Parking lot enhancementsPlehal Blacktopping, LLC 12414 Hwy 41 Frontage Rd P/ 952-445-7676 PO Box 317 F/ 952-445-7682 Shakopee MN 55379 www.plehal.com Submitted To: Project: Dakota Retail 190 Lake Dr E Chanhassen, MN Klasic Property Services 905 Jefferson Ave Unit 101 St. Paul, MN Phone: Cell: Email: Description: Parking Lot Enhancements Price Excavation, Pipe, & Base Installation Install inlet protection 3 at $250.00 each if required. $750.00 Tree protection fence 260 feet at $2.75 per foot. $715.00 Install silt fence and bio-logs 990 feet at $2.75 per LF. $2,722.50 Remove trash pad, curb, asphalt, concrete, saw cutting, storm, 6 trees, bushes and 1-light pole footing. (Light pole and disconnect by others) $25,420.00 Install 2 catch basin and storm pipe including material, export and import. $19,226.00 Dig trash enclosure. $1,895.00 Backfill trash enclosure. $2,660.00 Export soil 14 CY at $19.00 per CY. $266.00 Supply class 5 base 18 tons at $25.00 per ton. $450.00 Grade site, load out excess soil and place class 5 base. $11,885.00 Export soil 238 CY at $19.00 per CY. $4,522.00 Supply class 5 base 324 tons at $25.00 per ton. $8,100.00 Finish grade green area. $2,583.00 Supply tops soil borrow for green area 42 CY at $36.00 per CY. $1,512.00 Concrete Install 680 Lf of B612 Curb & gutter, 300 Sf 6” NRF trash slab, 400 Sf 4” NRF patio, 320 Sf 8” NRF Driveway, 330 Sf 7” NRF HD paving, 460 Sf 4” NRF sidewalk. $34,800.00 Asphalt Install 2” (compacted) of MN/Dot spec MV3 Base course, apply tack coat, and install 2” (compacted) MV4 wear course. (657 SY) $24,920.00 Stripe all pavement markings per plan. $500.00 Staking- Mark control points, back of curb and trash enclosure. Allowance: $3,000.00 Total: $145,926.00 *Excludes permitting, traffic control, survey, private locates, testing, winter conditions, irrigation repairs, landscaping, lighting and electrical, signage, utility conflicts, winter conditions. *Based on completing each phase in one mobilization. Additional mobs $1,500 ea. Plehal Blacktopping, LLC 13060 Dem Con Drive P/ 952-445-7676 PO Box 317 F/ 952-445-7682 Shakopee MN 55379 www.plehal.com Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman’s Compensation Insurance. Estimator: Erik Anderson Cell: 612-919-2235 Email: e.anderson@plehal.com This proposal may be withdrawn by us if not accepted within 15 days. All depths are average and measurements are approximate. All material is guaranteed to be as specified. All work is to be completed in a workmanlike manner according to standard practices. See additional contract terms on reverse. ________________________________ ______________ Authorized Plehal Blacktopping Signature Date Payment Terms: Net due upon completion. Past due invoices will be charged 1½% per month Finance Charge (18% annual percentage rate). Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. The general provisions on the back of this contract are made a part of this contract and incorporated herein by this reference. You are authorized to do the work as specified. Payment will be made as outlined. ________________________________ ______________ Signature Date 3/22/22 TERMS OF CONTRACT CHANGE ORDERS: Any alteration or deviation from the specifications listed on the forefront that involve extra costs will be executed only upon written orders and will become an additional charge over and above the original estimate. If undesirable base is discovered in a remove and replace scope of work or more than three inches of asphalt are found during the removal work, you will be notified of the extra cost involved to bring the base to asphalt paving standards. This will be an extra charge over the original proposal amount. Plehal Blacktopping, LLC will not be responsible for pavement failure and will be paid as proposed if no corrective measures are authorized. GENERAL EXCLUSIONS: Bonds, permits, testing, engineering and surveying. Removal of hazardous materials or unforeseen sub -terrain. Damage to unmarked electric, sewer, water, irrigation systems, building foundation, or telephone/cable TV lines located on or near the construction area. Damaged grass or tree root systems, sod restoration, removal of waste caused by others. It will be at no expense to the contractor to move or tow vehicles in the construction zone after the job has been scheduled. If area is not accessible due to any of these exclusions, a re-mobilization charge will be assessed. Any increase or decrease, greater than 5% is subject to re-bid. Field measurements prevail. At times our work requires crossing over existing concrete walks, aprons and/or slabs and assume it will support our equipment. We are not responsible for damage done (i.e. cracking, etc.). We are required by law to locate all public utilities prior to any construction activity. Unless advised by an owner, we will not be responsible for damage to private underground utilities on private property (i.e. dog wires, sprinkler systems, yard lights, etc.). WARRANTY: Plehal Blacktopping, LLC guarantees all our new driveways for a minimum of two years against chuckholes, breakup and excessive cracking due to faulty installation of materials. Reflective cracks, thermal expansion and contraction cracks, and cracks caused by underground wires, pipes or tree roots are not covered. We cannot guarantee a 100% uniform appearance to the asphalt surface. Aggregate segregations, seams between passes and hand work all impact the finished product. We make every effort to minimize those transitions. WARRANTY EXCLUSIONS & OWNER RESPONSIBILITIES: • No guarantee against erosion, settlement or sinking. • Complete drainage of surface water will not be guaranteed for surfaces having less than 2% grade. • No warranty against damage done by vegetation growth, gas, oil/chemical spills or by large veh icles in excess of design capacity. • Owner is responsible for any necessary lawn grading, backfilling of edges or re-seeding after installation unless specifically included in proposal. • The edges of your asphalt are not guaranteed against invasion by grass or weeds. Grass and weeds will grow through the edges of the asphalt if not properly maintained. You are responsible for keeping grass/weeds away from the edges of the asphalt by using a grass/weed control killer. • No guarantee for damage done by placement of sharp or pointed objects such as bicycle kick stands, chair legs, tables, high heeled shoes or ladders to name a few. This can be prevented by placing a piece of plywood underneath the object. • Don’t allow large heavy vehicles in your driveway. Chances are the base has not been designed for it. • Don’t turn the wheels of your car sharply while the car is standing still as this will scuff the surface and may cause “ravel” (loose aggregate) areas in your driveway. Start the car and while moving, gradually turn the wheels as the car is in motion. Scuffing may also occur due to vehicle tires exceeding an acceptable turning radius (SUVs, all - wheel drive and 4-wheel drive vehicles in particular). FAILURE TO PAY: The failure to pay all amounts owed to Plehal Blacktopping, LLC upon completion of the work (unless otherwise stated in this contract) shall constitute a material breach of this contract. Upon such breach, the purchaser shall be lia ble to Plehal Blacktopping, LLC for all costs incurred in collecting the amount owed including collection agency/atto rney’s fees and interest at the rate of 1½% per month (18% annual percentage rate). If payment is not received in full within 90 days, then any and all warranty rights are waived, without Plehal Blacktoppin g, LLC waiving any of its lien rights.