter from Kenneth Larson, University of Minnesota dated 1-11-07. gAplan\2006 planning cases\07-02 the arbors\PC arboretum issues memo.doc CITY OF CHANHASSEN STAFF REPORT PC DATE: January 2, 2007 Revised January 16, 2007 CC DATE: January 22, 2007 REVIEW DEADLINE: January 30, 2007 CASE #: 07-02 BY: AF, RG, LH, ML, JM, JS PROPOSAL: Request for Rezoning from RR, Rural Residential, to RSF, Single Family Residential; Comprehensive Land Use Map Amendment from Residential -Large Lot to Residential -Low Density on the westerly portion of Lot; Subdivision of approximately 20 acres into 22 lots and 3 outlots; and Vacation of existing right-of-way (with the final plat) — THE ARBORS. LOCATION: APPLICANT: 7537 and 7570 Dogwood Road. Lots 1 and 2, Block 1, Zimmerman Farm 1st Addition Carlson Custom Homes, Inc. 1440 Bavarian Shores Dr. Chaska, MN 55318 (952) 475-8045 Peter and Dee Brandt 7570 Dogwood Road Chanhassen, MN 55317 PRESENT ZONING: Rural Residential District, RR 2020 LAND USE PLAN: Residential — Large Lot and Residential — Low Density ACREAGE: DENSITY: gross: 1.10 units per acre; net: 1.36 units per acre SUMMARY OF REQUEST: The developer is proposing a 22 lot single-family residential subdivision. LEVEL OF CITY DISCRETION IN DECISION -MAKING: The City has a relatively high level of discretion in approving rezonings because the City is acting in its legislative or policy making capacity. A rezoning must be consistent with the City's Comprehensive Plan. The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi judicial decision. The City's discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi judicial decision. Lake Minnewashta Location Map The Arbors Planning Case No. 07-02 City of Chanhassen SUBJECT PROPERTY 5 Arboretum Boulevard F1.a The Arbors Planning Case 07-02 January 2, 2007 Page 2 of 18 PROPOSAL/SUMMARY The site currently contains two single-family homes on lots platted as part of the Zimmerman Farm Addition in 1990. The applicant is proposing a 22 lot single-family residential development on approximately 20 acres. The two existing homes on the properties will remain. The primary access to the site will be via an extension of West 78th Street. The property to the north and east is zoned Office and Institutional District, OI, and is part of the Westwood Community Church site. The property to the south is zoned Rural Residential, RR, and is part of the Minnesota Landscape Arboretum. The property to the west is zoned Single-family Residential District, RSF, and includes single-family homes within the Sunset Hill on Lake Minnewashta Addition. Water and sewer service as well as an upgrade to Dogwood Road is proposed as part of a City project. The proposed development of the site is contingent on the City undertaking those public improvements. Without the City utilities, this project is premature. Dogwood Road is proposed to be realigned with the utility easement to minimize the amount of tree loss due to road construction. The site varies from gentle grass slopes on the east side to steeper wooded slopes on the west side. The high point of the property lies on the east side at an elevation of 1039. The site slopes down to Lake Minnewashta which has an ordinary high water (OHW) elevation of 944.5. The northwest corner and western portion of the site, approximately one-third of the property, is wooded with the balance of the site in open field. The Arbors Planning Case 07-02 January 2, 2007 Page 3 of 18 The project approval includes a land use amendment from Residential — Large Lot to Residential — Low Density for the home site west of Dogwood, a rezoning from Rural Residential, RR, to Single - Family Residential, RSF and preliminary plat approval for 22 lots, 3 outlots and right-of-way for public streets. The proposed lots are all in excess of the minimum requirements of the RSF district. Staff is recommending approval of the development, subject to the conditions of the staff report. APPLICABLE REGUATIONS Chapter 18, Subdivisions Chapter 20, Article II, Division 2, Amendments Chapter 20, Article II, Division 3, Variances Chapter 20, Article VI, Wetland Protection Chapter 20, Article VII, Shoreland Management District Chapter 20, Article XII, RSF Single -Family Residential District BACKGROUND In 2005, Westwood Community Church extended West 78`h Street from Highway 41 to their driveway to permit the expansion of their campus. Additionally, Westwood dedicated the right-of- way for the extension of West 78t' Street to the western property line to permit the future extension of the street. In 2002, project #2002-5 for Timber Lake, a residential subdivision of the property was submitted for the site. Ultimately, the application was withdrawn due to the lack of public infrastructure. On June 4, 1990, the City of Chanhassen approved the final plat for Zimmerman Farm creating the two lots being subdivided as part of the current development proposal. In January 1990, the subdivision of these parcels, consisting of 20 acres, was reviewed by the Planning Commission. The issue of access to the property was the primary area of discussion. At that time, staff was recommending that right-of-way be dedicated from the end of Dogwood Road to Crimson Bay Road. Sometime between June 1989 and January 1990, the 100 acres was split into an 80-acre parcel and a 20-acre parcel. State statutes define these types of splits as exempt from the subdivision review requirements without requiring Planning Commission or City Council approval. On June 21, 1989, the Planning Commission reviewed a preliminary plat to subdivide 100 acres into three single-family lots of ten, five and five acres and one 80-acre outlot. The primary issue of discussion was the locations of trail easements and the extent of improvements to the existing road. The Planning Commission tabled the item. Van Doren -Hazard -Stallings, Inc. prepared a feasibility study for Tanadoona Drive and Dogwood Road in June 1988. The study looked at four alternatives for providing access to Highway 41, improving both Dogwood Road and Tanadoona Drive. However, a connection to Crimson Bay was The Arbors Planning Case 07-02 January 2, 2007 Page 4 of 18 not evaluated as part of the study. The residents withdrew their request for public street improvements after reviewing the feasibility cost estimates. In 1987, the City Council approved a preliminary plat for this property. The major issue that surfaced during the development review was the provision of road access to the lots. On July 6, 1987, the City Council approved the preliminary subdivision with the following conditions: 1. The applicant shall be required to install a cul-de-sac into Lot 3, at the end of Dogwood; however, the applicant may be allowed to put in a driveway as approved by City Staff. 2. No development shall occur on either five -acre lots until completion of a feasibility study and the plans for that road are determined. 3. A feasibility study shall be initiated to evaluate the alternatives to improving Dogwood Road and Tanadoona Drive, as well as evaluating the connection to the Worm property (Crimson Bay) to the south. 4. The developer shall be required to enter into a development agreement guaranteeing the installation of the improvements and provide financial sureties as required. 5. Dedication of a 20-foot trail easement along the south and east property lines. The proposed subdivision was not pursued further and no development took place. LAND USE AMENDMENT In 2001, City staff initiated a proposed land use map amendment for the properties along Dogwood. Planning Staff held an open house at the Chanhassen Recreation Center on Tuesday, January 23, 2001, to discuss land use and zoning inconsistencies. These properties were some of the properties that were discussed as being up for change. Staff processed amendments to the Comprehensive Plan and Zoning map to ensure they were consistent and this will be one of the changes that was processed. The recommendation was to re -guide the property from large lot residential to low density residential, which is consistent with the RSF zoning except for the portion west of the southerly extension of Dogwood Road of Zimmerman Farm ls` Addition, which is currently zoned Rural Residential, RR. At that time, the Planning Commission tabled the amendment to address the issue of the provision of urban services to this area. Now that City utilities are being proposed, one of the properties is in for development review. A land use amendment is necessary to permit the subdivision of the property on the west side of Dogwood. The rest of the properties west of Dogwood are subdivided in to lots of less than 2.5 acres. The Arbors Planning Case 07-02 January 2, 2007 Page 5 of 18 Lot, and Subdivision Address Lot Area (square feet) Frontage (feet) 1, Sunset Hill on Lake Minnewashta 7301 Dogwood 36,426 108 2, Sunset Hill on Lake Minnewashta 7311 Dogwood 48,908 171 3, Sunset Hill on Lake Minnewashta 7321 Dogwood 42,540 149 4, Sunset Hill on Lake Minnewashta 7331 Dogwood 37,896 126 5, Sunset Hill on Lake Minnewashta 7341 Dogwood 31,535 102 6, Sunset Hill on Lake Minnewashta 7401 Dogwood 40,966 102 7, Sunset Hill on Lake Minnewashta (formerly lots 7 —10), consisting of three amended parcels. 7431 Dogwood 120,001 372 1, Getsch Addition 7460 Dogwood 44,506 101 2, Getsch Addition 7480 Dogwood 61,369 125 3, Getsch Addition 7530 Dogwood 53,282 141 4, Getsch Addition 7550 Dogwood 54,955 100 5, Getsch Addition 7560 Dogwood 55,065 124 1, Zimmerman Farms ls` Addition 7570 Dogwood 1 438,788 1 30 On December 7, 2006, the City submitted the proposed land use map amendment to all the adjacent governmental jurisdictions for their review and comment. Upon City Council review, the proposed amendment must be submitted to the Metropolitan Council for their review and determination of compliance with the regional plan. The proposed amendment would permit the development of the property as proposed as well as be consistent with the existing uses of the properties north of the site on the west side of Dogwood and compatible with the Office Institutional uses to the north and east. Staff is recommending approval of the land use map amendment for the 2.57 acres of the development west of the Dogwood extension contingent on Metropolitan Council review. REZONING The proposed rezoning is consistent with the Residential — Low Density land use designation of the property which permits net densities of 1.2 — 4.0 units per acre. The Single Family Residential District, RSF, is consistent with this land use category and is the typical zoning for single-family residential developments in the City. Other zoning districts that would be consistent with the Residential — Low Density designation include Mixed Low Density Residential District, R4, Low and Medium Density Residential District, RLM, and Planned Unit Development — Residential, PUD-R. Staff is recommending approval of the rezoning subject to approval of the land use map amendment and final plat approval. The Arbors Planning Case 07-02 January 2, 2007 Page 6 of 18 SUBDIVISION REVIEW RIGHT-OF-WAY The proposed development was platted as Zimmerman Farm 0 Addition in 1991 and included a 30-foot wide right-of-way for Zimmerman Road. This street was never constructed and is not needed due to the proposed West 78`h Street extension; therefore, this right-of-way will be vacated in conjunction with the final plat. GRADING AND DRAINAGE The developer proposes to mass grade the majority of the site. Lots 1 through 3, Block 1 are proposed custom -grade lots. In order to meet the 10% maximum allowable driveway grade on these lots, the builder may have to put steps in the garage to accommodate the grade change. The plans do not show proposed grading on Lots 1 through 3, Block 3 since the owner of the existing home within proposed Lot 1, Block 3 intends to retain ownership of the area encompassed by these proposed three lots and final plat at a later date. A pond is proposed in the southwest corner of Block 2. The pond is to treat runoff from the majority of the lots within the development, the new portion of West 78t' Street within the plat, and approximately 440 feet of the proposed Dogwood Road extension. Based on the hydrology calculations submitted, the dead pool volume of the pond needs to be increased by 360 cubic feet to meet the MPCA Phase II requirements. The proposed 1036-foot contour on Lots 12 and 14, Block 1 must be shifted so that the backyard grade is minimum 2%. The proposed major contours must be a different line weight or type. Based on the grading plan, the home on Lot 5, Block 1 will be a walkout, not a full basement. RETAINING WALLS The developer proposes to construct a tiered retaining wall system on the south side of Lot 4, Block 1, south of the existing home. The top and bottom elevations of the wall must be shown on the grading plan; it appears that each tier will be a maximum of four feet high. EROSION AND SEDIMENT CONTROL A NPDES Phase H Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. A Storm Water Pollution Prevention Plan (SWPPP) will be required in conjunction with this application. The SWPPP should be provided to the City so it can be reviewed by the Carver Soil and Water Conservation District prior to the preconstruction meeting for the project. The Arbors Planning Case 07-02 January 2, 2007 Page 7 of 18 The proposed storm water pond should be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet should be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans should be revised to include a detail for the temporary pond outlet. It should be noted on the SWPPP that all areas that will not be permanently stabilized within the timeframe required by the NPDES permit should be temporary mulched and seeded. A note shall be included in the dewatering section of the SWPPP that states: "If construction of the proposed temporary/permanent sediment pond is not completed prior to dewatering, the City's on -site construction observer must approve proposed dewatering methods prior to beginning dewatering." The plans should be revised to incorporate Chanhassen's standard details for erosion and sediment control, including 5302A and 5302D. Proposed erosion and sediment controls for individual lots should include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy. The applicant shall provide erosion and sediment control along the south and east property lines to prevent discharge of sediment onto adjacent properties. All silt fence that is not laid parallel to the contours should have J Hooks installed every 50 -75 feet. This should be noted on the plans and discussed at the preconstruction meeting. Energy dissipation should be provided at the inlet to the proposed pond and at the end of the discharge pipe that outlets to the wetland within 24 hours of pipe installation. The discharge location for the outlet of the proposed pond should be evaluated to ensure that the proposed discharge will not cause erosion issues. Reinforced erosion control matting may be required. A stable emergency overflow (EOF) for the stormwater pond should be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail should be included in the plan. The overland route from the EOF to Lake Minnewashta should be shown on the plans and should be encumbered by a drainage and utility easement. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can Steeper than 3:1 7 days remain open when the area 10:1 to 3:1 14 daysis not actively being worked.) Flatter than 10:1 21 days These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, The Arbors Planning Case 07-02 January 2, 2007 Page 8 of 18 storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets should be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. The plans should be revised to show a rock construction entrance (minimum 75 feet in length) wherever construction traffic will access the site. The rock construction entrance should be constructed in accordance with Chanhassen's Standard Detail 5301. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. SURFACE WATER MANAGEMENT PLAN (SWMP) CONNECTION CHARGES Water Quality Fees Because of the impervious surface associated with this development, the water quality fees for this proposed development are based on rural residential development rates of $1,900/acre. Therefore, the water quality fees associated with this project are $33,478. Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage. Single- family residential developments have a connection charge of $3,100 per developable acre. This results in a water quantity fee of approximately $54,622 for the proposed development. SWMP Credits This project proposes the construction of one NURP pond. The applicant will be credited for 50% of the water quality charge for each acre draining to the NURP pond on -site. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $74,570.50. UTILITIES Lateral sanitary sewer and watermain to serve the proposed development are proposed to be constructed in conjunction with City Project 06-06, Dogwood/Tanadoona Street and Utilities. City Council ordered the preparation of the feasibility study for Project 06-06 on November 27, 2006. In January, 2007, staff expects that the City Council will consider accepting the feasibility report and ordering the preparation of plans and specifications. Portions of the project costs for Project 06-06 are proposed to be assessed to the existing residents along Dogwood Road and the proposed units within The Arbors plat. Staff has met with the The Arbors Planning Case 07-02 January 2, 2007 Page 9 of 18 residents several times throughout the past 18 months to discuss Project 06-06; the neighborhood is generally supportive of the project. Under Project 06-06, eight -inch gravity sanitary sewer will extend from the intersection of the Dogwood Road/West 78`h Street intersection to the lift station located near the southeast corner of Dogwood Road and Tanadoona Drive. Lift station and forcemain upgrades are also proposed with Project 06-06. The remainder of lateral sanitary sewer to serve the proposed development will be installed and paid for by the developer. Based on the information provided, lots within the preliminary plat will not require an ejector pump. In conjunction with Project 06-06, eight -inch lateral watermain will extend from the Dogwood Road/West 78`h Street intersection to the existing stub within Tanadoona Drive, which is approximately 1100 feet east of the Dogwood Road/Tanadoona Drive intersection. The remainder of the lateral watermain to serve the development will be installed and paid for by the developer. Eight -inch lateral sanitary sewer and watermain will be stubbed south of the Dogwood Road/Tanadoona Drive intersection to service Lots 1 through 3, Block 3 when they are final platted, and to provide service to the residences on Crimson Bay Road to the south. A pressure reducing station will likely be required for the Crimson Bay residents. Due to a significant drop in grade from the Dogwood Road/West 78`h Street intersection to Crimson Bay, sanitary sewer service for Crimson Bay will likely require a lift station and forcemain. Due to the timing of The Arbors and Project 06-06, Staff anticipates that grading and utility installation for The Arbors would be done simultaneously with the construction of Project 06-06. Preliminary plat approval shall be contingent upon the approval and construction of Project 06-06. Watermain must be minimum 18 inches above or below the sanitary sewer. STREETS Access to the proposed development will be from West 78`h Street and Dogwood Road. Dogwood Road is proposed to be constructed with Project 06-06. The final cross section of Dogwood Road has not yet been determined. The developer will extend West 78`h Street from its current terminus within the Westwood Church property within the existing roadway, drainage and utility easement. West 78`h Street will be a 31- foot wide urban section. Access for Lots 2 and 3, Block 3 will be addressed and constructed when those lots are final platted. The property owner on Lots 1 through 3, Block 3 has requested that the gravel driveway and turnaround area within the Dogwood Road right-of-way south of West 781h Street remain, with the portion of the turnaround within Lot 1, Block 2 being removed. This gravel drive and turnaround will require an Encroachment Agreement which would be filed with the final plat. The drive and turnaround will be removed when Dogwood Road is extended in the future. The Arbors Planning Case 07-02 January 2, 2007 Page 10 of 18 LANDSCAPING AND TREE PRESERVATION Tree canopy coverage and preservation calculations have been submitted for The Arbors development. They are as follows: Total upland area (excluding wetlands, bluff, park) 20 ac. Baseline canopy coverage 36.7% or 319,770 SF Minimum canopy coverage required 30 % or 261,360 SF Proposed tree preservation 22.5 % or 195,791 SF The developer does not meet minimum canopy coverage allowed; therefore, the difference between the baseline and proposed tree preservation is multiplied by 1.2 to calculate the required replacement plantings. Difference in canopy coverage 65,569 SF Multiplier 1.2 Total replacement 78,683 SF Total number of trees to be planted 72 trees The total number of trees required for the development is 72. The applicant has proposed a total of 60 trees. There are no bufferyard requirements for this development. The applicant has proposed a conservation easement over parts of Lots 1-3, 5, and 8-9, Block 1. The existing woods are of high value and consist primarily of sugar maple. The applicant has protected a reasonable amount of the wooded area on Lots 1 through 3, but staff recommends that the easement be enlarged on Lots 5, 8 and 9 to cover more of the wooded area because of its high quality. PARKS AND RECREATION Parks This property is located within an area of the City not currently served by a neighborhood park. However, there is an abundance of parkland and open space in the vicinity of The Arbors. The property shares its southern border with the Minnesota Landscape Arboretum. This particular portion of the Arboretum, consisting of research fields, is not open to the public. Minnewashta Regional Park is located approximately one-half mile north of the site off of State Highway 41. This 340-acre regional park facility is operated by Carver County and features a swimming beach, bathhouse, concession stand, picnic shelters, volleyball courts, playground, trails and fishing pier. The City owns ten acres of wooded open space at the intersection of Tanadoona Drive and State Highway 41. No additional parkland acquisition is being recommended as a condition of this subdivision. The Arbors Planning Case 07-02 January 2, 2007 Page 11 of 18 TRAILS The subject site has convenient access to the West 78"' Street pedestrian trail. The applicant should be required to connect The Arbors neighborhood to this trail with a sidewalk connection along the entire north side of the new section of West 78ffi Street. No additional trail construction is being recommended as a condition of this subdivision. The two existing homes paid park and trail fees. Therefore, only 20 additional dwelling units will be required to pay park fees. , Based on 2007 park fees, the total fees payable at the time of final plat approval would be $116,000.00. WETLANDS Existing Wetlands Two natural wetlands exist on -site. Kjolhaug Environmental Services delineated the wetlands in May 2001. The wetland boundaries were reevaluated in November 2006 and are consistent with those delineated in 2001. Wetland 1 is a Type 3 wetland adjacent to Lake Minnewashta in the southwest corner of the property. The wetland is dominated by reed canary grass, cattail, red osier dogwood and sedges. This project does not propose to impact Wetland 1. Wetland 1 is classified as a Preserve wetland by the City Wetland Inventory. Wetland 1 is approximately 17,965 square feet on the site. Wetland 2 is a forested Type 1 wetland in the north center portion of the property. The wetland is dominated by American elm, black ash, box elder and sedges. This project does not propose to impact Wetland 2. Wetland 2 is not included in the City Wetland Inventory. The applicant should classify Wetland 2 using the results from the Minnesota Routine Assessment Method for Evaluating Wetland Functions (MnRAM Version 3.0). An electronic version of the completed MnRAM evaluation should be submitted to and approved by the city to establish the classification of Wetland 2 so the appropriate wetland buffer and setback requirements can be determined. Wetland 2 is approximately 6,920 square feet. A wetland buffer 50 in width and a 50 foot setback from the wetland buffer must be maintained around Wetland 1. Wetland buffer areas should be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. Wetland buffer and setback requirements for Wetland 2 are contingent upon review and approval of the MnRAM for that wetland. The proposed driveways and structures on Lots 1 and 2, Block 1 appear to be within the wetland setback for Wetland 2. The applicant should submit house plans that will meet the required setbacks on Lots 1 and 2, Block 1. The proposed conservation easement should be revised to envelop Wetland 2 and the required wetland buffer. The Arbors Planning Case 07-02 January 2, 2007 Page 12 of 18 LAKES The proposed project is within 1,000 feet of the ordinary high water level (OHW) of Lake Minnewashta and is therefore within the lake's shoreland management district. The Minnesota Department of Natural Resources (DNR) classifies Lake Minnewashta as a recreational development lake. The ordinary high water (OHW) elevation from Lake Minnewashta is 944.5. COMPLIANCE TABLE Area (sq. ft.) Frontage (ft.) Depth (ft.) Notes Code 15,000 non -riparian 20,000 riparian 90 125 L1 B1 35,715 154 367 Wetland 2, net lot area 28,795 s . ft. L2 B 1 31,452 111 332 Wetland 2 L3 B1 31,169 118 299 L4 B1 46,867 186 214 Corner lot L5 B 1 37,940 144 269 L6 B1 25,071 120 208 Corner lot L7 B 1 18,360 130 177 L8 B 1 53,860 71 * 310 *98' width at bldg setback L9 B 1 31,623 72 * 236 *97' width at bldg setback L10 B1 30,238 72 * 217 *102' width at bldg setback L11 131 35,371 80 * 236 * 101' width at bldg setback L12 B1 28,797 112 251 L13 B1 24,302 116 182 Corner lot L14 B 1 28,220 156 208 L1 132 21,645 144 140 Corner lot L2 B2 21,845 170 160 L3 B2 19,826 118 151 L4 B2 25,309 122 188 L5 132 18,964 130 142 L1 133 39,730 92 353 Lakeshore & wetland 1, net lot area 34,485 s . ft. L2 133 36,495 100 380 Lakeshore & wetland 1, net lot area 31,195 s . ft. L3 B3 35,865 100 379 Lakeshore & wetland 1, net lot area 28,445 sq. ft. Outlot A 3,372 Landscape island Outlot B 9,520 Signage/gazebo Outlot C 39,268 Storm water pond ROW 132,850 3.05 acres Total 863,674 19.83 acres including 0.57 acres of wetland The Arbors Planning Case 07-02 January 2, 2007 Page 13 of 18 SETBACKS Setback (ft.) Front 30 Sides 10 Rear 30 Lakeshore (OHW) 75 Wetland 1 50 (plus 50 foot buffer) Wetland 2 To be determined based on MnRAM evaluation OTHER AGENCIES The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. RECOMMENDATION Staff recommends that the Planning Commission adopt the following three motions and adoption of the attached findings of fact and recommendation: A. "The Chanhassen Planning Commission recommends that the City Council approve Comprehensive Land Use Map Amendment from Residential -Large Lot to Residential -Low Density for Lots 1 through 3, Block 3, of the preliminary plat of The Arbors contingent on Metropolitan Council review." B. "The Chanhassen Planning Commission recommends that the City Council approve the Rezoning from RR, Rural Residential, to RSF, Single Family Residential for the land within the plat of The Arbors subject to final plat approval for The Arbors." C. "The Chanhassen Planning Commission recommends that the City Council approve the preliminary plat for the Arbors creating 22 lots, 3 outlots and public right-of-way, plans prepared by Otto Associates, dated October 31, 2006, subject to the following conditions: 1. The house designs, locations and driveway configurations for Lots 1 and 2, Block 1, must be revised to maintain the required wetland setback. 2. Full park fees in lieu of parkland dedication and/or trail construction shall be collected as a condition of approval for The Arbors. The park fees shall be collected in full at the rate in force upon final plat submission and approval. 3. Fire Marshal's Conditions: The Arbors Planning Case 07-02 January 2, 2007 Page 14 of 18 a. A 10-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. b. Fire apparatus access roads and water supply for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternate methods of protection are provided. c. Temporary street signs shall be installed at street intersections once construction of the new roadway allows passage of vehicles. Pursuant to 2002 Minnesota Fire Code Section 501.4. d. Fire apparatus access roads shall be designed and maintained to support the imposed load of fire apparatus and shall be serviced so as to provide all-weather driving capabilities. Pursuant to Minnesota State Fire Code Section 503.2.3. e. Submit proposed cul-de-sac name to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. f. No burning permits shall be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. 4. Building Official Conditions: a. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. b. Demolition permits must be obtained prior to demolishing any structures on the site. c. Existing wells and on -site sewage treatment systems on the site must be abandoned in accordance with State Law and City Code. d. The developer must submit a list of proposed street names for review and approval prior to final plat of the property. e. Retaining walls more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. f. Separate sewer and water services must be provided each lot. 5. City Forester's Conditions: a. Tree preservation fence shall be installed at the edge of the grading limits prior to any construction. Fencing shall be in place and maintained until all construction is completed. The Arbors Planning Case 07-02 January 2, 2007 Page 15 of 18 b. Any trees removed in excess of proposed tree preservation plans, dated 10/31/06, will be replaced at a ratio of 2:1 diameter inches. c. A minimum of two trees shall be planted on each lot. d. Tree conservation easements on Lots 5, 8, and 9, Block 1 shall be enlarged beyond what is shown on plans dated 10/31/06. e. Tree conservation easements shall be located on Lots 1-3, 5, 8-9, Block 1. f. The applicant shall replace Colorado spruce shown on landscape plan with concolor fir or Norway spruce. 6. City Engineer's Conditions: a. In order to meet the 10% maximum allowable driveway grade on Lots 1 through 3, Block 1, the builder may have to put steps in the garage to accommodate the grade change. b. The dead pool volume of the pond needs to be increased by 360 cubic feet to meet the MPCA Phase II requirements. c. The proposed 1036 foot contour on Lots 12 and 14, Block 1 must be shifted so that the backyard grade is minimum 2%. d. The proposed major contours must be a different line weight or type. e. Based on the grading plan, the home on Lot 5, Block 1 will be a walkout, not a full basement. f. The top and bottom of wall elevations of the wall must be shown on the grading plan. g. Preliminary plat approval shall be contingent upon the approval and construction of Project 06-06. h. Watermain must be minimum 18 inches above or below the sanitary sewer. Access for Lots 2 and 3, Block 3 will be addressed and constructed when those lots are final platted. j. An encroachment agreement is required for the gravel drive and turnaround within the Dogwood Road right of way south of West 781h Street. 7. Water Resources Coordinator's Conditions: The Arbors Planning Case 07-02 January 2, 2007 Page 16 of 18 a. The applicant shall classify Wetland 2 using the results from the Minnesota Routine Assessment Method for Evaluating Wetland Functions (MnRAM Version 3.0). An electronic version of the completed MnRAM evaluation shall be submitted to and approved by the city to establish the classification of Wetland 2 so the appropriate wetland buffer and setback requirements can be determined. b. A wetland buffer 50 in width and a 50 foot setback from the wetland buffer must be maintained around Wetland 1. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. Wetland buffer and setback requirements for Wetland 2 are contingent upon review and approval of the MnRAM for that wetland. c. The proposed driveways and structures on Lots 1 and 2, Block 1 appear to be within the wetland setback for Wetland 2. The applicant shall submit house plans that will meet the required setbacks on Lots 1 and 2, Block 1. d. The proposed conservation easement shall be revised to envelop Wetland 2 and the required wetland buffer. e. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. A Storm Water Pollution Prevention Plan (SWPPP) will be required in conjunction with this application. The SWPPP shall be provided to the City so it can be reviewed by the Carver Soil and Water Conservation District prior to the preconstruction meeting for the project. f. The proposed storm water pond shall be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet shall be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. g. It shall be noted on the SWPPP that all areas that will not be permanently stabilized within the timeframe required by the NPDES permit shall be temporary mulched and seeded. A note shall be included in the dewatering section of the SWPPP that states: "If construction of the proposed temporary/permanent sediment pond is not completed prior to dewatering, the City's on -site construction observer must approve proposed dewatering methods prior to beginning dewatering." h. The plans shall be revised to incorporate Chanhassen's standard details for erosion and sediment control, including 5302A and 5302D. Proposed erosion and sediment controls for individual lots shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy. The Arbors Planning Case 07-02 January 2, 2007 Page 17 of 18 i. The applicant shall provide erosion and sediment control along the south and east property lines to prevent discharge of sediment onto adjacent properties. j. All silt fence that is not laid parallel to the contours shall have J Hooks installed every 50 -75 feet. This shall be noted on the plans and discussed at the preconstruction meeting. k. Energy dissipation shall be provided at the inlet to the proposed pond and at the end of the discharge pipe that outlets to the wetland within 24 hours of pipe installation. The discharge location for the outlet of the proposed pond shall be evaluated to ensure that the proposed discharge will not cause erosion issues. Reinforced erosion control matting may be required. A stable emergency overflow (EOF) for the stormwater pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. The overland route from the EOF to Lake Minnewashta shall be shown on the plans and shall be encumbered by a drainage and utility easement. m. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time Steeper than 3:1 7 days 10:1 to 3:1 14 days Flatter than 10:1 21 days (Maximum time an area can remain open when the area is not actively being worked.) n. These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. o. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets shall be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. p. The plans shall be revised to show a rock construction entrance (minimum 75 feet in length) wherever construction traffic will access the site. The rock construction entrance shall be constructed in accordance with Chanhassen's Standard Detail 5301. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. q. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $74,570.50. The Arbors Planning Case 07-02 January 2, 2007 Page 18 of 18 r. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. 8. The developer shall provide in both their sales material and within the association covenants full disclosure about the Minnesota Landscape Arboretum location, use of electric fence, research operations, and agricultural operations including the spraying of trees. 9. The developer shall install signage on Lots 4 and 5, Block 2, and Outlots B and C warning of the electrical fence on the Minnesota Landscape Arboretum property." ATTACHMENTS 1. Findings of Fact and Recommendation 2. Development Review Application 3. Reduced Copy Preliminary Plat 4. Reduced Copy Preliminary Utility Plan 5. Reduced Copy Preliminary Street Plan 6. Reduced Copy Preliminary Grading Plan 7. Reduced Copy Existing Tree Inventory 8. Reduced Copy Tree Inventory (After Primary Construction) 9. Reduced Copy Tree Inventory (After Secondary Construction) 10. Reduced Copy Site Landscape Plan 11. Park & Trail Map (partial) 12. Letter from Steven Von Bargen (Center Point Energy) to Robert Generous dated 12/19/06. 13. Public Hearing Notice and Mailing List g:\plan\2007 planning cases\07-02 the arbors\staff report the arbors.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application the Carlson Custom Homes, Inc. request for a land use amendment from Comprehensive Land Use Map Amendment from Residential -Large Lot to Residential -Low Density on the westerly portion of Lot 1, Block 1, Zimmerman Farm I't Addition; Rezoning from RR, Rural Residential, to RSF, Single Family Residential; and the Subdivision of approximately 20 acres into 22 lots, 3 outlots and public right-of-way for THE ARBORS. On January 2, 2007, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application. The Planning Commission conducted a public hearing on the proposed amendment and rezoning preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Rural Residential, RR. 2. The property is guided in the Chanhassen Comprehensive Plan for Residential — Large Lot (the westerly 2.57 acres) and Residential — Low Density uses. 3. The legal description of the property is: Lots 1 and 2, Block 1, Zimmerman Farms I" Addition. 4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of the proposed amendment. The six (6) affects and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. b. The proposed use is or will be compatible with the present and future land uses of the area. The proposed use conforms with all performance standards contained in the Zoning Ordinance. d. The proposed use will not tend to or actually depreciate the area in which it is proposed. e. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f. Traffic generation by the proposed use is within capabilities of streets serving the property. 5. The Subdivision Ordinance, City Code section 18-39, directs consideration of seven standards in considering approval of a subdivision. The City Council finds that all applicable standards have been met. The seven standards and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance, specifically the Single -Family Residential District standards; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; C. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter upon construction of Public Project #06-06. e. The proposed subdivision will not cause significant environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature. The subdivision has upon construction of Public Project #06-06: 1) adequate storm water drainage. 2) adequate roads. 3) adequate sanitary sewer systems. 4) adequate off -site public improvements or support systems. 6. The planning report #07-02, dated January 2, 2007, prepared by Robert Generous, et al, is incorporated herein. 2 RECOMMENDATION The Planning Commission recommends that the City Council approve a Comprehensive Land Use Map Amendment from Residential -Large Lot to Residential -Low Density on the westerly portion of Lot 1, Block 1, Zimmerman Farm I" Addition; Rezoning from RR, Rural Residential, to RSF, Single Family Residential; and the preliminary plat approval of approximately 20 acres into 22 lots, 3 outlots and public right-of-way for THE ARBORS. ADOPTED by the Chanhassen Planning Commission this 2nd day of January, 2007. CHANHASSEN PLANNING COMMISSION BY: Its Chairman CITY OF CHANHASSEN 7700 Market Boulevard — P.O. Box 147 Chanhassen, MN 55317 — (952) 227-1100 DEVELOPMENT REVIEW APPLICATION PLEASE PRINT Applicant Name and Address: dk er. '--rc� r RAP Contact: Z' li Phone:I,V z/7 - 9,��4 Fax: 5Z Y?5 - 6a16 Email: @ 6cim6ci5-f- ver. Owner Name /3� Gii1� Planning Case No. 0-7-Oa CITY OF CHANHASSEN RECEIVED DEC 0 1'2006 CHANHASSEN PLAMWN© DEpT ress: 7�tt, ,�Yar�1 Contact: IY)�aA : 7- Phone: 752 1/70-Fax: Email: NOTE: Consultation with City staff is required prior to submittal, including review of development plans 4' ` Comprehensive Plan Amendment �� ora Temp rY Sales Permit C- Conditional Use Permit (CUP) t/ Vacation of Right-of-Way/Easements (VAC) Interim Use Permit (IUP) Non -conforming Use Permit Planned Unit Development* Rezoning Sign Permits Sign Plan Review Site Plan Review (SPR)* Subdivision' EGA 4 %5 Variance (VAR) Wetland Alteration Permit (WAP) Zoning Appeal Zoning Ordinance Amendment 1/Notification Sign - $200 (City to install and remove) X Escrow for Filing Fees/Attorney Cost" - $50 CUP/SPR/VAC/VAR/WAP/Metes & Bounds - $450 Minor SUB TOTAL FEE $ 4�5.3 An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8'/s" X 11" reduced copy for each plan sheet along with a digital copy in TIFF -Group 4 (*.tif) format. **Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews. SCANNED NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. !J » PROJECT NAME: LOCATION:.__Jogd�JooC %uf`f��°� LEGAL DESCRIPTION: TOTAL ACREAGE:1 WETLANDS PRESENT: X YES NI PRESENT ZONING: I�Zjrql REQUESTED ZONING: '5j-P1 Ile Taf, // PRESENT LAND USE DESIGNATION: ' Y�� - ?lt�t 't s 1' �/ �t/,yG+ REQUESTED LAND USE DESIGNATION: REASON FOR REQUEST:�'/'L',��i�1 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. . This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and 1 am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. Applicant; 'e7Ad ,ignature of Fee Ownerf o,v;, /Gr',. ,e I'�J�ia pG'�1'C� F9 Y �"r'1 a o `j�1 a61/ / Date Il •aq- Dlo Date SCANNED GApLAMformslDevelopment ReviewApplication.DOC Rev. 12J05 J 8 . J. 1 / / �r . ma \ / /1 N1440 DEVELOPER 5 I ' /aw � / \ A1TN BgVCE TG RL50 ES 1 o rY l/ / �rv> 'O1tloraw I 1 1 /.rear . CHASKA VRIAN MN 5531a SHORES DRIVE d] .p PH— ISr2-2r10-3317 \gQOt� R �.. \ I III `8 I / I o I� O � 1 I 1 Q / MINIMUM LOT AREAS 15.000 5F \ \ b) �'/ \ 1 80 \ d/ m..:,. MINIMUM LOT WD7H- 90' Y, —SETBACKS '\ �' L \.U✓-"2� \ O Ps 8 \\\V. / Rt \ :I I. .rw. \� ,q4_ \ — \ SDE N 10}D. REAR - 30' N of I 1 �+ 4r 0\ \ `� YTRnvFAeR,c>ReARcwowN,uua j,i 0v'I \ \II rA„r . a \E' IL�\ 11�19 y �}'•_4 .. r.,.. / O / 4/ r 1 //7 -- 1 _ ` w ,I . owHDRTraPUT. TW. DnRAo µ°No o uwe:Ae 1\ \ •'�\ \\ \g\ \� \ \�b wrr��ri_�-- ��`i � L_�- .ra.>.. / i � .ram.. 14.an,� I la O p1 �O \. \\ `Q `` \b \ �\ \ l \ �IULIUL �>. I 1O I1�)®J I \ \Lp\ �� \ \ \ \\ I 1 Z %lbv v \ \\ iL� \\ \' i \ \ \ OutlaorB , - - ; 'r—t— man \ \ \ �_ --�,p� __� r„ - `___'�1S____ -----a- _-- I.. IRTr MscRv1. D Lob 1 2 B/oct 1, llwwfRYAR FARM 1ST r10p11d4 C anfM wMmf4 accerOhrp fa Ns recwtl Naf Mno% ArA7 WcofH Zhrmemran RORQ D[.501W DRAWN f7 n,AT iNq PLW wA4 vgEPMEO [/\/�/!}�y��/�7 y,p,r S% YE EL UHDER W DFEC! SUPEIMSbE AND RNT / \ PROJECT NQ M.P.C. M.L.N. I W A DOLT RE(RSIFRW PRDiE55ipY1 ENGNEER THE ARBORS PRELIMINARY PLAT L. T E UYB N TQ pfATE OP MNW�OLA TTO °- scmPnr», ��» CARLSON CUSTOM HOMES 2-06-0136 la+s w P. `°'"°"" """""tl CHANHASSEN, MN SHEET NO. 1 OF 13 SHEETS 10/31/06 CITY OF CHANHASSEN RECEIVED DEC 0 1 2006 CHANHASSEN PLANNING CX 0 I ' TO BE COMPLETED /1 UNDER CITY PROJECT I If ` ^ utlot B 10 7 utlot A mD BF RVA�Cas=1 u , 1 12 C7 1 . x. AN, 13 14 Y I I . ; Outlo \ 3 I I r I 1 I, POND BY DeswlRna EMBOVS DESIGNED INAWN M.P.C. M.L.H. CHECKED M.P.C. T' ME ORCUXDER MY MELT P6M1IPERIISON µD ., AM A WLT 0 STEREO PROFESSIONAL ENOINEEN THE IAWS OF iXE RATE OF MINNESOTA MI�r T�TA ;R6 R a6wm w-.r-.MwR..M..,M.'�'"'"""" THE ARBORS CARLSON CUSTOM HOMES CHANHASSEN, MN NO. DA CaIN01en REC. NO. 199D, W P. IM NC RLSOPER CARLSON ERLSON CA HONES tHA BAVARIAN SHORES DRIVE PPHA95!1-2 S553,E X— 95—200-331] NOTES: i. ALL WATERMAIN SHALL BE INSTALLED WITH DUCTILE IRON FITTINGS. FlTTINGS SHALL BE POLYIMAPPED. MECAWCS SHALL BE COMPATIBLE 1WTH PVC PIPE. 12 GAUGE TRACER WIRE SHALL BE INSTALLED WITH ALL PLASTIC W. TRACER WIRE SHALL BE TERMINATED AT ALL HYDRANT BREAK OFF FLANOES. 2 ALL 6" PVC SANITARY Sl V SHALL BE SOR 33 UNIESS OTXERWSE NOTED. I SANITARY SERMCES SHALL BE 6" PVC SOR 26 AND SHALL BE LOCATED 3 FEET DOWNSTREAN OF WATER SERMCE. l WATER SERMCES SHALL BE 1" COPPER WITH 1" CORP. IALL HYDRANT LEADS SHALL BE 6" DIP CLASS 51 5. CONTRACTOR SHALL INSTALL HYDRANT EKTENSIONS AS NECESSARY WHERE WN HAS SEEN LOWERED TO AVOID CONFLICT WITH OTHER UTUTES EXTENSIONS SHALL BE CONSIDERED MCIDENTAL TO HYDRANT COST. 7. SERMCES SHALL BE STUBBED TO 9 FEET BEYOND THE RIGHT OF WAY. 6. UTILITY AND STREET CONSTRUCTON ON DOGWOOD ROAD TO BE COMPLETED UNDER CITY CONTRACT. 9. EXISTNG WELLS 6: SEPTC SITES SHALL BE ABANDON IN ACCORDANCE WITH ALL STATE h LOCAL REQUIREMENTS AFTER SEWER k WATER CONNECTONS ARE MADE PROJECT N0: PRELIMINARY UTILITY PLAN 2-06-0135 EET NO. 2 OF 13 SHEETS " ' 10/31/06 CITY OF CHANHASSEN RECEIVED DEC 0 1 2006 CHANHASSEN PLANNING DEPT TO BE COMPLETED UNDER CITY PROJECT i \: I N I UtIot B Q 9 10 1 I 1-; I I I 1 1 I 1. II POND 14 re N DEVELOPER AARLSON CUSTOM NOMES TTI: .— CARLSON 1.W0 BAVARIAN S.—S DRIVE d1ASAA MN 553" PN- 9511-200-JJ317 PL CL PL 30' _ ]o' 15.3' to Back 15.5' to Back SEE DETAIL 23 W.w Coun. to b. 1/2' FOR ORAINTI Ab°wn EE9. of Gultw `4�q rA� 3.Dx 20f Y "o" `4 W' T—ol. S..O t k Mu- or Sob 1 /2'-NNDOT 2350 LVWE350}OB SVrmou,tobl. Tack Coot - 2357 Coev.t. Curb 2'-MNOOT 23SO LYNW350308 12'-dou 5 A9yrpat. Ba... 1001D CN.N.O 24' NNDOT 311R.28 SN.ot Grrnular Borrow (S.. N.I. 7) tl016 r„ao�t-er-rar - ed —� .v..t q— lax i ARi .. • e • ..sNq 1eekn..N.mowt ,—.eau.pwaW Me y M.ytbw L—myu.n..t.e.twwnww h M NacM .anq .aU .1a.. N r.M.aW Sn N.l. SZ32 TYPICAL STREET SECTION — 5200 oM.P.C. l.", IANAq)LYNPEEG6 �fED 1YRJfF551dM1 dGINEEl1 T �' M �� ONDER ME LAWS OF TE STATE OF MINNE50TA TTA rwwww. THE ARBORS PRELIMINARY STREET PLAN 2.06-0135 11v w W. DATE r DescRaRM.rc �"`rNR`"N°"+i: CARLSON CUSTOM HOMES RAlla .a R' — — RD. n.ot �y� I�mP.tRrurM CHANHASSEN, MN SHEET NO. 6 OF 13 SHEETS_ _ 10/31/O6 CITY OF CHANHASSEN RECEIVED DEC 0 1 2006 CHANHASSEN PLANNING DEPT • 1p1q}p � x0p e.x r rwT. x.• a x«wa p I / aM vncatranr. .auDmw'3a00 'w ro n" i/o,a,Eaxw I ,TG"BE -COMPLU6 1 t -Y VAwm R M V EROSION CONTROL Iviw°.mpMmM ATINS BRUCE CA'P SONES m6s\ / iFNCE - TYPE 1 CHABKA YMNI 5o31 SORES DRIK / ")" •)DrAw UNDE&A=CITY PROJECT / O IW ] IS I. uA= w 1 vnn Mr epa ItNeAN w p.r a.la sE0t1FNCE FOR CONSTRutnON p. 9 b.. uxa !. pnt.a wf maA 1. IN- poeuerzp SEWDAT eaNTRM DSxm AND CONSmlrcm" N / / S7qu B( / ro aro no W Aml xpaw soar / ,I D �_ •r ••� 44gpEo' i f ).// / // ',ov w Rmr cax5 r•1Tau r�my�e�_I Jm_,r_.._ fo aeA�sw""oun'ocays 1WW corm.�aunTo-x AS AASEDrm,TAnw �' ) I �'i+'w+.�6 1 r / f / - - - •'°'•p, m n.. .+.,x r. ze n'e' u.."""w�. a ilPus v°"wAOEi T nury °Na sr.elua ° snfReEo urcAs AcwlaxD ro TNc f 1 T i I cO'� - / /p/ j / •,azx \ ERosoN roxrROL ... • w �.... ~•• ••• 1cu .Dno s-Tipp�o.'�D wxsxuci:Ar�rn°M AN our iaa: roRu.ATu � °u I00 �D� \SLT FENCE-53'wu;""'°'"""""°°•°"�°" LAEn ', E" D-Kl .AmE"��T.E=pEE PA,. T. .s E°"`>Is TIE "sisar i Dw�irf "" DpEEa O DDDDD�°,•` mr• °: :A°"DAAYAE.rD °rz w f x 6 — O ° O ,., \\ \ \ ; \ \ _ S. 9rDDxD Dnu r YPD T.sDA`0`"M' S' N Aip� T FOR ca:Re"",D°Tlox :D,R,"'n`ES. THE DDN>w MR -AIDAMTS Of V. rcDar fposw wxTROD xspEcnDNx xaPEc,wNs uTEp a. "DUR RUNp..z 1 .r.AAtL AA_ V Da' w OWSTPUCR014 1NE ODNTRADTop ax°w2DDE5 TEE TER uEAEUREa O O /LX� \ 1 ¢ N'" / I I \ an aPWrR—A4TFES TO ASSI eY T"EM. C'PxllJ \ T peti — — \ � /�. ��w A =,•~ :�':am u9 TASTS,.ySTE °.�B \\ \\ \1 \ \\\\ �.., \ `• `t , Q\ / \ i / 09 i t; \ raa, - \ y aY . w=,n of TDxro'E pDADA''wTTn s urnaE Ills sruu It -EC D •OEE aT DIED AXAS sxwD u STA. ITN u 1D., a®-_ I. /A ­=AxD /oDT wEw TwE t u —/A.1 a ux ANDNDpEDx io1 O \ i A,w n .r eiNav aaT"wvl nn"wn rDIi sTivN nplE"N x . rs sores tat ro >t µo u'o.n vale nEi nnTTu 1NAx" +rca ro BE PRDrDe McApua Duxes t1NE AE.,ACIDR sNAu BE AS_ pOR TfulMur IXTaIE; plrmG p1 \ �,�p� �REDD . x r 1 I I 1 , I I _ % i 10 \ \ \ a Am DfWA-- axwt BE xAxD xxARTD A TENPSEDE- .T eASw t °' �°` " wN"m`aPoDE�Aas wm I RESP S IAFIDE"T, n —=: � A�^Dc°a sArYEri \ \ • I-`.�-'f'•}\ y+ \ ��. ox Deue TNe n1 WDus AREA, uxx, - alAu xauoE wT xar M \� & E a TEIT MDx p AID W �wW� HW NM AID D.DN DDxapDm DDMPY DI DF ..T 1' wax Acaxuunw .24 OxD d RD Tx[ �E,� " '- 'M' 1 1 I • 8 1 �\ _ _ _ _ _ _ _ •'�A, u"Di+mur�pov ausn�"a T. EA.M., Re FAIT wRxo ` \ \ ,"`� 1 , ro I I `i•rm�j ? + \\ /r-- / -'1 \I cwsTpucTlw uAT BE "Eau I S, 1 . rpw.A. ANY D 11. p 411 OR wD DN NE1Y OR EA4 STORM SE B QRa I_ _ / 4DASWm axN1 IS BI — EA. Rul AxD A/RCRD MEAS SURpAm auu DE sEDwEpT Axo Mua s F.. D eE . "o aR"sa uDFDa�r n¢, RExD s Au eDp pr m°nDN No �\ r^n:•^ _ - 05� • r.r.+ vn xo,T DDxn« KEAwmn Ex ,xE v,E NAe rDR .ETO BIT DENa.Y. �\ �- \ ' \ d° _ - -°- \ i Iz rT s THE RoroxWxuTr " wE `_ coNTRAr:Tm ro xSTAu RRET Plro.ccTlw ;�y, =B wcTS At- - AtS xsTAum (RETEA ro caysmucn°" wws EDR DETAILS) _\ I 1 _ �•:A., " I I I " 13 Ix aucnED SEwENT Alt-T a DDA c ewTLw, noAnxD DEema PAto / 3 FEAST TASED, cONSIRUDTax AND 0[MDLingl DE.R. — — WASTES wST I ee Dar9sm or PpwuEr AxD wsr capLr wTH uPCA DvosAE REaAREUExTa awx 1 �' I rE . rpurp A STdADE AW DSADSAL Ord DA—E, PAwT AID NIY XAEMDOUE •rtSTANCEE ,� I \. ry 1 ).-r - / �.rga�pa I I xu T x x wupu TN DA pwwnws kr..o><x Dy TO A DEva .. as TR T. A"D oTNm cw A.B . TxwaEs uusl BE uuITED d I ) ro A E aTe a aEULr u.ED AED 7r _ I A. SAt P°'wR"avroEav ols:"Dam a. xo ENW Dl PI 111 -1 or�•res'wAvr°gARus ro eE b \ Gg u_rwz i p \ \� - \ ' / / / A NxxD a Em :<, pA Nr EnwDa�Pfm�aaw D ER W ER eDD a b ,^ a o:.'aTT°"`°"D«P`ADE nt BE At!` NAT DR3ED TM°rv°xE ETho«.eIL°c"n"a.r wTNln �m.DND.o�)THE "LA"s:" rsR 17. ai CAAiir pE SLOAES. . >` "Y.."5�.�) -ll — �i CT✓O \ \ ��N'� 1 , \ 1074 �\ I' \ .rwn 15 „hrr.r +.^,;.5 c"�.;r \ 1 ,fit q�\ \ '\ \\�"\ \\\� \ \ \Z \\ \\ � \� A-_ -'mx� DEFDNED DRAWx t( Mf M:.MM AT OmECR SUPS-SION A�NO Y ETNT "� PROJECT N6. M.P.C. M.LH. Ax A CUREO6TpiW NIDEiI n1AIONE.INR E AoHSTAn MNNETHE ARBORS PRELIMINARY GRADING PLAN 2-06-0135 DN R.C. "ipzun CARLSON CUSTOM HOMES No. DATE BY DESIXaP1gx M.P.C. �p P. cvnpim S"0C1^TM Rxl N'E P N S 7E: PEG NO. 19901-•w...,.,A. _. _ _ CHANHASSEN, MN SHEET NO. 10 OF 13 SHEETS lAl 10/31/os CITY OF CHANHASSEN RECEIVED DEC 0 1 2006 CHANHASSEN PLANNING DEPT ON CUSTOM HOMES 0 lJ °pCXYi ' " . `. J 1CMOSBBRUCE ARSNORES DRIVE y.� ' w 1° , P1 GIASB52-200S33B7 :7- v� EXISTING BASE LINE CANOPY COVERAGE"319,770 SF (36.7%) NOTE: SEE ATTACHED 8 1/2 X 11 SHEETS FOR INDIVIDUAL TREE L' O'�Qdv �Q " Q °v "�l.A' • ` \ ` ` HEALTHAASSOC ATESRENCW1 BY KATHY DIN FROM PLANT �.�'i '0 'b l'a 10 0. Utiot\ 5 � , a -b--- I� 12 J- -------- dg 2 14 .I �Atea"8 "c� V 1 0 3 Z.13 16 11 .. 2 5 r� m c6. ISL I d' Cc» WP S Via" Q"y� outtot B �4 ➢ �� 1 ' '� BESIWEO DRAWN C TINT TIB PWI WAS EO wMr PROJECT NR M.P.C. ".L.K eiva uNOEi mRpsuPERr,sioN"E'iJ,oTNa THE ARBORS EXISTING TREE INVENTORY 1 AN A BRL RESIST IX PESSIONK CNciNFLR uNou THE uws a 1NE sort a N"NEwu TTO a 2-06-0135 OEc m k".w� CARLSON CUSTOM HOMES N0. 0.1E BY OESU�Pnp1 N.P.G CHANHASSEN, MN ISHEET NO. 11 OF 13 SHEETS DAZE 10/31/06 CITY OF CHANHASSEN RECEIVED DEC 0 12006 CHX-MASMN PLANNING [)---PT ~ LO '" <0 0 Q tl> ~ 0 ~ N ZVl Qt;:; t-W U:c >-1i1 Vl Ii I a:: t- '" 0(1) ~ ! t-Z Z w 1 Z 0 LL W to Cl ~U 0 en Cl (!) ~ 1 ~~ N en Cl z T- I w< ~ <(0 N Z l:!;;; c5 :r:LU z 1 z> ..-l S T- t-ll:z <(- I :r:LU Cl. T- ffit;:; uU 0 z C'\I I w t;:w LLLU Q m T- 1 <~ 00: W <( I ~ 0 x I 0 ~ (V') I :J: T- o ~ II I j ! I ! I i , (I) ! l1J I cn~z ! I 0::: I::;: ! 0::;- I a:l ~m ! I o:::"'(/) ! :>(/) <(0< i ZI I LUOZ I~~ I ~~U i I 0 I I l I ! I ! i I ! ! C'\I i I I I I"~I f Ullj . ~!I jcdJ I 1 I, J o~ ioe. ~'~a ~~ij 'h ~ ~.i~ ..,1:; ~ ~ ~~o~ ~;I~ .i ~S~~ ~;;~~ ~:!i ~~ Ja ii d !:i g~ Su ~~ !~ ~ ~ :;, m z ,., 0 ~ ! ~ . 0 ~g~ u . .u i ~o=> C!3.~ bd~~ &' o Ou C> ~~~ z ii' ;;;~~ is a!. II ~ * ~~~ ~ ~5.... 08< U"'''' '" ~~: m 12 :<",\l! In 0*8 '" "'u>- ~ ~~~ In ~ ~~~ 0 muo z ()::E~ '" 0 Z=>o F:::l;(L 0 ~~~ ...".. "- '.", I - J I I l ~ ! ~ a~ ~~ I _....-/ TA NNEWASH ..", LAKE MI g40f.~ ,..t (N-G.~~\I_o. 1,:9' "'...I..(JrO........:~~_H..R.......-~,..t T:.~jCI ~ ! I ! ! ! I ! ! ~ ! j ! f 1 I I 1 i I j [ 1 l f l l l ! ! j l -V- i "I 1 1 I U) w CJ)~z C:::to ::;: Q::!;i [O~LU c:: ~l:l <(0<( z:C woz I~~ I-~U o ~ """ "'"- z o ~ ~ 8 1< <'i 15 ~ 1<'1<' I<' .....q 10 ~c E. z o F <.> ~ 8 >- ~ :> il' g " 5 ~ i3 '" ~ ::. o C) ~ 1;} ~ U) ~ ~g ~ ~ 6 I';. "l ri .... ~ ~~ ~ ~ ~ t=:8~~l..cn U- ~~~g;~ ~ 08 <r: 1l1-..... ~ .~:~~ ~~ l:1 ~g~ir~g ~ u~u<5o ~ ~~~~~~ ~ l:j~ji;l~~ ~ mUo~<8 ~ ~~~S ~5 ~o ~~~~ ~~ ~ ~ :io..a,. u ('I') "'"- lO ~ w ~ ~ ~ 01 ., -.-"l. '"" .) \ I .i~1 II lib. ~!f I EB=II I I \ ! = -~- i J _/ A ,~ ASHT 1129)82') ,.....,. NNEW ,..t (N.G.;~...,p. I LAKE M~/"fltI~~:'-,o"" 1fGCO/'"................. T;:~ z lli ~O :rW Z> <l:- :rW uU l1..W 00:: ~ U ~ h ~S ~ co c:J c:J C'-J T-f o U l.LJ a fu Cl (!) ;2 z ;2 it z w ~ 1 ~ u ~ ~._I III III r f ..I Iii !! ! III .. III III .i~I'I;! I~ ~~ III I ~ ~I~: i III ~'E ~ III Il.!lil~! III ~ " III ~ i I II . 'f ~ II ~ > PlfilW~ I ... 1!IIIHvl ~ IJ\ \ 1 I r m-dd - III III =-=0 ,- ~} J ~ I ~. ,., ..... ... "..~ ,. <J/;" ,. . 1 Ifh\ III l 1""'1$ /~I I t !/~" '\~Jo!;L T~~II If I" ~~1~Dd/~11 I ," ~., '/- '~!/wiL(~J~/ II I /TFff( tt:~ r=-''" .. I II L~-1~lJJt/~ I ,,"'."', _, ~~u "".."",1/ I 7 ,I. /lk/(&: fj{r:n/~ ffl./I~~_~ II wr--~ ~ ~ I -----41 ~. I !I! I ri::! /!I,-J~".~~/!ii;J II II Uf( \/ ~ //ff::::~1 \ I ~..". ".. \.. . ... ". "" "" L~jt ~ 71" I liJfJI )1~1t~~ ~L%Pfil /f i III ';~1Lt-i~~~'~f~W/I.~\ It8~r~~r H I '" '.,".-,- .~=-- ~ "-~~ic~~f~ III: III II' ~;- ~-. hl\\.:r.l~! \Ii II I I - ~--~ rkJ!\~ j 01 III I In 111111111 m I I . I ~l~ II 5'-'!li\l\ ~ " ~\ I] I I ~IIIIIIIIIIIIIIII iH j~ln!H H!ni! n I II \~ l-/JrJ I I ~~~II~Uii!!~ii!i!I~~t;i I ~~I I. I~ ffiffiffi filii s~ ~~ "~~e ~ =:;8 . =10 ~':~ q I I ~) I ':i--r- "ti t n~~~u ~H~J,i I ~ " l' ~~~1~""'-1 I ~1!ldjiU'~.l~:;t II ~nHii!~~Mt~~~ihH~~H~~, , '~_. I .~~B:~ II !~iUi!i~H~jHH~H~~i~~Hi~ I I \'-. N~ 'uasse4ue4::> JoqJv elll Ntrld 3dtf:JSONtrI 3115 ~ z fh at) UJ co 0 ~. If) = " LL ~fii ~ ~ en ~m N ~ .~. 00 T"""'I z Ii; LLW C,.) ~ ~ ocr: w ~ ~ Cl 2 u :IE u . 15 'U 5 ~g .--ou ~a~ ~m~- u. 0: t.i (1)(0 CD m ~~: .1 ~~~ ~ ~ ~.~ i 5 It) R~d:LL. .fiG) .~.~ tD'~-a 1r~'"'i t:o~~a, a:; ~ ~a:::~..-: ~f8. 8~~13';;; ~ ~~ ~~~-~~ 9aiij lii88~e 6m f o >.5-01 com.... !! g"f2 ~-~... "it~' t;: ii ~~lrm~ .t?~-'~~~ mE'" .0: ." eo 010 ~-;a .~-~~' ~ "'-NIC !~l~l ~I I I ./ J?Li?-,pe c;,/ ~ Glencfa;e-- ks Dr ~ >trr~;!~~/ ~cn L tV ......., .~ .:t:~~ o ~.~~ 8 "J:JO ~ Q:; .~ ..s & Z,' Immerman Road Minnesota Landscape Arboretum )/ D D Minnesota Landscape Arboretum G CenterPoint@ Energy 700 West Linden Avenue PO Box 1165 Minneapolis, MN 55440-1165 December 19, 2006 Robert Generous Senior Planner City of Chanhassen 690 City Center Drive, P.O. Box 147 Chanhassen, MN. 55317 RE: Preliminary Plat of The Arbors Dear Mr. Generous: With reference to the preliminary plat of The Arbors, CenterPoint Energy currently has two easements crossing this plat. A drawing is enclosed for reference. CenterPoint Energy pipelines are operated and maintained in accordance with the Code of Federal Regulations, Part 192, Title 49, "Transportation of Natural and Other Gasses by Pipeline: Minimum Federal Safety Standards. CenterPoint Energy's easement number 1992-60 and 1992-61. The easements are recorded with the Carver County Registrar of Titles as document number T74942 and as document number T74943. To aid in an acceptable development in the easement area, I have enclosed a copy of CenterPoint Energy's Guidelines for Construction and/or Encroachment within Gas Pipeline Easements. . Please instruct the developer to use these Guidelines when making the necessary changes to their plans in the easement area. Additionally these easements are not referenced on the plat and must be included. Subsequent to the changes mentioned above, please send a set of the final plans to me at the address below for approval. Respectfully, CENTERPOINT ENERGY S~ v~6-y-- Steven Von Bargen Right-of-Way Administrator pc: Cherie Monson, Sales Consultant Andrew Balgobin, Administration Engineer CENTERPOINT ENERGY RESOURCES CORP., D.B.A. CENTERPOINT ENERGY MINNESOTA GAS GUIDELINES FOR CONSTRUCTION AND/OR ENCROACHMENT WITHIN GAS PIPELINE EASEMENTS The following are general requirements only. CenterPoint Energy must inspect the area and review construction plans. Final construction olans must be reviewed and aooroved. in writing. by Center Point Energy Engineering orior to the start of any construction within Center Point Energy's easement. Grading and utility olans showing CenterPoint Energy's aooroval must be on site and available to CenterPoint Energy oersonnel during construction within the easement. 1. Soil shall not be removed or placed in a manner that will result in earth or pavement cover over the pipeline of less than three feet or more than five feet unless otherwise approved. A level area of not less than six feet on each side of the pipeline shall be maintained at all times. Slope beyond 6' from the pipeline shall not be steeper than 4 to 1, unless otherwise agreed. Any amount of cut or fill, within the 4 to 1 slope area, shall increase the width of the level area on each side of the pipeline by that same footage of cut or fill. Blasting in the vicinity of any pipeline requires review and written approval by a CenterPoint Energy engineer prior to start. The pipeline must be fully accessible at all times before. during, and after the construction. 2. Landscaping over and within ten feet on each side of the pipeline is restricted to grass cover only. Beyond ten feet on each side of the pipeline. upright plantings are restricted to, and shall not exceed an eventual growth height of six (6) feet. No trees shall be planted or remain within the easement. Any trees, removed by CenterPoint Energy from within the easement, while performing maintenance activities shall not be replaced by CenterPoint Energy or the current owner. their successors or assigns. 3. Any buried utility line installed across the in-place pipeline shall be placed below the pipeline with no less than one foot of vertical separation, padded with well compacted (95% Standard Procter) and cross at an angle between 45 degrees and 90 degrees from the pipeline unless otherwise approved. 4. With prior CenterPoint Energy approval by a Senior Engineer or Right of Way Administrator, parking lots, perpendicular driveways or roadways of portland cement concrete or asphaltic concrete (or similar materials) may be placed within the easement, but shall be limited in width when crossing the easement to minimize the interference with or access to the pipeline for inspection and maintenance. Any contractor equipment movement over the pipeline shall only be at an angle greater than 45 degrees to the pipeline, and must be on a constructed haul road composed of well-graded gravel, 3 feet thick, for a minimum distance of ten feet on each side of the pipeline Permanent structures including, but not limited to, buildings, signs, screen walls, decks. tennis courts, and swimming pools are not allowed under any circumstances within the easement. Installations including, but not limited to, retaining walls and fences crossing the pipeline require approval by the CenterPoint Energy Senior Engineer or the Right of Way Administrator, before construction. All fences crossing the pipeline must have a 10-foot wide gate centered over the pipeline. All fences installed parallel with the pipeline will maintain a minimum of 10 feet of separation from the pipeline. 5. Once CenterPoint Energy and the Owner, Developer or Contractor have reached an agreement, CenterPoint Energy shall be given at least two working days advance notice of planned construction activity so arrangements can be made for CenterPoint Energy Personnel to monitor the construction. CenterPoint Energy will locate and stake the pipeline, but will not assume responsibility to expose or backfill the pipeline or to determine the actual elevation of the in-place pipeline. Excavation to expose the pipeline shall be parallel to the pipeline. CenterPoint Energy Personnel must be present during this excavation. Backfill must be free of rocks and shall be compacted to 95% Standard Procter. 6. Any subsequent damage or removals caused by CenterPoint Energy in the exercise of its easements rights, of any and all of those certain foreign constructions (landscaping, driveway, roadway, utility lines, etc.) which may be permitted within the easement area, will be permanently repaired or replaced at the owner's or contractor's (not CenterPoint Energy's) expense. 7. In accordance with Federal Department of Transportation Codes, CenterPoint Energy must place markers over transmission pipelines. These markers will be placed at all road crossings, in back of curb or at property line, at changes of direction and periodically along the pipeline. All natural gas transmission line locating markers placed by CenterPoint Energy will not be removed. If you have any questions call 612.321.5426 or 612.321.5381. January 20, 2005 GENERAL LOCATION ONLY. DO NOT USE TO LOCATE FOR EXCAVATION. CALL 1-800-252-1166 FOR ONSITE LOCATIONS AND STAKING. ~ ~ r 151D ~1S,1 U :J ~ '..,.IJ~Q .Aa l ...5 I / ~ I s /~ l-i 7tP~O / ~ I ..... . I Plotted by: gasread Plot Date: 12/19/2006 Field 1 : Field2: Scale: 1": 150 ' @ North CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE ST ATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on December 21, 2006, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for THE ARBORS - Planning Case 07-02 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this~day of DCI Pry, bP r , 2006. ~ - \ . 0tA!~ I ' ~ I i'" .~~i KIM T. MEUWISSEN ~.... /fi,5 Notary Public-Minnesota < .,;...' My Commission Expires Jan 31, 2010 Ol C ; 0) 0) :i: Ol5 c.- .- II) 1l- II) m._ 0) E J:E .~ 0 :cO ::IOl a.c -'c o c 0) m 0- ;0. o c ZO) II) II) m .c c m .c o Ol C ; 0) 0) :i: c 0)0 .S 'iij (ij .~ 0) E J:E .~ 0 :cO ::10) a.c -c o c 0) m 0- ._ a. - o c zO) II) II) m .c c m .c o CJ) 0:: o .a.~'-m "0 LLello$OO:: c U):E-1 iil a: C1l...!...-;:::<( E. OUl~~W g .gJ ......:J ffi C') J: .;:: a3 ~ " "0 "0 '7 tll 9 +:; C .- c :?: ~ tll ~ C ctl ~ ctl ctl .!!l ~ in .gs -1 a: $ ~ Qi .c - ..... '(ii C1l 0 0 15 .!:! I-'OQ)Q)>.....- "0 .~~a:.iij.....C\JE c EOl'" cOC\Jg CIl . "E ~ ~ C1l -1 0 .;:: ;S c..O..:::...~Q).....~ o Ol 0 a::J C1l e>.~ c '0 0-50 "'ellCll+:; Cll "cl'-- -a.-1Q)CIl "tl I'-- 0 I'-- a: E ...!... ... 'x "0 .- CilgClla:OjggQ)u gl~ 1'--'0'" EO co15 C a:l!! o c Q) 0 ~ Q) C\J '^..... Cll> 91.0 ... ell "0 _ C v, '-' o .". E - +:; .- 0 0 Q) 0 Cll C\JOl C)cCll '-Eo'- ."OellcQ)Q)c'i6 ~Cll C\J ci .s= .- "0 a: 0 u 0 0>:5 >-.~ 0 c'(ii E 'iij ea I 0 c: eo a3 '0 ~ Q) 0 .:; > E 0 0 :J> c C1la:~:c"O OO.!!! SOlOl :JO::~_... S~ I'--c. '" 0... .- C -.. 'v w LO III -,-500EC1l:JUl:JI'--E -c -ellECJ)C1l0"O >-.- - i.ii LL . - U C C S ellQiell ">-COell:;::; "OcaI ~~ C~ ea CIl I'--IlI ~= > CJo>C1l C';::;:: C')o :J E :!:: Q).!; E Q) ea ctl LO.2 I-:::>Oa:(f)<(O>O I'--c:( t tll 1ii C1l E i= ~ C1l - ea C ea Ul o a. o ... a.. +.: .. C >- C eat:: 0 .~ C1l:;:: ~ c.. ea gog <(D:-I C o :;:: ea u o -I CJ) ~ 0:: 1ii 0 "0 LLg.~l1~ ;, (f)a: :E -,l .Q ..... tll C1l~s"'" E. OUl+:;oW g.gJ ....._:J ffiC')J: .;:: a3 (ij " "0 "0 '7 tll i5 "0 +:; C .- c :?: Oltll>ceaCllellell ~~in.gs-l~$~ Qi .c - ..... '(ii C1l 0 0 15 .!:! ~~~~'~=5;jE g EOJell C C\J:Q: CIl ."E,"",~C1l-10';:: :i:_ c..o..:::...~Q).....g: o OJ 0 a::J C1l e>.~ c '0 0-50 "'ellCll+:; Cll "cl'-- -a.-1Q)CIl "tl I'-- 0 I'-- a: E . ....x "0 .- -:;::12 a:O~~Q)cSellCll w c CIl .- 'v 0 Cll 1'--'0'" EOco15 ca:l!! Oc~o~Q)C\J... "OCll> 091........ell"O_...CIl ~ E - +:; .- 0 0 Q) 0 e ":~ellc)C~C:;::E~Cll C\J r:i.s= .5 .gs a: 0 ~ 0 0>:5 >-.~ 0 c'(ii E 'iij ea I 0 c: eo a3'- ~ Q) 0':; > E 0 0 :J> g C1la:~:;:;"O OO.!!! cOl:JO::>- "'c.....l'--c. ell OJ 0 ...='E.o ell CIl LOlli -,-500 E C1l~ UlO I'--E ~c -ellE C1l "Oc: .......;: - i.ii LL . - U C C 0 ellOlellQ) "CCOell'- -g Iii ~ 5- ~ ~ .~ .!2 El I'-- 1i ~ E :!: Q).~ E Q) ~ eo f2.E I-:::>Oa:U)<(O>O I'--c:( C1l E i= ~ C1l - ea C ea Ul o a. o ... a.. - C ea u ~ <( C o :;:: ea u o -I Q)-g~ CIl .s=o..... Q) ......s="O CIl +--'-co: en :JOQ) :J .8 ~ = t) .~_ ell 0>= Q) :J '0; ~ '0' ~ "0 o C .= Q. ~ .2 >-Q)jg "0"0 CIl E .s= () Q)'" .!a ......... CIlc..cS .2EQ)"oQ)=E .!; e.s 8. g-.s -g E 0- -Q)....cc..O .....s g'i.ii c..o Q)O .!a c.. +:; 0> Q) CIl.s= Q) ~CQ)c.sc""'.s= ,-,,'- Q) .- ell E ..... 'E .!; E ~ 15 e. 0 -g ffi2Q)=~""'~ell .s=.g.s=.2Q)ffi"O"O u 0 ;, Q) .~ CIl ~ Q) = ..... c .s= Q) ~.- CIl .0 "0 .;:: ..... > c.. Q) .Q :JC:J.s=o_~u c.. ell 0 g> c = .... .!a .!a ..... 0 ell ~ Q) 0> .s ~ t5 .c Q) ceo.!; - :J Q) ..... .2= ell CIl .... ~ o g"O Ol o>,g C ffi u Q)........c=c..Q)~Q) CIl c..';:: .- c.. ~'o O_CIlCllell~ellEg~ 2-c:.c Q):::: Q) E:O.... :Jell......s=ell.s=O::JQ) c..,gs,gcnl-Oo...s Q) c.. 0 .0 .r:: c...o:J . I- ell ell c..,... C\i t'? ..; UlC) C C C1l._ 0.- a.C1l ea C1l J::E _C1l ea~ ~- 3:'i6 .8 E c J!! ..... .s=.... .0:;:- '(ii CIl 0 c ea oW 'S: .~ CIl Q) Q) ~ -g Q) :JCE.s=>'" CIl :J.o Q)..........ea~ ooc:::::.... ~ ffi ~ mE';:: ~.8 .8 l- e. t)C~Q)Q)CIl_C1l Ol E ~ ~ E ~ '0.. ~;:: ci c :EOctl..o-E8E~C ~ C\J u .s= :J 0 0 .- Q) oQ)cCll.....Q),S!.o'G) E . CIl ell 0 >-32.- ea C1l Q) t;ffi-5~g-6.!!!"E .s c: e.'cj ~ u Q.;:: ,S! C Q) ell -@OQ)-...UlO ....:0..... .s=c=o'-'- .2,,'S;;~~uo~-"Q;~ Q) Cil L '0' 0 :J Q) :::: t:: := .- .oQ)3lQ.wO>20UlE CIl~-- c>-ell(f)a..oE C,-,'CIlCll _.s= C1l ellell~:.c~-:o ....~o e. c.. c ..... 15 ,... ..... Ol:t: ;> 0 Q) ~ E S Cil C') "S .!; .s '0 c: .s=~co ;:a.a>UlC1l.5 .....Q) CIl Q).o~ . Q) Q) C1l'OC Q)..... CIl ell EI'--C\J.s= E~'" C uCllQ) I-a.ea CIl Q) ell c Q) C\J .!a Q) C1l -a.. o '~.s= 0 N .s= ..... e c Q) >-.,,:!:: ..... C ~ C1l ..... c.. ell .o~, - - 0 - c .s= E CIl en CIl 0.- C ~ ellCll 0 .......... CIl - - U :JellcQ)CIlOo ~ c'cj CIl e Q) u '-E C1l _ :J 0'- . 0 Q) Q) E c C'" o ~..... c c E ell E'- 0 >- Q) ::: == Q) ,g 0 -6 0 i: .;: :=.s ~2(9 c..u ell 0 0 C. ~.. Ul.:!l C C o C1l :;::E ~ E ~ 0 00 "OQ) .8 E ~ ~>- Q)0.s= '^:!::.s=.... = .s=o..... w CIl CIl 0 ..... eaea =€~ i ~ ~ CIl ffi ~i :J0Q) CIl Q) :J.o:JffiE~~~ .8~= ~ ~ ~ ooc.....t ~ ello>= u CIl __>-mE:!::ellOC1l1- :::l '0; ~ Q) '6 ~c.. ~ ~ g- -;;;.0_ C1l '- oe t5 ~ t5 C +-' Q) oc_ C ellQ)_"O_=~ E>- ~ jg c.. .~ 0 Ol E c ~ E Q) g- 3: -;;; .: .........0 ie ~ ~Q) EOell.o.suE>~ o E Q)" CIl c..cS'E- C\J u.s= ~ 0 Q) C1l 0'- - CIlOQ)= Q) OQ)C ..... -.o'G) .5 e .;; c. c...c..o EEl C/) ctS 0 >. ~.- C'CS OJ 0:: cii2 e ~ 6,0 Q) t; ffi~ ~ g-6.!!!" E .....:::lcCllc..OQ)O .s c:e.~~uQ.;::,S!c .!a c..+:; OlQ) CIl.s= Q) ell _= 0 Q)_... Ul 0 o>~i~.sc""'.s ~ ~""'~.s=c=o-- .!; c E ~ - ~ E "0 0.. 'S;; ~ ~ u 0 ~ - a; ~ eo~ oOc..oc ~Cil~"Oo:::lQ)~t:::=- Q)E~~~c~ell 'OQ)CIlQ.wo>.....oUlE .s= 0 ..... - .~ Q)"O "0 CIl 0>....... C >- ell (f) a..o E UOOlQ)~CIlQ)Q) Cell~CIlQ)-.s= C1lC1l0 =.....C.s=LQ)>CIl ellc.. .:.c c-: 0 ....~O .o"O-.....Q)....~o e. C.....'O,........Ol:t:;> :::lc~.s=6c..u~ Q)~ESCilC')"S~.s'O~ c..ellog>ca~CIl .s=~co ;:a.a>UlC1lS .!a i.ii . 0 ell ~ Q) .- ~ CIl Q) .g ~ ~ Q) Q) C1l '0 C .sQ)t).cQ)ceog' Q)t)~Q)EC\J.s=E~l-a~ _:::lQ).....>ell - CIlQ)ell C\JCIlQ) o CJ'~ Ol'- U CIl ~ ~ .s= c Q) I .- C1l ii: Q)Q)ecO>=cQ)u.8~c~>-C\J:!::.sc~ CIl .... c..';:: a c.. Q) .s= .~ ..... c.. ell .0 LO - _ 0 _ C1l O~CIlell~c..Euoc_.s=ECIlen$o~c;:: c....... .- Q) ell .- ~ ell oW U 0 :::l ..... C Q) CIl 0 ....c.s=.s==Q)E:O....~>-~CIloellQ)U- 0 :::lell..... ell.s=O:::lQ) :!::uo....Q)EcEC1l- c..,g5,g~I-Oo...s~o~"",~c ellES~ Q)c..o.o >-Q)>~Q)oE>o;_ .s= c...o :::l > (ij .s= 0"0 ... = l-ellellc..""N~"; :=.s~.....(9c..UellOO~ >-C t::o C1l:;:: a.ea o U ... 0 a..-I UlC) C C C1l._ 0.- a.C1l ea C1l J::E _C1l ea~ ~- 3:ili ~.. Ul.:!l C C o C1l :;::E ~ E ~ 0 00 Q) W ID -0 ~ ~ c :5 .o~ ._ID ~ u~ .~ 0 .~ ~ ~ ~:: c >.'~ ~ CD ~ .9 Q3(])u ~'~(lj 0::0 (Qcg>.25 c.cc ~5w "CWW 2 g<~ CD~ CD.~O <(Q)~ ~~~ ~~ a.a5~ ~.~ -@~~ 1?,E g E(ij ~ (lj;'~ fij-]? g ~ [; -;; ~g ra Q) E..o 0 Q) t:.c . Q) a...... Q).... ..... >.+= ~..o~ o....a.~rao(ij.cE- -0 cu_o Wo ~~e(lja.~E;o~ 5- m~c ~~.9 ....(lja.E~E~wuE .~ S~! ~m~ ~~!-g~~~~.9i ~~ ~~~ rn ..c Cf.) c .- ... ('(J (5 0.._ =' (f) a. U co :2: 0 0 ~uU ra~SE~~~Cf.)5ID CD> .0'0 E :.= .~ c =s: 0 2' :: (f) '0 fa 5 0 :5 cu (5 >- Q.) ._..0..0 .Q>"O.->.ra....uErn ....0 c~E ~&~ ~~~!~Q)~o_E s~ Cl)U~ ~(ljQ) ~~(lj-O~EID~~ u~ ~~c 'O~5 0 ~~~E.....o.~~ro -s_ "0-0 ~'5o ~g>~~O-E6~~a:: g~ TI.9~ (ijg<Ud>c~-.~EQ):::3:Q)~ UU) 5~c c .... Q) C Q) Q) ,2 u.= E.~ "'0 ~ - ca ~ 0 c.:::: .Q~-~.SE~-g~-gc~.s5 ~~ U!.s :6 55 8 Q) ai c 5. co - Q) ~ ~ ~ ';: 'S; 0 ~ Q) en gEl!) E ~.~ Q) g>:Jl ~'w g Ene g. (3 -::; g O~~~(ij.~5.c~Q)~~>-Q) a.~ Q)C'2 ~~j;~~~m[;~EQ)~~ s.~ 5~~ ~ <( >- a5 -g 0:; ~ ~-6 ,g ~ -a~ -g:5 @-g 0:: .5Q)t=TIU~~~cS-Eo go 'cnQ) ~ "8 ~ ~ .S g> ~ 5.:= : ffi ~ 8 ~ :; :5 m .s = cue.....~~omg~Eg.~~ 8~ ~m~ ~~~~=~~=g~~~~~rn~~ ~~c ~roro~c~=mucm~~g~~~ ~'i8 $ 2 ~.s g Q)'i ~ >..!2 Eo."'" a. Q.) .- "0 a. c m '-c'-~ro~ -..... .ctSrom mmo mo~ OOQ)~.-u-Eu5~m=~Q)E.~~ ~'-rn ~EQ.)>.li~Q)~Q)g~rou=_~~ .....rom ~u~iO'.~~~.E~~~~.O~B ~~a Q.)~~0.~~~g~2~.~.Qg~~~.~fr~ ~ E g u ~ ~ ~ '(1; :::: m.!2 ~ ~ e 8 ~'ID en ~ rn 8 o<rn2Err.~g~uQ)gs>.a.c~gmQ) ~c.S~~~cE~ .c~a. ~~Q)O'(I;=~ aJ E.! "E (u Cf) >. g E 0 g rn m g. ~ u C = ~ .~ en ~ o~OE~D~OU~~~Q)~m~~~E.~- ~.~~.~~~g~~~.~~E~~(uj"O~~~ ..=> ~() ~ DE.! E~U Q.) 2 $c75~.E 5}a;"* u g>-g ~~~~ .~.~~~~E~~ .grn~Q)~~~~ ~cQ.).Qga.~OCf)o~.....S"ES~&E$.E~U cu ~ a.~~ ~ Q) ~~..... u ~oo{g o~ ~,g.s c ~.s g~E.~.~ro~rngg~~$c~Q)"O"O>.E.!u~ ~ DE Cf)Cf)"o~~wQ)ctSctSc~aQ.)c~c ~ en() a.S ~"t c o.{g -c:= U5 oo:c ~ ~ g C'd Q) &.9 ::.~ ~() g ~8.~.~~.~ g $~.~-g o:;E:5 ~'g ~~cg~~~D~E.~gg.....~rn~8~~~:c > .~ 'E.- ~ a. m c.. IV E E () Q.) ~ c Cf) rn c U ~ a ..... ~E2~li~~~~aE>.~.~~a.IDIV.~B~~ ~~~~~~~~~~85~~~~~~K~~g C3.. ... ~ Q) -~ .~Q) ! c :5 .at ~"O~ ~ 0 .~ ~ ~ ~:: ~ >.~ ~ <D ~ .9 ffiQ)u ~'~rn ~o rncg.2= c~~ .....~Q.) "OQ)(/) Q) U<._ Q)~ Q)Cf)a ~i~ ~~~ ~~ ~~~ ~.~ ~'i~ -g S g E (G ~ ctS >.~ rn ~ g> ~ ~ Q) 5 ~ rn m E -e a Q) t.c . Q) a. I... Q) I... I... >.:0:::: :a5 ..0 ~ 8 Q) c..1tj rn.Q,]2 :5 E ~ ~ .9 ~ ::= g ~ga 0>>eEO'~~~8Q) OQ) Q)'Q) en'~ ; ~ ~ ~"O 0 <D.g ~ .9 ~ ~~ ~ g':; ~~'(I; ~.~=~~a~~Cf)[ 'O~ ~g~ =>uU ctSen5E~E~~:5w 0>> ()u E ~ .92., c ~ 0 $ 3:'iI).o ~ ~ 0 .:; ctS 15 >. 0> ._..0..0 .Q~D.->.rn~"OEC>> ~o c~E ~~~ ro~~~~Q)~o_.5 s~ Cf)()~ SctSQ) ~oom;~1tjE~~~ ~~ ~~c -g.~= ~ci~~~;8~~~ c~ ~~~ ~g~rn~.~.8.~~~~.i~i? 8U5 g~~ ~ .... Q) C 0> Q).9 "O.~ E.~ "0 ~ ..... rn ~ g 8.:::: .Q22~.SE~~~-gc~$:5 ~~ u~s :a ~ g 0> ~ ~ ~ co ~ Q) ~ ~ i;"i 'S; 0 ~ Q) (f) CEl!)E~-Q)rn:JlE~uE~ og. (3~g O"ocQ)=~~c~ctSQ)O 0 a I... .....~ U~~srn~~i~~~a.~~ a~ ~.5~ ~E.~"O~ES~~oEo>~u ~'ID ~~E.! ~ < >. ~ -g 0"0 U >.~ g ~ a~ 0>':; g-g ~ '-Q)t=-()Q)~~cCf)""'Eo rnrn 'c-O> aJ"OQ)cogo~~Erncwo~ ~c rngS a: a a. 0 .- c c.. 0.== Q) Q) C U Cf) :J U Q) ._ _ c()e-~'2oo>g~Eg.~~ 8~ ~Q)~ E.!~~2S~~Sg~~~i?~~~~ ~~c ~ctSro's;c~-<D()cQ)=-g.5wl... :J'~o 2 2 ~.s ~ Q) ~ ~ >.E.! E fr.9 I... ID '-"0 a. U '-C'-~CO~ S!...... .C'drnQ)o..Q)cvo Q)5~ ~Q)~'-.Q=E~5~0>=:J~E~~ .:;~ctS ~EQ)~a<(2==wc(l)ctS"O-:=$o (I)B~ C "0 "- a. .- ~ ~'c ~ Cf) ~ ~ U C D U ~ \oJ Q)~~~~~~~~2~.~.~g~~~.~fr~ KEg u ~ ~ ~ 'iI) ~ 0>.!2 ~ ~ e 8 ~'Qj en ~ ca 8 o <( ctS 2 "E rr '.~ g a: "0 Q) g S >. a. C ~ g <D 0> ~c.5~~~cE:J .cl...o. ~~Q)o'~S~ ~.!2"E (u Cf) >.~ E 0 5 C'd ~ ~ ~ () e':; ~ .~ o~ o[Lo-Q).c"'ou.,~. _Q)O~Q) EC- ~~~'S~~~U~~.5~~~':;~~:E~~ c'-G>'c~IDQ)Gccmoca~a.~o>oro"O .. => ~ ~ OE.! E~ 0> Q) 2 ~oo 3:.9 Cf)a;oo () g>a.> ~i~~ .~'~~~SE~2 .g~~a.>~~~~ :Jc~.Qga.ctSO~o~""'~~S=&E2'E~U ~ ~ a.~~ ~ Q) ~ ~~ U ~(f)~ o~ ~.9.S c ~.5 uo~E~'jrn~~go~~~c~a.>uu>.E.!"OB oE (I)Cf)UI...~~Q)C'drnc~oQ)c~c 0:. ~ u o.s ~ t c a. {g ~c := U5 oo:c ~ ~ g rn Q) &.9 ~ .~ ~ () 5 ~ 8. ~ .~ ~ .~ g $ ~ .~ -g 0 :; ~ :5 ~. g ~.~cg~~~o~E.~gg-~ctS~8!~~~ ~~'~'E~~~~~EE()~~~~.~~~~8ID ~g~~frE~Q)Q)8~~.5'~~E~~~~~~ _CIlOC[L"'CIl~-::;-::;~UU~:;;~w<",~m",w 0.. ... ...- ---I Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227.1107. The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the use(s access or use of data provided. ...- '-----~ ,::;;.------:;------... I Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes ~466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. r Public Hearing Notification Area (500+ feet) The Arbors Planning Case No. 07-02 City of Chanhassen Tanadoona Drive Lake Minnewashta Dogwood Rd Tanadoona Drive ) 1 4 y w H ( d v l B Dogwood Rd e n i t l SUBJECT e z a H PROPERTY Highwood Dr Century Ct W . t C . 7 m l 8 P Arboretum Vill. Ln. u t e h t g e e gra S o al l b i l V r t l r i i V A r C A rbo retu h m V i e l la g e c C e t a r C v e g m o a C t l u l i V t e m r h u o C c t n ea b L ro o r o C a A b c r h A D Village Cir Coach Pl r T e r g A r d b o a r Village Crt e it u l ml i V C a o e R g a y l l i V a B Village Lane m u n t e r o Ao r b s Village St m C ri Village Pl S r t a t tum ebore Bo ul HArev 5 a D wy rd m u t e r o b r A GETSCH CORP 1069 DORLAND RD S MAPLEWOOD, MN 55119-3576 REGENTS OF UNIV OF MINNESOTA 319 15TH AVE SE 424 DON HOWE BLDG MINNEAPOLIS, MN 55455-0118 JOHN & JOYCE FOLEY 4804 DUN BERRY LN MINNEAPOLIS, MN 55435-1537 ROGER W OAS 7301 DOGWOOD EXCELSIOR, MN 55331-8015 JANET M QUIST & 7331 DOGWOOD EXCELSIOR, MN 55331-8015 GETSCH CORP 7530 DOGWOOD RD EXCELSIOR, MN 55331-8053 PEMTOM COMPANY 7597 ANAGRAM DR EDEN PRAIRIE, MN 55344-7399 ROBERTW & MARY M HAGEMAN & 7660 CRIMSON BAY RD CHASKA, MN 55318-9603 MINNESOTA ST HORTICULTURAL U OF M RM 1 HORTICULTURE BLDG ST PAUL, MN 55108- CARLSON CUSTOM HOMES INC 1440 BAVARIAN SHORES DR CHASKA, MN 55318-1547 GRETCHEN L F STARKS 3301 TANADOONA DR EXCELSIOR, MN 55331-8048 GETSCH CORP 5404 GLENGARRY PKY EDINA, MN 55436-2006 SCOTT A VERGIN 7311 DOGWOOD EXCELSIOR, MN 55331-8015 RICHARD C LUNDELL 7341 DOGWOOD EXCELSIOR, MN 55331-8015 CHARLES & JENNIFER NEWELL 7550 DOGWOOD RD EXCELSIOR, MN 55331-8053 PAUL GREGORY & MARY S SUMNERS 7620 CRIMSON BAY RD CHASKA, MN 55318-9603 ROB M & CALI L OLSON 7700 CRIMSON BAY RD CHASKA, MN 55318-9623 WESTWOOD COMMUNITY CHURCH 3121 WESTWOOD DR EXCELSIOR, MN 55331-8044 PETERSON REVOCABLE TRUST 3301 T ANADOONA DR EXCELSIOR, MN 55331-8048 MPLS COUNCIL OF CAMPFIRE GIRLS 640 GRANT ST E MINNEAPOLIS, MN 55404-1431 L MARTIN & DONNA R JONES 7321 DOGWOOD EXCELSIOR, MN 55331-8015 ALAN H & KAREN L DIRKS 7431 DOGWOOD EXCELSIOR, MN 55331-8013 PETER T & DEANNA 0 BRANDT 7570 DOGWOOD RD EXCELSIOR, MN 55331-8053 DANIEL J & KAREN A HERBST 7640 CRIMSON BAY RD CHASKA, MN 55318-9603 RICHARD A & DARLENE J HANSON 7750 CRIMSON BAY RD CHASKA, MN 55318-9623