RPBCWD Permit 2022-046_10262022 Riley-Purgatory-Bluff Creek Watershed District 18681 Lake Drive East Chanhassen, MN 55317 Tel: (952)807-6885 PERMIT 2022-046 Expiration Date 10/26/2023 Pursuant to the rules of the Riley-Purgatory-Bluff Creek Watershed District, permission is hereby granted to the applicant named below to conduct the activity described below: 1. Applicant Information Property Owner Name: Klasic Property Point of Contact (if different): Dario Klasic Mailing Address: 905 Jefferson Ave Unit 101 City: St Paul State: MN Zip: 55114 Email Address: Dario@klasicpropertyservices.com Phone: 1 (651) 356-6226 Fax: Engineer/Designer: Mike Brandt – Kimley Horn Phone: 1 (651) 645-4197 Fax: Mailing Address: 767 Eustis Street Suite 100 City: St Paul State: MN Zip: 55114 Email Address: mike.brandt@kimley-horn.com 2. Project Information Project Name: Dakota Retail PID: 252410010 Address: 190 Lake Drive East City: Chanhassen State: MN Zip: 55317 Description: The proposed development consists of improving site access, adding parking stalls, landscaping, and an underground stormwater management BMP for the existing ±8,000 square foot multi-tenant building. Date of RPBCWD Approved Plans and Specifications: 05/24/2022 Date of RPBCWD Approved H&H and WQ Models: 05/24/2022 3. Permit Authorized ✓ B: Floodplain Management ✓ C: Erosion Prevention & Sediment Control  D: Wetland and Creek Buffers  E: Dredging and Sediment Removal  F: Shoreline/Streambank Stabilization  G: Waterbody Crossings  H: Appropriation of Public Waters ✓ J: Stormwater Management 4. Contractor Information Individual Responsible for EPSC: To be determined Phone: Email: Contractor: To be determined Phone: Email: Page 2 D:\Draft Permits\RPBCWD Permit 2022-046_10262022.docx 5. Inspections EPSC BMP Installation Date: Inspector Signature: Stormwater BMP Installation Date: Inspector Signature: Topsoil Inspection Date: Inspector Signature: Decompaction Testing Date: Inspector Signature: Final Stabilization (site stabilized with 75% cover of requisite species composition) Inspector Signature: Email Mat at mnicklay@rpbcwd.org at least 72 hours prior to inspection to schedule 6. Close-out Items (all items may not be applicable to every permit) Close-out Item Description and Date of materials Demonstrate vegetative cover consisting of a uniform perennial vegetation with a density of 75 percent laboratory testing and/or gradations of key stormwater materials (including but not limited to iron enhanced sand, washed sand, riprap, filter media, angular storage stone, etc.), pumping and irrigation tests (as applicable) construction and completion photos monitoring data, if required 1As-built/record drawings must be signed by a professional engineer licensed in Minnesota and include: 1. the surveyed bottom elevations, water levels, and general topography of all facilities; 2. the size, type, and surveyed invert elevations of all stormwater facility inlets and outlets; 3. the surveyed elevations of all emergency overflows including stormwater facility, street, and other; 4. other important features to show that the project was constructed as approved by the Managers and protects the public health, welfare, and safety. 5. the surveyed minimum floor elevations and low building opening elevations of constructed structures; 6. the required minimum floor elevations for all lots and unbuilt structures; and All surveys must be certified by a Minnesota registered land surveyor or engineer. 2Documentation that constructed infiltration and filtration facilities perform as designed Documentation that disturbed pervious areas have been decompacted 1 IMPORTANT: This includes all underground facilities. 2 This may include infiltration testing, flood testing, or other with prior approval from RPBCWD Page 3 D:\Draft Permits\RPBCWD Permit 2022-046_10262022.docx This Permit is granted subject to the following General Requirements: 1. Construction must be consistent with the plans, specifications, and models that were submitted by the applicant that were the basis of permit approval and the criteria listed for the rules under which the permit is authorized in section 3. The date(s) of the approved plans, specifications, and modeling are listed on the permit. The grant of the permit does not in any way relieve the permittee, its engineer, or other professional consultants of responsibility for the permitted work. 2. The grant of the permit does not relieve the permittee of any responsibility to obtain approval of any other regulatory body with authority, except as may be provided under Minnesota Department of Natural Resources General Permit 2015-1192, compliance with which, if applicable, is entirely the responsibility of the permittee. 3. The issuance of this permit does not convey any rights to either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state, or local laws or regulations. 4. In all cases where the doing by the permittee of anything authorized by this permit involves the taking, using or damaging of any property, rights or interests of any other person or persons, or of any publicly owned lands or improvements or interests, the permittee, before proceeding therewith, must acquire all necessary property rights and interest. 5. The permit is transferable only with the approval of RPBCWD (please see RPBCWD Rule A). RPBCWD’s determination to issue this permit was made in reliance on the information provided by the applicant. Any substantive change in the work affecting the nature and extent of applicability of RPBCWD regulatory requirements or substantive changes in the methods or means of compliance with RPBCWD regulatory requirements must be the subject of an application for a permit modification to the RPBCWD. 6. In accepting this permit, the permittee grants access to the site of the work subject to the permit at all reasonable times during and after construction to authorized representatives of the RPBCWD for inspection of the work authorized by the permit. 7. In accepting this permit, the permittee and their assigns acknowledge that will abide with the criteria applicable to the rule(s) to which the project is subject to. 8. All work subject to the permit must be completed on or before the date specified in the permit. The permittee may request that RPBCWD extend the valid period of the permit by submitting a request in writing prior to the expiration date stated in the permit. (Please see RPBCWD Rule A, section 5.) Authorized RPBCWD Signature: Title: Date: Administrator 10/26/2022