CAS-26_LAKESIDE SECOND ADDITION• • 6� -ate
�rcf �►�
CITY OF
CBANBASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone:952.227.1100
Fax:952.227.1110
Building Inspections
Phone:952,227,1180
Fax: 952.227.1190
Engineering
Phone:952.227.1160
Fax:952.227.1170
Finance
Phone:952.227.1140
Fax:952.227.1110
Park & Recreation
Phone:952.227.1120
Fax:952.227.1110
July 22, 2015
Mr. Thomas D. Johnson, Vice President
Bridgewater Bank
21500 Highway 7
Greenwood, MN 55331
Re: Release of Letter of Credit #224/John Arthur Homes at Lakeside, LLC
Lakeside 2ad Addition — Planning Case 2006-26
Dear Mr. Johnson:
This letter is to notify you that the landscaping for the above -referenced project has
been completed in general conformance with the approved plans. Enclosed please
find your original Letter of Credit #224 along with all associated amendments. We
are now closing our files on this project.
Sincerely,
Recreation Center C NHASSEN
2310 Coulter Boulevard
Phone:952.227.1400
Fax:952,227.1404
Planning & Robert Generous, AICP
Natural Resources Senior Planner
Phone:952.227.1130
Fax:952.2271110 RG:ktm
Public Works Encs.
7901 Park Place
Phone:952.227.1300
Fax:952.227.1310 c: Jill Sinclair, Environmental Resource Coordinator
Senior Coulter 9; Ptan\2006 pig ca \06-26 takesideVwe d addirim\k 224 rdease Jew (10 z
Phone: 952.227.1125
Fax:952.227.1110
Webatte
www.ci.chanhassen.mn.us
SCANNED
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
BRIDGEWATER, BANK
IRREVOCABLE LETTER OF CREDIT
No. 224
Date: June 26, 2012
TO: City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, Minnesota 55317
Dear Sir or Madam:
We hereby issue, for the account of John Arthur Homes at Lakeside, LLC and in your favor, our
Irrevocable Letter of Credit in the amount of $10,400.00, available to you by your draft drawn on sight on
the undersigned bank.
Bank";
The draft must:
a) Bear the clause, 'Drawn under Letter of Credit No. 224, dated June 26, 2012, of Bridgewater
b) Be signed by the Mayor or City Manager of the City of Chanhassen.
c) Be presented for payment at 21500 Highway 7, Greenwood, MN 55331, on or before 4:00 p.m.
on June 26, 2013.
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-
five (45) days prior to the next annual renewal date (which shall be May 12th of each year), the Bank
delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this
Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the
U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows:
Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN
55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not
referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw
may be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits, International Chamber of Commerce Publication No. 600.
We hereby agree that a draft drawn under and in
honored upon presentation.
Bloomington
3800 American Blvd. West, Suite 100 MOVE 952.893.6868
Bloomington, MN 55431 Enz 952.893.6869
this Letter of Credit shall be duly
21500 Highway 7 moaE 952.653.0606
Greenwood, MN 55331 FM 952.470.3933
bridgewaterbankmn. com
BRIDGEWATER BANK
June 26, 2013
City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, MN 55317
Re: LOC #224/John Arthur Homes at Lakeside, LLC
To Whom It May Concern:
This letter hereby extends Letter of Credit #224 in the amount of $10,400.00 issued to
you in your favor for the account of John Arthur Homes at Lakeside, LLC. The above
mentioned Letter of Credit is extended to June 26, 2014. All other terms listed in the
original Letter of Credit remain unchanged.
Sincerely,
RECEIVED
JUN 17 2013
CfTY OF CHANHASSEN
Greenwood
21500 Highway 7 PHONE 952.653.0606 bndgewaterbankmn.com
Gree od, MN 55331 FAX 952.470.3933
BRIDGEWATER BANK
June 26, 2014
City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, MN 55317
Re: LOC #224/John Arthur Homes at. Lakeside, LLC
To Whom It May Concern:
This letter hereby extends Letter of Credit #224 in the amount of $10,400.00 issued to
you in your favor for the account of John Arthur Homes at Lakeside, LLC. The above
mentioned Letter of Credit is extended to June 26, 2015. All other terms listed in the
original Letter of Credit remain unchanged.
Sincerely,
MD. Johnson
President
Greenwood
21500 Hghw y7 PHONE 952.653.0606 bndgewaterbankmn.com
Greenwood, MN 55331 FAX 952.4703933
0 r777 0
■
BRIDGEWATER BANK
CITYOFCHMHASSEN
RECEIVED
SEP 212014
September 17, 2014
City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, MN 55317
Re: LOC #224/John Arthur Homes at Lakeside, LLC
To Whom It May Concern:
This letter hereby reduces Letter of Credit #224 issued to you in your favor for the
account of John Arthur Homes at Lakeside, LLC. The above mentioned Letter of Credit
is hereby reduced to $1,040.00 and the maturity date is extended to August 14, 2015. All
other terms listed in the original Letter of Credit remain unchanged.
Sincerely,
President
Greenwood
21500 Highway 7 PHONE 952.653.0606 bndgewaterbamkmn.om
Greenwood, MN 55331 FAX 952.470.3933
M
2000 A ust 2000tember 2000 T F M T W T F M T W T F S1 2 3 4 5 1 25 _8...... 1fi.. 2.. 8...y ..i0 � ii 12.3 ..q ..5...fi ... ._8..912"13 i4 15 i3, 14 "15 18 1] 1819 i0 1i 12"13 14 15'ffi9 20 21'22 20"21 22 2*3 25�A i] 18 19"20"2i Z2�26 2] 28'29 2]28 29'30"3i *" """" 24 25 2621 28 29'76................ ............................. .............................
Securities
ISlart Due S P Category Description I
8/l/2015 8/1/2015 0 Escrows ® LC k224 from Bridgewater Bank expires 6 26 2013 at 4:00 pm
(Automatically renews for successive one-year terms)
Lakeside 2nd Addition - Planning Case 2006-26
John Arthur Homes at lakeside Landscaping Security
S1,040.00 (previously S10,400.00)
Notify Bob Generous
6/6/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim
VN14-Notified Bob. Kim
6/26/14 - Per Jill site still under construction. KM
626/14 - Received LC extension letter extending LC to 6/26/15. Kim
8/l/14 - Notified Bob/Jill. Kim
8/1/14 - Per Jill, ok to reduce to 10%(S1,040.00)
9/15/14 - Sent letter to Bridgewater Bank requesting reduction to S1,040.00 (10% of S10,400.00).
Waiting for confirmation of reduction. Check status 10/15/14. Kum
922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9/17/14. Check status
8/1/15. Kim
722/15 - Per Jill Sinclair, ok to release LC #224. Letter and letter of credit returned to Bridgewater
Bank. Activity closed. Kim
Ot DewOpnRCa 7r 15 a a2u M1 5-Spu WP1bar pw1
MP�
0 Au ust2000 tember 2000
T F M T W T F S M T W T F
1 2 3 1 5
.2 .8.../..-6 .fi...7.. 8...9 ..10 i1 12 .3 ..4 _.5...6 .. 7...8...9
9 114 15 13 10 15_16 17 18 19 10 11 12 13 14 15 16
16 20 21 22 021 222324 25 N 17 18 19 20 21 22 23
2321 28.29 2728 29 80 31 232826 21................ ............................. .............................
Securities
Due S P Category Desch 'on
8/12015 8/12015 F Escrows ® LC #224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm
(Automatically renews for successive one-year terms)
Lakeside 2nd Addition - Planning Case 2006-26
John Arthur Homes at Lakeside landscaping Security
S1,040.00 (previously $10,400.00)
Notify Bob Generous
616/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim
62/14-Notified Bob. Kim
626/14 - Per Jill site still under construction. KM
626/14 - Received L.0 extension letter extending GC to 626/15. Kim
8/1/14- Notified Bob/Jill. Kim
8/1/14 - Per Jill, ok to reduce to 10%(S 1,040.00)
9/15/14 - Sent letter to Bridgewater Bank requesting reduction to $1,040.00 (10%of $10,400.00).
Waiting for confirmation of reduction. Chock status 10/15/14. Kim
922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9/17/14. Check status
8/1/15. Kim
...........................................................................................................................................................................................................................
............................................................................r.Rm...lA...ts...d...t:.ss.....VlA .....s.=..sleM........F-.v..ei.o.......................................................................................................
I
Olo6�Dmwkpnv�(yp. iily Peps
Bon
00 Au us1200 a tember 2000
T F S M T W T F M T W T F
1 1 2 3 4 5 1 2
.fi...�..0 .fi...�..e._9..10 11 ..iz 3..4..5...0..�. .8 9�13 i4�15 13� 14 �1516 �f]�WY6 i0'1i�i2'i310'65 f620 z1 22 29.2i.22_?7.24 25�A i7.18, 99 20 21 ff�2.21_ H 29 2] 2B 29 3d 31...... 2/, 25 .26..21._2B,.N M... .. ... .. ...
Securities
)Start Due S P Category Description 1
R 1 201 i R 1 1015 F Escrows 0 EC g224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm
(Automatically renews for successive one-year terms)
Lakeside 2nd Addition - Planning Case 2006-26
John Arthur Homes at lakeside Landscaping Security
$1,040.00 (previously $10,400.00)
Notify Bob Generous
6/6/13 -Notified Bob. Per Bob, extend until 6/1/14. Kim
6/2/14 - Notified Bob. Kim
6/26/14 - Per Jill site still under construction. KM
626/14 - Received 1.0 extension letter extending I.0 to 626/15. Kim
8/1/14-Notified Bob/Jill. Kim
8/l/14 - Pa JiB, ok to reduce to 10% ($1,040.00)
9/15/14 - Sent letterto Bridgewater Bank requesting reduction to S1,040.00 (10%of $10,400.00).
Waiting for confirmation of reduction. Check status 10/15/14. Kim
922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9117/14. Check status
8/1115. Kim
..............................................................................................
OIaNMVYopM edp. Y'2YN1�Y 11:16 AM i-YIMY O�1
September 15, 2014
CITY OF
C&NNSEN
Mr. Thomas D. Johnson
Vice President
7700 Market Boulevard
Bridgewater Bank
PBox
Chanhassen, MNN 55317
21500 Hi
Highway 7
Greenwood, MN 55331
Administration
Re: Reduction to Letter of Credit No. 224 for
Phone: 21100
Lakeside Second Addition Landscaping
Pin g
Planning Case #06-26
Building Inspections
Phone: 952.227.1180
Dear Mr. Johnson:
Fax: 952.227.1190
This letter is to notify you that Letter of Credit No. 224 in the amount of $10,400.00
Engineering
Phone:2271
can be reduced to $1,040.00 (10%). The landscaping for the project was inspected
Fax: 952-2222z1170
and roved
approved on August 14, 2014. The City will hold the reduced letter of credit for
one full year until August 14, 2015, at which time it can be released upon passing
Finance
final inspection.
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone:952.227.1120
Fax:952.2271110
Recreation Center
2310 Coulter Boulevard
Phone:952.227.1400
Fax:952.227.1404
Planning &
Natural Resources
Phone:952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone:952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
Please send confirmation of reduction of Letter of Credit No. 224 in the amount of
$1,040.00 to my attention at your earliest convenience. All other terms and
conditions shall remain unchanged.
If you have any questions, please contact me at 952-227-1131 or by email at
b¢enerousAci.chanhassen.mn.us.
Sincerely,
Robert Generous, AICP
Senior Planner
RG:ktm
Enclosure: Copy of original Letter of Credit No. 224.
c: Jill Sinclair, Environmental Resources Coordinator
9:191an\2006 planning cases\06-26 lakeside\vxond addil;onVc reduction letter 09-15-2014.doc
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
SCANNED
Meuwissen, Kim
From:
Sinclair, Jill
Sent:
Thursday, August 14, 2014 5:04 PM
To:
Meuwissen, Kim
Subject:
RE: lakeside 2nd
Great. The landscaping has been completed. The LOC can be reduced to 10%.
Thanks,
Jill Sinclair
Environmental Resources Specialist
City of Chanhassen
952-227-1133
From: Meuwissen, Kim
Sent: Thursday, August 14, 2014 2:23 PM
To: Sinclair, Jill
Subject: RE: lakeside 2nd
Jill,
Yes. I sent you and Bob and email on August 111. Here is the info:
LC #224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm
(Automatically renews for successive one-year terms)
Lakeside 2nd Addition - Planning Case 2006-26
John Arthur Homes at Lakeside Landscaping Security
$10,400.00
Notify Bob Generous
6/6/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim
6/2/14 - Notified Bob. Kim
6/26/14 - Per Jill site still under construction. KM
8/1/14 - Notified Bob/Jill. Kim
0 Kim MeunVissett
Sr. CommunicationslAdministrative Support Specialist
952-227-1107
km euwissenCa;ci. chanh assen. m n. us
1
'CTTY O
7700 M
PO BO)
CHANT
Ff
From:
Sent: T
To: Me
Subject
I i Kin
Do we
Jill Sin
Envira
City of
952-22
dM 2000 Au use 201 Se tember 2000
S M T W T F S S M T W T F S M T W T F
1 1 2 3 4 5 1 2
2 ..3.. 4...5..5...2...8 5..7 8...9 ..10 11 ..12 .'ti 4.. 5...8......8...4
8 10 11 12 13 14*% J8 14 1$ 16 'W 18 19 10 11 12 13 14 15 16
10 11 i8 i9 20 21 O 20 2i 22 23 24 25 26 17 18 19 20 21 22 23
24 25 26 2128 29 29 28 29 30 31......... 24 25 28 2] 28 29 36
...1...................... ............................. .............................
Securities
[tart Due S P Category Description i
6/1/2014 6/1/2014 F Escrows ® LC 4224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm
(Automatically renews for successive one-year terms)
Lakeside 2nd Addition - Planning Case 2006-26
John Arthur Homes at lakeside Landscaping Security�-"-
$10.400.00 /
Notify Bob Generous
6/6/13 -Notified Bob. Per Bob, extend until 6/1/14. Kim
Vl D.V b~ Cap. 6W01391aVW S VMm P-Prortly Pe l
• 0
CAMPBELL KNUTSON
Professional Associatio_,
Author's Direct Dial: (65I) 234-6222 RECEIVED
E-mailAddress: sndson®ek-law.com
JAN 2 2 2007
January 18, 2007 CITY OF CHANHASSEN
Thomas J. Campbell
Roger N. Knutson HAND DELIVERED
Thomas M. Scott
Elliott B. Knetsch Mr. Dennis Moore
Joel J. Jamnik Custom Home Builders Title, LLC
Andrea McDowell Poehler 10850 Old County Road 15
Matthew K. Brokl'
John F. Kelly Plymouth, Minnesota 55441
Soren M. Mattick
Henry A. Schaeffer, Ill RE: L4ATSIDESECUNDADDr77oN, Chanhassen, MN
Aline Schwartz Developer: Sienna Corporation
Craig R. McDowell
Marguerite M. McCarron Dear Dennis:
*A h. Licensed in Wisconsin
As you know, this office is legal counsel for the City of Chanhassen. The City hereby
releases to you in escrow the official final plat Mylars for LAKFSLDE SECOND ADDITION,
together with a paper reduction (1" = 200' scale) of the final plat for the County
Auditor's office. Also enclosed please find the following documents which need to be
recorded simultaneously with the plat:
• Mortgagee Consent to Plat from Eagle Crest Capital Bank dated January 8,
2007.
• Development Contract between the City of Chanhassen and Sienna
Corporation dated January 8, 2007.
The plat and the enclosed documents all appear to be in order and you may record the
same with Carver County subject to the following conditions:
I) You should not release the plat to anyone except under the conditions
specified in this letter.
2) The enclosed mortgagee consent to plat and development contract need
to be recorded simultaneously with the plat, and before any new or
additional mortgages against the subject property, if any.
1380 Corporate Center Curve 3) The 2007 taxes need to be paid in full before the plat can be filed and I
Suite 317 • Eagan, MN 55121 understand that you have been in contact with the County to get the
651-452-5000 2007 tax figure. I have enclosed for your information a copy of the plat
rax 651-452-5550 certification sheet I received from the Carver County Taxpayer
www.ck-law.com
Mr. Dennis Moore
Custom Home Builders Title, LLC
January 18, 2007
Page 2
Services Department which indicates that the estimated tax on each
underlying parcel is $15,862.00, if that helps.
Also enclosed is this firm's check in the amount of $148.00 to cover the recording fees
for the final plat Mylars, the Mortgagee Consent to Plat and the Development Contract
as outlined on the enclosed Summary of County Plat Fees sheet. As noted in plat
certification sheet, the Carver County Taxpayer Services Department informed me that
effective January 1, 2007, in addition to the recording fees required by the Carver
County Recorder's Office, the Taxpayer Services Department is requiring a plat fee of
$100.00 plus $10.00 for each lot and outlot within the plat. Therefore, I have included
a second check in the amount of $520.00 to cover those additional fees.
If the conditions for recording the plat cannot be satisfied within thirty (30) days, the
plat and all related documents should be returned to me. Once all documents have
been recorded with the County, please provide this office with the appropriate
recording information by requesting the County Recorder to complete the enclosed
blue "Filing of Documents" sheet and forward the same to me in the self-addressed
envelope provided.
If you have any questions, please call.
Regards,
CAMPBELL KNUTSON
Professional Association
B`
Sl san R. Nelson, Legal 4sistant
SRN:ms Chanhassen City Attorney's Office
Enclosures
cc: Alyson Fauske, Asst. City Engineer (letter only)
Bob Generous, Senior Planner (letter only)
Maggie Pierce, Sienna Corporation (letter only)
Agreed to and accepted this day of January, 2007.
CUSTOM HOME BUILDERS TTILE, LLC
M
Dennis Moore
o�- zs,
January 10, 2007
CITY OF
W. John Vogelbacher
CgANHASSEN
Sienna Corporation
4940 Viking Drive, #608
7700Market Boulevard
Minneapolis, MN 55435
PC Box 147
Chanhassen, MN 55317
Re: Lakeside Second Addition— Planning Case #06-26
Administration
Phone:952227.1100
Dear Mr. Vogelbacher:
Fax: 952.227.1110
Building Inspections
This letter is to notify you that on January 8, 2007, the Chanhassen City Council
Phone:952.227.1180
approved the following:
Fax: 952.227.1190
Engineering
Final Plat for Lakeside Second Addition creating 39 lots and 3 outlots (plans
Phone:952.227.1160
prepared by Pioneer Engineering, date stamped "Received 12-14-W'), subject to the
Fax:952.227,1170
following conditions:
Finance
Phone:952.227.1140
1. The applicant shall supply details about the water feature between the rear
Fax:952.227.1110
yards of the units in Block 3, specifically the source for the water in the water
Park & Recreation
feature. As an alternative to the current proposal, the applicant should
Phone:952.227.1120
consider revising the plans to utilize storm water as an amenity as part of a
Fax:952.227.1110
rain garden system in this area.
Recreation Center
2Pho Coulter e:952.2 7.1400
Phone:952.227.14W
2. Wimco- or other comparable inlet controls shall be used and installed
h'Pe P
Fax:952.227.1404
within 24 hours of installation of the inlets. Perimeter controls and inlet
protection shall be in place and maintained as needed until 70% of the
Planning &
Natural Resources
vegetation is established.
Phone: 952.227.1130
Fax:952.227.1110
3. Typical building lot controls shall be shown on the plan in a typical detail.
Public works
These controls shall include perimeter controls (silt fence), rock driveways,
1591 Park Road
street sweeping, inlet control and temporary mulch after final grade and prior
Phone:952.227.1300
to issuing the Certificate of Occupancy (CO).
Fax: 952227.1310
Senior Center 4. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as
Phone:952.227.1125 specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be
Fax 952.227.11to used for the remainder of the site. The grading plan shall be revised to show
Web She the proposed silt fence following the grading limits for the site and shall be
www.ci.chanhaw.mn.us located outside of the required 16.5-foot wetland buffer. Silt fence shall be
placed at the proposed high water level elevation of the proposed storm water
pond.
5. Street gutters and catch basins are considered "surface waters" and shall be
protected from exposed soils with a positive slope within 200 linear feet.
Following installation of curb and gutter, silt fence shall be installed curbside
along all positive slopes to the street with exposed soils.
SCANNED
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A lest place to live, work, and play.
0
Mr. John Vogelbacher
Lakeside Second Addition — Planning Case 06-26
January 10, 2007
Page 2
6. All perimeter controls shall be inspected by the city and the SWCD prior to grading.
7. Details for concrete washout areas where drivers will wash out their trucks and how the
water will be treated should be developed and included in the SWPPP.
8. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
9. The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22,
Block 2; and Outlots A and B) is $39,458.50.
10. Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and/or at the edge of proposed grading limits.
11. A walk-through inspection of the silt/tree preservation fence shall be required prior to
construction.
12. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
13. The applicant shall increase landscape plantings along the east property line to minimum
bufferyard requirements.
14. No trees shall be removed behind the northwestern comer of the silt fence as shown on
grading plans dated 05/19/06.
15. A total of 139 trees shall be planted in the development as required for canopy coverage.
16. Building permits are required for all retaining walls four feet tall or higher and must be
designed by a Structural Engineer registered in the State of Minnesota.
17. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and
maintained.
18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk
hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance. All of these charges are based on the number of SAC units assigned by the
Met Council and are due at the time of building permit issuance_
19. The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for
the second phase of the development prior to final plat recording_
20. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated
as follows: 3.76 developable acres x $2,400/acre = $9,024.
Mr. John Vogelbacher
Lakeside Second Addition — Planning Case 06-26
January 10, 2007
Page 3
21. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18,
Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside
Second Addition.
Administrative fees and financial security, a copy of the title commitment or deed for the
property, two 1" = 200' scale mylar reductions of the final plat and one 1" = 200' scale mylar
reduction of the final plat with just street names and lot and block numbers shall be submitted.
In addition, a digital copy of the final plat in Axf and .tif formats (.pdf compatible) in Carver
County coordinates shall be submitted.
If you have any questions or need additional information, please contact me at (952) 227-1131 or
bgenerous@ci.chanhassen.mn.us
Sinc
Robert Generous, AICP
Senior Planner
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistance City Engineer
Jerry Mohn, Building Official
g:\plan\2006 planning cases\06-26 lakeside\c and addition\approval leaer.doc
�City Council Meeting - Jan6ary 8, 2007 0 6c.,�v -a (o
Councilman Peterson moved, Councilwoman Ernst seconded to appoint Councilwoman
Tjornhom as Acting Mayor. All voted in favor and the motion carried unanimously with a
vote of 5 to 0.
CONSENT AGENDA: Councilman Peterson moved, Councilwoman Tjornhom seconded
to approve the following consent agenda items pursuant to the City Manager's
recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated December 11, 2006
-City Council Verbatim and Summary Minutes dated December 11, 2006
Receive Commission Minutes:
-Planning Commission Verbatim and Summary Minutes dated December 5, 2006
-Park and Recreation Commission Verbatim and Summary Minutes dated December 12,
2006
b. Accept $1,050 Donation from Klein Bank for the Senior Life -Long Leaming Project.
C. Resolution #2007-01: Koehnen Area/Yosemite Area Street Reconstruction Project 07-
01: Approve Plans & Specifications; Authorize Ad for Bids.
d. Resolution #2007-02: 2007 Rehabilitation Project 07-02: Accept Feasibility Study;
Call Public Hearing.
e. Resolution #2007-03: 2007 Sealcoating Project 07-04: Authorize Preparation of Plans
& Specifications.
Lakeside 2°d Addition:
1) Approval Final Plat.
2) Approve Development Contract
g. Approve Consultant Contract for Comprehensive Plan Update, Land Use Element.
h. Accept Donation from Minnesota Valley Electric Co-op for Veteran's Monument.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
VISITOR PRESENTATIONS: None.
PUBLIC HEARING: MUSA EXPANSION PROJECT 06-05: HOLD ASSESSMENT
HEARING.
Paul Oehme: Thank you Mayor, City Council members. Tonight staff is requesting that the
council hold an assessment hearing and consider adoption of assessment roll for the Bluff Creek
Boulevard Improvement Project. This project completes the city's initiated trunk improvements
4 SCANNED
0
CITY OF
CAAN9A3SEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phore:952.227.1180
Fax:952.227.1190
Engineering
Phone. 952.227.1160
Fax. 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning A
Natural Resources
Phone,: 952,227.1130
Fax: 952.227.1110
Public Wola
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner
DATE: January 8, 2007 Q
SUBJ: Final Plat Approval for Lakeside Second Addition
Planning Case No. 06-26
PROPOSAL SUMMARY
The applicant is requesting final plat approval for the second phase of Lakeside
consisting of 41 lots and one outlot. Seven of the lots are for Wooddale Builders,
32 of the lots are for Charles Cudd Company, 2 lots would be common open
space and Outlot A is for future platting for building sites.
The subdivision improvements for the project are being undertaken as part of the
first addition. No additional subdivision improvements are proposed with this
phase of the development.
The subdivision complies with the Planned Unit Development - Residential (PUD-
R) regulations for Lakeside. Staff is recommending approval of the final plat for
Lakeside Second Addition.
BACKGROUND
On October 23, 2006, the Chanhassen City Council approved the final plat for
Lakeside consisting of 18 lots, 10 outlots and right-of-way for public streets. The
first phase of the development consisted of the community building and storm
water pond, 11 lots for townhouses on the west side of the development
(Wooddale Builders, Inc.), 4 lots for twin homes on the east side of the
development (Charles Cudd Company), Outlot A which will contain the private
street and utilities for the project and Outlots I and J, the recreational beachlot
site.
Senior Canter
Phone: 952 227.1125
On July 24, 2006, the Chanhassen City Council approved the following:
Fax: 952.2271110
Web Site
A. Rezoning of the property located within the Lakeside development. from
www.ci.chanhassen.mn.us
High Density Residential District (R12) to Planned Unit Development -
Residential (PUD-R)
B. Preliminary Plat for Lakeside.
C. Site Plan for 231 housing units and a community building with pool, with a
Variance for building height for the condominium units consistent with the
Building elevations prepared by Harriss Architects.
The City of Chanhassen . 4 growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gieal place to live, work, and play.
Todd Gerhardt •
Lakeside Second Addition Final Plat
January 8, 2007
Page 2
D. Conditional Use Permit for a recreational beach lot with a Variance from the requirement
that 80 percent of the units be within 1,000 feet of the recreational beach lot.
FINAL PLAT REVIEW
The developer is performing all the site improvements as part of the original plat. Grading,
streets and utility construction for Lakeside Second Addition is under the first addition
construction contract; therefore, no security is required for site improvements.
COMPLIANCE
There are no minimum lot dimensions or lot areas established for the Lakeside Planned Unit
Development. The overall project is limited to 231 dwelling units consisting of twin homes,
townhouses, and three condominium buildings and their ancillary uses.
Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The following
table displays those setbacks.
Setback Standards
Highway 212
50 feet
East(Perimeter) Lot Line
50 feet -townhouses/twin homes;
Building Height — Condominiums
with a minimum of 30 feet
Lyman Boulevard
50 feet/30 feet for beach lot
West(Perimeter) Lot Line
50 feet
Twin Home separation between buildings
15 feet
Townhouse separation between buildings
20 feet
Minimum Driveway length (to back of curb,
trail or sidewalk)
25 feet
Hard Surface Coverage
50 %
Wetland: Buffer and buffer setback
16.5 feet and 40 feet
Lake Riley
75 feet
# Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard.
* The entire development, including the public and private streets and Outlots, may not exceed
50 percent hard coverage. Individual lots will exceed the 50 percent site coverage.
LOT INFORMATION TABLE
Parcel
Area (sq. ft.)
I Frontage (ft.)
I Depth (ft.)
Notes
LI B1
4,465
43
104
Twin home unit
L2 B 1
4,465
143
1104
Town house unit
L3 B 1
4,465
138
1 104
Town house unit
L4 B2
j 4,139
43
96
Twin home unit
L5 B2
4,139
43
96
Twin home unit
L6 B2
4,142
43
96
Twin home unit
L7 B2
4,142
43
96
Twin home unit
L8 B2
4,142
43
96
Twin home unit
L9 B2
4,142
43
96
Twin home unit
L10 B2
4,142
43
96
Twin home unit
L11 B2
4,142
43
96
Twin home unit
L12 B2
4,142
43
96
Twin home unit
L13 B2
4,142
43
96
Twin home unit
L14 B2
4,120
43
96
Twin home unit
L15 B2
4,092
43
93
Twin home unit
L16 B2
4,042
47
86
Town house unit
L17 B2
3,612
42
86
Town house unit
L18 B2
14,042
47
86
Town house unit
L19 B2
14,042
47
86
Town house unit
L20 B2
3,612
42
86
Town house unit
L21 B2
3,612
42
86
Town house unit
L22 B2
4,042
47
86
Town house unit
L23 B2
78,075
NA
NA
Common area, Designate as
Outlot B
Outlot A
50,634
NA
NA
Future development.
Designate as Outlot C
TOTAL
334,062
7.669acres
Todd Gerhardt 0 •
Lakeside Second Addition Final Plat
January 8, 2007
Page 4
REVIEW CONDITIONS OF APPROVAL
The developer must submit a list of proposed street name(s) and an addressing plan to
Chanhassen Building Official and Chanhassen Fire Marshal for review and approval prior to
final plat of the property.
*This condition has been met: Riley Lake Drive (main road) and Riley Lake Trail (east -west
street).
2. Each lot must be provided with separate sewer and water services.
*This condition has been met.
3. Additional fire hydrants will be required. Please contact the Chanhassen Fire Marshal for
exact location of additional hydrants and any to be relocated.
*This condition has been met.
4. A minimum buffer of 16.5 to 20 feet shall be preserved around the perimeter of the wetland.
All structures (including parking lots) shall maintain a 40-foot setback from the wetland
buffer. All trails and retaining walls shall be modified to remain outside the wetland buffer.
The plans shall be revised to reflect the required wetland buffer and wetland buffer setback.
Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's
wetland ordinance. The applicant shall install wetland buffer edge signs before construction
begins and shall pay the City $20 per sign.
*This condition does not apply to this phase.
5. The plans shall be revised to depict the OHW of Lake Riley, which is 865.3. All structures
shall be located a minimum of 75 feet from the OHW. The proposed fire pit shall be located
a minimum of 75 feet from the OHW and shall be buffered from the lake by vegetation. No
grading or intensive clearing of vegetation shall occur within the shore impact zone (all areas
within 37.5 feet of the OHW).
*This condition does not apply to this phase.
6. A conditional use permit (CUP) shall be obtained from the City prior to the operation of a
recreational beach lot.
*This condition has been met.
7. All existing amenities and/or structures (including any docks, existing beach that is not
proposed to remain and the boat launch) on Outlot B, North Bay shall be removed. A boat
launch is not permitted.
*This condition does not apply to this phase.
Todd Gerhardt •
0
Lakeside Second Addition Final Plat
January 8, 2007
Page 5
8. The location of the building on Lot 1, Block 1 shall be adjusted to respect all drainage and
utility easements.
*This condition has been met.
9. The applicant shall supply details about the water feature between the rear yards of the units
in Block 3, specifically the source for the water in the water feature. As an alternative to the
current proposal, the applicant should consider revising the plans to utilize storm water as an
amenity as part of a rain garden system in this area.
*This condition still applies.
10. The applicant shall provide additional information detailing the proposed emergency
overflow (EOF) route from Pond 1 to Lake Riley.
*This condition has been met.
11. The grading and landscaping proposed around Pond I shall be revised to provide a flat, open
area so maintenance equipment can access the flared end sections from Lake Riley Road East
without damaging the retaining wall or the landscaping and without being below the NWL of
the pond.
*This condition has been met.
12. All storm water infrastructure, including catch basins, storm sewer pipes, manholes, flared -
end sections, outlet structures, ponds and swales, shall be owned, operated and maintained by
the developer and, eventually, the homeowners association. Prior to final plat recording, the
developer shall enter into an agreement with the City that outlines the parameters of
operation, inspection and maintenance of the storm water infrastructure. This agreement
shall be transferred to the homeowners association prior to the developer relinquishing
responsibility for the development.
*This condition does not apply. The City is requiring these improvements as a public project
and will be responsible for maintenance once the public improvements have been accepted
by City Council.
13. The SWPPP shall be provided to the City for review by the Carver Soil and Water
Conservation District.
*This condition has been met.
14. The plans shall be revised to show that erosion control blanket will be installed over all areas
with 3:1 slopes or steeper.
*This condition has been met.
Todd Gerhardt 0 0
Lakeside Second Addition Final Plat
January 8, 2007
Page 6
15. A stable emergency overflow (EOF) for the pond shall be provided. The EOF could consist
of riprap and geotextile fabric or a turf re -enforcement mat (a permanent erosion control
blanket). A typical detail shall be included in the plan.
*This condition has been met.
16. Energy dissipation shall be provided for all inlets and outlets within 24 hours of installation
*This condition does not apply to this phase.
17. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of
installation of the inlets. Perimeter controls and inlet protection shall be in place and
maintained as needed until 70% of the vegetation is established.
*This condition still applies.
18. Typical building lot controls shall be shown on the plan in a typical detail. These controls
shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control
and temporary mulch after final grade and prior to issuing the Certificate of Occupancy
(CO).
*This condition still applies.
19. The proposed storm water pond shall be used as a temporary sediment basin during mass
grading. The pond shall be excavated prior to disturbing up -gradient areas. Plans shall show
how the temporary basin will be constructed and how water will be diverted to the temporary
basin. Berms and/or ditches may be needed to divert water to the pond, and temporary pond
outlets are needed. The outlet could be a temporary perforated standpipe and rock cone. The
plans shall be revised to include a detail for the temporary pond outlet.
*This condition has been met.
20. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as specified in
Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of
the site. The grading plan shall be revised to show the proposed silt fence following the
grading limits for the site and shall be located outside of the required 16.5-foot wetland
buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed
storm water pond.
*This condition still applies.
21. Street gutters and catch basins are considered "surface waters" and shall be protected from
exposed soils with a positive slope within 200 linear feet. Following installation of curb and
gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed
soils.
Todd Gerhardt • 0
Lakeside Second Addition Final Plat
January 8, 2007
Page 7
*This condition still applies.
22. Plans shall be revised to show erosion and sediment control measures for the road ditch along
Lyman Boulevard. All perimeter controls shall be inspected by the city and the SWCD prior
to grading.
*This condition has been partially met and shall be modified as follows: All perimeter
controls shall be inspected by the city and the SWCD prior to grading.
23. Details for concrete washout areas where drivers will wash out their trucks and how the
water will be treated should be developed and included in the SWPPP.
*This condition still applies.
24. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
*This condition still applies.
25. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat
recording, is $195,293.
*This condition shall be modified as follows: The SWMP fee for Lakeside Second Addition
(including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50.
26. The owner/operator of the proposed development shall apply for and obtain permits from the
appropriate regulatory agencies (e.g., Riley -Purgatory -Bluff Creek Watershed District,
Minnesota Pollution Control Agency (NPDES Phase II Construction Site Permit), Minnesota
Department of Natural Resources (for dewatering), Minnesota Department of Transportation,
Minnesota Department of Health) and comply with their conditions of approval.
*This condition has been met.
27. Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and/or at the edge of proposed grading limits.
*This condition still applies.
28. A walk-through inspection of the silt/tree preservation fence shall be required prior to
construction.
*This condition still applies.
29. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
Todd Gerhardt • 0
Lakeside Second Addition Final Plat
January 8, 2007
Page 8
*This condition still applies.
30. The applicant shall increase landscape plantings along the east property line to minimum
bufferyard requirements.
*This condition still applies.
31. No trees shall be removed behind the northwestern corner of the silt fence as shown on
grading plans dated 05/19/06.
*This condition still applies.
32. A total of 139 trees shall be planted in the development as required for canopy coverage.
*This condition still applies.
33. All existing buildings, driveways and accessory structures must be removed before grading
commences.
*This condition has been met.
34. The lowest floor elevation of 106 Lakeview Road East must be field verified.
*This condition has been met.
35. The high water level of the proposed pond must be minimum three feet lower than the lowest
floor elevation of the adjacent homes along Lakeview Road East.
*This condition does not apply (a variance was granted).
36. The high water level of the wetland must be determined.
*This condition has been met
37. The proposed grading in the northwest corner near the wetland needs to be adjusted so that
the floor elevation of the homes within Lot 13, Block 2 comply with city standards.
*This condition does not apply.
38. Pavement grades at the following locations must be adjusted so that the grade does not
exceed 7%: West of Building A, and the northern street extending from the Lakeview Road
East intersection.
*This condition has been met.
Todd Gerhardt • •
Lakeside Second Addition Final Plat
January 8, 2007
Page 9
39. Private driveway grades shall not exceed 10%.
*This condition has been met
40. Ground (i.e. non -paved) surface grades shall not be less than 2%.
* This condition has been met.
41. Emergency overflow locations and elevations must be shown on the plan.
*This condition has been met.
42. High point elevations between the catch basins must be shown along the east side of Block 2.
*This condition has been met.
43. Each lot must be provided with separate sewer and water services.
*This condition has been met.
44. An easement is required from the appropriate property owner for any off -site grading. The
developer must receive approval from the City of Eden Prairie for grading in to the Outlot for
Bearpath Yd Addition.
*This condition does not apply.
45. If importing or exporting material for development of the site is necessary, the applicant will
be required to supply the City with detailed haul routes.
*This condition does not apply.
46. Building permits are required for all retaining walls four feet tall or higher and must be
designed by a Structural Engineer registered in the State of Minnesota.
*This condition still applies.
47. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and
maintained.
*This condition still applies.
48. The watermain extension from Lyman Boulevard must be wet -tapped and must be done
under traffic.
*This condition is duplicated in the next condition and may be deleted.
Todd Gerhardt • •
Lakeside Second Addition Final Plat
January 8, 2007
Page 10
49. The developer must provide ingress/egress to the North Bay residents for the duration of the
utility extension within Lake Riley Road East.
*This condition has been met.
50. Each new lot is subject to the sanitary sewer and water hookup charges. The 2006 trunk
hookup charge is $1,575 for sanitary sewer and $4,078 for watermain. Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance. All of these charges are based on the number of SAC units assigned by the
Met Council and are due at the time of building permit issuance.
*This condition shall be modified as follows: Each new lot is subject to the sanitary sewer
and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and
$4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed
against the parcel at the time of building permit issuance. All of these charges are based on
the number of SAC units assigned by the Met Council and are due at the time of building
permit issuance.
51. The 15-foot wide sanitary sewer easement on the northwest side of the property must be
vacated.
*This condition has been met.
52. The proposed pool house must not lie within the drainage and utility easement.
*This condition has been met.
53. The payment of full park dedication fees at the rate in force upon final plat approval in lieu of
parkland dedication.
*This condition can be modified as follows: The developer shall pay $179,400.00 park
dedication fees in lieu of parkland dedication for the second phase of the development prior
to final plat recording.
54. The applicant shall provide all design, engineering, construction and testing services required
of the "Lyman Boulevard Trail." All construction documents shall be delivered to the Park
and Recreation Director and City Engineer for approval prior to the initiation of each phase
of construction. The trail shall be 10 feet in width, surfaced with bituminous material, and
constructed to meet all city specifications. The applicant shall be reimbursed for the actual
cost of construction materials for the Lyman Boulevard Trail. This reimbursement payment
shall be made upon completion and acceptance of the trail and receipt of an invoice
documenting the actual costs for the construction materials utilized in its construction.
*This condition does not apply to this phase.
Todd Gerhardt • •
Lakeside Second Addition Final Plat
January 8, 2007
Page 11
55. The trail connection at the northeast comer of the site connecting the Lakeside area to the
future Highway 212 trail and underpass, as depicted in the applicant's plans, is completed.
*This condition does not apply to this phase.
Based on the review of the subdivision plans, staff recommends that the following conditions be
added:
1. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated
as follows: 3.76 developable acres x $2,400/acre = $9,024.
2. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18,
Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside
Second Addition.
RECOMIIIENDATION
Staff recommends that the City Council adopt the following motion:
"The Chanhassen City Council approves the Final Plat for Lakeside Second Addition creating 39
lots and 3 outlots (plans prepared by Pioneer Engineering, date stamped received 12/14/06), subject
to the following conditions:
1. The applicant shall supply details about the water feature between the rear yards of the units
in Block 3, specifically the source for the water in the water feature. As an alternative to the
current proposal, the applicant should consider revising the plans to utilize storm water as an
amenity as part of a rain garden system in this area.
2. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of
installation of the inlets. Perimeter controls and inlet protection shall be in place and
maintained as needed until 70% of the vegetation is established.
Typical building lot controls shall be shown on the plan in a typical detail. These control.
shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control
and temporary mulch after final grade and prior to issuing the Certificate of Occupancy
(CO).
4. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as specified in
Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of
the site. The grading plan shall be revised to show the proposed silt fence following the
grading limits for the site and shall be located outside of the required 16.5-foot wetland
buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed
storm water pond.
5. Street gutters and catch basins are considered "surface waters" and shall be protected from
exposed soils with a positive slope within 200 linear feet. Following installation of curb and
Todd Gerhardt • •
Lakeside Second Addition Final Plat
January 8, 2007
Page 12
gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed
soils.
6. All perimeter controls shall be inspected by the city and the SWCD prior to grading.
7. Details for concrete washout areas where drivers will washout their trucks and how the
water will be treated should be developed and included in the SWPPP.
8. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
9. The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22,
Block 2; and Outlots A and B) is $39,458.50.
10. Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and/or at the edge of proposed grading limits.
11. A walk-through inspection of the silt/tree preservation fence shall be required prior to
construction.
12. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
13. The applicant shall increase landscape plantings along the east property line to minimum
bufferyard requirements.
14. No trees shall be removed behind the northwestern comer of the silt fence as shown on
grading plans dated 05/19/06.
15. A total of 139 trees shall be planted in the development as required for canopy coverage.
16. Building permits are required for all retaining walls four feet tall or higher and must be
designed by a Structural Engineer registered in the State of Minnesota.
17. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and
maintained.
18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk
hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance. All of these charges are based on the number of SAC units assigned by the
Met Council and are due at the time of building permit issuance.
19. The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for
the second phase of the development prior to final plat recording.
Todd Gerhardt • •
Lakeside Second Addition Final Plat
January 8, 2007
Page 13
20. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated
as follows: 3.76 developable acres x $2,400/acre = $9,024.
21. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18,
Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside
Second Addition."
ATTACHMENTS
1. Reduced Copy Final plat.
2. Development Design Standards
gApIm\2006 planning casesU06-261akeside\second additionVakmde 2nd fp memo.doc
44b �bN N"�Y � m_ '"w'n�•uF Nw
• Yw YAY. s. �FNY w w
FIgrM14�IN4 WM.
4vYbn w
nose
/ a
rnoy
eo
N29
p /J
w
\\ >
GRAPMC SCAU
\\ er
LA�K�rESIDE SECOND. ADDITIONI MNO-
CRTOOG N0.
m�uNt w�uNy�.�Ygi��/Y�i�ba w�MI �� nNY �.yyNy n.�.lYfwV RFY��nn.NYNW N�IM�NI�.R�
4�n siNNn�+� yw�iW�.�e� WY.W1 YY.
b n�
[FWCWw4 Y ea�V�s
w. F.Nr Ywnr � rry rr. s N � 4F� R�4ree t
uiv. W Mw. NW.4ry h I4Y
W bw+w� Mw
Y bllub� ftli WIO.w Nti N rb.lFN OyY.IM Cbw6e� Wes.
•i4W�wY Nuµw�b/�R�.w N�pY�NNNrrN�Y
..MwFW.4Y.Ay�NwXr1
w NrM �MwM.�Y YUN eM4 RILL YY.aFi �.
4 •w b aF
eoo-rays 8EA RPA'11
evn psR w srY W�
i Y�O w•r•q�Y�N Mw Yw ew WFYFW wNR
w INe� uy Yr
b MY
nvn Wt 4� Y4 �u.
r�1��ywoWb� YFN�NF >m�
bI M1 Ir. F tab FwY
3 R D
M
V 1' 1 0 N
A stSr-'r ZI
10
!1
{72 �)19
�, e14 �g 166 �Ie. 17
A K E S 1 C E
1. A K E S f C E
.n
�./✓
own. a snw M:..r,b ne. i�
B
r
J
o �4. a,vpey'I n.n:en
,oaoa
wc18
DRAINAGE AND UML
EASEMENTS ARE SNDNN I US
(Nm m S.)
--I----------I
W w w N wm. nappwy .a. a r.r ma
[M
SCANNED
r1
L
Adopted July 24, 2006
DEVELOPMENT DESIGN STANDARDS
Lakeside Development Standards
a. Intent
The purpose of this zone is to create a PUD for a mix housing type multi -family
development. The use of the PUD zone is to allow for more flexible design standards while
creating a higher quality and more sensitive proposal. The PUD requires that the
development demonstrate a higher quality of architectural standards and site design.
Ancillary uses may be permitted as listed below once a primary use has occupied the site.
b. Permitted Uses
The permitted uses in this zone shall be twin homes, townhouses, and three condominium
buildings and their ancillary uses. If there is a question as to whether or not a use meets
the definition, the Planning Director shall make that interpretation. The type of uses to be
provided on common areas shall be low -intensity neighborhood -oriented accessory
structures to meet daily needs of residents. Such uses may include a bus shelter,
community building, development signage, fountain, garden, gazebo, maintenance shed,
picnic shelter, pool, playground equipment or tennis courts.
C. Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The
following table displays those setbacks.
Setback Standards
Highway 212
50 feet
East(Perimeter) Lot Line
50 feet -townhouses/twin
homes;
Building Height —
Condominiums with a
minimum of 30 feet
Lyman Boulevard
50 feet/30 feet for beach lot
West(Perimeter) Lot Line
50 feet
Twin Home separation between buildings
15 feet
Townhouse separation between buildings
20 feet
Minimum Driveway length (to back of curb, trail or sidewalk)
25 feet
Hard Surface Coverage
50 % *
Wetland: Buffer and buffer setback
16.5 feet and 40 feet
Lake Riley
75 feet
# Decks, patios, porches, and stoops may project up to seven (7) feet in to the required
yard.
* The entire development, including the public and private streets and Outlots, may not
exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site
coverage.
d. Building Materials and Design
1. Townhouses
• Building height shall be limited to 35 feet.
• Building exterior material shall be a combination of fiber -cement or vinyl
siding or shake and brick or stone.
• No two adjacent structures shall be of the same color scheme.
• Colors used shall be varied across color tones.
• All units shall utilize minimum timberline 30-year asphalt shingles.
• Each unit shall have a minimum of one overstory tree within its front
landscape yard.
• All mechanical equipment shall be screened with material compatible to
the building, landscaping or decorative fencing.
• Garage doors shall be decorative and have windows.
2. Community Clubhouse
• Building height shall be limited to 35 feet.
• Building exterior material shall be a combination of stone and stucco and
fiber -cement.
• Natural cedar shakes roofing.
Condominium Building
• Building height shall be limited to 48 feet.
• Building exterior material shall be a combination of 80 percent or greater
stone and brick. Accent and trim areas in fiber -cement lap siding and
shake.
• Roofing shall be a minimum timberline 30-year asphalt shingles (pitched
roofs).
e. Signage
Signage shall comply with city standards for Residential Districts.
Landscaping
Landscaping shall comply with the landscaping plan prepared by Pioneer
Engineering, dated May 19, 2006, revised June 7, 2006.
SWMP FEE WORKSHEET
DATE 12/22/06
PLANNING CASE 06-26
PROJECT Lakeside at Bearpath - Duplexes
Site Area in Acres
Lots 4-17, Block 1
1.44
Lots 4-15, Block 2
1.07
Lot 18, Block 1 (83% of 1.03)
0.85
Lot 23, Block 2 (54% of 1.79)
0.97
Assessable area
4.33
ZONING CLASSIFICATION Medium Density
WATER QUALITY
WATER QUANTITY
IyD)Dy
Rate per Acre Acres Total
$ 2,200.00 4.33 $ 9,526.00
Rate per Acre Acres Total
$ 4,700.00 4.33 $ 20,351.00
CREDITS
ITEM UNIT QUANTITY 50% UNIT TOTAL
PRICE
Storm water pond
acre
4.33
0.5
$ 2,200.00
$ 4,763.00
Outlet structure
,11
$ 2,500.00
$ -
$ 4,763.00
SWMP FEE $ 29,877.00
SWMP CREDITS $ 4,763.00
TOTAL SWMP FEE $ 25,114.00
SWMP FEE WORKSHEET
DATE 12t22/06
PLANNING CASE 06-26
PROJECT Lakeside at Bearpath - Townhomes CZ^a 1
Site Area in Acres J
Lots 1-3, Block 1 0.30
Lots 1-3 and 16-22, Block 2 0.89
Lot 18, Block 1 (17% of 1.03) 0.18
Lot 23, Block 2 (46% of 1.79) 0.82
Assessable area 2.19
ZONING CLASSIFICATION Medium Density
I
Rate per Acre Acres Total
WATER QUALITY
$ 3,700.00 2.19 $ 8,103.00
Rate per Acre Acres Total
WATER QUANTITY
$ 4,700.00 2.19 $ 10,293.00
CREDITS
ITEM UNIT QUANTITY 50% UNIT TOTAL
PRICE
Storm water pond
acre
2.19
0.5
$ 3,700.00
$ 4,051.50
Outlet structure
each
$ 2,500.00
$ -
SWMP FEE $ 18,396.00
SWMP CREDITS $ 4,051.50
TOTAL SWMP FEE
14.344.50
$ 4,051.50
,aj1slo1.0
F
CITY OF CHANHASSEN
P O BOX 147
CHANHASSEN MN 55317
12/15/2006 11:52 AM
Receipt No. 0029758
CLERK: katie
PAYEE: SIENNA CORPORATION
06-26 LAKESIDE 2ND ADDITION
FINAL PLAT FEE
-------------------------------------------------------
Use & Variance 250.00
Total
250.00
Cash
0.00
Check 36702
250.00
Change
-----------
0.00
SCANNED
SIENNA CORPORATION
rcl-VI K
OUR REF. NO. YOUR INVOICE NO. INVOICE DATE lb
INVOICE AMOUNT AMOUNT PAID 411
DISCOUNT TAKEN NET CHECK AMOUNT
220-78
LS2 PLAT
12/13/06
$250.00
�CANNEO
CITY OF CHANHASSEN
$250.00
0
I 1- 1 -o b
PIONEER ENGINEERING, P.A.
PLEASE RESPOND TO:
210 85i6 Avevue \.N'.
2422 ENTERPRISE DRIVE
X Cvvv Rapi,, - 55433
MENTIOTA HEIGHTS, MN 55120
763-78}1880
PHONE: 651fi81-1914
FAX:PHONE:76}78}188.i
FAX:
F
FAX: 651-681-9488
TO: CITY OF CHANHASSEN
7700 MARKET BLVD.
P.O. BOX 147
CHANHASSEN, MN 55317-0147
CORRESPONDENCE SENT VIA:
MAR. FAX PAGES INCLUDING TRANSMITTAL
ORIGINAL TO FOLLOW
LE17ER OF MAMMAL
M� lei QL
DATE 11/14/06
1 ToB NO. 205207
ATTENTION BOB GENEROUS
RE: LAKESIDE SECOND ADDITION
X OTHER MESSENGER
COPIES
DATE
NO.
DESCRIPTION
5
1
FINAL PLAT —FULL SIZE
1
1
11 x 17 REDUCTION OF FINAL PLAT
5
1
LOT TABULATION
I
1
CD WITH TO IMAGE OF FINAL PLAT AND LEGAL DESCRIPTION
THESE ARE TRANSMITTED AS CHECKED BELOW
FOR APPROVAL X AS REQUESTED
X I FOR YOUR USE FORBIDS DUE
CHANHASSEN
REMARKS RECEIVED
C1iANHA WN PLANNIN0 DeT
PLEASE FEEL FREE TO CALL WITH ANY QUESTIONS. THANM.
COPY TO N/A SIGNED THOMAS R BALLUFF, L.S. 763-489-2268
IF ENCLOSURES ARE NOT AS NOTED, XDIDLY NOTIFY US AT ONCE
SCANNED
LAKESIDE SECOND ADDITION
18
45,023 sq.ft.
CITY OF CHANHASSEN
RECEIVED
DEC 1 4 2006
CHANHASSEN PLANNING DEPT
1
2
3
4,465 sq.ft.
3,946 sq.ft
4,465 sq.ft.
GRAPHIC SCALE
40 0 20 40
( IN FEET )
1 inch = 40 Feet
PISNEERengineering
CIVII GINFII2S LA PIANNF L SMVEYC IA SC"EA CWII=
4,465 sq. ft. I 4,465 sq.ft.
1
2
3
4,130 sq.ft.
3,661 sq.ft.
4,142 sq.ft.
4,465 sq.ft. I 4,465 sq.ft.
AREA MAP
4,465 sq.ft. I 41465 sq.ft.
10 I 11
4,465 sq.ft. 4,465 sq.ft.
-LLj
45,023 sq.ft.
12 , 13
4,465 sq.ft. 4,465 sq.ft.
14 115
4,465 sq.ft. 4,465 sq.ft.
16 F17
4,465 sq.ft. 4,465 sq.ft.
TOTAL BOUNDARY AREA
±337,681 sq.ft. — t7.75 acres
0
SIENNA
CORPORATION
December 13, 2006
Suite 608 - 4940 Viking Drive - Minneapolis, Minnesota 55435 - 952-835-2808
Planners • Developers • Contractors
TO: Alyson Fauske
FROM: Sharon Day
SUBJECT: Lakeside Second Addition
FAK 952-835-7008
CI'TV OF RECEIVED
N
DEC 1 3 2006
CHANHASSEN PLANNING DEPT
Enclosed are a check and a final plat application fee for Lakeside Second
Addition.
Should you have any questions, please contact John Vogelbacher at
952-835-2808.
Thank you.
SCANNED
CITY OF CHANHASSEN
7700 Market Boulevard - P.O. Box 147
Chanhassen, MN 55317 - (952) 227-1100
DEVELOPMENT REVIEW APPLICATION
PLEASE PRINT
Applicant Name and
Email:
Planning Case No.
CITY OF CHANHASSEN
RECEIVED
DEC 1 3 2006
CHANHASSEN PLANNING DEPT
Owner Name and Address:
/.J --SAW F, .
zs -�'3. =7003' Phone:
&jsF^AiA,co2P• Email:
Fax:
NOTE: Consultation with City staff is required prior to submittal, including review of development
plans
Comprehensive Plan Amendment
Conditional Use Permit (CUP)
Interim Use Permit (IUP)
Nonconforming Use Permit
Planned Unit Development*
Rezoning
Sign Permits
Sign Plan Review
Temporary Sales Permit
Vacation of Rightof-Way/Easements (VAC)
Variance (VAR)
Wetland Alteration Permit (WAP)
Zoning Appeal
Zoning Ordinance Amendment
Notification Sign - $200
(City to install and remove)
X Escrow for Filing Fees/Attorney Cost"
Site Plan Review (SPR)* Itili3l`� - $50 CUP/SPRNACNAR/WAP/Metes & Bounds
S� - $450 Minor SUB
Subdivision* �gu�62 TOTAL FEE $
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the ipplicant
prior to the public hearing. (—/l-1 M ekt vo�SS��
*Sixteen (16) full-size folded copies of the plans must be submitted, including an 8%" X 11"
reduced copy for each plan sheet along with a digital copy in TIFF -Group 4 (*.tif) format.
**Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for
each application. r)
SCANNED
PROJECT NAME: l�/wS / 0E,
LOCATION:
LEGAL DESCRIPTION: J 1-7 P, &/R C-+i- o
TOTAL ACREAGE: ± 1z- ^'4 ' �
WETLANDS PRESENT: ✓ YES NO
PRESENT ZONING: —�' CA, I)
REQUESTED ZONING:
PRESENT LAND USE DESIGNATION:
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST:
S ?t-S —
o C tq--,A .J 6 r=
tAT-A
013
c 9-%A, C, 4�'
tocC�'-MANA-/-- /3K,641
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before fling this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that 1 am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
of
/z-1z-4�c
Date
U /
gnature 7Feew aDate
Q\Documents and SettingsUohnVlocal Settings\Temporary Internet Files\01-1<6N\Development Review Application.DOC
Rev. 12/05
CITY
Vuy wpm anu runirvmr�IM wnm u.u.0 wyuia.+ap.0
banes u =r
w r rr..un
1 4 2006
PLANNING DEPT
W •.—
V
m
y `
\
I' l *NEERengineering
LAKErySIDE SECOND ADDITION IYZRG-
�! ram. C.: "rw"r. w•.: I.-.T ..w.. n u.�r..rx. rr wa... r .`.7.r
I4�Y,1� YVM.
uan wwa Mnon v arxr.mE woo.. n.xa
M rM .n rtrx
2E ARP A'H 3 R D ACCI T10 N'
---1. A K E S I D E
---
M
.—M—bb
.
4 Mo
r..r �r en ru. M wnixmn wmo .mmr .0 n.. w _ w.r
A K E S I C E
ra W urp....1 Ml. rla. x. m.,III.
L.vFp al %uN OOYdCU' E..l
r/z x a a I. it. w,
M and rtmw .Id Im-- -.. toes
u InwwM. rwwe by Nmnwb s,.wrn .n.m.
Nr.w. m rnl. w, - nb'... O. M .I I. m. p
N IM.. M..I Ub M., aJ 4JIM
m:rw er° Iousn by I. xn r.n ra
`'
GGR"RAP--HIIC�C�-- SCALEyy''
®p
,ram w�i.w
SCANNED
I4�Y,1� YVM.
uan wwa Mnon v arxr.mE woo.. n.xa
M rM .n rtrx
2E ARP A'H 3 R D ACCI T10 N'
---1. A K E S I D E
---
M
.—M—bb
.
4 Mo
r..r �r en ru. M wnixmn wmo .mmr .0 n.. w _ w.r
A K E S I C E
ra W urp....1 Ml. rla. x. m.,III.
L.vFp al %uN OOYdCU' E..l
r/z x a a I. it. w,
M and rtmw .Id Im-- -.. toes
u InwwM. rwwe by Nmnwb s,.wrn .n.m.
Nr.w. m rnl. w, - nb'... O. M .I I. m. p
N IM.. M..I Ub M., aJ 4JIM
m:rw er° Iousn by I. xn r.n ra
`'
GGR"RAP--HIIC�C�-- SCALEyy''
®p
,ram w�i.w
SCANNED
LAKESIDE SECOND ADDITION
AREA MAP
1
la
1 2 3 4 6 6 ry 8 8 10 11 12 13 14 15 16 17
2 B
23 ......... .... ....».. ,,,... ,�..,,� ,�.. ,,, ,,., ..
GRAPHIC SCALE
�u me
PIIINEERenglneering
10 Il 12 13 14 16
232
18,,
21
20
IB
17
la
OUTLOT A
22
CITY OF CHANHASSEN
RECEIVED
DEC 1 4 2006
CHANHASSEN PLANNING DEPT
TOTAL BD IND Ry ARKA
SCANNED
Coon> p�Of m
201 85i6 M. N.W.
C. H C,&. MN 55433
(763)783-1880 F.:783.1883
I'i42NEERengineering
C QiGP S I.4N0 R.WNERS U 51IR OA V SG ARC73[SFLR
Coon Rapids Office
Magda Heigh Of¢
2422 Fivery`iss Drive
Magda Heigh.. MN 551M
(651)681-1914 F.:681-9488
LAKESIDE 2ND ADDITION LOT SUMMARY
Lot/Blk
Lot
Area
Lot/Blk
Lot
Area
Lot/Blk
Lot
Area
1 1
4,465
sq.ft.
15
1
4,465
sq.ft.
11
2
4,142
sq.ft.
2 1
3,946
sq.ft.
16
1
4,465
sq.ft.
12
2
4,142
sq.ft.
3 1
4,465
sq.ft.
17
1
4,465
sq.ft.
13
2
4,142
sq.ft.
4 1
4,465
sq.ft.
18
1
45,023
sq.ft.
14
2
4,120
sq.ft.
5 1
4,465
sq.ft.
1
2
4,130
sq.ft.
15
2
4,092
sq.ft.
6 1
4,465
sq.ft.
2
2
3,661
sq.ft.
16
2
4,042
sq.ft.
7 1
4,465
sq.ft.
3
2
4,142
sq.ft.
17
2
3,612
sq.ft.
8 1
4,465
sq.ft.
4
2
4,139
sq.ft.
18
2
4,042
sq.ft.
9 1
4,465
sq.ft.
5
2
4,139
sq.ft.
19
2
4,042
sq.ft.
10 1
4,465
sq.ft.
6
2
4,142
sq.ft.
20
2
3,612
sq.ft.
11 1
4,465
sq.ft.
7
2
4,142
sq.ft.
21
2
3,612
sq.ft.
12 1
1 4,465
sq.ft.
8
2
4,142
sq.ft.
22
2
4,042
sq.ft.
13 1
4,465
sq.ft.
9
2
4,142
sq.ft.
23
2
78,075
sq.ft.
14 1
4,465
sq.ft.
10
2
4,142
sq.ft.
OUTLOT A
50,634
sq.ft.
Date: 12/15/06
Lot Block
1 1
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Outlot A
Area (sf)
4465 Townhouse
3946 Townhouse
4465 Townhouse
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
4465 Duplex
45023 Common
4130 Townhouse
3661 Townhouse
4142 Townhouse
4139 Duplex
4139 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4142 Duplex
4120 Duplex
1092 Duplex
4042 Townhouse
3612 Townhouse
4042 Townhouse
4042 Townhouse
3612 Townhouse
3612 Townhouse
4042 Townhouse
78075 Common
50634
334,681
7.68
17%
62510
83 %
12876
75386
46 %
46626
54%
Lot/Blk
Lot
Area
Lot/Blk
Lot
Area
Lot/Blk
Lot
Area
1
1
4,465
sq.ft.
15
1
4,465
sq.ft.
11
2
4,142
sq.ft.
2
1
3,946
sq.ft.
16
1
4,465
sq.ft.
12
2
4,142
sq.ft.
3
1
4,465
sq.ft.
17
1
4,465
sq.ft.
13
2
4,142
sq.ft.
4
1
4,465
sq.ft.
18
1
45,023
sq.ft.
14
2
4,120
sq.ft.
5
1
4,465
sq.ft.
1
2
4,130
sq.ft.
15
2
4,092
sq.ft.
6
1
4,465
sq.ft.
2
2
3,661
sq.ft.
16
2
4,042
sq.ft.
7
1
4,465
sq.ft.
3
2
4.142
sq.ft.
17
2
3,612
sq.ft.
8
1
4,465
s q.ft.
4
2
4,139
sq.ft.
18
2
4,042
sq.ft.
9
1
4,465
sq. ft.
5
2
4,139
s g.ft.
19
2
4,042
sq.ft.
10
1
4,465
sq.ft.
6
2
4,142
sq.ft.
20
2
3,612
sq.ft.
11
1
4,465
sq.ft.
7
2
4,142
sq.ft.
21
2
3,612
sq.ft-
12/1
4,465
sq.ft.
8?
4,142
sq.ft.
22
2
4,042
sq.ft.
13
1
4,465
sq.ft.
9
2
4,142
sq.ft.
23
2
78,075
sq.ft.
14
1
4,465
sq. f t.
10
2
4,142
sq.ft. I
OUTLOT A 150,634
sq.ft.
38937 0.455068
85563
•
(1
N
F�
DZ, F
OL tf
Z 33
ti
��.z9 -h1