Loading...
Narrative Lifetime Life Time Chanhassen Pickleball Addition Development Plan Project Narrative May 19, 2023 INTRODUCTION The purpose of this request is for site plan approval for the development of a Life Time Pickleball facility in Chanhassen, MN. This facility would include 8 indoor and 6 outdoor courts located southwest of the Life Time Athletic Club and Corporate Campus, directly across from Life Time’s Corporate 3 Building. As shown in the graphic below, the current improvements on site consist of a paved asphalt parking lot constructed in 2019. The Site is currently zoned PUD with indoor recreation/health club as a permitted use. Life Time is not at this time requesting any change or variance to zoning or permitted land use. SURROUNDING CONTEXT The site lies within the Arboretum Business Park PUD located East of Highway 41 and south of Highway 5. To the north is Life Time’s Athletic Club, and corporate headquarters. To the west of the site lies the 1,200 acre Minnesota Landscape Arboretum. To the east and south are offices, light industrial, daycare facilities and commercial buildings.67th Ave SITE PLAN The proposed Life Time Pickleball facility will consist of an approximate 26,000 square foot precast building with the entry oriented to the east. Located to the west of the building will be an additional 6 fenced outdoor pickleball courts with lounge area accessed from the building. Outdoor courts, and the walking path will be lighted from dusk until closing. Additional site features will include landscaping, a surface filtration pond BMP and a screened ground level mechanical HVAC area. Accessible sidewalks will encompass the east side of the building, between the parking lot running north and south, and connect to the existing walking path from the Club on the northern side of the lot. During operating hours, Life Time staff will be on site to handle check in and operations. Parking All parcels within the Life Time campus are part of a shared parking agreement. Development of the site shall include repaving and restriping of the impacted parking lot, where affected by construction activity and utility installation. SSTS, LLC conducted a traffic and parking memo on behalf of Life Time. The memo has been included with the application submittal documents. Parking requirements per Chanhassen City Code require a total of 48 stalls. Parking demand is anticipated to be handled by the existing main corporate and club lot to the north, and with the adjacent corporate 3 building lot. No additional parking area is anticipated to be constructed due to the available capacity of parking between these lots, however a set number of corporate 3 parking stalls shall be signed and striped accessible for pickleball use only. Existing Stairway/ Connection to Club BUILDING This proposed 26,000 sf building will feature reception, changing & restrooms, lockers, lounge area and 8 indoor pickleball courts. The building will be constructed to match similar styles to the nearby buildings. The final building roof height will be kept under 30’ to satisfy the aerial fire apparatus rules and will be fire accessible from the parking lot. Life Time is currently working with several precast manufacturers and anticipates having additional renderings and building samples available for the city to review at a later date. Design Guidelines The exterior finishes of the proposed building will of high quality and will be in compliance with the Arboretum Business Park Development Design Standards. A continuous masonry base is proposed on all four sides and will vary in height from 6’ to 8’. Exposed precast concrete panels will be acid-etched to provide texture and will feature integral coloring with earth-tone consistent with the Life Time typical brand finish palette. The large expanses on the east and west facing elevations will be broken up with accent color portions and artificial green wall elements. The roof line will be adorned with a projecting cornice element and will vary in height on the east and west façade to add architectural interest and break up the long expanse. The interior use: the Pickleball, is not conducive to daylighting and solar glare. Life Time members expect a certain playing environment, with consistently colored background fields, free from distractions for improved visibility of the ball. For these reasons the fenestration is proposed at the main building entry, access doors to outdoor courts and the north and south ends of the building. Signage Wall signs are proposed on the east, west and south facing facades. The east and west elevations exceed 4,500 SF; the signage on each side is proposed to be at or under the 275 sf maximum allowed. The south facing elevation is approximately 2,600 sf the proposed sign on this façade will be at or under the allowed 182 SF (7%) per Municipal Code. CLOSING Due to the enormous popularity of pickleball over the last few years, and the growing demand for court availability, Life Time’s goal is to have this facility open and operating by the end of the year, following both the schedule of approvals for the City and the watershed. Attached to this narrative you will find an application for development review, draft construction plans, details and building elevations. Life Time anticipates having supplemental information available in the coming weeks to support our application. If there are any questions, comments or concerns please feel free to contact us. Gage Thompson, PE Engineering Manager Life Time Real Estate & Development C 612.219.8309