CAS-09_BLUFF CREEK WOODS-7331 HAZELTINE BOULEVARD 25-00904000 mn m V ENSlHftl
..__
Construction Plans
For
BLUFF CREEK WOODS
Chanhassen, Minnesota
CITY OF CHANHASSEN
RECFIVED
aT
JUL 2. 6 2013
r"'£1$1pq
DEVELOPER: CIVIL ENGINEER:
CHANHASSEN PUNNING DEPT
MNQH.�.
r a g
Ryan
Marty Schutrop Engineering
540 Lakota Lane^
Chaska, MN 55318
5elmorn(
(952) 470-9400 E19655
x�c IAN 55 71
(952) 20-3700
oon«To.N
"w
......,ew......a„
SLUFF CREEK WOODS
REVISED SUSMRTAL 7126113
SITE
cats
INDEX
T
SHEET NO. OCSCFI
COKF SN 5NEE
PLAN
C-I 44AOrr
RECEIVED
LAN
C-XTAS
C-J OETAttS
JUL 2 6 2013
CITY OF CHANHASSEN
• a a ;t�
a�
\ a�
%l \ y41 \\
Z9 '�i �• � II
D Raz
5
a� €
'It ME
Fj j rMS, 111
M-7409\� Y':r I'
� �
�•, 11 I A
2O
1
a i
I
`
r�lO
p
2
�
Z
n
t� I
Y.
p
0D
pm
N
f f
_s
xda i
a
qiT
33
:9 �Y6�TG pE
^
R
a�
gpq'L R
�pe`zM €Fa
5
S
FF aE pill E
m
IYd€ V ya
oil!
3
R
3 � u
flt��'irp:d
q
's' 3};eE s 8
15
mn z
3��>
S3?'a;
®
itL:nES6
Y y
R <
p
ig
6 4
S
A
L ]
q
T
3
1
$6 •t 3tt 1 fill,
# 1 k F pz
E �R •epf, � ! ��it a I'EI!§ �_ 1NF�i
i e
•vv��IIF'��Fg^iF!
i.a4 ;Ei T•ap
q
}p
a �aa S'Rgg
3
gg
5
��5�9 �yd•Y iPjf
tE
R
n
Q
�s
�•a�1�1� q^£a
e •
y�
5
i x(§
3
�NR
SaEo5t¢ o
s yyY
14
lggp"p
,
A
a
ny m D
O
=� v
5
Om
7
\
�C
R an
yEngineering
LAND DEVELOPMENT SERVICES
July 26, 2013
Re: Bluff Creek Woods
Chanhassen, MN
Drainage Calculations
19655 Waterford Place
Excelsior, MN 55331
Tel 952-221-3700
Per discussions with Terry Jeffery, City Water Resources Coordinator, the proposed
development will need to propose infiltration basins sufficiently designed to capture a'h" rain
event over the new impervious surface. No additional storm water detention will be required due
to the open space and the Outlot A proposed.
Impervious Surface per new lot:
50'x60' Pad = 3,000 square feet gross, typical home use 2,500 square feet
Driveway = 2,000 square feet
4,500 square feet X '/2" = 187.5 cubic feet.
Average Infiltration Pond depth of 1 foot =187.5 square feet pond area
RYAN ENGINEERING
4
Perry M. Ryan, P.E.
President
CITY OF CHANHASSEN
RECEIVED
JUL 2 6 2013
CHANHASSEN PLANNING DEPT
I
June 14, 2013
Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Re: Preliminary Plat for Bluff Creek
Woods
Planning Case #2013-09
Dear Mr. Schutrop:
Todd IVAII/Alvson/Terry/Jerry MJMark:
BLUFF CREEK WOODS FINAL PLAT is scheduled for
the August 26, 2013 City Council meeting.
Please review the conditions of approval in this letter
with the attached plans and respond to Bob no later than
Friday. August 9.2013. Respond to each condition as
follows:
• Still applies
• Does not apply or has been met
• Is modified as follows (include modification)
• New condition
This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the
Rezoning of the property from Agricultural Estate District (A-2) to Single -Family Residential
District (RSF); PreliminaryPlat with Variances for a neck lot and the construction of a private
street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
1. At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for j
approval.
`2 Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
oe3. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms
are available from MnDOT's utility website at hqV://www.dot.state.mn.us/utility/.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2.
The common lot line between Outlot A and Lot 1 shall be shifted 15 feet to the southwest.
G
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. The proposed grading plans shall be amended to show
how the lots may be developed.
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
Martin Schutrop
June 14, 2013
Page 2
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot 1 shall share a common drive with Lot 2 until the existing
hammerhead.
9. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
12. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
15. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed.
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
17. The developer shall work with staff to realign the access to Lot 1.
18. The developer must provide proof that the common portion of the driveway to Lots 1 and 2
meets a 7-ton design.
19. If the existing driveway does not meet the 7-ton design standard, the developer must install
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification.
20. The driveway easement shall be recorded as a separate document; all references to the
driveway easement shall be removed from the preliminary plat.
21. The grading plan must be revised so that the grades do not exceed 3H:1 V.
Martin Schutrop
June 14, 2013
Page 3
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
24. The sewer and water service connections must be inspected and approved by the City.
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
26. Lots 1 and 3 will be subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance
with the City Code at the rate in effect at the time.
Final plat documents must be submitted to the City 30 days prior to the City Council meeting in
which you wish to have your final plat approved. Conditions of the preliminary plat approval
must be addressed for final plat approval. Enclosed is the list of items required for submittal for
final plat approval.
Should you have any questions, please contact me at (952) 227-1131 or by email at
bgenerousAci.chanhassen.mn.us.
Sincerely,
Robert Generous, AICP
Senior Planner
Enclosure
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Perry Ryan, Ryan Engineering
9dplant2013 planning casest2013-09 bluff creek woods\approval letter prelim plat for final plat review.doc
4-
June 14, 2013
Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Re: Preliminary Plat for Bluff Creek
Woods
Planning Case #2013-09
Dear Mr. Schutrop:
Todd H/Jill/Alvson/Terrv/Jerry MJMark:
BLUFF CREEK WOODS FINAL PLAT is scheduled for
the August 26, 2013 City Council meeting.
Please review the conditions of approval in this letter
with the attached plans and respond to Bob no later than
Friday, August 9, 2013. Respond to each condition as
follows:
• Still applies
• Does not apply or has been met
• Is modified as follows (include modification)
• New condition
This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the
Rezoning of the property from Agricultural Estate District (A-2) to Single -Family Residential
District (RSF); PrefiminaryPlat with Variances for a neck lot and the construction of a private
street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
1. At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
3. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms
are available from MnDOT's utility website at hW://www.dot.state.mn.us/utility/.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2,
The common lot line between Outlot A and Lot 1 shall be shifted 15 feet to the southwest.
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. The proposed grading plans shall be amended to show
how the lots may be developed.
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
Martin Schutrop
June14,2013
Page 2
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot 1 shall share a common drive with Lot 2 until the existing
hammerhead.
9. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
12. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
4;u •"u P-s
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
15. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed.
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
17. The developer shall work with staff to realign the access to Lot 1.
18. The developer must provide proof that the common portion of the driveway to Lots 1 and 2
meets a 7-ton design.
19. If the existing driveway does not meet the 7-ton design standard, the developer must install
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification.
20. The driveway easement shall be recorded as a separate document; all references to the
driveway easement shall be removed from the preliminary plat.
21. The grading plan must be revised so that the grades do not exceed 3H:IV.
M
~ Martin Schutrop
June 14, 2013
Page 3
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
24. The sewer and water service connections must be inspected and approved by the City.
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
26. Lots 1 and 3 will be subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance
with the City Code at the rate in effect at the time.
Final plat documents must be submitted to the City 30 days prior to the City Council meeting in
which you wish to have your final plat approved. Conditions of the preliminary plat approval
must be addressed for final plat approval. Enclosed is the list of items required for submittal for
final plat approval.
Should you have any questions, please contact me at (952) 227-1131 or by email at
bRenerous(a),ci.chanhassen.mn.us.
Sincerely,
Robert Generous, AlCP
Senior Planner
Enclosure
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Perry Ryan, Ryan Engineering
gdp1an12013 planning cases\2013-09 bluff creek woodslapproval letter prelim plat for final plat review.doc
June 14, 2013
Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Re: Preliminary Plat for Bluff Creek
Woods
Planning Case #2013-09
Dear Mr. Schutrop:
Todd H/Jill/Alvson/Terry/Jerry MJMark:
BLUFF CREEK WOODS FINAL PLAT is scheduled for
the August 26, 2013 City Council meeting.
Please review the conditions of approval in this letter
with the attached plans and respond to Bob no later than
Friday, August 9.2013. Respond to each condition as
follows:
• Still applies
• Does not apply or has been met
• Is modified as follows (include modification) /
• New condition
This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the
Rezoning of the property from Agricultural Estate District (A-2) to Single -Family Residential
District (RSF); PreliminaryPlat with Variances for a neck lot and the construction of a private
street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
2. Park fees shall be collected in fill for the two new homes at the rate in force upon final plat
submission and approval.
3. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms
are available from MnDOT's utility website at http://www.dot.state.nm.us/utility/.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2.
The common lot line between Outlot A and Lot 1 shall be shifted 15 feet to the southwest.
A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. The proposed grading plans shall be amended to show
how the lots may be developed.
- A
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
�eA
tWp\\�:
okF�06
Martin Schutrop
June 14, 2013
Page 2
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot I shall share a common drive with Lot 2 until the existing
hammerhead.
9. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the \
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
12. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
5. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed.
CMNC4 . he s
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
17. The developer shall work with staff to realign the access to Lot 1.
sii II o..Q P11es o
18. a common portion of the driveway to Lots I and 2
is dnMacdl dvri`� Cd1nSdYUG.t1Dn i+NWts}'i�Lrt(kwcol wi'f1�"v�nir�iivutsK 30
19. If the existing driveway dL not meet the 7-ton design standard, the developer must install d- 6iAlvw;01A
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification. !ems no} 0�fP
20. The driveway easement shall be recorded as a separate document;
shall he removed fiem the prelitninary rw-
21. The grading plan must be revised so that the grades do not exceed 3H:IV.
51A applies
Martin Schutrop
June 14, 2013
Page 3
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
5-►'t It Q.IDp a �5
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed. 5tjll ��liCf
24. The sewer and water service connections must be inspected and approved by the City.
Sf7/( Qy�eS
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
4rrE
26. Lots 1 and 3 walllresub'ect to the City sewer and water hook - c r e 4 d the
r '1 l Y stWtY r welt/ hoJkcy�
tit V ptk i_ i f r
Mod Metropolitan Council Sanitary Access Charge.',
�`I�Sr a, i th tl�e �'' �' a r rl, r ff r r rh r' Q`rG dare W t't►�`I� fn �-L (Jlcc# U1 ��
7o 7. due Fui ldi Pub aill-era L iL1
Final plat documents musf be submitted to the City 30 days prior to the City Council meeting ine ge—ck -
which you wish to have your final plat approved. Conditions of the preliminary plat approval
must be addressed for final plat approval. Enclosed is the list of items required for submittal for
final plat approval. -flt 0UYj0-LLrLt0UL
Should you have any questions, please contact me at (952) 227-1131 or by email at (,t11� 4Q- 7 1
beenerousna ci.chanhassen mn.us. P�Qt IS
Sincerely, 1
yJ AC Z uni is K l8 l 8� wni� ` 3li 3�
SAC-: Z„A.nittx f (ySl�ttrut= /3aL
Robert Generous, AICP
Senior Planner
Enclosure
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Perry Ryan, Ryan Engineering
g:\plan\2013 planning cases\2013-09 bluff creek woods\approval letter prelim plat for final plat reNdew.doc
MEMORANDUM
TO: Bob Generous
FROM: Jenitt Mohn, Building Official
DATE: July 30, 2013
SUBJ: Request to Rezone 3.57 acres of property from Agricultural Estate
District (A-2) to Single -Family Residential District (RSF); Subdivision
with Variances for the construction of a private street; and a Conditional
Use Permit to allow development within the Bluff Creek Overlay
District. Property is located 7331 Hazeltine Boulevard. Applicant:
Martin Schutrop.
Planning Case: 2013-09
I have reviewed the plans for above project and offer the following comments,
which should be included in the conditions of approval:
1. The developer must submit a proposed street name for review and approval
prior to final plat of the property.
2. Provide a 1:200 scale plat drawing.
3. Demolition permits must be obtained before demolishing any structures on the
site.
4. A final grading plan and soils report must be to the Inspections Division before
permits can be issued.
5. Retaining walls over four feet high require a permit and must be designed by a
professional engineer.
6. Each lot must be provided with separate sewer and water services.
7. The developer and or their agent shall meet with the Inspections Division as
early as possible to discuss plan review and permit procedures.
GAPLAM2013 Planning Cases\2013-09 Bluff Creek Woods%uildingofficialcom mt2.doc
y
June 14, 2013
Martin Schutmp
540 Lakota Lane
Chaska, MN 55318
Re: Preliminary Plat for Bluff Creek
Woods
Planning Case #2013-09
Dear Mr. Schutrop:
Todd H/JUUAlyson/Terry/Jerry MJMark:
BLUFF CREEK WOODS FINAL PLAT is scheduled for
the August 26, 2013 City Council meeting.
Please review the conditions of approval in this letter
with the attached plans and respond to Bob no later than
Friday. August 9.2013. Respond to each condition as
follows:
• Still applies
• Does not apply or has been met
• Is modified as follows (include modification)
• New condition
This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the
Rezoning of the property from Agricultural Estate District (A-2) to Single -Family Residential
District (RSF); PreliminaryPlat with Variances for a neck lot and the constriction of a private
street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
3. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms
are available from MnDOT's utility website at htto://www.dot.state.mn.us/utility/.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2.
The common lot line between Outlot A and Lot 1 shall be shifted 15 feet to the southwest.
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. The proposed grading plans shall be amended to show
how the lots may be developed.
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
Martin Schutrop
June 14, 2013
Page 2
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot 1 shall share a common drive with Lot 2 until the existing
hammerhead.
9. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
12. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
15. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed.
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
17. The developer shall work with staff to realign the access to Lot 1.
18. The developer must provide proof that the common portion of the driveway to Lots 1 and 2
meets a 7-ton design.
19. If the existing driveway does not meet the 7-ton design standard, the developer must install
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification.
20. The driveway easement shall be recorded as a separate document; all references to the
driveway easement shall be removed from the preliminary plat.
21. The grading plan must be revised so that the grades do not exceed 3HA V.
Martin Schutrop
June 14, 2013
Page 3
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
24. The sewer and water service connections must be inspected and approved by the City.
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
26. Lots 1 and 3 will be subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance
with the City Code at the rate in effect at the time.
Final plat documents must be submitted to the City 30 days prior to the City Council meeting in
which you wish to have your final plat approved. Conditions of the preliminary plat approval
must be addressed for final plat approval. Enclosed is the list of items required for submittal for
final plat approval.
Should you have any questions, please contact me at (952) 227-1131 or by email at
benerous(a)ci.chanhassen.mn.us.
Sincerely,
Robert Generous, AICP
Senior Planner
Enclosure
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Perry Ryan, Ryan Engineering
gAplanQ013 planning cases\2013-09 bluff creek woodslapproval letter prelim plat for final plat review.doc
Liitfjn, Mark
From:
Littfin, Mark
Sent:
Wednesday, July 31, 2013 11:56 AM
To:
Generous, Bob
Subject:
Preliminary plat for Bluff Creek Woods, Planning case 2013-09
Robert, there are no changes or corrections from my original comments dated June 14", 2013. Thanks
9VarkLiton
Chanhassen Fire Marshal
7700 Market Blvd. PO box 147
Chanhassen MN. 55317
Direct 952.227.1151
Fax 952.227.1190
CITY OF CHANHASSEN
P O BOX 147
CHANHASSEN MN 55317
07/29/2013 1:10 PM
Receipt No. 00226160
CLERK: AshleyM
PAYEE: Schutrop Building and
540 Lakota Lane
Chaska MN 55318-
Bluff Creek Woods
Case # 2013-09
Development Corporation
-------------------------------------------------------
Final Plat 250.00
Total
Cash
Check 6522
Change
250.00
0.00
250.00
0.00
CITY OF CHANHASSEN
ENGINEERING DEPARTMENT
7700 Market Boulevard
P.O. Box 147
CHANHASSEN, MN 55317
(952) 227-1160 FAX (952) 227-1170
TO: Campbell Knutson
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
WE ARE SENDING YOU
❑ Shop drawings
❑ Copy of letter
LETTER ORRANSMITTAL
DATE JOB NO.
8/28/2013 n/a
ATTENTION
Carol Hoeft
RE:
1. Bluff Creek Woods plat, DC, etc
2. Jay Meyer subdivision 1611 West 63rd
Street
® Attached ❑ Under separate cover via the following items:
❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Change Order ❑ Pay Request ❑ Mylars
COPIES
DATE
NO.
DESCRIPTION
1
Final plat submittal checklist for Bluff Creek Woods ; r1 . m "5
1
8/28/2013
Grant of Permanent Easement Agreement from Jay and Debra
Meyer
THESE ARE TRANSMITTED as checked below:
❑
For approval
❑
For your use
❑
As requested
❑
For review and comment
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
® For recording
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
REMARKS Hi Carole- Please contace Nicole Taylor with Title Mark (Waconia) 952-442-7700 to arrange the release of
the Bluff Creek Woods mylars, DC, etc for filing.
COPY TO: Files
SIGNED:
Alysdh Fauske, (952) 227-1164
SCANNED,
k
has
if enclosures are not as noted, kindly notify us at once.
E
TO: CAMPBELL KNUTSON
ATTN: CAROLE HOEFT
317 EAGANDALE OFFICE CENTER
1380 CORPORATE CENTER CURVE
EAGAN, MN 55121
FROM: CITY OF CHANHASSEN
ENGINEERING DEPARTMENT
7700 MARKET BOULEVARD
PO Box 147
CHANHASSEN MN 55317
Enclosed are the following for recordation: n o1 rr.a� fi�
fie Final Plat Mylars no larger than 22" x 34" 7,, i1 " as %,09gtie� Cop
[f "�
Three, I" = 200' scale paper copy of the final plat (one copy each ? 'A
orounty
Auditor, Assessor and Surveyor)
P"'Signed Development Contract
G✓Mortgage Holder Consent to Plat
ID/Mortgage Holder Consent to the Development Contract i rn c-Lt-,op-ed 'L� C- dam" �Q
Y*Narranty deed (if deeding an outlot to the City)
' ❑ Easements!n nrwi,.v. u
IYO-Other: ® "-, • , : - -- - rdre2f'
b deveioper!s O-Wbrne�. Teti J W cG vnti5i-✓fe�liewf
[➢/A recent cop of the tale commitment. W°(N°�c`7�rim Yccordir�
tmw/ed to JOu o» si-w2o13
Copy of resolution approving final plat.
b 1e-+iNe-re-%s a dde,Jelz�prr RA- Ga,•�+o
w 12 0aloA- A -{D tot deeded JD -ice Ci t. b4 warrw did
The City of Chanhassen has received the following, as required:
Final Plat Mylars ("City Copy")
Vl" = 200' scale my�reduction of the final plat
C*�1" = 200' scale paper reduction of the final plat (with street names and lot and block
numbers only)
N1111Security:$ 11 t3')0,SS-
fear— Ccos1,�
&*"Cash fee: $ 9 3 ,'+70 t to P
.k ❑ Digital copy of the final plat in Axf and .tif formats (.pdf compatible) in Carver
County coordinates s1'i kl V\, cC
❑ Electronic Copy of Drainage Model sli tt ro-ca � i71C
Developerhas been notified that the following must be done before the plat can be filed:
Cy/r Current year property taxes must be paid in full and any delinquent property taxes or
green acres taxes must also be paid.
G:TNG\plat recording checklist.doc
0
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
BLUFF CREEK WOODS
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
TABLE OF CONTENTS
SPECIAL PROVISIONS
PAGE
1. REQUEST FOR PLAT APPROVAL............................................................................SP-1
2. CONDITIONS OF PLAT APPROVAL........................................................................SP-1
3. DEVELOPMENT PLANS............................................................................................SP-1
4. IMPROVEMENTS........................................................................................................ SP-2
5. TIME OF PERFORMANCE.........................................................................................SP-2
6. SECURITY....................................................................................................................SP-2
7. NOTICE.........................................................................................................................SP-3
8. OTHER SPECIAL CONDITIONS................................................................................SP-3
9. GENERAL CONDITIONS...........................................................................................SP-7
GENERAL CONDITIONS
1.
RIGHT TO PROCEED.................................................................................................GC-1
2.
PHASED DEVELOPMENT........................................................................................GC-I
3.
PRELIMINARY PLAT STATUS................................................................................GC-I
4.
CHANGES IN OFFICIAL CONTROLS.....................................................................GC-1
5.
IMPROVEMENTS.......................................................................................................GC-1
6.
IRON MONUMENTS..................................................................................................GC-2
7.
LICENSE......................................................................................................................GC-2
8.
SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2
8A. EROSION CONTROL DURING CONSTRUCTION
OF A DWELLING
OR OTHER BUILDING..................................................................................GC-2
9.
CLEAN UP...................................................................................................................GC-3
10.
ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3
11.
CLAIMS.......................................................................................................................GC-3
12.
PARK DEDICATION..................................................................................................GC-3
13.
LANDSCAPING..........................................................................................................GC-3
14.
WARRANTY...............................................................................................................GC-4
15.
LOTPLANS.................................................................................................................GC-4
16.
EXISTING ASSESSMENTS.......................................................................................GC-4
17.
HOOK-UP CHARGES.................................................................................................GC-4
18.
PUBLIC STREET LIGHTING.....................................................................................GC-4
19.
SIGNAGE.....................................................................................................................GC-5
20.
HOUSE PADS..............................................................................................................GC-5
21.
RESPONSIBILITY FOR COSTS................................................................................GC-5
22.
DEVELOPER'S DEFAULT.........................................................................................GC-6
22.
MISCELLANEOUS
A. Construction Trailers........................................................................................GC-6
B. Postal Service ....................................................................................................GC-7
C. Third Parties......................................................................................................GC-7
D. Breach of Contract...................................................... ..................................
....GC-7
E. Severability.......................................................................................................GC-7
i
F.
Building Permits...............................................................................................GC-7
G.
Waivers/Amendments.......................................................................................GC-7
H.
Release......................................................... .....................................................GC-7
I.
Insurance...........................................................................................................GC-7
J.
Remedies...........................................................................................................GC-8
K.
Assignability .....................................................................................................GC-8
L.
Construction Hours...........................................................................................GC-8
M.
Noise Amplification..........................................................................................GC-8
N.
Access...............................................................................................................GC-8
O.
Street Maintenance............................................................................................GC-8
P.
Storm Sewer Maintenance................................................................................GC-9
Q.
Soil Treatment Systems....................................................................................GC-9
R.
Variances...........................................................................................................GC-9
S.
Compliance with Laws, Ordinances, and Regulations.....................................GC-9
T.
Proof of Title.....................................................................................................GC-9
U.
Soil Conditions................................................................................................GC-10
V.
Soil Correction ................................................................................................GC-10
W.
Haul Routes..........................................................................................................GC-10
X.
Development Signs..............................................................................................GC-10
Y.
Construction Plans...............................................................................................GC-10
Z.
As -Built Lot Surveys...........................................................................................GC-11
ii
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
BLUFF CREEK WOODS
69'7:T1f3�1`LY[�1i�9
AGREEMENT dated August 26, 2013 by and between the CITY OF CHANHASSEN, a
Minnesota municipal corporation (the "City"), and, Marlin K. Schutrop and Kathleen M. Schutrop,
husband and wife (the "Developer").
1. Request for Plat Approval. The Developer has asked the City to approve a plat for
Bluff Creek Woods (referred to in this Contract as the "plat"). The land is legally described on the
attached Exhibit "A".
2. Conditions of Plat Approval. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with
the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat.
3. Development Plans. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may
be prepared, subject to City approval, after entering the Contract, but before commencement of any
work in the plat. If the plans vary from the written terms of this Contract, the written terms shall
control. The plans are:
Plan A: Final plat approved August 26, 2013, prepared by Advance Surveying &
Engineering, Co.
Plan B: Grading, Drainage and Erosion Control Plan dated August 26, 2013, prepared by
Ryan Engineering.
Plan C: Plans and Specifications for Improvements dated August 26, 2013, prepared by
Ryan Engineering.
Plan D: Landscape Plan dated August 26, 2013, prepared by Ryan Engineering.
SP-1
4. Improvements. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Water Drainage System
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading/Restoration
H. Underground Utilities (e.g. gas, electric, telephone, CATV)
I. Setting of Lot and Block Monuments
J. Surveying and Staking
K. Landscaping
L. Erosion Control
5. Time of Performance. The Developer shall install all required improvements by
November 15, 2014. The Developer may, however, request an extension of time from the City
Engineer. If an extension is granted, it shall be conditioned upon updating the security posted by
the Developer to reflect cost increases and the extended completion date.
6. Security. To guarantee compliance with the terms of this Contract, payment of
special assessments, payment of the costs of all public improvements, and construction of all public
improvements, the Developer shall furnish the City with a letter of credit in the form attached
hereto, from a bank acceptable to the City, or cash escrow ("security") for $11,33055. The amount
of the security was calculated as 110% of the following:
Site Grading/Erosion Control/Restoration $ 2,250.00
Sanitary Sewer and Water services $ 7,200•00
Sub -total, Construction Costs $ 9,450.00
Engineering, surveying, and inspection (7% of construction costs) $ 661.50
Landscaping (2% of construction costs) $ 189.00
Sub -total, Other Costs $ 850.50
TOTAL COST OF PUBLIC IMPROVEMENTS S 10,30050
SECURITY AMOUNT 110% of $10,300 50 $11,330.55
This breakdown is for historical reference; it is not a restriction on the use of the security. The
security shall be subject to the approval of the City. The City may draw down the security, without
notice, for any violation of the terms of this Contract. If the required public improvements are not
completed at least thirty (30) days prior to the expiration of the security, the City may also draw it
down. If the security is drawn down, the draw shall be used to cure the default. With City approval,
the security may be reduced from time to time as financial obligations are paid, but in no case shall
SP-2
the security be reduced to a point less than 10% of the original amount until (1) all improvements
have been completed, (2) iron monuments for lot comers have been installed, (3) all financial
obligations to the City satisfied, (4) the required "record" plans have been received by the City, (5) a
warranty security is provided, and (6) the public improvements are accepted by the City.
7. Notice. Required notices to the Developer shall be in writing, and shall be either
hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered
mail at the following address:
Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Phone: 612-480-8251
Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or
mailed to the City by certified mail in care of the City Manager at the following address:
Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317,
Telephone (952) 227-1100.
8. Other Special Conditions.
A. SECURITIES AND FEES
An $11,330.55 letter of credit or escrow for the developer -installed improvements, the $23,470.66
cash administration fee and the filly -executed development contract must be submitted and shall be
submitted prior to scheduling a pre -construction meeting. The cash fees were calculated as follows:
Administration fee: 3% of $9,450.00
$
283.50
GIS fee: $25 (plat) + (4 parcels x $10/parcel)
$
65.00
Surface water management fee
$
6,584.16
Park Dedication Fee
$
11,600.00
Partial sewer hookup fee: 2 units x $651/unit
$
1,302.00
Partial water hookup fee: 2 units x $1,818/unit
$
3,636.00
Total cash fee
$
23,470.66
B. ENGINEERING DEPARTMENT CONDITIONS OF APPROVAL
1. The developer shall work with staff to realign the access to Lot 1.
2. If the common portion of the driveway to Lots 1 and 2 is damaged during construction, it
must be replaced with three inches of bituminous.
3. The driveway easement shall be recorded as a separate document.
SP-3
4. The grading plan must be revised so that the grades do not exceed 3H:1 V.
5. A permit is required from MnDOT to install the sewer and water services as well as
grading in the right-of-way.
6. The City must be notified a minimum of 72 hours before the sewer and water services are
to be installed.
7. The sewer and water service connections must be inspected and approved by the City.
8. The developer must submit an escrow for the sewer and water service installation and
necessary boulevard restoration associated with the service installation.
9. Lots 1 and 3 are subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. Thirty percent of the City sewer and
water hookups are due with the final plat with the remaining 70 percent due with the
building permit at the rate in effect at that time. The amount due with the final plat is
WAC: 2 units x $1,818/unit = $3,636 and SAC: 2 units x $651/unit = $1,302.
10. The driveway for Lot 1 must be a minimum of five feet from the existing utility pedestal
and five feet from the Lot 1/Lot 2 property line.
11. A driveway easement in favor of Lot 3 is required over the common driveway located on
Lot 2.
12. The existing overhead service to the existing home on Lot 2 crosses over Lot 3. The
developer's options are as follows:
a) Record a private easement over the overhead utility against Lot 3 in favor
of Lot 2, or
b) Relocate the overhead utility and record any necessary private easement,
or
c) Convert the service to underground.
13. If not already available, the developer is responsible for extending private utilities to the
property, such as telephone, cable, electric and gas.
14. The existing propane tank must be removed from Lot 3.
15. The grading plan must be revised to include the 972 ft. and 974 ft. contours at the house
pads on Lots 3 and 1, respectively.
16. The hydrology calculations must be revised as follows:
SP-4
a) Include drainage from Highway 41. The applicant is not required to treat this
runoff, but the volume for a 100-year event needs to be incorporated into the
calculations to accurately determine the 100-year elevation of the proposed
stomtwater feature.
b) The existing drainage area boundaries used for the runoff calculations needs to be
revised to include all the area draining to the wetlands, including area outside of
the proposed development. This is necessary to accurately calculate the HWL of
the wetland.
c) Ensure that the post -development discharge rates to both wetlands do not exceed
the existing condition. Including the proposed infiltration basins in the hydrology
calculations should help to achieve this.
d) The curve number for the wetland areas must be 78
C. WATER RESOURCES COORDINATOR CONDITIONS OF APPROVAL
1. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit
forms are available from MnDOT's utility website at hqp://www.dot.state.mn.us/utility/.
2. Outlot A and the preservation easement shall be coincidental with the primary zone for
the Bluff Creek Overlay District and shall be recorded with the final plat. The primary
zone shall follow the east property lines of Lots 2 and 3 and the southeast 55 feet of Lots
1 and 2.
3. A structure setback of 40 feet is required from the primary zone. No disturbance shall
occur within the first 20 feet of the setback.
4. The Bluff Creek Overlay District primary zone and the corresponding setback shall be
shown on all plan sheets.
5. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be
installed at all major angle points and at the intersection of lot lines with the primary zone
boundary. Site plans shall be amended to show the placement of the signs.
6. The applicant shall provide drainage calculations for pre -development and post -
development conditions.
7. Preservation of natural vegetation shall be allowed as a volume and rate control tool.
Water quality best management practices are still required. This shall meet the
requirements of the NPDES permit for drainage to an impaired water or NURP plus
enhanced treatment, whichever is stricter.
SP-5
8. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
9. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet
must be provided for this area and the existing drainage patterns must be maintained.
10. Infiltration areas must be protected from compaction due to construction related
activities. Plans shall be amended to indicate how this will occur.
D. ENVIRONMENTAL RESOURCES COORDINATOR CONDITONS OF APPROVAL
1. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
2. Building permit surveys for each lot shall be required to show all inventoried trees within
the grading limits and 10 feet beyond and their removal or preservation status.
E. BUILDING OFFICIAL CONDITIONS OF APPROVAL
1. The developer must submit a proposed street name for review and approval prior to final
plat of the property.
2. Demolition permits must be obtained before demolishing any structures on the site.
3. A final grading plan and soils report must be to the Inspections Division before permits
can be issued.
4. Retaining walls over four feet high require a permit and must be designed by a
professional engineer.
5. Each lot must be provided with separate sewer and water services.
6. The developer and or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
F. FIRE MARSHAL CONDITION OF APPROVAL: At the entrance off Hazeltine Boulevard, a
monument sign displaying all four address numbers shall be installed. In addition, at the start of
the individual driveways to each home, an address sign shall also be installed. Submit proposed
signage to Fire Marshal for approval.
G. PARKS AND RECREATION DIRECTOR CONDITION OF APPROVAL: Park fees shall be
collected in full for the two new homes at the rate in force upon final plat submission and approval.
SP-6
9. General Conditions. The general conditions of this Contract are attached as
Exhibit "B" and incorporated herein.
[Remainder of Page Intentionally Left Blank]
SP-7
CITY OF CH�ANHASSEN
BY:
(SEAL)
Thomas A. Furlong, Mayor
� /
AND: �' 7
Todd Gerhardt, City Manager
STATE OF MINNESOTA
)ss.
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this day of
2013, by Thomas A. Furlong, Mayor, and by Todd Gerhardt, City Manager, of tm City of
Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the
authority granted by its City Council.
p
KARENJ.ENGELHARDT
Notary Public -Minnesota
My Commission Expires Jan 31, 2015
►y
11
DEVELOPER:
STATE OF MINNESOTA )
)ss.
COUNTY OF lbw T Yt r
The foregoing instrument was acknowledged before me this Mday of ,
2013, by Martin K. Schutrop and Kathleen M. Schutrop, husband and wife.
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
952-227-1100
NOTARY PUZLIG
KIM T. MEUWISSEN
Notary Public -Minnesota
My commission Expires Jan 31, 2015
SP-9
0 0
EXHIBIT "A"
TO
DEVELOPMENT CONTRACT
LEGAL DESCRIPTION OF SUBJECT PROPERTY:
Beginning at the center of Section 9, Township 116, Range 23, Carver County, Minnesota; thence
West along the North line of the Southwest Quarter of said section a distance of 228.05 feet; thence
deflecting to the left 49 degrees 15 minutes a distance of 514.8 feet along the Easterly right-of-way
line of State Highway No. 41; thence deflecting to the left 130 degrees 45 minutes on a line parallel
to the North line of the said Southwest Quarter of said section a distance of 571 feet more or less, to
a point on the East line of the Southwest Quarter of said section distant 390 feet South of the center
of said section; thence North along the East line of the Southwest Quarter of said section a distance
of 390 feet to a point of beginning, according to the United States Government Survey thereof and
situated in Carver County, Minnesota.
r
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property, the development of which is governed by the
foregoing Development Contract, affirm and consent to the provisions thereof and agree to be
bound by the provisions as the same may apply to that portion of the subject property owned by
them.
Dated this day of 20_
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this _ day of
20_, by
NOTARY PUBLIC
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
v
4�
which holds a mortgage -ion the subject property, the development of which is govemed by the
foregoing Development Contract, agrees that the Development Contract shall remain in full force
and effect even if it forecloses on its mortgage.
Dated this A21f day of A" j . 20 (3
STATE OF MINNESOTA )
( ss.
COUNTY OF�Vt- )
The foregoing instrument was acknowledged before me thisA4* day of
20lZ,bY�r(c}r� A. ���victclkLL�Z ov�d L«.Ann b. Y,U
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
OTARY PUBL C
""'='�_� KIM T. MEUWISSEN
s.. Notary Public -Minnesota
�;�r MY Canmissian Expires Jan 37, 2015
• 0
IRREVOCABLE LETTER OF CREDIT
No. _
Date:
TO: City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, Minnesota 55317
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our
Irrevocable Letter of Credit in the amount of $ available to you by your draft drawn on sight
on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. , dated
2 of (Name of Bank) ;
b) Be signed by the Mayor or City Manager of the City of Chanhassen.
c) Be presented for payment at (Address of Bank) on or before 4:00 p.m. on November 30,
2
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-
five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank
delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this
Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the
U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows:
Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN
55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not
referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw
may be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits, International Chamber of Commerce Publication No. 500.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation.
Im
Its
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
EXHIBIT "B"
1. Right to Proceed. Within the plat or land to be platted, the Developer may not
grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets,
utilities, public or private improvements, or any buildings until all the following conditions have
been satisfied: 1) this agreement has been fully executed by both parties and filed with the City
Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been
recorded with the County Recorder's Office or Registrar of Title's Office of the County where the
plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been
satisfied and then the Developer may proceed.
2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this
Contract and the breach has not been remedied. Development of subsequent phases may not
proceed until Development Contracts for such phases are approved by the City. Park charges and
area charges for sewer and water referred to in this Contract are not being imposed on outlots, if
any, in the plat that are designated in an approved preliminary plat for future subdivision into lots
and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots
and blocks.
3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final
platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval.
4. Changes in Official Controls. For two (2) years from the date of this Contract, no
amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current
urban service area, or official controls shall apply to or affect the use, development density, lot size,
lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the
contrary, to the full extent permitted by state law the City may require compliance with any
amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
5. Improvements. The improvements specified in the Special Provisions of this
Contract shall be installed in accordance with City standards, ordinances, and plans and
specifications which have been prepared and signed by a competent registered professional engineer
furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary
GC-1
pemvts from the Metropolitan Council Environmental Services and other pertinent agencies before
proceeding with constriction. The City will, at the Developer's expense, have one or more
construction inspectors and a soil engineer inspect the work on a full or part-time basis. The
Developer shall also provide a qualified inspector to perform site inspections on a daily basis.
Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall
instruct its project engineer/inspector to respond to questions from the City hispector(s) and to make
periodic site visits to satisfy that the construction is being performed to an acceptable level of
quality in accordance with the engineer's design. The Developer or his engineer shall schedule a
preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties
concerned, including the City staff, to review the program for the construction work.
6. Iron Monuments. Before the security for the completion of utilities is released, all
monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd.
1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments
have been installed.
7. License. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development.
8. Site Erosion and Sediment Control. Before the site is rough graded, and before
any utility construction is commenced or building permits are issued, the erosion and sediment
control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may
impose additional erosion and sediment control requirements if they would be beneficial. All areas
disturbed by the excavation and backfilling operations shall be reseeded forthwith after the
completion of the work in that area Except as otherwise provided in the erosion and sediment
control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible.
All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The
parties recognize that time is of the essence in controlling erosion and sediment transport. If the
Developer does not comply with the erosion and sediment control plan and schedule of
supplementary instructions received from the City, the City may take such action as it deems
appropriate to control erosion and sediment transport at the Developer's expense. The City will
endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so
will not affect the Developer's and City's rights or obligations hereunder. No development will be
allowed and no building permits will be issued unless the plat is in full compliance with the erosion
and sediment control requirements. Erosion and sediment control needs to be maintained until
vegetative cover has been restored, even if construction has been completed and accepted. After the
site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and
sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay
bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control
measures.
8a. Erosion Control During Construction of a Dwelling or Other Building. Before
a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash
GC-2
0
escrow or letter of credit per lot shall also be finished to the City to guarantee compliance with
City Code § 7-22.
9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily
clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area
that has resulted from construction work by the Developer, its agents or assigns.
10. Acceptance and Ownership of Improvements. Upon completion and acceptance
by the City of the work and construction required by this Contract, the improvements lying within
public easements shall become City property. After completion of the improvements, a
representative of the contractor, and a representative of the Developer's engineer will make a final
inspection of the work with the City Engineer. Before the City accepts the improvements, the City
Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved
plans and specifications and the Developer and his engineer shall submit a written statement to the
City Engineer certifying that the project has been completed in accordance with the approved plans
and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of
the public improvements shall be by City Council resolution.
11. Claims. In the event that the City receives claims from laborers, materialmen, or
others that work required by this Contract has been performed, the sums due them have not been
paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees
posted with the City, and if the claims are not resolved at least ninety (90) days before the security
required by this Contract will expire, the Developer hereby authorizes the City to commence an
Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts,
to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in
compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the
District Court, except that the Court shall retain jurisdiction to determine attorneys' fees.
12. Park Dedication. The Developer shall pay firll park dedication fees in conjunction
with the installation of the plat improvements. The park dedication fees shall be the current amount
in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council
resolutions.
13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless
otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The
minimum tree size shall be two and one-half (2%:) inches caliper, either bare root in season, or
balled and burlapped. The trees may not be planted in the boulevard (area between curb and
property line). In addition to any sod required as a part of the erosion and sediment control plan,
Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each
lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on
all disturbed areas of the lot. If these improvements are not in place at the time a certificate of
occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall
be provided to the City. 'These conditions must then be complied with within two (2) months after
the certificate of occupancy issued, except that if the certificate of occupancy is issued between
GC-3
October 1 through May 1 these conditions must be complied with by the following July 1 st. Upon
expiration of the time period, inspections will be conducted by City staff to verify satisfactory
completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00
inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the
financial guarantee shall be returned. If the requirements are not satisfied, the City may use the
security to satisfy the requirements. The City may also use the escrowed funds for maintenance of
erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this
Contract or of City ordinances. These requirements supplement, but do not replace, specific
landscaping conditions that may have been required by the City Council for project approval.
14.- Warranty. The Developer warrants all improvements required to be constructed by
it pursuant to this Contract against poor material and faulty workmanship. The Developer shall
submit either 1) a warranty/maintenance bond for 1001/6 of the cost of the improvement, or 2) a
letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements.
A. The required warranty period for materials and workmanship for the utility
contractor installing public sewer and water mains shall be two (2) years from the date of final
written City acceptance of the work.
B. The required warranty period for all work relating to street construction, including
concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2)
years from the date of final written acceptance.
C. The required warranty period for sod, trees, and landscaping is one full growing
season following acceptance by the City.
15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading,
Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each
lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained
away from buildings and that tree removal is consistent with development plans and City
Ordinance.
16. Existing Assessments. Any existing assessments against the plat will be re -spread
against the plat in accordance with City standards.
17. Hook-up Charges. The Developer also acknowledges overall sanitary sewer and
water trunk availability to the site and the hook-up charges established by the City as reasonable
compensation for oversizing costs previously incurred, as well as, long-term maintenance. Said
hook-up charges are collectible at time of building permit unless a written request is made to assess
the costs over a four year term at the rates in effect at time of application. If paid with the building
permit, the party applying for the building permit is responsible for payment of these fees.
18. Public Street Lighting. The Developer shall have installed and pay for public street
lights in accordance with City standards. The public street lights shall be accepted for City
ownership and maintenance at the some time that the public street is accepted for ownership and
GC-4
maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation.
Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street
light installed in the plat. The fee shall be used by the City for furnishing electricity and
maintaining each public street light for twenty (20) months.
19. Signage. All street signs, traffic signs, and wetland monumentation required by the
City as a part of the plat shall be famished and installed by the City at the sole expense of the
Developer.
20. House Pads. The Developer shall promptly furnish the City "as -built" plans
indicating the amount, type and limits of fill on any house pad location.
21. Responsibility for Costs.
A. The Developer shall pay an administrative fee in conjunction with the
installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead
for items such as review of construction documents, preparation of the Development Contract,
monitoring construction progress, processing pay requests, processing security reductions, and final
acceptance of improvements. This fee does not cover the City s cost for construction inspections.
The fee shall be calculated as follows:
i) if the cost of the construction of public improvements is less than $500,000,
three percent (3%) of construction costs;
ii) if the cost of the construction of public improvements is between $500,000
and $1,000,000, three percent (30/6) of construction costs for the first
$500,000 and two percent (2%) of construction costs over $500,000;
iii) if the cost of the construction of public improvements is over $1,000,000, two
and one-half percent (2%:%) of construction costs for the first $1,000,000 and
one and one-half percent (1'/z%) of construction costs over $1,000,000.
Before the City signs the final plat, the Developer shall deposit with the City a fee based upon
construction estimates. After construction is completed, the final fee shall be determined based
upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the
Special Provisions.
B. In addition to the administrative fee, the Developer shall reimburse the City for
all costs incurred by the City for providing construction and erosion and sediment control
inspections. This cost will be periodically billed directly to the Developer based on the actual
progress of the construction. Payment shall be due in accordance with Article 21E of this
Agreement.
C. The Developer shall hold the City and its officers and employees harmless from
claims made by itself and third parties for damages sustained or costs incurred resulting from plat
GC-5
• 0
approval and development. The Developer shall indemnify the City and its officers and employees
for all costs, damages, or expenses which the City may pay or incur in consequence of such claims,
including attorneys' fees.
D. In addition to the administrative fee, the Developer shall reimburse the City for
costs incurred in the enforcement of this Contract, including engineering and attorneys' fees.
E. The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time,
the City may halt all plat development work and construction, including but not limited to the
issuance of building permits for lots which the Developer may or may not have sold, until the bills
are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year.
F. In addition to the charges and special assessments referred to herein, other
charges and special assessments may be imposed such as, but not limited to, sewer availability
charges ("SAC"), City water connection charges, City sewer connection charges, and building
permit fees.
G. Private Utilities. The Developer shall have installed and pay for the installation
of electrical, natural gas, telephone, and cable television service in conjunction with the overall
development improvements. These services shall be provided in accordance with each of the
respective franchise agreements held with the City.
H. The developer shall pay the City a fee established by City Council resolution,
to reimburse the City for the cost of updating the City's base maps, GIS data base files, and
converting the plat and record drawings into an electronic format. Record drawings must be
submitted within four months of final acceptance of public utilities. All digital information
submitted to the City shall be in the Carver County Coordinate system.
22. Developer's Default. In the event of default by the Developer as to any of the work
to be performed by it hereunder, the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the City, provided the Developer is
first given notice of the work in default, not less than four (4) days in advance. This Contract is a
license for the City to act, and it shall not be necessary for the City to seek a Court order for
permission to enter the land. When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
23. Miscellaneous.
A. Construction Trailers. Placement of on -site construction trailers and temporary
job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for
installation of public improvements. Trailers shall be removed from the subject property within
thirty (30) days following the acceptance of the public improvements unless otherwise approved by
the City Engineer.
.ram
r
B. Postal Service. The Developer shall provide for the maintenance of postal
service in accordance with the local Postmaster's request.
C. Third Parties. Third parties shall have no recourse against the City under this
Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City
shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce
this Contract or for allowing deviations from it.
D. Breach of Contract. Breach of the terms of this Contract by the Developer shall
be grounds for denial of building permits, including lots sold to third parties. The City may also
issue a stop work order halting all plat development until the breach has been cured and the City has
received satisfactory assurance that the breach will not reoccur.
E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or
phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of
the remaining portion of this Contract.
F. Building Permits. Building permits will not be issued in the plat until sanitary
sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the
streets needed for access have been paved with a bituminous surface and the site graded and
revegetated in accordance with Plan B of the development plans.
G. Waivers/Amendments. The action or inaction of the City shall not constitute a
waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers
shall be in writing, signed by the parties and approved by written resolution of the City Council.
The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or
release.
H. Release. This Contract shall run with the land and may be recorded against the
title to the property. After the Developer has completed the work required of it under this Contract,
at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the
issuance of such a certificate, individual lot owners may make as written request for a certificate
applicable to an individual lot allowing a minimum of ten (10) days for processing.
I. Insurance. Developer shall take out and maintain until six (6) months after the
City has accepted the public improvements, public liability and property damage insurance covering
personal injury, including death, and claims for property damage which may arise out of
Developer's work or the work of its subcontractors or by one directly or indirectly employed by any
of them. Limits for bodily injury and death shall be not less than $500,000 for one person and
$1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each
occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as
an additional insured on the policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that the City
must be given ten (10) days advance written notice of the cancellation of the insurance. The
certificate may not contain any disclaimer for failure to give the required notice.
100M
J. Remedies. Each right, power or remedy herein conferred upon the City is
cumulative and in addition to every other right, power or remedy, expressed or implied, now or
hereafter arising, available to City, at law or in equity, or under any other agreement, and each and
every right, power and remedy herein set forth or otherwise so existing may be exercised from time
to time as often and in such order as may be deemed expedient by the City and shall not be a waiver
of the right to exercise at any time thereafter any other right, power or remedy.
K. Assi hflIZi . The Developer may not assign this Contract without the written
permission of the City Council. The Developer's obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots, the entire plat, or any part of it.
L. Construction Hours. Construction hours, including pick-up and deliveries of
material and equipment and the operation of any internal combustion engine, may only occur from
7:00 am. to 6:00 pm. on weekdays, from 9:00 am. to 5:00 p.m. on Saturdays with no such activity
allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents
and supplies to comply with these requirements and the Contractor is responsible for their failure to
do so. Under emergency conditions, this limitation may be waived by the written consent of the City
Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall
pay the following administrative penalties:
First violation $ 500.00
Second violation $ 1,000.00
Third & subsequent violations All site development and construction must
cease for seven (7) calendar days
M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms,
and similar devices is prohibited in conjunction with the construction of homes, buildings, and the
improvements required under this contract. The administrative penalty for violation of construction
hours shall also apply to violation of the provisions in this paragraph.
N. Access. All access to the plat prior to the City accepting the roadway
improvements shall be the responsibility of the Developer regardless if the City has issued building
permits or occupancy permits for lots within the plat.
O. Street Maintenance. The Developer shall be responsible for all street
maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by
the Developer when hazards develop in streets to prevent the public from traveling on same and
directing attention to detours. if streets become impassable, the City may order that such streets
shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and
provide proper surface drainage. The Developer may request, in writing, that the City plow snow
on the streets prior to final acceptance of the streets. The City shall have complete discretion to
approve or reject the request. The City shall not be responsible for reshaping or damage to the street
base or utilities because of snow plowing operations. The provision of City snow plowing service
does not constitute final acceptance of the streets by the City.
am-
P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and
maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales)
within the plat and the adjacent off -site storm sewer system that receives storm water from the plat.
The Developer shall follow all instructions it receives from the City concerning the cleaning and
maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end
two (2) years after the public street and storm drainage improvements in the plat have been accepted
by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special
provisions of this contract, will be held by the City for the duration of the 2-year maintenance
period.
Q. Soil Treatment Systems. If soil treatment systems are required, the Developer
shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first
provided, the two soil treatment sites identified during the platting process for each lot. This shall
be done prior to the issuance of a Grading Pemut. Any violation/disturbance of these sites shall
render them as unacceptable and replacement sites will need to be located for each violated site in
order to obtain a building permit.
R. Variances. By approving the plat, the Developer represents that all lots in the
plat are buildable without the need for variances from the City s ordinances.
S. Compliance with Laws, Ordinances, and Re ations. In the development of the
plat the Developer shall comply with all laws, ordinances, and regulations of the following
authorities:
1. City of Chanhassen;
2. State of Minnesota, its agencies, departments and commissions;
3. United States Army Corps of Engineers;
4. Watershed District(s);
5. Metropolitan Government, its agencies, departments and commissions.
T. Proof of Title. Upon request, the Developer shall furnish the City with evidence
satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract.
U. Soil Conditions. The Developer acknowledges that the City makes no
representations or warranties as to the condition of the soils on the property or its fitness for
construction of the improvements or any other purpose for which the Developer may make use of
such property. The Developer further agrees that it will indemnify, defend, and hold harmless the
City, its governing body members, officers, and employees from any claims or actions arising out of
the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or
pollutants were caused to be there by the City.
V. Soil Correction. The Developer shall be responsible for soil correction work on
the property. The City makes no representation to the Developer concerning the nature of
GC-9
suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots
which have no fill material a soils report from a qualified soils engineer is not required unless the
City's building inspection department determines from observation that there may be a soils
problem. On lots with fill material that have been mass graded as part of a multi -lot grading project,
a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a
building permit for the lot. On lots with fill material that have been custom graded, a satisfactory
soils report from a qualified soils engineer shall be provided before the City inspects the foundation
for a building on the lot.
W. Haul Routes. The Developer, the Developer's contractors or subcontractors
must submit proposed haul routes for the import or export of soil, construction material,
construction equipment or construction debris, or any other purpose. All haul routes must be
approved by the City Engineer
X. Development Signs. The Developer shall post a six foot by eight foot
development sign in accordance with City Detail Plate No. 5313 at each entrance to the project.
The sign shall be in place before construction of the required improvements commences and
shall be removed when the required improvements are completed, except for the final lift of
asphalt on streets. The signs shall contain the following information: project name, name of
developer, developer's telephone number and designated contact person, allowed construction
hours.
Y. Construction Plans. Upon final plat approval, the developer shall provide the
City with two complete sets of full-size construction plans and four sets of 11"x17" reduced
construction plan sets and three sets of specifications. Within four months after the completion of
the utility improvements and base course pavement and before the security is released, the
Developer shall supply the City with the following: (1) a complete set of reproducible Mylar
as -built plans, (2) two complete full-size sets of blue linelpaper as -built plans, (3) two complete sets
of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing
and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital
file of as -built plans in both Axf & .tif format (the Axf file must be tied to the current county
coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a
breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The
Developer is required to submit the final plat in electronic format.
Z. As -Built Lot Survevs. An as -built lot survey will be required on all lots prior to
the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and
dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before
the as -built survey is completed. If the weather conditions at the time of the as -built are not
conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may
be issued and the as -built escrow withheld until all work is complete.
_X4MrArmM
GC-10
•
July 19, 2013
CONSENT TO FILE PLAT
Brian A. Klingelhutz and Lou Ann D. Klingelhutz, holder of that certain mortgage dated
May 13, 2013, as document number A576719, in the office of the county
recorder/Registrar of Titles of Carver county, Minnesota, hereby consents to the filing of
that certain plat of Bluff Creek Woods described as follows:
See attached exhibit A
And hereby joins in and agrees that its interest in the land platted is subject to
easements and dedications set forth in the plat as recorded in the office of the County
Recorder/Registrar of Titles.
Brian A. Klingelhutz
Lou Ann D. Klingelhutz
STATE OF MINNESOTA
COUNTY OF CARVER
This instrument was acknowledged before me on by
V d..Y`
This instrument was drafted by:
Brian A. Klingelhutz
8860 Klein Drive
Waconia, MN 55387
Notary P
My commission expires !S.,(k y .a3 .a0kt3
PATRICIAA. DRESSEL
NOTARY PUBLIC•MINNE90TA
� w My Comm. Exp. Jan. 31, 2015
1d
F
•
EXHIBIT "A"
Beginning at the center of Section 9, Township 116, Range 23, Carver County, Minnesota, thence West along the
North line of the Southwest Quarter of said section a distance of 228.05 feet; thence deflecting to the left 49
degrees 15 minutes a distance of 514.8 feet along the Easterly right-of-way line of State Highway No. 41, thence
deflecting to the left 130 degrees 45 minutes on a line parallel to the North line of the said Southwest Quarter of
said section a distance of 571 feet more or less. to a point on the East line of the Southwest Quarter of said
section distant 390 feet South of the center of said section; thence North along the East line of the Southwest
Quarter of said section a distance of 390 feet to the point of beginning, according to the United States Government
Survev thereof and situate in Carver County, Minnesota.
CITY'OF CHANHASSEN • •
F O BOX 147
CHANHASSEN MN 55317
08/27/2013 9:57 AM
Receipt No. 00229071
CLERK: AshleyM
PAYEE: Brian & Lou Ann Klingelhutz
8860 Klein Drive
Waconia MN 55387-
Bluff Creek Woods
-------------------------------------------------------
Security Escrow 11,330.55
Total
Cash
Check 11589
Change
11,330.55
0.00
11,330.55
0.00
CITY'OF CHANHASSEN • •
9 0 BOX 147
CHANHASSEN MN 55317
08/27/2013 10:05 AM
Receipt No. 00229072
CLERK: AshleyM
PAYEE: Brian & Lou Ann
8860 Klein Drive
Waconia MN 55387
Bluff Creek Woods
Klingelhutz
--------- --------------------------------------
Administration Fee 283.50
GIS Fee 65.00
Surface Water Management Fee 6,584.16
Park Dedication Fee 11,600.00
Sewer Hookup Fee 1,302.00
Water Hookup Fee 3,636.00
Total
Cash
Check 11588
Change
23,470.66
0.00
23,470.66
0.00
40
0
Uff OF
CgA NSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
August 28, 2013
Mr. Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Re: Bluff Creek Woods — Final Plat
Planning Case # 2013-09
Dear Mr. Schutrop:
This letter is to confirm that on August 26, 2013, the Chanhassen City Council
approved the final plat for Bluff Creek Woods creating three lots and one outlot
subject to the following conditions:
Engineering
1.
At the entrance off Hazeltine Boulevard, a monument sign displaying all four
Phone:952.2271160
address numbers shall be installed. In addition, at the start of the individual
Fax:952,227.1170
driveways to each home, an address sign shall also be installed. Submit proposed
signage to Fire Marshal for approval.
Finance
Phone: 952.227.1140
2.
Park fees shall be collected in full for the two new homes at the rate in force upon
Fax: 952.227.1110
final plat submission and approval.
Park Recreation
Phone: 952.2271120
3
Any use of or work within or affecting MnDOT rights -of -way requires a permit.
Fax: 952.227.1110
Pern►it forms are available from MnDOT's utility website at
htto://www.dot.state.mn.ustutility/.
Recreation Center
2310 Coulter Boulevard
4.
Outlot A and the preservation easement shall be coincidental with the primary
Phone: 952.227.1400
zone for the Bluff Creek Overlay District and shall be recorded with the final plat.
Fax: 952.227.1404
The primary zone shall follow the east property lines of Lots 2 and 3 and the
Planning a
southeast 55 feet of Lots 1 and 2.
Natural Resources
Phone:952.227.1130
5.
A structure setback of 40 feet is required from the primary zone. No disturbance
Fax: 952.227.1110
shall occur within the first 20 feet of the setback
Public works 6. The Bluff Creek Overlay District primary zone and the corresponding setback
79Park Place
Phone: 952.2271300 shall be shown on all plan sheets.
e:
Fax: 952.227.1310
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be
Senior center installed at all major angle points and at the intersection of lot lines with the
Phone:952.227,1125 primary zone boundary. Site plans shall be amended to show the placement of the
Fax:952227.1110 signs.
Web Site www.ci.chanhassen.mn.us 8. The applicant shall provide drainage calculations for pre -development and post -
development conditions.
SCANNED
Chanhassen is a Community for Life -Providing for Today and Planning for Tomorrow
Mr. Martin Schutrop • •
August 28, 2013
Page 2
9. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
10. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
11. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
12. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
13. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
14. The developer shall work with staff to realign the access to Lot 1.
15. If the common portion of the driveway to Lots 1 and 2 is damaged during construction, it
must be replaced with three inches of bituminous.
16. The driveway easement shall be recorded as a separate document.
17. The grading plan must be revised so that the grades do not exceed 3H:IV.
18. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
19. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
20. The sewer and water service connections must be inspected and approved by the City.
21. The developer must submit an escrow for the sewer and water service installation and
necessary boulevard restoration associated with the service installation.
22. Lots 1 and 3 are subject to the City sewer and water hook-up charges and the Metropolitan
Council Sanitary Access Charge. Thirty percent of the City sewer and water hookups are due
with the final plat with the remaining 70 percent due with the building permit at the rate in
effect at that time. The amount due with the final plat is WAC: 2 units x $1,818/unit =
$3,636 and SAC: 2 units x $651/unit = $1,302.
Mr. Martin Schutrop •
August 28, 2013
Page 3
23. The developer must submit a proposed street name for review and approval prior to final plat
of the property.
24. Demolition permits must be obtained before demolishing any structures on the site.
25. A final grading plan and soils report must be submitted to the hvcpections Division before
permits can be issued.
26. Retaining walls over four feet high require a permit and must be designed by a professional
engineer.
27. Each lot must be provided with separate sewer and water services.
28. The developer and/or their agent shall meet with the Inspections Division as early as possible
to discuss plan review and permit procedures.
29. Infiltration areas must be protected from compaction due to construction -related activities.
Plans shall be amended to indicate how this will occur.
30. The driveway for Lot 1 must be a minimum of five feet from the existing utility pedestal and
five feet from the Lot 1/Lot 2 property line.
31. A driveway easement in favor of Lot 3 is required over the common driveway located on
Lot 2.
32. The existing overhead service to the existing home on Lot 2 crosses over Lot 3. The
developer's options are as follows:
a) Record a private easement over the overhead utility against Lot 3 in favor of Lot 2, or
b) Relocate the overhead utility and record any necessary private easement, or
c) Convert the service to underground
33. If not already available, the developer is responsible for extending private utilities to the
property, such as telephone, cable, electric and gas.
34. The existing propane tank must be removed from Lot 3.
35. The grading plan must be revised to include the 972 ft. and 974 ft. contours at the house pads
on Lots 3 and 1, respectively.
36. The hydrology calculations must be revised as follows:
a) Include drainage from Highway 41. The applicant is not required to treat this runoff, but
the volume for a 100-year event needs to be incorporated into the calculations to
accurately determine the 100-year elevation of the proposed stormwater feature.
Mr. Martin Schutrop •
August 28, 2013
Page 4
b) The existing drainage area boundaries used for the runoff calculations needs to be revised
to include all the area draining to the wetlands, including area outside of the proposed
development. This is necessary to accurately calculate the HWL of the wetland.
c) Ensure that the post -development discharge rates to both wetlands do not exceed the
existing condition. Including the proposed infiltration basins in the hydrology
calculations should help to achieve this.
d) The curve number for the wetland areas must be 78.
Two signed mylar copies of the final plat shall be submitted to our office for signatures. One
1 "=200' scale mylar reduction of the final plat and one 1 "=200' scale paper reduction of the final plat
with just street names and lot and block numbers shall be submitted. The executed development
contract and the required fees ($23,470.66) and security ($11,330.55) specified therein shall be
submitted to the City. In addition, a digital copy in .dxf format and a digital copy in .tif format (pdf
compatible) in Carver County coordinates of the final plat shall be submitted. The City will submit
all the necessary documents to Carver County for recording. Processing of the final plat documents
prior to recording usually takes approximately two weeks upon receipt by the city
A warranty deed for Outlot A, the preservation easement and private street easement shall be
prepared and executed for recording with the final plat documents. Additionally, all current year
taxes must be paid in full and any delinquent property taxes or green acres taxes must also be paid.
Once everything is submitted, please contact Gordy Stauff at 952-227-1166 to coordinate the
preconstruction meeting
Should you have any questions, please contact me at (952) 227-1131 or by email at
bgenerousna ci.chanhassen.mn.us.
Sincere` %�
Robert Generous, AICP
Senior Planner
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
gAplan\2013 planning cases12013-09 bluff creek woodAfinal plat documentstappmval leuer.doc
• q /3-b�
Chanhassen City Council — August 26, 2013
David Hodell: Yep.
Mayor Furlong: Ali Muffenbier. Bailey Muffenbier. Nick Olson. Laura Price. Jake Smith. Sam Smith.
Let's give them a round of applause.
(A picture was taken of all the volunteers with Mayor Furlong.)
Mayor Furlong: Thanks so much. We really appreciate your help. Just a quick follow-up for those
watching. Mitch or Mr. Hoffrnan, for people that might be interested in participating next year, the
information was out in the Connection I assume or on the website, is that correct?
Mitch Johnson: In the summer Connection we'll post that.
Mayor Furlong: In the summer Connection next year? Okay, very good. Thank you. Let's move on
now with our agenda items. The first set will be on the consent agenda.
CONSENT AGENDA:
Mayor Furlong: I know Mr. McDonald you had an item that you wanted to remove from the consent
agenda for separate discussion.
Councilman McDonald: Yes Mr. Mayor. I would like to remove item number 6 which is the approval of
the resolution of support for Southwest Transit for discussion among council.
Mayor Furlong: Are you looking for a long discussion? Should we bring that up after the law
enforcement presentations or under new business?
Councilman McDonald: Wherever you want to put it, I'm fine with that.
Mayor Furlong: Why don't we just bring it up under, we'll add new business after G after H, if that's
okay.
Councilman McDonald: That's okay with me.
Mayor Furlong: Alright, thank you. Any other items? Items 1 through 7 excluding 6 under E.
Councilman Laufenburger moved, Councilwoman Ernst seconded to approve the following consent
agenda items pursuant to the City Manager's recommendations:
1. Approval of City Council Minutes dated August 12, 2013.
2. Receive Park and Recreation Commission Minutes dated July 23, 2013.
3. Approve Amendment to Pages SP-2 and SP-3 of The Preserve at Bluff Creek 5'" Addition
Development Contract.
4. Bluff Creek Woods, 7331 Hazeltine Boulevard, Applicant: Martin Schutrop:
a. Final Plat Approval.
b. Approval of Development Contract.
SCANNED
0 •
Chanhassen City Council — August 26, 2013
5. Fretham 15" Addition, 6300 Chaska Road, Applicant: Curt Fretham:
a. Final Plat Approval.
b. Approval of Development Contract.
7. Surface Water Management Plan Update: Award of Contract.
All voted in favor and the motion carried unanimously with a cote of 5 to 0.
VISITOR PRESENTATIONS. None.
LAW ENFORCEMENT/FIRE DEPARTMENT UPDATE.
Lt. Jeff Enevold: Good evening Mr. Mayor, council. I got a short power point for you here and I also
have our School Resource Officer, Bob Zydowsky who's going to give an update on the 2013/2014
school year. Just wanted to update you on National Night Out. Before we got to National Night Out Beth
came into my office a couple weeks before and said what can we do to kind of make things new and make
things a little bit more exciting on National Night Out. So I thought about it and I said to Beth, why don't
we implement some of the programs that we've done in our Citizens Academy and bring them out to the
neighborhoods and see what they think about it so one of the things we did here is we purchased a mat
that goes with the DWI goggles that you have to walk down and this was really a big hit in some of the
neighborhoods. Some of the kids got involved. You'll see some of the, and some of the kids just goofed
around and played on it. Some other things that we implemented were, we talked about let's bring the
taser out there so we got a cardboard target. We brought the tasers out and we let some of the folks shoot
some training rounds and we also brought out our preliminary breath test which gives you an alcohol
reading and we showed them how to use that and we brought some Bianca in case anybody didn't have
any beers at their party so brought some Bianca and kind of showed them how that worked and it was
pretty successful. I mean I think they really enjoyed it and it kind of gives them a feel of some of the
things that we do and changes things up a little bit so. And then we also showed off the squad cars that
we have. We've got some great equipment in there and hopefully that's a recruit we got sitting behind the
wheel there so. And then you can see some more, Sergeant Bromwell was at this neighborhood and I
think Todd and Laurie were with John so great, great event. Then you can see how National Night Out
ended there. The Chanhassen storm rolled in and kind of put a damper on things so we had to call it quits
early. And I'll ask Bob to come up here and kind of give his update on the upcoming school year in the
Chanhassen High School.
Bob Zydowsky: Thank you Mayor.
Mayor Furlong: Good evening.
Bob Zydowsky: City Council for having me. I guess I'm just going to kind of go through some of the
things I do to get ready for school. You know there was a buzz today at school, the teachers are back.
They're getting their bulletin boards ready and it's alive and well at Chanhassen High School but you
know some of the things I've done this past year in January, the 3 of us always attend a conference in
Duluth. Minnesota Juvenile Officers Association. There's about 250 officers that attend that so it's a
great conference to network with other SRO's from different communities. Kind of talk about how
they're doing different types of things. This year in January if we're approved to go there so I can do
some live exercises with lockdowns and those sorts of things. This past February I attended a Prepare
class, kind of a crisis prevention and a preparedness with school safety planning. That was sponsored
through the school district. And in early June Mental Health for Teens was sponsored by the Carver
is • 45 - q a,
CITY OF
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone:952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone:952.227.1160
Fax: 952.227.1170
Finance
Phone:952.2271140
Fax:952.227.1110
Park & Recreation
Phone:952.227.1120
Fax:952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone:952.227.1130
Fax:952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax:952.227.1110
Web Site
www.ci.chanhassen.mn.us
Ihm Did to) A110 1111111131
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner
DATE: August 26, 2013 ok"
SUBJ: Final Plat Approval — Bluff Creek Woods
Planning Case #2013-4
4
PROPOSED MOTION
"The Chanhassen City Council approves the final plat for Bluff Creek Woods
subject to the conditions of the staff report"
Approval requires a majority vote of City Council.
PROPOSAL SUMMARY
The applicant, Martin Schutrop, is requesting final plat approval for a three lot
single-family development on 3.57 acres zoned Single -Family Residential District
(RSF) located at 7331 Hazeltine Boulevard.
BACKGROUND
On June 10, 2013, the Chanhassen City Council approved Rezoning the property
from Agricultural Estate District (A-2) to Single -Family Residential District
(RSF); PreliminaryPlat with Variances for a neck lot and the construction of a
private street; and a Conditional Use Permit to allow development within the
Bluff Creek Overlay District.
SUBDIVISION REVIEW
The applicant is requesting final
plat review for a three lot, single-
family residential subdivision with
one outlot containing the Bluff
Creek primary zone. The existing
house on the property is proposed
to remain on Lot 2. The Bluff
Creek primary zone boundary
1V1W carer NUM
i
i,.
i
Chanhassen is aCommunilyforLife- ProvidingforTodayandPlanningforTomorrow SCANNED
Bluff Creek Woods Final Plat
August 26, 2013
Page 2
follows the eastern perimeter of the site, crosses the southern 55 feet of Lots 1 and 2, and
encompasses all of Outlot A. Access will be via a private street which serves the property to the
north as well as the three lots within the development.
STREETS AND ACCESS
The property is east of State Highway 41. The existing home on the subject property shares an
access with the home to the north. The two additional lots proposed would also share this access
to Highway 41. The driveway to Lot 3 will extend between the two existing driveways. This
driveway is not 10 feet from the property line, therefore a variance is required. Staff supports the
variance because the site constraints do not allow for the 10-foot separation. The driveway must
be at least five feet from the existing utility pedestal to the northeast and five feet from the
Lot 1/Lot 2 property line.
The developer proposes to utilize a portion of the driveway on Lot 2 to provide access to Lot 1.
A driveway easement must be dedicated over this section of the driveway. If the common
portion is damaged during site construction it must be replaced with a minimum of 3 inches of
bituminous.
iTI'ILITIES
Eight -inch public sanitary sewer and 12-inch public watermain lie east of State Highway 41
within the right-of-way. The developer proposes to install sewer and water services to Lots 1
and 3. A permit is required from MnDOT to install these services. The City must be notified a
minimum of 72 hours before the services are to be installed. The service connections must be
inspected and approved by the City. The developer must submit an escrow for the sewer and
water service installations and the associated boulevard restoration.
Lots 1 and 3 will be subject to City sewer and water hook-up charges and the Metropolitan
Council Sanitary Access Charge. Thirty percent (30%) of the City hook-up charges must be paid
with the final plat and are calculated as follows:
Water: 2 units x $1,818/unit = $3,636
Sewer: 2 units x $651/unit = $1,302
The remaining 70% of the hook-up fees and the Metropolitan Council Sanitary Access Charge
must be paid with the building permits at the rate in effect at that time.
Surface water management (SWMP) fees are based upon an assessable area of 2.90 acres
(3.58 acres less Outlot A). The SWMP fees due at final plat are $6,584.16.
The existing overhead service to the existing home on Lot 2 crosses over Lot 3. The developer's
options are as follows:
1. Record a private easement over the overhead utility against Lot 3 in favor of Lot 2, or
2. Relocate the overhead utility and record any necessary private easement, or
Bluff Creek Woods Final Plat
August 26, 2013
Page 3
3. Convert the service to underground.
If not already available, the developer is responsible for extending private utilities to the
property, such as telephone, cable, electric and gas.
The existing propane tank must be removed from Lot 3.
GRADING, DRAINAGE AND EROSION
The developer proposes that the lots be custom graded and has submitted a plan showing how the
proposed lots can accommodate a home. The grading plan must be revised so that the grades do
not exceed 3H:IV, must include the 972-ft. and 974-ft. contours at the house pads on Lots 3 and
1, respectively.
Currently the southern 1/3 acre of the property drains to the south, ultimately to a storm sewer
owned and maintained by the Minnesota Department of Transportation (MnDOT). The
remainder of the property currently drains to the wetland to the north. This wetland outlets to the
west into the MnDOT storm sewer. The proposed drainage patterns are very similar to the
existing condition.
The developer proposes custom graded lots, meaning that final grading plans for Lots 1 and 3
will be submitted with the building permit for approval. The final grading plans shall not
adversely impact the drainage to adjacent properties.
The developer must obtain a MnDOT drainage permit to ensure that the proposed discharge rates
to MnDOT right-of-way will not exceed the existing condition.
The developer's engineer has submitted drainage calculations for the proposed subdivision. The
calculations must be revised to address the following:
1. Include drainage from Highway 41. The applicant is not required to treat this runoff, but
the volume for a 100-year event needs to be incorporated into the calculations to
accurately determine the 100-year elevation of the proposed stormwater feature.
2. The existing drainage area boundaries used for the runoff calculations needs to be revised
to include all the area draining to the wetlands, including area outside of the proposed
development. This is necessary to accurately calculate the HWL of the wetland.
3. Ensure that the post -development discharge rates to both wetlands do not exceed the
existing condition. Including the proposed infiltration basins in the hydrology
calculations should help to achieve this.
4. The curve number for the wetland areas must be 78.
The site is 3.58 acres in area and may have a total disturbance of one acre. This means that the
site will require an NPDES construction permit. The City shall be provided confirmation of the
Bluff Creek Woods Final Plat
August 26, 2013
Page 4
permit and a Surface Water Pollution Prevention Plan (SWPPP) must be prepared and submitted
to the City for review and comment.
PARKS AND RECREATION
The Bluff Creek Woods subdivision request for three single-family lots is subject to a single
condition of approval for parks and trails. The payment of park dedication fees at the rate in
force upon final plat approval for two of the three lots. The lot with the existing residence is
exempt from this fee. At today's rate, the payment of a total of $11,600 in park dedication fees
is required. These fees will be deposited in the City's park and trail dedication fund for
utilization on future park and trail improvements.
COMPLIANCE TABLE
Lot Area
Excluded
Lot
Lot
(sq. ft.)
Lot Area
Width
Depth
Notes
Code
Area in
private street
15,000
easement,
100
125
neck lot area
less than
100 ft. width
Lot 1
Bluff Creek primary zone to
47,625
0
135
353
east, south 55 feet and
southwest y line.
Lot 2
Bluff Creek primary zone
44,167
300
120
387
southeast 55 feet and east
property line
Lot 3
Neck lot, Bluff Creek primary
33,895
5,050
100
182
zone east lot line
Outlot A
30,060
Bluff Creek Prim Zone
Total
155,74
5,350
3.57 acres
Setbacks: Front 30 feet, Side 10 feet, Rear 30 feet, Bluff Creek Primary Zone 40 feet.
The setback for neck lots begins at the point the lot measures 100 feet in width.
REVIEW CONDITIONS OF APPROVAL
At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
*This condition still applies.
Bluff Creek Woods Final Plat •
August 26, 2013
Page 5
2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
*This condition still applies.
3. Any use of or work within or affecting MnDOT rights -of -way requires a permit. Permit
forms are available from MnDOT's utility website at http://www.dot.state.mn.us/utility/.
*This condition still applies.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of Lots 2 and 3 and the southeast 55 feet of Lots 1 and 2.
The common lot line between Outlot A and Lot 1 shall be shifted 15 feet to the southwest.
*This condition shall be modified as follows: Outlot A and the preservation easement shall
be coincidental with the primary zone for the Bluff Creek Overlay District and shall be
recorded with the final plat. The primary zone shall follow the east property lines of Lots 2
and 3 and the southeast 55 feet of Lots 1 and 2.
< 40 WM k
ws.
Preliminary Plat (70 ft.) Final Plat (55 ft.)
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. The proposed grading plans shall be amended to show
how the lots may be developed.
*This condition shall be modified as follows: A structure setback of 40 feet is required from
the primary zone. No disturbance shall occur within the first 20 feet of the setback. -The
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
*This condition still applies.
Bluff Creek Woods Final P •
August 26, 2013
Page 6
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
*This conditions still applies.
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot I shall share a common drive with Lot 2 until the existing
hammerhead.
*This condition has been met.
9. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
*This condition still applies.
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
*This condition still applies.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of final plat recording.
*This condition still applies.
12. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
*This condition still applies.
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
*This condition still applies.
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
Bluff Creek Woods Final PO •
August 26, 2013
Page 7
*This condition still applies.
15. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed.
*This condition has been met.
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
*This condition has been met.
17. The developer shall work with staff to realign the access to Lot 1.
*This condition still applies.
18. The developer must provide proof that the common portion of the driveway to Lots I and 2
meets a 7-ton design.
This condition shall be modified as follows: The developer- Riust provide pr-e .f lhat If the
common portion of the driveway to Lots 1 and 2 Fneets a 7 ton design is damaged during
construction, it must be replaced with three inches of bituminous.
19. If the existing driveway does not meet the 7-ton design standard, the developer must install
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification.
*This condition does not apply.
20. The driveway easement shall be recorded as a separate document; all references to the
driveway easement shall be removed from the preliminary plat.
*This condition shall be modified as follows: The driveway easement shall be recorded as a
separate document; all _ec _enees to the drivewa , easement shall be _ ed ffem the
pr-eliminar-y plat.
21. The grading plan must be revised so that the grades do not exceed 3H:IV.
*This condition still applies.
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
*This condition still applies.
Bluff Creek Woods Final A •
August 26, 2013
Page 8
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
*This condition still applies.
24. The sewer and water service connections must be inspected and approved by the City.
*This condition still applies.
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
*This condition shall be modified as follows: The developer must submit an escrow for the
sewer and water service installation and necessary boulevard restoration associated with
the service installation.
26. Lots I and 3 will be subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance
with the City Code at the rate in effect at the time.
*This condition shall be modified as follows: Lots I and 3 are willhe subject to the City
sewer and water hook-up charges and the Metropolitan Council Sanitary Access ChargeThese fees shall be eelleeted in aeeerdanee wi4h the City Gode at the rate in efteet at the
4Fn,— Thirty percent of the City sewer and water hookups are due with the final plat
with the remaining 70 percent due with the building permit at the rate in effect at that
time. The amount due with the final plat is WAC: 2 units x $1,818/unit = $3,636 and
SAC: 2 units x $651/unit = $1,302.
Based on review of the final plat, staff recommends that the following conditions be added:
The developer must submit a proposed street name for review and approval prior to final plat
of the property.
2. Demolition permits must be obtained before demolishing any structures on the site.
3. A final grading plan and soils report must be submitted to the Inspections Division before
permits can be issued.
4. Retaining walls over four feet high require a permit and must be designed by a professional
engineer.
5. Each lot must be provided with separate sewer and water services.
Bluff Creek Woods Final Po •
August 26, 2013
Page 9
6. The developer and/or their agent shall meet with the Inspections Division as early as possible
to discuss plan review and permit procedures.
7. Infiltration areas must be protected from compaction due to construction -related activities.
Plans shall be amended to indicate how this will occur.
8. The driveway for Lot 1 must be a minimum of five feet from the existing utility pedestal and
five feet from the Lot not 2 property line.
9. A driveway easement in favor of Lot 3 is required over the common driveway located on
Lot 2.
10. The existing overhead service to the existing home on Lot 2 crosses over Lot 3. The
developer's options are as follows:
a) Record a private easement over the overhead utility against Lot 3 in favor of Lot 2, or
b) Relocate the overhead utility and record any necessary private easement, or
c) Convert the service to underground
11. If not already available, the developer is responsible for extending private utilities to the
property, such as telephone, cable, electric and gas.
12. The existing propane tank must be removed from Lot 3.
13. The grading plan must be revised to include the 972 ft. and 974 ft. contours at the house pads
on Lots 3 and 1, respectively.
14. The hydrology calculations must be revised as follows:
a) Include drainage from Highway 41. The applicant is not required to treat this runoff, but
the volume for a 100-year event needs to be incorporated into the calculations to
accurately determine the 100-year elevation of the proposed stormwater feature.
b) The existing drainage area boundaries used for the runoff calculations needs to be revised
to include all the area draining to the wetlands, including area outside of the proposed
development. This is necessary to accurately calculate the HWL of the wetland.
c) Ensure that the post -development discharge rates to both wetlands do not exceed the
existing condition. Including the proposed infiltration basins in the hydrology
calculations should help to achieve this.
d) The curve number for the wetland areas must be 78.
Bluff Creek Woods Final A •
August 26, 2013
Page 10
RECOMMENDATION
Staff recommends approval of the final plat for Bluff Creek Woods subject to the following
conditions:
At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
3. Any use of or work within or affecting MnDOT rights -of -way requires a permit. Permit
forms are available from MnDOT's utility website at httn://www.dot.state.mn.us/utility/.
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of Lots 2 and 3 and the southeast 55 feet of Lots 1 and 2.
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback
6. The Bluff Creek Overlay District primary zone and the corresponding setback shall be shown
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary.
Site plans shall be amended to show the placement of the signs.
8. The applicant shall provide drainage calculations for pre -development and post -development
conditions.
9. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment,
whichever is stricter.
10. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.00 at the time of fmal plat recording.
11. Water that now heads west and then south along the trail and away from this area will be
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained.
Bluff Creek Woods Final A
August 26, 2013
Page 11
12. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
13. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
14. The developer shall work with staff to realign the access to Lot 1.
15. If the common portion of the driveway to Lots 1 and 2 is damaged during construction, it
must be replaced with three inches of bituminous.
16. The driveway easement shall be recorded as a separate document.
17. The grading plan must be revised so that the grades do not exceed 3H:1V.
18. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
19. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
20. The sewer and water service connections must be inspected and approved by the City.
21. The developer must submit an escrow for the sewer and water service installation and
necessary boulevard restoration associated with the service installation.
22. Lots 1 and 3 are subject to the City sewer and water hook-up charges and the Metropolitan
Council Sanitary Access Charge. Thirty percent of the City sewer and water hookups are due
with the final plat with the remaining 70 percent due with the building permit at the rate in
effect at that time. The amount due with the final plat is WAC: 2 units x $1,818/unit =
$3,636 and SAC: 2 units x $651/unit = $1,302.
23. The developer must submit a proposed street name for review and approval prior to final plat
of the property.
24. Demolition permits must be obtained before demolishing any structures on the site.
25. A final grading plan and soils report must be submitted to the Inspections Division before
permits can be issued.
26. Retaining walls over four feet high require a permit and must be designed by a professional
engineer.
27. Each lot must be provided with separate sewer and water services.
Bluff Creek Woods Final If
August 26, 2013
Page 12
28. The developer and/or their agent shall meet with the Inspections Division as early as possible
to discuss plan review and permit procedures.
29. Infiltration areas must be protected from compaction due to construction -related activities.
Plans shall be amended to indicate how this will occur.
30. The driveway for Lot 1 must be a minimum of five feet from the existing utility pedestal and
five feet from the Lot I /Lot 2 property line.
31. A driveway easement in favor of Lot 3 is required over the common driveway located on
Lot 2.
32. The existing overhead service to the existing home on Lot 2 crosses over Lot 3. The
developer's options are as follows:
a) Record a private easement over the overhead utility against Lot 3 in favor of Lot 2, or
b) Relocate the overhead utility and record any necessary private easement, or
c) Convert the service to underground
33. If not already available, the developer is responsible for extending private utilities to the
property, such as telephone, cable, electric and gas.
34. The existing propane tank must be removed from Lot 3.
35. The grading plan must be revised to include the 972 ft. and 974 ft. contours at the house pads
on Lots 3 and 1, respectively.
36. The hydrology calculations must be revised as follows:
a) Include drainage from Highway 41. The applicant is not required to treat this runoff, but
the volume for a 100-year event needs to be incorporated into the calculations to
accurately determine the 100-year elevation of the proposed stormwater feature.
b) The existing drainage area boundaries used for the runoff calculations needs to be revised
to include all the area draining to the wetlands, including area outside of the proposed
development. This is necessary to accurately calculate the HWL of the wetland.
c) Ensure that the post -development discharge rates to both wetlands do not exceed the
existing condition. Including the proposed infiltration basins in the hydrology
calculations should help to achieve this.
d) The curve number for the wetland areas must be 78.
Bluff Creek Woods Final 1
August 26, 2013
Page 13
ATTACHMENTS
1. Reduced Copy Final Plat
•
J
m
Q
/ I \
!�
� a
pl
•
£
�
rrww
s
Q
£
6
F
�
Y
<
B
�
g 9
E
`8
a.$
Y
a
t
y
�g
g
C
8$
D
�y
3
p
O
gp
6g
a
June 14, 2013
Martin Schutrop
540 Lakota Lane
Chaska, MN 55318
Re: Preliminary Plat for Bluff Creek
Woods
Planning Case #2013-09
Dear Mr. Schutrop:
BLUFF CREEK WOODS FINAL PLAT is scheduled for
the August 26, 2013 City Council meeting.
Please review the conditions of approval in this letter
with the attached plans and respond to Bob no later than
Friday. August 9.2013. Respond to each condition as
follows:
• Still applies
• Does not apply or has been met
• Is modified as follows (include modification)
• New condition
This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the
Rezoning of the property from Agricultural Estate District (A-2) to Single -Family Residential
District (RSF); PreliminaryPlat with Variances for a neck lot and the construction of a private
street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
At the entrance off Hazeltine Boulevard, a monument sign displaying all four address
numbers shall be installed. In addition, at the start of the individual driveways to each home,
an address sign shall also be installed. Submit proposed signage to Fire Marshal for
approval.
2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat
submission and approval.
3. Any use of or work within or affecting MnDOT right-of-way requires a permit. Permit forms y,,
are available from MnDOT's utility website at htti)://www.dot.state.mn.us/utiliiy/. ARU6S
4. Outlot A and the preservation easement shall be coincidental with the primary zone for the
Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone
shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2. nc r
TF'a"^ " '^* li ►fie between�tlat A ant r ^tl shalLheed-}4 fert to thesoutl�vest.
5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur
within the first 20 feet of the setback. IU m aced eradin 1 ns shall he amended to show
how .
6. The Bluff Creek Overlay District primary zone and the correspondingAetbaek shall be shown vn.
on all plan sheets.
7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at
all major angle points and at the intersection of lot lines with the primary zone boundary. 571�
Site plans shall be amended to show the placement of the signs. W ILICS
SCANNED
Martin Schutrop • •
June 14, 2013
Page 2
8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources,
the proposed driveway for Lot I shall share a common drive with Lot 2 until the existing ,�. hammerhead.
4 M'TON
IlE
9. The applicant shall provide drainage calculations for pre -development and post -development 3iw
conditions. A(P. CS
10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water
quality best management practices are still required. This shall meet the requirements of the
NPDES permit for drainage to an impaired water or NURP plus enhanced treatment, 3T pg4u �S
whichever is stricter. `.
11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the
protection of land through a combination of preservation easement and the dedication of
Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP
fees of $6,584.90 at the time of final plat recording.
IV
12. Water that now heads west and then south along the trail and away from this area will be J
directed northwest into the depression north of the shared entrance. An adequate outlet must
be provided for this area and the existing drainage patterns must be maintained. 571. WmE >
13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits.
S
14. Building permit surveys for each lot shall be required to show all inventoried trees within the
grading limits and 10 feet beyond and their removal or preservation status.
15. The developer must revise the Existing Conditions plan to show the power pole, utility box,
propane tank and shed. "`t
16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a
topographic survey was completed.
17. The developer shall work with staff to realign the access to Lot 1.
18. The developer must provide proof that the common portion of the driveway to Lots 1 and 2
meets a 7-ton design.
19. If the existing driveway does not meet the 7-ton design standard, the developer must install
the 7-ton driveway and submit an escrow with the final plat to ensure that the driveway meets
this specification.
20. The driveway easement shall be recorded as a separate document; all references to the
driveway easement shall be removed from the preliminary plat.
21. The grading plan must be revised so that the grades do not exceed 3H:1 V.
Y
Martin Schutrop
June 14, 2013
Page 3
22. A permit is required from MnDOT to install the sewer and water services as well as grading
in the right-of-way.
23. The City must be notified a minimum of 72 hours before the sewer and water services are to
be installed.
24. The sewer and water service connections must be inspected and approved by the City.
25. The developer must submit an escrow for the necessary boulevard restoration associated with
the service installation.
26. Lots 1 and 3 will be subject to the City sewer and water hook-up charges and the
Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance
with the City Code at the rate in effect at the time.
rl. l"nVr"71y4 ARisks hos-r -ee wwanao reen tee+tlt_1 �r1 i>x ro cows�R.a� t W tc"LM2O
Final plat documents must be submitted to the City 30 days prior to the City Council meeting in kv,v�a�s
which you wish to have your final plat approved. Conditions of the preliminary plat approval T.te Q,A.,.S
must be addressed for final plat approval. Enclosed is the list of items required for submittal fors rva,,_
final plat approval. AlheNeao -ro
2f. [nu` P%*- hva-t SKO,-+ -taasaW t-MSTost �cccAt %C H4 .
Mw
Should you have any questions, please contact me at (952) 227-1131 or by email at
bgenerousna ci.chanhassen.mn.us.
Sincerely,
Robert Generous, AICP
Senior Planner
Enclosure
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Perry Ryan, Ryan Engineering
g:Iplan\2013 planning cas 2013-09 bluff meek woodslappmval letter prelim plat for final plat review.doc
1ntS NEc.Es1161.7.7
Srto..� NOti, Txt S tS
�• `3c Ac�RPu Srtn
E
0
ADVANCE SURVEYING & ENGINEERING CO.
5300 Highway 101, Minnetonka, MN 55345 Phone (952) 474-7964 Fax (952) 225- 0502 Web: www.advsur.com
Date: July 19, 2013
Lot Tabulations for Bluff Creek Woods
Lot 1. Block 1: 47,625 Sq. Ft.
Lot 2. Block 1: 44,167 Sq. Ft.
Lot 3, Block 1: 33,895 Sq. Ft.
Outlot A. Block l: 30,060 Sq. Ft.
ADVANCE SURVEYING & ENGINEERING CO.
SCANNED
§
.
`
TW
}
�
%'
T
TW ^
=
m
(�
z
7
;
_
»
§2
,
- -
---
3
§
+
®-.
- --
- - -
-
- ` . m-
- - - -
<-
�
)
/
q
/
-
2
�
; z
\
m
(
,
-
:
U
w x
,2
\
§
�
p p
I I
I I
110 10 I
I I
I I
I I
I I
1
B Ww■a I M w
1!f Ma ax V f\Y uo uaO�
alas Imlm a H MT
auwo c1oa1 we aam Va x rYr uc Q x s t� Q a
L ca1 aolwr �rwsswaa
use
O oen16 aa11101�l1! Ni
� 0 1A apl R N COI IION 141�81! fT MO Y�II®R 11®Z
ru aaualls ima®R raon� n1nnL acne aaal a W
Mi a aYr, aLL � aT a�a1 a[ tell a x I®aa�a wa a •a
Mi, MO !WL �[ [1®®R 41/t COI R H api pl NC YM®
R RL.i pl Ya
BLUFF
— — �aa uc or x � 1N ar uloi o
GRAPHIC SCALE
fuel //
/ ♦9
,
' P
91
lb
, 1J
i NET LAND
bj \
/
/
/
/
FA
CREEzr
PRgORE-��M
v\��POE
FOODS
N 89-"47' W
228.05 (DEED)
RECEIVED
JUL 2 6 2013
CITY OF CHANHASSEN
vNP�P-�-�Eo
CITY OF CHANHASSEN
RECEIVED
JUL 2 6 2013
CHANHASSEN PUNNING DEPT
M
$9 PRBORE G
SCANNED
ADVANCE SURVEYING & ENGINEERING CO.
JWLL I L UP l JHLP Ri
BLUFF CIIEEX 1lOOD9
KNOW ALL PERSONS BY THESE PRESENTS: That Martin K. Schutrop and Kathleen M. Schutrop, husband and wife, fee owners of the following described
property situated in the County of Carver, State of Minnesota, to wit:
Beginning at the center of Section 9, Township 116, Range 23, Carver County, Minnesota; thence West along the North line of the Southwest Quarter of said section a
distance of 225.05 feet; thence deflecting to the left 49 degrees 15 minutes a distance of 514.5 feet along the Easterly right-of-way line of State Highway No. 41; thence
deflecting to the left 130 degrees 45 minutes on a line parallel to the North line of the said Southwest Quarter of said section a distance of 571 feet more or less, to a
point on the East line of the Southwest Quarter of said section distant 390 feet South of the center of said section; thence North along the East Tine of the Southwest
Quarter of said section a distance of 340 feet to the point of beginning, according to the United States Government Survey thereof and situate in Carver County,
Minnesota.
Has caused the same to be surveyed and platted as BLUFF CREEK WOODS and does hereby donate and dedicate to the public for public use forever the easements as
shown on this plar for drainage and utility purposes only.
In witness whereof said Martin K. Schutrop and Kathleen M. Schutrop, husband and wife, have hereunto set their hands this _ day of 2013,
Martin K. Schutrop
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me this day of
Notary Public, _
My Commission
Kathleen M_ Schutrop
County, Minnesota Notary Primed Name
2013, by Martin K. Schutrop and Kathleen M. Schutrop.
1 hereby certify that 1 surveyed and platted or directly supervised the surveying and platting of the lard described on this plat, this plat is a correct representation of the
boundary survey; that all mathematical data and labels are correctly designated on the plat, all monuments depicted on this plat have been, or will be correctly set
within one year, all water boundaries and wet lands as of the date of this date are shown and labeled; and all public ways are shown and labeled.
James n. career, tlegenered land Surveyor
Minnesota License No. 9235
STATE OF MINNESOTA
COUNTYOF
The foregoing Surveyor's Certificate by James H. Parker, Minnesota License No. 9235, was acknowledged before me this day of
.2013.
Notary Public, _
My Cammrssne,
Minnesota Notary Printed Name
CHANHASSEN, MINNESOTA
This plat of Bluff Cmek Woods was approved and accepted by the City Council of the City of Chanhassen, Minnesota at a regular mating thereof held tlnis
day of . 2013, and is in compliance with the provisions of Minnesota Statutes, Section 505.03, Solid. 2.
CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA
Mayor Clerk
COUNTY SURVEYOR Carver County, Minnesota
Pursuant to Chapter 395, Minnesota Laws of 1971, this plat has been approved this day of .2013
John E. Freemyer, County Surveyor By:
COUNTY AUDITORfrREASURER, Carver County, Minnesota
I hereby certify that taxes payable in and prior years have been paid for land desmbed on this plat Dated this day of 2013
Laurie Engelen, Courtly AuddoriTreasurer By:
COUNTY RECORDER, Carver County, Minnesota
1 hereby certify that this plat of BLUFF CREEK WOODS was filed this _ day of , 2013 in —o'clock _.M as Document
No.
Carl W. Hansom. Jr_ County Recorder By:
SCANNED
ADVANCE SURVEYING & ENGINEERING CO.
SHEET J OF 2 SHEETS