Loading...
CAS-26_LAKESIDE SECOND ADDITION• • 6� -ate �rcf �►� CITY OF CBANBASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone:952.227.1100 Fax:952.227.1110 Building Inspections Phone:952,227,1180 Fax: 952.227.1190 Engineering Phone:952.227.1160 Fax:952.227.1170 Finance Phone:952.227.1140 Fax:952.227.1110 Park & Recreation Phone:952.227.1120 Fax:952.227.1110 July 22, 2015 Mr. Thomas D. Johnson, Vice President Bridgewater Bank 21500 Highway 7 Greenwood, MN 55331 Re: Release of Letter of Credit #224/John Arthur Homes at Lakeside, LLC Lakeside 2ad Addition — Planning Case 2006-26 Dear Mr. Johnson: This letter is to notify you that the landscaping for the above -referenced project has been completed in general conformance with the approved plans. Enclosed please find your original Letter of Credit #224 along with all associated amendments. We are now closing our files on this project. Sincerely, Recreation Center C NHASSEN 2310 Coulter Boulevard Phone:952.227.1400 Fax:952,227.1404 Planning & Robert Generous, AICP Natural Resources Senior Planner Phone:952.227.1130 Fax:952.2271110 RG:ktm Public Works Encs. 7901 Park Place Phone:952.227.1300 Fax:952.227.1310 c: Jill Sinclair, Environmental Resource Coordinator Senior Coulter 9; Ptan\2006 pig ca \06-26 takesideVwe d addirim\k 224 rdease Jew (10 z Phone: 952.227.1125 Fax:952.227.1110 Webatte www.ci.chanhassen.mn.us SCANNED Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow BRIDGEWATER, BANK IRREVOCABLE LETTER OF CREDIT No. 224 Date: June 26, 2012 TO: City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, Minnesota 55317 Dear Sir or Madam: We hereby issue, for the account of John Arthur Homes at Lakeside, LLC and in your favor, our Irrevocable Letter of Credit in the amount of $10,400.00, available to you by your draft drawn on sight on the undersigned bank. Bank"; The draft must: a) Bear the clause, 'Drawn under Letter of Credit No. 224, dated June 26, 2012, of Bridgewater b) Be signed by the Mayor or City Manager of the City of Chanhassen. c) Be presented for payment at 21500 Highway 7, Greenwood, MN 55331, on or before 4:00 p.m. on June 26, 2013. This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty- five (45) days prior to the next annual renewal date (which shall be May 12th of each year), the Bank delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN 55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in honored upon presentation. Bloomington 3800 American Blvd. West, Suite 100 MOVE 952.893.6868 Bloomington, MN 55431 Enz 952.893.6869 this Letter of Credit shall be duly 21500 Highway 7 moaE 952.653.0606 Greenwood, MN 55331 FM 952.470.3933 bridgewaterbankmn. com BRIDGEWATER BANK June 26, 2013 City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, MN 55317 Re: LOC #224/John Arthur Homes at Lakeside, LLC To Whom It May Concern: This letter hereby extends Letter of Credit #224 in the amount of $10,400.00 issued to you in your favor for the account of John Arthur Homes at Lakeside, LLC. The above mentioned Letter of Credit is extended to June 26, 2014. All other terms listed in the original Letter of Credit remain unchanged. Sincerely, RECEIVED JUN 17 2013 CfTY OF CHANHASSEN Greenwood 21500 Highway 7 PHONE 952.653.0606 bndgewaterbankmn.com Gree od, MN 55331 FAX 952.470.3933 BRIDGEWATER BANK June 26, 2014 City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, MN 55317 Re: LOC #224/John Arthur Homes at. Lakeside, LLC To Whom It May Concern: This letter hereby extends Letter of Credit #224 in the amount of $10,400.00 issued to you in your favor for the account of John Arthur Homes at Lakeside, LLC. The above mentioned Letter of Credit is extended to June 26, 2015. All other terms listed in the original Letter of Credit remain unchanged. Sincerely, MD. Johnson President Greenwood 21500 Hghw y7 PHONE 952.653.0606 bndgewaterbankmn.com Greenwood, MN 55331 FAX 952.4703933 0 r777 0 ■ BRIDGEWATER BANK CITYOFCHMHASSEN RECEIVED SEP 212014 September 17, 2014 City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, MN 55317 Re: LOC #224/John Arthur Homes at Lakeside, LLC To Whom It May Concern: This letter hereby reduces Letter of Credit #224 issued to you in your favor for the account of John Arthur Homes at Lakeside, LLC. The above mentioned Letter of Credit is hereby reduced to $1,040.00 and the maturity date is extended to August 14, 2015. All other terms listed in the original Letter of Credit remain unchanged. Sincerely, President Greenwood 21500 Highway 7 PHONE 952.653.0606 bndgewaterbamkmn.om Greenwood, MN 55331 FAX 952.470.3933 M 2000 A ust 2000tember 2000 T F M T W T F M T W T F S1 2 3 4 5 1 25 _8...... 1fi.. 2.. 8...y ..i0 � ii 12.3 ..q ..5...fi ... ._8..912"13 i4 15 i3, 14 "15 18 1] 1819 i0 1i 12"13 14 15'ffi9 20 21'22 20"21 22 2*3 25�A i] 18 19"20"2i Z2�26 2] 28'29 2]28 29'30"3i *" """" 24 25 2621 28 29'76................ ............................. ............................. Securities ISlart Due S P Category Description I 8/l/2015 8/1/2015 0 Escrows ® LC k224 from Bridgewater Bank expires 6 26 2013 at 4:00 pm (Automatically renews for successive one-year terms) Lakeside 2nd Addition - Planning Case 2006-26 John Arthur Homes at lakeside Landscaping Security S1,040.00 (previously S10,400.00) Notify Bob Generous 6/6/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim VN14-Notified Bob. Kim 6/26/14 - Per Jill site still under construction. KM 626/14 - Received LC extension letter extending LC to 6/26/15. Kim 8/l/14 - Notified Bob/Jill. Kim 8/1/14 - Per Jill, ok to reduce to 10%(S1,040.00) 9/15/14 - Sent letter to Bridgewater Bank requesting reduction to S1,040.00 (10% of S10,400.00). Waiting for confirmation of reduction. Check status 10/15/14. Kum 922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9/17/14. Check status 8/1/15. Kim 722/15 - Per Jill Sinclair, ok to release LC #224. Letter and letter of credit returned to Bridgewater Bank. Activity closed. Kim Ot DewOpnRCa 7r 15 a a2u M1 5-Spu WP1bar pw1 MP� 0 Au ust2000 tember 2000 T F M T W T F S M T W T F 1 2 3 1 5 .2 .8.../..-6 .fi...7.. 8...9 ..10 i1 12 .3 ..4 _.5...6 .. 7...8...9 9 114 15 13 10 15_16 17 18 19 10 11 12 13 14 15 16 16 20 21 22 021 222324 25 N 17 18 19 20 21 22 23 2321 28.29 2728 29 80 31 232826 21................ ............................. ............................. Securities Due S P Category Desch 'on 8/12015 8/12015 F Escrows ® LC #224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm (Automatically renews for successive one-year terms) Lakeside 2nd Addition - Planning Case 2006-26 John Arthur Homes at Lakeside landscaping Security S1,040.00 (previously $10,400.00) Notify Bob Generous 616/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim 62/14-Notified Bob. Kim 626/14 - Per Jill site still under construction. KM 626/14 - Received L.0 extension letter extending GC to 626/15. Kim 8/1/14- Notified Bob/Jill. Kim 8/1/14 - Per Jill, ok to reduce to 10%(S 1,040.00) 9/15/14 - Sent letter to Bridgewater Bank requesting reduction to $1,040.00 (10%of $10,400.00). Waiting for confirmation of reduction. Chock status 10/15/14. Kim 922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9/17/14. Check status 8/1/15. Kim ........................................................................................................................................................................................................................... ............................................................................r.Rm...lA...ts...d...t:.ss.....VlA .....s.=..sleM........F-.v..ei.o....................................................................................................... I Olo6�Dmwkpnv�(yp. iily Peps Bon 00 Au us1200 a tember 2000 T F S M T W T F M T W T F 1 1 2 3 4 5 1 2 .fi...�..0 .fi...�..e._9..10 11 ..iz 3..4..5...0..�. .8 9�13 i4�15 13� 14 �1516 �f]�WY6 i0'1i�i2'i310'65 f620 z1 22 29.2i.22_?7.24 25�A i7.18, 99 20 21 ff�2.21_ H 29 2] 2B 29 3d 31...... 2/, 25 .26..21._2B,.N M... .. ... .. ... Securities )Start Due S P Category Description 1 R 1 201 i R 1 1015 F Escrows 0 EC g224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm (Automatically renews for successive one-year terms) Lakeside 2nd Addition - Planning Case 2006-26 John Arthur Homes at lakeside Landscaping Security $1,040.00 (previously $10,400.00) Notify Bob Generous 6/6/13 -Notified Bob. Per Bob, extend until 6/1/14. Kim 6/2/14 - Notified Bob. Kim 6/26/14 - Per Jill site still under construction. KM 626/14 - Received 1.0 extension letter extending I.0 to 626/15. Kim 8/1/14-Notified Bob/Jill. Kim 8/l/14 - Pa JiB, ok to reduce to 10% ($1,040.00) 9/15/14 - Sent letterto Bridgewater Bank requesting reduction to S1,040.00 (10%of $10,400.00). Waiting for confirmation of reduction. Check status 10/15/14. Kim 922/14 - Received reduction confirmation letter from Bridgewater Bank dated 9117/14. Check status 8/1115. Kim .............................................................................................. OIaNMVYopM edp. Y'2YN1�Y 11:16 AM i-YIMY O�1 September 15, 2014 CITY OF C&NNSEN Mr. Thomas D. Johnson Vice President 7700 Market Boulevard Bridgewater Bank PBox Chanhassen, MNN 55317 21500 Hi Highway 7 Greenwood, MN 55331 Administration Re: Reduction to Letter of Credit No. 224 for Phone: 21100 Lakeside Second Addition Landscaping Pin g Planning Case #06-26 Building Inspections Phone: 952.227.1180 Dear Mr. Johnson: Fax: 952.227.1190 This letter is to notify you that Letter of Credit No. 224 in the amount of $10,400.00 Engineering Phone:2271 can be reduced to $1,040.00 (10%). The landscaping for the project was inspected Fax: 952-2222z1170 and roved approved on August 14, 2014. The City will hold the reduced letter of credit for one full year until August 14, 2015, at which time it can be released upon passing Finance final inspection. Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone:952.227.1120 Fax:952.2271110 Recreation Center 2310 Coulter Boulevard Phone:952.227.1400 Fax:952.227.1404 Planning & Natural Resources Phone:952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone:952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us Please send confirmation of reduction of Letter of Credit No. 224 in the amount of $1,040.00 to my attention at your earliest convenience. All other terms and conditions shall remain unchanged. If you have any questions, please contact me at 952-227-1131 or by email at b¢enerousAci.chanhassen.mn.us. Sincerely, Robert Generous, AICP Senior Planner RG:ktm Enclosure: Copy of original Letter of Credit No. 224. c: Jill Sinclair, Environmental Resources Coordinator 9:191an\2006 planning cases\06-26 lakeside\vxond addil;onVc reduction letter 09-15-2014.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow SCANNED Meuwissen, Kim From: Sinclair, Jill Sent: Thursday, August 14, 2014 5:04 PM To: Meuwissen, Kim Subject: RE: lakeside 2nd Great. The landscaping has been completed. The LOC can be reduced to 10%. Thanks, Jill Sinclair Environmental Resources Specialist City of Chanhassen 952-227-1133 From: Meuwissen, Kim Sent: Thursday, August 14, 2014 2:23 PM To: Sinclair, Jill Subject: RE: lakeside 2nd Jill, Yes. I sent you and Bob and email on August 111. Here is the info: LC #224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm (Automatically renews for successive one-year terms) Lakeside 2nd Addition - Planning Case 2006-26 John Arthur Homes at Lakeside Landscaping Security $10,400.00 Notify Bob Generous 6/6/13 - Notified Bob. Per Bob, extend until 6/1/14. Kim 6/2/14 - Notified Bob. Kim 6/26/14 - Per Jill site still under construction. KM 8/1/14 - Notified Bob/Jill. Kim 0 Kim MeunVissett Sr. CommunicationslAdministrative Support Specialist 952-227-1107 km euwissenCa;ci. chanh assen. m n. us 1 'CTTY O 7700 M PO BO) CHANT Ff From: Sent: T To: Me Subject I i Kin Do we Jill Sin Envira City of 952-22 dM 2000 Au use 201 Se tember 2000 S M T W T F S S M T W T F S M T W T F 1 1 2 3 4 5 1 2 2 ..3.. 4...5..5...2...8 5..7 8...9 ..10 11 ..12 .'ti 4.. 5...8......8...4 8 10 11 12 13 14*% J8 14 1$ 16 'W 18 19 10 11 12 13 14 15 16 10 11 i8 i9 20 21 O 20 2i 22 23 24 25 26 17 18 19 20 21 22 23 24 25 26 2128 29 29 28 29 30 31......... 24 25 28 2] 28 29 36 ...1...................... ............................. ............................. Securities [tart Due S P Category Description i 6/1/2014 6/1/2014 F Escrows ® LC 4224 from Bridgewater Bank expires 6/26/2013 at 4:00 pm (Automatically renews for successive one-year terms) Lakeside 2nd Addition - Planning Case 2006-26 John Arthur Homes at lakeside Landscaping Security�-"- $10.400.00 / Notify Bob Generous 6/6/13 -Notified Bob. Per Bob, extend until 6/1/14. Kim Vl D.V b~ Cap. 6W01391aVW S VMm P-Prortly Pe l • 0 CAMPBELL KNUTSON Professional Associatio_, Author's Direct Dial: (65I) 234-6222 RECEIVED E-mailAddress: sndson®ek-law.com JAN 2 2 2007 January 18, 2007 CITY OF CHANHASSEN Thomas J. Campbell Roger N. Knutson HAND DELIVERED Thomas M. Scott Elliott B. Knetsch Mr. Dennis Moore Joel J. Jamnik Custom Home Builders Title, LLC Andrea McDowell Poehler 10850 Old County Road 15 Matthew K. Brokl' John F. Kelly Plymouth, Minnesota 55441 Soren M. Mattick Henry A. Schaeffer, Ill RE: L4ATSIDESECUNDADDr77oN, Chanhassen, MN Aline Schwartz Developer: Sienna Corporation Craig R. McDowell Marguerite M. McCarron Dear Dennis: *A h. Licensed in Wisconsin As you know, this office is legal counsel for the City of Chanhassen. The City hereby releases to you in escrow the official final plat Mylars for LAKFSLDE SECOND ADDITION, together with a paper reduction (1" = 200' scale) of the final plat for the County Auditor's office. Also enclosed please find the following documents which need to be recorded simultaneously with the plat: • Mortgagee Consent to Plat from Eagle Crest Capital Bank dated January 8, 2007. • Development Contract between the City of Chanhassen and Sienna Corporation dated January 8, 2007. The plat and the enclosed documents all appear to be in order and you may record the same with Carver County subject to the following conditions: I) You should not release the plat to anyone except under the conditions specified in this letter. 2) The enclosed mortgagee consent to plat and development contract need to be recorded simultaneously with the plat, and before any new or additional mortgages against the subject property, if any. 1380 Corporate Center Curve 3) The 2007 taxes need to be paid in full before the plat can be filed and I Suite 317 • Eagan, MN 55121 understand that you have been in contact with the County to get the 651-452-5000 2007 tax figure. I have enclosed for your information a copy of the plat rax 651-452-5550 certification sheet I received from the Carver County Taxpayer www.ck-law.com Mr. Dennis Moore Custom Home Builders Title, LLC January 18, 2007 Page 2 Services Department which indicates that the estimated tax on each underlying parcel is $15,862.00, if that helps. Also enclosed is this firm's check in the amount of $148.00 to cover the recording fees for the final plat Mylars, the Mortgagee Consent to Plat and the Development Contract as outlined on the enclosed Summary of County Plat Fees sheet. As noted in plat certification sheet, the Carver County Taxpayer Services Department informed me that effective January 1, 2007, in addition to the recording fees required by the Carver County Recorder's Office, the Taxpayer Services Department is requiring a plat fee of $100.00 plus $10.00 for each lot and outlot within the plat. Therefore, I have included a second check in the amount of $520.00 to cover those additional fees. If the conditions for recording the plat cannot be satisfied within thirty (30) days, the plat and all related documents should be returned to me. Once all documents have been recorded with the County, please provide this office with the appropriate recording information by requesting the County Recorder to complete the enclosed blue "Filing of Documents" sheet and forward the same to me in the self-addressed envelope provided. If you have any questions, please call. Regards, CAMPBELL KNUTSON Professional Association B` Sl san R. Nelson, Legal 4sistant SRN:ms Chanhassen City Attorney's Office Enclosures cc: Alyson Fauske, Asst. City Engineer (letter only) Bob Generous, Senior Planner (letter only) Maggie Pierce, Sienna Corporation (letter only) Agreed to and accepted this day of January, 2007. CUSTOM HOME BUILDERS TTILE, LLC M Dennis Moore o�- zs, January 10, 2007 CITY OF W. John Vogelbacher CgANHASSEN Sienna Corporation 4940 Viking Drive, #608 7700Market Boulevard Minneapolis, MN 55435 PC Box 147 Chanhassen, MN 55317 Re: Lakeside Second Addition— Planning Case #06-26 Administration Phone:952227.1100 Dear Mr. Vogelbacher: Fax: 952.227.1110 Building Inspections This letter is to notify you that on January 8, 2007, the Chanhassen City Council Phone:952.227.1180 approved the following: Fax: 952.227.1190 Engineering Final Plat for Lakeside Second Addition creating 39 lots and 3 outlots (plans Phone:952.227.1160 prepared by Pioneer Engineering, date stamped "Received 12-14-W'), subject to the Fax:952.227,1170 following conditions: Finance Phone:952.227.1140 1. The applicant shall supply details about the water feature between the rear Fax:952.227.1110 yards of the units in Block 3, specifically the source for the water in the water Park & Recreation feature. As an alternative to the current proposal, the applicant should Phone:952.227.1120 consider revising the plans to utilize storm water as an amenity as part of a Fax:952.227.1110 rain garden system in this area. Recreation Center 2Pho Coulter e:952.2 7.1400 Phone:952.227.14W 2. Wimco- or other comparable inlet controls shall be used and installed h'Pe P Fax:952.227.1404 within 24 hours of installation of the inlets. Perimeter controls and inlet protection shall be in place and maintained as needed until 70% of the Planning & Natural Resources vegetation is established. Phone: 952.227.1130 Fax:952.227.1110 3. Typical building lot controls shall be shown on the plan in a typical detail. Public works These controls shall include perimeter controls (silt fence), rock driveways, 1591 Park Road street sweeping, inlet control and temporary mulch after final grade and prior Phone:952.227.1300 to issuing the Certificate of Occupancy (CO). Fax: 952227.1310 Senior Center 4. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as Phone:952.227.1125 specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be Fax 952.227.11to used for the remainder of the site. The grading plan shall be revised to show Web She the proposed silt fence following the grading limits for the site and shall be www.ci.chanhaw.mn.us located outside of the required 16.5-foot wetland buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed storm water pond. 5. Street gutters and catch basins are considered "surface waters" and shall be protected from exposed soils with a positive slope within 200 linear feet. Following installation of curb and gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed soils. SCANNED The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A lest place to live, work, and play. 0 Mr. John Vogelbacher Lakeside Second Addition — Planning Case 06-26 January 10, 2007 Page 2 6. All perimeter controls shall be inspected by the city and the SWCD prior to grading. 7. Details for concrete washout areas where drivers will wash out their trucks and how the water will be treated should be developed and included in the SWPPP. 8. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 9. The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50. 10. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. 11. A walk-through inspection of the silt/tree preservation fence shall be required prior to construction. 12. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. 13. The applicant shall increase landscape plantings along the east property line to minimum bufferyard requirements. 14. No trees shall be removed behind the northwestern comer of the silt fence as shown on grading plans dated 05/19/06. 15. A total of 139 trees shall be planted in the development as required for canopy coverage. 16. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. 17. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and maintained. 18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance_ 19. The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for the second phase of the development prior to final plat recording_ 20. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated as follows: 3.76 developable acres x $2,400/acre = $9,024. Mr. John Vogelbacher Lakeside Second Addition — Planning Case 06-26 January 10, 2007 Page 3 21. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18, Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside Second Addition. Administrative fees and financial security, a copy of the title commitment or deed for the property, two 1" = 200' scale mylar reductions of the final plat and one 1" = 200' scale mylar reduction of the final plat with just street names and lot and block numbers shall be submitted. In addition, a digital copy of the final plat in Axf and .tif formats (.pdf compatible) in Carver County coordinates shall be submitted. If you have any questions or need additional information, please contact me at (952) 227-1131 or bgenerous@ci.chanhassen.mn.us Sinc Robert Generous, AICP Senior Planner ec: Kate Aanenson, Community Development Director Alyson Fauske, Assistance City Engineer Jerry Mohn, Building Official g:\plan\2006 planning cases\06-26 lakeside\c and addition\approval leaer.doc �City Council Meeting - Jan6ary 8, 2007 0 6c.,�v -a (o Councilman Peterson moved, Councilwoman Ernst seconded to appoint Councilwoman Tjornhom as Acting Mayor. All voted in favor and the motion carried unanimously with a vote of 5 to 0. CONSENT AGENDA: Councilman Peterson moved, Councilwoman Tjornhom seconded to approve the following consent agenda items pursuant to the City Manager's recommendations: a. Approval of Minutes: -City Council Work Session Minutes dated December 11, 2006 -City Council Verbatim and Summary Minutes dated December 11, 2006 Receive Commission Minutes: -Planning Commission Verbatim and Summary Minutes dated December 5, 2006 -Park and Recreation Commission Verbatim and Summary Minutes dated December 12, 2006 b. Accept $1,050 Donation from Klein Bank for the Senior Life -Long Leaming Project. C. Resolution #2007-01: Koehnen Area/Yosemite Area Street Reconstruction Project 07- 01: Approve Plans & Specifications; Authorize Ad for Bids. d. Resolution #2007-02: 2007 Rehabilitation Project 07-02: Accept Feasibility Study; Call Public Hearing. e. Resolution #2007-03: 2007 Sealcoating Project 07-04: Authorize Preparation of Plans & Specifications. Lakeside 2°d Addition: 1) Approval Final Plat. 2) Approve Development Contract g. Approve Consultant Contract for Comprehensive Plan Update, Land Use Element. h. Accept Donation from Minnesota Valley Electric Co-op for Veteran's Monument. All voted in favor and the motion carried unanimously with a vote of 5 to 0. VISITOR PRESENTATIONS: None. PUBLIC HEARING: MUSA EXPANSION PROJECT 06-05: HOLD ASSESSMENT HEARING. Paul Oehme: Thank you Mayor, City Council members. Tonight staff is requesting that the council hold an assessment hearing and consider adoption of assessment roll for the Bluff Creek Boulevard Improvement Project. This project completes the city's initiated trunk improvements 4 SCANNED 0 CITY OF CAAN9A3SEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phore:952.227.1180 Fax:952.227.1190 Engineering Phone. 952.227.1160 Fax. 952.227.1170 Finance Phone: 952.227.1140 Fax: 952227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning A Natural Resources Phone,: 952,227.1130 Fax: 952.227.1110 Public Wola 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Bob Generous, Senior Planner DATE: January 8, 2007 Q SUBJ: Final Plat Approval for Lakeside Second Addition Planning Case No. 06-26 PROPOSAL SUMMARY The applicant is requesting final plat approval for the second phase of Lakeside consisting of 41 lots and one outlot. Seven of the lots are for Wooddale Builders, 32 of the lots are for Charles Cudd Company, 2 lots would be common open space and Outlot A is for future platting for building sites. The subdivision improvements for the project are being undertaken as part of the first addition. No additional subdivision improvements are proposed with this phase of the development. The subdivision complies with the Planned Unit Development - Residential (PUD- R) regulations for Lakeside. Staff is recommending approval of the final plat for Lakeside Second Addition. BACKGROUND On October 23, 2006, the Chanhassen City Council approved the final plat for Lakeside consisting of 18 lots, 10 outlots and right-of-way for public streets. The first phase of the development consisted of the community building and storm water pond, 11 lots for townhouses on the west side of the development (Wooddale Builders, Inc.), 4 lots for twin homes on the east side of the development (Charles Cudd Company), Outlot A which will contain the private street and utilities for the project and Outlots I and J, the recreational beachlot site. Senior Canter Phone: 952 227.1125 On July 24, 2006, the Chanhassen City Council approved the following: Fax: 952.2271110 Web Site A. Rezoning of the property located within the Lakeside development. from www.ci.chanhassen.mn.us High Density Residential District (R12) to Planned Unit Development - Residential (PUD-R) B. Preliminary Plat for Lakeside. C. Site Plan for 231 housing units and a community building with pool, with a Variance for building height for the condominium units consistent with the Building elevations prepared by Harriss Architects. The City of Chanhassen . 4 growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gieal place to live, work, and play. Todd Gerhardt • Lakeside Second Addition Final Plat January 8, 2007 Page 2 D. Conditional Use Permit for a recreational beach lot with a Variance from the requirement that 80 percent of the units be within 1,000 feet of the recreational beach lot. FINAL PLAT REVIEW The developer is performing all the site improvements as part of the original plat. Grading, streets and utility construction for Lakeside Second Addition is under the first addition construction contract; therefore, no security is required for site improvements. COMPLIANCE There are no minimum lot dimensions or lot areas established for the Lakeside Planned Unit Development. The overall project is limited to 231 dwelling units consisting of twin homes, townhouses, and three condominium buildings and their ancillary uses. Setbacks The PUD ordinance requires setbacks from roadways and exterior property lines. The following table displays those setbacks. Setback Standards Highway 212 50 feet East(Perimeter) Lot Line 50 feet -townhouses/twin homes; Building Height — Condominiums with a minimum of 30 feet Lyman Boulevard 50 feet/30 feet for beach lot West(Perimeter) Lot Line 50 feet Twin Home separation between buildings 15 feet Townhouse separation between buildings 20 feet Minimum Driveway length (to back of curb, trail or sidewalk) 25 feet Hard Surface Coverage 50 % Wetland: Buffer and buffer setback 16.5 feet and 40 feet Lake Riley 75 feet # Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard. * The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. LOT INFORMATION TABLE Parcel Area (sq. ft.) I Frontage (ft.) I Depth (ft.) Notes LI B1 4,465 43 104 Twin home unit L2 B 1 4,465 143 1104 Town house unit L3 B 1 4,465 138 1 104 Town house unit L4 B2 j 4,139 43 96 Twin home unit L5 B2 4,139 43 96 Twin home unit L6 B2 4,142 43 96 Twin home unit L7 B2 4,142 43 96 Twin home unit L8 B2 4,142 43 96 Twin home unit L9 B2 4,142 43 96 Twin home unit L10 B2 4,142 43 96 Twin home unit L11 B2 4,142 43 96 Twin home unit L12 B2 4,142 43 96 Twin home unit L13 B2 4,142 43 96 Twin home unit L14 B2 4,120 43 96 Twin home unit L15 B2 4,092 43 93 Twin home unit L16 B2 4,042 47 86 Town house unit L17 B2 3,612 42 86 Town house unit L18 B2 14,042 47 86 Town house unit L19 B2 14,042 47 86 Town house unit L20 B2 3,612 42 86 Town house unit L21 B2 3,612 42 86 Town house unit L22 B2 4,042 47 86 Town house unit L23 B2 78,075 NA NA Common area, Designate as Outlot B Outlot A 50,634 NA NA Future development. Designate as Outlot C TOTAL 334,062 7.669acres Todd Gerhardt 0 • Lakeside Second Addition Final Plat January 8, 2007 Page 4 REVIEW CONDITIONS OF APPROVAL The developer must submit a list of proposed street name(s) and an addressing plan to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval prior to final plat of the property. *This condition has been met: Riley Lake Drive (main road) and Riley Lake Trail (east -west street). 2. Each lot must be provided with separate sewer and water services. *This condition has been met. 3. Additional fire hydrants will be required. Please contact the Chanhassen Fire Marshal for exact location of additional hydrants and any to be relocated. *This condition has been met. 4. A minimum buffer of 16.5 to 20 feet shall be preserved around the perimeter of the wetland. All structures (including parking lots) shall maintain a 40-foot setback from the wetland buffer. All trails and retaining walls shall be modified to remain outside the wetland buffer. The plans shall be revised to reflect the required wetland buffer and wetland buffer setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs before construction begins and shall pay the City $20 per sign. *This condition does not apply to this phase. 5. The plans shall be revised to depict the OHW of Lake Riley, which is 865.3. All structures shall be located a minimum of 75 feet from the OHW. The proposed fire pit shall be located a minimum of 75 feet from the OHW and shall be buffered from the lake by vegetation. No grading or intensive clearing of vegetation shall occur within the shore impact zone (all areas within 37.5 feet of the OHW). *This condition does not apply to this phase. 6. A conditional use permit (CUP) shall be obtained from the City prior to the operation of a recreational beach lot. *This condition has been met. 7. All existing amenities and/or structures (including any docks, existing beach that is not proposed to remain and the boat launch) on Outlot B, North Bay shall be removed. A boat launch is not permitted. *This condition does not apply to this phase. Todd Gerhardt • 0 Lakeside Second Addition Final Plat January 8, 2007 Page 5 8. The location of the building on Lot 1, Block 1 shall be adjusted to respect all drainage and utility easements. *This condition has been met. 9. The applicant shall supply details about the water feature between the rear yards of the units in Block 3, specifically the source for the water in the water feature. As an alternative to the current proposal, the applicant should consider revising the plans to utilize storm water as an amenity as part of a rain garden system in this area. *This condition still applies. 10. The applicant shall provide additional information detailing the proposed emergency overflow (EOF) route from Pond 1 to Lake Riley. *This condition has been met. 11. The grading and landscaping proposed around Pond I shall be revised to provide a flat, open area so maintenance equipment can access the flared end sections from Lake Riley Road East without damaging the retaining wall or the landscaping and without being below the NWL of the pond. *This condition has been met. 12. All storm water infrastructure, including catch basins, storm sewer pipes, manholes, flared - end sections, outlet structures, ponds and swales, shall be owned, operated and maintained by the developer and, eventually, the homeowners association. Prior to final plat recording, the developer shall enter into an agreement with the City that outlines the parameters of operation, inspection and maintenance of the storm water infrastructure. This agreement shall be transferred to the homeowners association prior to the developer relinquishing responsibility for the development. *This condition does not apply. The City is requiring these improvements as a public project and will be responsible for maintenance once the public improvements have been accepted by City Council. 13. The SWPPP shall be provided to the City for review by the Carver Soil and Water Conservation District. *This condition has been met. 14. The plans shall be revised to show that erosion control blanket will be installed over all areas with 3:1 slopes or steeper. *This condition has been met. Todd Gerhardt 0 0 Lakeside Second Addition Final Plat January 8, 2007 Page 6 15. A stable emergency overflow (EOF) for the pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf re -enforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. *This condition has been met. 16. Energy dissipation shall be provided for all inlets and outlets within 24 hours of installation *This condition does not apply to this phase. 17. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of installation of the inlets. Perimeter controls and inlet protection shall be in place and maintained as needed until 70% of the vegetation is established. *This condition still applies. 18. Typical building lot controls shall be shown on the plan in a typical detail. These controls shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy (CO). *This condition still applies. 19. The proposed storm water pond shall be used as a temporary sediment basin during mass grading. The pond shall be excavated prior to disturbing up -gradient areas. Plans shall show how the temporary basin will be constructed and how water will be diverted to the temporary basin. Berms and/or ditches may be needed to divert water to the pond, and temporary pond outlets are needed. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. *This condition has been met. 20. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of the site. The grading plan shall be revised to show the proposed silt fence following the grading limits for the site and shall be located outside of the required 16.5-foot wetland buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed storm water pond. *This condition still applies. 21. Street gutters and catch basins are considered "surface waters" and shall be protected from exposed soils with a positive slope within 200 linear feet. Following installation of curb and gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed soils. Todd Gerhardt • 0 Lakeside Second Addition Final Plat January 8, 2007 Page 7 *This condition still applies. 22. Plans shall be revised to show erosion and sediment control measures for the road ditch along Lyman Boulevard. All perimeter controls shall be inspected by the city and the SWCD prior to grading. *This condition has been partially met and shall be modified as follows: All perimeter controls shall be inspected by the city and the SWCD prior to grading. 23. Details for concrete washout areas where drivers will wash out their trucks and how the water will be treated should be developed and included in the SWPPP. *This condition still applies. 24. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. *This condition still applies. 25. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $195,293. *This condition shall be modified as follows: The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50. 26. The owner/operator of the proposed development shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Site Permit), Minnesota Department of Natural Resources (for dewatering), Minnesota Department of Transportation, Minnesota Department of Health) and comply with their conditions of approval. *This condition has been met. 27. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. *This condition still applies. 28. A walk-through inspection of the silt/tree preservation fence shall be required prior to construction. *This condition still applies. 29. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. Todd Gerhardt • 0 Lakeside Second Addition Final Plat January 8, 2007 Page 8 *This condition still applies. 30. The applicant shall increase landscape plantings along the east property line to minimum bufferyard requirements. *This condition still applies. 31. No trees shall be removed behind the northwestern corner of the silt fence as shown on grading plans dated 05/19/06. *This condition still applies. 32. A total of 139 trees shall be planted in the development as required for canopy coverage. *This condition still applies. 33. All existing buildings, driveways and accessory structures must be removed before grading commences. *This condition has been met. 34. The lowest floor elevation of 106 Lakeview Road East must be field verified. *This condition has been met. 35. The high water level of the proposed pond must be minimum three feet lower than the lowest floor elevation of the adjacent homes along Lakeview Road East. *This condition does not apply (a variance was granted). 36. The high water level of the wetland must be determined. *This condition has been met 37. The proposed grading in the northwest corner near the wetland needs to be adjusted so that the floor elevation of the homes within Lot 13, Block 2 comply with city standards. *This condition does not apply. 38. Pavement grades at the following locations must be adjusted so that the grade does not exceed 7%: West of Building A, and the northern street extending from the Lakeview Road East intersection. *This condition has been met. Todd Gerhardt • • Lakeside Second Addition Final Plat January 8, 2007 Page 9 39. Private driveway grades shall not exceed 10%. *This condition has been met 40. Ground (i.e. non -paved) surface grades shall not be less than 2%. * This condition has been met. 41. Emergency overflow locations and elevations must be shown on the plan. *This condition has been met. 42. High point elevations between the catch basins must be shown along the east side of Block 2. *This condition has been met. 43. Each lot must be provided with separate sewer and water services. *This condition has been met. 44. An easement is required from the appropriate property owner for any off -site grading. The developer must receive approval from the City of Eden Prairie for grading in to the Outlot for Bearpath Yd Addition. *This condition does not apply. 45. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. *This condition does not apply. 46. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. *This condition still applies. 47. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and maintained. *This condition still applies. 48. The watermain extension from Lyman Boulevard must be wet -tapped and must be done under traffic. *This condition is duplicated in the next condition and may be deleted. Todd Gerhardt • • Lakeside Second Addition Final Plat January 8, 2007 Page 10 49. The developer must provide ingress/egress to the North Bay residents for the duration of the utility extension within Lake Riley Road East. *This condition has been met. 50. Each new lot is subject to the sanitary sewer and water hookup charges. The 2006 trunk hookup charge is $1,575 for sanitary sewer and $4,078 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. *This condition shall be modified as follows: Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 51. The 15-foot wide sanitary sewer easement on the northwest side of the property must be vacated. *This condition has been met. 52. The proposed pool house must not lie within the drainage and utility easement. *This condition has been met. 53. The payment of full park dedication fees at the rate in force upon final plat approval in lieu of parkland dedication. *This condition can be modified as follows: The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for the second phase of the development prior to final plat recording. 54. The applicant shall provide all design, engineering, construction and testing services required of the "Lyman Boulevard Trail." All construction documents shall be delivered to the Park and Recreation Director and City Engineer for approval prior to the initiation of each phase of construction. The trail shall be 10 feet in width, surfaced with bituminous material, and constructed to meet all city specifications. The applicant shall be reimbursed for the actual cost of construction materials for the Lyman Boulevard Trail. This reimbursement payment shall be made upon completion and acceptance of the trail and receipt of an invoice documenting the actual costs for the construction materials utilized in its construction. *This condition does not apply to this phase. Todd Gerhardt • • Lakeside Second Addition Final Plat January 8, 2007 Page 11 55. The trail connection at the northeast comer of the site connecting the Lakeside area to the future Highway 212 trail and underpass, as depicted in the applicant's plans, is completed. *This condition does not apply to this phase. Based on the review of the subdivision plans, staff recommends that the following conditions be added: 1. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated as follows: 3.76 developable acres x $2,400/acre = $9,024. 2. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18, Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside Second Addition. RECOMIIIENDATION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council approves the Final Plat for Lakeside Second Addition creating 39 lots and 3 outlots (plans prepared by Pioneer Engineering, date stamped received 12/14/06), subject to the following conditions: 1. The applicant shall supply details about the water feature between the rear yards of the units in Block 3, specifically the source for the water in the water feature. As an alternative to the current proposal, the applicant should consider revising the plans to utilize storm water as an amenity as part of a rain garden system in this area. 2. Wimco-type or other comparable inlet controls shall be used and installed within 24 hours of installation of the inlets. Perimeter controls and inlet protection shall be in place and maintained as needed until 70% of the vegetation is established. Typical building lot controls shall be shown on the plan in a typical detail. These control. shall include perimeter controls (silt fence), rock driveways, street sweeping, inlet control and temporary mulch after final grade and prior to issuing the Certificate of Occupancy (CO). 4. The proposed silt fence along Wetland Basin B shall be Type 2 silt fence, as specified in Chanhassen Standard Detail Plate 5300. Type 1 silt fence may be used for the remainder of the site. The grading plan shall be revised to show the proposed silt fence following the grading limits for the site and shall be located outside of the required 16.5-foot wetland buffer. Silt fence shall be placed at the proposed high water level elevation of the proposed storm water pond. 5. Street gutters and catch basins are considered "surface waters" and shall be protected from exposed soils with a positive slope within 200 linear feet. Following installation of curb and Todd Gerhardt • • Lakeside Second Addition Final Plat January 8, 2007 Page 12 gutter, silt fence shall be installed curbside along all positive slopes to the street with exposed soils. 6. All perimeter controls shall be inspected by the city and the SWCD prior to grading. 7. Details for concrete washout areas where drivers will washout their trucks and how the water will be treated should be developed and included in the SWPPP. 8. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 9. The SWMP fee for Lakeside Second Addition (including Lots 1-17, Block 1; Lots 1-22, Block 2; and Outlots A and B) is $39,458.50. 10. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. 11. A walk-through inspection of the silt/tree preservation fence shall be required prior to construction. 12. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. 13. The applicant shall increase landscape plantings along the east property line to minimum bufferyard requirements. 14. No trees shall be removed behind the northwestern comer of the silt fence as shown on grading plans dated 05/19/06. 15. A total of 139 trees shall be planted in the development as required for canopy coverage. 16. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. 17. All sanitary sewer, watermain and storm sewer within this site shall be privately owned and maintained. 18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2007 trunk hookup charge is $1,669 for sanitary sewer and $4,485 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 19. The developer shall pay $179,400.00 park dedication fees in lieu of parkland dedication for the second phase of the development prior to final plat recording. Todd Gerhardt • • Lakeside Second Addition Final Plat January 8, 2007 Page 13 20. Before the plat is filed, the developer must pay the Arterial Collector fee, which is calculated as follows: 3.76 developable acres x $2,400/acre = $9,024. 21. Designate proposed Outlot A as Outlot C, Lakeside Second Addition. Designate Lot 18, Block 1, as Outlot A, Lakeside Second Addition and Lot 23, Block 2 as Outlot B, Lakeside Second Addition." ATTACHMENTS 1. Reduced Copy Final plat. 2. Development Design Standards gApIm\2006 planning casesU06-261akeside\second additionVakmde 2nd fp memo.doc 44b �bN N"�Y � m_ '"w'n�•uF Nw • Yw YAY. s. �FNY w w FIgrM14�IN4 WM. 4vYbn w nose / a rnoy eo N29 p /J w \\ > GRAPMC SCAU \\ er LA�K�rESIDE SECOND. ADDITIONI MNO- CRTOOG N0. m�uNt w�uNy�.�Ygi��/Y�i�ba w�MI �� nNY �.yyNy n.�.lYfwV RFY��nn.NYNW N�IM�NI�.R� 4�n siNNn�+� yw�iW�.�e� WY.W1 YY. b n� [FWCWw4 Y ea�V�s w. F.Nr Ywnr � rry rr. s N � 4F� R�4ree t uiv. W Mw. NW.4ry h I4Y W bw+w� Mw Y bllub� ftli WIO.w Nti N rb.lFN OyY.IM Cbw6e� Wes. •i4W�wY Nuµw�b/�R�.w N�pY�NNNrrN�Y ..MwFW.4Y.Ay�NwXr1 w NrM �MwM.�Y YUN eM4 RILL YY.aFi �. 4 •w b aF eoo-rays 8EA RPA'11 evn psR w srY W� i Y�O w•r•q�Y�N Mw Yw ew WFYFW wNR w INe� uy Yr b MY nvn Wt 4� Y4 �u. r�1��ywoWb� YFN�NF >m� bI M1 Ir. F tab FwY 3 R D M V 1' 1 0 N A stSr-'r ZI 10 !1 {72 �)19 �, e14 �g 166 �Ie. 17 A K E S 1 C E 1. A K E S f C E .n �./✓ own. a snw M:..r,b ne. i� B r J o �4. a,vpey'I n.n:en ,oaoa wc18 DRAINAGE AND UML EASEMENTS ARE SNDNN I US (Nm m S.) --I----------I W w w N wm. nappwy .a. a r.r ma [M SCANNED r1 L Adopted July 24, 2006 DEVELOPMENT DESIGN STANDARDS Lakeside Development Standards a. Intent The purpose of this zone is to create a PUD for a mix housing type multi -family development. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Ancillary uses may be permitted as listed below once a primary use has occupied the site. b. Permitted Uses The permitted uses in this zone shall be twin homes, townhouses, and three condominium buildings and their ancillary uses. If there is a question as to whether or not a use meets the definition, the Planning Director shall make that interpretation. The type of uses to be provided on common areas shall be low -intensity neighborhood -oriented accessory structures to meet daily needs of residents. Such uses may include a bus shelter, community building, development signage, fountain, garden, gazebo, maintenance shed, picnic shelter, pool, playground equipment or tennis courts. C. Setbacks The PUD ordinance requires setbacks from roadways and exterior property lines. The following table displays those setbacks. Setback Standards Highway 212 50 feet East(Perimeter) Lot Line 50 feet -townhouses/twin homes; Building Height — Condominiums with a minimum of 30 feet Lyman Boulevard 50 feet/30 feet for beach lot West(Perimeter) Lot Line 50 feet Twin Home separation between buildings 15 feet Townhouse separation between buildings 20 feet Minimum Driveway length (to back of curb, trail or sidewalk) 25 feet Hard Surface Coverage 50 % * Wetland: Buffer and buffer setback 16.5 feet and 40 feet Lake Riley 75 feet # Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard. * The entire development, including the public and private streets and Outlots, may not exceed 50 percent hard coverage. Individual lots will exceed the 50 percent site coverage. d. Building Materials and Design 1. Townhouses • Building height shall be limited to 35 feet. • Building exterior material shall be a combination of fiber -cement or vinyl siding or shake and brick or stone. • No two adjacent structures shall be of the same color scheme. • Colors used shall be varied across color tones. • All units shall utilize minimum timberline 30-year asphalt shingles. • Each unit shall have a minimum of one overstory tree within its front landscape yard. • All mechanical equipment shall be screened with material compatible to the building, landscaping or decorative fencing. • Garage doors shall be decorative and have windows. 2. Community Clubhouse • Building height shall be limited to 35 feet. • Building exterior material shall be a combination of stone and stucco and fiber -cement. • Natural cedar shakes roofing. Condominium Building • Building height shall be limited to 48 feet. • Building exterior material shall be a combination of 80 percent or greater stone and brick. Accent and trim areas in fiber -cement lap siding and shake. • Roofing shall be a minimum timberline 30-year asphalt shingles (pitched roofs). e. Signage Signage shall comply with city standards for Residential Districts. Landscaping Landscaping shall comply with the landscaping plan prepared by Pioneer Engineering, dated May 19, 2006, revised June 7, 2006. SWMP FEE WORKSHEET DATE 12/22/06 PLANNING CASE 06-26 PROJECT Lakeside at Bearpath - Duplexes Site Area in Acres Lots 4-17, Block 1 1.44 Lots 4-15, Block 2 1.07 Lot 18, Block 1 (83% of 1.03) 0.85 Lot 23, Block 2 (54% of 1.79) 0.97 Assessable area 4.33 ZONING CLASSIFICATION Medium Density WATER QUALITY WATER QUANTITY IyD)Dy Rate per Acre Acres Total $ 2,200.00 4.33 $ 9,526.00 Rate per Acre Acres Total $ 4,700.00 4.33 $ 20,351.00 CREDITS ITEM UNIT QUANTITY 50% UNIT TOTAL PRICE Storm water pond acre 4.33 0.5 $ 2,200.00 $ 4,763.00 Outlet structure ,11 $ 2,500.00 $ - $ 4,763.00 SWMP FEE $ 29,877.00 SWMP CREDITS $ 4,763.00 TOTAL SWMP FEE $ 25,114.00 SWMP FEE WORKSHEET DATE 12t22/06 PLANNING CASE 06-26 PROJECT Lakeside at Bearpath - Townhomes CZ^a 1 Site Area in Acres J Lots 1-3, Block 1 0.30 Lots 1-3 and 16-22, Block 2 0.89 Lot 18, Block 1 (17% of 1.03) 0.18 Lot 23, Block 2 (46% of 1.79) 0.82 Assessable area 2.19 ZONING CLASSIFICATION Medium Density I Rate per Acre Acres Total WATER QUALITY $ 3,700.00 2.19 $ 8,103.00 Rate per Acre Acres Total WATER QUANTITY $ 4,700.00 2.19 $ 10,293.00 CREDITS ITEM UNIT QUANTITY 50% UNIT TOTAL PRICE Storm water pond acre 2.19 0.5 $ 3,700.00 $ 4,051.50 Outlet structure each $ 2,500.00 $ - SWMP FEE $ 18,396.00 SWMP CREDITS $ 4,051.50 TOTAL SWMP FEE 14.344.50 $ 4,051.50 ,aj1slo1.0 F CITY OF CHANHASSEN P O BOX 147 CHANHASSEN MN 55317 12/15/2006 11:52 AM Receipt No. 0029758 CLERK: katie PAYEE: SIENNA CORPORATION 06-26 LAKESIDE 2ND ADDITION FINAL PLAT FEE ------------------------------------------------------- Use & Variance 250.00 Total 250.00 Cash 0.00 Check 36702 250.00 Change ----------- 0.00 SCANNED SIENNA CORPORATION rcl-VI K OUR REF. NO. YOUR INVOICE NO. INVOICE DATE lb INVOICE AMOUNT AMOUNT PAID 411 DISCOUNT TAKEN NET CHECK AMOUNT 220-78 LS2 PLAT 12/13/06 $250.00 �CANNEO CITY OF CHANHASSEN $250.00 0 I 1- 1 -o b PIONEER ENGINEERING, P.A. PLEASE RESPOND TO: 210 85i6 Avevue \.N'. 2422 ENTERPRISE DRIVE X Cvvv Rapi,, - 55433 MENTIOTA HEIGHTS, MN 55120 763-78}1880 PHONE: 651fi81-1914 FAX:PHONE:76}78}188.i FAX: F FAX: 651-681-9488 TO: CITY OF CHANHASSEN 7700 MARKET BLVD. P.O. BOX 147 CHANHASSEN, MN 55317-0147 CORRESPONDENCE SENT VIA: MAR. FAX PAGES INCLUDING TRANSMITTAL ORIGINAL TO FOLLOW LE17ER OF MAMMAL M� lei QL DATE 11/14/06 1 ToB NO. 205207 ATTENTION BOB GENEROUS RE: LAKESIDE SECOND ADDITION X OTHER MESSENGER COPIES DATE NO. DESCRIPTION 5 1 FINAL PLAT —FULL SIZE 1 1 11 x 17 REDUCTION OF FINAL PLAT 5 1 LOT TABULATION I 1 CD WITH TO IMAGE OF FINAL PLAT AND LEGAL DESCRIPTION THESE ARE TRANSMITTED AS CHECKED BELOW FOR APPROVAL X AS REQUESTED X I FOR YOUR USE FORBIDS DUE CHANHASSEN REMARKS RECEIVED C1iANHA WN PLANNIN0 DeT PLEASE FEEL FREE TO CALL WITH ANY QUESTIONS. THANM. COPY TO N/A SIGNED THOMAS R BALLUFF, L.S. 763-489-2268 IF ENCLOSURES ARE NOT AS NOTED, XDIDLY NOTIFY US AT ONCE SCANNED LAKESIDE SECOND ADDITION 18 45,023 sq.ft. CITY OF CHANHASSEN RECEIVED DEC 1 4 2006 CHANHASSEN PLANNING DEPT 1 2 3 4,465 sq.ft. 3,946 sq.ft 4,465 sq.ft. GRAPHIC SCALE 40 0 20 40 ( IN FEET ) 1 inch = 40 Feet PISNEERengineering CIVII GINFII2S LA PIANNF L SMVEYC IA SC"EA CWII= 4,465 sq. ft. I 4,465 sq.ft. 1 2 3 4,130 sq.ft. 3,661 sq.ft. 4,142 sq.ft. 4,465 sq.ft. I 4,465 sq.ft. AREA MAP 4,465 sq.ft. I 41465 sq.ft. 10 I 11 4,465 sq.ft. 4,465 sq.ft. -LLj 45,023 sq.ft. 12 , 13 4,465 sq.ft. 4,465 sq.ft. 14 115 4,465 sq.ft. 4,465 sq.ft. 16 F17 4,465 sq.ft. 4,465 sq.ft. TOTAL BOUNDARY AREA ±337,681 sq.ft. — t7.75 acres 0 SIENNA CORPORATION December 13, 2006 Suite 608 - 4940 Viking Drive - Minneapolis, Minnesota 55435 - 952-835-2808 Planners • Developers • Contractors TO: Alyson Fauske FROM: Sharon Day SUBJECT: Lakeside Second Addition FAK 952-835-7008 CI'TV OF RECEIVED N DEC 1 3 2006 CHANHASSEN PLANNING DEPT Enclosed are a check and a final plat application fee for Lakeside Second Addition. Should you have any questions, please contact John Vogelbacher at 952-835-2808. Thank you. SCANNED CITY OF CHANHASSEN 7700 Market Boulevard - P.O. Box 147 Chanhassen, MN 55317 - (952) 227-1100 DEVELOPMENT REVIEW APPLICATION PLEASE PRINT Applicant Name and Email: Planning Case No. CITY OF CHANHASSEN RECEIVED DEC 1 3 2006 CHANHASSEN PLANNING DEPT Owner Name and Address: /.J --SAW F, . zs -�'3. =7003' Phone: &jsF^AiA,co2P• Email: Fax: NOTE: Consultation with City staff is required prior to submittal, including review of development plans Comprehensive Plan Amendment Conditional Use Permit (CUP) Interim Use Permit (IUP) Nonconforming Use Permit Planned Unit Development* Rezoning Sign Permits Sign Plan Review Temporary Sales Permit Vacation of Rightof-Way/Easements (VAC) Variance (VAR) Wetland Alteration Permit (WAP) Zoning Appeal Zoning Ordinance Amendment Notification Sign - $200 (City to install and remove) X Escrow for Filing Fees/Attorney Cost" Site Plan Review (SPR)* Itili3l`� - $50 CUP/SPRNACNAR/WAP/Metes & Bounds S� - $450 Minor SUB Subdivision* �gu�62 TOTAL FEE $ An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the ipplicant prior to the public hearing. (—/l-1 M ekt vo�SS�� *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced copy for each plan sheet along with a digital copy in TIFF -Group 4 (*.tif) format. **Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews. NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. r) SCANNED PROJECT NAME: l�/wS / 0E, LOCATION: LEGAL DESCRIPTION: J 1-7 P, &/R C-+i- o TOTAL ACREAGE: ± 1z- ^'4 ' � WETLANDS PRESENT: ✓ YES NO PRESENT ZONING: —�' CA, I) REQUESTED ZONING: PRESENT LAND USE DESIGNATION: REQUESTED LAND USE DESIGNATION: REASON FOR REQUEST: S ?t-S — o C tq--,A .J 6 r= tAT-A 013 c 9-%A, C, 4�' tocC�'-MANA-/-- /3K,641 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before fling this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that 1 am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. of /z-1z-4�c Date U / gnature 7Feew aDate Q\Documents and SettingsUohnVlocal Settings\Temporary Internet Files\01-1<6N\Development Review Application.DOC Rev. 12/05 CITY Vuy wpm anu runirvmr�IM wnm u.u.0 wyuia.+ap.0 banes u =r w r rr..un 1 4 2006 PLANNING DEPT W •.— V m y ` \ I' l *NEERengineering LAKErySIDE SECOND ADDITION IYZRG- �! ram. C.: "rw"r. w•.: I.-.T ..w.. n u.�r..rx. rr wa... r .`.7.r I4�Y,1� YVM. uan wwa Mnon v arxr.mE woo.. n.xa M rM .n rtrx 2E ARP A'H 3 R D ACCI T10 N' ---1. A K E S I D E --- M .—M—bb . 4 Mo r..r �r en ru. M wnixmn wmo .mmr .0 n.. w _ w.r A K E S I C E ra W urp....1 Ml. rla. x. m.,III. L.vFp al %uN OOYdCU' E..l r/z x a a I. it. w, M and rtmw .Id Im-- -.. toes u InwwM. rwwe by Nmnwb s,.wrn .n.m. Nr.w. m rnl. w, - nb'... O. M .I I. m. p N IM.. M..I Ub M., aJ 4JIM m:rw er° Iousn by I. xn r.n ra `' GGR"RAP--HIIC�C�-- SCALEyy'' ®p ,ram w�i.w SCANNED I4�Y,1� YVM. uan wwa Mnon v arxr.mE woo.. n.xa M rM .n rtrx 2E ARP A'H 3 R D ACCI T10 N' ---1. A K E S I D E --- M .—M—bb . 4 Mo r..r �r en ru. M wnixmn wmo .mmr .0 n.. w _ w.r A K E S I C E ra W urp....1 Ml. rla. x. m.,III. L.vFp al %uN OOYdCU' E..l r/z x a a I. it. w, M and rtmw .Id Im-- -.. toes u InwwM. rwwe by Nmnwb s,.wrn .n.m. Nr.w. m rnl. w, - nb'... O. M .I I. m. p N IM.. M..I Ub M., aJ 4JIM m:rw er° Iousn by I. xn r.n ra `' GGR"RAP--HIIC�C�-- SCALEyy'' ®p ,ram w�i.w SCANNED LAKESIDE SECOND ADDITION AREA MAP 1 la 1 2 3 4 6 6 ry 8 8 10 11 12 13 14 15 16 17 2 B 23 ......... .... ....».. ,,,... ,�..,,� ,�.. ,,, ,,., .. GRAPHIC SCALE �u me PIIINEERenglneering 10 Il 12 13 14 16 232 18,, 21 20 IB 17 la OUTLOT A 22 CITY OF CHANHASSEN RECEIVED DEC 1 4 2006 CHANHASSEN PLANNING DEPT TOTAL BD IND Ry ARKA SCANNED Coon> p�Of m 201 85i6 M. N.W. C. H C,&. MN 55433 (763)783-1880 F.:783.1883 I'i42NEERengineering C QiGP S I.4N0 R.WNERS U 51IR OA V SG ARC73[SFLR Coon Rapids Office Magda Heigh Of¢ 2422 Fivery`iss Drive Magda Heigh.. MN 551M (651)681-1914 F.:681-9488 LAKESIDE 2ND ADDITION LOT SUMMARY Lot/Blk Lot Area Lot/Blk Lot Area Lot/Blk Lot Area 1 1 4,465 sq.ft. 15 1 4,465 sq.ft. 11 2 4,142 sq.ft. 2 1 3,946 sq.ft. 16 1 4,465 sq.ft. 12 2 4,142 sq.ft. 3 1 4,465 sq.ft. 17 1 4,465 sq.ft. 13 2 4,142 sq.ft. 4 1 4,465 sq.ft. 18 1 45,023 sq.ft. 14 2 4,120 sq.ft. 5 1 4,465 sq.ft. 1 2 4,130 sq.ft. 15 2 4,092 sq.ft. 6 1 4,465 sq.ft. 2 2 3,661 sq.ft. 16 2 4,042 sq.ft. 7 1 4,465 sq.ft. 3 2 4,142 sq.ft. 17 2 3,612 sq.ft. 8 1 4,465 sq.ft. 4 2 4,139 sq.ft. 18 2 4,042 sq.ft. 9 1 4,465 sq.ft. 5 2 4,139 sq.ft. 19 2 4,042 sq.ft. 10 1 4,465 sq.ft. 6 2 4,142 sq.ft. 20 2 3,612 sq.ft. 11 1 4,465 sq.ft. 7 2 4,142 sq.ft. 21 2 3,612 sq.ft. 12 1 1 4,465 sq.ft. 8 2 4,142 sq.ft. 22 2 4,042 sq.ft. 13 1 4,465 sq.ft. 9 2 4,142 sq.ft. 23 2 78,075 sq.ft. 14 1 4,465 sq.ft. 10 2 4,142 sq.ft. OUTLOT A 50,634 sq.ft. Date: 12/15/06 Lot Block 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Outlot A Area (sf) 4465 Townhouse 3946 Townhouse 4465 Townhouse 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 4465 Duplex 45023 Common 4130 Townhouse 3661 Townhouse 4142 Townhouse 4139 Duplex 4139 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4142 Duplex 4120 Duplex 1092 Duplex 4042 Townhouse 3612 Townhouse 4042 Townhouse 4042 Townhouse 3612 Townhouse 3612 Townhouse 4042 Townhouse 78075 Common 50634 334,681 7.68 17% 62510 83 % 12876 75386 46 % 46626 54% Lot/Blk Lot Area Lot/Blk Lot Area Lot/Blk Lot Area 1 1 4,465 sq.ft. 15 1 4,465 sq.ft. 11 2 4,142 sq.ft. 2 1 3,946 sq.ft. 16 1 4,465 sq.ft. 12 2 4,142 sq.ft. 3 1 4,465 sq.ft. 17 1 4,465 sq.ft. 13 2 4,142 sq.ft. 4 1 4,465 sq.ft. 18 1 45,023 sq.ft. 14 2 4,120 sq.ft. 5 1 4,465 sq.ft. 1 2 4,130 sq.ft. 15 2 4,092 sq.ft. 6 1 4,465 sq.ft. 2 2 3,661 sq.ft. 16 2 4,042 sq.ft. 7 1 4,465 sq.ft. 3 2 4.142 sq.ft. 17 2 3,612 sq.ft. 8 1 4,465 s q.ft. 4 2 4,139 sq.ft. 18 2 4,042 sq.ft. 9 1 4,465 sq. ft. 5 2 4,139 s g.ft. 19 2 4,042 sq.ft. 10 1 4,465 sq.ft. 6 2 4,142 sq.ft. 20 2 3,612 sq.ft. 11 1 4,465 sq.ft. 7 2 4,142 sq.ft. 21 2 3,612 sq.ft- 12/1 4,465 sq.ft. 8? 4,142 sq.ft. 22 2 4,042 sq.ft. 13 1 4,465 sq.ft. 9 2 4,142 sq.ft. 23 2 78,075 sq.ft. 14 1 4,465 sq. f t. 10 2 4,142 sq.ft. I OUTLOT A 150,634 sq.ft. 38937 0.455068 85563 • (1 N F� DZ, F OL tf Z 33 ti ��.z9 -h1