Loading...
CAS-12_WATER TREATMENT PLANT - CITY OF CHANHASSEN (5)1 1 1 1 i 1 1 Preliminary Design Report East Water Treatment Plant Chanhassen, Minnesota SEH No. A-CHAHN0502.00 January 10, 2005 SEH Multidisciplined. Single Source. Trusted solutions for more than 75 years. -A SEH January 10, 2005 RE: City of Chanhassen East Water Treatment Plant Preliminary Design Report SEH No. A-CHANH0502.00 Mr. Paul Oehme, PE Director of Public Works/City Engineer City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317-0147 Dear Mr. Oehme: Enclosed please find our Preliminary Design Report. The contents include all the items called for in the City's Request for Proposal (RFP) and our proposal. Please review with your staff and with other City officials as required. ' We look forward to continued discussion with and input from you and your staff, and the start of final design. ' Please call with your comments or questions. I 11 H Sincerely, 4-4,� P James P. Norton, PE Project Manager nn Enclosure x:�acicFanM1N14R1YXrzporu.�Iwa:,WyreLmtlr igndc Jay R. Whitaker, PE Project Engineer Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer I vv w.sehinc.conn 1 651.490.2000 1 800.325.2055 1 651.490.2f50 fax [1 1 1 Letter of Transmittal Table of Contents L [1 1 r 1 t r 1 1 1 Table of Contents Page 1.0 Background.............................................................................................................1 2.0 Discussion...............................................................................................................2 3.0 Schedule..................................................................................................................3 4.0 Preliminary Construction Cost Estimate...............................................................3 5.0 Typical Specification Sections...............................................................................4 List of Drawings Drawing GG2 Sheet Index Drawing C1 Site Plan Grading Drawing C2 Site Plan Grading Drawing 01 P1 Lower Level Plan Drawing 01 P2 Main Level Floor Plan Drawing 01 P3 Upper Level Floor Plan Drawing 01 P4 Typical Section Study A Exterior Elevation SEH is a registered trademark of Short Elliott Hendrickson Inc. Preliminary Design Report City of Chanhassen A-CHAHN0502.00 Page ' January 10, 2005 I ' Preliminary Design Report IEast Water Treatment Plant Prepared for City of Chanhassen 1.0 Background The City of Chanhassen provides municipal water to its residents from eight ' wells. The raw water exceeds the recommended levels for both iron and manganese and the arsenic levels are approaching the Maximum Contaminant Level (MCL) of 10 parts per billion (ppb) in Well Nos. 5 and 6. Limited sequestering treatment is provided with the addition of chlorine at the well houses. Fluoride is also added at the well houses as required by the State of Minnesota to prevent tooth decay. The average iron and manganese levels in Well Nos. 2, 5 and 6 are 0.8 parts per million (ppm) and 0.3 ppm, respectively. This is about 3 times the iron standard (0.3 ppm) and about 7 times the manganese standard (0.05 ppm). These levels are too high for effective sequestering treatment. Well Nos. 5 and 6 also have arsenic present at levels approaching the MCL. Absorption of arsenic into the iron floc and subsequent filtration is expected to reduce the arsenic levels by about 80% in the water treatment plant's (WTP) finished water. Thus, the City desires to provide improved water quality through the construction of a new WTP. It is anticipated a minimum of three to four new wells will be needed in the future to provide additional supply capacity that will be treated at the new WTP. In preparation for the present WTP design, the following studies have been performed: ' 1. Pilot Report for the Removal of Iron, Manganese and Arsenic, May 17, 2004. The pilot plant study confirmed the effectiveness of the proposed treatment. 2. Distribution System Capacity Study, May 20, 2004. This computer model study confirmed the existing distribution system is adequate to handle the output from a new 6,000 gallon per minute (gpm) WTP ' located at the Ready Mix Site. 3. Lotus Lake Well Siting Study, May 20, 2004. This study confirmed the ' glacial drift and Prairie du Chien -Jordan aquifers could each provide one new 1,000 gpm (max. rate) well at both the WTP Ready Mix Site and the South Lotus Lake Park Site. 1 A-CHAHN0502.00 ' Page 1 n Lt✓ 4. Preliminary Investigation Report, Lotus Lake Water Treatment Plant, May 24, 2004. This report and subsequent review with the Minnesota Department of Health confirmed the Ready Mix Site A to be the most suitable for a new WTP. 5. Security system will include consideration of potential future homeland defense security requirements and have a high level of automation. This ' item will be addressed in more detail at the 60% review stage. 2.0 Discussion ' SEH received City Council approval to provide engineering services for a new WTP on October 25, 2004. An initial kick-off meeting was held on November 4, 2004 followed by a complete design team kick-off meeting on December 9, 2004. Preliminary design commenced for a 6,000 gpm iron, manganese and arsenic removal WTP at the Ready Mix Site (Site A). The site is located between Highway 5 and the Twin Cities and Western Railroad and just west of the intersection of Highway 5 (Arboretum Boulevard) and Chanhassen Road. The WTP will have the following features: ' ■ Water Treatment: — In -line pressure aeration. — Chlorine and potassium permanganate addition. — Gravity filtration using green sand and anthracite media. — Fluoride addition for prevention of tooth decay (state requirement). ' — Orthophosphate addition as a corrosion inhibitor. ■ The WTP below -grade components and the filter cells will be constructed with cast -in- place reinforced concrete. ■ A finished water clearwell pumping chamber will be provided below the WTP operating floor. ■ The WTP above -grade components will be constructed with brick and block. ■ The WTP roof will be a blend of sloped standing seam metal roofs and ' flat roofs with parapet perimeter walls. ■ A buried Filter Backwash Tank will be constructed adjacent to the WTP. It will also be constructed of poured -in -place concrete and provide for the recycling of 90% water used in the filter backwash process. ' ■ The WTP will include a control room, laboratory, meeting room, break room and a uni-sex toilet, in addition to the basic treatment and pumping facilities. ■ A standby power generator will be provided to enable the WTP to ' operate when the local electric power grid is inoperative. ■ The WTP operation will be tied into the City's SCADA system and be designed for automatic un-manned operation. Preliminary Design Report A-CHAHN0502.00 City of Chanhassen Page 2 I ' ■ An emergency overflow system to prevent any damage due to equipment malfunction or operator error. The local stormwater system must ' accommodate this flow. ■ A Security system will include consideration of potential future homeland defense security requirements. This item will be studied at the ' 60% design review. The following items are submitted for the preliminary design review or will be available at the work session for review: 1. Site Plan. 2. Floor Plan. 3. Typical WTP Cross Section. 4. Architectural Elevation. 5. Samples of Architectural Materials. 3.0 Schedule ' The tentative schedule is as follows: 30% Design review.................................................................January 10, 2005 60% Design Review.............................................................February 28, 2005 90% Design Review...................................................................April 11, 2005 Approve Pans & Specifications ....................................................May 9, 2005 OpenBids..........................................................................................June 2005 Start Construction............................................................................. July 2005 Start up of Treatment Plant........................................................... August 2006 Alternate Start Up of Treatment Plant .....................................December 2006 4.0 Preliminary Construction Cost Estimate Basic WTP in 2004 Dollars [including Sewer Availability Charge(SAV)] ............................ $9,000,000.00 Inflation @ 5%..............................................................................$450,000.00 ' Deduct for Longer Construction Schedule ................................. ($300,000.00) Engineering Fee............................................................................. $638,500.00 Subtotal....................................................................................... $9,788,500.00 Contingency at 7.27%.................................................................... $711,500.00 ' TOTAL..................................................................................... $10,500,000.00 Deduct for State Sales Tax Rebate (Reimbursement) ................ ($300,000.00) ' Net Total Cost................................................................ $10,200,000.00 Preliminary Design Report A-CHAHN0502.00 ' City of Chanhassen Page 3 5.0 Typical Specification Sections Number Document 00001 Title Page 00005 Certification 00008 Project Directory 00010 Table of Contents BIDDING REQUIREMENTS 00100 Advertisement for Bids 00200 Instructions to Bidders 00320 Geotechnical Data 00330 Pilot Plant Report 00340 Well Logs 00350 Water Quality Analysis 00370 Existing Sanitary Sewer and Water Main Drawings 00410 Bid Form 00432 List of Proposed Subcontractors 00434 List of Proposed Suppliers 00455 Non-discrimination Affidavit 00456 Project References Chanh. Affidavit of Non -Collusion CONTRACT FORMS 00520 Standard Form of Agreement 00610 Performance Bond 00615 Payment Bond IC-134 Taxation Affidavit CONDITIONS OF THE CONTRACT 00700 Standard General Conditions 00800 Supplementary Conditions Preliminary Design Report City of Chanhassen A-CHAHN0502.00 Page 4 ' SPECIFICATIONS Section Title - DIVISION 1- GENERAL REQUIREMENTS Summary 01110 Summary of Work 01120 Work Sequence Price and Payment Procedures 01210 Allowances 01230 Alternates ' 01290 Applications for Payment Administrative Requirements ' 01310 Coordination 01315 Project Meetings 01325 Progress Schedules ' 01330 Submittal Procedures Quality Requirements 01410 Code Review 01421 Specification Format Definitions and Abbreviations 01422 Reference Standards 01450 Quality Control ' 01458 Testing Laboratory Services Temporary Facilities and Controls ' 01505 Mobilization 01510 Temporary Utilities ' 01518 Temporary Water 01521 Field Office 01522 Storage and Fabrication Sheds 01552 Access Roads and Parking Areas 01555 Maintenance and Restoration of Haul Roads 01567 Air, Land and Water Pollution 01570 Temporary Controls 01572 Erosion Control ' 01574 Application of Water 01576 Application of Calcium Chloride ' 01581 Project Signs Product Requirements ' 01600 Product Requirements 01630 Product Substitution Procedures Preliminary Design Report A-CHAHN0502.00 ' City of Chanhassen Page 5 ' Execution Requirements 01725 Field Engineering 01750 01770 Starting and Adjusting Closeout Procedures 01784 Operation and Maintenance Data 01788 Product Warranties DIVISION 2 - SITE CONSTRUCTION rSite Remediation 02120 Handling of Contaminated Soils/Debris Site Preparation 02228 Removing Pavement and Miscellaneous Structures 02232 Clearing and Grubbing Earthwork 02310 Site Grading ' 02316 Excavation and Embankment 02318 Trench Excavation and Backfill 02320 Structure Excavations and Backfills ' 02338 Subgrade Preparation 02345 Geotextile Installation 02372 Temporary Erosion Control ' 02376 Riprap Tunnel, Boring, and Jacking 02405 Subsurface Crossings Utility Services ' 02510 Chanh. Water Distribution Systems Water Main Specifications 02530 Sanitary Sewer Systems Chanh. Sanitary and Storm Sewer Specifications ' Drainage and Containment 02630 Storm Sewer Systems 02634 Manholes and Catch Basins ' 02660 Storm Water Holding Ponds Bases, Pavements, and Appurtenances ' 02722 Aggregate Base 02742 Plant -Mixed Bituminous Pavement 02744 Plant -Mixed Bituminous Pavement Quality Assurance ' (QUA) 02748 Bituminous Tack Coat ' 02765 02772 Pavement Marking Concrete Curbing 02775 Walks Preliminary Design Report A-CHAHN0502.00 City of Chanhassen Page 6 ' Planting 02920 Turf Establishment ' 02930 Plant Installation 02931 Exterior Plants Site Restoration and Rehabilitation 02956 Television Inspection of Sewers ' DIVISION 3 - CONCRETE 03300 Cast -in -Place Concrete 03400 Precast Concrete Hollow Core Slabs ' 03402 Precast Concrete Structures 03450 Plant -Precast Architectural Concrete DIVISION 4 - MASONRY ' 04810 Unit Masonry Assemblies J l� II u Preliminary Design Report ' City of Chanhassen DIVISION 5 - METALS 05120 Structural Steel 05500 Metal Fabrications 05521 Aluminum Handrails and Railings 05530 Gratings and Floor Plates DIVISION 6 - WOOD AND PLASTICS 06105 Miscellaneous Carpentry 06400 Interior Architectural Woodwork 06620 Glass Fiber Reinforced Plastic Panels DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07130 Sheet Waterproofing 07210 Building Insulation 07220 Nail Base Rigid Board Insulation 07410 Metal Roofing and Wall Panels 07511 Built-up Asphalt Roofing 07620 Sheet Metal Flashing and Trim 7840 Firestopping 07920 Joint Sealers A-CHAHN0502.00 Page 7 DIVISION 8 - DOORS AND WINDOWS 08010 Door and Frame Schedule ' 08110 Steel Doors and Frames (Heavy Commercial) 08210 Wood Doors 08220 Plastic Doors ' 08315 Roof and Floor Hatches 08410 Aluminum Framed Storefront 08520 Aluminum Windows 08710 Finish Door Hardware 08800 Glazing tDIVISION 9 - FINISHES 09250 09300 Gypsum Board Tile 09512 Acoustical Ceiling Panel System 09658 Resilient Tile Flooring and Base 09670 Fluid Applied Flooring 09915 Shop Painting 09966 Coating Systems for Industrial Facilities 1 DIVISION 10 - SPECIALTIES ' 10430 Dimensional Letters and Plaques 10520 Fire Protection Specialties 10810 Toilet Accessories ' DIVISION 11- EQUIPMENT Audio -Visual Equipment 11132 Projection Screens Water Supply and Treatment Equipment 11200 Process Equipment General Provisions 11216 Non -Clog Submersible Pumps 11218 Plant Vertical Turbine Pumps 11243 Potassium Permanganate Feed Equipment 11244 Fluoride Feed Equipment ' 11245 Orthophosphate Feed Equipment 11248 Chemical Transfer Pumps l t262 11280 Sodium Hypochlorite Feed Equipment Gravity Filter System 11370 Packaged Air Compressed System 11372 Air Wash Blower Preliminary Design Report A-CHAHN0502.00 ' City of Chanhassen Page 8 I DIVISION 12 - FURNISHINGS 12510 Office Furniture and Accessories DIVISION 13 - SPECIAL CONSTRUCTION 13215 Disinfection Water of Storage Facilities DIVISION 14 CONVEYING SYSTEMS - ' 14600 Hoists and Cranes DIVISION 15 - MECHANICAL 15020 Mechanical General Provisions 15050 Basic Mechanical Materials and Methods ' 15060 Pipes, Pipe Fittings, Valves and Unions 15080 Mechanical Insulation 15130 Gauges and Thermometers 15140 Supports and Anchors 15150 Meters 15170 Motors 15185 Electrical ' 15190 Mechanical Identification 16195 Mechanical Sound, Vibration Control 15205 15220 Process Piping General Provisions Process Water and Waste Piping 15221 Process Instrumentation Piping 15240 Process Piping Valves and Operators ' 15250 Process Piping Specialties 15260 Process Piping Hangers and Supports 15295 Process Piping Testing, Adjusting, and Disinfection 15300 Fire Protection 15310 Fire Protection Piping 15330 Wet Pipe Sprinkler System 15400 Plumbing ' 15410 Plumbing Piping 15430 Plumbing Specialties 15440 Plumbing Fixtures 15450 Plumbing Equipment 15500 Heating, Ventilating, and Air Conditioning 15510 15515 Hydronic Piping Hydronic Specialties 15530 Refrigerant Piping 15540 HVAC Pumps 15545 Chemical Water Treatment 15550 Heat Generation 15555 Boilers Preliminary Design Report A-CHAHN0502.00 ' City of Chanhassen Page 9 I 1 DIVISION 15 — MECHANICAL (CONT.) 15575 Breechings and Stackings 15650 Refrigeration 15670 Condensing Units 15750 Heat Transfer 15780 Packaged Air Conditioning Units 15820 Dehumidifiers 15830 Terminal Heat Transfer Units 15850 Air Handling 15855 Air Handling Units With Coils 15860 Centrifugal Fans 15870 Power Ventilators 15880 Air Distribution 15890 Ductwork 15910 Ductwork Accessories 15930 Air Terminal Units 15940 Air Outlets and Inlets 15950 Controls 15990 Testing, Adjusting and Balancing 15992 Piping Systems Testing, Adjusting and Balancing 15993 Air Systems Testing, Adjusting and Balancing 15994 Demonstration of Mechanical Equipment DIVISION 16 - ELECTRICAL General Provisions 16010 ' 16100 16150 16200 16400 16500 16700 ' 16900 '16950 ' 16951 ' Appendix A ' nn Electrical General Provisions Basic Materials and Methods Motors Standby Power Generation System Electrical Service & Distribution Lighting Special Systems Starters and Motor Control Instrumentation and Control and Access Control / Security SCADA System and Access Control / Security System Suppliers Cable and Conduit Schedule Preliminary Design Report A-CHAHN0502.00 ' City of Chanhassen Page 10 4 4 n 9yb ®Id—V_ e E t J G . 78� /4 9 s STORM WATER POND d� s 942 9 �6` a i m \ 24- a. 24" CU —DE—SAC \ � 16 o \ � m � 7 Oo s+- s 1 0� Q 9 EL¢ eA • 1 0 9 WELL n 0 4N LOWER LEVEL PLAN o Y e' GENERAL DRAWINGS (G) G-Cl TITLE SHEET G-G2 SHEET INDEX REMOVAL DRAWINGS_(R) R-Cl REMOVAL. RELOCATE AND ABANDON PLAN (') CIVIL DRAWINGS C-C LEGEND AND SECTIONS (•) G-C2 STE uYOUT PLAN (•) C-C GRADING PLAN (•) C-C2 GRADING RAN (•) C-C3 UTILITY PLAN (•) C-C4 WATFANAIN TO WELLS (•) C-CS WATERWAN TO WELLS (•) D-Cl CIVIL DETAILS (•) D-C2 CIVIL DETAILS (•) D-GT CIVIL DETAILS (•) ARCHITECTURAL DRAWINGS G-Al GENERAL NOTES AND TYPICAL MOUNTING HEIGHTS. LEGENDS AND ABBREVIATIONS C-A2 FIRE STOPPING DETAILS , WALL TYPES AND OOLONG CODE M-At LOWER LEVEL PLAN M-A2 MAIN LEVEL PLAN 01-A3 GALLERY LEVEL PLAN DI-A4 UPPER LEVEL PLAN AT MNDOWS 01-A5 ROOF PLAN 01-M MAIN LEVEL EFLARGED PLAN AND REELECTED CEILING PLAN 01-A7 EXTFNOt ELEVATORS O1-AS EXTERIOR ELEVATIONS 01-AS BUILDING SECTIONS 01-AIO BUILDING SECTIONS M-All BUILDING SECTIONS 01-Al2 WALL SECTIONS GI-A13 WALL SECTONS O1-A14 WALL SECTIONS O1-A15 WALL SECTIONS Ot-A, WALL SECTIONS O-A17 INTERIOR ELEVATIONS AND DETAILS. ROOM FINISH SCHEDULE. OPENING SCHEDULE O1-AlO DOON, FRAME, W1N110w AND LOUVER TYPES AND DETAILS M-Al9 EXTERIOR DETAILS 01-A20 EXTERIOR DETAILS N-A21 EXTERIOR DETAILS N-A22 EXTE OR DETAILS OI-A23 EXTERIOR DETAILS AND PRECAST TYPES PROCESS DRAWINGS G-PI PROCESS ABBREVIATIONS, LEGENDS. AND GENERAL NOTES G-P2 PROCESS SCHEMATIC G-P3 PROCESS VALVE SCHEDULE STRUCTURAL DRAWINGS 01-P1 LOWER LEVEL FLOOR PLAN N-P2 MAIN LEVEL FLOOR PLAN G-S1 GENERAL NOTES AND ABBREVIATIONS N-P3 UPPER LEVEL FLOOR PLAN N-P4 LOWER LEVEL ENLARGED FLOOR PUN 01-SI STRUCTURAL KEY PLANS 01-P5 MAIN LEVEL ENLARGED FLOOR PLAN OI-S2 FOUNDATION PUN N-P6 MAIN LEVEL ENLARGED FLOOR PLAN 0-W MAN LEVEL PLAN 01-P7 UPPER LEVEL ENLARGED FLOOR PLAN M-S4 UPPER LEVEL PUN O-P8 BUILDING SECTION O-S5 ROOF FRAMING PUN 01-P9 BUILINNG SECTION 01-W ENLARGED PLANS, SECTONS h DETAILS O-PIO WILDING SECTION O1-S7 STAIR R LANDINGS, SECTONS k DETAILS 01-Pil BUILDING SECTION 01-S8 SECTIONS k DETAILS 01-P12 BUILDING SECTION 01-S9 SECTIONS @ DETAILS 01-Pi3 WILDING SECTION 01-SIO SECTIONS h DETAILS Ol-P14 BUILDING SECTION 01-Sll SECTONS R DETAILS O-P15 BUILDING SECTION 01-S12 SECTIONS k DETAILS 01-S13 SECTIONS R DETAILS 02-P1 BELOW GRADE PLAN 01-S14 GRAIN RAIL SECTIONS h DETAILS 02-P2 SECTIONS 01-S15 BEAM h COLUMN SECTIONS § DETAILS 02-P3 SECTIONS 02-51 SLAB PLAN 0-PI STANDADETAILS 02-OVVER S.FOUNDATION COVER SLAB PLANO-P3 CS3 D-P2 STANDARD DETAILS 02-W SECTONS AND DETAILS STANDARD DETAILS 02-S4 SECTIONS AND DETAILS D-P4 STANDARD DETAILS ox-ss gcnaws AND DETAILS D-P4 STANDARD DETAILS D-SI DETAILS D-S2 DETAILS D-53 DETAILS D-S4 DETAILS D-SS DETAILS D-S6 DETAILS MECHANICAL DRAWINGS G-MI MECHANICAL ABBREVIATIONS h SYMBOLS 01-MI UNDER FLOOR PLUMBING PLAN 01-M2 MAIN LEVEL PLUMBING h PIPING PLAN 01-M3 UPPER LEVEL MECHANICAL PLAN 01-M4 MAIN LEVEL DUCTVICRI PLAN 01-M5 MECHANICAL ROOF PLAN N-M6 MECHANICAL PARTIAL PLAN AND PLUMBING PIPNG DIAGRAMS 01-117 FIRE SPIMIQER PLAN D-MI DETAILS D-M2 EOUIPMENT SCHEDULES ELECTRICAL DRAWINGS G-El ELECTRICAL SYMBOLS AND ABBREVIATIONS G-E2 EECTRICAL SCADA SYSTEM CONFIGVRAnCN DIAGRAM G-E3 ELECTRICAL INSTAIIATON DETAILS G-E4 ELECTRICAL INSTALLATION DETAILS G-E5 ELECTRICAL NSTALLAMON DETAILS C-El SITE W - ELECTRICAL SITE PLAN C-E2 SITE WDRIR - ENLARGED CENERATOR AREA PLAN 02-El MAIN LEVEL ELECTRICAL OVERVIEW PLAN 01-E2 MAIN LEVEL. PROCESS ELECTRICAL PLAN - EAST PORTION W -ED MAIN LEVEL PROCESS ELECTRICAL PUN - WEST PORTIGN 01-E4 MAIN LEVEL LIMITING AND GENERAL POWER PLAN 01-0 UPPER LEVEL ELECTRICAL PLAN 01-E6 ELECTRICAL MOTOR CONTROL CENTER (MCC) ORE -ENE DIAGRAM 01-U ELECTRICAL MOTOR CONTROL CENTER (MCC) ONE -ENE DIAGRAM 01-E8 ELECTRICAL DISTRIBUTION PANELS DPI ! DP2 ONE -RUNE DIAGRAM OI-E9 ELECTRICAL MOTOR CONTROL. SCHELATICS 01-EIO ELECTRICAL MOTOR CONTROL SCHEMATICS AND MCC ELEVATION 01-Ell ELECTRICAL SCHEDULES N-E12 ELECTRICAL PANEL 'A' SCHEMATC 01-E13 ELECTRICAL PANEL 'A' SCELIATIC OI-E14 ELECTRICAL PANEL 'A' SOREAARC W-EIS ELECTRICAL PANEL 'A' SCHEMARC OI-E16 ELECTRICAL PANEL 'A' SCHEMATIC N-E17 ELECTRICAL PANEL 'A' SCHEMATC 01-EIS ELECTRICAL PANEL 'A' SCEMATC Ot-E19 ELECTRICAL PANEL 'A' SCHEMATIC 01-UO ELECTRICAL PANEL'A' SCHEMATIC 01-E21 ELECTRICAL PANEL 'A' SCHEMATIC O-E21A ELECTRICAL PANEL'A' SCHEMATC 01-M ELECTRICAL PANEL 'A' SCHEMATIC M-E22A ELECTRICAL PANEL 'A' SCHEMATIC Oi-E23 ELECTRICAL PANEL *A' SCHEMATIC N-E24 ELECTRICAL PANEL 'A' SCHEMATIC al-E25 ELECTRICAL PANEL'S' SCHI IATIC DI-E26 EtECMICAL WATER TREATMENT PUNT MISC SCHEMATICS NOrs. SHEET TIRES ON THIS SHEET INDEX ENDING WAIN AN ASTERISK SHALL BID UNDER SO SCHEDULE W UM.ESS NOTED OTHERWISE. SHEET TIRES ON THIS SIM INDEX NOT ENDING IN AN ASTERISK SMALL BE UNDER 00 SCHEDULE 'A' UNLESS OTHERWISE NOTED. SHEET NUMBERING LEGEND STIR ICTIIR IDENTIFIER OR SHEET TYPE G GENERAL INFORMATION C SITEWORK 01 WATER TREATMENT PLANT 02 BACKWASH TANK D STANDARD DETAILS FNCCIoU INF G GENERAL R REMOVAL C CIVIL S STRUCTURAL A ARCHITECTURAL p PROCESS M MECHANICAL E ELECTRICAL t 0 r- ao h u i i t 1 \ m \ SAC \ \ Oz \ 7 Op 34" 0�O + / n � �j e it • w Li) 7�.. ;� G e �•�a ������� Y d 11 � •. � � � � ?� T3''.-Pa`� a'�tF`rT�`+.3)"'..ir�°' -tom':-r {� 'r4, i � ; �_ a■ j „®u n� _ niu�� 114 . ',=, ,I �`a,•i { / � �•" ■ is J': <R) MPdN LEVEL FLOOR PLAN i'w�\ UPPER LEVEL FLOOR PLAN �r ° 1 v paa of oy a� N S 6 1n o e§ ig4 3 22iOC�mm 9�i .S.FY a N ¢ �O 0 YXa. 01P3 a PEDESTRIANEXISTING MIDGE 1'a<"'P� CV VY� YY� YYY� YYY� Y�NYYYVCYYYVQYJ �'J <'< YYYYYYYYY i. �; • , • � � • I _'___ • ■ ■ � � ■ 1 �� r`�JpJ?�?�tQ�'�Y� _ ' �Ob\yaj�� ��j��� ♦ �� .�T,`A. r. �♦ Clem»��0 �" �r TYPICAL SECTION 1 r e ��■ � '-�_ - �- -- i = - s �eia I _, -- _ ,R:� - �� u .� u .ev iad �� i� _ _ _ _ _ _ -iO m ie01-� ieO—iOF. v ea v vv v o v v vv v s e_s �es���v eei e I" I - w o ovv 1 v 71 :q vs -eias v .�.��- Chanhassen Waler Treahnenl Planl _ _sMMZ' —w�r.•R •� " 6 8•,i • a —em -off o=WREIMM 7A ■ ■ ie ie— I = nr Trn,%frrnnt O A U A 0 SEH TRANSMITTAL To: Kate Aanenson Community Development Director 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 0 Date: March 3, 2005 SEH File No.: achanh0502.00 Client No.: Re: Planning Commission Packet - East Water Treatment Plant We are: ® Enclosing ❑ Sending under separate cover ❑ Sending as requested 26 copies Site plan, Grading and Yard piping plan Exterior Building Elevations MAR 0 4 2005 CITY OF CHANHASSEN For your: ® Information/Records ❑ Review and comment ❑ Approval ❑ Action ❑ Distribution ❑ Revision and resubmittal Remarks: Landscape plan to follow by middle next week. Materials sample package sent separately By: c: JRW JPN CITY OF CN RECE �EpSSEN h'AR 0 4 2005 CHANHASSEN PANNING OEpr Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer i wv w.sehinc.com 1 651.490.2000 1 600.325.2055 1 651.490.2150 fax