Loading...
Certified Metes and Bounds Resolution2023-111 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 23, 2023 RESOLUTION NO: 2023-11 MOTION BY: McDonald SECONDED BY: Kimber A RESOLUTION APPROVING A METES AND BOUNDS SUBDIVISION SCHUTROP BUILDING & DEVELOPMENT, 6730 GOLDEN COURT WHEREAS, Schutrop Building & Development has requested approval of a metes and bounds subdivision creating two single-family lots on property in Chanhassen described as: The north 240 feet of the south 674 feet of the west 215 feet of the Northwest Quarter of the Southeast Quarter of Section 2, Township 116 North, Range 23 West, Carver County, Minnesota, Excepting therefrom the following: Commencing at the southeast corner of said property; thence northerly along the easterly line of said property, for a distance of 55.2 feet to the true point of beginning; thence southerly along said easterly line to the southeast corner of said property; thence westerly along the southerly boundary of said property for a distance of 25 feet; thence northeasterly to the true point of beginning; and WHEREAS, the property is guided for Residential Low Density use; and WHEREAS, the property is zoned Single-Family Residential district, RSF; and WHEREAS, the proposed metes and bounds subdivision complies with all requirements of the Chanhassen City Code; and WHEREAS, the proposed metes and bounds subdivision adequately provides for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by the city; and WHEREAS, the proposed metes and bounds subdivision is consistent with the Chanhassen Comprehensive Plan and Zoning ordinance. NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves a metes and bounds subdivision consisting of two tracts, Parcels A and B, subject to the following conditions of approval: Building: 1. A building permit must be obtained prior to demolishing any structures on the site and before beginning any construction on the site. 2. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review. DocuSign Envelope ID: 637CC4E8-E2E0-4F08-A315-2EE7FC9D0BB7 2 3. Retaining walls (if present) more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construction. Retaining walls (if present) under four feet in height require a zoning permit. Engineering/Water Resources: 1. Public drainage and utility easements shall be recorded prior to, or concurrently with, the recording of the subdivision in accordance with the Proposed Property Division plan drafted by Demars-Gabriel Land Surveyors, Inc., dated August 16, 2022. 2. The applicant shall enter into an encroachment agreement for the existing retaining wall within Golden Court right-of-way abutting Parcel A prior to, or concurrently with, the recording of the subdivision and public easements. All other encroachments within public easements will be reviewed at the time of building permit reviews. 3. A security in the amount of $12,940.00 shall be provided for grading, site restoration, erosion control and wetland buffer re-establishment prior to the recording of the subdivision. 4. The applicant and their engineer must work with city staff in amending the construction plans, dated December 7, 2022, prepared by Kent E. Brander with Civil Methods, Inc. to fully satisfy staff concerns. Final construction plans will be subject to review and approval by staff prior to recording of the subdivision. 5. Prior to connecting to the existing service laterals, their serviceability shall be verified. For sanitary sewer, this shall be accomplished via CCTV which will be provided to the city’s Engineering Department for review prior to connection. 6. The development fees associated with this subdivision shall be paid prior to recording of the subdivision. Fees are based on rates in effect at the time of recordation and for 2022 they total $19,080.02, and are enumerated as such: a. Partial hookup fees: a Water Hook-Up of $2,563.00 and a Sewer Hook-Up of $691.00 b. Surface water development fee: $10,026.02 c. Park dedication fee: $5,800.00 7. The applicant shall update the Operations and Maintenance plan based on city comments and enter into an Operations and Maintenance Agreement for the privately owned stormwater facilities onsite which shall be recorded prior to the recording of the subdivision. 8. The conservation easement shall be changed to a drainage and utility easement. 9. The applicant must submit a wetland buffer landscaping plan as defined in Sec. 20-412(h). 10. The buffer landscaping plan including permanent buffer monuments must be approved by the water resources engineer and installed with the project. DocuSign Envelope ID: 637CC4E8-E2E0-4F08-A315-2EE7FC9D0BB7 3 11. A security in the amount of $2,900 shall be provided for onsite Best Management Practices (BMP) construction and close out prior to the recording of the subdivision. The security shall be released when as-builts are approved and the BMP/site is approved by the water resources engineer as constructed per plan. Environmental Resources: 1. Tree preservation fencing must be installed at the dripline or the furthest point possible from the trunk around trees #94, #95, and #180. 2. If trees #94, #95, or #180 are damaged or removed due to construction, they must each be replaced with a 2.5-inch overstory shade tree or 8-foot high conifer. Parks & Recreation: 1. Park Dedication fees in the amount of $5,800 shall be paid prior to recording the subdivision. Planning: 1. The existing driveway on Parcel A shall be removed and the existing driveway on Parcel B shall be brought into compliance with Section 20-1122 of the City Code. An escrow of 110% of the estimated removal cost for the required sections of the existing driveway must be received prior to recording, and the required sections of the existing driveway must be removed within six months of the approval of this subdivision. And adoption of the Findings of Fact and Decision. PASSED AND ADOPTED by the Chanhassen City Council this 23rd day January of 2023. ATTEST: Kim Meuwissen, City Clerk Elise Ryan, Mayor YES NO ABSENT Ryan Schubert McDonald von Oven Kimber DocuSign Envelope ID: 637CC4E8-E2E0-4F08-A315-2EE7FC9D0BB7