Preliminary Design Report
East Water Treatment Plant
Chanhassen, Minnesota
SEH No. A-CHAHN0502.00
January 10, 2005
SEH
Multidisciplined. Single Source.
Trusted solutions for more than 75 years.
-A
SEH
January 10, 2005
RE: City of Chanhassen
East Water Treatment Plant
Preliminary Design Report
SEH No. A-CHANH0502.00
Mr. Paul Oehme, PE
Director of Public Works/City Engineer
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317-0147
Dear Mr. Oehme:
Enclosed please find our Preliminary Design Report.
The contents include all the items called for in the
City's Request for Proposal (RFP) and our proposal.
Please review with your staff and with other City
officials as required.
'
We look forward to continued discussion with and input from you and your staff, and the start of final
design.
'
Please call with your comments or questions.
I
11
H
Sincerely,
4-4,� P
James P. Norton, PE
Project Manager
nn
Enclosure
x:�acicFanM1N14R1YXrzporu.�Iwa:,WyreLmtlr igndc
Jay R. Whitaker, PE
Project Engineer
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196
SEH is an equal opportunity employer I vv w.sehinc.conn 1 651.490.2000 1 800.325.2055 1 651.490.2f50 fax
[1
1
1 Letter of Transmittal
Table of Contents
L
[1
1
r
1
t
r
1
1
1
Table of Contents
Page
1.0 Background.............................................................................................................1
2.0 Discussion...............................................................................................................2
3.0 Schedule..................................................................................................................3
4.0 Preliminary Construction Cost Estimate...............................................................3
5.0 Typical Specification Sections...............................................................................4
List of Drawings
Drawing GG2
Sheet Index
Drawing C1
Site Plan Grading
Drawing C2
Site Plan Grading
Drawing 01 P1
Lower Level Plan
Drawing 01 P2
Main Level Floor Plan
Drawing 01 P3
Upper Level Floor Plan
Drawing 01 P4
Typical Section
Study A
Exterior Elevation
SEH is a registered trademark of Short Elliott Hendrickson Inc.
Preliminary Design Report
City of Chanhassen
A-CHAHN0502.00
Page
' January 10, 2005
I
' Preliminary Design Report
IEast Water Treatment Plant
Prepared for City of Chanhassen
1.0 Background
The City of Chanhassen provides municipal water to its residents from eight
'
wells. The raw water exceeds the recommended levels for both iron and
manganese and the arsenic levels are approaching the Maximum
Contaminant Level (MCL) of 10 parts per billion (ppb) in Well Nos. 5 and 6.
Limited sequestering treatment is provided with the addition of chlorine at
the well houses. Fluoride is also added at the well houses as required by the
State of Minnesota to prevent tooth decay. The average iron and manganese
levels in Well Nos. 2, 5 and 6 are 0.8 parts per million (ppm) and 0.3 ppm,
respectively. This is about 3 times the iron standard (0.3 ppm) and about 7
times the manganese standard (0.05 ppm). These levels are too high for
effective sequestering treatment. Well Nos. 5 and 6 also have arsenic present
at levels approaching the MCL. Absorption of arsenic into the iron floc and
subsequent filtration is expected to reduce the arsenic levels by about 80% in
the water treatment plant's (WTP) finished water. Thus, the City desires to
provide improved water quality through the construction of a new WTP. It is
anticipated a minimum of three to four new wells will be needed in the future
to provide additional supply capacity that will be treated at the new WTP.
In preparation for the present WTP design, the following studies have been
performed:
'
1. Pilot Report for the Removal of Iron, Manganese and Arsenic, May 17,
2004. The pilot plant study confirmed the effectiveness of the proposed
treatment.
2. Distribution System Capacity Study, May 20, 2004. This computer
model study confirmed the existing distribution system is adequate to
handle the output from a new 6,000 gallon per minute (gpm) WTP
'
located at the Ready Mix Site.
3. Lotus Lake Well Siting Study, May 20, 2004. This study confirmed the
' glacial drift and Prairie du Chien -Jordan aquifers could each provide one
new 1,000 gpm (max. rate) well at both the WTP Ready Mix Site and the
South Lotus Lake Park Site.
1
A-CHAHN0502.00
' Page 1
n
Lt✓
4. Preliminary Investigation Report, Lotus Lake Water Treatment Plant,
May 24, 2004. This report and subsequent review with the Minnesota
Department of Health confirmed the Ready Mix Site A to be the most
suitable for a new WTP.
5. Security system will include consideration of potential future homeland
defense security requirements and have a high level of automation. This
'
item will be addressed in more detail at the 60% review stage.
2.0 Discussion
'
SEH received City Council approval to provide engineering services for a
new WTP on October 25, 2004. An initial kick-off meeting was held on
November 4, 2004 followed by a complete design team kick-off meeting on
December 9, 2004. Preliminary design commenced for a 6,000 gpm iron,
manganese and arsenic removal WTP at the Ready Mix Site (Site A). The
site is located between Highway 5 and the Twin Cities and Western Railroad
and just west of the intersection of Highway 5 (Arboretum Boulevard) and
Chanhassen Road. The WTP will have the following features:
'
■ Water Treatment:
— In
-line pressure aeration.
— Chlorine and potassium permanganate addition.
— Gravity filtration using green sand and anthracite media.
— Fluoride addition for prevention of tooth decay (state requirement).
'
— Orthophosphate addition as a corrosion inhibitor.
■ The WTP below -grade components and the filter cells will be
constructed with cast -in- place reinforced concrete.
■ A finished water clearwell pumping chamber will be provided below the
WTP operating floor.
■ The WTP above -grade components will be constructed with brick and
block.
■ The WTP roof will be a blend of sloped standing seam metal roofs and
'
flat roofs with parapet perimeter walls.
■ A buried Filter Backwash Tank will be constructed adjacent to the WTP.
It will also be constructed of poured -in -place concrete and provide for
the recycling of 90% water used in the filter backwash process.
'
■ The WTP will include a control room, laboratory, meeting room, break
room and a uni-sex toilet, in addition to the basic treatment and pumping
facilities.
■ A standby power generator will be provided to enable the WTP to
'
operate when the local electric power grid is inoperative.
■ The WTP operation will be tied into the City's SCADA system and be
designed for automatic un-manned operation.
Preliminary Design Report A-CHAHN0502.00
City of Chanhassen Page 2
I
'
■ An emergency overflow system to prevent any damage due to equipment
malfunction or operator error. The local stormwater system must
'
accommodate this flow.
■ A Security system will include consideration
of potential future
homeland defense security requirements. This item
will be studied at the
'
60% design review.
The following items are submitted for the preliminary design review or will
be available at the work session for review:
1. Site Plan.
2. Floor Plan.
3. Typical WTP Cross Section.
4. Architectural Elevation.
5. Samples of Architectural Materials.
3.0 Schedule
'
The tentative schedule is as follows:
30% Design review.................................................................January
10, 2005
60% Design Review.............................................................February
28, 2005
90% Design Review...................................................................April
11, 2005
Approve Pans & Specifications ....................................................May
9, 2005
OpenBids..........................................................................................June
2005
Start Construction.............................................................................
July 2005
Start up of Treatment Plant...........................................................
August 2006
Alternate Start Up of Treatment Plant .....................................December
2006
4.0 Preliminary Construction Cost Estimate
Basic WTP in 2004 Dollars
[including Sewer Availability Charge(SAV)] ............................
$9,000,000.00
Inflation @ 5%..............................................................................$450,000.00
'
Deduct for Longer Construction Schedule .................................
($300,000.00)
Engineering Fee.............................................................................
$638,500.00
Subtotal.......................................................................................
$9,788,500.00
Contingency at 7.27%....................................................................
$711,500.00
'
TOTAL.....................................................................................
$10,500,000.00
Deduct for State Sales Tax Rebate (Reimbursement) ................
($300,000.00)
'
Net Total Cost................................................................
$10,200,000.00
Preliminary Design Report A-CHAHN0502.00
' City of Chanhassen Page 3
5.0 Typical Specification Sections
Number
Document
00001
Title Page
00005
Certification
00008
Project Directory
00010
Table of Contents
BIDDING REQUIREMENTS
00100
Advertisement for Bids
00200
Instructions to Bidders
00320
Geotechnical Data
00330
Pilot Plant Report
00340
Well Logs
00350
Water Quality Analysis
00370
Existing Sanitary Sewer and Water Main Drawings
00410
Bid Form
00432
List of Proposed Subcontractors
00434
List of Proposed Suppliers
00455
Non-discrimination Affidavit
00456
Project References
Chanh.
Affidavit of Non -Collusion
CONTRACT FORMS
00520
Standard Form of Agreement
00610
Performance Bond
00615
Payment Bond
IC-134
Taxation Affidavit
CONDITIONS OF THE CONTRACT
00700 Standard General Conditions
00800 Supplementary Conditions
Preliminary Design Report
City of Chanhassen
A-CHAHN0502.00
Page 4
'
SPECIFICATIONS
Section Title -
DIVISION 1- GENERAL REQUIREMENTS
Summary
01110 Summary of Work
01120 Work Sequence
Price and Payment Procedures
01210 Allowances
01230 Alternates
'
01290 Applications for Payment
Administrative Requirements
'
01310 Coordination
01315 Project Meetings
01325 Progress Schedules
'
01330 Submittal Procedures
Quality Requirements
01410 Code Review
01421 Specification Format Definitions and Abbreviations
01422 Reference Standards
01450 Quality Control
'
01458 Testing Laboratory Services
Temporary Facilities and Controls
'
01505 Mobilization
01510 Temporary Utilities
'
01518 Temporary Water
01521 Field Office
01522 Storage and Fabrication Sheds
01552 Access Roads and Parking Areas
01555 Maintenance and Restoration of Haul Roads
01567 Air, Land and Water Pollution
01570 Temporary Controls
01572 Erosion Control
'
01574 Application of Water
01576 Application of Calcium Chloride
'
01581 Project Signs
Product Requirements
'
01600 Product Requirements
01630 Product Substitution Procedures
Preliminary Design Report A-CHAHN0502.00
' City of Chanhassen Page 5
'
Execution Requirements
01725
Field Engineering
01750
01770
Starting and Adjusting
Closeout Procedures
01784
Operation and Maintenance Data
01788
Product Warranties
DIVISION 2 - SITE CONSTRUCTION
rSite
Remediation
02120
Handling of Contaminated Soils/Debris
Site Preparation
02228
Removing Pavement and Miscellaneous Structures
02232
Clearing and Grubbing
Earthwork
02310
Site Grading
'
02316
Excavation and Embankment
02318
Trench Excavation and Backfill
02320
Structure Excavations and Backfills
'
02338
Subgrade Preparation
02345
Geotextile Installation
02372
Temporary Erosion Control
'
02376
Riprap
Tunnel, Boring, and Jacking
02405
Subsurface Crossings
Utility Services
'
02510
Chanh.
Water Distribution Systems
Water Main Specifications
02530
Sanitary Sewer Systems
Chanh.
Sanitary and Storm Sewer Specifications
'
Drainage and Containment
02630
Storm Sewer Systems
02634
Manholes and Catch Basins
'
02660
Storm Water Holding Ponds
Bases, Pavements,
and Appurtenances
'
02722
Aggregate Base
02742
Plant -Mixed Bituminous Pavement
02744
Plant -Mixed Bituminous Pavement Quality Assurance
'
(QUA)
02748
Bituminous Tack Coat
'
02765
02772
Pavement Marking
Concrete Curbing
02775
Walks
Preliminary Design Report
A-CHAHN0502.00
City of Chanhassen
Page 6
'
Planting
02920 Turf Establishment
'
02930 Plant Installation
02931 Exterior Plants
Site Restoration and Rehabilitation
02956 Television Inspection of Sewers
'
DIVISION 3 - CONCRETE
03300 Cast -in -Place Concrete
03400 Precast Concrete Hollow Core Slabs
'
03402 Precast Concrete Structures
03450 Plant -Precast Architectural Concrete
DIVISION 4 - MASONRY
'
04810 Unit Masonry Assemblies
J
l�
II
u
Preliminary Design Report
' City of Chanhassen
DIVISION 5 - METALS
05120
Structural Steel
05500
Metal Fabrications
05521
Aluminum Handrails and Railings
05530
Gratings and Floor Plates
DIVISION 6 - WOOD AND PLASTICS
06105 Miscellaneous Carpentry
06400 Interior Architectural Woodwork
06620 Glass Fiber Reinforced Plastic Panels
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07130
Sheet Waterproofing
07210
Building Insulation
07220
Nail Base Rigid Board Insulation
07410
Metal Roofing and Wall Panels
07511
Built-up Asphalt Roofing
07620
Sheet Metal Flashing and Trim
7840
Firestopping
07920
Joint Sealers
A-CHAHN0502.00
Page 7
DIVISION 8 - DOORS AND WINDOWS
08010
Door and Frame Schedule
'
08110
Steel Doors and Frames (Heavy Commercial)
08210
Wood Doors
08220
Plastic Doors
'
08315
Roof and Floor Hatches
08410
Aluminum Framed Storefront
08520
Aluminum Windows
08710
Finish Door Hardware
08800
Glazing
tDIVISION
9 - FINISHES
09250
09300
Gypsum Board
Tile
09512
Acoustical Ceiling Panel System
09658
Resilient Tile Flooring and Base
09670
Fluid Applied Flooring
09915
Shop Painting
09966
Coating Systems for Industrial Facilities
1
DIVISION 10 - SPECIALTIES
'
10430
Dimensional Letters and Plaques
10520
Fire Protection Specialties
10810
Toilet Accessories
'
DIVISION 11- EQUIPMENT
Audio -Visual
Equipment
11132
Projection Screens
Water Supply and Treatment Equipment
11200
Process Equipment General Provisions
11216
Non -Clog Submersible Pumps
11218
Plant Vertical Turbine Pumps
11243
Potassium Permanganate Feed Equipment
11244
Fluoride Feed Equipment
'
11245
Orthophosphate Feed Equipment
11248
Chemical Transfer Pumps
l t262
11280
Sodium Hypochlorite Feed Equipment
Gravity Filter System
11370
Packaged Air Compressed System
11372
Air Wash Blower
Preliminary Design Report A-CHAHN0502.00
' City of Chanhassen Page 8
I
DIVISION 12 - FURNISHINGS
12510
Office Furniture and Accessories
DIVISION 13 - SPECIAL CONSTRUCTION
13215
Disinfection Water
of Storage Facilities
DIVISION 14 CONVEYING SYSTEMS
-
'
14600
Hoists and Cranes
DIVISION 15 - MECHANICAL
15020
Mechanical General Provisions
15050
Basic Mechanical Materials and Methods
'
15060
Pipes, Pipe Fittings, Valves and Unions
15080
Mechanical Insulation
15130
Gauges and Thermometers
15140
Supports and Anchors
15150
Meters
15170
Motors
15185
Electrical
'
15190
Mechanical Identification
16195
Mechanical Sound, Vibration Control
15205
15220
Process Piping General Provisions
Process Water and Waste Piping
15221
Process Instrumentation Piping
15240
Process Piping Valves and Operators
'
15250
Process Piping Specialties
15260
Process Piping Hangers and Supports
15295
Process Piping Testing, Adjusting, and Disinfection
15300
Fire Protection
15310
Fire Protection Piping
15330
Wet Pipe Sprinkler System
15400
Plumbing
'
15410
Plumbing Piping
15430
Plumbing Specialties
15440
Plumbing Fixtures
15450
Plumbing Equipment
15500
Heating, Ventilating, and Air Conditioning
15510
15515
Hydronic Piping
Hydronic Specialties
15530
Refrigerant Piping
15540
HVAC Pumps
15545
Chemical Water Treatment
15550
Heat Generation
15555
Boilers
Preliminary Design Report
A-CHAHN0502.00
'
City of Chanhassen
Page 9
I
1
DIVISION 15 — MECHANICAL (CONT.)
15575
Breechings and Stackings
15650
Refrigeration
15670
Condensing Units
15750
Heat Transfer
15780
Packaged Air Conditioning Units
15820
Dehumidifiers
15830
Terminal Heat Transfer Units
15850
Air Handling
15855
Air Handling Units With Coils
15860
Centrifugal Fans
15870
Power Ventilators
15880
Air Distribution
15890
Ductwork
15910
Ductwork Accessories
15930
Air Terminal Units
15940
Air Outlets and Inlets
15950
Controls
15990
Testing, Adjusting and Balancing
15992
Piping Systems Testing, Adjusting and Balancing
15993
Air Systems Testing, Adjusting and Balancing
15994
Demonstration of Mechanical Equipment
DIVISION 16 - ELECTRICAL
General Provisions
16010
'
16100
16150
16200
16400
16500
16700
'
16900
'16950
' 16951
' Appendix A
' nn
Electrical General Provisions
Basic Materials and Methods
Motors
Standby Power Generation System
Electrical Service & Distribution
Lighting
Special Systems
Starters and Motor Control
Instrumentation and Control and Access Control /
Security
SCADA System and Access Control / Security System
Suppliers
Cable and Conduit Schedule
Preliminary Design Report A-CHAHN0502.00
' City of Chanhassen Page 10
4
4 n 9yb
®Id—V_ e
E t J
G .
78� /4
9
s
STORM WATER POND
d� s
942
9 �6`
a
i
m
\ 24-
a. 24"
CU —DE—SAC \
� 16
o \
� m � 7 Oo s+-
s 1 0�
Q 9
EL¢ eA
• 1
0
9 WELL n
0
4N LOWER LEVEL PLAN
o Y e'
GENERAL DRAWINGS (G)
G-Cl TITLE SHEET
G-G2 SHEET INDEX
REMOVAL DRAWINGS_(R)
R-Cl REMOVAL. RELOCATE AND ABANDON PLAN (')
CIVIL DRAWINGS
C-C LEGEND AND SECTIONS (•)
G-C2 STE uYOUT PLAN (•)
C-C
GRADING PLAN (•)
C-C2
GRADING RAN (•)
C-C3
UTILITY PLAN (•)
C-C4
WATFANAIN TO WELLS (•)
C-CS
WATERWAN TO WELLS (•)
D-Cl CIVIL DETAILS (•)
D-C2 CIVIL DETAILS (•)
D-GT CIVIL DETAILS (•)
ARCHITECTURAL DRAWINGS
G-Al GENERAL NOTES AND TYPICAL MOUNTING HEIGHTS.
LEGENDS AND ABBREVIATIONS
C-A2 FIRE STOPPING DETAILS , WALL TYPES AND OOLONG CODE
M-At LOWER LEVEL PLAN
M-A2 MAIN LEVEL PLAN
01-A3 GALLERY LEVEL PLAN
DI-A4 UPPER LEVEL PLAN AT MNDOWS
01-A5 ROOF PLAN
01-M MAIN LEVEL EFLARGED PLAN AND REELECTED CEILING PLAN
01-A7 EXTFNOt ELEVATORS
O1-AS EXTERIOR ELEVATIONS
01-AS BUILDING SECTIONS
01-AIO BUILDING SECTIONS
M-All BUILDING SECTIONS
01-Al2 WALL SECTIONS
GI-A13 WALL SECTONS
O1-A14 WALL SECTIONS
O1-A15 WALL SECTIONS
Ot-A,
WALL SECTIONS
O-A17 INTERIOR ELEVATIONS AND DETAILS. ROOM
FINISH SCHEDULE. OPENING SCHEDULE
O1-AlO DOON, FRAME, W1N110w AND LOUVER TYPES AND DETAILS
M-Al9 EXTERIOR DETAILS
01-A20 EXTERIOR DETAILS
N-A21 EXTERIOR DETAILS
N-A22 EXTE OR DETAILS
OI-A23 EXTERIOR DETAILS AND PRECAST TYPES
PROCESS DRAWINGS
G-PI PROCESS ABBREVIATIONS, LEGENDS. AND GENERAL NOTES
G-P2 PROCESS SCHEMATIC
G-P3 PROCESS VALVE SCHEDULE
STRUCTURAL DRAWINGS 01-P1 LOWER LEVEL FLOOR PLAN
N-P2
MAIN LEVEL FLOOR PLAN
G-S1
GENERAL NOTES AND ABBREVIATIONS
N-P3
UPPER LEVEL FLOOR PLAN
N-P4
LOWER LEVEL ENLARGED FLOOR PUN
01-SI
STRUCTURAL KEY PLANS
01-P5
MAIN LEVEL ENLARGED FLOOR PLAN
OI-S2
FOUNDATION PUN
N-P6
MAIN LEVEL ENLARGED FLOOR PLAN
0-W
MAN LEVEL PLAN
01-P7
UPPER LEVEL ENLARGED FLOOR PLAN
M-S4
UPPER LEVEL PUN
O-P8
BUILDING SECTION
O-S5
ROOF FRAMING PUN
01-P9
BUILINNG SECTION
01-W
ENLARGED PLANS, SECTONS h DETAILS
O-PIO
WILDING SECTION
O1-S7
STAIR R LANDINGS, SECTONS k DETAILS
01-Pil
BUILDING SECTION
01-S8
SECTIONS k DETAILS
01-P12
BUILDING SECTION
01-S9
SECTIONS @ DETAILS
01-Pi3
WILDING SECTION
01-SIO
SECTIONS h DETAILS
Ol-P14
BUILDING SECTION
01-Sll
SECTONS R DETAILS
O-P15
BUILDING SECTION
01-S12
SECTIONS k DETAILS
01-S13
SECTIONS R DETAILS
02-P1
BELOW GRADE PLAN
01-S14
GRAIN RAIL SECTIONS h DETAILS
02-P2
SECTIONS
01-S15
BEAM h COLUMN SECTIONS § DETAILS
02-P3
SECTIONS
02-51
SLAB PLAN
0-PI
STANDADETAILS
02-OVVER
S.FOUNDATION
COVER SLAB PLANO-P3
CS3
D-P2
STANDARD DETAILS
02-W
SECTONS AND DETAILS
STANDARD DETAILS
02-S4
SECTIONS AND DETAILS
D-P4
STANDARD DETAILS
ox-ss
gcnaws AND DETAILS
D-P4
STANDARD DETAILS
D-SI
DETAILS
D-S2
DETAILS
D-53
DETAILS
D-S4
DETAILS
D-SS
DETAILS
D-S6
DETAILS
MECHANICAL DRAWINGS
G-MI MECHANICAL ABBREVIATIONS h SYMBOLS
01-MI UNDER FLOOR PLUMBING PLAN
01-M2 MAIN LEVEL PLUMBING h PIPING PLAN
01-M3 UPPER LEVEL MECHANICAL PLAN
01-M4 MAIN LEVEL DUCTVICRI PLAN
01-M5 MECHANICAL ROOF PLAN
N-M6 MECHANICAL PARTIAL PLAN AND PLUMBING PIPNG DIAGRAMS
01-117 FIRE SPIMIQER PLAN
D-MI DETAILS
D-M2 EOUIPMENT SCHEDULES
ELECTRICAL DRAWINGS
G-El ELECTRICAL SYMBOLS AND ABBREVIATIONS
G-E2 EECTRICAL SCADA SYSTEM CONFIGVRAnCN DIAGRAM
G-E3 ELECTRICAL INSTAIIATON DETAILS
G-E4 ELECTRICAL INSTALLATION DETAILS
G-E5 ELECTRICAL NSTALLAMON DETAILS
C-El SITE W - ELECTRICAL SITE PLAN
C-E2 SITE WDRIR - ENLARGED CENERATOR AREA PLAN
02-El MAIN LEVEL ELECTRICAL OVERVIEW PLAN
01-E2 MAIN LEVEL. PROCESS ELECTRICAL PLAN - EAST PORTION
W
-ED
MAIN LEVEL PROCESS ELECTRICAL PUN - WEST PORTIGN
01-E4 MAIN LEVEL LIMITING AND GENERAL POWER PLAN
01-0 UPPER LEVEL ELECTRICAL PLAN
01-E6 ELECTRICAL MOTOR CONTROL CENTER (MCC) ORE -ENE DIAGRAM
01-U ELECTRICAL MOTOR CONTROL CENTER (MCC) ONE -ENE DIAGRAM
01-E8 ELECTRICAL DISTRIBUTION PANELS DPI ! DP2 ONE -RUNE DIAGRAM
OI-E9 ELECTRICAL MOTOR CONTROL. SCHELATICS
01-EIO ELECTRICAL MOTOR CONTROL SCHEMATICS AND MCC ELEVATION
01-Ell ELECTRICAL SCHEDULES
N-E12 ELECTRICAL PANEL 'A' SCHEMATC
01-E13 ELECTRICAL PANEL 'A' SCELIATIC
OI-E14 ELECTRICAL PANEL 'A' SOREAARC
W-EIS ELECTRICAL PANEL 'A' SCHEMARC
OI-E16 ELECTRICAL PANEL 'A' SCHEMATIC
N-E17 ELECTRICAL PANEL 'A' SCHEMATC
01-EIS ELECTRICAL PANEL 'A' SCEMATC
Ot-E19 ELECTRICAL PANEL 'A' SCHEMATIC
01-UO ELECTRICAL PANEL'A' SCHEMATIC
01-E21 ELECTRICAL PANEL 'A' SCHEMATIC
O-E21A ELECTRICAL PANEL'A' SCHEMATC
01-M ELECTRICAL PANEL 'A' SCHEMATIC
M-E22A ELECTRICAL PANEL 'A' SCHEMATIC
Oi-E23 ELECTRICAL PANEL *A' SCHEMATIC
N-E24 ELECTRICAL PANEL 'A' SCHEMATIC
al-E25 ELECTRICAL PANEL'S' SCHI IATIC
DI-E26 EtECMICAL WATER TREATMENT PUNT MISC SCHEMATICS
NOrs.
SHEET TIRES ON THIS SHEET INDEX ENDING WAIN AN
ASTERISK SHALL BID UNDER SO SCHEDULE W UM.ESS
NOTED OTHERWISE. SHEET TIRES ON THIS SIM INDEX
NOT ENDING IN AN ASTERISK SMALL BE UNDER 00
SCHEDULE 'A' UNLESS OTHERWISE NOTED.
SHEET NUMBERING LEGEND
STIR
ICTIIR IDENTIFIER OR SHEET TYPE
G
GENERAL INFORMATION
C
SITEWORK
01
WATER TREATMENT PLANT
02
BACKWASH TANK
D
STANDARD DETAILS
FNCCIoU INF
G GENERAL
R REMOVAL
C CIVIL
S STRUCTURAL
A ARCHITECTURAL
p PROCESS
M MECHANICAL
E ELECTRICAL
t
0
r-
ao h
u
i
i
t
1 \
m \
SAC \
\ Oz
\
7 Op 34"
0�O +
/ n �
�j
e
it •
w
Li)
7�..
;�
G
e
�•�a
�������
Y
d
11 �
•. �
�
� �
?� T3''.-Pa`�
a'�tF`rT�`+.3)"'..ir�°' -tom':-r
{� 'r4,
i
�
; �_ a■
j
„®u
n� _
niu��
114
.
',=,
,I
�`a,•i
{
/
�
�•"
■
is J':
<R) MPdN LEVEL FLOOR PLAN
i'w�\ UPPER LEVEL FLOOR PLAN
�r ° 1 v
paa
of
oy
a�
N S 6 1n
o e§
ig4
3
22iOC�mm 9�i
.S.FY
a
N ¢
�O
0
YXa.
01P3
a
PEDESTRIANEXISTING
MIDGE
1'a<"'P� CV VY� YY� YYY� YYY� Y�NYYYVCYYYVQYJ �'J <'< YYYYYYYYY i. �;
• , • � � • I _'___ • ■ ■ � � ■ 1 �� r`�JpJ?�?�tQ�'�Y� _ ' �Ob\yaj�� ��j��� ♦ �� .�T,`A.
r. �♦ Clem»��0 �"
�r
TYPICAL SECTION
1 r
e ��■
� '-�_ - �-
-- i
= -
s �eia I
_,
--
_
,R:� -
��
u .� u .ev iad �� i�
_ _ _ _ _ _
-iO m ie01-� ieO—iOF. v ea v vv
v o v v vv v
s e_s �es���v eei
e
I" I - w
o ovv 1
v
71 :q
vs -eias v
.�.��-
Chanhassen Waler Treahnenl Planl
_ _sMMZ'
—w�r.•R
•�
" 6 8•,i • a —em -off o=WREIMM
7A
■
■ ie ie— I =
nr Trn,%frrnnt O
A
U
A 0
SEH TRANSMITTAL
To: Kate Aanenson
Community Development Director
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
0
Date: March 3, 2005
SEH File No.: achanh0502.00
Client No.:
Re: Planning Commission Packet - East Water Treatment Plant
We are:
® Enclosing ❑ Sending under separate cover ❑ Sending as requested
26 copies
Site plan, Grading and Yard piping plan
Exterior Building Elevations
MAR 0 4 2005
CITY OF CHANHASSEN
For your:
® Information/Records ❑ Review and comment ❑ Approval
❑ Action ❑ Distribution ❑ Revision and resubmittal
Remarks:
Landscape plan to follow by middle next week.
Materials sample package sent separately
By:
c:
JRW
JPN
CITY OF CN
RECE �EpSSEN
h'AR 0 4 2005
CHANHASSEN PANNING OEpr
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196
SEH is an equal opportunity employer i wv w.sehinc.com 1 651.490.2000 1 600.325.2055 1 651.490.2150 fax