Loading...
Project NarrativeONLINEPICKUPONLYORDERDRIVETHRUPROPOSED RESTAURANT 3,050 SF FFE = 973.00 EXITONLYXXXX XXX9' 18' 12' 12' 26' 12' 9' 18' 60° 72.27' 9' CHANHASSENCHANHASSEN SITE KICKOFF | MAY 2,2023 CHANHASSEN, MN W 78th St and Kerber Drive Chanhassen, MN 55317 ONLINEPICKUPONLYORDERDRIVETHRUPROPOSED RESTAURANT 3,050 SF FFE = 973.00 EXITONLYXXXX XXX9' 18' 12' 12' 26' 12' 9' 18' 60° 72.27' 9' SITE KICKOFF | MAY 2,2023 Café Zupas Brandon Pfunder Edgar Cepuritis Travis Larsen 460 West Universal Cir Sandy, Utah 84070 (801) 878-4536 Phillips Edison c/o Andy Schneider aschneider@phillipsedison.com 513-746-2605 Quinn Gadow-Dev Dir 513-338-2735 Babcock Design David Plastow 52 Exchange Place Salt Lake City, Utah 84111 (801) 531-1144 Westwood Professional Services, Inc. Joseph Schramm 12701 Whitewater Drive, Ste 300 Minnetonka, MN 55343 (9/52) 937-5150 PHILLIPS EDISON & COMPANY 460 West Universal Circle Sandy, Utah 84070 801-878-4536 www.cafezupas.com Café Zupas – CUP (Conditional Use Permit) Statement of Compliance – Chanhassen, MN Café Zupas is looking to build a new, free-standing drive-thru restaurant on the pad of the West Village shopping center. The fast casual restaurant use is complimentary to the shopping center and compatible with the retail and restaurant uses in the area and the zoning district. The addition of the Café Zupas restaurant will not create any hazard or nuisance to the neighboring uses. Given the location in an existing shopping center, the site can supply the necessary services, including fire, police, trash and required utilities, and will not stress the system. Also, the new building will not be detrimental to the economic welfare of the community, providing a new, fresh, house-made food alternative. The use and design are in accordance with the city’s comprehensive plan and design standards and will be complimentary to the existing shopping center while also keeping with Café Zupas brand identity. Again, given the location in the existing West Village Shopping Center the new restaurant will not create additional traffic congestion in the area, rather it will allow the city to work with the owners to improve the flow into the existing center. This new Café Zupas restaurant will operate similarly to all the Café Zupas Drive Thru restau- rants and will not create conditions that are detrimental to the area is it relates to odors, trash, traffic, and we expect it will only have a positive impact to the community and the surrounding property values. The parking study dated Dec. 2022 shows that overall parking in the West Village Shopping Center is underutilized (see table 9, pg. 42) and the addition of a new build- ing with drive-thru would keep the parking demand below capacity. In addition to the Conditional Use approval Café Zupas is requesting consideration for a vari- ance as it relates to a design element for our building. We have designed a building that has variations in depth and height to make for a more interesting and attractive design. The east elevation proposes a small tower element that has a faux living wall and a painted element that says, “Nourish the Good Life”, a reference to our fresh, healthy, and house made offerings. This wall would otherwise be a large blank surface and with the design element presents a more complete presentation. While this painted element is not signage, per the Chanhassen code it will be considered a sign and therefore be more than what we would be permitted. It is for this painted element that we are requesting the variance. We do feel that this request will make for a more attractive design and will be in harmony with the area and the West Village Shopping Center.