Loading...
2024-0126 Chanhassen Apartments_EAST BUILDING ARCH Elevations_Sections_3d ViewsLEVEL 1 103' - 4" LEVEL 2 114' - 0" LEVEL 3 124' - 8" LEVEL 4 135' - 4" LEVEL 5 146' - 0" ROOF PLAN 156' - 8" MINUS 1 LEVEL 87' - 0" LEVEL RETAIL 100' - 0"14' - 0" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 4' - 0" 975' 975'4' - 0"971'8' - 6"64' - 8"14' - 0" 10' - 8" 10' - 8" 10' - 8" 10' - 8" BRICK COLOR #1 BRICK COLOR #1 - HORIZONTAL DETAILING BRICK COLOR #1 BRICK COLOR #1 - HORIZONTAL DETAILING FIBER CEMENT WALL PANEL - CHARCOAL FIBER CEMENT WALL PANEL - WARM GRAY HORIZONTAL ACCENT PANEL FIBER CEMENT PANEL - RUST RED ALUMINUM STOREFRONT SYSTEM BRICK COLOR #2 PREFABRICATED METAL BALCONY & RAILING SYSTEMELEVATOR OVERRUN LEVEL 1 103' - 4" LEVEL 2 114' - 0" LEVEL 3 124' - 8" LEVEL 4 135' - 4" LEVEL 5 146' - 0" ROOF PLAN 156' - 8" MINUS 1 LEVEL 87' - 0" LEVEL RETAIL 100' - 0" BRICK COLOR #1 FIBER CEMENT WALL PANEL - CHARCOAL FIBER CEMENT WALL PANEL - WARM GRAY HORIZONTAL ACCENT PANEL FIBER CEMENT WALL PANEL - CHARCOAL BRICK COLOR #2 PREFABRICATED METAL BALCONY & RAILING SYSTEM Signature Typed or Printed Name License #Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS: KEY PLANNOT FOR CONSTRUCTIONI hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota 1/26/2024 3:34:11 PMA.22 EAST BUILDING ELEVATIONS Project Number Author Checker 01/19/24 Market Blvd & W 78th St - East Building Market Blvd & W 78th St -East Building Chanhassen, MN LAND USE APPLICATION 1/19/2024 3/32" = 1'-0"A.22 1 NORTH ELEVATION 3/32" = 1'-0"A.22 2 SOUTH ELEVATION No. Description Date LEVEL 1 103' - 4" LEVEL 2 114' - 0" LEVEL 3 124' - 8" LEVEL 4 135' - 4" LEVEL 5 146' - 0" ROOF PLAN 156' - 8" MINUS 1 LEVEL 87' - 0" LEVEL RETAIL 100' - 0" BRICK COLOR #1 FIBER CEMENT WALL PANEL - CHARCOAL FIBER CEMENT WALL PANEL - WARM GRAY FIBER CEMENT PANEL - RUST RED FIBER CEMENT PANEL - WHITE BRICK COLOR #2 FIBER CEMENT WALL PANEL - CHARCOAL FIBER CEMENT WALL PANEL - WARM GRAY BRICK COLOR #1 PREFABRICATED METAL BALCONY & RAILING SYSTEM PRECAST DARK GRAY PRECAST GRAY BRICK COLOR #1 BRICK COLOR #1 - HORIZONTAL DETAILING LEVEL 1 103' - 4" LEVEL 2 114' - 0" LEVEL 3 124' - 8" LEVEL 4 135' - 4" LEVEL 5 146' - 0" ROOF PLAN 156' - 8" MINUS 1 LEVEL 87' - 0" LEVEL RETAIL 100' - 0" PREFABRICATED METAL BALCONY & RAILING SYSTEM BRICK COLOR #1 FIBER CEMENT WALL PANEL - CHARCOALFIBER CEMENT WALL PANEL - WARM GRAY FIBER CEMENT PANEL - RUST RED FIBER CEMENT PANEL - WHITE PRECAST DARK GRAY PRECAST GRAY BRICK COLOR #1 BRICK COLOR #1 - HORIZONTAL DETAILING HORIZONTAL ACCENT PANEL FIBER CEMENT PANEL - RUST RED BRICK COLOR #2 HORIZONTAL ACCENT PANEL Signature Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS: KEY PLANNOT FOR CONSTRUCTIONI hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota 1/26/2024 3:34:11 PMA.23 EAST BUILDING ELEVATIONS Project Number Author Checker 01/19/24 Market Blvd & W 78th St - East Building Market Blvd & W 78th St -East Building Chanhassen, MN LAND USE APPLICATION 1/19/2024 3/32" = 1'-0"A.23 1 EAST ELEVATION 3/32" = 1'-0"A.23 2 WEST ELEVATION No. Description Date LEVEL 1 103' - 4" LEVEL 2 114' - 0" LEVEL 3 124' - 8" LEVEL 4 135' - 4" LEVEL 5 146' - 0" ROOF PLAN 156' - 8" MINUS 1 LEVEL 87' - 0" ABCDEFGHJKMN 963.00'10' - 8"10' - 8"10' - 8"10' - 8"14' - 0"11' - 4"LEVEL RETAIL 100' - 0" L K.5 HOUSING RESIDENTIAL AMENITY RETAIL PARKING HOUSING HOUSING HOUSING HOUSING HOUSING HOUSING HOUSING HOUSING HOUSING HOUSING BEYOND10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"16' - 4"Signature Typed or Printed Name License # Date PROJECT NUMBER ORIGINAL ISSUE: REVISIONS:NOT FOR CONSTRUCTIONI hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota 1/26/2024 3:34:12 PMA.24 EAST BUILDING SECTION Project Number 01/19/24 Market Blvd & W 78th St - East Building Market Blvd & W 78th St -East BuildingChanhassen, MN LAND USE APPLICATION 1/19/2024 No. Description Date 3/32" = 1'-0"A.24 1 LONGITUDINAL SECTION Signature Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS: KEY PLANNOT FOR CONSTRUCTIONI hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota 1/26/2024 3:34:13 PMA.25 EAST BUILDING 3D VIEWS Project Number Author Checker 01/19/24 Market Blvd & W 78th St - East Building Market Blvd & W 78th St -East Building Chanhassen, MN LAND USE APPLICATION 1/19/2024 No. Description Date 1 2 3 4 5 6 1 2 3 4 5 6