Loading...
CAS-17_PLANNING CASE NO. 2020-17LEGAL DESCRIPTION (Tax Description - No other form provided): The South 80 feet of Lots I & 2, Block 1, City Lots of Chanhassen, Carver County, Minnesota. SCOPE OF WORK & LIMITATIONS: 1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be included on the survey have been shown. 2. Showing the location of observed existing improvements we deem necessary for the survey. 3. Setting survey markers or verifying existing survey markers to establish the comers of the property. 4. Existing building dimensions and setbacks measured to outside of siding or stucco. 5. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies that may have jurisdiction over these requirements to verify they are correctly shown before proceeding with construction. 6. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or before beginning construction. 7. This survey has been completed without the benefit of a current tide commitment. There may be existing easements or other encumbrances that would be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than the ones shown hereon. 8. It is possible that an overlap exists with the property to the North based on tax descriptions. At this time, we have not been provided any documents to verify the legal descriptions. The boundary shown is that part of Lots 1 & 2 lying South of the North 62 feet thereof, more or less. If this uncertainty is something you would like to remove, you could contact a title insurance company or a competent attorney to review the possible title issues, if any. 9. While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as you, your architect, or the builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match your plans before construction begins. Also, we are not as familiar with local codes and minimum requirements as the local building and zoning officials in this community are. Be sure to show this survey to said officials, or any other officials that may have jurisdiction over the proposed improvements and obtain their approvals before beginning construction or planning improvements to the properly. STANDARD SYMBOLS & CONVENTIONS: "0" Denotes iron survey marker, found, unless otherwise noted. GRADING & EROSION CONTROL NOTES: BEFORE DEMOLITION AND GRADING BEGIN • Install silt fence/bio roll around the perimeter of the construction area. • Sediment control measures must remain in place until final stabilization has been established and then shall be removed. Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next rain. • A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with permeable geotextile fabric. The entrance shall be maintained during construction by top dressing or washing to prevent tracking or flow of sediments onto public streets, walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent unprotected exit from the site. • Contractor shall install inlet protection on all existing storm sewer inlets in accordance with the city standard details. Inlet protection shall also be provided on all proposed storm sewer inlets immediately following construction of the inlet. Inlet protection must be installed in a manner that will not impound water for extended periods of time or in a manner that presents a hazard to vehicular or pedestrian traffic. DURING CONSTRUCTION: • When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be seeded with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch. • A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be serviced regularly to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with Minnesota Pollution Control Agency requirements. • A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with MPCA requirements. • Concrete truck washout shall be in the plastic lined ditch and dispose of washings as solid waste. • Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as necessary to provide downstream protection. • Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly be removed. 1 DATE I REVISION DESCRIPTION 0 EXISTING HARDCOVER HOUSE 1,157 SQ. FT PORCH/STEPS 437 SQ. FT WALKS 67 SQ. FT SHED 95 SQ. FT TOTAL EXISTING HARDCOVER 1,756 SQ. FT. AREA OF LOT 8,819 SQ. FT. LOT COVERAGE 19.9% 7:I112*1 1210.111911091 HOUSE 1,157 SQ. FT. PORCH/STEPS 437 SQ. FT. WALKS 67 SQ. FT. SHED 95 SQ. FT. GARAGE 528 SQ. FT. DRIVEWAY/APRON 343 SQ. FT. TOTAL PROPOSED HARDCOVER AREA OF LOT LOT COVERAGE • If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas • Moisture shall be applied to disturbed areas to control dust as needed. • Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained. • If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the double silt fence around these areas can filter the water before it leaves the site. • Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall consist of broadcast seeding with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch. • Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, sediment traps or basins and additional silt fencing as deemed necessary to control erosion. SITE WORK COMPLETION: • When final grading has been completed but before placement of seed or sod an "as built" survey shall be done per City of Chanhassen requirements to insure that grading was properly done. • When any remedial grading has been completed, sod or seeding shall be completed including any erosion control blankets for steep areas. • When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and clean. • Contractor shall maintain positive drainage of a minimum 2% slope away from proposed building. 'ION SCALE CLIENT/JOB ADDRESS POPE BUILDERS N 7727FRONTIER TRAIL 20' 40' CHANHASSEN, MN 2,627 SQ. FT. 8,819 SO. FT. 29.8% BENCHMARK` MANHOLE ELEV.=970.7 (ASSUMED) W 0) w a v 0 of N to 1 EXISTING DWELLING N LOT 2 '01"I E 119; 78 LOT 2 1 / �96 Fo — —9ft-I s u w L �` , N L0 ' �, ' INSTALS 2 N W -- - �`° y, SIL T FENCE W N - 13.5 $F ����^ too 0 ��` _ ��`� SF \ In LL -- 1 i F i l/ !__gad �•=@�5 3 w - 40.3LO —n EXISTING o �' PROPOSED�o I I 0 WALK X DWELLING "' GARA�ry 1 �J o 10.0 4.1 // 't � FIRST OOR N ELEV.=974.1 2.0 40.3 --io CO/JC. APRGW f \/ 1P 0.3 Sc h—.qn i N v PORCH P1 1 7 \ 'o PROPOSED io " DRIVEWAY Advance Surveying & Engineering, Co 17917 Highway No. 7 Minnetonka, Minnesota 55345 Phone (952) 474-7964 Web: www.aCysur wm •szt _ �esmG N 9'17'46";— EXISTING WALK , EXISTING , CURB CUT , INSTALL SYLT FENCE-- ; w o 78ThT ST. IMDER THE LAWS OF THE STATE OF /TA Wayne W. Preko #43603 LICENSE NO. .itn V iA 7ry7n ,,-SOUTH LINE SECT. 12, TWP. 116, RING. 23 DATE SURVEYED: JULY 8, 2020 DATE DRAFTED: JULY 14, 2020 SHEET TITLE PROPOSED SURVEY SHEET SIZE: 17X72 DRAWING NUMBER 200983 JR LOT EXISTING DWELLING N 0 SHEET NO. S1 SHEET10F1 =--'% N N E D LEGAL DESCRIPTION (Tax Description - No other form provided): The South 80 feet of Lots 1 & 2, Block 1, City Lots of Chanhassen, Carver County, Minnesota. SCOPE OF WORK & LIMITATIONS: 1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be included on the survey have been shown. 2. Showing the location of observed existing improvements we deem necessary for the survey. 3. Setting survey markers or verifying existing survey markers to establish the comers of the property. 4. Existing building dimensions and setbacks measured to outside of siding or stucco. 5. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies that may have jurisdiction over these requirements to verify they are correctly shown before proceeding with construction. 6. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or before beginning construction. 7. This survey has been completed without the benefit of a current title commitment. There may be existing easements or other encumbrances that would be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than the ones shown hereon. 8. It is possible that an overlap exists with the property to the North based on tax descriptions. At this time, we have not been provided any documents to verify the legal descriptions. The boundary shown is that part of Lots 1 & 2 lying South of the North 62 feet thereof, more or less. If this uncertainty is something you would like to remove, you could contact a title insurance company or a competent attorney to review the possible title issues, if any. 9. While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as you, your architect, or the builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match your plans before construction begins. Also, we are not as familiar with local codes and minimum requirements as the local building and zoning officials in this community are. Be sure to show this survey to said officials, or any other officials that may have jurisdiction over the proposed improvements and obtain their approvals before beginning construction or planning improvements to the property. STANDARD SYMBOLS & CONVENTIONS: "0" Denotes iron survey marker, found, unless otherwise noted. GRADING & EROSION CONTROL NOTES: BEFORE DEMOLITION AND GRADING BEGIN • Install silt fence/bio roll around the perimeter of the construction area. • Sediment control measures must remain in place until final stabilization has been established and then shall be removed. Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next rain. • A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with permeable geotextile fabric. The entrance shall be maintained during construction by top dressing or washing to prevent tracking or flow of sediments onto public streets, walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent unprotected exit from the site. • Contractor shall install inlet protection on all existing storm sewer inlets in accordance with the city standard details. Inlet protection shall also be provided on all proposed storm sewer inlets immediately following construction of the inlet. Inlet protection must be installed in a manner that will not impound water for extended periods of time or in a manner that presents a hazard to vehicular or pedestrian traffic. DURING CONSTRUCTION: • When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be seeded with Minnesota Department of Transportation Seed Mixture 22-111 at 100 Ib/acre followed by covering with spray mulch. • A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be serviced regularly to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with Minnesota Pollution Control Agency requirements. • A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with MPCA requirements. • Concrete truck washout shall be in the plastic lined ditch and dispose of washings as solid waste. • Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as necessary to provide downstream protection. • Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly be removed. EXISTING HARDCOVER HOUSE 1,157 SQ. FT PORCH/STEPS 437 SQ. FT WALKS 67 SQ. FT SHED 95 SQ. FT TOTAL EXISTING HARDCOVER 1,756 SQ. FT. AREA OF LOT 8,819 SQ. FT. LOT COVERAGE 19.9% PROPOSED HARDCOVER HOUSE PORCH/STEPS WALKS SHED GARAGE DRIVEWAY/APRON 1,157 SQ. FT. 437 SQ. FT. 67 SQ. FT. 95 SQ. FT. 528 SQ. FT. 343 SQ. FT. TOTAL PROPOSED HARDCOVER 2,627 SQ. FT. AREA OF LOT 8,819 SQ. FT. LOT COVERAGE • If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas • Moisture shall be applied to disturbed areas to control dust as needed. • Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained. • If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the double silt fence around these areas can filter the water before it leaves the site. • Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall consist of broadcast seeding with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray mulch. • Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, sediment traps or basins and additional silt fencing as deemed necessary to control erosion. SITE WORK COMPLETION: • When final grading has been completed but before placement of seed or sod an "as built" survey shall be done per City of Chanhassen requirements to insure that grading was properly done. • When any remedial grading has been completed, sod or seeding shall be completed including any erosion control blankets for steep areas. • When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and clean. • Contractor shall maintain positive drainage of a minimum 2% slope away from proposed building. L_ 29.8% I 66 I Q N N LOT EXISTING DWELLING 2 N 89'21'01"I E 119; 78 LOT 2 rn 01 N 01 �o O 3 LO m v D N v i I i j LOTS, ------ `970. I \ c - INSTALL W N 13.5 '1 _Q S/LT FENCE -----. oo SF L_ SF \ LAO LL M F� ti 9j4.���8705 C'm.5 L96'l r w 13.0 ' $ ' RPV- 403 PV 40.3 _� 4 1 e —M EXISTING o �j PROPOSED�o %� I MO WA�O m u DWELLING "' �GARA�ry ,/ \ �J O 10.0 4.1 //// -q w FIRST FLOOR ,� i •,� EIE '7 220 9712 � 03 \ --�-- ^„� C0APRON \ / fs 0.3 It I H PORCH o I PROPOSED o BENCHMARK: MANHOLE ELEV =970.7 (ASSUMED) DRIVEWAY ' .74 EXISTING WALK EXISTING CURB CUT INSTALL SILT FENCE--% W. 7i9M ST. 1 a 7- — — — — J- -SOUTH UNE SECT. 12, TWP. 116, RNG. 23 LOT 3 EXISTING DWELLING DATE REVISION DESCRIPTION DWG ORIENTATION SCALE CLIENT/JOB ADDRESS I HMBY CERRFY THAT THIS PUN, SURVEY OR REPORT DATE SURVEYED: SHEET TITLE SHEET NO. Advance WAS PREPARED A IE R UNDER NY AND S SUPEAN96N AN THAT I ED A DULY REQSnRFM LAND SUtJ"V POPE BUILDERS UNDER TFE LAWS Or THE Sr TE ar TA JULY 8, 2020 PROPOSED SURVEY Surveying & Engineering, Co. �S SHEET SIZE: 17 X 22 " 7727FRONTIER TRAIL' �+ Wayne W. Pre DATE DRAFTED: CHANHASSEN MN Minnetonka, Highway No 7 #43503 S1 20' 40' Minnetonka, Minnesota 55345 LICENSE350 No.DRAWING NUMBER Phone (952) 4747964 JULY 14, 2020 JULY 14, 2020 200983 JR Webw aovsucoom DATE SHEET 1 OF 1 SCANNED RogerN. Knutson Elliott B. Knetsch Joel J. Jamnik Andrea McDowell Poehler Soren M. Mattick David S. Kendall Henre A. Schaeffer, 111 Alina Schwartz Shana N. Conklin James J. Monge, III Jerome M. Porter Leah C.M. Koch Meagan K. Kelle\ Thomas J. Campbell* *Mired PROFESSIONAL ♦ASSOCIATION October b. Ms. Jean Steckling City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Re: Miscellaneous Recordings Dear Ms. Steckling: Please find enclosed, for the City's files, the following documents which have been erecorded with Carver County on October 5, 2020: 1. Variance No. 2020-17 (7727 Frontier Trail) recorded as document number A706618;and 2. Variance No. 2020-18 (9391 Kiowa Trail) recorded as document number A706619. Thank you. Very truly yours, CAMPBELL KNUTSON Professional Associado r Jean 1 n, Legal Assistant /jmo Enclosures 200786v4 • • Document Number: A706618 Filed and/or Recorded on Oct 5, 2020 4:02 PM Office of the County Recorder/Registrar of Titles Carver County, Minnesota Kaaren Lewis, County Recorder Deputy CS Document Recording Fees $ 46.00 ---------------------------------------------------------- Document Total $ 46.00 Requesting Party: City of Chanhassen Pages: 2 CITY OF CHANHASSEN CARVER COUNTY, MINNESOTA VARIANCE 2020-17 1. Permit. Subject to the terms and conditions set forth herein, the City of Chanhassen hereby grants the following variance: The Chanhassen Board of Appeals and Adjustments approves an 11 foot 9 inch front yard setback variance and a 7 percent lot cover variance for the construction of a detached garage. 2. Prope . The variance is for a property situated in the City of Chanhassen, Carver County, Minnesota, and legally described as: "The South 80 feet of Lots One and Two (1 &2) of Block 1, Village of Chanhassen, Carver County, Minnesota, according to the map or plat on file and of record in the Office of the County Recorder of said Carver County, Minnesota" 3. Conditions. The variance approval is subject to the following conditions: 1. A building permit must be obtained prior to construction and the building must comply with the Minnesota State Building Code. 2. Eaves may encroach an additional one foot beyond the granted variance, as shown in the plans dated July 31, 2020. 3. The detached garage must be architecturally compatible with the existing home. 4. The driveway turnaround shall be relocated at least one-half foot north so as not to be on the property line; the maximum driveway width at the right-of-way line shall not exceed 24 feet. 4. Lapse. If within one (1) year of the issuance of this variance the allowed construction has not been substantially completed, this variance shall lapse. 9 Dated: September 1, 2020 (SEAL) STATE OF MINNESOTA (ss. COUNTY OF CARVER LJ CITY OF CHANHASSEN The foregoing instrument was acknowledged before me thio day of 2020 by Elise Ryan, Mayor, and Heather Johnston, Interim City Manager, of the7cRy of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted by its City Council. 7 NOTARY PUBLI DRAFTED BY: City of Chanhassen ,JEAN M STECKUN 7700 Market Boulevard Notary Pub"Wem P.O. Box 147 wca.ar+oneod«+�a+ Chanhassen, MN 55317 115; (952) (952)227-1100 gAplad= plaimmg cases= -17 7727 fmnfia til varWarience document 20.17.doc T 0 0 CITY OF CHANHASSEN CARVER COUNTY, MINNESOTA VARIANCE 2020-17 1. Permit. Subject to the terns and conditions set forth herein, the City of Chanhassen hereby grants the following variance: The Chanhassen Board of Appeals and Adjustments approves an 11 foot 9 inch front yard setback variance and a 7 percent lot cover variance for the construction of a detached garage. 2. Property. The variance is for a property situated in the City of Chanhassen, Carver County, Minnesota, and legally described as: "The South 80 feet of Lots One and Two (1&2) of Block 1, Village of Chanhassen, Carver County, Minnesota, according to the map or plat on file and of record in the Office of the County Recorder of said Carver County, Minnesota." 3. Conditions. The variance approval is subject to the following conditions: I. A building permit must be obtained prior to construction and the building must comply with the Minnesota State Building Code. 2. Eaves may encroach an additional one foot beyond the granted variance, as shown in the plans dated July 31, 2020. 3. The detached garage must be architecturally compatible with the existing home. 4. The driveway turnaround shall be relocated at least one-half foot north so as not to be on the property line; the maximum driveway width at the right-of-way line shall not exceed 24 feet. 4. Lapse. If within one (1) year of the issuance of this variance the allowed construction has not been substantially completed, this variance shall lapse. P Dated: September 1, 2020 (SEAL) STATE OF MINNESOTA ) (ss. COUNTY OF CARVER ) 0 CITY OF CHANHASSEN The foregoing instrument was acknowledged before me thiOS day of 2020 by Elise Ryan, Mayor, and Heather Johnston, Interim City Manager, of theldly of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted by its City Council. "' r NARAUBL(* DRAFTED BY: City of Chanhassen JEAN M STECKLING 7700 Market Boulevard wry puby WwWism P.O. Box 147 Mrs may^ 91. sma Chanhassen, MN 55317 (952)227-1100 gAplan\2020 planting cas VO -17 7727 frontier trail var\variance document 20.17.doc • • Pc ao :�)D-1'7 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND DECISION (APPROVAL) Application of Paul Pope for an 11 -foot 9 -inch front setback variance and a 6.35 percent lot cover variance on a property zoned Single -Family Residential District (RSF) - Planning Case 2020-17. On September 1, 2020, the Chanhassen Planning Commission, acting as the Board of Appeals and Adjustments, met at its regularly scheduled meeting to consider the application. The Planning Commission conducted a public hearing on the proposed variance preceded by published and mailed notice. The Board of Appeals and Adjustments makes the following: FINDINGS OF FACT 1. The property is currently zoned Single -Family Residential District (RSF). 2. The property is guided in the Chanhassen Comprehensive Plan for Residential Low Density. 3. The legal description of the property is: The South 80 feet of Lots One and Two (1&2) of Block 1, Village of Chanhassen, Carver County, Minnesota, according to the map or plat on file and of record in the Office of the County Recorder of said Carver County, Minnesota 4. Variance Findings —Section 20-58 of the City Code provides the following criteria for the granting of a variance: a. Variances shall only be permitted when they are in harmony with the general purposes and intent of this Chapter and when the variances are consistent with the Comprehensive Plan. Finding: Since the City Code requires single-family homes to have a two -car garage granting a variance to permit the construction of a two -car garage is in harmony with the general purpose and intent of Chapter 20. Concerning the requested lot cover variance, the intent of the City Code is to regulate and limit the amount of lot cover in order to allow for the management of stormwater. Since this area of the city does not have a known history of drainage issues or known deficiencies in the stormwater infrastructure, allowing a relatively modest increase in the absolute amount of lot cover on a property to facilitate the construction of a garage and a driveway meeting city design standards is in harmony with the intent of Chapter 20. Sr�wwsD Concerning the requested front yard setback, the intent of the city's yard setback ordinance is to provide for a uniform neighborhood aesthetic and greenspace. In this instance, the proposed garage is set further back than the existing home and granting the requested front yard setback will allow the property to maintain a larger and more usable rear yard. Given the existing development pattern of the area and wide variance in the front yard setbacks within the neighborhood, granting the requested front setback variance is in harmony with the intent of Chapter 20. b. When there are practical difficulties in complying with the zoning ordinance. "Practical difficulties" as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by this Chapter. Practical difficulties include, but are not limited to, inadequate access to direct sunlight for solar energy systems. Finding: The applicant's proposed two -car garage is a reasonable accessory use for property with a single-family home and no garage. The location of the existing home on the parcel and substandard nature of the parcel make it impossible for the applicant to construct a two -car garage without a variance. c. That the purpose of the variation is not based upon economic considerations alone. Finding: The variance request is not solely based upon economic considerations. d. The plight of the landowner is due to circumstances unique to the property not created by the landowner. Finding: The neighborhood was platted 1887 and the home was built in 1906. Since the creation of the lot and construction of the home predates the creation of the city and adoption of a Zoning Code, the applicant is forced to work within the constraints created by the non -conforming lot and house placement. e. The variance, if granted, will not alter the essential character of the locality. Finding: The property is located in one of the city's oldest neighborhoods. Many of the properties in the area do not have the required 30 -foot front yard setback, either by virtue of variances or by virtue of their status as non -conforming uses. Additionally, no property sharing a block with 7727 Frontier Trail, with one possible exception, appears to meet the required front yard setback. Given that the neighborhood largely consists of smaller lots with structures located within the required setbacks, the proposed variance would not represent a departure from the existing character of the neighborhood. Furthermore, the proposed garage is broadly architecturally compatible with the existing structure and will not negatively impact the property's appearance as seen from the street. f. Variances shall be granted for earth -sheltered construction as defined in Minnesota Statutes Section 216C.06, subdivision 14, when in harmony with this Chapter. Finding: This does not apply to this request. 9 LI 5. The planning report #2020-17, dated September 1, 2020, prepared by MacKenzie Young - Walters, is incorporated herein. DECISION "The Chanhassen Board of Appeals and Adjustments approves an 11 foot 9 inch front yard setback variance and a 7 percent lot cover variance for the construction of a detached garage, and adopts the attached Findings of Fact and Decision, subject to the following condition: 1. A building permit must be obtained prior to construction and the building must comply with the Minnesota State Building Code. 2. Eaves may encroach an additional one foot beyond the granted variance, as shown in the plans dated July 31, 2020. 3. The detached garage must be architecturally compatible with the existing home. 4. The driveway turnaround shall be relocated at least one-half foot north so as not to be on the property line; the maximum driveway width at the right-of-way line shall not exceed 24 feet. ADOPTED by the Chanhassen Planning Commission this 1 st day of September, 2020. CITE giplan\2020 planning cases\20-17 7727 frontier trail var\findings of fact and decision 7727 frontier trail (approval)AM 0 CITY OF CHANHASSEN 0 AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ( ss. COUNTY OF CARVER ) I, Kim T. Meuwissen, being fust duly swom, on oath deposes that she is and was on August 20, 2020, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of a Public Hearing to Consider a Request for Lot Cover and Setback Variances to Construct a Detached Garage and Driveway with Turnaround at 7727 Frontier Trail, Zoned Single - Family Residential (RSF), Planning Case No. 2020-17 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and om to before me this�6 "fay of 2020. Kim 1. Mein w ssen, Deputy Clerk (Seal) _Notary Public JEAN M STECKLING �ry �In SCANNED :N � This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City tices not warrent that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City tices not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arse out of the users access or use of data provided. 0 «TAX_NAME» ((TAX—ADD—LU «TAX ADD L2u «Next Recordu«TAX_NAME» ((TAX—ADD—Ll)) «TAX ADD L2» Notice of Public Hearing Chanhassen Planning Commission Meeting Date & Time: Tuesday September 1, 2020 at 7:00 P.M. This hearing may not start until later in the evening, depending on the order of theagenda. Location: City Hall Council Chambers 7700 Market Blvd. The purpose of this hearing is to consider a request for lot cover and setback variances to construct a detached Proposal: garage and driveway with turnaround. Zoned: Single -Family Residential (RSF). Applicant: Paul Poe Paul Poe Builders, LLC Property 7727 Frontier Trail Location: A location map is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following What Happens steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the pro4ect. If you want to see the plans before the meeting, please visit the city's projects web page at: www.ci.chanhassen.mn.us/2020-17. If you wish to talk to someone about this project, please contact MacKenzie Young -Walters by email at mwaitersCcDci.chanhassen.mn.us Questions 8 or by phone at 952-227-1132. If you choose to submit Comments: written comments, please send one copy to staff in advance of the meeting. Staff will provide copies to the Commission. The staff report for this Item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEWI Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Revises Procedure: . Subdivisions. Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings, Comprehensive Plan Amendments and Code Amendments require a Public hearing before the Planning Commission. City ordinances require all property within SW feet d the subject site to be notified of the application in writing. Any interested parry is invited to attend the meeting. • Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of the hearing process. The Commission will dose the public hearing and discuss the item and make a recommendation to the City Council. The City Counal may reversal affirm or modify wholly or pertly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority vole of the City Council except razonings and land use amendments from residential to commerciaVindustrial. • Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant waives this standard Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process should check with the Planning Department regarding its status and scheduling for the City Council meeting. • A neighborhood spokesperson/repress native Is encouraged to provide a contact for the cry. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s) • Because the Planning Commission holds the public hearing, the City Council does not Minutes are taken end any correspondence regarding the application will be included in the report to the City Councilff you wish to have something to be included in the report, lease contact the Plannina Staff Person named on the nodficatior. Notice of Public Hearing Chanhassen Planning Commission Meeting Date & Time: Tuesday, September 1, 2020 at 7:00 P.M. This hearing may not start until later in the evening, depending on the order of theagenda. Location: City Hall Council Chambers 7700 Market Blvd. The purpose of this hearing is to consider a request for lot cover and setback variances to construct a detached garage Proposal: and driveway with turnaround. Zoned: Single -Family Residential (RSF). Applicant: Paul Pope, Paul Poe Builders, LLC Property 7727 Frontier Trail Location: A location map Is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, th• Chair will lead the public hearing through the following What Happens steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the city's projects web page at: www.ci.chanhassen.mn.us/2020-17. If you wish to talk to someone about this project, please contact MacKenzie Young -Walters by email at mwaltersOci.chanhassen.mn.us Questions & or by phone at 952-227-1132. If you choose to submit Comments: written comments, please send one copy to staff in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior tis the Planning Commission meeting. NEWT Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/noti me to sign up! City Review Procedure: • Subdivisions, Planned Unit Developmenbs, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonirgs, Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission City ordinances require all Property within 500 feet of the subject site to be notified of the application m writing. Any interested Party is invited to attend the meeting. • Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of the hearing process. The Commission will close the public hearing and discuss the Rem and make a recommendation to the City Council. The City Counal may reverse, affirm or modify wholly or Partly the Planning Commission'a recommendation. Remnings, land use and coda amendments take a simple majority vole of the City Council except rezonings and land use amendments from residential to commercial/industnal, • Minnesota Slate Statute 519.99 requires all applications to be processed within 60 days unless the applicant waives this standard. Some appiications due to their complexity may take several months to complete. My person wishing to follow an item through the process should check with the Planning Department regarding its status and scheduling for the City Council meeting. • A neighborhood spokesparsonimpremntalive is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s). • Because the Planning Commission holds the public hearing, the City Counal does not. Minutes are taken and any correspondence regarding Ne application will be included in the report to the City Council. R you wish fo have something to be included in the report, lease contact the Planning Stafl person named on the notification. PIN TAX -NAME TAX -ADD -Ll TAX -ADD -L2 SITEADD 250500160 VERDELL BORTH 202 78TH ST W CHANHASSEN, MN 55317-9755 202 78TH ST W 250500170 TODD W PERTTU 203 1/2 CHAN VIEW CHANHASSEN, MN 55317-9701 203 CHAN VW 250500141 JONATHAN ROLLIER 204 78TH ST W CHANHASSEN, MN 55317 204 78TH ST W 250500190 TROY P KIMPTON 205 CHAN VIEW CHANHASSEN, MN 55317 205 CHAN VW 250500140 MADELINE A HILL 206 78TH ST W CHANHASSEN, MN 55317-9713 206 78TH ST W 250500230 DEAN C & JANET M BURDICK 206 CHAN VIEW CHANHASSEN, MN 55317-9707 206 CHAN VW 250500200 TONJA ST MARTIN 207 CHAN VIEW CHANHASSEN, MN 55317-9701 207 CHAN VW 250500090 JOHN W & PAULA J ATKINS 220 78TH ST W CHANHASSEN, MN 55317-9755 220 78TH ST W 250500360 AMY LOUISE DIEDRICH 221 77TH ST W CHANHASSEN, MN 55317 22177TH ST W 250500110 GREGORY J & KAREN J ODASH 221 CHAN VIEW CHANHASSEN, MN 55317-9750 221 CHAN VW 250500080 TAYLOR T BOTHUN 222 78TH ST W CHANHASSEN, MN 55317 222 78TH ST W 250500340 TAYLOR S KAHL 222 CHAN VW CHANHASSEN, MN 55317 222 CHAN VW 250500330 GREGORY L HUBERS 224 CHAN VIEW CHANHASSEN, MN 55317-9613 224 CHAN VW 250500070 JORDAN UDELHOFEN 224 W 78TH ST CHANHASSEN, MN 55317 224 78TH ST W 250500370 JEANNE M BURKE REV TRUST U/A 225 77TH ST W CHANHASSEN, MN 55317-9709 225 77TH ST W 250500380 1896HOUSE LLC 225 W 77TH ST CHANHASSEN, MN 55317 7701 FRONTIER TRL 250500320 SARAH HUMMER 226 CHAN VW CHANHASSEN, MN 55317 226 CHAN VW 259990200 TWIN CITIES & WESTERN RAILROAD 2925 12TH ST E GLENCOE, MN 55336-3368 250500411 ARUN SUBBIAH 301 W 77TH ST CHANHASSEN, MN 55317 301 77TH ST W 250500410 THEODORE VAN BLYENBURGH 303 77TH ST W CHANHASSEN, MN 55317-9798 303 77TH ST W 250500010 CHAPEL HILL ACADEMY 306 78TH ST W CHANHASSEN, MN 55317-9734 306 78TH ST W 250500405 TODD KAMMEIJER 307 77TH ST W CHANHASSEN, MN 55317-9798 307 77TH ST W 250500400 MERLIN FLAMING 311 77TH ST W CHANHASSEN, MN 55317 311 77TH ST W 250500120 JAMES & KELLEY A DEGROSS 3911 MEADOWVIEW LN ELKO, MN 55020-9538 223 CHAN VW 250130101 MARIANNE BURGER LLC 5925 WOODLAND CIR MINNETONKA, MN 55345-6440 7811 GREAT PLAINS BLVD 250500221 JEFFREY W & MARY L BORNS 7199 FRONTIER TRL CHANHASSEN, MN 55317-9605 7702 ERIE AVE 250500220 JOHN E & KAREN M KRAEMER 7703 ERIE AVE CHANHASSEN, MN 55317-9612 7703 ERIE AVE 250500350 BRIANNA A BACHRACH 7706 ERIE AVE CHANHASSEN, MN 55317-9612 7706 ERIE AVE 250500100 MARY E JANSEN ETAL 7720 ERIE AVE CHANHASSEN, MN 55317-9713 7720 ERIE AVE 250500020 LARRY A & KATHLEEN A SCHROEDER 7720 FRONTIER TRL CHANHASSEN, MN 55317-9753 7720 FRONTIER TRL 250500210 RICHARD A & ELIZABETH M NUSTAD 7721 ERIE AVE CHANHASSEN, MN 55317-9713 7721 ERIE AVE 256050010 THOMAS A & LYNN M PAULY 7721 FRONTIER TRL CHANHASSEN, MN 55317-9712 7721 FRONTIER TRL 256050020 MATTHEW FAUST 7723 FRONTIER TRL CHANHASSEN, MN 55317-9712 7723 FRONTIER TRL • L 250500050 CHAD A MINKEL 250500130 BRIAN P & COLLEEN S NUSTAD 250136500 CHURCH OF ST HUBERT 250500060 HAGEN HOMES LLC 250130200 CENTERPOINT ENERGY MINNEGASCO 252870030 RLB COMMERCIAL PROPERTIES LLC • • 7725 FRONTIER TRL 7791 ERIE AVE 8201 MAIN ST 850 FLYING CLOUD DR PO BOX 1475 PO BOX 474 CHANHASSEN, MN 55317-9712 CHANHASSEN, MN 55317-9713 CHANHASSEN, MN 55317-9647 CHASKA, MN 55318-9503 HOUSTON, TX 77251-1475 CHANHASSEN, MN 55317-0474 7725 FRONTIER TRL 7791 ERIE AVE 381 78TH ST W 7727 FRONTIER TRL 225 79TH ST W CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO. 2020-17 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday, September 1, 2020 at 7:00 P.M. in the Council Chambers in Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for lot cover and setback variances to construct a detached garage with turnaround on property located at 7727 Frontier Trail. Zoned Single -Family Residential (RSF). Applicant: Paul Pope, Paul Pope Builders, LLC. A plan showing the location of the proposal is available for public review on the city's web site at www.ci.chanhassen. mn.us/2020-17 or at City Hall during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with respect to this proposal. MacKenzie Young -Walters Associate Planner Email: mwalters@ ci.chanhassen.mn.us Phone: 952-227-1132 (Published in the Chanhassen Villager on Thursday, August 20, 2020: No 4918) SCANNED • 'pe-, Noah—I^7 Affidavit of Publication Southwest News Media State of Minnesota) )SS. County of Carver ) Laurie A. Hartmann, being duly swom, on oath says that she is the General Manager the news- papers known as the Chaska Herald and the Chanhassen Villager and has full knowledge of the facts herein stated as follows: (A) These newspapers have complied with the requirements constituting qualification as a legal newspaper, as provided by Minnesota Statute 331 A.02, 331A.07, and other applicable laws, as amended. 0� (B) The printed public notice that is attached to this Affidavit and identified as No.� 9 / i was published on the date or dates and in the newspaper stated in the attached Notice and said Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both inclusive, and is hereby acknowledged as being the kind and size of type used in the composition and publication of the Notice: abcdefghijklmnopgrstuvwxyz Subscribed and swom before me on thisday of 2020 Public r F rm°'MMEJEANNETTEBARKTARYPUBUC-MINNESOTAOMMISSIONEX 11RES01131123 RATE INFORMATION Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch Maximum rate allowed by law for the above matter ................................ $31.20 per column inch Rate actually charged for the above matter .............................................. $14.03 per column inch I� COMMUNITY DEVELOPMENT D RTMENT Planning Division — 7700 Market Boulevard OF Mailing Address — P.O. Box 147, Chanhassen, MN 55317 CI'T'Y CHMNSEN 0 Phone: (952) 227-1130 / Fax: (952) 227-1110 AGENCY REVIEW REQUEST LAND DEVELOPMENT PROPOSAL Please review and respond no later than the review response deadline Agency Review Request Date: Agency Review Response Deadline: Date Application Filed: August 7, 2020 August 20, 2020 July 31, 2020 Contact: Contact Phone: Contact Email: MacKenzie Young -Walters 952-227-1132 mwalters@ci.chanhassen.mn.us Associate Planner Planning Commission Date: City Council Date: 60 -Day Review Period Deadline: September 1, 2020 at 7:00 p.m. September 28, 2020 at 7:00 p.m. September 29, 2020 Application: Request for lot cover and setback variances to construct a detached garage and driveway with turnaround on property located at 7727 Frontier Trail. Zoned Sin le-Famil Residential RSF . PlanningCase: 2020-17 Web Pa e: www.ci.chanhassen.mn.us/2020-17 In order for staff to provide a complete analysis of issues for Planning Commission and City Council review, we would appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites, street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City Council. Your cooperation and assistance is greatly appreciated. City Departments: Federal Agencies: Adjacent Cities: ❑ Attorney ❑ Army Corps of Engineers ❑ Chaska ® Building Official ❑ US Fish & Wildlife ❑ Eden Prairie ® Engineer ❑ Jackson Township ® Fire Marshal Watershed Districts: ❑ Minnetonka ® Forester El Shorewood ® Park Director ❑Carver County E-1Victoria r ® Water Resources El Lower River F] Minnehaha Creek El Law Enforcement Adiacent Counties: ® Riley -Purgatory -Bluff Creek Carver County Agencies: El HennepinUtilities: ❑ Scott ❑ Community Development ❑ Cable TV — Mediacom ❑ EngineerSchool Districts: El Environmental ❑ Electric — Minnesota Valley services ® Historical Society F] Electric — Xcel Energy E] Eastern Carver County 112 El Parks ElMagellan Pipeline [:1Minnetonka 276 El &Water Conservation District ❑ Natural Gas — CenterPoint Energy ❑ Phone — CenturyLink Other Agencies: State Agencies: ❑ Hennepin County Regional Railroad ❑ Board of Water & Soil Resources Author ty ❑ MN Landscape Arboretum ❑ Health El Historical Society ❑ SouthWest Transit E] Natural Resources -Forestry El TC&W Railroad ❑ Natural Resources -Hydrology ❑ Pollution Control ❑ Transportation 0 0 CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO. 2020-17 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday, September 1, 2020 at 7:00 p.m. in the Council Chambers in Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for lot cover and setback variances to construct a detached garage with turnaround on property located at 7727 Frontier Trail. Zoned Single -Family Residential (RSF). Applicant: Paul Pope, Paul Pope Builders, LLC. A plan showing the location of the proposal is available for public review on the city's web site at www.ci.chanhassen.mn.us/2020-17 or at City Hall during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with respect to this proposal. MacKenzie Young -Walters Associate Planner Email: mwaltersAci.chanhassen.mn.us Phone: 952-227-1132 (Publish in the Chanhassen Villager on August 20, 2020) gAplant2020 planning cases\20-17 7727 frontier trail var\ph notice to villager.docx SCANNED ,uthenusign ID: E4CC98234C4C43D7.8104-8E2732F396B6 COMMUNITY DEVELOPMENT DWTMENT Planning Division — 7700 Market Boulevard CITY OF CHMNSEN Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1100 / Fax: (952) 227-1110 APPLICATION FOR DEVELOPMENT REVIEW Submittal Date: t L PC Date: I L% CC Date: n a 60 -Day Review Date: ag� Section 1: Application Type (check all that apply) (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) ❑ Comprehensive Plan Amendment ......................... $600 ❑ Subdivision (SUB) ❑ Minor MUSA line for failing on-site sewers ..... $100 ❑ Create 3 lots or less ........................................ $300 EJ Conditional El Create over 3 lots.......................$600 + $15 per lot Use Permit (CUP) ( lots) ❑ Single -Family Residence ................................ $325 ❑ Metes & Bounds (2 lots).................................. $300 ❑ All Others......................................................... $425 ❑ Consolidate Lots..............................................$150 El Interim Use Permit (IUP) [-ILotLine Adjustment.........................................$150 ❑ Final Plat $700 ❑ In conjunction with Single -Family Residence.. ❑ All Others $325 .......................................................... (Includes $450 escrow for attorney costs)* ......................................................... $425 `Additional escrow may be required for other applications EJ Rezoning (REZ) through the development contract. ❑ Planned Unit Development (PUD) .................. $750 ❑ Vacation of Easements/Right-of-way (VAC)........ $300 ❑ Minor Amendment to existing PUD ................. $100 (Additional recording fees may apply) ❑ All Others......................................................... $500 ❑ Variance (VAR) .................................................... $200 ❑ Sign Plan Review ................................................... $150 ❑ Wetland Alteration Permit (WAP) ❑ Site Plan Review (SPR) ❑ Single -Family Residence ............................... $150 ❑ Administrative ..................................................$100 ElAll Others ....................................................... $275 ElCommercial/Industrial Districts. ...................... $500 El Zoning Appeal $100 Plus $10 per 1,000 square feet of building area: ...................................................... thousand square feet) 'Include Ordinance Amendment (ZOA)................. $500 number of xi in employees: Include Include number of new employees: ❑ Residential ......................................... $500 NOTE: When multiple applications are processed concurrently, Plus $5 per dwelling unit (_units) dwelling the appropriate fee shall be charged for each application. ❑� Notification Sign (City to install and remove)...................................................................................................................... $200 R1 Property Owners' List within 500' (City to generate after pre -application meeting) ............ff................................ $3 per address ( ;Z@ addresses) R1 Escrow for Recording Documents (check all that apply)....................................................................... $50 per document ❑ Conditional Use Permit ❑ Interim Use Permit ❑ Site Plan Agreement ❑ Vacation ❑ Variance ❑ Wetland Alteration Permit ❑ Metes & Bounds Subdivision (3 docs.) ❑ Easements ( easements) 21 Deeds 6`t TOTAL FEE: $5W Section 2: Required Information Description of Proposal: Proposed detached garage with turnaround. Garage to have gutter and downspout to direct rainwater on to the property away from the street. Property Address or Location: Parcel #: 250500060 7727 Frontier Trail, Chanhassen, MN 55317 Legal Description: The South 80 feet of Lots 1 & 2, Block 1, City Lots of Chanhassen Total Acreage: 2024 Wetlands Present? Present Zoning: Single -Family Residential District (RSF) Present Land Use Designation: Residential Large Lot Existing Use of Property: Single Family Residence ❑Check box if separate narrative is attached. ❑ Yes ® No Requested Zoning: Not Applicable Requested Land Use Designation: Not Applicable ,uMen4Sign ID: E4CC98234C4C4327-61M4 E2732F396B6 APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Paul Pope Builders LLC Contact: Paul Pope Address: 5456 46th Avenue South Phone: City/State/Zip: Minneapolis, MN 55417 Cell: 612-720-5528 Email: paulpope2010@gmail.com Fax: Signature:�_ Date: 7/31/2020 T- A1/C3b9 RA CD7 PROPERTY OWNER: In signing this application, 1, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Signature: Date: This application must be completed in full and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before fling this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements and fees. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: ❑ Property Owner Via: ❑ Email ❑ Mailed Paper Copy Name: Dean Urevig 21 Applicant Via: ❑� Email ❑ Mailed Paper Copy Address: 5725 Blake Road South #105 ❑ Engineer Via: ❑ Email ❑ Mailed Paper Copy City/State/Zip: Edina, MN 55436 2 Other* Via: ❑� Email ❑ Mailed Paper Copy Email: deanurevig@gmail.com INSTRUCTIONS TO APPLICANT: Complete all necessary form fields, then select SAVE FORM to save a copy to your device. PRINT FORM and deliver to city along with required documents and payment. SUBMIT FORM to send a digital copy to the city for processing. SAVE FORM PRINT FORM SUBMIT FORM 0 • Urevig Design Group, LLP Dean Urevig 5725 Blake Road South #105 Edina, MN 55436 July 9, 2019 To: Members of the Planning Commission and City Staff SUBJECT: Variance Application Site 7727 Frontier Trail, Chanhassen, MN 55317 Scope of work • New Garage • New Driveway with Backup -Turnaround Variance Request The Owner is Requesting a Variance for the following reasons: 1. The City has a practical requirement for a minimum of a Two -Car Garage. This property does not have a garage and it would be practical to have a garage. 2. It is not possible to comply with zoning ordinances for lot coverage and setbacks. 3. This is for practical use, not for economic considerations alone. 4. The lot is nonconforming to current City Standards making it unique. S. The neighboring residential properties all have Garages. The Garage will conform to the character of the house with 4" exposure siding and 4" corners. On behalf of the Property Owner and the General Contractor please accept this Variance Application. Sincerely, Urevig Design Group, LLP Dean Urevig 612-424- 0211 deanurevig@gmaii.com SCANNn TITLE SPECIALISTS, INC. ESCROW ACCOUNT 12725 43RD ST. NE, SUITE 102 ST. MICHAEL, MN 55376 (763)493-2224 i –Four Thousand Six Hundred Eighty-Fourand 00/100 = -------- PAY TO THE eXp Realty ORDER OF 4525 White Bear PKWY White Bear Lake, MN 55110 MIDWESTONE BANK Commissions June 25, §6M 11.010427111 1:0739012331: 444 612311' FITLE SPECIALISTS, INC. ESCROW ACCOUNT * REAL ESTATE CLOSING "" Borrower. CCF Properties, LLC Seller. Hagen Homes, LLC Lender. Property: 7727 Frontier TraiUChanhassen Settlement Date: June 25, 2020 Disbursement Date: June 25, 2020 Check Amount: $4,884.00. 201299/28 Pay To: eXp Realty For. Commissions BrokerAdmin Commission (H.02) $499.00; Commission FITLE SPECIALIST, INC. ESCROW ACCOUNT 10427 201299 a $ "•' O — Dollars Closer/Responsible Party: Mara Montanez Selling Agent (H.04) $4,185.00 * REAL ESTATE CLOSING '" Borrower. CCF Properties, LLC Seller. Hagen Homes, LLC Lender: Property: 7727 Frontier Trail/Chanhassen Settlement Date: June 25, 2020 Disbursement Date: June 25, 2020 Check Amount: $4,684.00 201299128 Pay To: eXp Realty For: Commissions Broker Admin Commission (H.02) $499.00; Commission Closer/Responsible Party: Mario Montanez Selling Agent (H.04) $4,185.00 10427 10427 L6rNo6f1 To Raordw- PI"m Small «deroOxcurnb dnt o.r lMRF WN 0 0 (Top 3 inches reserved for recording data) WARRANTY DEED Minnesota Uniform Conveyancing Blanks Business Entity to Business Entity Form 10.1.9 (2013) e-CRV No.: DEED TAX DUE: $511.50 DATE: FOR VALUABLE CONSIDERATION, Hagen Homes LLC, a Limited Liability Company under the laws of Minnesota ("Grantor'), hereby conveys and warrants to CCF Properties,' LLC, a Limited Liability Company under the laws of Minnesota ("Grantee"), real property In Carver County, Minnesota, legally described as follows: Legal description attached hereto and made a part hereof marked Exhibit "A' Check here if al/ or part of the described real properly Is Registered (Torrens) ❑ together with all hereditaments and appurtenances belonging thereto, subject to the following exceptions: • 11 Page 2 of 3 Minnesota Uniform Conveyancing Blanks Form 10.1 .9 Check applicable box., ❑ The Seller certifies that the Seller does not know of any wells on the described real property. ❑ A well disclosure certificate accompanies this document or has been electronically filed. (If electronically filed, Insert WDC number. ❑ I am familiar with the property described in this instrument and I certify that the status and number of wells on the described real property have not changed since the last previously filed well disclosure certificate. State of Minnesota, County of Hennepin Grantor Hagen H 9�rHage BY: Ch toSole emr This Instrument was acknowledged before me on b ris pher Hagen as Sole Member of Hagen Homes LLC. (Stamp) (Ngrra(un Wnoramlalfieer) ^^^� ERICA SOMER Kp,ISER Natwy Puaio-Ming M,camet:n,�,tr,a1.20�5 THIS INSTRUMENT WAS DRAFTED BY: Edina Realty Title, Inc. 6800 France Ave S, Suite 200 Edina, MN 55435 Title (and Rank): My commission expires: (niorANdayywr) TAX STATEMENTS FOR THE REAL PROPERTY DESCRIBED IN THIS INSTRUMENT SHOULD BE SENT TO: CCF Properties, LLC Cl Page 3 of 3 Minnesota Unliorm Conveyancing Blanks Form 11.1 .1 EXHIBIT "A" The South BO feet of Lots One and Two (1 & 2) of Block 1, Village of Chanhasses, Carver County, Minnesota, according to the map or plat on file and of record in the Office of the County Recorder of said Carver County, Minnesota ABSTRACT PROPERTY u Amercan Land TUe Associatlon ALTA Settlement Statement - Seller Adopted 05.01-2015 Title Specialists, Inc. ALTA UnlversalID: 1029982 12725 43rd St NE Ste, 102 Saint Michael, MN 55376 File No./Escrow No.: 201299 Print Date & Time: June 23, 2020 5:38 pm Officer/Escrow Officer: Marto Montanez Settlement Location : 12725 43rd St NE, Ste. 102 Saint Michael, MN 55376 Property Address: 7727 FronfierTrall Chanhassen, MN 55317 Borrower: CCF Propertles, LLC Seller: Hagen Homes, LLC 7727 Frontier Trail Chanhassen, MN 55317 Lender: Settlement Date: June 25, 2020 Disbursement Dale: June 25, 2020 ., e.q:!.ep: ilCi li,-:'.:_S.•'i :_,,.,. ::. :, •2Ll �:S'_N� �jb i..'44�.: :. a. •f� �iy(, . "y L1 s Description Seller - -..Debit -Credit Financial Sale Price of Property 155,000.00 Proration/Adjustments County Taxes 06/25/20 - D7/01/20 37.53 Title Charges and Escrow/Settlement Charges Payoff Processing Fee to TrUe Specialists, Inc. 30.00 Recording Service Fee to Title Specialists, Inc. 30.00 Seller Closing Fee to Edina Realty Title, Inc. 425.00 Seller Document Preparation to Edina Really Title, Inc. 75.OD Commisslons Broker Admin Commission to Edina Really, Inc. 499.00 Commission - Listing Agent to Edina Really, Inc. 5,115.00 Commission - Selling Agent to eXp Realty 4,185.00 Government Recording and Transfer Charges Conservation Fee to Carver County Recorder 5.00 Copyfigh12015 Amedmn lend Title Assoda4on FlIe # 201299 126 Ag nghts reserved Pepe 1 d2 Printed on 06123120 at 636;1 SPM by Jessim 0 0 SP --. Description s - - Se08r Debit Credit Government Recording and Transfer Charges (continued) Recording Fees (Satisfaction) to Carver County Recorder 46.00 SDT to Carver County Treasurer 511.50 Payoff(s) Payoff of First Mortgage Loan to Old National Bank Loan Payoff 0.00 Total Payoff 63.393.71 63,393.71 Miscellaneous Estimated Final Water Charges to City of Chanhassen 97.00 Non -Homestead Diff 2nd half 2020 to Carver County Tax Treasurer 90.50 - Debit Credit Subtotals 74,502.71 155,037.53 Due to Seller 80,534.82 Totals 155,037.53 155,037.53 Acknowledgement Well have carefully reviewed the ALTA Settlement Statement and find K to be a true and accurate statement of all receipts and disbursements made on my account or by me in this transaction and further certify that I have received a copy of the ALTA Settlement Statement. Wall authorize Title Specialists, Inc. to cause the funds to be disbursed in accordance with this statement. Seller .- 'o / Mario Montanez Executive Closer CopYnghl 2015 American Lend T Ie Aszoclebm File # 2 01 29 9 126 All rights reservod Page 2 of 2 Printed on 082320 at 5:38:15PM by Jesslca 10 • American LandTitle Association ALTA Settlement Statement - Borrower/Buyer Adopted 05-01-2015 Title Specialists, Inc. ALTA Universal ID: 1029982 12725 43rd St NE Ste. 102 Saint Michael, MN 55376 File No./Escrow No.: 201299 Print Date & Time: June 25, 2020 12:02 pm Officer/Escrow Officer: "Mario Montanez Settlement Location: 12725 43rd St NE, Ste. 102 Saint Michael, MN 55376 Property Address: 7727 Frontier Trail Chanhassen, MN 55317 Borrower. CCF Properties, LLC Seller: Hagen Homes, LLC 7727 Frontier Trail Chanhassen, MN 55317 Lender: Settlement Date: June 25, 2020 Disbursement Date: June 25, 2020 - - •Description -_ Borrowerl-Buyer - - - •. - - _ Debit ; - - - Credit . Financial Sale Price of Property 155,000.00 Deposit 1,500.00 Proration/Adjustments County Taxes 06/25/20 - 07/01/20 37.53 Title Charges and Escrow/Settlement Charges Closing Fee to Title Specialists, Inc. 275.00 Exam Fees to Title Specialists, Inc. 200.00 Recording Service Fees to Title Specialists, Inc 50.00 Title Search Fees to Title Specialists, Inc. 325.00 Wire/Courier Fees to Title Specialists, Inc. 50.00 Owner's Title Insurance to Title Specialists, Inc. Coverage: 155,000.00 Premium: 503.75 .503.75 Commissions Broker Admin Commission to eXp Realty 499.00 CoMrigit 2015 Amedi Land Title Aswdaliw, File # 201299 / 28 All nghts reserved Page 1 of 2 Printed on 06/25/20 at 12:02:28PM by J=6 Acknowledgement We/I have carefully reviewed the ALTA Settlement Statement and find it to be a true and accurate statement of all receipts and disbursements made on my account or by me in this transaction and further certify that I have received a copy of the ALTA Settlement Statement. Weft authorize Title Specialists, Inc. to cause the funds to be disbursed in accordance with this statement. Borrower CCF ProMilles, LLC BY: GopyrgM 2015 Amerkzn Lard TltleAWMIallon File p 201299 / 28 All rights reserved Page 2 o12 Printed on 06125/20 at 12:0228PM by Jessica Description Borrower/Buyer - - -.- Debit - - Credit Government Recording and Transfer Charges Recording Fees to Carver County Recorder 92.00 Conservation Fee to Carver County Recorder 5.00 Record Well Cert to Carver County Recorder 50.00 .Debit ; Ciedit _ Subtotals 157,087.28 1,500.00 Due from Borrower 155,587.28 Totals 157,087.28 157,087.28 Acknowledgement We/I have carefully reviewed the ALTA Settlement Statement and find it to be a true and accurate statement of all receipts and disbursements made on my account or by me in this transaction and further certify that I have received a copy of the ALTA Settlement Statement. Weft authorize Title Specialists, Inc. to cause the funds to be disbursed in accordance with this statement. Borrower CCF ProMilles, LLC BY: GopyrgM 2015 Amerkzn Lard TltleAWMIallon File p 201299 / 28 All rights reserved Page 2 o12 Printed on 06125/20 at 12:0228PM by Jessica CITY OF CHANHASSEN • P O BOX 147 CHANHASSEN MN 55317 08/10/2020 10:43 AM Receipt No. 00445699 CLERK: kimh PAYEE: Paul Pope 5456 46th Ave S Minneapolis MN 55417-1454 7727 Frontier Trail Case Co 2020-17 ------------------------------------------------------- Use & Variance 314.00 Sign Rent 200.00 Recording Fees 50.00 Total Cash Check 8931 Change SCANNED 564.00 0.00 564.00 0.00 E 7727 Frontier Trail, Planning Case No. 2020-17 (MYW) $0.00 Consolidate Lots $0.00 Lot Line Adjustment $0.00 Subdivision ($600 + $15 per lot) $0.00 Vacation $114.00 Property Owners List ($3.00 x 38) $200.00 Variance $200.00 Notification Sign $50.00 Deeds $0.00 Attorney's Fees $0.00 Recording Fees $564.00 TOTAL $564.00 Ck #8931 from Paul Pope, Paul Pope Builders LLC $0.00 Balance Owed $0.00 Adjustment SCOPE OF WORK & LIMITATIONS: 1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, if necessary, to make sure that it is wrtect and that any matters of record, such as easements, that you wish in be included on the survey have been shown. 2. Showing the location of observed existing improvements we deem necessary for the survey. 3. Setting survey markers or verifying existing survey markers to establish the comers of the property. 4. Existing building dimensions and setbacks measured to outside of siding or stucco_ 5. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies thin may have jurisdiction over these requirements to verify they are correctly shown before proceeding with construction. 6. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a benchmark for vour use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or before beginning construction. 7. This survey has been completed without the benefit of a current tide commitment. There may be existing easements or other encumbrances thin would be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than the ones shown hereon. 8. It is possible thin an overlap exists with the property to the North based on tax descriptions. At this time, we have not been provided any documents to verify the legal descriptions. The boundary shown is that part of Lots I & 2 lying South of the North 62 feet thereof, more or less. If this uncertainty is something you would like to remove. you could contact a rude insurance company or a competent attorney to review the possible tide issues, if any. 9. While we show a proposed location for this home or addition, we are not as familiar with you proposed plans as you, your architect, or the builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match your plans before construction begins. Also, we are not as familiarwith local codes and minimum requirements as the local building and zoning officials in this community are. Be sure to show this survey to said officials, or any other officials that may have jurisdiction over the proposed improvements and obtain their approvals before beginning construction or planning improvements to the property. STANDARD SYMBOLS &CONVENTIONS: "9" Denotes two survey marker, found, unless otherwise noted. BEFORE DEMOLITION AND GRADING BEGIN • Install sill fenceJbio roll around the perimeter of the construction area. • Sediment control measures most remain in place until final stabilization has been established and then shall be removed. Sediment controls may be removed to accommodate short term construction activity but must be replaced before the next rain. • A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer of I to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with permeable geolextile fabric. The entrance shall be maintained during construction by top dressing or washing to prevent tracking or Bow of sediments onto public streets, walks or alleys. Potential entrances that are not so protected shall be closed by fencing to prevent unprotected exit from the site. • Contractor shall install inlet protection on all existing storm sewer inlets in accordance with the city standard details. Inlet protection shall also he provided on all proposed storm sewer inlets immediately following construction of the inlet. Inlet protection must be installed in a manner that will not impound water for extended periods of time or in a manner that presents a hazard to vehicular or pedestrian traffic. DURING CONSTRUCTION: • When din stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment laden runoff and if the piles or other disturbed areas are to remain in place for more than 14 days, they shah be seeded with Mimresoua Department of Transportation Seed Mixture 22-111 ar 100 Ib/acre followed by covering with spray mulch. • A dumpster shall be placed on the site for prompt disposal of construction debris_ These dumpsiers shall be serviced regularly to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from the site shall in accordance with Minnesota Pollution Control Agency requirements. • .A separate contaimer shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in accordance with MPCA requirements. • Concrete truck washout shall be in the plastic lined ditch and dispose of washings as solid waste. • Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and repaired as necessary to provide downstream protection. • Streets and other public ways shall be inspected daily and if litter or snits has been deposited it shall promptly be removed. EXISTING HARDCOVER cleaned before exiting the site in the rock entrance areas HOUSE 1,157 SO. FT. PORCH/STEPS 437 SO. FT. WALKS 67 SO. FT. SHED 95 SO. FT. TOTAL EXISTING HARDCOVER 1,756 SO. FT. AREA OF LOT 8,819 SO. FT. LOT COVERAGE 19.9% absolute minimum. The contractor shall install temporary earth PROPOSED HARDCOVER dikes, sediment traps or basins and additional sill fencing as deemed HOUSE 1,157 SO. FT. PORCH/STEPS 437 SO. FT. WALKS 67 SO. FT. SHED 95 SO. FT. GARAGE 528 SO. FT. DRIVEWAY/APRON 343 SO. FT. TOTAL PROPOSED HARDCOVER 2,627 SO. FT. AREA OF LOT 8,819 SO. FT. LOT COVERAGE 29.8% • If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock entrance areas • Moisture shall be applied to disturbed meas to control dust as needed. • Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained. • If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile areas so that the double silt fence around these areas can filter the water before it leaves the site. • Temporary erosion control shall be installed no later than 14 days after the site is fiat disturbed and shall consist of broadcast seeding I with Minnesota Department of Transportation Seed Mixture 22-111 a 10016/acre followed by covering with spray mulch. I • Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth 66 dikes, sediment traps or basins and additional sill fencing as deemed necessary to control erosion. SITE WORK COMPLETION: • When final grading has been completed but before placement of seed or and an "as built" survey shall be done per City of Chanhassen Q requirements to insure that grading was properly done. I • When any remedial grading has been completed, sod or seeding shall y be completed including any erosion control blankets for steep areas. I • When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of and adjacent streets, y alleys slid walks shall be cleaned as needed to deliver a site that is 'V erosion resistant and clean. • Contractor shall maintain positive drainage of a minimum 2% slope away from proposed building. SCANNED BENC, ARK_ MANHOLE ELEV,970.7 (ASSUMED) LOT 2 - — — — — — — — — — — — — — — --- - — — — — — — — — — — — — — — it I I) I U I I N p w o EXISTING DWELLING I I :6 LOT 2 I i 1.I — N 89"21'01"1 E 119.78 — ,L u 3 LOT LOT u .,q �� - 1NsrAu=�� W us >, �— SF 0 SF n ,F: n- EXISTING w / 40.3 �` 1 DWELLING n EXISTING a • ,I PRO'OSEO I\� 0 I. wAtxo DWELLING GARAGE ry ,` FTE -971.2' \1 J e 10. EUEV ROOK Yl/1 o ErEv..a7•.I 220 %71 x 40.311 1 I ---S-- v rata " 1 �mvEw O • e s7t — L>K N 9"1746• E 11 .74 E%ISMNO w'� E>oSMtC + awe at WSIALL Sit FENCE K 79TH ST. DMG ORIENTATION, SCALE I OUENTIJ08 ADDRESS I A �_ •^� ^ ^ — — -L -`.SOUTN LINE SECT. 12, TMP. 116, RNG. 21 DATE SURVEYED: SHEET TITLE SHEET NO. 0 0 0 • I I I I I I1 �-- --------------I-------------------------- I I 5EE SURVEY PRODUCED BY ADVANCE i SURVEYING 6 ENGINEERING, CO. DATED JULY 14, 2020 FOR ADDITIONAL EXI5TING INFORMATION. I 1 I I I I I I SCANNED AFTER ACCEPTANCE OF VARIANCE, THE SURVEY WILL BE UPDATED TO ACCEPTED LAYOUT. EXISTING HOUSE PROP05ED DRIVEWAY R10'-0" q' -Z" ITE PLAN 3/32"=1'-O" 0 10, 20, SHED 1,151 SF HOUSE 4315E PORLH/STEPS 61 SF WALKS 95 SF SHED 1,156 5F TOTAL EXISTING 0,519 5F AREA OF LOT 1,151 SF HOUSE 431 SF PORLH/5TEFS 67 SF WALKS q5 SF SHED 523 5F GARAGE 451 SF DRIVEWAY/APRON 2,165 SF TOTAL EXISTING H 8,819 SF AREA OF LOT 31.35% LOT COVERAGE i� ONE INCH v� m dy O mm � yah W V crnmcl £3y v NJ��v4i m Jymmc� —E cLc_ a,+3'aoo�o O �L9 �9�pcp NdJ ��iOd V N JAN N�LL� N Qcn�O ,��mm pEEipJ O > pec N N 3J f E2 p�yyc��,00 V X0=1 am E,'�+1� a O J% ul of lu J mLLZ rN CIL fJr� 131/2020 �o m � d m Q X19 Z tll !r ry v� m dy O mm � yah W V crnmcl £3y v NJ��v4i m Jymmc� —E cLc_ a,+3'aoo�o O �L9 �9�pcp NdJ ��iOd V N JAN N�LL� N Qcn�O ,��mm pEEipJ O > pec N N 3J f E2 p�yyc��,00 V X0=1 am E,'�+1� a �J� z ul of lu mLLZ rN CIL fJr� 131/2020 �o 0 GENERAL NOTE5: A. ALL ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL AND WORK SHALL MEET APPLICABLE CODES. B. CONTRACTOR TO VISIT THE 517E AND REVIEW EXISTING CONDITIONS PRIOR TO BIDDING. CONTACT UREVIG DESIGN GROUP WITH ANY NOTICED DISCREPANCIES. G. ALL PIMEN51ONS SHALL BE VERIFIED BY THE CONTRACTOR. DO NOT SCALE THE DRAWINGS. D. CONTRACTOR TO VERIFY EXISTING SITE CONDITIONS AND PROVIDE NECESSARY ADJUSTMENT FOR CONSTRUCTION TO BE COMPLETED W THIN THE INTENT OF THE DESIGN. E. VERIFY AND MODIFY GRADE AS REQUIRED TO ACCOMMODATE THE BUILDING AND TO MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING AND MINIMUM OF 6" BETWEEN WOOD AND GRADE. F. ALL EXTERIOR FRAMED WALLS ARE 2X4 UNLESS NOTED OTHERWISE. O❑ KEYED NOTES THIS SHEET 1. NEW CONCRETE APRON AT NEW UPWARD ACTING SECTIONAL DOOR. 2. NEW 16 x 7' UPWARD ACTING SECTIONAL DOOR, FINAL DESIGN BY CONTRACTOR. GARAGE DOOR OPENING SYSTEM TO COMPLY WITH MINNESOTA STATUTES, SECTIONS 325F.82 AND 325F.83 3. NEW 50 x 68 DOOR, 4. 2-2x10 HEADER AND 1/2" PLYWOOD 5. 2-1 3/4" x 11 1/4" OR 11 7/8" 2.0E LVL HEADER. RUN FULL WIDTH OF WALL TO FACE OF PERPENDICULAR WALL. 6. 5AWCUT CONTROL JOINTS. MAXIMUM OF 8' O.G. 7. DOWN5POUT WITH SPLASH BLOCK. 0 a 0 1 OARAOE ILOOR PLAN A, 1/4"=1'-O" 0 5' 10, i um w u3 n �ya��ovim �'++iy SlV mO aa£� sao C � • L � L � 6� mEJai���� �QriO��yp S a mmJ �—da3c 0 O1��NC1L�� r OJ��ny cs N£.30ip La' �mVcp3 soa�Q�Ey� Hp 4�JW aFP 'Ow gdzW OL 06 maz rQ h x LL I] F V '131/2020 CKD 1 A5 4 A4 --- - - — -- -- — — -- -- — - - - -- --- ---- - tl 2 MALL CONSTRUCTION - SIDING A4 • VINYL SIDING, 4" EXPOSURE • BUILDING PAPER (AIR INFILTRATION BARRIER) • 1/2" OR "1/16" SHEATHING • 2x4'5 ®16" O.G. FLOOR CONSTRUCTION -4 THICK 5000 P51 (MIN) CONCRETE SLAB, STEEL TROWEL FINISHED AND SEALED. TABLE R402.2 SLOPE FLOOR TO DOOR -bxb 10/10 WWF ON SEATS PLACE IN 2% IN PARKING AREA LATOPTHIRD. -4" 5AND/GRAVEL BASE --_4 _—__•________ ______________�____--_____-_.___ __-A— -_- __6-__ ___ i. S BUILDING SECTION 1/2 =1 —0 0 11 21 31 4, ONE INCH L pp � ami a 3 ry mN ��pO �yv~` Wa ma+l d vNE3v.°im� cifai�iiw :9.EJm� c 3c3 oco� �O W c Lj�a a ala O.y°y"V0 NJ�v G�W�yS yJJ (1Y9q -ami aVmO iEi °>OC 3� t IV �N OIL O.L�Rm E�O�R �m HBO IER O_ Js J F p� d m Q o n � n �fJnsm L pp � ami a 3 ry mN ��pO �yv~` Wa ma+l d vNE3v.°im� cifai�iiw :9.EJm� c 3c3 oco� �O W c Lj�a a ala O.y°y"V0 NJ�v G�W�yS yJJ (1Y9q -ami aVmO iEi °>OC 3� t IV �N OIL O.L�Rm E�O�R �m HBO IER *OF FRAMING NOTES • • Attach all truss ends with Simpson 1-12.5A ties to wall plates. • Use 1/2" plywood roof sheathing, see structural notes for nailing. • Provide minimum 2 - 2x trimmer studs and 1 - 2x king stud unless noted. • Block solid below all posts to foundation. • Provide minimum of 2 studs (5" bearing length), full width of beam/header/girder truss must be supported. • Mend all fascia board butt splices with 5lmpson LSTA24 horizontal strap. • Extend plywood wall sheathing up face of truss heel and nail to trusses. Stop short for venting as required. • Exterior studs to be 2x4 at 16" oc. L_J BUILDING SECTION 1/2 11=1 -O O 1' 2' 3' 4' cLQV�YI JI a+ EB lfi§z $v'V :wo r= D lu J W ^dK' Z r I w Z u'Jn O m LL = s nF� ,�v2ozo �3 0 SEE FLOOR PLAN ACTING AL DOOR DOOR/YVALL DETAIL O 4 8" 12" 24" 1/2" EXPANSION JOINT MATERIAL #5 55 REBAR DOYVEL ® 24" O.G., HOLD 3" FROM FACE OF CONCRETE DRIVEYVAY THICKEN PERIMETER OF APRON. PROVIDE 1 #4 CONTINUOUS, HOLD BACK 3" FROM 501L7 3'-0" 0 _ WRAPPED FASCIA SOFFIT A- ROOF/YELL DETAIL 1 =1 —O O 4" 8" 12" 24" _ _ _ -- -- --------------- _ _ p _______�T___ D `t c `o ' p p -L4 " I_ p p f 2 # 45 CONTINUOUS, HOLD E==_' p p BACK 3" FROM 501L 0 8,. EXTEND DEPTH OF FOOTING AS NECESSARY TO REACH UNDISTURBED GRANULAR 501L OR ENGINEERED FILL SLAB DETAIL 1 11=1 —O 0 4" S" 12" 24" 2x4 SILL PLATE, TREATED IF NECE55ARY OPTIONAL 2x6 SILL PLATE, TREATED FOAM SILL SEALER, RUN PAST OUT5IDE EDGE 6" CMU. 5" OR 4" HIGH, GORE FILL 1/2" AB, 16" MIN. INTO GONG., 6' O.G. MAX, 3 1/2" TO 12" FROM EACH END, 2 BOLTS PER SILL PLATE MIN. YELL/ FLOOR DETAIL 1 =1 —O 0 4" 8" 12" 24" r�L Nw oWi u3 h Lw �WvccO 9.�i�dTw W O�VQL�� W�wOc� N EJwWt�� m�`off y ���wwQw voc°�9 pcp wd a'•+iu0_NJ tJQ Ln c�.yw. o >mc�w3d me wE3 p�mdyci �,�O U xv' V U. E.t.+U N O � J J n = IL F tll d d m Z�gN a��F4 4 m h >iU �1 N N �QIon ga Nw oWi u3 h Lw �WvccO 9.�i�dTw W O�VQL�� W�wOc� N EJwWt�� m�`off y ���wwQw voc°�9 pcp wd a'•+iu0_NJ tJQ Ln c�.yw. o >mc�w3d me wE3 p�mdyci �,�O U xv' V U. E.t.+U 2x6 BLOCKING BETY CEN OUTRIGGER5 ADD ROW OF BRACING AS REQUIRED. T' -2x6 DIAGONAL BRACE ® 48" O.G. W/ 4-10ddp,NA�OASS NAILS 2-2xb GT. HORIZ. L-REINF W/ 4-10d NAILS TO EACH TRU55 WEB DROPPED STRUCTURAL GABLE ROOF TRUSS GABL NO 5GALE 51MP50N H2.5A HURRICANE TIE @ EA. 2x 2x OUTRIGGER ® 24" O.G. FOR OVERHANGS GREATER THAN 18". OTHERWI5E 2x GABLE BLOCKING ® 24" O.G. 51MP50N LU524 HANGER UP51DE DOM 2x6 ROOF DIAPHRAGM BLKG. ® 48" O.G. YV 5-1bd NAILS EA. END TO TRU55. NAIL ROOF SHEATHING. 2x4x12'-0" BTM. CHORD PERMANENT CONT. LATERAL RESTRAINT ® 48" O.G. W/ 2-10d NAILS TO EACH TRU55 (SEE TRUSS DRAWING5 FOR ADDITIONAL BTM. CHORD BRACING) T -2x6 GABLE END YVALL PERMANENT DIAGONAL BRACING ® 48" O.G. YV/ 5-10d NAILS TO BLOCKING 4 4-10d TOE -NAILS TO WALL PLATES SIMP50N L550 CLIP ® 4'-0" O.G. AT 71PU55 TO PLATE & KICKER TO PLATE UNLE55 NOTED BRAISE DETAIL t wm m w3 n m�—oaov� SSO°ll� 9 Y�1 Ol � U�1 9 v��sio�s d o., �m�OEEL oo�rnc�;v3a s�jN�d9ij 0 p�p�mmW2�+vQ `UOQ=� ilm Eai+�� F u�� Z N 0 LU W Q Z�� J u� F Io r Q LU N Q L1�v A�5 In O a >i J = pp�L p u� d m Z ! N In agf4 Z kft �« n t wm m w3 n m�—oaov� SSO°ll� 9 Y�1 Ol � U�1 9 v��sio�s d o., �m�OEEL oo�rnc�;v3a s�jN�d9ij 0 p�p�mmW2�+vQ `UOQ=� ilm Eai+�� F u�� Z N 0 LU W Q Z�� J u� F Io r Q LU N Q L1�v A�5 0 E Framing/Sheathing for overhead door walls OUTSIDE ELEVATION EXTENT OF HEADER WITH DOUBLE PORTAL FRAMES (TWO BRACED WALL EXTENT OF HEADER WITH SINGLE PORTAL FRAMES (ONE BRACED WALL SEGMENT) I 2'-18' FINISHED WIDTH OF OPENING FOR SINGLE 0 1•zzz•1 p TENSION STRAP (ON 0 OPPOSITE SIDE OF p p SHEATHING) 0 000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 MIN 3"X11 1/4" NET HEADER p 0 0 0 0 0 0 0 0 STEEL HEADER PROHIBITED p 0 0 0 0 O 0 0 0 0 pop 0 01 _0 0 00 o 0 FASTEN SHEATHING TO HEADER WITH 8D O 00 = 00 oo COMMON OR GALVANIZED BOX NAILS IN 3" p IF NEEDED, PANEL SPLICE 00 w U 00 00 TERN AS SHOWN 0 GRID PATEDGES SHALL OCCUR OVER 0 J z o 0 o p AND BE NAILED TO COMMON 0 BLOCKING WITHIN 24" OF THE a o 0 00 HEADER TO JACK -STUD STRAP ON WALL MID -WEIGHT. ONE ROW p Q 00 00 BOTH SIDES OF OPENING OPPOSITE 0 OF 3" O.C. NAILING IS F cz7 ¢ 00 00 SIDE OF SHEATHING o REQUIRED IN EACH PANEL 09 0= a o 0 EDGE. 0 < < O 00 O O o TYPICAL PORTAL FRAME O 00 CONSTRUCTION 0 0 0 0 0 O o O MIN DOUBLE 2X4 FRAMING COVERED WITH MIN 000 o O UJ 00 oo 7/16" THICK WOOD STRUCTURAL PANEL 00 p SHEATHING WITH 8D COMMON OR GALVANIZEDp o o BOX NAILS AT 3" O.C. IN FRAMING (STUDS AND MIN DOUBLE 2X4 POST (KING 00 a 0 O SILLS AS SHOWN, TYP AND JACK STUD). 00 O 03 00 °D O MIN LENGTH OF PANEL 00 00 00 00 o INTERMITTENT BRACED WALL pp O MIN (2INSTALLED 1/2" DIAMETER ANCHOR BOLTS PANEL REQUIRED ADJACENT 0 o o INSTALLED WITH 2"X2"X3/16" PLATE WASHER OPENING FOR SINGLE PORTAL 0101 O o d FRAME o o b o ; o d o o b . , GARAGE FLOOR . ,. 6II&B9T d6.A AAL'R PORTAL FRAMING NO 5CALE 0 SIDE ELEVATION FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3" O.C. TYR MIN 7/16" WOOD STRUCTURAL PANEL SHEATHING n t mm v m� h Awa€w o+a,ry m® a¢W���sao L33 O g j q L L@ Oc JLm �.�uv C L 3S �Ovama« t O LL1J C14 LCW JC �Od@CNW3J O yp�TT�p�L?�6-��.Oim Ea3tLR VI -1V udN Et\D J W2