Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-05-2023 PC Agenda and Packet
A.6:00 P.M. - CALL TO ORDER B.PUBLIC HEARINGS B.1 Affinitech Site Plan Review - 2451 Galpin Court C.GENERAL BUSINESS D.APPROVAL OF MINUTES D.1 Approve Planning Commission Meeting Minutes dated November 6, 2023 E.COMMISSION PRESENTATIONS F.ADMINISTRATIVE PRESENTATIONS F.1 Discussion On Maximum Lot Cover Percentage in Residential Single Family (RSF) District and Shoreland Overlay Zoning District. F.2 Civic Campus Project Update G.CORRESPONDENCE DISCUSSION H.ADJOURNMENT I.OPEN DISCUSSION AGENDA CHANHASSEN PLANNING COMMISSION TUESDAY, DECEMBER 5, 2023 CITY COUNCIL CHAMBERS, 7700 MARKET BOULEVARD NOTE: Planning Commission meetings are scheduled to end by 9:00 p.m. as outlined in the official by-laws. We will make every attempt to complete the hearing for each item on the agenda. If, however, this does not appear to be possible, the Chairperson will notify those present and offer rescheduling options. Items thus pulled from consideration will be listed first on the agenda at the next Commission meeting. If a constituent or resident sends an email to staff or the Planning Commission, it must be made part of the public record 1 based on State Statute. If a constituent or resident sends an email to the Mayor and City Council, it is up to each individual City Council member and Mayor if they want it to be made part of the public record or not. There is no State Statute that forces the Mayor or City Council to share that information with the public or be made part of the public record. Under State Statute, staff cannot remove comments or letters provided as part of the public input process. 2 Planning Commission Item December 5, 2023 Item Affinitech Site Plan Review - 2451 Galpin Court File No.2023-22 Item No: B.1 Agenda Section PUBLIC HEARINGS Prepared By Rachel Arsenault, Associate Planner Applicant Eden Trace Corporation, 8821 Sunset Trail, Chanhassen MN, 55317 Present Zoning Planned Unit Development District (PUD) Land Use Office/Industrial Acerage 2.81 Density Not Applicable Applicable Regulations Chapter 20, Article II, Division 6, Site Plan Review Chanhassen West Business Park PUD Regulations SUGGESTED ACTION The Chanhassen Planning Commission recommends approval of the site plan for Affinitech subject to the conditions of approval and adoption of the findings of fact and recommendation. SUMMARY Eden Trace Corporation is requesting a site plan review for development of a 33,283 square-foot office and light industrial building. BACKGROUND The Chanhassen West Business Park was created as a Planned Unit Development in 2005. This is the final lot available for development in the PUD. 3 DISCUSSION RECOMMENDATION Staff recommends approval of the site plan for Affinitech subject to the conditions of approval and adoption of the findings of fact and recommendation. ATTACHMENTS Staff Report Water Resources Report - Affinitech Findings of Fact Application Affidavit of Mailing Architectural Elevations Civil Plans 4 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 1 of 9 SUMMARY OF REQUEST: The developer is requesting recommendation of approval for the site plan review of a commercial development containing a 33,283-square-foot building. LOCATION: 2451 Galpin Court Lot 3, Block 2, Chanhassen West Business Park Application: November 3, 2023 Planning Commission Review Date: December 5, 2023 City Council Review Date: January 8, 2024 60 Day Extension Notice Sent: November 30, 2023 120 Day Action Deadline: March 3, 2024 CASE #: 2023-22 PROPOSED MOTION: “The Chanhassen Planning Commission recommends approval of the site plan for Affinitech subject to the conditions of approval and adoption of the Findings of Fact and Recommendation.” 5 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 2 of 9 APPLICANT: Eden Trace Corporation Owner: Todd Brown 8821 Sunset Trail Park Road Chanhassen, MN 55317 Chanhassen, MN 55317 PRESENT ZONING: Planned Unit Development District 2040 LAND USE PLAN: Office Industrial ACREAGE: 2.81 acres DENSITY: 0.28 F.A.R. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city’s discretion in approving or denying a Site Plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the city must then approve the site plan. This is a quasi-judicial decision. Notice of this public hearing has been mailed to all property owners within 500 feet. PROPOSAL/SUMMARY The developer is requesting site plan approval for a 33,283 square-foot building for the use of an office and a light industrial warehouse that would be used in part by Affinitech, Inc. Affinitech is an existing business in Chanhassen providing professional audio and video systems. They are currently located at 1264 Park Rd. The proposed building would allow for their business expansion. APPLICABLE REGULATIONS Chapter 20, Article II, Division 6, Site Plan Review Chanhassen West Business Park – Planned Unit Development Regulations BACKGROUND The City of Chanhassen and Volk-Minger Properties, LLC, a Minnesota limited liability company, entered into a development contract for Chanhassen West Business Park dated October 10, 2005, recorded October 13, 2005, as Carver County document No.A426223; was amended by Addendum “A” to the Chanhassen West Business Park development contract dated November 16, 2005, recorded November 28, 2005, as Carver County document No.A429887; and also amended by Addendum “B” to the Chanhassen West Business Park development contract dated August 14, 2006, recorded September 13, 2006, as Carver County document No.A449656. 6 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 3 of 9 Environmental Protection Districts · Bluff Creek corridor - This parcel is not encumbered by the Bluff Creek Overlay District. · Bluff Protection - There are no bluffs on the property. · Floodplain Overlay - This property is not within a floodplain. · Shoreland Management - The property is not located within a shoreland protection district. · Wetland Protection - There is not a wetland located on the development site. Site Plan Review The developer is requesting site plan approval for a 33,283-square-foot building. Approximately 17,754 square feet will be used as office space and 20,056 square feet will be used for light industrial/warehousing. Architectural Compliance Materials and Color The site is located in the Chanhassen West Business Park, which does establish requirements for building materials and design. The material finishes on the structure include precast concrete painted panels, exposed aggregate precast concrete panels, aluminum window/door frames, architectural metal coping, and composite wood. The colors of these materials will be light gray, dark steel, cobalt blue, and medium brown wood. The design provides architectural relief on the front façade by staggering walls to break the plane. Entryway projections are used as architectural treatments to provide interest. All building elevations potentially visible from the public right-of-way are highly developed to ensure visual quality. 7 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 4 of 9 Building Size, Placement, and Lot Coverage The Chanhassen West Business Park requires a minimum front setback of 30 feet, the building is placed on the plans 79.4 feet from the front property line. The site has a minimum setback of zero feet, the plans show 49.3 feet and 58.5 feet. The minimum rear setback is zero feet, and the plans show 104 feet. The setbacks are as determined by the street and interior lot lines. The Planned Unit Development (PUD) limits the hard surface coverage to 70%, any lot can exceed the 70% requirement so long as the entire finished development does not exceed 70%. The site exceeds the per-site limit at 77.6%; however, the finished development will have a hard surface coverage of 62.6%. This is the last remaining site to be developed in the Chanhassen West Business Park. Height and Roof Design The building has a flat roof with parapets that reach a maximum of 34 feet with the highest points being the entrances. The proposed building’s height is within the maximum allowed of three stories or 40 feet, as established by the PUD. All roof equipment is fully screened by the parapet from 250 feet from the building towards the right-of-way. Lighting and Signage There is no proposed signage associated with this site plan review. All signage will be permitted and reviewed separately. Lighting has been proposed and photometrics have been provided along with the site plan. Four shoe box fixtures with square ornamental poles will be provided per the PUD standards. A total of 14 shielded wall lights will be installed. Light level at the property line does not exceed ½ foot-candle. Loading Areas and Refuse All loading areas on the proposed site plan are located in the rear of the property and are fully screened from the public right-of-way. No plans have been provided for refuse, if the refuse is to be stored outside the enclosure shall meet all building requirements. As a part of the building permit process, the Developer shall submit plans for city review and approval. 8 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 5 of 9 Parking Locations and Requirements The city code requires one parking space per 1,000 square feet of warehousing space and five parking spaces per 1,000 square feet of office space. The project is proposing 20,056 square feet of warehousing space, resulting in 20 required parking stalls. In addition, the project is proposing 17,754 square feet of office space resulting in 89 required parking stalls. In total, the site shall provide a minimum of 109 parking spaces. All parking is set back from the front property line the minimum 10 feet, as stipulated by the PUD. Parking located on the side and rear does not have a minimum setback from the property line. City code allows for flexibility in the number of parking stalls constructed at project inception if the Applicant indicates a parking need less than the minimum allowed; however, the Applicant must show through a proof of parking exhibit that the site as designed has the capability to support the total number of parking stalls required by city code in the event that parking becomes an issue and the additional parking must be constructed. The applicant has provided proof of parking exceeding the requirement at 117 parking spaces. Site Furnishings The Developer shall provide an area for bicycle parking and storage; this is not currently provided for on the plans but is a part of staff stipulations and comments. A sidewalk connection between the sidewalk within the public right-of-way to the building is provided on the NE side of the lot. Access No public streets are proposed as part of this project. The developer is proposing two full accesses to the site off Galpin Court, one from the north and one from the south sides of the lot. As the northeasterly access extends onto the adjacent lot (Lot 4, Block 2, Chanhassen West Business Park), it must either be relocated south to be wholly on the development’s lot (Lot 3, Block 2, Chanhassen West Business Park), or a private access agreement or cross-access easements will need to be obtained and recorded against the lots. Easements Public drainage and utility easements DUE were recorded with the Chanhassen West Business Park final plat along Lot 3, Block 2’s property lines. These include a 10-foot-wide DUE along all property lines other than a five-foot-wide DUE along the north and northwest property lines, which are standard widths associated with Chanhassen City Code. As discussed under the “Utilities” section of this report, the water main will be public and adequate DUE shall be recorded over the water main. 9 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 6 of 9 Utilities The site has access to public sanitary sewer and water main stubs abutting the property within Galpin Court right-of-way. These were installed in conjunction with the build-out of Galpin Court and the Chanhassen West Business Park development. The applicant proposes extending these existing sanitary sewers and water main stubs. The proposed water main extensions shall be owned and maintained by the city after acceptance of the public improvements by the City Council. As such the installation of these public utilities will be required to be constructed in conformance with the latest edition of the City of Chanhassen’s Standard Specifications and Detail Plates (Standards). In order to access and maintain the newly installed public utilities, adequate public drainage, and utilities (DUE) must be recorded prior to or concurrently with the site plan agreement. Minimum DUE are 20 feet wide from the center of the alignment in typical construction applications, however, easements can vary in width depending on the depth and size of infrastructure proposed. In order to determine appropriate easement widths, the applicant will be required to supply profile drawings of all the public utilities being extended on site. Profile drawings will also determine if any additional improvements may be necessary with the construction of the utilities (i.e., insulation, horizontal bends, material type, air relief valves, etc.). All hydrant locations must be verified by the Fire Department. Based on the plans provided, which are in general conformance with the Chanhassen West Business Park’s preliminary plat plans, the public water main will be looped internally as well as interconnecting to the west and southeast properties to provide better serviceability and water quality to the site(s). Final construction plans shall be updated to eliminate redundant water main valving to the maximum extent practicable. Sanitary sewer extended into the site will be privately owned and maintained in accordance with the Chanhassen City Code which demarcates the ownership between public and private at the right-of-way line. However, the sanitary improvements will also need to meet Standards up to, and including, the proposed sanitary manhole (SMH2 from the “Galpin Industrial Final” plans dated 11/2/2023) in order to protect the public system against infiltration and inflow. Final construction plans will be subject to review and approval by staff prior to recording the site plan agreement. The parent property associated with the Chanhassen West Business Park was assessed the trunk sanitary sewer and trunk watermain charges in 1994 in conjunction with City Project 91-17B, Upper Bluff Creek Sewer and Water. This assessment has been paid and in accordance with Addendum “B” to Chanhassen West Business Park’s Development Contract, Sewer and Water Hookup Fees are not due with the building permit. The Metropolitan Council Sanitary Access Charge (“MCES SAC”) is payable at the time of building permit issuance as required by the city’s Fee Schedule. The 2023 MCES SAC is $2,485 plus a $75 city surcharge. 10 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 7 of 9 Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the MPCA, NPDES, Minnesota Department of Health, Carver County and Watershed District. Landscaping Natural resources staff reviewed the proposed plan set and found it to be generally in conformance with the city code; however, some revisions are required to the plan set so that the proposed project adheres to the city code. Those revisions are outlined in the conditions found at the end of this report. RECOMMENDATION Staff recommends that the City Council adopt the Findings of Fact and Decision in approving the requested site plan subject to the following conditions and findings: 1. The Developer shall provide an area for bicycle parking and storage. Two upside-down U racks shall suffice. 2. The Developer shall update the development summary table on the civil plans to state the required number of parking spaces is 109. 3. The Developer shall either state the placement of the refuse collection being incorporated into the interior of the building or shall update the plans to include the placement of the refuse collection outside which shall have proper screening as required by city code. 4. The north access shall either be relocated south to be wholly on Lot 3, Block 2, Chanhassen West Business Park, in accordance with Chanhassen City Code, or a private access agreement or cross-access easement shall be recorded against Lot 4, Block 2, Chanhassen West Business Park, benefiting the development, prior to or concurrently with recording of the site plan agreement. 5. All newly constructed water mains shall be public water mains, owned and maintained by the city, after acceptance of the public improvements by the City Council. 6. All sanitary sewer and water main improvements on the site will be constructed in accordance with the latest edition of the City of Chanhassen’s Standard Specifications and Detail Plates. 7. The Developer shall record public drainage and utility easements over all public utilities prior to or concurrently with the site plan agreement. 8. The Developer and their Engineer shall work with city staff in amending the construction plans, dated November 2, 2023, prepared by Brady D. Busselman, PE with Sambatek., to 11 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 8 of 9 fully satisfy construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording of the site plan agreement. 9. It is the Developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e., Carver County, Carver County WMO, Board of Water and Soil Resources, US Army Corps of Engineers, etc.) prior to the commencement of construction activities. 10. The tree survey shall include a delineation of existing canopy coverage on site which outlines all areas covered by tree canopy, including the Northeast side of the site. A canopy coverage percentage based off of current site conditions must be calculated. This percentage will be used to determine the minimum canopy coverage requirements- outlined in the City Code- and therefore, the number of trees that must be replanted. The survey shall be amended to also include the condition of all trees in the survey. The survey must also include an inventory of all trees 10 inches diameter at breast height (DBH) or more- the site was visited by the City Forester, and it appears not all trees 10 inches or more were included in the survey. 11. The Developer shall revise the landscape plan to diversify species according to city code which requires that no more than 10% of total trees to be planted be the same species, no genus will have more than 20% of total trees and no one tree family will have more than 30% of total trees. It is recommended to substitute Sienna Glenn Maple for an Autumn Blaze Maple. Overstory trees must account for no less than 75% of the total trees required. 12. In addition to the tree protection fencing being shown on the Tree Preservation Plan, it must also be shown on the grading plan. 13. Bufferyard planting calculations must be corrected based on width of the buffer and length of buffer areas on each side of the property. 14. It is the policy of the city to preserve natural woodland areas throughout the city and to retain as far as practical substantial tree stands, such as the mature oak trees on this site, which can be incorporated into the overall landscape plan. The existing plant material can also be counted toward the total buffer yard plant material requirement as well as canopy coverage requirements. 15. A building permit must be obtained before beginning any construction. 16. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 12 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 9 of 9 17. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review. 18. The building is required to have automatic fire extinguishing systems. 19. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for the proposed buildings, including but not limited to; allowable size, protected openings and fire-resistive construction. These requirements will be addressed when complete building and site plans are submitted. 20. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers, Separated or non-separated, fire resistive elements (Ext walls, bearing walls - exterior or interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel distance), Minimum plumbing fixture count. 21. Retaining walls (if present) more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a separate building permit must be obtained prior to construction. Retaining walls (if present) under four feet in height require a zoning permit. 22. Accessibility to be provided in accordance with Minnesota State Building Code Chapter 1341. 13 Memorandum To: Rachel Arsenault, Associate Planner From: Joe Seidl, Water Resources Engineer CC: Charles Howley, Public Works Director/City Engineer George Bender, Assistant City Engineer Manuel Jordan, Environmental Resource Specialist Charlie Burke, Public Works Operations Manager Date: 12/01/2023 Re: Affinitech, Inc. Site Plan Review (2451 Galpin Court) - City Planning Case No. 2023-22 DRAINAGE AND REGIONAL BMP Drainage on the existing undeveloped lot drains to the east to Galpin Court and to the south property boundary, both of which is picked up in existing storm sewer and discharged to an existing regional stormwater pond with a filtration shelf located on Outlot A of the Chanhassen West Business Park Plat. The site is part of the 2005 Chanhassen West Business Park PUD. In addition to the stormwater management provided by the regional basin, the PUD plans show two rain gardens planned for this lot and a third rain garden on the southern border of the lot. Approximately 2.19 acres of impervious were included for this lot on the PUD plans. There is no FEMA floodplain on the site. In the proposed condition, the majority of the drainage from the parking lot is proposed to be directed to one of four rain gardens proposed adjacent to the parking lot which outlet to the existing storm sewer trunkline running on the southern boundary of the parcel. Roof drainage and a small portion of the parking lot is picked up by storm sewer which directly connects into the same storm sewer trunkline. The stormwater infrastructure will continue to discharge water to the existing regional basin as it does in the current condition. As part of the site review staff researched the ownership of the regional BMP system. The BMP collects and treats stormwater from both private property and public ROW. The drainage from 14 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 2 of 6 the ROW makes up approximately 10% of the total drainage area compared to approximately 90% from private property. Outlot A is owned by Volk-Minger Properties LLC. The Chanhassen West Business Park Plat does not show drainage and utility easement over Outlot A which would be required for the city to maintain the regional BMP. Furthermore, 2005 Chanhassen West Business Park Project Plans and archived correspondence between the original developer and the Carver County Water Management Organization (CCWMO) outline that an owner’s association will be responsible for the operation and maintenance of the storm water management system onsite. The 2023 site plan submittal did not address the maintenance or ownership of the regional BMP. It is critical that the ownership and maintenance of the regional BMP be confirmed and memorialized in an agreement recorded against the property. The applicant shall work with City staff and the CCWMO to confirm the ownership of the regional BMP system and ensure that a plan is in place for its perpetual maintenance. 15 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 3 of 6 16 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 4 of 6 EROSION CONTROL The proposed development will impact one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant has prepared and submitted a Surface Water Pollution Prevention Plan (SWPPP) to the city for review. The SWPPP is a required submittal element for final site plan review along with the Erosion and Sediment Control Plan (ESCP) in accordance with Section 19-145 of City Ordinance. No earth disturbing activities may occur until an approved SWPPP is developed. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements of the permit. The SWPPP will need to be updated as the plans are finalized, when the contractor and their sub-contractors are identified and as other conditions change. All erosion control shall be installed and inspected prior to initiation of site grading activities. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that “these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features.” These standards include abstraction of runoff and water quality treatment resulting in the removal of 90% total suspended solids (TSS) and 60% total phosphorous (TP). The proposed development is located within the Carver County Water Management Organization (CCWMO) and is therefore subject to the CCWMO’s rules and regulations. A Stormwater Management Report dated November 17, 2023 was submitted by the applicant to the City and provided to the CCWMO concurrently as part of the site plan review. Comments provided by the CCWMO must be addressed and a permit from CCWMO is required prior to construction. The site is within CCWMO and is required to meet all applicable WMO rules which includes volume abstraction of 1 inch of runoff from all new or fully reconstructed impervious. A geotechnical report was submitted dated July 12, 2023, which included one soil boring onsite that showed sandy clays onsite and no groundwater present. Based on the soil borings the applicant noted this is a restricted site and that infiltration is not achievable onsite. The site is proposing meeting water quality requirements through use of the existing regional pond and filter bench and the four proposed rain gardens. The outlet control structure of the existing regional BMP is proposed to be modified to increase the water quality treatment within the pond. The rain gardens are proposed to be constructed with amended soil media and drainage due to the restrictive soils onsite. MIDS modeling was provided to demonstrate the 2005 PUD planned treatment and the 2023 proposed development treatment. While the modeling shows the site is proposing to provide more treatment than the 2005 PUD plan, the site is not in compliance with the City’s water quality treatment regulations which require 90% TSS and 60% TP removal efficiencies. 17 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 5 of 6 Currently the site is meeting the TSS removal requirement but is only providing a 59% TP removal efficiency. However, there are comments on the MIDS modeling which need to be addressed to confirm the removal efficiencies stated in the Stormwater Management Report. Additionally, the applicant assumed the regional BMP is at an as-built condition for water quality modeling. A survey is needed to confirm the current condition of the BMP to accurately calculate removal efficiencies. It is possible a pond cleanout project is needed to ensure that the stormwater system is functioning as designed. With the final design the applicant shall confirm the City’s water quality requirements are met once the modeling updates and other plan changes have been made. The Stormwater Management Report and supporting Hydrologic and Hydraulic HydroCAD model was reviewed. A HydroCAD model for the PUD site with the proposed conditions was provided. Because the PUD was developed prior to Atlas 14 conditions and would have been utilizing TP 40 rainfall data, a HydroCAD model showing the planned PUD site with Atlas 14 conditions prior to the proposed modifications (OCS modification, rain garden additions, etc.) shall be submitted to compare the proposed stormwater infrastructure modifications to what was approved with the PUD when looking at Atlas 14 conditions. These HydroCAD models will be used to confirm the site is meeting overall rate control requirements. The applicant shall provide final versions of all modeling (HydroCAD and MIDS) and SWMP report to address remaining comments and confirm rate control and water quality requirements are being met as part of the final site plan approval. As outlined in the City’s Surface Water Management Plan adopted in December 2018, the city requires at least 3 feet of freeboard between a building elevation and adjacent ponding features. The HydroCAD modeling shows the proposed HWLs with Atlas 14 rainfall events, which are higher than the HWLs noted on the PUD plan since those were based on TP 40 rainfall events. All existing and proposed buildings appear to be in compliance with the City’s three-foot freeboard requirement with respect to the Atlas 14 HWL 949.88. Even though the building on Lot 4 has an FFE (951) less than three feet above the Atlas 14 HWL, the pond does not present a flooding risk to the building due to the berm between the building and the pond graded up to a 952.0 elevation, which is 2.7 feet higher than the pond EOF. Additionally, the building on Lot 4 is located at a distance where groundwater impacts are not anticipated especially considering the clay soils observed in the soil borings. It does appear that water from the pond could back up into the existing storm sewer and surcharge through the existing CBMH on Lot 4 which has a rim elevation at 949.6, which could present a small risk to the existing building on Lot 4. It is unclear if this is an effect of utilizing Atlas 14 rainfall conditions or if it is a combined effect of Atlas 14 rainfall depths and the proposed modification to the existing regional basin BMP. The final BMP configuration shall be analyzed to confirm the proposed modifications do not create adverse impacts to the existing lots. The proposed BMPs are to be privately owned and therefore will require an Operations and Maintenance (O&M) Agreement and associated plan. The plan will need to identify the maintenance schedule, responsible party, and shall include information on how the system will 18 Todd Brown – Affinitech Planning Case 2023-22 December 5, 2023 Page 6 of 6 be cleaned. The proposed private BMPs are to be located outside of drainage and utility easements. WATER RESOURCES RECOMMENDATIONS: 1. The applicant shall provide a copy of conditional approval from the CCWMO as part of any future construction plan submittals. 2. The applicant shall update the models (HydroCAD and MIDS) per City any CCWMO comments and submit updated computations and models in their native forms with the final site plan and final construction plans. a. An additional HydroCAD model for the PUD plans utilizing Atlas 14 conditions and discharge rate analysis shall be included in future submittals. b. The applicant shall confirm the 90% and 60% removals of TSS and TP are being met with future plan submittals. 3. The applicant shall confirm the proposed stormwater design will not adversely impact adjacent and/or downstream properties and water resources. 4. The applicant shall enter into an Operations and Maintenance Agreement for any proposed privately owned stormwater facilities prior or concurrently to recording of the site plan agreement. 5. The applicant shall work with City staff and the CCWMO to confirm the ownership of the regional BMP and ensure that a plan is in place for its perpetual maintenance. 19 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Affinitech Site Plan Review. On December 5, 2023, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Affinitech for site plan review for a 33,283 square-foot office and light industrial warehouse facility located at 2451 Galpin Court. The Planning Commission conducted a public hearing on the proposed site plan was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Planned Unit Development, PUD. 2. The property is guided by the Land Use Plan for Highway and Business Services District. 3. The legal description of the property is: Lot 3, Block 2, Chanhassen West Business Park. 4. Site Plan: a) Is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; b) Is consistent with the requirements of Chapter 20, Article II, Division 6, Site Plan; c) Preserves the site in keeping with the general appearance of the neighboring developed or developing areas; d) Creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; e) Creates a functional and harmonious design for structures and site features, with special attention to the following: 20 1) An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; 2) The amount and location of open space and landscaping; 3) Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4) Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. f) Protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. The planning report #2023-22 dated December 5, 2023, prepared by Rachel Arsenault, et al, is incorporated herein. The water resources report #2023-22 dated December 5, 2023, prepared by Joe Seidl, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the site plan review subject to the conditions of the planning report. ADOPTED by the Chanhassen Planning Commission this _____ day of _____________, 2023. CHANHASSEN PLANNING COMMISSION BY:___________________________________ Its Chairman 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MTNNESOTA) )ss COUNTY OF CARVER ) I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on November 22,the duly qualified and acting City Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice to consider a request for a Site Plan Review for property located at245l Galpin Court, zoned Planned Unit Development. Property Owner: Todd Brown Applicant: Eden Trace Corp. to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. \ Kim T City Subscribed and sworn to before me this &day ot N\VYlnbtv ,2023 Public JENNIFER ANN Public-Minnesota POTTER Notary 202731,Explres JanCommlsrlo0My otary 37 Subject Parcel Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. ihls map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The city does not warrant that the Geographic lnformation system (Gls) Data used to prepare this map are error free, and the city does not represeni that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota St;tutes 5466.03, Subd. 21 (2000), and the user of this map acknowledges that the city shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the city from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. (Tax_nameD <Tax_add_!l > <Tax_add_!2> <<Next Record ><rTax-nameD <Tax_add_!l> <Tax_add_|2> * Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. ihis map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be usld for reference purposes only. The City does not warrant that the Geographic lnformation system (Gls) Data used to prepare this map are error free, and the city does not represeni that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the bepiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota St;tutes 5466.03, Subd. 2'l (2000)' and the user of this map acknowledges that the city shall not be liable for any damages, and expressly waives all claims, and agrees to dLfend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data Provided. Subject Parcel a 5- tr , ar hara ai!stc'.rt il r ; I I L Cl k' t- t ;Ii lr -Eila a: I-. rtt'It ! Id F'1 38 Chan hassen Notice of Public Hearing Commission Date & Time: berDecem 5 2023 6at 00 .mTuesday Th S hearip ng may startnot until later thein theonevening oforderdepending the Location:HallCouncil Cham 7700 Market Blvd. Proposal Consider a request for located at2451Galpin a Site Plan Review for property Court, zoned Planned Unit Eden Trace Corp. Owner:Todd Brown Propefi Location: 2451 Galpin Court the reverse side of this notice.A location ts on What Happens at the Meeting:Staff will give an overview of the proposed project. The applicant will present plans for the project. Comments are received from the public. is closed and the Planning Commission 1 2 3 4 The thisof toispurposepublic inform theabouthearingyou toand nobtai inrequest thefromapplicant's put neighborhood about this th e Chatheroject.p During wil ead themeeting th h thepublichearingroug steps:following Public hearing discusses the Questions & Comments: Bob Generous by email at rarsenault@chanhassenmn.oov or by phone a|952-227-1132.|f you choose to submit written comments, please send one copy to staff in advance of the meeting. Staff will provide copies to the planning Commission. The staff report for this item will be available online on the city's Agendas & Minutes web page the to the Planni Commission Sign up to receive email updates about this or other projects. Go to City Review Procedure: ' Subdivisions' Planned Unit Developments, site Plan Reviews, Conditional and lnterim Uses, Weland Alterations, Razonings,Comprehansive Plan Amendments, Varian@s, Appeals, and Code Amendments requira a puotic irearing before lhe planning commission. cityordinan@srequiroall propedywithin5oofeetofthesuu;ectsiratbuenJtirieJoit#alprietiontnwriting. Anyinterested party is invited to attend the meeting. ' Staff prepares a report on the subject appli€tion that includas all pertinent information and a rercmmendation. These reports areavailable by requesl Al the Planning commission maeting, staff will give a verbal overviil of th; report ano a recommenoation.The item will be opened for the public to speak about the pioposal asi part of the hearing proess. ihe commission will close thepublic hearing and disilss the item and make a recomm€ndation to the city councir. rnE biiy councitirly rererse, attirm ormodrfy wholly or partly the Planning Commission's re@mmendation. R6zonings, land use anJ ode amendments {ake a simplemaiority vote of lhe City council except rezonings and land use amendments irom residential to mmmeiciattinoustriat. ' Minnesota state Statute 519.99 requtss all appliGtions to be processed within 60 days unless the appli€nt waaves this standard.Some appli€tions due to their @mplexity may take sevoEl months to @mplete. Any per$n wishing to foilw an item lhrough theproess should check with the Planning Dspartment regarding its status and sctreoutini for tne Clty douncit meting. ' A neighborhood spokesperson/repr€sentative is encou;aged io provide a ontac{ for the city. often developers are en@uEged lomest with the neighborh@d regarding their proposal. S6ff is also availabla to reviaw the p'rcj"a *itt "ny int"r."ted parmn(i). ' Be€usa the Planning Commission hoids the public haaring, the city Council does not. Minuies are taken and anycoffesponden@ regarding the applicatioNill be included in ths rep;rt to the City Council. r you ,istr to nave something to beincluded in the report, plaase @ntact the planning Staff person named on the notifletion. Cha Notice of Public Hearing nhassen Plann Commission Date & Time: Tuesday, December 5, 2023, start until later in the evening at 6:00 p.m. This hearing may not , depending on the order of the Location HallCouncil 7700 Market Blvd. Proposal: Consider a request for a Site located at2451 Galpin Court, Plan Review for property zoned Planned Unit Applicant:Eden Trace Corp. Owner:Todd Brown Property Location 2451 Galpin Court is on the revense side of this notice.A location What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair wiil lead the public hearing through the following steps: 1 Staff will give an overview of the proposed project.2 The applicant will present plans for the project.3. Comments are received from the public.4. Public hearing is closed and the planning Commission discusses the project. Questions & Gomments: documents before the meeting, please visit the development webpage at: . tf you wish to talk to someone about this project, please contact Bob Generous by email at rarsenault@chanhassenmn.qov or by phone a|952-227-1132.|f you choose to submit written comments, please send one copy to staff in advance of the To view project city's proposed meeti willStaff tong the Comcopiesprovide mission.Planning staffThe for itemthis wil availablebereport ononline the city's Minutes&web theAgendas or theto P annpageThursdaypri ing missiCom on sign up to receive email updates about this or other projects. Go to City Reyiew Procedurc: ' Subdivisions, Planned Unit Developments, Site Plan Revi€ws, Conditional and lntarim Usas, Wefland Alterations, Rezonings,comprehensiva Plan Amendments, varian@s, Appeals, and iode Amendments r€quire a public hearini oefore the planning Commission. Cilyordinan@srequireall propertywithinsOOfeatofthesub.lectsitetboenotineJofrnea"pprietioninwriting. interested party is invited to attend the meeting. ' staff preparas a report on the sub.iect appliGtion that includes all partinent infomation and a recommendalion. These reports areavailable by request. At the Planning commission meeting, staff will give a varbal overuiew of the report ano a remmmendation. Theitem will be opened for the public to speak about the propolal as a part of the hearing proess. trre bommission will close the publichearing and discuss the item and make a recommendatibn to the city council. rhe 6liv Coun"ir ,"/r"r"r"", affim or modify whoily 9r paaly the Planning commission's re@mmendation. Rezonings, land use and code ah€ndments tiake a simple majority vote of theCity Council ex@pt rezonings and land use amendmenls from [sidential to ommercial/industrial. ' Minnesota State Statute 519.99 requires all applications to b€ pr@ssed within 60 days unless the appli€nt waives this standard.Some applications due to their @mplexity may take several months to @mplste. Any per$n wishing to iollN an item through theprocess should check with the Planning Department regarding its status and scheduling for the City douncit meting. ' A neighborhood spokesperson/representative is enmuraged io provide a mntacl for th! city. often Jevetopers are en@uraged tomeet with the neighborh@d regarding their proposal. staff is also available to review the p'rcj*t *ittr "ny int"r""ted per$nG). ' Because the Planning commission.holdslhe public hearing, the city council does not. Minui." "r" t"t n "nd any @rrespondenceregarding the appli€tion will be included in the report to tne clty council. lf you wish to har" ao."ttrlng io o" included in the report,please contact the Planning Staff person named on the notifimtion. Any the city's proposed development at: lf you wish to to someone about To view visitmeeting, 39 Tax name 2451GALPIN LLC 8610 LLP Tax add 11 Tax add 12 vlcToRtA, MN 55386- CHANHASSEN, MN 55317- 1930 EDGEWATER PL 8821 SUNSET TRL BAJA INVESTMENTS LLC 2985 WATER TOWER PL CHANHASSEN, MN 55317. 8821 SUNSET TRL CHANHASSEN, MN 55317 -9737CHAN WEST II LLP CROWN FAB LLC 4035 NOREX DR CHASKA, MN 55318-3043 CW-V LLP 8821 SUNSET TRL CHANHASSEN, MN 55317 -9L37 GALPIN COURT LLC 60 SETTLERS CT CHANHASSEN, MN 55317- LBIACQUISITION CORP 15963 STRATHERN ST VAN NUYS, CA 91406- MP DEVELOPMENT LLC 3248 IRON WORKS RD GEORGETOWN, KY 40324- PHOENtX, AZ 85018-TAUNTON VENTURES LLC 5724 N ECHO CANYON DR TAUNTON VENTURES LLC 3600 IVY PL WAYZATA, MN 55391- TAUNTON VENTURES LP 9980 DEERBROOK DR CHANHASSEN, MN 55317-8551 WEST FARGO, ND 58078-3502THE NORDICK GROUP INC 675 T2TH AVE NE VOLK-MINGER PROPERTIES LLC L6925 COUNTY ROAD 40 2440 GALPIN CT CARVER, MN 55315- CHANHASSEN, MN 553L7 -4621.WAYTEK INC 40 41 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/2/2023 5:21:32 PML:\PROJECTS\52152\CAD\SHEETS\52152-C1.01-TITLE.DWG:C1.01 TITLE SHEETAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE TITLE SHEET C1.01 GEOTECHNICAL AMERICAN ENGINEERING TESTING 550 CLEVELAND AVE NORTH ST. PAUL, MN 55114 TEL 651-659-1301 RFLICKINGER@TEAMAET.COM CONTACT: ROB FLICKINGER DEVELOPER/OWNER EDEN TRACE CORP 8821 SUNSET TRAIL CHANHASSEN, MN 55317 TEL 612-803-6970 MARK@EDENTRACE.COM CONTACT: MARK UNDESTAD ARCHITECT HOUWMAN ARCHITECTS 31572 SNOWBALL RD PENGILLY, MN 55775 TEL 651-631-0200 NICKHOUWMAN@GMAIL.COM CONTACT: NICK HOUWMAN CIVIL ENGINEER SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 BBUSSELMAN@SAMBATEK.COM CONTACT: BRADY BUSSELMAN LANDSCAPE ARCHITECT SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 JWORKMAN@SAMBATEK.COM CONTACT: JOHN WORKMAN SURVEYOR SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 MSALO@SAMBATEK.COM CONTACT: MARK SALO SHEET INDEX SHEET DESCRIPTION C1.01 TITLE SHEET C1.02 CONSTRUCTION NOTES C2.01 EXISTING CONDITIONS C3.01 SITE PLAN C4.01 GRADING PLAN C5.01 PHASE 1 EROSION CONTROL PLAN C5.02 PHASE 2 EROSION CONTROL PLAN C5.03 EROSION CONTROL NOTES C5.04 EROSION CONTROL DETAILS C6.01 UTILITY PLAN C9.01 DETAILS C9.02 DETAILS C9.03 DETAILS C9.04 DETAILS L1.01 LANDSCAPE PLAN L1.02 LANDSCAPE NOTES & DETAILS ALTA NSPS LAND TITLE SURVEY for Final Site Development Plans Galpin Industrial Affinitech, Inc. Chanhassen, Minnesota Presented by: NO SCALE VICINITY MAP SITE N.T.S. CITY OF CHANHASSEN STANDARD SPECIFICATIONS (2023) CITY ENGINEER'S ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS (2018) MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (2020 EDITION) MN PLUMBING CODE (2020)GALPIN CT 5 CONSULTANT CONTACT LIST: GOVERNING SPECIFICATIONS ARBORETUM B L V D 18 GALPIN BLVDLYMAN BLVDNOREX DR COULT E R B L V D 42 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/2/2023 5:21:32 PML:\PROJECTS\52152\CAD\SHEETS\52152-C1.01-TITLE.DWG:C1.02 CONSTRUCTION NOTESAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE CONSTRUCTION NOTES C1.02 GRADING NOTES 1.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE. 2.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB. 3.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.00% (1:50). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 2.00% (1:50). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING CONTRACTOR. 4.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 5.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. 6.CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY: COMPANY: AMERICAN ENGINEERING TESTING, INC. ADDRESS: 550 CLEVELAND AVENUE NORTH PHONE:651-659-1301 DATED:JULY 12, 2023 CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT. 7.CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. 8.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL SHALL BE PERFORMED ON THE STREET AND PARKING AREA SUBGRADE. CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. 9.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 11.EXISTING TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS AND SHALL BE A RESTRICTED AREA. CONTRACTOR SHALL PROTECT TREES TO REMAIN AT ALL TIMES. EQUIPMENT SHALL NOT NEEDLESSLY BE OPERATED UNDER NEARBY TREES AND EXTREME CAUTION SHALL BE EXERCISED WHEN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF OPERATION. SHOULD CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE TO THE TREE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. a.RESTRICTED AREAS SHALL INCLUDE ALL DESIGNATED TREED AREAS OUTSIDE OF THE DESIGNATED CONSTRUCTION ZONE. ALL VEGETATION WITHIN THE RESTRICTED AREAS SHALL REMAIN. b.CONTRACTOR SHALL RESTRICT ALL GRADING AND CONSTRUCTION ACTIVITIES TO AREAS DESIGNATED ON THE PLANS. ACTIVITIES WITHIN THE CONSTRUCTION MAY BE RESTRICTED TO A NARROWER WIDTH IN THE FIELD TO SAVE ADDITIONAL TREES AS DIRECTED BY THE OWNER. c.ACTIVITIES PROHIBITED OUTSIDE OF THE CONSTRUCTION BOUNDARIES WOULD INCLUDE, BUT NOT BE LIMITED TO: SOIL AND OTHER MATERIAL STOCKPILING, EQUIPMENT OR MACHINERY STORAGE, DRIVING OF ANY VEHICLE, LEAKAGE OR SPILLAGE OF ANY “WASHOUT” OR OTHER TOXIC MATERIAL. THE COLLECTION OF OTHER DEBRIS AND SOIL STOCKPILING WILL BE IN AN AREA DETERMINED ON-SITE BY THE ENGINEER. d.ALL RESTRICTED AREAS SHALL BE FENCED OFF WITH BRIGHT ORANGE POLYETHYLENE SAFETY NETTING AND STEEL STAKES AS SHOWN ON THE TREE PROTECTION DETAIL. AT NO TIME SHALL THIS FENCING BE REMOVED OR ACTIVITY OF ANY KIND TAKE PLACE WITHIN IT. FINAL PLACEMENT OF ALL PROTECTIVE FENCING SHALL BE COMPLETE BEFORE ANY WORK COMMENCES ON-SITE. e.BEFORE COMMENCING WITH ANY EXCAVATION CONTRACTOR SHALL COMPLETE ALL PREPARATORY WORK REGARDING TREE REMOVAL, ROOT PRUNING, TREE PRUNING AND STUMP REMOVAL TO THE SATISFACTION OF THE OWNER. f.PREPARATORY WORK SHALL INCLUDE THE FOLLOWING AND SHALL BE COMPLETED UNDER THE DIRECT SUPERVISION OF THE OWNER'S REPRESENTATIVE: i.TREE REMOVAL: CONTRACTOR SHALL FELL THE TREES. AT NO TIME SHALL TREES BE BULLDOZED OUT, BUT SHALL BE CUT DOWN AND STUMPS REMOVED SEPARATELY. PRIOR TO THE FELLING OF ALL TREES, PROPER REMOVAL OF A PORTION OR ALL OF THE CANOPY SHALL BE COMPLETED SO THAT TREES IN THE RESTRICTED AREAS SHALL NOT BE INJURED IN THE PROCESS. ii.ROOT PRUNING: BEFORE ANY STUMPS ARE TO BE REMOVED, ALL ROOTS SHALL BE SEVERED FROM ROOTS IN THE RESTRICTED AREAS BY SAW CUTTING WITH A VERMEER DESIGNED FOR ROOT PRUNING, BY HAND, OR WITH A CHAINSAW. TREE ROOTS PROJECTING INTO THE CONSTRUCTION ZONE SHALL BE EXPOSED PRIOR TO ROOT PRUNING WITH SMALL MACHINERY, I.E..., BOBCAT. iii.STUMP REMOVAL: AT SUCH TIME THAT ROOTS HAVE BEEN PROPERLY SEVERED, STUMPS MAY BE REMOVED. WHERE REMOVAL OF CERTAIN STUMPS COULD CAUSE DAMAGE TO EXISTING PROTECTED TREES, TREE STUMPS SHALL BE GROUND OUT. ALL STUMP REMOVAL SHALL BE UNDER THE DIRECT SUPERVISION OF THE OWNER'S REPRESENTATIVE. iv.TREE PRUNING: PROPER PRUNING OF TREES IN THE RESTRICTED ZONE SHALL BE DIRECTED BY AND SUPERVISION AT ALL TIMES BY THE OWNER'S REPRESENTATIVE. g.AN OWNER'S REPRESENTATIVE WILL BE AVAILABLE AT ALL TIMES DURING THE PREPARATORY AND CONSTRUCTION PERIOD. h.MULCH RATHER THAN SEED OR SOD WILL BE USED AT THE BASE OF QUALITY TREES TO A PERIMETER DETERMINED BY THE OWNER'S REPRESENTATIVE. AREAS TO BE SEEDED FOR EROSION CONTROL PURPOSES WITHIN THE CONSTRUCTION ZONE ARE TO BE DETERMINED BY THE OWNER'S REPRESENTATIVE. NATURAL GROUND COVER WILL BE MAINTAINED WHEREVER POSSIBLE. i.THE USE OF RETAINING WALLS NEAR TREES, IN ADDITION TO THOSE REQUIRED ON THE PLANS SHALL BE DETERMINED IN THE FIELD, BASED ON TREE LOCATIONS AND TOPOGRAPHY. 12.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO THE DEPTH SPECIFIED IN THE LANDSCAPE PLANS. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED PER LANDSCAPE PLANS. 13.TRENCH BORROW CONSTRUCTION: IF ALLOWED BY THE OWNER, CONTRACTOR SHALL COMPLETE “TRENCH BORROW” EXCAVATION IN AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TREES SHALL NOT BE REMOVED OR DAMAGED AS A RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2. SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1). 14.FINISHED GRADING SHALL BE COMPLETED, CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED, ERODED OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. 15.TOLERANCES a.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. b.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. c.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.10OOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. d.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. 16.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. 17.CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION AND SHALL INDICATE HAUL ROADS ON EROSION AND SEDIMENT CONTROL “SITE MAP”. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. CONTRACTOR SHALL POST WHATEVER SECURITY AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY. 18.RETAINING WALL(S) SHALL BE CONSTRUCTED OF MODULAR BLOCK MATERIAL. CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. 19.CONTRACTOR SHALL PROVIDE RECORD PLANS AS REQUIRED BY PERMITTING AGENCIES. CIVIL 3D MODEL LIMITATIONS SAMBATEK'S DELIVERABLE AND GOVERNING DOCUMENTS FOR CONSTRUCTION SHALL BE A HARD COPY AND/OR PDF PLAN SHEETS. IF A CIVIL 3D MODEL IS GENERATED IN THE PROCESS OF PREPARING THE PLAN SHEETS, IT IS AS A DESIGN TOOL ONLY AND NOT AS A SEPARATE DELIVERABLE. AT THE OWNER'S REQUEST, WE WILL RELEASE OUR CIVIL 3D MODEL FOR THE CONTRACTOR'S USE. HOWEVER, ITS USE IS AT THE CONTRACTOR'S RISK AND SHALL NOT BE USED FOR STAKING OF CURB, SIDEWALK, OR OTHER HARD SURFACE IMPROVEMENTS. IF A CIVIL 3D MODEL FOR STAKING HARD SURFACE IMPROVEMENTS IS REQUIRED, WE CAN PROVIDE A SUPPLEMENTAL AGREEMENT FOR REFINEMENT AND PREPARATION OF THE CIVIL 3D MODEL. UTILITY CONSTRUCTION NOTES 1.THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. a.ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REQUIRMENTS, INCLUDING BUT NOT LIMITED TO CITY, DEPARTMENT OF LABOR AND INDUSTRY AND MINNESOTA DEPARTMENT OF HEALTH REQUIREMENTS. b.CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR. c.A MINIMUM VERTICAL SEPARATION OF 18 INCHES, AND HORIZONTAL SEPARATION OF 10-FEET, BETWEEN OUTSIDE PIPE AND/OR STRUCTURE WALLS, IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN (STORM AND SANITARY) CROSSINGS. 2.ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. a.ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. b.ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE. i.ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING (SEE TABLE 701.2 OF 2020 MN PLUMBING CODE). ii.ALL SANITARY SEWER WITHIN 10 FEET OF, CROSSING ABOVE, OR WITHIN 12-INCHES BELOW, A POTABLE WATER LINE SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING (SEE TABLE 701.2 OF 2020 MN PLUMBING CODE). c.ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, or PVC C-900, UNLESS NOTED OTHERWISE. i.ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN. ii.PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN JOINTS PER CITY STANDARDS. iii.WHERE A SEWER LINE CROSSES A WATER SERVICE, THE WATER SERVICE SHALL NOT CONTAIN ANY JOINTS OR CONNECTIONS WITHIN 10 FEET OF THE CROSSING. d.ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATERTIGHT GASKETS, UNLESS NOTED OTHERWISE. i.ALL STORM SEWER CROSSING ABOVE, OR WITHIN 12-INCHES BELOW, A POTABLE WATER LINE SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING (SEE TABLE 701.2 OF 2020 MN PLUMBING CODE). ii.ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO THE BUILDING, OR WITHIN 10' OF A BUILDING, SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING (SEE TABLE 701.2 OF 2020 MN PLUMBING CODE). e.RIP RAP SHALL BE Mn/DOT CLASS 3. 3.COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. 4.ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED. 5.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 6.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. 7.ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. 8.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 9.ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: COMPANY:AMERICAN ENGINEERING TESTING, INC. ADDRESS:550 CLEVELAND AVENUE NORTH PHONE: 651-659-1301 DATED: JULY 12, 2023 CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. 10.CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO SAMBATEK. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. 11.CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. 12.THE UTILITY DESIGN DOES NOT INCLUDE WATERMAIN ELEVATIONS. THE CONTRACTOR SHALL INSTALL WATERMAIN AT DEPTHS REQUIRED BY APPLICABLE AGENCIES AND SHALL DETERMINE LOCATIONS OF CONFLICTS WITH OTHER UTILITIES AND INCLUDE THE REQUIRED EFFORTS TO AVOID CONFLICTS (BENDS, MATERIAL CHANGES, ETC.) IN THEIR BIDS. 13.CONTRACTOR SHALL PROVIDE RECORD PLANS AS REQUIRED BY PERMITTING AGENCIES. 43 N89°31'55"E 197.92S00°28'05"E 256.45S37°18'41"W 204.74N88°58'56"E 129.12 S09°52'22"E 121.45N55° 06'4 4"E 2 30. 26Δ=23°42'54"L=24.83 R=60.00Δ= 6 0 ° 0 0 '00"R = 6 0 . 0 0L = 6 2 . 8 3Δ=33°59'10"R=210.00L=124.57GATE GATE 5 10 101 0 10 BLOCK 2 LOT 3 DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT GALPIN COURTFOUND 1/2" IRON PIPE FOUND 1/2" IRON PIPE 60606011.0037 37 SIGN CABLE BOX DRAINAGE AND UTILITY EASEMENT 11.4010.654.93RE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 NO DATE BY CKD APPR SHEET OF Date License # Print Name: DRAWN BY DESIGNED BY CHECKED BY I hereby certify that this plan, survey, or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/2/2023 4:55:52 PML:\PROJECTS\52152\CAD\SHEETS\52152-C2.01-EXCND.DWG:C2.01 EXISTING CONDITIONSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 CDJ CDJ MRS MARK SALO 43933 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH EXISTING CONDITIONS C2.01 44 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NO PARKINGNO PARKINGTTBLOCK 2 LOT 3 GALPIN COURT1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 A A A A A A A A A A A J I I J J H H B B B L L L G C C C C L 6 6 5 11 11 10 5 5 K 4 6 R70.0'R200.0' R1 0 0 . 0 'R50.0 'R30.0 'R23.6'R104.7'R12.0' R38.0'R20.0'R100.0 'R36.0'1 8 . 0 ' 2 6 . 0 ' 4 . 5 ' 9.0'TYP18.0'26.0'18.0' 7.4'9.0'TYP49.3'66 . 9 ' F A F M M M M M G G 32.0'15.0'5 26.0 '25.0 ' N N M NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 2:33:02 PML:\PROJECTS\52152\CAD\SHEETS\52152-C3.01-SITE.DWG:C3.01 SITE PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH SITE PLAN C3.01 THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. A.BUILDING, STOOPS, STAIRS (SEE ARCHITECTURAL PLANS) B.B-612 CONCRETE CURB AND GUTTER C.MEET & MATCH EXISTING D.CONCRETE APRON E.FLAT CURB SECTION F.CONCRETE SIDEWALK G.SEGMENTAL BLOCK RETAINING WALL H.ADA ACCESS LOCATION I.ACCESSIBLE STALL STRIPING J.ACCESSIBLE PARKING SIGN K.TRANSFORMER L.MOUNTABLE CONCRETE CURB AND GUTTER M.CURB CUT WITH RAIN GUARDIAN BUNKER AND RIPRAP N."STOP" SIGN KEY NOTES 1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT. 2.ALL DIMENSIONS SHOWN ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB. COORDINATE WITH GRADING CONTRACTOR. 4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED. 6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 7.SEE ARCHITECTURAL PLANS FOR PYLON/MONUMENT SIGN DETAILS 8.LIGHT STANDARD LOCATIONS ARE FOR REFERENCE ONLY, SITE LIGHTING PLAN IS DESIGN BUILD BY CONTRACTOR. CONTRACTOR SHALL CONFIRM LIGHT STANDARD LOCATION WITH LIGHTING VENDOR. 9.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. 10.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.00% (1:50). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 2.00% (1:50). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING CONTRACTOR. 11."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY. 12.STREET NAMES ARE SUBJECT TO APPROVAL BY THE CITY. 13.BUILDING ADDITION HAS BEEN LOCATED BASED ON ORIGINAL GRIDLINE DESIGN AND/OR EXISTING BUILDING EXTERIOR CORNER SURVEY LOCATIONS. EXTERIOR CORNERS DO NOT REPRESENT EXISTING BUILDING GRIDLINES. CONTRACTOR SHALL LOCATE EXISTING GRIDLINES IN THE FIELD FOLLOWING DEMOLITION AND COORDINATE REQUIRED MODIFICATIONS, IF ANY, TO EXPANSION PLACEMENT WITH CIVIL AND ARHCITECT ACCORDINGLY. 14.CONTRACTOR SHALL PROVIDE RECORD PLANS AS REQUIRED BY PERMITTING AGENCIES. CIVIL 3D MODEL LIMITATIONS SAMBATEK'S DELIVERABLE AND GOVERNING DOCUMENTS FOR CONSTRUCTION SHALL BE A HARD COPY AND/OR PDF PLAN SHEETS. IF A CIVIL 3D MODEL IS GENERATED IN THE PROCESS OF PREPARING THE PLAN SHEETS, IT IS AS A DESIGN TOOL ONLY AND NOT AS A SEPARATE DELIVERABLE. AT THE OWNER'S REQUEST, WE WILL RELEASE OUR CIVIL 3D MODEL FOR THE CONTRACTOR'S USE. HOWEVER, ITS USE IS AT THE CONTRACTOR'S RISK AND SHALL NOT BE USED FOR STAKING OF CURB, SIDEWALK, OR OTHER HARD SURFACE IMPROVEMENTS. IF A CIVIL 3D MODEL FOR STAKING HARD SURFACE IMPROVEMENTS IS REQUIRED, WE CAN PROVIDE A SUPPLEMENTAL AGREEMENT FOR REFINEMENT AND PREPARATION OF THE CIVIL 3D MODEL. DEVELOPMENT NOTES PROPOSED EXISTING LEGEND DEVELOPMENT SUMMARY RETAINING WALL WETLAND TREE LINE SAW CUT LINE BOLLARD PARKING STALL COUNT## 1 KEY NOTE HEAVY DUTY ASPHALT PAVING CONCRETE PAVING CONCRETE SIDEWALK PAVEMENT BY OTHERS (SEE ARCHITECTURAL PLANS) BOUNDARY LINE STANDARD DUTY ASPHALT PAVING LIGHT POLE (BY OTHERS) EASEMENT LINE CONCRETE CURB BUILDING LINE SIGN AREA SITE AREA GROSS FLOOR BUILDING AREA BUILDING AREA PARKING AREA PROPOSED PERVIOUS PROPOSED IMPERVIOUS PARKING SUMMARY STANDARD REQUIRED STANDARD PROVIDED ADA PROVIDED PROOF OF PARKING BUILDING USE OFFICE LIGHT INDUSTRIAL/WAREHOUSE TOTAL BUILDING SETBACKS FRONT YARD REAR YARD SIDE YARD PARKING SETBACKS FRONT YARD REAR YARD SIDE YARD ZONING EXISTING ZONING PROPOSED ZONING 122,832 SF 2.82 AC 33,283 SF 0.76 AC 27.1% 47.3% 27,471 SF 95,361 SF 105 STALLS 70 STALLS 4 STALLS 43 STALLS 17,754 SF 20,056 SF 37,804 SF 30 FT 0 FT 0 FT 10 FT 0 FT 0 FT PUD PUD 58,128 SF 45 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NO PARKINGNO PARKINGTTBLOCK 2 LOT 3 GALPIN COURTFOUND 1/2" IRON PIPE FOUND 1/2" IRON PIPE RE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 SEE INSET A FOR DETAIL SEE INSET B FOR DETAIL 964.00964.00 964.00 964.00 963.96 964.00 964.00 964.00960.00 960.00T/W: 959.24 B/W: 959.25 B/W: 960.00 T/W: 961.88 961.00 964.00 B/W: 959.99 T/W: 964.00 960.00 960.00 960.00 960.00 964.00 964.00 964.00 964.00 962.96 957.70 958.80 962.32 962.68 962.27 962.03 961.73 962.03 962.59 962.05 962.46 962.43 962.63 963.34 963.41 963.41 963.45 963.39 959.79 959.80 958.68 961.07 963.22 963.01 962.87 962.69 962.61 962.01 961.27 961.97 963.17 963.21 964.00 963.04 962.36 961.86 961.55 962.07 962.91 962.03 961.52 963.39 963.38 963.60 963.02963.38 962.13 961.71 960.50 960.98 960.71 958.70 958.33 959.89 960.51 960.51 960.05 961.46 961.78 962.35 962.02 962.55 962.63 958.90 958.90 960.76 959.50 959.50 961.68 964.00 961.76 962.23 963.43 963.43 958.43 B/W: 963.30 T/W: 963.40 B/W: 961.71 T/W: 962.09 B/W: 963.15 T/W: 964.50 B/W: 963.20 T/W: 964.50 B/W: 963.00 T/W: 965.50 B/W: 961.82 T/W: 965.00 B/W: 963.29 T/W: 965.50 963.05 962.69962963 960961962960959961962963962963963963 96 0 95 9 9 6 1 9 6 2 9 6 3 9589599609 5 9 96196296 3 962 963 962960 956 957 958 959 961 962 955954953960965959961962963964965966967968 960 958 958 959 959 961 962 957958959956.50 956.50 957.19 957.19 957.19 957.19 9 5 6 9 5 7 9 5 8 953 954 9 5 0 9 4 9 952 95 5 956.50 9 5 7 958.50 958.55 958.43 958.26 958.38 NOPARKING1366 963.44 962.28 TC/GL 963.55 963.58 963.60 963.55 963.94 TC/GL 963.89 GL 963.80 GL 963.95 TC 963.93 TC 963.40 GL 963.89 TC 963.92 TC/GL 963.78 GL 963.44 GL 962.25 TC/GL 962.07 GL 962.30 GL 962.80 TC 962.57 TC 963.90 TC 963.94 TC NOPARKING963.05 963.32 GL 963.82 TC 963.80 TC 963.36 GL 963.39 TC/GL 963.39 TC/GL 963.87 963.87 963.35 GL 963.85 TC 963.04 963.04 963.03 963.37 GL 963.87 TC 963.83 963.14 GL 963.64 TC 962.96 963.83 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/2/2023 6:28:02 PML:\PROJECTS\52152\CAD\SHEETS\52152-C4.01-GRAD.DWG:C4.01 GRADING PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH GRADING PLAN C4.01 PROPOSED EXISTING LEGENDGRADING NOTES 1.GRADING NOTES, SEE SHEET C1.02 THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. SOIL BORING999.9 ST # DRAINTILE 902.50 902.50 SPOT ELEVATIONS RIPRAP EOF 902.50 OVERFLOW ELEV. CONCRETE PAVING CONCRETE SIDEWALK PAVEMENT BY OTHERS (SEE ARCHITECTURAL PLANS) BOUNDARY LINE RETAINING WALL WETLAND TREE LINE 902 CONTOUR CONCRETE CURB STORM SEWER BUILDING LINE INSET A - 1"=10' INSET B - 1"=10' 46 GATE GATE BLOCK 2 LOT 3 GALPIN COURT60SIGN CABLE BOX RE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 IP2 IP2 IP2 IP3 IP3 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.01 PHASE 1 EROSION CONTROL PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH PHASE 1 EROSION CONTROL PLAN C5.01 THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. ITEM UNIT QUANTITY SILT FENCE LINEAR FEET 1090 SILT DIKE LINEAR FEET BIO-ROLL LINEAR FEET CONSTRUCTION ENTRANCE UNIT 2 INLET PROTECTION DEVICE (IP-1)UNIT INLET PROTECTION DEVICE (IP-2)UNIT 3 INLET PROTECTION DEVICE (IP-3)UNIT 2 THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. * REFER TO SHEET C5.03 & C5.04 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS PROPOSED EXISTING LEGEND NOTE TO CONTRACTOR EROSION CONTROL MATERIALS QUANTITIES BIO-ROLL SILT FENCE SILT DIKE LIMITS OF DISTURBANCE DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH CHECK DAM LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICEIP# TEMPORARY SEDIMENT BASINSB TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPP) TSM TEMPORARY STORAGE AND PARKING AREATS TEMPORARY STONE CONSTRUCTION ENTRANCE DRAINTILE 902 CONTOUR OVERFLOW ELEV.EOF 902.5 SOIL BORING999.9 ST # RIPRAP CONCRETE CURB STORM SEWER 47 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NO PARKINGNO PARKINGTTGATE GATE BLOCK 2 LOT 3 GALPIN COURT60SIGN CABLE BOX RE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 IP1 IP3 IP1 IP2 IP1 IP3 IP2 IP2 IP2 IP1 IP3 IP1 IP2 IP1 IP3 IP1 IP3 TSM IP3 IP3 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.02 PHASE 2 EROSION CONTROL PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH PHASE 2 EROSION CONTROL PLAN C5.02 THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. ITEM UNIT QUANTITY SILT FENCE LINEAR FEET 1090 SILT DIKE LINEAR FEET BIO-ROLL LINEAR FEET CONSTRUCTION ENTRANCE UNIT 2 INLET PROTECTION DEVICE (IP-1)UNIT 7 INLET PROTECTION DEVICE (IP-2)UNIT 5 INLET PROTECTION DEVICE (IP-3)UNIT 5 THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. * REFER TO SHEET C5.03 & C5.04 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS PROPOSED EXISTING LEGEND NOTE TO CONTRACTOR EROSION CONTROL MATERIALS QUANTITIES BIO-ROLL SILT FENCE SILT DIKE LIMITS OF DISTURBANCE DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH CHECK DAM LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICEIP# TEMPORARY SEDIMENT BASINSB TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPP) TSM TEMPORARY STORAGE AND PARKING AREATS TEMPORARY STONE CONSTRUCTION ENTRANCE DRAINTILE 902 CONTOUR OVERFLOW ELEV.EOF 902.5 SOIL BORING999.9 ST # RIPRAP CONCRETE CURB STORM SEWER 48 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.03 EROSION CONTROL NOTESAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE DEVELOPER/OWNER: XXXXXXX XXXXXXX XXXXXXXX XXX-XXX-XXXX SITE OPERATOR / GENERAL CONTRACTOR SUPERINTENDENT: NOT TO SCALE EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" SITE LOCATION MAP NOT TO SCALE USGS MAP GENERAL EROSION NOTES AREA SUMMARY IN ACRES PAVEMENT AREA 1.42AC± BUILDING AREA 0.76 AC± SEEDED AREA 0.69 AC± TOTAL DISTURBED 2.87 AC± PRE - CONSTRUCTION IMPERVIOUS 0.00 AC± POST - CONSTRUCTION IMPERVIOUS 2.18 AC± SEQUENCE OF CONSTRUCTION MAINTENANCE NOTES SITE SITE 1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS AND SAMBATEK STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY. 2.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. 3.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT, ISSUED AUGUST 1, 2023) AND BECOME FAMILIAR WITH THE CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE DURING CONSTRUCTION. 4.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. 5.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART 21.1-21.3 OF THE GENERAL PERMIT. 6.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. 7.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. 8.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE THE LIMITS OF DISTURBANCE. 9.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE. 11.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER IS NOT ACCEPTABLE. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. SELF-CONTAINED CONCRETE WASHOUTS ON CONCRETE DELIVERY TRUCKS ARE ALLOWED. 12.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 13.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 14. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 15.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS. 16.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES UPSLOPE. 17.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING (SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY, HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH. 18.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER. 19.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY. 20.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 21.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES. 22.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 23.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS, INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION. 24.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: 1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART 10.1-10.5 OF THE GENERAL PERMIT). 3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. CONTRACTOR MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK. 4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART 9.11-9.12 OF THE GENERAL PERMIT. 5.CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL (ACCORDING TO PART 3.1 TO 3.8 OF THE MPCA GENERAL PERMIT) OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A (N.O.T.) HAS BEEN SUBMITTED TO THE MPCA. 6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS (E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS). PHASE I: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2.PREPARE TEMPORARY PARKING AND STORAGE AREA. 3.CONSTRUCT THE SILT FENCES ON THE SITE. 4.INSTALL INLET PROTECTION DEVICES ON EXISTING STORM STRUCTURES, AS SHOWN ON THE PLAN. 5.CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS, AS REQUIRED. 6.CLEAR AND GRUB THE SITE. 7.BEGIN GRADING THE SITE. 8.START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1.TEMPORARY SEED DENUDED AREAS. 2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. 4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5.PREPARE SITE FOR PAVING. 6.PAVE SITE. 7.INSTALL INLET PROTECTION DEVICES. 8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. 9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT. EROSION CONTROL NOTES C5.03 49 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.04 EROSION CONTROL DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE EROSION CONTROL DETAILS C5.04 PUBLIC R O A D HAR D S URF ACE MI N 0 . 5 % G R A D E 20' MINI M U M 50' M I N I M U M MINIMUM 0.5% GRADE DOWN FROM PUBLIC STREET GEOTEXTILE UNDERLINER 4"- 6" DIAMETER CLEAN STONE 10" MINIMUM N.T.S. TEMPORARY STONE CONSTRUCTION EXIT CE UNDISTURBED SOIL BACKFILL 6"x 6" TRENCH FILTER FABRIC (MIRAFI-ENVIRO FENCE OR APPROVED EQUAL) MIN 30" - MAX 36" ABOVE GRADE MINIMUM POST LENGTH IS 5 FEET 2"x 2" WOOD POSTS 6'-0" O.C. DIRECTION OF DRAINAGE 18" MINNOTES: 1.MAXIMUM SPACING BETWEEN POSTS (CENTER TO CENTER) SHALL NOT EXCEED 6 FEET IN SPACING. 2.A MINIMUM OF 5 FASTENERS PER POST N.T.S. PREASSEMBLED SILT FENCE- WOOD POSTS (MNDOT 3886) SF 8' X 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA 2'-0" MIN BERM AROUND PERIMETER GROUND SURFACE 12" MIN 12" MIN COMPACTED EMBANKMENT MATERIAL (TYP.)3:1 OR FLATTER SIDE SLOPES NOTES: 1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. 2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC LINER. 3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. 7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. N.T.S. CONCRETE WASHOUT AREACW MIN.15"18"MAX.3' MIN.(TYP.) 5' MIN. 1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE (SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1" VERTICALLY APART. 2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED ACROSS TWO POSTS. 3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE. 4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT. OVERLAP 5' MIN. POSTS: 2 X 4 WOODEN STAKE FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. N.T.S. SILT FENCE MATERIAL TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH THREE TIES SPACED AT 30" ON CENTER (SEE NOTE 1) ATTACH THE WOVEN WIRE FENCE TO EACH POST WITH THREE WIRE TIES OR OTHER FASTENERS (SEE NOTE 1) DROP INLET WITH GRATE CROSS BRACE 2"X4" WOOD FRAME SECURELY FASTEN OVERLAPPING ENDS OF SILT FENCE MATERIAL TO ADJACENT STAKES WITH THREE WIRE TIES OR OTHER FASTENERS 2" X 4" STAKE WOVEN WIRE FENCE WITH SILT FENCE MATERIAL COVER EXTEND WIRE FENCE A MIN. OF 3" INTO GROUND EXTEND SILT FENCE MATERIAL A MIN. OF 1'-0" INTO GROUND SILT FENCE INLET PROTECTIONIP1 ROAD DRAIN CASTING APPLICABILTY ·NEENAH R-3067 ·NEENAH R-3512 N.T.S. DEFLECTOR PLATE OVERFLOW 1 - CENTER OF FILTER ASSEMBLY OVERFLOW 2 - TOP OF CURB BOX 10" FILTER ASSEMBLY CURB CG 3067 HIGH-FLOW FABRIC MIRAFI FF101 CURB DRAIN INLET PROTECTIONIP2 GEOTEXTILE BAG OVERFLOW HOLES LOOPS SIZED FOR 1" REBAR. USE REBAR FOR A HANDLE TO EMPTY FILTER SACK AT A SEDIMENT COLLECTION LOCATION. LOOPS SIZED FOR RECTANGULAR BAR 2"X1/4". LIFT FILTER BAG FROM INLET USING RECTANGULAR BAR FOR HANDLES. 2"X2"X3/4" RUBBER BLOCK (TYP) (FILTER SACK INSTALLED) FRAME TO HOLD FILTER BAG IN PLACE 1/4" BRIGHTLY COLORED NYLON ROPE EXPANSION RESTRAINT ISOMETRIC VIEW SECTION VIEW FOR USE ONLY IN PAVED AREAS WHERE SEDIMENT LOADS ARE EXPECTED TO BE VERY LOW. FILTER SACK MUST HAVE OVERFLOW HOLES TO PREVENT PONDING. SECURE RECTANGULAR BAR TO OR UNDER SURROUNDING SURFACE. 1/4" BRIGHTLY COLORED NYLON ROPE EXPANSION RESTRAINT FINISH GRADE NOTES: 1.GEOTEXTILE SHALL BE A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS REQUIREMENTS IN THE SPECIFICATIONS TABLE. 2.PLACE AN OIL ABSORBENT PAD OR PILLOW OVER INLET GRATE WHEN OIL SPILLS ARE A CONCERN. 3.THE WIDTH, "W", OF THE FILTER SACK SHALL MATCH THE INSIDE WIDTH OF THE GRATED INLET BOX. 4.THE DEPTH, "D", OF THE FILTER SACK SHALL BE BETWEEN 18 INCHES AND 36 INCHES. 5.THE LENGTH, "L", OF THE FILTER SACK SHALL MATCH THE INSIDE LENGTH OF THE GRATED INLET BOX. D H MAINTENANCE NOTES: 1.INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN. REMOVE TRAPPED SEDIMENT WHEN BRIGHTLY COLORED EXPANSION RESTRAINT CAN NO LONGER BE SEEN. 2.REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3.INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW-RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4.CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5.INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. INLET GRATE N.T.S. INLET PROTECTION FILTER SACKIP3 50 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.05 SWPPPAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SWPPP C5.05 SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING 1.1 PROJECT/SITE INFORMATION GALPIN INDUSTRIAL 2451 GALPIN COURT CITY: CHANHASSEN STATE: MN ZIP CODE: 55317 COUNTY: CARVER THE EXISTING SITE CONSISTS OF GRAVEL PARKING, GRASS AND TREES. THERE ARE NO EXISTING BUILDINGS OR STRUCTURES ONSITE. THE PROPOSED PROJECT INCLUDES CONSTRUCTION OF ONE INDUSTRIAL BUILDING WITH ASSOCIATED PARKING LOTS AND UTILITY IMPROVEMENTS. THE DESIGN INTENT SHALL BE IN ACCORDANCE WITH THE CHANHASSEN WEST BUSINESS PARK DEVELOPMENT, ORIGINALLY APPROVED IN 2005. NPDES PERMIT NUMBER: 1.2 CONTACT INFORMATION/RESPONSIBLE PARTIES COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: GENERAL CONTRACTOR (TO BE COMPLETED BY GENERAL CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: INSERT AREA OF CONTROL (IF MORE THAN ONE OPERATOR AT SITE): THE GENERAL CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PERMIT PROGRAM (GENERAL PERMIT). THE GENERAL CONTRACTOR MUST COMPLY WITH ANY LOCAL GOVERNING AGENCY (LGU) HAVING JURISDICTION CONCERNING EROSION AND SEDIMENT CONTROL. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO BE A CO-APPLICANT WITH THE OWNER. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL DEVICES. THE “APPLICATION FOR GENERAL STORM-WATER PERMIT FOR CONSTRUCTION ACTIVITY (MN R100001)” SHALL BE COMPLETED BY THE GENERAL CONTRACTOR AND SUBMITTED ONLINE, ALONG WITH THE REQUIRED APPLICATION FEE, THROUGH THE MPCA'S WEBSITE. UNLESS NOTIFIED BY THE MINNESOTA POLLUTION CONTROL AGENCY (MPCA) TO THE CONTRARY, APPLICANTS WHO SUBMIT A COMPLETE APPLICATION FORM IN ACCORDANCE WITH THE REQUIREMENTS OF THE GENERAL PERMIT ARE AUTHORIZED TO DISCHARGE STORM WATER FROM THE CONSTRUCTION SITE UNDER THE TERMS AND CONDITIONS OF THIS PERMIT SEVEN (7) CALENDAR DAYS THE ONLINE APPLICATION PROCESS IS COMPLETE(HTTPS://NETWEB.PCA.STATE.MN.US/PRIVATE/). (NOTE: ALL PROJECTS UNDER 50 ACRES MUST SUBMIT THE PERMIT APPLICATION USING THE ONLINE PROCESS. MAILED APPLICATIONS ARE ONLY ACCEPTED FOR PROJECTS THAT DISTURB 50 OR MORE ACRES, AND HAVE A DISCHARGE POINT WITHIN 1 MILE OF A PROTECTED WATER.) ADDITIONALLY, AUTHORIZATION WILL BE DELAYED UNDER THE FOLLOWING CIRCUMSTANCES: ·IF THE PROJECT DISTURBS 50 ACRES OR MORE AND HAS A DISCHARGE POINT WITHIN 1 MILE AND FLOWS TO AN IMPAIRED OR SPECIAL WATER WHOSE DISCHARGE MAY REACH AN IMPAIRED OR SPECIAL WATER LISTED IN SECTION 23 OF THE GENERAL PERMIT THE APPLICANT SHALL SUBMIT THE STORM WATER POLLUTION PREVENTION PLAN AND A COMPLETED APPLICATION AT LEAST 30 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. UNLESS NOTIFIED BY THE MPCA TO THE CONTRARY, COVERAGE BECOMES EFFECTIVE 30 CALENDAR DAYS AFTER THE POSTMARKED DATE OF THE COMPLETED APPLICATION. ·IF THE PROJECT INCLUDES ALTERNATIVE METHODS THE APPLICATION AND TWO ALTERNATIVE TREATMENT PLANS MUST BE SUBMITTED A MINIMUM OF 90 DAY BEFORE CONSTRUCTION STARTS. EROSION & SEDIMENT CONTROL SUBCONTRACTOR (RESPONSIBLE FOR IMPLEMENTING & UPDATING SWPPP - TO BE COMPLETED BY CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: EROSION & SEDIMENT CONTROL INSPECTOR (SEE PART 6.1 OF THIS SWPPP FOR MORE INFORMATION ON INSPECTION RESPONSIBILITIES- TO BE COMPLETED BY CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: GROUND DISTURBING SUBCONTRACTOR(S): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: THE GENERAL CONTRACTOR SHALL PROVIDE A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE CONSTRUCTION PROJECT IS COMPLETE AND THE NOT SUBMITTED. THIS SWPPP WAS PREPARED BY: COMPANY/ORGANIZATION NAME: SAMBATEK CONTACT NAME: ALESSANDRA STUTZ ADDRESS: 12800 WHITEWATER DRIVE, SUITE 300 CITY, STATE, ZIP CODE: MINNETONKA, MN, 55343 TELEPHONE NUMBER:763.520.8460 FAX/EMAIL:ASTUTZ@SAMBATEK.COM SWPPP DESIGNER CERTIFICATION CARD: 1.3 NATURE OF CONSTRUCTION ACTIVITY NATURE OF CONSTRUCTION: THIS SWPPP HAS BEEN PREPARED FOR MAJOR ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF ONE INDUSTRIAL BUILDING AT 2451 GALPIN COURT IN CHANHASSEN MINNESOTA. THE PROJECT INCLUDES BITUMINOUS PARKING LOT CONSTRUCTION, UNDERGROUND UTILITY IMPROVEMENTS, AND INSTALLATION OF STORMWATER MANAGEMENT RAIN GARDENS. ANTICIPATED APPROXIMATE TIMELINES: ESTIMATED PROJECT START DATE: XX/XX/XX ESTIMATED PROJECT COMPLETION DATE:XX/XX/XX 1.4 SOILS, SLOPES, VEGETATION, AND CURRENT DRAINAGE PATTERNS SOIL TYPE(S): ACCORDING TO THE REPORT OF GEOTECHNICAL EXPLORATION BY AMERICAN ENGINEERING TESTING SUBMITTED ON JULY 12, 2023, EXISTING ONSITE SOILS CONSIST OF SANDY LEAN CLAY AND CLAY WITH SAND. THESE SOILS ARE CONSIDERED TO BE HYDROLOGIC SOIL GROUP D AND ARE UNSUITABLE FOR INFILTRATION. SLOPES: EXISTING SLOPES ON GRAVEL SURFACES RANGE FROM 1-5%. EXISTING SLOPES ON GRASS SPACES RANGE FROM 2-50%. PROPOSED SLOPES ON IMPERVIOUS SURFACES WILL RANGE FROM 2-5%. PROPOSED SLOPES ON GRASS SURFACES WILL RANGE FROM 2-33%. DRAINAGE PATTERNS: THE WEST CHANHASSEN BUSINESS PARK DEVELOPMENT PLAN FROM 2005 ASSUMED THE ENTIRE PROPOSED PROJECT SITE WOULD DRAIN TO ONE REGIONAL OFFSITE FACILITY FOR RATE CONTROL AND TREATMENT. IN EXISTING DRAINAGE PATTERNS, STORMWATER RUNOFF FLOWS OVERLAND AND THROUGH EXISTING STORM SEWER PIPES TO THE OFFSITE FACILITY LOCATED SOUTH-WEST OF THE PROJECT AREA. IN PROPOSED DRAINAGE PATTERNS, STORMWATER WILL FLOW THROUGH ONSITE RAIN GARDENS BEFORE DISCHARGING TO EXISTING STORM SEWER INFRASTRUCTURE AND ROUTING TO THE SAME OFFSITE REGIONAL FACILITY. VEGETATION: EXISTING VEGETATION WILL REQUIRE CLEARING & GRUBBING DUE TO ALTERING GRADES. VEGETATION WILL BE ESTABLISHED IN PROPOSED CONDITIONS IN ACCORDANCE WITH THE LANDSCAPING PLAN. RAINFALL INFORMATION: RAINFALL INFORMATION - THE AVERAGE TOTAL ANNUAL PRECIPITATION IS ABOUT 28.32 INCHES. OF THIS ABOUT 17.31 INCHES, OR 61 PERCENT, USUALLY FALLS IN MAY THROUGH SEPTEMBER. THE AVERAGE ANNUAL SNOWFALL IS 57.3 INCHES. 1.5 CONSTRUCTION SITE ESTIMATES PROJECT AREA SUMMARY: TOTAL PROJECT AREA: 2.82 ACRES CONSTRUCTION SITE AREA TO BE DISTURBED: 2.66 ACRES IMPERVIOUS AREAS: IMPERVIOUS AREA BEFORE CONSTRUCTION (ACRES): 0.32 IMPERVIOUS AREA AFTER CONSTRUCTION (ACRES): 2.19 1.6 RECEIVING WATERS CONSTRUCTION PHASE STORM WATER SYSTEM DESCRIPTION: SILT FENCE AND INLET PROTECTION DEVICES WILL ENSURE RETENTION OF CONSTRUCTION PHASE SEDIMENT DISCHARGE ONSITE AND PROTECT DOWNSTREAM RECEIVING WATERS. DESCRIPTION OF RECEIVING WATERS: STORMWATER RUNOFF FROM THE SITE DISCHARGES TO ONE REGIONAL STORMWATER POND. THE SITE IS WITHIN 1 MILE FROM IMPAIRED WATERS HAZELTINE LAKE AND BLUFF CREEK. HAZELTINE LAKE IS IMPAIRED FOR NUTRIENTS, AND BLUFF CREEK IS IMPAIRED FOR FISH BIOASSESSMENTS AND TURBIDITY. 1.7 SITE FEATURES AND SENSITIVE AREAS TO BE PROTECTED THE SITE HAS NO INTERNAL FEATURES TO BE PROTECTED. 1.8 POTENTIAL SOURCES OF POLLUTION POTENTIAL SOURCES OF SEDIMENT AND OTHER POLLUTANTS TO STORMWATER RUNOFF: CONSTRUCTION PHASE POLLUTANT SOURCES ANTICIPATED AT THE SITE ARE DISTURBED (BARE) SOIL, VEHICLE FUELS AND LUBRICANTS, CHEMICALS ASSOCIATED WITH BUILDING CONSTRUCTION, AND BUILDING MATERIALS. WITHOUT ADEQUATE CONTROL THERE IS THE POTENTIAL FOR EACH TYPE OF POLLUTANT TO BE TRANSPORTED BY STORM WATER. 1.9 ENDANGERED/THREATENED SPECIES THE SITE HAS POTENTIAL OF CONTAINING THE NORTHERN LONG EARED BAT, THE TRICOLOR BAT, THE WHOOPING CRANE, THE MONARCH BUTTERFLY, AND THE RUSTY PATCH BUMBLE BEE. IT IS NOT ANTICIPATED THE CONSTRUCTION ACTIVITIES WILL DISRUPT HABITAT OF THESE ENDANGERED SPECIES, HOWEVER IF ANY OF THEM ARE IDENTIFIED, THE CONTRACTOR IS TO STOP WORK IMMEDIATELY AND CONTACT THE ENGINEER OF RECORD. THE WHOOPING CRANE BREEDS, MIGRATES, WINTERS, AND FORAGES IN A VARIETY OF WETLAND AND OTHER HABITATS, INCLUDING COASTAL MARSHES AND ESTUARIES, INLAND MARSHES, LAKES, PONDS, WET MEADOWS AND RIVERS, AND AGRICULTURAL FIELDS. THERE IS ONE GROUP OF CRANES WHICH ARE KNOWN TO MIGRATE THROUGH MINNESOTA. THE NORTHERN LONG EARED BAT ROOSTS SINGLY OR IN COLONIES UNDERNEATH BARK, IN CAVITIES, OR IN CREVICES OF BOTH LIVE AND DEAD TREES. THIS BAT SEEMS OPPORTUNISTIC IN SELECTING ROOSTS, USING TREE SPECIES BASED ON SUITABILITY TO RETAIN BARK OR PROVIDE CAVITIES OR CREVICES. IT HAS ALSO BEEN FOUND, RARELY, ROOSTING IN STRUCTURES LIKE BARNS AND SHEDS. WITHIN HIBERNACULA, SURVEYORS FIND THEM IN SMALL CREVICES OR CRACKS, OFTEN WITH ONLY THE NOSE AND EARS VISIBLE. THE TRICOLOR BAT IS OFTEN FOUND IN CAVES AND ABANDONED MINES DURING THE WINTER. DURING THE SPRING, SUMMER, AND FALL, TRICOLORED BATS ARE FOUND IN FORESTED HABITATS WHERE THEY ROOST IN TREES, PRIMARILY AMONG LEAVES OF LIVE OR RECENTLY DEAD DECIDUOUS HARDWOOD TREES, BUT MAY ALSO BE FOUND IN SPANISH MOSS, PINE TREES, AND OCCASIONALLY HUMAN STRUCTURES. RUSTY PATCHED BUMBLE BEES ONCE OCCUPIED GRASSLANDS AND TALLGRASS PRAIRIES OF THE UPPER MIDWEST AND NORTHEAST, BUT MOST GRASSLANDS AND PRAIRIES HAVE BEEN LOST, DEGRADED, OR FRAGMENTED BY CONVERSION TO OTHER USES. BUMBLE BEES NEED AREAS THAT PROVIDE NECTAR AND POLLEN FROM FLOWERS, NESTING SITES (UNDERGROUND AND ABANDONED RODENT CAVITIES OR CLUMPS OF GRASSES), AND OVERWINTERING SITES FOR HIBERNATING QUEENS (UNDISTURBED SOIL). MONARCH HABITAT REQUIRES MILKWEED AND FLOWERING PLANTS WHETHER IT’S A FIELD, ROADSIDE AREA, OPEN AREA, WET AREA OR URBAN GARDEN. ADULT MONARCHS FEED ON THE NECTAR OF MANY FLOWERS DURING BREEDING AND MIGRATION, BUT THEY CAN ONLY LAY EGGS ON MILKWEED PLANTS.FOR OVERWINTERING MONARCHS, HABITAT WITH A SPECIFIC MICROCLIMATE IS NEEDED FOR PROTECTION FROM THE ELEMENTS, AS WELL AS MODERATE TEMPERATURES TO AVOID FREEZING. THESE CONDITIONS VARY BETWEEN POPULATIONS. FOR THE EASTERN NORTH AMERICAN POPULATION, MOST MONARCHS OVERWINTER IN OYAMEL FIR TREE ROOSTS LOCATED IN MOUNTAINOUS REGIONS IN CENTRAL MEXICO AT AN ELEVATION OF 2,400 TO 3,600 METERS. BOTH THE NORTHERN LONG-EARED BAT AND TRICOLORED BAT ARE GREATLY THREATENED BY WHITE-NOSE SYNDROME (WNS), WHICH HAS CAUSED A DECLINE IN BAT POPULATIONS BY UP TO 99 PERCENT. THIS FUNGAL DISEASE LOOKS LIKE A WHITE FUZZ ON THE BATS FACE. BATS WITH WNS MAY DO STRANGE THIGNS LIKE FLY OUTSIDE IN THE DAYTIME AND WINTER. IF A BAT WITH WNS IS ENCOUNTERED OR SUSPECTED, REPORT THE SIGHTING TO THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES: REPORT WEBSITE: HTTP://WWW.DNR.STATE.MN.US/REPORTBATS/INDEX.HTML REPORT PHONE: 888-345-1730 REPORT EMAIL: MBS.REPORTS@STATE.MN.US TO REPORT UNUSUAL BAT ACTIVITY OR GROUPS OF BATS IN MINNESOTA. THE DNR IS INTERESTED IN WINTER AND SUMMER ROOST SITES –AS WELL AS SICK OR DYING BATS 1.10 HISTORIC PRESERVATION THERE ARE NO KNOWN HISTORIC SITES ON OR NEAR THE CONSTRUCTION SITE. 1.11 APPLICABLE FEDERAL, TRIBAL, STATE OR LOCAL PROGRAMS LOCAL GOVERNING UNIT (LGU) REQUIREMENTS: CHANHASSEN WEST BUSINESS PARK WAS DESIGNED IN 2005 TO SATISFY THE DESIGN REQUIREMENTS BELOW: 1.RATE CONTROL FOR THE 2- (2.80”), 10- (4.10”), AND 100-YEAR (5.90”) TP 40 RAINFALL EVENTS. a.DISCHARGE RATES FOR THE FULL PUD WERE ANALYZED TO EACH MAJOR RUNOFF LOCATION (SOUTH WETLAND, NORTHWEST WETLAND, AND GALPIN BLVD CULVERT) 2.A WATER QUALITY TREATMENT VOLUME (FILTRATION VOLUME) OF 0.306 INCHES OVER THE IMPERVIOUS AREA a.TREATMENT VOLUME (FT^3) = IMPERVIOUS AREA (SF) X 0.34/12 (INCHES) X 0.9 3.A WET POND DESIGNED TO NURP STANDARDS, WITH A DEAD STORAGE CONTAINING A VOLUME EQUIVALENT TO THE RUNOFF FROM A 2.5” RAINFALL EVENT. THE PROPOSED DEVELOPMENT WILL NOT EXCEED THE ALLOWABLE IMPERVIOUS COVERAGE OUTLINED IN THE PUD. 1.12 MITIGATION MEASURES FROM ENVIRONMENTAL REVIEWS/TMDLS/IMPAIRED WATERS 1.13 MAPS EROSION AND SEDIMENT CONTROL PLANS: THE FOLLOWING SITE DEVELOPMENT PLAN SHEETS ARE AN INTEGRAL PART OF THIS SWPPP: C-5.01 - PHASE I EROSION AND SEDIMENTATION CONTROL PLAN/”SITE MAP” C-5.02 - PHASE II EROSION AND SEDIMENTATION CONTROL PLAN/”SITE MAP” C-5.04 - EROSION AND SEDIMENTATION CONTROL DETAILS C-5.03 - EROSION AND SEDIMENTATION CONTROL NOTES/”SITE MAP” SHOW THE FOLLOWING ON THE EROSION AND SEDIMENT CONTROL PLANS: · EXISTING AND FINAL GRADES ·DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORM WATER RUNOFF DRAINAGE AREAS LOCATED WITHIN THE PROJECT LIMITS ·IMPERVIOUS SURFACE AREAS (PRE- AND POST-CONSTRUCTION AREA TABULATIONS) ·SOIL TYPES ·DELINEATED WETLAND LOCATIONS WITHIN ONE MILE OF THE PROJECT BOUNDARIES, WHICH WILL RECEIVE STORM WATER RUNOFF FROM THE SITE, (IF NOT POSSIBLE TO SHOW ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW INDICATING BOTH DIRECTION AND DISTANCE TO THE SURFACE WATER, OR ON A USGS 7.5 MINUTE QUADRANGLE MAP OR EQUIVALENT) ·LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL MEASURES, INCLUDING METHODS FOR FINAL STABILIZATION ·BOUNDARIES OF DISTURBED CONSTRUCTION AREAS ·PHASING OF CONSTRUCTION IN ORDER TO MINIMIZE DURATION OF EXPOSED SOILS ·STANDARD PLATES/SPECS FOR PROPOSED BMPS ·SEDIMENT CONTROL PRACTICES FOR PROPOSED TEMPORARY OR PERMANENT DRAINAGE DITCHES WHERE APPROPRIATE ·ESTIMATED PRELIMINARY QUANTITIES TABULATION FOR TEMPORARY BMPS ·ANY AREAS THAT ARE ADJACENT TO AND DRAIN TO PUBLIC WATERS FOR WHICH THE DNR HAS PROMULGATED “WORK IN WATER RESTRICTIONS” ·BUFFERS ·STEEP SLOPES ·MAINTENANCE PLANS FOR PERMANENT STORMWATER SYSTEMS ·KARST AREAS SECTION 2: EROSION AND SEDIMENT CONTROL BMPS EROSION CONTROL BMPS: THE PURPOSE OF EROSION CONTROL IS TO PREVENT SOIL PARTICLES FROM BECOMING SUSPENDED IN WATER AND BEING TRANSPORTED TO EITHER DOWNSTREAM SURFACE WATERS OR DOWNSTREAM PROPERTIES. APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION MUST BE PLANNED FOR AND IMPLEMENTED. IN THE NATURAL CONDITION, SOIL IS STABILIZED BY NATIVE VEGETATION. THE PRIMARY TECHNIQUE TO BE USED AT THIS PROJECT FOR FINAL STABILIZATION OF SITE SOIL WILL BE TO PROVIDE A PROTECTIVE COVER OF VEGETATION, PAVEMENT, OR BUILDING. ALL EXPOSED AREAS MUST BE STABILIZED AS SOON AS POSSIBLE (BUT NO LATER THAN THE NEXT WORK DAY) TO LIMIT SOIL EROSION, BUT IN NO CASE LATER THAN 7 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G. CLEAN AGGREGATED STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT, BUT MUST COMPLY WITH SECTION 2.7 OF THIS SWPPP (SECTION 8.4, 9.9, 9.10, AND 23.9 OF THE GENERAL PERMIT). SEDIMENT CONTROL BMPS: THE PURPOSE OF SEDIMENT CONTROL IS TO PREVENT SOIL PARTICLES THAT HAVE BEEN SUSPENDED IN WATER FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS. SEDIMENT CONTROL BMPS HAVE BEEN DESIGNED AS PART OF THIS SWPPP. IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING ADDITIONAL UP GRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND MUST AMEND THE SWPPP TO IDENTIFY THE ADDITIONAL PRACTICES. SEDIMENT CONTROL PRACTICES MUST ALWAYS BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER ZONES. THE PERIMETER SEDIMENT CONTROL PRACTICES MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES MUST REMAIN IN PLACE UNTIL FINAL STABILIZATION IS ACHIEVED (SEE SECTION 8 OF THIS SWPPP). THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES MUST BE RE-INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT RAIN EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE. 2.1 MINIMIZE DISTURBED AREA AND PROTECT NATURAL FEATURES AND SOIL CONSTRUCTION PHASED SHALL BE PERFORMED IN ACCORDANCE WITH THE PHASING SCHEDULE ON SHEET C5.03 TO MINIMIZE IMPACTS FROM CONSTRUCTION ACTIVITIES TO DOWNSTREAM RECEIVING WATERS. 2.2 PRESERVE 50 FOOT NATURAL BUFFER THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER (OR IF A BUFFER IS INFEASIBLE ON THE SITE PROVIDE REDUNDANT SEDIMENT CONTROLS) WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECTS EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. THE CONTRACTOR IS NOT REQUIRED TO ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE BUFFER OR PROVIDE VEGETATION IF NONE EXISTS. 2.3 CONTROL STORMWATER FLOWING ONTO AND THROUGH THE PROJECT MEASURES SHOULD BE TAKEN TO ENSURE THAT “CLEAN” RUNOFF FROM OFF SITE IS DIVERTED AROUND DISTURBED AREAS ON SITE. CARE SHOULD BE TAKEN THAT RE-ROUTING OFF SITE RUNOFF DOES NOT RESULT IN FLOODING OR OTHER ISSUES ON ADJACENT PROPERTIES. BMP DESCRIPTION: TEMPORARY DIVERSION DITCH INSTALLATION SCHEDULE: INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO UP GRADIENT GROUND DISTURBING ACTIVITIES MAINTENANCE AND INSPECTION REQUIREMENTS: THE WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. THIS STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 DAYS OF CONNECTING TO A SURFACE WATER AND AFTER CONSTRUCTION HAS CEASED. TEMPORARY OR PERMANENT DITCHES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE STABILIZED, BUT MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. DITCHES MUST BE INSPECTED EVERY 7 DAYS, AND WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. ANY SEDIMENT DEPOSITED IN DIVERSION DITCHES MUST BE REMOVED AND ANY EXPOSED SOILS STABILIZED WITHIN 7 DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. IF PRECLUDED, NOTE REASON FOR DELAY ON MAINTENANCE LOG. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.4 STABILIZE SOILS 1.TEMPORARY SEEDING - DISTURBED AREAS THAT ARE NOT YET AT FINAL GRADE BUT THAT WILL NOT BE ACTIVELY WORKED FOR 7 DAYS OR MORE MUST BE TEMPORARILY STABILIZED. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY WHERE WORK HAS TEMPORARILY CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER WORK IN THAT PORTION OF THE SITE HAS TEMPORARILY CEASED. TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING (SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3C. ALTERNATIVELY, HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3E MAY BE USED IN PLACE OF TEMPORARY MULCH. 2.PERMANENT STABILIZATION - ALL AREAS AT FINAL GRADE MUST BE STABILIZED WITHIN 7 DAYS AFTER COMPLETION OF THE MAJOR CONSTRUCTION ACTIVITY. PERMANENT STABILIZATION MUST BE INITIATED IMMEDIATELY WERE WORK HAS PERMANENTLY CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. SEEDED AREAS SHALL BE PROTECTED WITH MULCH. PERMANENT MULCH SHALL CONFORM TO MN/DOT SPECIFICATION 3882, TYPE 3 AT 2 TONS/ACRE AND SHALL BE DISK ANCHORED. HYDRAULIC SOIL STABILIZER MAY BE USED IN PLACE OF MULCH IF APPROVED BY CIVIL ENGINEER. IF HYDRAULIC SOIL STABILIZER IS USED, IT SHALL BE MN/DOT TYPE 6. 2.5 PROTECT SLOPES STEEP SLOPE AREAS - THE CONTRACTOR MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT THAT HAVE STEEP SLOPES (3:1 OR STEEPER). FOR THOSE SLOPED AREAS WHICH MUST BE DISTURBED, THE CONTRACTOR MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES, SUCH AS DRAINING AND TERRACING. SLOPES STEEPER THAN 3:1 MUST BE PROTECTED BY EROSION CONTROL BLANKETS. BMP DESCRIPTION: EROSION CONTROL BLANKET INSTALLATION SCHEDULE: INSTALL EROSION CONTROL BLANKETS AS SHOWN ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, WITHIN THE TIMEFRAME ALLOWED FOR STABILIZATION AFTER WORK HAS CEASED IN AN AREA, DEPENDING ON THE LOCATION (I.E. 24 HOURS, 7 DAYS, 14 DAYS) MAINTENANCE AND INSPECTION REQUIREMENTS: TO FUNCTION PROPERLY, EROSION CONTROL BLANKETS MUST BE IN CONTACT WITH THE SOIL BENEATH THE BLANKET. BLANKETS MUST BE SECURED PER THE CONSTRUCTION DETAIL PROVIDED WITH THE SWPPP PLAN SHEETS. INSPECT BLANKETS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. REPAIR, REPLACE, OR SUPPLEMENT NON-FUNCTIONAL BLANKETS WITHIN 3 DAYS OR BY THE NEXT RAIN EVENT, WHICHEVER COMES FIRST. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.6 PROTECT STORM DRAIN INLETS ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE MEANS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS BEEN IDENTIFIED AND PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL AUTHORITY (E.G. CITY/COUNTY/TOWNSHIP/MNDOT/ETC.) VERIFYING THE NEED FOR REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THIS SWPPP. BMP DESCRIPTION: SILT FENCE INLET PROTECTION INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: INLET PROTECTION (INLET INSERT DEVICE) INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT INLET PROTECTION EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE CAPACITY OF THE DEVICE, OR, IF MORE STRINGENT, IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.7 ESTABLISH PERIMETER CONTROLS AND SEDIMENT BARRIERS ALL STRUCTURAL SEDIMENT CONTROLS INTENDED TO RECEIVE AND TREAT CONSTRUCTION RUNOFF MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND ALTERATION CAN BEGIN AND MUST STAY IN OPERATION UNTIL FINAL STABILIZATION OF THE SITE HAS BEEN ACHIEVED. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND CANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER. BMP DESCRIPTION: SILT FENCE INSTALLATION SCHEDULE: INSTALL SILT FENCE AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND DISTURBING ACTIVITIES. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: BIOLOGS INSTALLATION SCHEDULE: INSTALL BIOLOGS AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND DISTURBING ACTIVITIES. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT BIOLOGS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE BIOLOG. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.8 RETAIN SEDIMENT ON-SITE ANY OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACT (E.G. FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS. REMINDER, FOR DISCHARGES TO SOME SPECIAL WATERS AND IMPAIRED WATERS, TEMPORARY SEDIMENTATION BASINS ARE REQUIRED WHERE DISTURBED AREAS OF 5 ACRES OR MORE DRAIN TO A COMMON LOCATION (SECTION 23.10) IF A TEMPORARY SEDIMENTATION BASIN IS REQUIRED BUT UNFEASIBLE, A NOT MUST BE ADDED TO THE DOCUMENT STATING SUCH. TEMPORARY SEDIMENTATION BASINS AND SEDIMENT TRAPS ARE TO BE UTILIZED DURING CONSTRUCTION TO CAPTURE AND TREAT SEDIMENT LADEN RUN OFF. THE TEMPORARY SEDIMENTATION BASINS SHALL BEEN DESIGNED TO PROVIDE 3,600 CUBIC FEET OF STORAGE BELOW THE OUTLET PIPE PER ACRE DRAINED TO THE BASIN. THE OUTLET STRUCTURE MUST BE DESIGNED TO WITHDRAW WATER FROM THE SURFACE IN ACCORDANCE WITH SECTION 14.5 AND 14.6 OF THE GENERAL PERMIT. PERMITTEES MUST PROVIDE ENERGY DISSIPATION FOR THE BASIN OUTLET WITHIN 24 HOURS AFTER A CONNECTION TO A SURFACE WATER (SECTION 14.7 OF THE GENERAL PERMIT) BMP DESCRIPTION: TEMPORARY SEDIMENTATION BASIN INSTALLATION SCHEDULE: INSTALL TEMPORARY SEDIMENTATION BASIN PRIOR TO BEGINNING UPSLOPE LAND DISTURBING ACTIVITIES. IF THIS IS NOT POSSIBLE DUE TO EXISTING TOPOGRAPHY, LIMIT DISTURBANCE TO ONLY THOSE AREAS NECESSARY TO INSTALL TEMPORARY SEDIMENTATION BASIN. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT TEMPORARY SEDIMENTATION BASINS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE VOLUME OF SEDIMENT COLLECTED IN THE BASIN REACHES ½ THE STORAGE VOLUME. THIS MAINTENANCE MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. IF CONDITIONS DO NOT ALLOW MAINTENANCE TO BE PERFORMED WITHIN 72 HOURS, DOCUMENT THE CAUSE OF DELAY ON THE MAINTENANCE FORM. REFER TO SECTION 3.1 OF THIS SWPPP FOR BASIN DRAINING GUIDELINES. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.9 ESTABLISH VEHICLE TRACKING PADS VEHICLE TRACKING PADS HAVE BEEN DESIGNED TO PREVENT SEDIMENT TRACK OFF. IF THERE IS EVIDENCE OF SEDIMENT TRACKING FROM VEHICLES IN PAVED AREAS, THE SEDIMENT MUST BE REMOVED BY STREET SWEEPING OR OTHER METHOD AS SOON AS FEASIBLY POSSIBLE, BUT NO LONGER THAN 24 HOURS AFTER DISCOVERY. (SECTION 9.11 AND 9.12 OF THE GENERAL PERMIT) BMP DESCRIPTION: VEHICLE TRACKING PAD INSTALLATION SCHEDULE: INSTALL VEHICLE TRACKING PAD AS SHOWN ON THE SWPPP PLAN SHEETS AS SOON AS POSSIBLE AT THE BEGINNING OF CONSTRUCTION ACTIVITIES. INSTALL ADDITIONAL VEHICLE TRACKING PADS AS NEEDED THROUGHOUT CONSTRUCTION. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT VEHICLE TRACKING PADS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. VEHICLE TRACKING PADS MUST BE PERIODICALLY 'REFRESHED' TO ENSURE PROPER FUNCTIONALITY. MAINTENANCE SHOULD BE PERFORMED WHEN THE EXIT APPEARS SMOOTH AND COMPACTED OR WHEN THE VEHICLE TRACKING PAD CEASES TO FUNCTION PROPERLY. VEHICLE TRACKING PAD LOCATIONS SHOULD BE INSPECTED FOR SIGNS OF OFF-SITE SEDIMENT TRACKING. TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MUST BE USED IF VEHICLE TRACKING PADS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 51 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 1:09:00 PML:\PROJECTS\52152\CAD\SHEETS\52152-C5.01-EROS.DWG:C5.06 SWPPPAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SWPPP C5.06 2.10 CONTROL STORMWATER DISCHARGE POINTS 1.PIPE OR OTHER TEMPORARY OR PERMANENT OUTLETS MUST BE STABILIZED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. 2.STABILIZE THE NORMAL WETTED PERIMETER OF A DRAINAGE DITCH OR SWALE WITHIN 200 FEET OF THE PROPERTY EDGE WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 OF CONNECTION. BMP DESCRIPTION: RIPRAP INSTALLATION SCHEDULE: INSTALL RIPRAP AS SHOWN ON SWPPP PLANS AND/OR GRADING PLANS. INSTALLATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT OUTLETS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. REPAIR, REPLACE OR SUPPLEMENT NON-FUNCTIONING RIPRAP ENERGY DISSIPATION WITHIN 3 DAYS OR BY THE NEXT RAIN EVENT, WHICHEVER COMES FIRST. ANY OFF SITE ACCUMULATION OF SEDIMENT MUST BE REMOVED IN MANNER AND AT A FREQUENCY TO MINIMIZE OFF-SITE IMPACTS. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.11 CHEMICAL EROSION AND SEDIMENT CONTROL BMPS POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS MUST BE APPLIED AFTER CONVENTIONAL EROSION AND SEDIMENT CONTROL DEVICES ARE UTILIZED. CHEMICALS MAY ONLY BE APPLIED WHERE TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS FOR FILTRATION OR SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. CONSIDERATION MUST BE GIVEN WHEN SELECTING CHEMICALS TO THE EXPECTED SOIL TYPES TO BE EXPOSED DURING CONSTRUCTION, AND TO THE EXPECTED TURBIDITY, PH AND FLOW RATE OF STORMWATER FLOWING INTO THE CHEMICAL TREATMENT SYSTEM OR AREA. IF CHEMICALS ARE PART OF THE EROSION CONTROL PLAN, THEY MUST BE USED IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, AND WITH DOSING SPECIFICATION AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE MANUFACTURER OR PROVIDER/SUPPLIER OF THE APPLICABLE CHEMICALS. SECTION 3: DEWATERING & BASIN DRAINING 3.1 DEWATERING AND BASIN DRAINING ALLOWABLE NON-STORMWATER DISCHARGES, AS DEFINED BY THE GENERAL PERMIT, ARE LIMITED TO DEWATERING AND BASIN DRAINING. DEWATERING OR BASIN DRAINING THAT MAY HAVE TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. ALL WATER FROM DEWATERING OR BASIN DRAINING MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WETLAND. IF THE CONTRACTOR ELECTS TO UTILIZE FILTERS WITH BACKWASH WATER, THE CONTRACTOR MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION. THE CONTRACTOR MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERING DEVICES WHEN REQUIRED TO RETAIN ADEQUATE FUNCTION. CONTRACTOR SHALL OBTAIN A WATER USE (APPROPRIATION) PERMIT FROM THE MINNESOTA DNR FOR DEWATERING ACTIVITIES THAT WILL WITHDRAW MORE THAN 10,000 GALLONS OF WATER PER DAY OR 1 MILLION GALLONS PER YEAR. SECTION 4: GOOD HOUSEKEEPING BMPS 4.1 MATERIAL HANDLING AND WASTE MANAGEMENT 1.SOLID WASTE DISPOSAL - NO SOLID MATERIALS, INCLUDING CONSTRUCTION AND DEMOLITION MATERIALS, COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, SHALL BE ALLOWED TO BE CARRIED FROM THE SITE WITH STORM WATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS WILL BE EMPTIED PERIODICALLY BY A CONTRACT TRASH DISPOSAL SERVICE AND HAULED AWAY FROM THE SITE. DISPOSAL OF SOLID WASTES MUST COMPLY WITH MPCA REQUIREMENTS. 2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE IMPACT THEY REPRESENT. 3.SANITARY FACILITIES - ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY SEPTIC SYSTEM REGULATIONS. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE SITE THROUGHOUT THE CONSTRUCTION PHASE WHERE REQUIRED BY STATE OR LOCAL REGULATIONS. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND BE SERVICED BY A COMMERCIAL OPERATOR. 4.2 ESTABLISH PROPER STORAGE, HANDLING & DISPOSAL PRACTICES HAZARDOUS MATERIALS & TOXIC WASTE (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) MUST BE STORED IN WATERPROOF CONTAINERS WITH SECONDARY CONTAINMENT, AND THEIR LOCATION(S) MUST BE NOTED ON THE SWPPP MAP. EXCEPT DURING APPLICATION, THE CONTENTS MUST BE KEPT IN TRUCKS OR WITHIN STORAGE FACILITIES IN ACCORDANCE WITH SECTION 12.4 OF THE GENERAL PERMIT. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MCPA REGULATIONS. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM THE SITE, TREATED, AND DISPOSED AT AN APPROVED SOLID WASTE OR CHEMICAL DISPOSAL FACILITY. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS AND PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS AND LANDSCAPE MATERIALS MUST BE UNDER COVER BY PLASTIC SHEETING OR TEMPORARY ROOFS TO PREVENT DISCHARGE, OR PROTECTED BY SIMILAR EFFECTIVE MEANS TO PREVENT CONTACT WITH STORMWATER. 4.3 DESIGNATE WASHOUT AREAS THE CONTRACTOR SHALL DESIGNATE AREAS FOR CONCRETE AND OTHER (STUCCO, PAINT, FOR RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS RELATED TO THE CONSTRUCTION ACTIVITY) WASHOUTS, AND NOTE THE LOCATIONS ON THE SITE MAP. ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK PROOF CONTAINMENT FACILITY OR IMPERMEABLE LAYER. A COMPACTED CLAY LINER IS NOT AN ACCEPTABLE IMPERMEABLE LAYER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTE MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM SITE WORKERS TO UTILIZE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASTES. BMP DESCRIPTION: CONCRETE WASHOUT INSTALLATION SCHEDULE: PRIOR TO CONCRETE WORK. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT CONCRETE WASHOUTS FOR EVIDENCE OF DISCHARGE EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. REPAIR, REPLACE OR SUPPLEMENT NON-FUNCTIONING CONCRETE WASHOUTS WITHIN 3 DAYS OR BY THE NEXT USE, WHICHEVER COMES FIRST. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 4.4 ESTABLISH PROPER EQUIPMENT/VEHICLE FUELING AND MAINTENANCE PRACTICES THE CONTRACTOR SHALL DESIGNATE AREAS FOR EQUIPMENT FUELING, CLEANING, MAINTENANCE AND REPAIR, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAPS. RUNOFF MUST BE CONTAINED WITHIN THE DESIGNATED AREAS (I.E. THROUGH USE OF A TEMPORARY BERM). THE AREAS MUST NOT BE LOCATED IN ANY SURFACE WATER. SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. NO ENGINE DEGREASING IS ALLOWED ON SITE. 4.5 CONTROL EQUIPMENT/VEHICLE WASHING THE CONTRACTOR SHALL DESIGNATE LOCATION(S) FOR VEHICLE WASHING, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAP. RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE SOAPS, DETERGENTS AND SOLVENTS. ENGINE DEGREASING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES IS ALSO PROHIBITED. 4.6 SPILL PREVENTION AND CONTROL PLAN 1.ACCIDENTAL SPILL - DISCHARGE OF OIL OR OTHER HAZARDOUS SUBSTANCES IS SUBJECT TO REPORTING AND CLEAN UP REQUIREMENTS. IN CASE OF AN ACCIDENTAL SPILL, THE MINNESOTA POLLUTION CONTROL AGENCY IS TO BE NOTIFIED AT THEIR 24-HOUR TELEPHONE NUMBER: 651-649-5451. REFER TO SECTION 12 OF THE GENERAL PERMIT. 2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE IMPACT THEY REPRESENT. SECTION 5: POST-CONSTRUCTION BMPS THE PROPOSED GALPIN INDUSTRIAL SITE WILL MEET THE STORMWATER REQUIREMENTS OF THE CITY OF CHANHASSEN BY NOT EXCEEDING THE IMPERVIOUS COVERAGE REQUIREMENTS OF THE PUD AND DISCHARGING TO THE EXISTING REGIONAL FACILITY.THE PROPOSED PROJECT WILL INCLUDE THE ADDITION OF RAIN GARDENS TO THE SITE TO AID IN CONVEYANCE AND TREATMENT PRIOR TO DISCHARGE TO REGIONAL FACILITIES SIZED TO ACCOMMODATE FUTURE DEVELOPMENT OF THE LOT. BMP DESCRIPTION: SUMP MANHOLE INSTALLATION SCHEDULE: ALONG WITH STORM SEWER NETWORK MAINTENANCE AND INSPECTION REQUIREMENTS: PRACTICE SHOULD BE INSPECTED (AND CLEANED OUT IF DEEMED NECESSARY) SEMI-ANNUALLY TO ENSURE THAT SEDIMENT IS NOT BEGINNING TO WASH OUT DURING STORM EVENTS. DEVICES SHOULD BE CLEANED OUT AT LEAST ONCE PER YEAR OR AS NEEDED. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: INFILTRATION BASIN INSTALLATION SCHEDULE: AFTER SITE IS STABILIZED MAINTENANCE AND INSPECTION REQUIREMENTS: NO HEAVY EQUIPMENT TO BE PLACED IN THESE AREAS, MINIMIZING THE COMPACTION. PERIODIC CHECK OF FLOW CONDITIONS TO TRACK DRAWDOWN OF THE WATER IN THE BASIN. THE DEVICE WILL BE INSPECTED AND CLEARED OF SEDIMENT BUILD UP TWICE PER YEAR AND AS NEEDED. PLANTED VEGETATION ALSO NEEDS TO BE INSPECTED PERIODICALLY AND REPLACED AS NECESSARY. INSPECTION WILL ALSO INCLUDE CHECKING FOR ANY PROBLEMATIC EROSION TAKING PLACE ON THE SLOPES OF THE BASIN. EROSION ISSUES WILL BE REPAIRED AS THEY ARE FOUND. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: FILTRATION BASIN INSTALLATION SCHEDULE: THE FILTRATION BASIN WILL BE INSTALLED DURING THE INITIAL GRADING FOR THE SITE. THE STORM SEWER SYSTEM WILL THEN BE CONNECTED INTO THE FILTRATION BASIN. MAINTENANCE AND INSPECTION REQUIREMENTS: ONCE CONSTRUCTION IS COMPLETE, THE BASIN WILL BE INSPECTED AND CLEARED OF ANY SEDIMENT BUILD-UP TWICE PER YEAR AND AS NEEDED. INSPECTION WILL ALSO INCLUDE CHECKING FOR EROSION ISSUES ALONG THE SLOPES OF THE BASIN AND CLEANING ANY DEBRIS FROM THE INLET PIPES. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): SECTION 6: INSPECTIONS 6.1 INSPECTIONS 1.INSPECTION FREQUENCY AND RESPONSIBILITY [OPTION 1 - CONTRACTOR RESPONSIBLE FOR INSPECTIONS] BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS ACHIEVED AND THE NOTICE OF TERMINATION FILED WITH THE MPCA, ALL DISTURBED AREAS AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE PURPOSE OF SITE INSPECTIONS IS TO ASSESS PERFORMANCE OF POLLUTANT CONTROLS. THE INSPECTIONS WILL BE CONDUCTED BY THE CONTRACTOR'S DESIGNATED REPRESENTATIVE. BASED ON THESE INSPECTIONS, THE CONTRACTOR WILL DECIDE WHETHER IT IS NECESSARY TO MODIFY THIS SWPPP, ADD OR RELOCATE STRUCTURAL BMPS, OR WHATEVER ELSE MAY BE NEEDED IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER RUNOFF. IF THE SWPPP REQUIRES MODIFICATION, THOSE CHANGES TO THE SWPPP MUST BE DOCUMENTED. THE CONTRACTOR HAS THE DUTY TO CAUSE POLLUTANT CONTROL MEASURES TO BE REPAIRED, MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER ELSE IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE POLLUTANT CONTROL. 2. INSPECTION PROCEDURES - EXAMPLES OF PARTICULAR ITEMS TO EVALUATE DURING SITE INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE COMPREHENSIVE. DURING EACH INSPECTION THE INSPECTOR MUST EVALUATE OVERALL POLLUTANT CONTROL SYSTEM PERFORMANCE AS WELL AS PARTICULAR DETAILS OF INDIVIDUAL SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE TO THE CIRCUMSTANCES. A. PRE-INSPECTION PREPARATION: 1. INSPECTORS SHOULD BE FAMILIAR WITH THE SWPPP, INCLUDING THE EROSION AND SEDIMENT CONTROL PLANS, PAST INSPECTION REPORTS, AND MAINTENANCE LOGS. 2. PAY SPECIAL ATTENTION TO STORM WATER DISCHARGE TO SPECIAL/IMPAIRED WATERS AND WETLANDS; DISCHARGES TO SPECIAL/IMPAIRED WATERS AND WETLANDS HAVE ADDITIONAL REQUIREMENTS THAT ARE DESCRIBED IN SECTION 23 OF THE GENERAL PERMIT, AND ADDRESSED IN THIS SWPPP. B. SITE ENTRY: 1. BEFORE ENTERING THE SITE, OBSERVE THE SURROUNDINGS AND VARIOUS STAGES OF CONSTRUCTION. NOTE AREAS FOR IN-DEPTH REVIEW AND ANY POTENTIAL ISSUES. 2. THIS IS A GOOD TIME TO VIEW CONSTRUCTION SITE VEHICLE TRACKING PAD LOCATIONS AND PERIMETER CONTROLS. C. RECORDS REVIEW: 1. VERIFY THAT A COPY OF THE SWPPP AND APPLICATION FOR THE NPDES STORM WATER PERMIT, AND COPIES OF ALL CONSTRUCTION SITE INSPECTIONS ARE ON SITE. 2. VERIFY THAT THE TIMING FOR INSTALLATION OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, AS WELL AS CONSTRUCTION PHASING, IS GENERALLY BEING FOLLOWED. 3. SWPPPS ARE INTENDED TO BE DYNAMIC DOCUMENTS, VERIFY THAT AMENDMENTS OR CHANGES TO THE SWPPP ARE BEING MADE WHEN: A.A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVE A SIGNIFICANT EFFECT ON STORM WATER DISCHARGES B. INSPECTIONS INDICATE THE SWPPP IS NOT EFFECTIVE C. THE SWPPP IS NOT CONSISTENT WITH THE TERMS OF THE GENERAL PERMIT D. SITE INSPECTION (NOTE TIMELINES FOR MAINTENANCE INCLUDED IN INSPECTION/MAINTENANCE REPORT) 1. INSPECT DISCHARGE POINTS DOWNSTREAM AND OFF-SITE AREAS FOR SIGNS OF IMPACT. 2. INSPECT PERIMETER CONTROLS: A. HAVE PERIMETER CONTROLS BEEN PROPERLY INSTALLED AND MAINTAINED? B. ARE VEHICLE TRACKING PADS FUNCTIONING PROPERLY? ARE ADDITIONAL ENTRANCES/EXITS BEING USED THAT ARE NOT STABILIZED? C. ALL STORM DRAINS MUST BE PROTECTED AND TEMPORARY STOCKPILES MUST HAVE SEDIMENT CONTROLS INSTALLED. D. ALL EXPOSED SOILS MUST HAVE TEMPORARY OR PERMANENT EROSION PROTECTION WITHIN 7 DAYS OF INACTIVITY. 3. COMPARE BMPS IN THE SWPPP WITH CONSTRUCTION SITE CONDITIONS: ARE REQUIRED BMPS IN PLACE; ARE ADDITIONAL BMPS NEEDED; ARE BMPS IN PLACE PROPERLY INSTALLED AND MAINTAINED? 4. INSPECT AREAS THAT HAVE BEEN DISTURBED AND ARE NOT CURRENTLY BEING WORKED. ANY UNSEEDED OR UNMULCHED BARE AREAS THAT HAVE BEEN IDLE FOR 7 DAYS SHOULD BE NOTED. 5. INSPECT AREAS WITH FINAL STABILIZATION. IN ORDER FOR FINAL STABILIZATION TO BE ACHIEVED, AREAS MUST HAVE A UNIFORM COVER WITH A DENSITY OF 70% OVER ENTIRE AREA. TEMPORARY BMPS SHOULD BE REMOVED AND AREAS DISTURBED BY REMOVAL SEEDED AS NECESSARY. E. EXIT INTERVIEW: 1. DEBRIEF THE PERSON IN CHARGE. EXPLAIN THE IDENTIFIED DEFICIENCIES AND ANY AREAS OF CONCERN. F. A COPY OF THE COMPLETED INSPECTION REPORT MUST BE KEPT WITH THE SWPPP ON SITE. THE INSPECTION REPORT USED SHOULD INCLUDE, AT A MINIMUM, THE FOLLOWING: ·DATE & TIME OF INSPECTION ·NAME OF INSPECTOR(S) ·FINDINGS OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTIONS ·CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND NAMES OF PARTY COMPLETING MAINTENANCE ·DATE & AMOUNT OF RAINFALL ·RECORD OF ALL POINTS OF DISCHARGE FROM THE PROPERTY AND DESCRIPTION OF DISCHARGE ·NOTE TO UPDATE THE SWPPP 6.2 DELEGATION OF AUTHORITY DULY AUTHORIZED REPRESENTATIVE(S) OR POSITION(S): COMPANY OR ORGANIZATION NAME: NAME: POSITION: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: 6.3 CORRECTIVE ACTION LOG THE INSPECTION/MAINTENANCE FORM, AVAILABLE UPON REQUEST, INCORPORATES BOTH INSPECTION AND MAINTENANCE REPORTING INTO A SINGLE FORM. THIS FORM ALSO SPECIFIES THE TIME ALLOWED FOR CORRECTIONS TO BE PERFORMED. IF THE PARTY PERFORMING INSPECTIONS CHOOSES TO USE ANOTHER INSPECTION FORM, A SEPARATE CORRECTIVE ACTION LOG MUST BE PROVIDED. SECTION 7: RECORD KEEPING AND TRAINING 7.1 RECORDKEEPING RECORD RETENTION - THE OWNER MUST KEEP THE SWPPP INCLUDING ALL CHANGES MADE TO IT DURING CONSTRUCTION (SEE SECTION 7.2 OF THIS SWPPP), ALONG WITH THE FOLLOWING ADDITIONAL RECORDS ON FILE FOR THREE YEARS AFTER COMPLETION OF THE CONSTRUCTION PROJECT (FINAL STABILIZATION AND NOTICE OF TERMINATION): 1.ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT 2.RECORDS OF ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 3.ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE 4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS 7.2 AMENDMENTS THE CONTRACTOR SHALL KEEP A RECORD LOG OF ALL MODIFICATIONS TO THE SWPPP. AN EXAMPLE OF A SWPPP UPDATE LOG FORM CAN BE PROVIDED UPON REQUEST. MODIFICATIONS TO THE SWPPP - THIS SWPPP INTENDS TO CONTROL WATER-BORNE AND LIQUID POLLUTANT DISCHARGES BY SOME COMBINATION OF INTERCEPTION, FILTRATION, AND CONTAINMENT. THE GENERAL CONTRACTOR AND SUBCONTRACTORS IMPLEMENTING THIS SWPPP MUST REMAIN ALERT TO THE NEED TO PERIODICALLY REFINE AND UPDATE THE SWPPP IN ORDER TO ACCOMPLISH THE INTENDED GOALS. THIS SWPPP MUST BE AMENDED AS NECESSARY DURING THE COURSE OF CONSTRUCTION IN ORDER TO KEEP IT CURRENT WITH THE POLLUTANT CONTROL MEASURES UTILIZED AT THE SITE. AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, AND/OR REVISED DRAWINGS. THIS SWPPP MUST BE UPDATED AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER: 1.THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS. 2.INSPECTIONS OR INVESTIGATIONS BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES. 3.THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS IN STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, OR THE SWPPP IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE GENERAL PERMIT. 4.THE MPCA HAS DETERMINED THAT THE PROJECT'S STORM WATER DISCHARGES MAY CAUSE OR CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER STANDARD, OR THAT THE SWPPP DOES NOT INCORPORATE REQUIREMENTS RELATED TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL) IMPLEMENTATION PLAN. IN THIS CASE, THE SWPPP MUST BE UPDATED OR A SUPPLEMENTAL BMP ACTION PLAN DEVELOPED TO ADDRESS THE IDENTIFIED CONCERNS. 7.3 TRAINING THE PERMITTEE(S) MUST FULFILL TRAINING REQUIREMENTS AND INCLUDE RECORDS OF TRAINING IN THE SWPPP. REFRESHER TRAINING MUST BE ATTENDED EVERY THREE YEARS STARTING THREE YEARS, FROM THE ISSUANCE OF THE 2018 GENERAL PERMIT (ISSUED 8/1/18). INDIVIDUALS REQUIRED TO BE TRAINED INCLUDE: 1.INDIVIDUALS PREPARING THE SWPPP 2.INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND INDIVIDUALS PERFORMING INSPECTIONS. ONE OF THESE INDIVIDUALS MUST BE AVAILABLE FOR AN ON SITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. 3.INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THE GENERAL PERMIT. AT LEAST ONE INDIVIDUAL TRAINED IN THE JOB DUTIES LISTED ABOVE MUST BE PRESENT ON THE SITE OR AVAILABLE TO THE SITE IN 72 HOURS. TRAINING DOCUMENTATION MUST INCLUDE: 1.NAMES OF PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED 2.DATES OF TRAINING AND NAMES OF INSTRUCTOR AND ENTITY PROVIDING TRAINING 3.CONTENT OF TRAINING COURSE, INCLUDING NUMBER OF HOURS OF TRAINING 4.DOCUMENTATION MUST BE KEPT WITH THE SWPPP. TRAINING RECORD/CERTIFICATION TEMPLATE IS AVAILABLE UPON REQUEST. INDIVIDUALS MUST BE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, OR PERMANENT STORMWATER MANAGEMENT SUCH AS THE UNIVERSITY OF MINNESOTA, MINNESOTA EROSION CONTROL ASSOCIATION, SOIL AND WATER CONSERVATION DISTRICTS, OR THE MPCA. SECTION 8: FINAL STABILIZATION / PERMIT TERMINATION FINAL STABILIZATION - TO ACHIEVE FINAL STABILIZATION OF THE SITE, THE CONTRACTOR WILL IMPLEMENT THE FOLLOWING MEASURES AFTER ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED. 1.ALL SOILS MUST BE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OVER THE ENTIRE PERVIOUS SURFACE AREA, OR BY OTHER EQUIVALENT MEANS NECESSARY TO PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS. REFER TO LANDSCAPING PLANS/SPECIFICATIONS FOR TYPE OF VEGETATIVE COVER. 2.THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS IN SECTIONS 15, 16, 17, 18, AND 19 OF THE GENERAL PERMIT AND IS OPERATING AS DESIGNED. ALL SEDIMENT HAS BEEN REMOVED FROM CONVEYANCE SYSTEMS AND DITCHES ARE STABILIZED WITH PERMANENT COVER. 3.ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED. 4.FOR CONSTRUCTION PROJECTS ON LAND USED FOR AGRICULTURAL PURPOSES FINAL STABILIZATION MAY BE ACCOMPLISHED BY RETURNING THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE. 5.FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY STABILIZED IF THE STRUCTURE(S) ARE FINISHED AND TEMPORARY EROSION PROTECTION AND DOWNGRADIENT PERIMETER CONTROL HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOLD TO THE HOMEOWNER. ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED THE MPCA'S “HOMEOWNER FACT SHEET” TO THE HOMEOWNER TO INFORM THE HOMEOWNER OF THE NEED FOR, AND BENEFITS OF, PERMANENT COVER. PERMIT TERMINATION - TO ACHIEVE PERMIT TERMINATION FOR THE SITE, PERMITTEES MUST COMPLY WITH SECTIONS 4 & 13 OF THE GENERAL PERMIT. 52 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NO PARKINGNO PARKINGTT5 10 101 0 10 BLOCK 2 LOT 3 DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT GALPIN COURTFOUND 1/2" IRON PIPE FOUND 1/2" IRON PIPE DRAINAGE AND UTILITY EASEMENT RE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 RD 203A IE=954.00 STMH 201 RE=956.56 IE=950.27 W IE=950.27 SE CBMH 102 RE=960.86 IE=957.20 S PEDS 104 RE=960.17 IE=956.67 N IE=956.67 S CONNECT TO EXISTING STRUCTURE CBMH 100 RE=958.00 IE=953.00 N RD 203B IE=954.00 CBMH 203 RE=957.70 IE=952.48 NE IE=952.48 E IE=952.48 S 117 LF - 18" HDPE @ 1.00% 151 LF - 12" PVC SCH 40 @ 1.00% 76 LF - 12" PVC SCH 40 @ 2.00% 47 LF - 10" HDPE @ 1.09% 77 LF - 10" HDPE @ 1.52% BUILDING CONNECTION3 RE=963.94 IE=951.14 E SMH2 RE=962.93 IE=950.50 W IE=950.50 E SMH STUB1 RE=962.09 IE=949.98 W 31 LF - 6" PVC SDR 26 @ 2.08% 25 LF - 6" PVC SDR 26 @ 2.08% HYDRANT 6" GATE VALVE 6" x 6" TEE EXISTING 8" WATERMAIN DRAWN PER PLAN FIELD VERIFY HYDRANT 6" GATE VALVE CONNECT TO EXISTING 8" PVC C-900 WATERMAIN STUB 8" x 6" REDUCER 8" x 8" TEE 6" COMBINED DOMESTIC & FIRE PROTECTION WATER SERVICE 117 LF - 10" HDPE @ 1.71% PEDS 103 RE=962.15 IE=955.50 N IE=955.00 S YD 105 RE=961.21 IE=957.50 SE 39 LF - 8" HDPE @ 0.61% 25 LF - 8" HDPE @ 0.61% 52 LF - 8" HDPE @ 0.61% 20 LF - 8" HDPE @ 0.61% CBMH 202 RE=958.00 IE=951.31 N IE=954.20 NW IE=951.31 E 107 LF - 18" HDPE @ 0.97% FES101 IE=956.7 27 LF - 18" HDPE @ 1.00% 30 LF - 6" HDPE @ 1.01% RAISE EXISTING RE AND REPLACE EXISTING CASTING WITH BEEHIVE EXISTING 8" WATERMAIN DRAWN PER PLAN EXISTING 8" WATERMAIN DRAWN PER PLAN FIELD VERIFY CONNECT TO EXISTING 8" PVC C-900 WATERMAIN STUB EX STMH RE=958.18 REPLACE EXISTING CASTING WITH BEEHIVE 8" - 22.5° BEND 8" - 45° BEND CONNECT TO EXISTING 8" WATERMAIN STUB WITH 8" x 6" REDUCER 6" - 45° BEND 6" - 33.75° BEND 6" - 33.75° BEND 6" GATE VALVE 6" PVC C- 9 0 0 W M 8" PVC C-900 WM NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | EMILY CASTANIAS, PE (MN) | 11/2/2023 6:28:14 PML:\PROJECTS\52152\CAD\SHEETS\52152-C6.01-UTIL.DWG:C6.01 UTILITY PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH UTILITY PLAN C6.01 NUMBER TYPE CASTING* 102 CATCH BASIN MANHOLE R-3067-VB 103 **POLYETHYLENE DRAINAGE STRUCTURE **SOLID 104 **POLYETHYLENE DRAINAGE STRUCTURE **GRATE 105 **INLINE DRAIN **GRATE 201 STORM MANHOLE R-1642 202 CATCH BASIN MANHOLE R-3067-VB 203 CATCH BASIN MANHOLE R-3067-VB *INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL NOTE: CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. **POLYETHYLENE DRAINAGE STRUCTURES AND INLINE DRAINS SHALL BE "NYLOPLAST" OR APPROVED EQUAL AND INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS **POLYETHYLENE DRAINAGE STRUCTURE AND INLINE DRAIN CASTINGS SHALL BE "NYLOPLAST" OR APPROVED EQUAL AND INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. PROPOSED EXISTING LEGEND UTILITY CONSTRUCTION NOTES STORM SEWER STRUCTURE SCHEDULE 1.UTILITY CONSTRUCTION NOTES, SEE SHEET C1.02 UNDERGROUND GAS LINE UNDERGROUND TELEPHONE UNDERGROUND ELECTRIC DRAINTILE SANITARY SEWER FORCEMAIN (SAN.) STORM SEWER CONCRETE CURB WATERMAIN EASEMENT LINE 53 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 3:05:06 PML:\PROJECTS\52152\CAD\SHEETS\52152-C9.01-DTLS.DWG:C9.01 DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE DETAILS C9.01 STANDARD DUTY PAVEMENT HEAVY DUTY PAVEMENT NOTES: 1.THE PAVEMENT SECTIONS SHALL BE CONSTRUCTED IN ACCORDANCE WITH MNDOT "STANDARD SPECIFICATION FOR CONSTRUCTION", AND ALSO THE REQUIREMENTS OF THE OWNER'S GEOTECHNICAL CONSULTANT. 2.ALL THICKNESSES, AS SPECIFIED, ARE TO BE CONSIDERED MINIMUM DEPTHS, AFTER COMPACTION. 3.MN/DOT SPEC. 2357 BITUMINOUS TACK COAT SHALL BE PLACED BETWEEN SUCCESSIVE BITUMINOUS LIFTS AND AGAINST ABUTTING CONCRETE CURB EDGES. 2.5" BITUMINOUS BASE COURSE, MN/DOT 2360 SPNWB330F* 8" CLASS 5 AGGREGATE BASE, MN/DOT 3138 12" SELECT GRANULAR MATERIAL, MN/DOT 3149.2B APPROVED SUBGRADE 2" BITUMINOUS WEAR COURSE, MN/DOT 2360 SPWEA330F* 2" BITUMINOUS BASE COURSE, MN/DOT 2360 SPNWEB340F* 6" CLASS 5 AGGREGATE BASE, MN/DOT 3138 12" SELECT GRANULAR MATERIAL, MN/DOT 3149.2B APPROVED SUBGRADE 2" BITUMINOUS WEAR COURSE, MN/DOT 2360 SPWEA330F* N.T.S. * RECOMMENDED ASPHALT BINDER: PG 58V-34 HEAVY DUTY CONCRETE XX" PCC PAVEMENT, MN/DOT 2301* XX" CLASS 5 AGGREGATE BASE, MN/DOT 3138* APPROVED SUBGRADE GENERAL NOTES FOR CONCRETE CONSTRUCTION: 1.ALL THICKNESSES, AS SPECIFIED, ARE TO BE CONSIDERED MINIMUM DEPTHS AFTER COMPACTION. 2.MNDOT SPEC 2357 BITUMINOUS TACK COAT SHALL BE PLACED BETWEEN SUCCESSIVE BITUMINOUS LIFTS AND AGAINST ABUTTING CONCRETE CURB EDGES. 3.FOR PREPARATION OF PAVEMENT SUBGRADE, ANY SILT OR CLAY WITHIN THE UPPER 3 FEET OF FINISHED SUBGRADE ELEVATION SHALL BEREMOVED AND REPLACED WITH COMPACTED, CLEAN SANDS. EXISTING SUBGRADE SURFACE SHALL BE COMPACTED TO AT LEAST 100% OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698). 4.AFTER PROOF ROLLING WITH A LOADED TANDEM AXLE DUMP TRUCK AND REPAIRING DEEP SUBGRADE DEFICIENCIES, THE ENTIRE SUBGRADE SHOULD BE SCARIFIED TO A DEPTH OF 12 INCHES, MOISTURE CONDITIONED TO WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT AND UNIFORMLY COMPACTED TO AT LEAST 100% OF STANDARD PROCTOR DRY DENSITY. 5.AGGREGATE BASE SHALL CONFORM TO MNDOT SPECIFICATION 3138 FOR CLASS 5 AGGREGATE BASE AND SHALL BE COMPACTED TO AT LEAST 100% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). 6.BITUMINOUS WEAR AND BASE COURSES SHALL CONFORM TO MNDOT SPECIFICATION 2360 PLANT MIX BITUMINOUS PAVEMENTS. 7.BITUMINOUS WEAR AND BASE COURSES SHALL BE COMPACTED TO AN AVERAGE DENSITY OF 96 PERCENT ACCORDING TO AASHTO T245 (D1556), BUT NOT LESS THAN 92 PERCENT NOR GREATER THAN 100 PERCENT. 8.THE PORTLAND CEMENT CONCRETE PAVEMENT MIXTURE SHALL BE IN ACCORDANCE WITH AIR-ENTRAINED CONCRETE FOR PAVEMENT, SECTION 2301 OF THE MNDOT "STANDARD SPECIFICATIONS FOR CONSTRUCTION", LATEST EDITION. THE MIXTURE SHALL BE DESIGNED TO DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3900 PSI AT 28 DAYS WITH A 4 INCH MAXIMUM SLUMP FOR HAND PLACED CONCRETE AND A 2" MAXIMUM SLUMP FOR MACHINE PLACED (SLIPFORM) CONCRETE AND 5 TO 7% ENTRAINED AIR. THE MAXIMUM WATER CEMENT RATIO SHALL NOT EXCEED 0.45 FOR CONCRETE EXPOSED TO DEICERS. 01 PAVEMENT SECTIONS N.T.S. SLOPE 3/4" PER FT. 1 3 * WHEN SURFACE DRAINAGE IS AWAY FROM CURB B612 CONCRETE CURB W/REVERSE GUTTER* B612 CONCRETE CURB & GUTTER* 6"6"13-1/2"1/2" R 3" R 1/2" R 6" MIN 8"12"7"1" 0.2 2"2" 2 #4 REINFORCING RODS SEE PAVING DETAILS FOR PAVEMENT SECTIONS, SUBBASE, SUBGRADE AND COMPACTION REQUIREMENTS 6" MIN 8"12"7"SEE PAVING DETAILS FOR PAVEMENT SECTIONS, SUBBASE, SUBGRADE AND COMPACTION REQUIREMENTS 2 #4 REINFORCING RODS AT CATCH BASINS 20 FEET IN LENGTH, CENTERED ON THE STRUCTURE 0.2 2"2" 1 3 6"6"13-1/2"1/2" R 3" R 1/2" R 1 3 * WHEN SURFACE DRAINAGE IS AWAY FROM CURB MODIFIED B612 CONCRETE CURB (ALONG SIDEWALK)* 6"6"13-1/2"1/2" R 3" R 1/2" R 6" MIN 8"12"7"1" 0.2 2"2" 2 #4 REINFORCING RODS SEE PAVING DETAILS FOR PAVEMENT SECTIONS, SUBBASE, SUBGRADE AND COMPACTION REQUIREMENTS 04 B612 CONCRETE CURB & GUTTER SLOPE 1/4" PER FOOT B618 CURB TO BE USED AT RADIUS 7"3/4"R68"2"2" 2"R28"R12"2 - #4 REINFORCING RODS AT CATCH BASINS 20 FEET IN LENGTH, CENTERED ON THE STRUCTURE 10-1/2"6-1/2"4"17-1/2" 28" 10-1/2"6" MIN A MINIMUM OF 4" OF CLASS 5 SHALL BE PLACED BELOW THE CURB N.T.S. 02 MOUNTABLE CONCRETE CURB & GUTTER BITUMINOUS 6' MI N BASE COURSE WEAR COURSE N.T.S. CURB TRANSITION 105 6' MI N BITUMINOUS BASE COURSE WEAR COURSE N.T.S. CURB TRANSITION 206 N.T.S. 8"12"7-1/2"1/2" R 1/2" R 7"TIP OUT SLOPE 1/4" PER FT. CLASS 5 BASE SUBGRADE 03 B612 FLAT CURB & GUTTER N.T.S. 32' 15' 53' 11.2'± BUILDING WALLWB-67 32' 15' 48' CONCRETE LANDING PAD 11.2'± WB-62 BUILDING WALL CONCRETE LANDING PAD WB-62 - Interstate Semi-Trailer WB-67 - Interstate Semi-Trailer 11.2'36.8' 11.2'41.8' 15' 32' 53' AND 48' DRY TRAILERS ±4.8' ±5.2 DOLLY PAD - WB-62 & 6707 54 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 3:05:06 PML:\PROJECTS\52152\CAD\SHEETS\52152-C9.01-DTLS.DWG:C9.02 DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE DETAILS C9.02 FLOWAS NEEDED48" 27"1'-4"4'7"SECTION A-A SECTION B-B B B A A STEPS 16" O.C. ON DOWNSTREAM SIDE NOTES: 1.WHERE WATER MAY STAND, TOP OF MANHOLE SHALL BE 2 FEET ABOVE GROUND, AND/OR 2 FEET ABOVE THE 100 YEAR STORM WATER ELEVATION. 2.ON MANHOLES 8' DEEP AND GREATER, A ONE FOOT FOUR INCH (1'-4") PRECAST SECTION SHALL BE PLACED IMMEDIATELY BELOW THE CONE SECTION. 3.ALL JOINTS BETWEEN SECTIONS SHALL HAVE "O" RING RUBBER GASKETS. 4.MINIMUM SLAB THICKNESS, 6" FOR 14' DEPTH. INCREASE THICKNESS 1" FOR EACH 4' OF DEPTH GREATER THAN 14' AND REINFORCE WITH 6"X6" 10/10 MESH. MANHOLE CASTING AND COVER, NEENAH R-1642-B, ESS BROS. 309, OR APPROVED EQUAL WITH MACHINED BEARING SURFACES AND TWO (2) CONCEALED PICK HOLES. 20" TO SPRING LINE (MAX.) GASKETED FLEXIBLE WATERTIGHT CONNECTION (TYP) FULL BED OF MORTAR BETWEEN RINGS, CASTING AND ON OUTSIDE OF RINGS. 2" ADJUSTING RINGS AS REQUIRED (MIN. 2, MAX. 4) ADJUST CASTING TO 1/2" BELOW FINISHED BITUMINOUS GRADE. SLOPE 2"/FOOT N.T.S. 01 STANDARD SANITARY SEWER MANHOLE 4' DIA. M.H.-9" IN FROM BACK OF CURB 6' DIA. M.H.-3" BEHIND BACK OF CURB 8' DIA. M.H.-15" BEHIND BACK OF CURB DIMENSION FROM BACK OF CURB TO CENTER OF PIPE. FOR A 24" GRATE OPENING. 24"X 36" SLAB OPENING PROVIDE 27" DIAMETER OPENING IF ROUND CASTING TO BE PROVIDED. SEE STORM SEWER STRUCTURE SCHEDULE FOR DIMENSIONS FROM BACK OF CURB TO CENTER OF STRUCTURE. NOTE: SEE STORM SEWER STRUCTURE SCHEDULE FOR CASTING TYPE. ALL JOINTS IN MANHOLE TO HAVE "O" RING RUBBER GASKETS. MANHOLE STEPS NEENAH R1981J OR EQUAL, 16" O.C.- ALUMINUM STEPS APPROVED. DOGHOUSES SHALL BE GROUTED ON BOTH THE OUTSIDE AND THE INSIDE. GASKETED, FLEXIBLE, WATERTIGHT CONNECTION AT ALL PIPE CONNECTIONS UNLESS GROUTED CONNECTION IS APPROVED BY THE ENGINEER FULL BED OF MORTAR BETWEEN RINGS, AND A 6" COLLAR ON THE OUTSIDE OF THE RINGS MINIMUM OF 2, MAXIMUM OF 4 CONCRETE ADJUSTING RINGS PRECAST REINFORCED CONCRETE SLAB THICKNESS:6" FOR 42" TO 48" DIA. 8" FOR 54" TO 102" DIA. 12" FOR 108" TO 120" DIA. PRECAST CONCRETE MANHOLE SECTIONS GROUT BOTTOM MINIMUM SLAB THICKNESS 6" FOR 14' DEPTH. INCREASE THICKNESS 1" FOR EACH 4' OF DEPTH GREATER THAN 14' AND REINFORCE WITH 6"x6", 10/10 MESH PIPE DI A M E TE RVARIABLE 6"6" VARIABLE 5"1'-4"9" N.T.S. 03 CATCH BASIN MANHOLE USE T-SECTION MANHOLE WHERE POSSIBLE (MNDOT DESIGN J) WITH OFFSET CONE CONNECTION OR PRECAST SLAB. BASE: PRECAST CONCRETE FLOW STEPS 16" O.C. ON DOWNSTREAM SIDE SLOPE 2"/FOOT GASKETED, FLEXIBLE, WATERTIGHT CONNECTION AT ALL PIPE CONNECTIONS UNLESS GROUTED CONNECTION IS APPROVED BY THE ENGINEER "O" RING GASKETS BETWEEN EACH JOINT IN MANHOLE SECTIONS NOTES: 1.MANHOLES 8' DEEP OR GREATER, THE PRECAST SECTION IMMEDIATELY BELOW THE CONE SECTION, SHALL BE 1'-4" (16") IN HEIGHT 2.PROVIDE STEPS IN ALL MANHOLES OVER 4.5 FEET IN DEPTH FULL BED OF MORTAR BETWEEN RINGS, CASTING AND ON OUTSIDE OF RINGS 2" ADJUSTING RINGS AS REQUIRED (MIN 2, MAX 4) ADJUST CASTING TO 1/2" BELOW FINISHED BITUMINOUS GRADE MANHOLE FRAME AND COVER, NEENAH R-1642-B WITH MACHINED BEARING SURFACES WITH 2 CONCEALED PICK HOLES OR APPROVED EQUAL 27" *AS NEEDEDAS NEEDED1'-4"4'7"N.T.S. 02 STORM SEWER MANHOLE 1' 12" GRANULAR MATERIAL AS SPECIFIED BY SOILS ENGINEER. NOTES: 1. TIP CURB TO FACILITATE DRAINAGE 2. PAVEMENT SECTION SAME AS TYPICAL STREET 3. PROPOSED CENTERLINE SHOWN ON PROFILE SHEET IS 0.5' BELOW ACTUAL FINISH GRADE 4" POLYETHYLENE PERFORATED UNDERDRAIN WRAPPED WITH GEOTEXTILE MNDOT SPEC. 3773, TYPE 1.INSTALL AT EACH CATCH BASIN LOW POINT. EXTEND TILE 25 FEET EACH WAY FROM CATCH BASIN. CONTRACTOR TO INSTALL 4" UNDERDRAIN PIPE INTO STORM SEWER MANHOLE STRUCTURE AND GROUT OPENING AS REQUIRED. BITUMINOUS AND AGGREGATE BASE SECTION N.T.S. 04 DRAINTILE BEHIND CURB & GUTTER 55 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 3:05:06 PML:\PROJECTS\52152\CAD\SHEETS\52152-C9.01-DTLS.DWG:C9.03 DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE DETAILS C9.03 A A 4" P.C. CONCRETE* *THE THICKNESS SHALL BE INCREASED TO A MINIMUM DEPTH OF __ INCHES AT DRIVEWAY CROSSINGS. GENERAL NOTES FOR CONCRETE CONSTRUCTION: 1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR CONSTRUCTION". 2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER. SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100 FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE PERPENDICULAR TO THE LINE OF TRAFFIC. 3.SEE ARCHITECT PLANS FOR SIDEWALK ADJACENT TO BUILDING. 4.ALL THICKNESSES, AS SPECIFIED, ARE TO BE CONSIDERED MINIMUM DEPTHS AFTER COMPACTION. 5.FOR PREPARATION OF PAVEMENT SUBGRADE, ANY SILT OR CLAY WITHIN THE UPPER 3 FEET OF FINISHED SUBGRADE ELEVATION SHALL BE REMOVED AND REPLACED WITH COMPACTED, CLEAN SANDS. EXISTING SUBGRADE SURFACE SHALL BE COMPACTED TO AT LEAST 100% OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698). 6.AGGREGATE BASE SHALL CONFORM TO MNDOT SPECIFICATION 3138 FOR CLASS 5 AGGREGATE BASE AND SHALL BE COMPACTED TO AT LEAST 100% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). 7.THE PORTLAND CEMENT CONCRETE PAVEMENT MIXTURE SHALL BE IN ACCORDANCE WITH AIR-ENTRAINED CONCRETE FOR PAVEMENT, SECTION 2301 OF THE MNDOT "STANDARD SPECIFICATIONS FOR CONSTRUCTION", LATEST EDITION. THE MIXTURE SHALL BE DESIGNED TO DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3900 PSI AT 28 DAYS WITH A 4 INCH MAXIMUM SLUMP FOR HAND PLACED CONCRETE AND A 2" MAXIMUM SLUMP FOR MACHINE PLACED (SLIPFORM) CONCRETE AND 5 TO 7% ENTRAINED AIR. THE MAXIMUM WATER CEMENT RATIO SHALL NOT EXCEED 0.45 FOR CONCRETE EXPOSED TO DEICERS. SECTION A-A 4" CLASS 5 4" PORTLAND CEMENT CONCRETE 5'-0" MIN WIDTH 2.00% MAX. N.T.S. SUBGRADE TO BE APPROVED BY SOILS ENGINEER 03 CONCRETE SIDEWALK STANDARD STALL ADA STALL ACCESS ISLE ADA STALL STANDARD STALL 6" TRANSITION PAVEMENT TO FLUSH WITH SIDEWALK INTEGRAL SIDEWALK CURB SEE DETAIL ACCESSIBLE PARKING SIGN WITH BOLLARD SEE DETAIL 2' STRIPING - 4" TRAFFIC WHITE INTEGRAL SIDEWALK CURB SEE DETAIL INTEGRAL SIDEWALK CURB SEE DETAIL 1.5% (2% MAX.) PLAN VIEW OF ADA PARKING SECTION B-B B B AA N.T.S. NO PARKING ACCESSIBLE STALL MARKING SEE DETAIL 8' MAX NO PARKING SIGN (BOLLARD OR BREAKAWAY POST) STANDARD STALL ADA STALL ACCESS ISLE ADA STALL STANDARD STALL 6"INTEGRAL SIDEWALK CURB SEE DETAIL TRANSITION PAVEMENT TO FLUSH WITH SIDEWALK SECTION A-A (TYPE 2) SECTION A-A (TYPE 1) 01 ADA PARKING 3.5'3'1.5'27"1' VEHICLE ID REQUIRED PARKING FOR VIOLATION UP TO $200 FINE 5.0' MIN. 5.5' MAX.3500 P.S.I. P.C. CONCRETE BASE STEEL U-CHANNEL POST STANDARD MNDOT SIGN NO. R7-8B 12" ACCESSIBLE VAN PROVIDE VAN ACCESSIBLE SIGN AT RIGHT HAND DISCHARGE PARKING SPACES GROUND SURFACE SLOPE TOP OF CONCRETE N.T.S. STANDARD MNDOT SIGN NO. R7-8M (WHEN R7-8B PROVIDED)5.0' MIN. 5.5' MAX.(WHEN R7-8B NOT PROVIDED)NO PARKING ACCESS AISLE PROVIDE NO PARKING, ACCESS AISLE SIGN CENTERED AT HEAD OF ACCESSIBLE ACCESS AISLE BREAKAWAY ACCESSIBLE PARKING SIGN02 WHITE LEGEND RED BACKGROUND R1-1 N.T.S. 36" x 36" "STOP" SIGN 36"36"N.T.S. STOP SIGN04 56 NO DATE BY CKD APPR SHEET OF Date License # Print Name: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DRAWN BY DESIGNED BY CHECKED BY PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 3:05:06 PML:\PROJECTS\52152\CAD\SHEETS\52152-C9.01-DTLS.DWG:C9.04 DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 JMW EJC BDB BRADY D. BUSSELMAN 44579 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE DETAILS C9.04 N.T.S. PLANT MATERIAL TOLERANT OF INUNDATION AND DROUGHT. NATIVE PLANTS RECOMMENDED. (SEE LANDSCAPE PLAN)MEDIA WIDTH-VARIES BOTTOM-VARIES 2H:1L MAX. (SEE LANDSCAPE PLAN) UNDISTURBED, UNCOMPACTED INSITU SOIL FILTRATION MEDIA MEETING MPCA BIOFILTRATION MEDIA MIX C 85-88% BY VOLUME SAND 8-12% BY VOLUME FINES 3-5% BY VOLUME ORGANIC MATTER PHOSPHOROUS INDEX FOR THE MIX SHOULD BE 10-30 MILLIGRAMS PER KILOGRAM NON-WOVEN GEOTEXTILE ASTM D-4833 (PUNCTURE STRENGTH - 125 LB.) ASTM D-1117 (MULLEN BURST STRENGTH - 400 PSI) ASTM D-4632 (TENSILE STRENGTH - 300 LB.) 0.08” THICK EQUIVALENT OPENING SIZE OF #80 SIEVE 3" LAYER OF UNDERDRAIN GRAVEL BLANKET AASHTO M-43, #57 STONEPERFORATED UNDERDRAIN OUTLET PIPE 8" DIAMETER PVC SCH 40 3/8” PERF. @ 6” ON CENTER, 4 HOLES PER ROW 1' FINISHED BASIN SURFACE SEE SECTION DETAIL THIS SHEET 3"MIN.PRIMARY OUTLET ELEVAION 2" LAYER OF PEA GRAVEL CHOKING STONE TOP SOIL CONSISTING OF 4" OF MNDOT FILTER TOPSOIL BORROW TYPE 3877-F: THE COMPONENTS CONSIST OF THE FOLLOWING BY VOLUME: (1)60-80% SAND MEETING GRADATION REQUIREMENTS OF 3126, "FINE AGGREGATE FOR PORTLAND CEMENT CONCRETE" (2)20-40% GRADE 2 COMPOST PER 3890, "COMPOST"15"1:1 SIDE SLOPE ALONG MEDIA 3" MIN27" TOTAL DEPTH, 13" OVER TOP OF AGGREGATE ENVELOPE AROUND TILE 01 FILTRATION BASIN MEDIA SECTION 57 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NOPARKINGNOPARKINGTTLOT 3 GALPIN COURTRE:953.95 IE:947.05 NE IE:946.37 SW RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 NO DATE BY CKD APPR SHEET OF Date License # Print Name: DRAWN BY DESIGNED BY CHECKED BY I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 3:06:07 PML:\PROJECTS\52152\CAD\SHEETS\52152-L0.01-TREE.DWG:L1.01 LANDSCAPE PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 ML JRW JRW JOHN R. WORKMAN 59119 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH TREE PRESERVATION PLAN L0.01 TREE PRESERVATION: SEC. 18-61(c) ONE TREE PER 1,089 SF OF REPLACEMENT AREA WITH THE REQUIRED REPLACEMENT AREA CALCULATED AT TWO TIMES THE CANOPY COVERAGE AREA THAT WAS REMOVED. LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED TREE REPLACEMENT CODE TREE INVENTORY WETLAND LIMITS TREELINE REQUIRED 64,810 SF 60 TREES CONCRETE SIDEWALK S S SANITARY SEWER LANDSCAPE EDING STORM SEWER WATERMAIN FORCEMAIN (SAN.) YARDDRAIN TREE PROTECTION FENCE LIMITS OF DISTURBANCE TREE TO BE REMOVED D S LS RIPRAP REMOVED 32,405 SF TREE REMOVALS TAG DBH SPECIES STATUS CONDITION 1354 30.5 Quercus macrocarpa Remove 1355 13 Gleditsia tricanthos Remove 1356 20.5 Quercus macrocarpa Preserve 1357 12 Quercus macrocarpa Preserve 1358 22 Quercus macrocarpa Preserve 1359 23 Quercus macrocarpa Remove 1360 19.5 Quercus macrocarpa Remove 1361 24 Quercus macrocarpa Remove 1362 20 Quercus macrocarpa Remove 1363 26 Quercus macrocarpa Remove 1364 45 Quercus rubra Remove multi-stem 1365 10 Acer rubrum Remove 1366 10 Acer rubrum Remove 1367 10 Acer rubrum Remove 1368 10 Acer rubrum Remove 1369 8 Tilia cordata Remove 1370 35 Quercus macrocarpa Remove 1371 34 Quercus macrocarpa Off-site 1372 36 Populus deltoides Off-site poor/hollow 1373 22.5 Quercus macrocarpa Off-site 1374 23 Quercus macrocarpa Off-site 1375 21 Quercus macrocarpa Off-site multi-stem 1376 25 Quercus macrocarpa Off-site 1377 26.5 Quercus macrocarpa Off-site 1378 25 Quercus macrocarpa Preserve 1379 32 Quercus macrocarpa Off-site 1380 29 Quercus macrocarpa Remove 1381 26 Quercus macrocarpa Off-site 1382 27 Quercus macrocarpa Off-site 1383 27.5 Quercus macrocarpa Off-site 1384 18 Quercus macrocarpa Preserve *SEE L1.01 FOR TREE REPLACEMENT LOCATIONS 58 PROPOSED BUILDING 33,283 S.F. FFE=964.0 NOPARKINGNOPARKINGTTGALPIN COURT1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 NO DATE BY CKD APPR SHEET OF Date License # Print Name: DRAWN BY DESIGNED BY CHECKED BY I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 9:50:06 AML:\PROJECTS\52152\CAD\SHEETS\52152-L1.01-LSCP.DWG:L1.01 LANDSCAPE PLANAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 ML JRW JRW JOHN R. WORKMAN 59119 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE SCALE IN FEET 0 6030 NORTH LANDSCAPE PLAN L1.01 CALCULATIONS TYPE C BUFFER REQUIREMENTS: 3 CANOPY TREES PER 100 LF (298 / 100 *3)= 9 6 UNDERSTORY TREES PER 100 LF(298 / 100 *6)= 18 9 SHRUBS PER 100 LF(298 / 100 *9)= 27 VEHICULAR AREAS: INTERIOR LANDSCAPE TO EQUAL AT LEAST 8% OF PARKING AREA (25,848 * .08)= 2,068 SF 1 TREE PER 250SF OF REQUIRED LANDSCAPE AREA 3,038/ 250= 9 TREE REPLACEMENTS (FROM L0.01): *PLANTS PLACE AROUND SITE DUE TO UTILITIES AND RAIN GARDEN **FEE IN LIEU OF REPLACEMENT TREES: 24 TREES x (TREE COST+INSTALLATION) LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED CHANHASSEN LANDSCAPE CODE PLANT SCHEDULE WETLAND LIMITS TREELINE PROPOSED 9* 18* 27 2,717 SF 9 36 $12,000 CONCRETE SIDEWALK S S SANITARY SEWER LANDSCAPE EDING STORM SEWER WATERMAIN FORCEMAIN (SAN.) YARDDRAIN TREE PROTECTION FENCE LIMITS OF DISTURBANCE D S LS RIPRAP REQUIRED 9 18 27 2,068 SF 9 60 SYMBOL CODE BOTANICAL / COMMON NAME CONT CAL QTY TREES AB Acer freemanii `Autumn Blaze` / Autumn Blaze Maple B & B 2.5"Cal 6 GB Ginkgo biloba `Autumn Gold` TM / Maidenhair Tree B & B 2.5"Cal 3 HL Gleditsia triacanthos `Skyline` / Skyline Honey Locust B & B 2.5"Cal 4 KC Gymnocladus dioica `Espresso` / Kentucky Coffeetree B & B 2.5"Cal 4 SO Quercus bicolor / Swamp White Oak B & B 2.5"Cal 1 BO Quercus macrocarpa / Burr Oak B & B 2.5"Cal 3 BL Tilia americana `Boulevard` / Boulevard Linden B & B 2.5"Cal 5 ORN. TREES SB Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B 2"Cal 3 DP Betula platyphylla `Fargo` TM / Dakota Pinnacle Birch B & B 2"Cal 6 JL Syringa reticulata / Japanese Tree Lilac B & B 2"Cal 1 SYMBOL CODE BOTANICAL / COMMON NAME CONT SIZE QTY SHRUBS YD Cornus alba `Bud`s Yellow` / Bud`s Yellow Dogwood 5 gal 5 CD Cornus sericea `Alleman`s Compact` / Dwarf Red Twig Dogwood 5 gal 6 DW Salix purpurea `Nana` / Dwarf Arctic Willow 5 gal 9 MK Syringa patula `Miss Kim` / Miss Kim Lilac 5 gal 6 SYMBOL CODE BOTANICAL / COMMON NAME CONT GROUND COVERS 25-131 MNDOT Seed Mix 25-131 / Low Maintenance Fescue mix Seed 33-261 MNDOT Seed Mix 33-261 / Ponds and Wet Areas Seed TUR HIG Turf Sod Highland Sod / Sod Sod PLANT SCHEDULE 59 NO DATE BY CKD APPR SHEET OF Date License # Print Name: DRAWN BY DESIGNED BY CHECKED BY I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. PROJECT NO. PRELIMINARY DESIGN REVIEW PERMIT SUBMITTAL CONSTRUCTION DOCUMENTS REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/17/2023 9:50:06 AML:\PROJECTS\52152\CAD\SHEETS\52152-L1.01-LSCP.DWG:L1.02 LANDSCAPE NOTES & DETAILSAFFINITECH, INC. GALPIN INDUSTRIAL FINAL CHANHASSEN, MN52152 11/02/2023 ML JRW JRW JOHN R. WORKMAN 59119 1 11/17/2023 EJC BB BB CITY COMMENT RESPONSE LANDSCAPE NOTES & DETAILS L1.02 GENERAL NOTES: 1.THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK. 2.THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, REGULATIONS, AND PERMITS GOVERNING THE WORK. 4.THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5.LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION. 6.THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. 7.THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK. 8.THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST. QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. 9.THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES. 10.EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING. 11.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED. 12.CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION. PLANTING NOTES: 1.NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. 2.A GRANULAR PRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION. 3.ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK," ANSI-Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. 4.OVERSTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACES. 5.ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND. 6.PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS. 7.ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS SPECIFIED. 8.THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. 9.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. 10.ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR TO INSTALLATION. 11.ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED. 12.MULCH: DOUBLE SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR TREES, UNLESS INDICATED AS ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT PRIOR TO DELIVERY ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF INSTALLATION. USE 3" FOR SHRUB BEDS, TREE RINGS, AND 3" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED. 13.BUILDING MAINTENANCE STRIP: WHERE NO LANDSCAPE PLANTING BEDS EXIST ADJACENT TO A BUILDING FOUNDATION, CONTRACTOR SHALL INSTALL A DECORATIVE ROCK MAINTENANCE STRIP PER PLAN. DECORATIVE ROCK SHALL BE 1"-3" DRESSER TRAP ROCK, GREY IN COLOR. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO COMPLETE THE WORK SHOWN ON THE PLAN. 15.USE ANTI-DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY PERIOD. 16.WRAP ALL SMOOTH-BARKED DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO DECEMBER 1 AND REMOVE WRAPPING AFTER MAY 1. TREE WRAPPING MATERIAL SHALL BE WHITE TWO-WALLED PLASTIC SHEETING APPLIED FROM TRUNK FLARE TO THE FIRST BRANCH. 17.ALL DECIDUOUS, PINE, AND LARCH PLANTINGS SHALL RECEIVE RODENT PROTECTION PER MNDOT 2571.31.2 18.PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES, CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5 AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND ROTO-TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT MAINTAINED IN THIS MANNER WILL BE REJECTED. 19.CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT EACH EXCAVATED TREE AND SHRUB PIT WILL PERCOLATE PRIOR TO INSTALLING PLANTING MEDIUM AND PLANTS. THE CONTRACTOR SHALL FILL THE BOTTOM OF SELECTED HOLES WITH SIX INCHES OF WATER AND CONFIRM THAT THIS WATER WILL PERCOLATE WITHIN A 24-HOUR PERIOD. IF THE SOIL AT A GIVEN AREA DOES NOT DRAIN PROPERLY, A PVC DRAIN OR GRAVEL SUMP SHALL BE INSTALLED OR THE PLANTING SHALL BE RELOCATED IF DIRECTED BY THE LANDSCAPE ARCHITECT. 20.ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 - NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND PLANTS. 21.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN ADVANCE OF BEGINNING PLANT INSTALLATION. 22.SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PLANT IN OFF-SEASONS ENTIRELY AT HIS/HER RISK. 22.1.POTTED PLANTS: 4/1 - 6/1; 9/21 - 11/1 22.2.DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1 22.3.EVERGREEN POTTED PLANTS: 4/1 - 6/1; 9/21-11/1 22.4.EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1 22.5.TURF/LAWN SEEDING: 4/1 - 6/1; 7/20 - 9/20 22.6.NATIVE MIX SEEDING: 4/15 - 7/20; 9/20-10/20 23.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING, REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD. 24.ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND SPECIFICATIONS. 25.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. TURF NOTES: TURF ESTABLISHMENT SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE PROVISIONS OF THE MN/DOT 2105 AND 2575 EXCEPT AS MODIFIED BELOW: 1.ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE 6" OF TOPSOIL PRIOR TO INSTALLING SOD. TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL, AND TRASH, AND SHALL BE FREE OF STONES LARGER THAN 1 1 2" INCHES IN ANY DIMENSION. 2.WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. 3.SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY. 4.TURF ON ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED BY SEEDING, MULCHING AND FERTILIZING. SEED MIXTURE NO.25-121 WILL BE PLACED AT THE RATE OF 65 POUNDS PER ACRE. 5.ALL DISTURBED AREAS TO BE TURF SEEDED, ARE TO RECEIVE 6" TOP SOIL, SEED, MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. 6.ALL DISTURBED AREAS TO RECEIVE NATIVE SEED, ARE TO RECEIVE PLANTING SOIL, SEED, MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. GENERAL TREE SPECIFICATIONS: 1.ALL STREET AND PARKING LOT TREES SHALL BE LIMBED UP TO THE FOLLOWING HEIGHTS: 1.1.2" CAL. TREES: LOWEST BRANCH 6' HT. 1.2.3" CAL.+ TREES: LOWEST BRANCH 7' HT. 2.TREE CANOPY WIDTH SHALL BE RELATIVE TO HEIGHT/CALIPER OF TREE AND TYPE OF TREE. 2.1.1" CALIPER/6-8' HT: 3-4' WIDTH MIN. 2.2.2" CALIPER/12-14' HT: 4-5' WIDTH MIN. 2.3.3" CALIPER/14-16' HT: 6-7' WIDTH MIN. 3.CANOPY TREES SHALL NOT HAVE CO-DOMINATE LEADERS IN LOWER HALF OF TREE CROWN. 4.ALL TREES SHALL HAVE SYMMETRICAL OR BALANCED BRANCHING ON ALL SIDES OF THE TREE. 5.TREES SHALL NOT BE TIPPED PRUNED. 6.TREES SHALL BE FREE OF PHYSICAL DAMAGE FROM SHIPPING AND HANDLING. DAMAGED TREES SHALL BE REJECTED. 7.SUMMER DUG TREES SHALL HAVE ROOTBALL SIZE INCREASED BY 20% 8.TREES WHICH EXCEED RECOMMENDED CALIPER TO HEIGHT RELATIONSHIP SHALL BE REJECTED. IRRIGATION NOTES: 1.IRRIGATION SYSTEM TO BE DESIGN/BUILD. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL OF SYSTEM LAYOUT PRIOR TO INSTALLATION. 2.ALL SOD TO RECEIVE SPRAY OR ROTOR IRRIGATION HEADS WITH MINIMUM DESIGN OF 1" IRRIGATION PER WEEK. 3.ALL PLANT BEDS TO RECEIVE DRIP LINE IRRIGATION , WITH A MINIMUM DESIGN OF .25" IRRIGATION PER WEEK. 4.CONTRACTOR TO INSTALL A TOTAL OF 4 QUICK COUPLERS AT THE CORNERS OF THE PROPERTY. A 2.5" TYPE K SOURCE PIPE IS PROVIDED BY MECHANICAL. LOW MAINTENANCE FESCUE NOTES: 1.DURING GROWING SEASON NEVER MOW SHORTER THAN 3.5 INCHES, PREFERRED MAINTENANCE IS MOW ONCE PER MONTH AT 5" HEIGHT 2.DO NOT USE HIGH NITROGEN FERTILIZER ON FESCUE LAWN 3.OVERSEED THIN,BARE SPOTS IN FALL 4.ALWAYS USE SHARP BLADE WHEN MOWING TO AVOID TEARING LEAF BLADE 5.SET MOWER TO 3" FOR BAGGING AND MOWING IN LATE FALL AFTER GROWING SEASON NATIVE SEED MIX NOTES: 1.ESTABLISHMENT AND YEAR ONE: MOW THREE(3) TIMES FIRST YEAR ON 30-DAY INTERVALS TO A HEIGHT BETWEEN FIVE AND EIGHT INCHES. DO NOT USE FERTILIZERS. SPOT TREAT INVASIVE WOODY PLANTS OR HAND WEED INDIVIDUAL NOXIOUS WEEDS. 2.YEAR TWO: PERFORM ONE MOWING BETWEEN MID-JUNE AND MID-AUGUST. SPOT SPRAY WEEDS AS NEEDED WHERE THEY ARE ESPECIALLY DOMINATE. 3.YEAR THREE (AND BEYOND): CUT ONE TIME PER YEAR AS A CLEAN UP PROCEDURE (EITHER IN EARLY MAY OR LATE NOVEMBER). PRESCRIBED BURNS MAY BE USED AS WELL IN PLACE OF MOWING. CHECK LOCAL REGULATIONS AND PERMIT PROCEDURES. NOTES PROVIDE & INSTALL RODENT PROTECTION 1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR GREATER X 24" HT.. STAKE IN PLACE INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM TOP OF ROOT BALL TO EXPOSE 1ST 1/2" OR LARGER MAIN ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT COVER TOP OF ROOT BALL WITH SOIL. INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH. PLACE NO MULCH IN CONTACT WITH TREE TRUNK REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOT BALL BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL EDGE CONDITION VARIES PLACE ROOT BALL ON UNDISTURBED OR COMPACTED SOIL SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND TO BIND WITH PREPARED SOIL PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85% OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698 TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT DIG PLANTING PIT 4" TO 6" DEEPER THAN ROOT BALL UNDISTURBED SUBGRADE NOTE: CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB POSITION THROUGHOUT THE WARRANTY PERIOD. IF STAKING IS REQUIRED BY SITE CONDITIONS, CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1" WEBBING AROUND TRUNK OF TREE (NO WIRE OR CABLING TO BE USED) WRAP TREE TRUNKS PER NOTES. 30" RADIUS MULCH RING A1.5 X A MIN. 1 1 TREE PLANTING DETAIL 1/4" = 1'-0" L1.02 P-01 1 INSTALL 3" LAYER OF MULCH, DO NOT PLACE IN CONTACT W/ SHRUB STEM APPLY PRE-EMERGENT HERBICIDE EDGE CONDITION VARIES EDGER, REFER TO PLAN AND SPECIFICATION LOOSEN ROOTS OF CONTAINER GROWN PLANTS EXCAVATE PLANT BED MIN. 4" DEEPER THAN ROOT BALL HT. SCARIFY SIDES AND BOTTOM OF PLANTING BED WITH SPADE UNDISTURBED SUBGRADE PREPARE SOIL FOR THE ENTIRE BED SEE PLAN12" MIN SHRUB PLANTING DETAIL 3/8" = 1'-0" 18"MINPLANTING SOIL. REFER TO SPECIFICATIONS L1.02 P-02 2 MULCH/DECORATIVE ROCK PER PLAN AND LANDSCAPE NOTES 3 16" THICK STEEL EDGER (BLACK) W/ STAKE FINISHED GRADE AND EDGE CONDITION VARIES - SEE PLAN STEEL EDGER 1 1/2" = 1'-0" L1.02 P-06 3 60 N89°31'55"E 197.92S00°28'05"E 256.45S37°18'41"W 204.74N88°58'56"E 129.12 S09°52'22"E 121.45N55° 06'44"E 230. 26Δ=23°42'54"L=24.83 R=60.00Δ= 6 0 ° 0 0 '00"R = 6 0 . 0 0L = 6 2 . 8 3Δ=33°59'10"R=210.00L=124.57GATE GATE 5 10 101 0 10 BLOCK 2 LOT 3 DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT DRAINAGE AND UTILITY EASEMENT GALPIN COURTFOUND 1/2" IRON PIPE FOUND 1/2" IRON PIPE 60 606011.0037 37 SIGN CABLE BOX DRAINAGE AND UTILITY EASEMENT 11.40 1 10.654.93RE:953.95 IE:947.05 NE IE:946.37 SW FES:945.36 RE:958.19 IE:949.35 SW NE SUMP:948.73 (FULL OF SAND) RE:957.74 IE:950.06 NE SW RE:958.38 RE:960.14 IE:948.86 N S 1369 1368 1367 1366 1365 1370 1354 1371 1372 1375 1373 1374 1376 1377 1378 1379 1380 1381 1382 1356 1357 1358 1359 1360 1361 1363 1362 1384 1383 1355 1364 NO DATE BY CKD APPR SHEET OF DRAWN BY DESIGNED BY CHECKED BY PROJECT NO.REV. COMMENT Engineering | Surveying | Planning | Environmental© 2021 Sambatek24.1S (LMS TECH) | JOHNNIE WORKMAN, PLA (MN) | 11/2/2023 4:48:09 PML:\PROJECTS\52152\CAD\SURVEY\SHEETS\52152-ALTA.DWG:22X34DATE ISSUED Affinitech Galpin Industrial ALTA 05/01/2023 Chashassen, MN52152 05/09/2023 CDJ JN SCALE IN FEET 0 6030 NORTH To Affinitech, Inc., and First American Title Insurance Company: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 6(a), 7(a), 7(b)(1), 8, 9, 11(a) and 13 of Table A thereof. The field work was completed on 05/01/202023. Dated this 9th day of May 2023, Sambatek, Inc. Mark R. Salo Minnesota License No. 43933 msalo@sambatek.com 1.This survey was prepared utilizing Title Commitment No. 2320156 by First American Title Insurance Company , bearing an effective date of 04/04/2023. 2.The bearing system is based on the Carver County coordinate system, NAD83 (1986 Adjust), with an assumed bearing of S00°13'31"E for the East line of the Southeast 1/4 of , Section 16 , Township 116, Range 23. OVERHEAD ELECTRICAL WIRE LIGHT SANITARY SEWER STORM SEWER WATERMAIN UNDERGROUND ELECTRIC GUY ANCHOR UTILITY POLE GUARD POST UNDERGROUND TELEPHONE UNDERGROUND GAS CHAIN LINK FENCE WOOD FENCE BUILDING LINE CONCRETE CURB BITUMINOUS SURFACE CONCRETE SURFACE WET LAND SIGN TRAFFIC MARKERS POND / WATER LINE FEMA FLOOD ZONE LINE SOIL BORING TREE LINE FOUND MONUMENT FOUND CAST IRON MONUMENT EASEMENT LINE SETBACK LINE RESTRICTED ACCESS FOUND RIGHT-OF-WAY MONUMENT SET MONUMENT MARKED LS 43933 SECTION LINE UNDERLYING / ADJACENT LOT TIE LINE BOUNDARY LINE DEED DISTANCE(100.00) CONIFEROUS TREE TRANSFORMER BUILDING CANOPY REGULAR PARKING STALL COUNTGAS METER COMMUNICATIONS MANHOLE ELECTRIC MANHOLE GAS MANHOLE ELECTRIC METER TELEPHONE PEDESTAL CABLE TV BOX GATE VALVE / HYDRANT SANITARY MANHOLE CLEAN OUT STORM MANHOLE STORM CATCH BASIN FLARED END SECTION SPOT ELEVATION CONTOUR RETAINING WALL BLOCK RETAINING WALL STONE RETAINING WALL RIGHT-OF-WAY LINE WIRE FENCE DECIDUOUS TREE ## VICINITY MAP LEGEND SURVEY NOTES Description from title commitment: Lot 3, Block 2, CHANHASSEN WEST BUSINESS PARK, Carver County, Minnesota. The following notes correspond to the reference numbers listed in Schedule B, Section 2 of the title commitment. 11. Utility and drainage easements as shown on the recorded plat of CHANHASSEN WEST BUSINESS PARK. According to the description in said document, easements burden and benefit the surveyed property as shown hereon. 12. Conditional Use Permit dated December 19, 1984; filed July 1, 1985 as Document No. 71933. According to the description in said document, the Conditional Use Permit benefits and burdens the surveyed property. Document is blanket in nature and is not graphically depicted hereon. 13. Conditional Use Permit dated December 19, 1984; filed July 1, 1985 as Document No. 71934. According to the description in said document, the Conditional Use Permit benefits and burdens the surveyed property. Document is blanket in nature and is not graphically depicted hereon. 14. Easement for drain tile filed in Book 61 of Deeds, Page 455. Right of Use of Drainage Easement and Drain Tile dated June 22, 1982; filed July 21, 1982 as Document No. 55715. According to the description in Document No. 55715 and the construction plans, the inlet lies in Lot 3, Block 2, ARBOR PARK FINAL ADDITION. The surveyed property may benefit from the easement depending on drainage patterns. 15. Development Contract Addendum A dated November 16, 2005; filed November 28, 2005 as Document No. A429887. Development Contract Addendum B dated August 14, 2006; filed September 13, 2006 as Document No. A449656. According to the description in said document, the surveyed property is burdened and benefited by said document. Development Contracts are blanket in nature and are not graphically depicted hereon. 16. Wetland Alteration Permit dated --; filed May 11, 2007 as Document No. A464090. According to the description in said document, the surveyed property is burdened and benefited by said document. The description of the location of the alterations is ambiguous and therefore, the surveyor is unable to ascertain the exact location. SUBJECT PROPERTY 1.The survey shows property corner monuments or witness to the corner that were found during the field work, as well as property corner monuments or witness to the corner set by the surveyor at locations where there did not appear to be any evidence of an existing monument. 2.The address of the surveyed property is shown on the graphical portion of the survey. 3.The surveyed property lies within Flood Plain Zone X – 'Areas determined to be outside the 0.2% annual chance flood plain', as depicted by scaled map location and graphic plotting according to FEMA, FIRM Map No. 27019C0227D dated 12/20/2018. 4.The gross land area of the surveyed property is 2.820 Acres or 122,832 Square Feet. 6a. The zoning information has not been provided by the client. 7a.No Buildings Observed 7b1. No Buildings Observed 8.Visible substantial features observed in the process of conducting the fieldwork are shown hereon. 9. No Parking Stalls Observed 10.Evidence of underground utilities existing on or serving the surveyed property is shown per the following: a) Plans and/or reports were not provided by the client. b) A Gopher State One Call (GSOC) request was placed on 04/25/2023 and assigned GSOC Ticket No. 231153075. Utility information shown hereon is a compilation of provided map information and those visible utilities and marked utilities which were located during the survey field work. Utility suppliers often do not respond to locate requests in the field but may provide maps, plans, and drawings in lieu of physical location. The surveyor makes no guarantees that the underground utilities shown hereon comprise all such utilities in the area, either in service or abandoned. The surveyor further does not warrant that the underground utilities shown hereon are in the exact location as indicated, although they are located as accurately as possible from the available information. The surveyor has not physically located the underground utilities. Pursuant to MS 216.D contact Gopher State One Call at (651-454-0002) prior to any excavation. 13.The names of adjoining land owners according to the current county tax records as of 05/03/2023 are shown on the survey. "TABLE A" NOTES CERTIFICATION SECTION 16, TOWNSHIP 116, RANGE 23, CARVER COUNTY, MINNESOTA N.T.S. ALTA/NSPS LAND TITLE SURVEY 1 1 SITE 18 GALPIN BLVDGALPIN CT LYMAN BLVD OBSERVED POSSIBLE ENCROACHMENTS 1.Gate and driveway crosses property line, as shown hereon. 61 Planning Commission Item December 5, 2023 Item Approve Planning Commission Meeting Minutes dated November 6, 2023 File No.Item No: D.1 Agenda Section APPROVAL OF MINUTES Prepared By Jenny Potter, Sr. Admin Support Specialist Applicant Present Zoning Land Use Acerage Density Applicable Regulations SUGGESTED ACTION "The Chanhassen Planning Commission approves its October 3, 2023 meeting minutes" SUMMARY BACKGROUND DISCUSSION RECOMMENDATION 62 ATTACHMENTS Planning Commission Minutes dated November 6, 2023 63 CHANHASSEN PLANNING COMMISSION SPECIAL MEETING MINUTES NOVEMBER 6, 2023 CALL TO ORDER: Vice Chair Alto called the special meeting to order at 6:00 p.m. MEMBERS PRESENT: Erik Johnson, Kelsey Alto, Perry Schwartz, Edward Goff, Steve Jobe MEMBERS ABSENT: Chair Eric Noyes, Ryan Soller STAFF PRESENT: Rachel Arsenault, Associate Planner; Eric Maass, Planning Director PUBLIC PRESENT: None PUBLIC HEARINGS: 1. ORDINANCE XXX UPDATING MINIMUM PARKING STANDARDS Planning Director Eric Maass summarized the staff report, noting the updates discussed at the previous meetings regarding minimum parking standards. There were updates to the efficiency unit and one-bedroom parking requirements. There were also updates to parking requirements for assisted living facilities. There were additional updates for requirements for shopping centers. Commissioner Alto asked why there was a difference between full-liquor license parking requirements to non-liquor license parking requirements. Commissioner Schwartz asked why there were no requirements for handicapped parking spots or EV charging stations. Mr. Maass stated that the number of required handicap parking spots are established by the American Disabilities Act and state building code. Staff is supportive of EV charging spaces but did not feel comfortable requiring EV spaces at this point. Commissioner Goff requested clarification on the handicap requirements. He questioned whether the handicapped spaces would be included in the required total parking standards. Mr. Maass stated this would be included in the total parking standards. He did not think this needed to be clarified in the document. Commissioner Schwartz asked if staff would direct developers to this ordinance and the federal requirements to understand compliance requirements. Mr. Maass stated they connect developers with the city building officials to ensure handicap spots are created and in the correct location. Vice Chair Alto opened the public hearing. There were no public comments. Vice Chair Alto closed the public hearing. 64 Planning Commission Minutes – November 6, 2023 2 Commissioner Jobe moved, Commissioner Johnson seconded that the Chanhassen Planning Commission recommends that the City Council adopt the proposed ordinance amending the minimum parking standards in City Code in relation to multi-family residential development, senior living development, as well as retail and shopping center development. All voted in favor and the motion carried unanimously with a vote of 5 to 0. APPROVAL OF MINUTES: 1. APPROVAL OF PLANNING COMMISSION MINUTES DATED OCTOBER 3, 2023 Commissioner Goff moved, Commissioner Jobe seconded to approve the Chanhassen Planning Commission summary minutes dated October 3, 2023 as presented. All voted in favor, and the motion carried unanimously with a vote of 5 to 0. ADMINISTRATIVE PRESENTATIONS: Planning Director Eric Maass shared the Planning Commission should plan to review the site plan for the Civic Campus Project in January and February. ADJOURNMENT: Commissioner Schwartz moved, Commissioner Jobe seconded to adjourn the special meeting. All voted in favor and the motion carried unanimously with a vote of 5 to 0. The Planning Commission special meeting was adjourned at 6:11 p.m. Submitted by Eric Maass Planning Director 65 Planning Commission Item December 5, 2023 Item Discussion On Maximum Lot Cover Percentage in Residential Single Family (RSF) District and Shoreland Overlay Zoning District. File No.Item No: F.1 Agenda Section ADMINISTRATIVE PRESENTATIONS Prepared By Laurie Hokkanen, City Manager Applicant Present Zoning Land Use Acerage Density Applicable Regulations SUGGESTED ACTION Staff will present information; no action is required. SUMMARY Over the course of 2023, the City Council has discussed the lot cover requirements in Chanhassen. At the September 24 work session, the City Council set policy direction to increase the allowed impervious lot cover to 30% in as residential areas, including lots that are zoned Residential Single Family (RSF) and within the city's shoreland overlay district. The proposed ordinance includes reasonable requirements to mitigate impacts and implement best management practices (BMPs) for the area over 25%. 66 Lots within the city's shoreland overlay district that were established prior to 1976 shall be permitted to have lot cover of 30% under the ordinance. Lots established after 1976 will be required to apply for a variance (per DNR shoreland rules). Lots within a Planned Unit Development (PUD) have lot cover requirements that are prescribed by the PUD and are not impacted by this ordinance. There are three exceptions to this because the PUD Ordinance was silent on lot cover and therefore relies on the underlying zoning. Those PUDs are: Ches Mar Farms, Lake Susan Hills, and Mission Hills. The Ordinance is scheduled for a public hearing at the Planning Commission on January 16, 2024 and will be considered by the City Council for adoption on January 22, 2024. BACKGROUND DISCUSSION RECOMMENDATION ATTACHMENTS Shoreland Overlay Lot Cover Draft Ordinance RSF Lot Cover Draft Ordinance Residential PUDs - Lot Cover Stipulations Riparian Lot Dates - Pre/Post 1976 DNR Ordinance Inception Riparian lots map with past variances shown RSF zoning with Shoreland Overlay Map 67 1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO. XXX AN ORDINANCE AMENDING CHAPTER 20 CHANHASSEN CITY CODE, THE CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA ORDAINS: Section 1. Section 20-485 of the City Code, City of Chanhassen, Minnesota, is hereby amended to read as follows with the underlined language to be added and the crossed out language to be removed: Sec 20-485 Stormwater Management: Lot coverage of lots shall not exceed 25 percent of the lot area, except as follows: a) 30 percent for lots zoned Residential Single Family (RSF) which were platted prior to January 1, 1976 with the following conditions: 1) Riparian Lots a. Riparian lots shall be required to have a shoreline vegetative buffer area proportional in width to the width of the proposed impervious surface addition between 25% and 30% and shall have a minimum depth of 20 feet from the Ordinance High Water (OWH) line. The vegetative buffer is required and may satisfy the Best Management Practice (BMP) requirement outlined below. b. The following shall be provided at the time of permit application: 1. Pre and post project lot cover calculations. 2. Water Quality Volume shall be calculated by 1.1 inch multiplied by the area in square feet of impervious area over 25%. 3. BMPs shall be designed to treat the calculated amount of Water Quality Volume created by the proposed impervious area. 4. Project plans on a scaled survey shall show the proposed impervious surface as well as the offsetting location and design of (BMPs). This could include native vegetative buffers, rain gardens, rain barrels, infiltration/biofiltration basins/swales, etc.) 5. An erosion and sediment control plan in accordance with Section 19-145 of city code. 6. Additional information such as Hydrologic and Hydraulic Modeling, plans certified by a professional engineer, etc. may be required as determined by the City Engineer when there is reasonable cause for concern of the impacts by the increased stormwater runoff. 68 2 c. Changes in stormwater runoff shall not cause adverse impacts to adjacent and downstream infrastructure. d. BMPs installed shall be privately owned and may require an Operations and Maintenance Agreement to be recorded against the property at this discretion of the City Engineer. e. Vegetative buffer areas shall be protected in an easement recorded against the property and monuments shall be installed at the easement boundary. 2) Non-Riparian Lots a) The following shall be provided at the time of permit application: 1. Pre and post project lot cover calculations. 2. Water Quality Volume shall be calculated by 1.1 inch multiplied by the area in square feet of impervious area over 25%. 3. BMPs shall be designed to treat the calculated amount of Water Quality Volume created by the proposed impervious area. 4. Project plans on a scaled survey shall show the proposed impervious surface as well as the offsetting location and design of (BMPs). This could include native vegetative buffers, rain gardens, rain barrels, infiltration/biofiltration basins/swales, etc. 5. An erosion and sediment control plan in accordance with Section 19-145 of city code. 6. Additional information such as Hydrologic and Hydraulic Modeling, plans certified by a professional engineer, etc. may be required as determined by the City Engineer when there is reasonable cause for concern of the impacts by the increased stormwater runoff. b) Changes in stormwater runoff shall not cause adverse impacts to adjacent and downstream infrastructure. c) BMPs installed shall be privately owned and may require an Operations and Maintenance Agreement to be recorded against the property. b) 35 percent for medium/high density residential zones; and c) 70 percent in industrial zones within the Lake Susan Shoreland District. Section 2. This ordinance shall be effective immediately upon its passage and publication. PASSED AND ADOPTED this ___day of _____, 2024, by the City Council of the City of Chanhassen, Minnesota 69 3 ______________________________________________________________ Kim Meuwissen, City Clerk Elise Ryan, Mayor (Published in the Chanhassen Villager on ______________________________) 70 1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO. XXX AN ORDINANCE AMENDING CHAPTER 20 CHANHASSEN CITY CODE, THE CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA ORDAINS: Section 1. Section 20-615(e) of the City Code, City of Chanhassen, Minnesota, is hereby amended to read as follows with the underlined language to be added and the crossed out language to be removed: Lot Requirements and Setbacks: The following minimum requirements shall be observed in an "RSF" District subject to additional requirements, exceptions and modifications set forth in this chapter and chapter 18: a)The minimum lot area is 15,000 square feet. For neck or flag lots, the lot area requirements shall be met after the area contained within the "neck" has been excluded from consideration. b)The minimum lot frontage is 90 feet, except that lots fronting on a cul-de-sac "bubble" shall be 90 feet in width at the building setback line. The location of this lot is conceptually illustrated below. Frontage Measured at Setback Line 71 2 c)The minimum lot depth is 125 feet. d)Lot width on neck or flag lots and lots accessed by private streets shall be 100 feet as measured at the front building setback line. The location of these lots is conceptually illustrated below. Neck/Flag Lots 1)The maximum lot coverage for all impervious surfaces is 30 percent, unless further restricted by the City’s Shoreland Management District. For flag/neck lots neither the area within the neck, nor the lot coverage of the driveway within the neck shall be included within the calculation of the lot area or lot coverage of the lot. e)The setbacks are as follows: 1)For front yards, 30 feet. 2)For rear yards, 30 feet. 3)For side yards, ten feet. f)The setbacks for lots served by private streets and/or neck lots are as follows: 1)For front yard, 30 feet. The front yard shall be the lot line nearest the public right-of-way that provides access to the parcel, unless otherwise designated in accordance with section 20-922. The rear yard lot line is to be located opposite from the front lot line with the remaining exposures treated as side lot lines. On neck lots the front yard setback shall be measured at the point nearest the front lot line where the lot achieves a 100-foot minimum width. 2)For rear yards, 30 feet. 3)For side yards, ten feet. g)The maximum height is as follows: 1)For the principal structure, three stories/35 feet. 2)For accessory structures, one story/20 feet. 72 3 Section 2. This ordinance shall be effective immediately upon its passage and publication. PASSED AND ADOPTED this ___day of _____, 2024, by the City Council of the City of Chanhassen, Minnesota ______________________________________________________________ Kim Meuwissen, City Clerk Elise Ryan, Mayor (Published in the Chanhassen Villager on ______________________________) 73 SITE # PROJECT FILE NO. DESIGN STANDARD LOT COVER LISTED DETAILS NOTES 1 Minnewashta Creek 75-1 SUB Design Standard Y 25% 2 Red Cedar Cove Townhouses 85-5 PUD Design Standard Y 25% Can be averaged throughout the entire development 3 Ches Mar Farm & Trail 84-2, 88-1, 91-1 PUD Design Standard N 4a Meadows at Longacres 92-4 PUD Design Standard Y 25% 4b Woods at Longacres 93-3 PUD Design Standard Y 25% 5 Highlands at Bluff Creek 2003-3 PUD Design Standard Y 30% 6 Arboretum Village 99-2 PUD Design Standard Y 70% commercial / 30% total site 7 Pheasant Hills 83-1 PUD Design Standard Y 30% 8 The Park 2019-01 PUD Design Standard Y 36.7% for 90 ft lots / 52% for 65 ft lots Preserved 50 acres of woods adjacent top Lake Ann 9 Walnut Grove 96-04 PUD Design Standard Y 30% 10 WillowRidge 91-3 PUD Design Standard Y 25% in Shoreland / 30% Elsewhere 11 Chaparral 78-01, 79-3 PUD Design Standard Y 30% Can be averaged throughout the entire development 12 Triple Crown Estates 85-2 PUD Design Standard Y 30% 13 Chanhassen Vista 86-1 PUD Design Standard Y 30% 14 Saratoga 1st and 2nd Additions 77-1 PUD Design Standard Y 30% Can be averaged throughout the entire development 15 Saratoga 3rd Addition 98-2 PUD Design Standard Y 65% Multi-family residential 16 Western Hills 79-6 PUD Design Standard Y 30% 17 Laredo Lane 75-2 PUD Design Standard Y 30% 18 Oak Ponds 92-3 PUD Design Standard Y 50% Multi-family residential 19 Near Mountain 79-2 PUD Design Standard Y 25% / 25% / 30% / 30% Varies based on housing types 20 Fox Hollow 84-1 PUD Design Standard Y 25% Can be averaged throughout the entire development 21 South Lotus Lake 85-4 PUD Design Standard Y 25% in Shoreland / 30% Elsewhere 22 South Lotus Villas 89-4 SPR Design Standard Y 54% High-density residential 23 Townhomes at Creekside 96-3 PUD Design Standard Y 30% Averaged from the entire development, including the public and private streets and Outlots, may not exceed 30 percent hard coverage. Individual lots will exceed the 30 percent site coverage. 24 Trotters Ridge 93-2 PUD Design Standard Y 30% 25 Lynmore Addition 98-1 PUD Design Standard Y 30% 26 Autumn Ridge Townhouses 93-5 PUD Design Standard Y 30% Averaged from the entire development, including the public and private streets and Outlots, may not exceed 30 percent hard coverage. Individual lots will exceed the 30 percent site coverage. 27 Lake Susan Hills 87-3 PUD Design Standard N Includes RSF, R-8, and R-12/16 28 Chanhassen Hills 85-6 PUD Design Standard Y 25% 29 West Park 2017-12 PUD Design Standard Y 50% RSF and Mixed Use 30 Chanhassen Gateway 2006-05 PUD Design Standard Y 50% Residential / 70% Commercial and Office 31 Hidden Valley 85-1 PUD Design Standard Y 25% in Shoreland / 30% Elsewhere 32 Mission Hills 93-4 PUD Design Standard N 33 Preserve at Rice Lake 2013-12 PUD Design Standard Y 30% 34 Southwest Village 2006-18 PUD Design Standard Y 50% / 70% Commercial and Transit Facility 35 North Bay 95-1 PUD Design Standard Y 50% The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. (Townhomes) 36 Lakeside 2006-26 PUD Design Standard Y 50% The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. (Twinhomes, townhomes, and condos) 37 Springfield 1993-06 PUD Design Standard Y 25% in Shoreland / 30% Elsewhere 38 Arbor Glen 2015-16 PUD Design Standard Y 59% Residential The entire development, including the private street and outlots, may not exceed 25 percent hard coverage. 39 Preserve at Bluff Creek 2006-14 PUD Design Standard Y 45% Residential The entire development, including the public and private streets and Outlots, may not exceed 30 percent hard coverage. Individual lots will exceed the 30 percent site coverage. 40 Liberty on Bluff Creek 2005-11 PUD Design Standard Y 30% Averaged from the entire development. 41 Camden Ridge 2013-13 PUD Design Standard Y 25% Shoreland / 35% Total The entire development, including the public and private streets and Outlots, may not exceed 35 percent hard coverage. Individual lots may exceed the 35 percent site coverage. Lots within the shoreland district may not exceed 25 percent site coverage. 42 Lake Lucy Island 2020-23 PUD Design Standard Y 25% 74 Lake Total Lots Built Before 1976 Total Lots Built After 1976 Minnewashta 103 65 Lucy 12 10 Harrison 0 8 St. Joe 0 3 Christmas 3 11 Lotus 86 54 Rice Marsh 0 11 Riley 34 24 Susan 16 4 Totals 254 190 75 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Sunset Hill on Lake Minnewashta 1930 9 9 Getsch Addition 1995 5 5 The Arbors Second Addition 3 3 Crimson Bay 1987 5 5 Cedar Crest 1962 2 2 Gauer Addition 2007 1 1 Roberta Buchheit Addition 1987 3 3 Trolls-Glen First Addition 1975 6 6 Kellynne 1979 3 3 Maple Ridge 1985 3 3 Red Cedar Point Lake Minnewashta 1913 39 39 Leach Addition 1985 1 1 Red Cedar Cove 1985 12 12 White Oak Addition 2000 2 2 Pleasant Acres 1957 5 5 Minnewasha Creek First Addition 1976 3 3 Washta Bay Court 1992 3 3 Minnewashta Landings 1994 9 9 RLS 9 1958 2 2 RLS 78 1977 2 2 RLS 29 1965 2 2 Minnewashta Heights 1953 12 12 RLS 7 1957 6 6 Boyer's Sterling Estates 1965 6 6 RLS 13 1959 2 2 RLS 10 1958 1 1 Minnewashata Manor 1947 8 8 Olivewood 1998 7 7 Piper Ridge 1986 6 6 Totals 103 65 76 Subdivision Names Plat Date Number of Riparian Lots Before 1976 After 1976 Lake Lucy Highlands 1986 3 3 Whitetail Cove 1999 3 3 Pointe Lake Lucy 1995 4 4 Greenwood Shores 1959 12 12 Totals 12 10 77 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 The Woods at Longacres 4th Addition 1997 2 2 The Woods at Longacres 6th Addition 1999 6 6 Totals 0 8 78 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Highlands on Lake St. Joe 1995 3 3 Totals 0 3 79 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Crane's Vinyard Park 1908 3 3 Christmas Acres 1980 3 3 RLS 125 2008 1 1 RLS 123 2005 1 1 Schwartz Addition 1987 2 2 Edwards Addition 1982 2 2 Cunningham Addition 1995 2 2 Totals 3 11 80 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Larson's Subdivision 1978 1 1 Harvieux Addition 2005 1 1 Pleasant View 1910 29 29 Alicia Heights 1999 2 2 Sandy Point 2000 2 2 RLS 83 1980 2 2 Reichert's Addition 1978 1 1 RLS 22 1963 2 2 RLS 18 1961 2 2 Fox Chase 1983 11 11 Big Woods on Lotus Lake 2001 3 3 Shadowmere 1987 7 7 Sunrise Ridge 1971 1 1 Sunrise Hills Second Addition 1962 2 2 Sunrise Hills First Addition 1957 5 5 Lucas Igel Addition 2001 1 1 Auditor's Subdivision #2 1939 11 11 Colony Point 1988 2 2 Hiscox Addition 1997 3 3 South Lotus Lake 2nd Addition 1987 4 4 Sunset View 1954 12 12 Kurvers Point 2nd Addition 1991 5 5 Kurvers Point 1988 7 7 RLS 109 1989 1 1 Colonial Grove at Lotus Lake 1956 19 19 No Plat /3 3 Fox Ridge Estates /1 1 Totals 86 54 81 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Hidden Valley 1985 3 3 Rice Lake Manor 1980 8 8 Totals 0 11 82 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Lake Riley Highlands Addition 1987 3 3 Lake Riley Meadows 1988 5 5 Lake Riley Woods 1987 8 8 Banimere's Heights 1958 9 9 No Plat /4 4 No Plat /6 6 Shore Acres 1951 21 21 Roger's Addition 1987 2 2 Totals 34 24 83 Subdivision Names Plat Date Number of Riperian Lots Before 1976 After 1976 Chanhassen Hills 1st Addition 1986 2 2 Apple Tree Estates 2009 2 2 No Plat /16 16 Totals 16 4 84 85 86 Planning Commission Item December 5, 2023 Item Civic Campus Project Update Item No:F.2 Agenda Section ADMINISTRATIVE PRESENTATIONS Prepared By Laurie Hokkanen, City Manager SUGGESTED ACTION SUMMARY City Manager Laurie Hokkanen will attend the Planning Commission meeting to give a brief update on the new city hall floor plan, exterior renderings, and the park amenities proposed for the new Civic Campus. BACKGROUND DISCUSSION RECOMMENDATION ATTACHMENTS Civic Campus Update 87 Civic Campus Update 88 89 90 91 92 93 94 95 96 97