Loading...
03 Arch Chanhassen Planning Commission 2024-02-16Architecture Interior Design Landscape Architecture Engineering 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:02:05 PMAuthor Checker 2612-01 G100 COVER SHEET CHANHASSEN CIVIC CAMPUS CHANHASSEN CIVIC CAMPUS 7700 MARKET BLVD, CHANHASSEN, MN 55317 02/16/2024 PROJECT LOCATION RENDERING PROJECT TEAM: ARCHITECT Boarman Kroos Vogel Group, Inc 222 North Second Street Minneapolis, Minnesota 55401 Phone: 612.339.3752 Fax: 612.339.6212 Contact: Michael Healy AIA OWNER / APPLICANT: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Phone: 952.227.1100 Contact: CIVIL Stantec 733 Marquette Ave. Suite 1000 Minneapolis, Minnesota 55402 Phone: 612.712.2000 Contact: Clark Lohr LANDSCAPE HKGI 800 Washington Ave. N. Suite 103 Minneapolis, Minnesota 55401 Phone: 612.338.0800 Contact: Bryan Harjes STRUCTURAL ENGINEER Boarman Kroos Vogel Group, Inc 222 North Second Street Minneapolis, Minnesota 55401 Phone: 612.339.3752 Fax: 612.339.6212 Contact: Siobhan Dvergsten MECHANICAL ENGINEER Boarman Kroos Vogel Group, Inc 222 North Second Street Minneapolis, Minnesota 55401 Phone: 612.339.3752 Fax: 612.339.6212 Contact: Michael Dugan ELECTRICAL ENGINEER Boarman Kroos Vogel Group, Inc 222 North Second Street Minneapolis, Minnesota 55401 Phone: 612.339.3752 Fax: 612.339.6212 Contact: Chad Kurdi PE DEVELOPMENT SUBMITTAL SITE SECURITY TECHNOLOGY ENGINEER True North Consulting Group 140 3rd Street South Stillwater, Minnesota 55082 Phone: 512.596.3812 Contact: Nick Webber CONSTRUCTION MANAGER: Kraus Anderson 501 S. 8th St. Minneapolis, MN 55404 Phone: 612.332.7281 Contact: Dustin Phillips SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTAL1 - GENERAL G100 COVER SHEET X X X G120 CODE SUMMARY X G121 CODE PLAN - SITE X G122A LIFE SAFETY PLAN - LOWER LEVEL X G123A LIFE SAFETY PLAN - LEVEL 1 X G124A LIFE SAFETY PLAN - LEVEL 2 X G125 LIFE SAFETY PLAN - PARK PAVILION X G130 SYMBOLS & ABBREVIATIONS X G140 ACCESSIBILITY & MOUNTING HEIGHTS X 2 - CIVIL C-001 COVER SHEET X X C-002 GENERAL NOTES X C-003 OVERALL EXISTING CONDITIONS X X C-004 PHASE 1 EXISTING CONDITIONS X X C-005 PHASE 2 NORTHWEST EXISTING CONDITIONS X X C-006 PHASE 2 NORTHEAST EXISTING CONDITIONS X X C-007 OVERALL REMOVALS & PRECONSTRUCTION EROSION CONTROL PLAN X X C-008 PHASE 1 REMOVALS & PRECONSTRUCTION EROSION CONTROL PLAN X X C-009 PHASE 2 NW REMOVALS & PRECONSTRUCTION EROSION CONTROL PLAN X X C-010 PHASE 2 SW REMOVALS & PRECONSTRUCTION EROSION CONTROL PLAN X X C-101 OVERALL SITE PLAN X X C-102 PHASE 1 SITE PLAN X X C-103 PHASE 2 NORTHWEST SITE PLAN X X C-104 PHASE 2 NORTHEAST SITE PLAN X X C-201 OVERALL POST-CONSTRUCTION STABILIZATION PLAN X X C-202 PHASE 1 POST-CONSTRUCTION STABILIZATION PLAN X X C-203 PHASE 2 NORTHWEST POST-CONSTRUCTION STABILIZATION PLAN X X C-204 PHASE 2 NORTHEAST POST-CONSTRUCTION STABILIZATION PLAN X X C-205 SWPPP X C-301 OVERALL GRADING PLAN X X C-302 PHASE 1 GRADING PLAN X X C-303 PHASE 2 NORTHWEST GRADING PLAN X X C-304 PHASE 2 NORTHEAST GRADING PLAN X X C-401 OVERALL UTILITY PLAN X X C-402 PHASE 1 UTILITY PLAN X X C-403 PHASE 2 NORTHWEST UTILITY PLAN X X C-404 PHASE 2 NORTHEAST UTILITY PLAN X X C-501 OVERALL STORM SEWER PLAN X X C-502 PHASE 1 STORM SEWER PLAN X X C-503 PHASE 2 NORTHWEST STORM SEWER PLAN X X C-504 PHASE 2 NORTHEAST STORM SEWER PLAN X X C-601 OVERALL ITEMIZED BID ITEMS AND BID ALTERNATES X C-602 OVERALL ITEMIZED BID ITEMS AND BID ALTERNATES X C-603 OVERALL ITEMIZED BID ITEMS AND BID ALTERNATES X SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTALI015 SIGNAGE ACCESSIBILITY REQUIREMENTS X I050 INTERIOR ROOM FINISH SCHEDULE X I021 PAVILION FINISH PLAN X I100 LOWER LEVEL - OVERALL FINISH PLAN X I101 LEVEL 1 FINISH PLAN X I102 LEVEL 2 FINISH PLAN X I150 ENLARGED FLOOR FINISH PLANS X I400 LOWER LEVEL - FURNITURE PLAN X I401 LEVEL 1 - FURNITURE PLAN - FOR REFERENCE ONLY X I402 LEVEL 2 - FURNITURE PLAN X I421 PAVILION FURNITURE PLAN X 6 - STRUCTURAL S001 STRUCTURAL NOTES X X S001.1 STRUCTURAL NOTES X X S010 SPECIAL INSPECTIONS X X S030 SCHEDULES X X S050 LEVEL 1 - PRECAST LOADING PLAN X X S099 FOUNDATION PLAN X X S101 LEVEL 1 - PRECAST PLAN X X S101F LEVEL 1 - FRAMING PLAN X X S102 LEVEL 2 - FRAMING PLAN X X S140 ROOF - FRAMING PLAN X X S140.1 PARTIAL ROOF PLANS X X S140.2 PARTIAL ROOF PLANS X X S160 BUILDING SECTIONS & ELEVATIONS X X S161 BUILDING ELEVATIONS X X S162 BALCONY SECTIONS X X S201 STANDARD FOUNDATION DETAILS X X S202 FOUNDATION DETAILS X X S221 PRECAST GARAGE DETAILS X X S301 PRECAST DETAILS X X S450 MASONRY DETAILS X X S501 STEEL FRAMING DETAILS X X S502 STEEL FRAMING DETAILS X X S503 STEEL FRAMING DETAILS X X S504 STEEL FRAMING DETAILS X S505 STEEL JOIST DETAILS X X S510 METAL DECK DETAILS X X S520 ROOFING DETAILS X 7 - MECHANICAL M001 MECHANICAL COVERSHEET X M002 MECHANICAL NOTE SHEET X M021 PAVILION MECHANICAL PLANS M099 P1 PARKING MECHANICAL PLAN X M101 LEVEL 1 MECHANICAL PLAN X M102 LEVEL 2 MECHANICAL PLAN X M141 ROOF MECHANICAL PLAN X M299 LEVEL P1 HYDRONIC PLAN X M301 LEVEL 1 HYDRONIC PLAN X M302 LEVEL 2 HYDRONIC PLAN X SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTALC-801 DETAILS X X C-802 DETAILS X X C-803 DETAILS X X C-804 DETAILS X X C-805 DETAILS X C-806 DETAILS X 3 - LANDSCAPE L101 TITLE AND GENERAL NOTES X L102 SITE SURFACING X L201 MATERIALS LAYOUT X L202 MATERIALS LAYOUT X L203 MATERIALS LAYOUT X L204 MATERIALS LAYOUT X L205 MATERIALS LAYOUT X L206 MATERIALS LAYOUT X L207 MATERIALS LAYOUT X L208 MATERIALS LAYOUT X L209 MATERIALS LAYOUT X L300 PLANTING INDEX X L301 PLANTING LAYOUT X L302 PLANTING LAYOUT X L303 PLANTING LAYOUT X L304 PLANTING LAYOUT X L305 PLANTING LAYOUT X L306 PLANTING LAYOUT X L307 PLANTING LAYOUT X L308 PLANTING LAYOUT X L309 PLANTING LAYOUT X L401 LANDSCAPE DETAILS X L402 LANDSCAPE DETAILS X L403 LANDSCAPE DETAILS X L404 LANDSCAPE DETAILS X L405 LANDSCAPE DETAILS X L406 LANDSCAPE DETAILS X 4 - ARCHITECTURE A010 ARCHITECTURAL SITE PLAN X X X A011 ENLARGED SITE PLAN - CITY HALL X A012 ENLARGED SITE PLAN - PARK PAVILION AND STAGE X A021 PARK PAVILION FLOOR PLAN X X A022 PARK PAVILION ROOF PLAN AND RCP X A023 PARK PAVILION EXTERIOR ELEVATIONS X X A024 PARK PAVILION BUILDING SECTIONS X A025 PARK PAVILION WALL SECTIONS X A026 PARK PAVILION WALL SECTIONS X A090 PARK PAVILION FRAME TYPES & OPENING SCHEDULE X A100 LOWER LEVEL - FLOOR PLAN X X X A101 LEVEL 1 - FLOOR PLAN X X X A102 LEVEL 2 - FLOOR PLAN X X X A140 LOW ROOF PLAN X X A141 UPPER ROOF PLAN X X SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTALA151 ENLARGED PLANS X A152 ENLARGED PLANS X A153 ENLARGED PLANS X A154 ENLARGED PLAN - COUNCIL CHAMBERS X A155 COUNCIL CHAMBERS DIAS A300 LOWER LEVEL REFLECTED CEILING PLAN X A301 LEVEL 1 REFLECTED CEILING PLAN X A302 LEVEL 2 REFLECTED CEILING PLAN X A401 OVERALL EXTERIOR ELEVATIONS X X A402 OVERALL EXTERIOR ELEVATIONS X X A403 EXTERIOR RENDERINGS X A451 ENLARGED EXTERIOR ELEVATIONS X A501 BUILDING SECTIONS X X A502 BUILDING SECTIONS X X A503 BUILDING SECTIONS X X A551 WALL SECTIONS X A552 WALL SECTIONS X A553 WALL SECTIONS X A554 WALL SECTIONS X A555 WALL SECTIONS X A556 WALL SECTIONS X A557 WALL SECTIONS X A601 CONSTRUCTION TYPES - EXTERIOR X A602 CONSTRUCTION TYPES - EXTERIOR X A603 CONSTRUCTION TYPES - ROOF & FLOOR X A604 CONSTRUCTION TYPES - PARTITION TYPES X A620 DETAILS - WALL X A621 DETAILS - WALL X A630 DETAILS - SLAB EDGES X A662 DETAILS - ROOF X A671 DETAILS - ROOF CANOPIES AND BALCONIES X A672 DETAILS - ROOF CANOPIES AND BALCONIES X A673 DETAILS - ROOF CANOPIES AND BALCONIES X A701 ELEVATOR PLANS AND SECTIONS X A710 STAIR PLANS AND SECTIONS X A711 STAIR PLANS AND SECTIONS X A712 STAIR PLANS AND SECTIONS X A801 INTERIOR ELEVATIONS X A802 INTERIOR ELEVATIONS X A803 INTERIOR ELEVATIONS X A804 INTERIOR ELEVATIONS X A805 INTERIOR ELEVATIONS X A900 OPENING SCHEDULE X A910 PANEL TYPES, FRAME TYPES X A920 ALUMINUM FRAME TYPES - EXTERIOR SF X A921 ALUMINUM FRAME TYPES - EXTERIOR SF X A922 ALUMINUM FRAME TYPES - INTERIOR X A923 ALUMINUM FRAME TYPES - CW X 5 - INTERIORS I000 INTERIOR MATERIAL IDENTIFICATION LIST X SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTALM601 MECHANICAL DIAGRAMS X M681 HEATING WATER RISER DIAGRAMS M682 HEATING WATER RISER DIAGRAM M701 MECHANICAL DETAILS X M801 MECHANICAL SCHEDULES X M802 MECHANICAL SCHEDULES X 8 - MECHANICAL & ELECTRICAL ME801 MECHANICAL AND ELECTRICAL SCHEDULES X ME802 MECHANICAL AND ELECTRICAL SCHEDULES X 9 - PLUMBING P001 PLUMBING SYMBOLS, ABBREVIATIONS & NOTES X P081 UNDERGROUND PLUMBING PLAN X P099 LEVEL P1 PLUMBING PLAN X P101 LEVEL 1 PLUMBING PLAN X P102 LEVEL 2 PLUMBING PLAN X P141 ROOF PLUMBING PLAN X P651 NATURAL GAS RISER DIAGRAMS P701 PLUMBING DETAILS X P801 PLUMBING SCHEDULES X P951 FIRE PROTECTION RISER DIAGRAM X 10 - ELECTRICAL E001 ELECTRICAL COVERSHEET E010 ELECTRICAL SITE PLAN X E015 SITE PHOTOMETRIC X E021 PARK PAVILION ELECTRICAL PLAN E022 PARK PAVILION LIGHTING PLAN E099 LEVEL P1 ELECTRICAL PLAN X E101 LEVEL 1 ELECTRICAL PLAN X E102 LEVEL 2 ELECTRICAL PLAN X E141 ROOF ELECTRICAL PLAN X E151 ENLARGED ELECTRICAL ROOM PLANS X E299 LEVEL P1 LIGHTING PLAN X E301 LEVEL 1 LIGHTING PLAN X E302 LEVEL 2 LIGHTING PLAN X E401 ELECTRICAL POWER RISER DIAGRAMS X X E501 ELECTRICAL SCHEDULES X E521 ELECTRICAL PANEL SCHEDULES X X E522 ELECTRICAL PANEL SCHEDULES X E523 ELECTRICAL PANEL SCHEDULES X E601 ELECTRICAL DETAILS X E602 ELECTRICAL DETAILS X 11 - TECHNOLOGY T000 TECHNOLOGY INDEX X T010 TECHNOLOGY SITE PLAN X T021 TECHNOLOGY PARK PAVILION PLAN X T100 TECHNOLOGY LOWER LEVEL FLOOR PLAN X T101 TECHNOLOGY LEVEL 1 FLOOR PLAN X T102 TECHNOLOGY LEVEL 2 FLOOR PLAN X T299 TECHNOLOGY PARK PAVILION RCP X T300 TECHNOLOGY LOWER LEVEL RCP X ISSUE # DATE DESCRIPTION 01/24/2024 BID PACKAGE 1 02/16/2024 DEVELOPMENT SUBMITTAL SHEET INDEX SHEET NUMBER SHEET NAME DD SETBID PACKAGE 1DEVELOPMENT SUBMITTALT301 TECHNOLOGY LEVEL 1 RCP X T302 TECHNOLOGY LEVEL 2 RCP X T400 TECHNOLOGY ENLARGEMENTS X T500 TECHNOLOGY DETAILS X T501 TECHNOLOGY DETAILS X T600 TECHNOLOGY SECURITY DETAILS X T601 TECHNOLOGY SECURITY DETAILS X T700 TECHNOLOGY AV DETAILS X T701 TECHNOLOGY AV DETAILS X Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 CITY HALLEXISTING LIBRARY PARK PAVILION GENERATOR ENCLOSURE, BELOW GARAGE ACCESS DUMPSTER ENCLOSURE PUBLIC PARKING (47 SPACES) ACCESSIBLE PARKING (4 SPACES) PUBLIC PARKING (35 SPACES + 2 ACCESSIBLE SPACES) COVERED STAGE LAWN UPPER PARK SKATE PARK PICKLE BALL COURTS PLAYGROUND SPLASH PAD DROP OFF EXISTING PARKING EXISTING PARKING BOLLARDS, SEE LANDSCAPE BOLLARDS, SEE LANDSCAPE FDC KNOX BOX FDC KNOX BOX PROPERTY LINETRANSFORMER PROPERTY LINE W 78TH ST.KERBER BLVD.MARKET BLVD.PROPERTY LINEPROPERTY LINE PROPERTY LINE CITY HALL LEVEL 1 (CIVIL 982.5' = ARCH 100'-0") A011 1 A012 1 A015 5 Architecture Interior Design Landscape Architecture Engineering TRUE NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:02:40 PMAuthor Checker 2612-01 A010 ARCHITECTURAL SITE PLAN CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL SITE SITE PLAN GENERAL NOTES 1. REFER TO SITE SURVEY FOR EXISTING TOPOGRAPHY, UTILITIES, AND OTHER PERTINENT INFORMATION. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. 4. REFER TO 'C' SERIES (CIVIL) DRAWINGS FOR SITE DEMOLITION, EROSION CONTROL, SITE GRADING, UTILITIES, STORMWATER, AND SITE PAVING. 5. REFER TO 'L' SERIES (LANDSCAPE) DRAWINGS FOR LANDSCAPE PLANTINGS, SPECIALITY PAVING, FLAG POLES, AND SITE FURNISHINGS. 6. REFER TO 'E' SERIES (ELECTRICAL) DRAWINGS FOR SITE LIGHTING AND SITE POWER. 7. REFER TO 'T' SERIES (TECHNOLOGY) DRAWINGS FOR SITE SECURITY AND ACCESS CONTROL. 8. REFER TO 'M' SERIES (MECHANICAL) DRAWINGS FOR BUILDING STORM WATER, SEWER, AND OTHER CONNECTION LOCATIONS. 9. REFER TO GEOTECHNICAL REPORT PROVIDED IN PROJECT MANUAL FOR MORE INFORMATION. 10. CONCRETE APRONS/STOOPS AT EXTERIOR SIDE OF DOOR THRESHOLDS AND SILLS SHALL BE 1/2 INCH LOWER THAN INTERIOR FLOOR. AND SLOPE AWAY FROM BUILDING AT 1/4 INCH PER FOOT MINIMUM. 11. THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROM THE BUILDING AT A SLOPE NOT LESS THAN 5% FOR A MINIMUM DISTANCE OF TEN FEET MEASURED FROM THE PERPENDICULAR FACE OF THE BUILDING WALL. REFER TO CIVIL FOR ADDITIONAL GRADING REQUIREMENTS. 12. FINISHED FLOOR ELEVATION 100' -0" = XXXX' -XX". A010 1" = 30'-0" 1 ARCHITECTURAL SITE PLAN ISSUE # DATE DESCRIPTION 01/24/2024 BID PACKAGE 1 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 CITY HALL METAL GRATE OVER GENERATOR ENCLOSURE, BELOW GARAGE ACCESS ACCESSIBLE PARKING (4 SPACES) BOLLARDS, SEE LANDSCAPE FLAG POLES, SEE LANDSCAPE MONUMENT SIGN, SEE LANDSCAPE FDC KNOX BOX PROPERTY LINETRANSFORMERMARKET BLVD.CITY HALL LEVEL 1 (CIVIL 982.5' = ARCH 100'-0") TRANSFORMER, REF. ELECTRICAL CLEAR5' - 0"CLEAR5' - 0"PROPERTY LINE W 78TH ST MARKET BLVD95' - 0" 100' - 0" 95' - 0" 98' - 6"99' - 6" 99' - 6"98' - 6" 96' - 7" 96' - 6" 1 1/8" / 1'-0" 5/8" / 1'-0" T.O. WALL T.O. WALL T.O. WALL T.O. WALL T.O. CONC @ O.H. DOOR T.O. CONC @ DRAIN 96' -0 1/4" B.O. STAIR 99' -11 1/2" T.O. STAIR 95' -11 3/4" T.O. STAIR 92' -0 1/4" B.O. STAIR 98' - 6" 98' - 6" T.O. CONC T.O. WALL T.O. WALL T.O. CONC T.O. WALL B.O. WELL 3 LEVELS 59,509 SF 72' HEIGHT Architecture Interior Design Landscape Architecture Engineering TRUE NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:04:47 PMAuthor Checker 2612-01 A011 ENLARGED SITE PLAN - CITY HALL CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL SITE SITE PLAN GENERAL NOTES 1. REFER TO SITE SURVEY FOR EXISTING TOPOGRAPHY, UTILITIES, AND OTHER PERTINENT INFORMATION. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. 4. REFER TO 'C' SERIES (CIVIL) DRAWINGS FOR SITE DEMOLITION, EROSION CONTROL, SITE GRADING, UTILITIES, STORMWATER, AND SITE PAVING. 5. REFER TO 'L' SERIES (LANDSCAPE) DRAWINGS FOR LANDSCAPE PLANTINGS, SPECIALITY PAVING, FLAG POLES, AND SITE FURNISHINGS. 6. REFER TO 'E' SERIES (ELECTRICAL) DRAWINGS FOR SITE LIGHTING AND SITE POWER. 7. REFER TO 'T' SERIES (TECHNOLOGY) DRAWINGS FOR SITE SECURITY AND ACCESS CONTROL. 8. REFER TO 'M' SERIES (MECHANICAL) DRAWINGS FOR BUILDING STORM WATER, SEWER, AND OTHER CONNECTION LOCATIONS. 9. REFER TO GEOTECHNICAL REPORT PROVIDED IN PROJECT MANUAL FOR MORE INFORMATION. 10. CONCRETE APRONS/STOOPS AT EXTERIOR SIDE OF DOOR THRESHOLDS AND SILLS SHALL BE 1/2 INCH LOWER THAN INTERIOR FLOOR. AND SLOPE AWAY FROM BUILDING AT 1/4 INCH PER FOOT MINIMUM. 11. THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROM THE BUILDING AT A SLOPE NOT LESS THAN 5% FOR A MINIMUM DISTANCE OF TEN FEET MEASURED FROM THE PERPENDICULAR FACE OF THE BUILDING WALL. REFER TO CIVIL FOR ADDITIONAL GRADING REQUIREMENTS. 12. FINISHED FLOOR ELEVATION 100' -0" = XXXX' -XX". A011 3/32" = 1'-0" 1 ENLARGED CITY HALL SITE PLAN ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 PARK PAVILION 1 LEVEL 1,599 SF 25' HEIGHT PUBLIC PARKING (47 SPACES) COVERED STAGE LAWN PLAYGROUND SPLASH PAD FDC KNOX BOX ROOF DRAIN OUTLET LOCATIONS ROOF DRAIN OUTLET LOCATIONS Architecture Interior Design Landscape Architecture Engineering TRUE NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:05:17 PMAuthor Checker 2612-01 A012 ENLARGED SITE PLAN - PARK PAVILION AND STAGE CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL SITE SITE PLAN GENERAL NOTES 1. REFER TO SITE SURVEY FOR EXISTING TOPOGRAPHY, UTILITIES, AND OTHER PERTINENT INFORMATION. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. 4. REFER TO 'C' SERIES (CIVIL) DRAWINGS FOR SITE DEMOLITION, EROSION CONTROL, SITE GRADING, UTILITIES, STORMWATER, AND SITE PAVING. 5. REFER TO 'L' SERIES (LANDSCAPE) DRAWINGS FOR LANDSCAPE PLANTINGS, SPECIALITY PAVING, FLAG POLES, AND SITE FURNISHINGS. 6. REFER TO 'E' SERIES (ELECTRICAL) DRAWINGS FOR SITE LIGHTING AND SITE POWER. 7. REFER TO 'T' SERIES (TECHNOLOGY) DRAWINGS FOR SITE SECURITY AND ACCESS CONTROL. 8. REFER TO 'M' SERIES (MECHANICAL) DRAWINGS FOR BUILDING STORM WATER, SEWER, AND OTHER CONNECTION LOCATIONS. 9. REFER TO GEOTECHNICAL REPORT PROVIDED IN PROJECT MANUAL FOR MORE INFORMATION. 10. CONCRETE APRONS/STOOPS AT EXTERIOR SIDE OF DOOR THRESHOLDS AND SILLS SHALL BE 1/2 INCH LOWER THAN INTERIOR FLOOR. AND SLOPE AWAY FROM BUILDING AT 1/4 INCH PER FOOT MINIMUM. 11. THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROM THE BUILDING AT A SLOPE NOT LESS THAN 5% FOR A MINIMUM DISTANCE OF TEN FEET MEASURED FROM THE PERPENDICULAR FACE OF THE BUILDING WALL. REFER TO CIVIL FOR ADDITIONAL GRADING REQUIREMENTS. 12. FINISHED FLOOR ELEVATION 100' -0" = XXXX' -XX". A012 3/32" = 1'-0" 1 ENLARGED PARK PAVILION AND STAGE SITE PLAN ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 1 A024 1 A024 5 A024 5 A024 4 A023 1 A023 2 A023 3 A023 2 A024 2 A024 6 A024 6 A024 3 A024 3 A024 PA PA P1 P1 PB PB PC PC PD PD PE PE P2 P2 P4 P4 P3 P3 WOMEN'S RESTROOM P106 CONSESSIONS P102 EVENT SPACE P101 FAMILY RR P105 MEN'S RESTROOM P108 ELEC / MECH P104P108P106P104 P102.1A027 9 A0274 10 11 2 3 1 A027 7 8 CANOPY OVERHEAD CANOPY OVERHEADCANOPY OVERHEADA027 5 2' - 8"5' - 4"6' - 10"4' - 0"4' - 0"10' - 0"7' - 0"3' - 4"17' - 4"14' - 0" 12 8' - 6"8' - 3"6' - 4"2' - 3"1' - 6" SF-72 SF-70 10' - 0"27' - 8"14' - 0"39' - 8"13' - 6"12' - 2"10' - 8"6 10"5' - 7" FIN. 4' - 0"1' - 7" P102.2 P101.3VESTIBULE P107 P101.25' - 0"2' - 0" 1' - 8"3' - 4"1' - 8" P107.2P107.1 8' - 3"22' - 7" 4" 2' - 0" S6 S6 T4 S4 COUNTER 2' - 1"13' - 4"7' - 0"16' - 0"1' - 2" 1' - 8" 2' - 4"7' - 8"4" F.O.S. 1' - 9"1' - 6"5' - 1 1/8"3' - 0" CLR5' - 0 1/8"3' - 6 1/8"1' - 8"F.O.S.1' - 2 5/8"1' - 8" 6' - 8"1' - 10"7' - 4"1' - 10"6' - 8" P101.16' - 4"5"10"5' - 4"1' - 1"T4 T4 S6 3' - 0"80.00°STORAGE P103 P103FC-1 P105T25 R02 R02 R02 R15 R15 4' - 0"2' - 0"32' - 0"1' - 0"1' - 0"4' - 0"1' - 0"1' - 0"1' - 6"4' - 0"14' - 6"4' - 0"3' - 6"RAMP 108' - 0" CANOPY OVERHEAD CANOPY OVERHEADSTAGE 4 A024 4 A024 Architecture Interior Design Landscape Architecture Engineering TRUE NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:02:46 PMAuthor Checker 2612-01 A021 PARK PAVILION FLOOR PLAN CHANHASSEN CIVIC CAMPUS A021 1/4" = 1'-0" 1 PARK PAVILION -FLOOR PLAN KEYNOTES - ARCHITECTURAL FLOOR PLAN GENERAL NOTES 1. GENERAL NOTES APPLY TO ALL DRAWING SHEETS. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES UPON DISCOVERY. 4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL BUILDING CODES. COMPLIANCE WITH ALL APPLICABLE CODES WILL BE REQUIRED TO BE MET OR EXCEEDED. 5. REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS AND CEILING FINISHES. 6. REFER TO CODE PLANS FOR LOCATIONS OF RATED WALLS, SMOKE BARRIERS, FIRE EXTINGUISHER CABINETS, ETC. 7. REFER TO INTERIOR FINISH PLANS AND ROOM FINISH SCHEDULE FOR ROOM FINISHES. 8. REFER TO INTERIOR FURNITURE PLANS FOR FURNITURE/FIXTURE LAYOUT. 9. REFER TO SHEET G140 FOR TYPICAL MOUNTING ELEVATIONS. 10. ARCHITECTURAL FINISHED FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR TOPPING. 11. UNLESS NOTED OTHERWISE, ALL NON-RATED INTERIOR WALLS SHALL BE TYPE "S4", EXTENDING UP TO UNDERSIDE OF FLOOR OR ROOF ABOVE WITH MINERAL WOOL ACOUSTIC BATT INSULATION. SCRIBE GYPSUM BOARD TO IRREGULARITIES OF DECK ABOVE AND SEAL AROUND ALL PENETRATIONS WITH ACOUSTIC SEALANT. 12. PLAN DIMENSIONS ARE TO FINISHED SURFACE OF MASONRY WALLS, OR CENTERLINE OF STUDS AT METAL STUD INTERIOR WALLS, UNLESS NOTED OTHERWISE. REFER TO SHEET A602 CONSTRUCTION ASSEMBLY TYPES FOR MORE INFORMATION. 13. COORDINATE ALL LOCATIONS FOR IN-WALL BLOCKING AND/OR WALL BACKING FOR ITEMS SUCH AS TOILET ACCESSORIES, GRAB BARS, CASEWORK, WALL-MOUNTED FIXTURES, MARKER BOARDS, VISUAL DISPLAY BOARDS, AUDIO-VISUAL EQUIPMENT, HANDRAILS, ETC. INSTALL FIRE-RESISTIVE TREATED WOOD BLOCKING OR METAL BACKING PLATES IN METAL STUD PARTITIONS. 14. TRANSITIONS BETWEEN FINISH FLOOR ELEVATION(S) SHALL NOT EXCEED 1/2 INCH, UNLESS NOTED OTHERWISE. 15. PROVIDE 4 INCH HIGH CONCRETE HOUSEKEEPING PADS BELOW ALL FLOOR-MOUNTED INTERIOR MECHANICAL AND ELECTRICAL EQUIPMENT. VERIFY EXACT SIZES AND LOCATIONS WITH AFFECTED TRADES. 16. CONTRACTOR SHALL COORDINATE ALL REQUIRED FLOOR/WALL/ROOF PENETRATION SIZES AND LOCATIONS WITH ASSOCIATED TRADES PRIOR TO CUTTING. 17. CONTRACTOR SHALL INSTALL CONTINUOUS PERFORATED DRAIN TILE AROUND THE OUTSIDE PERIMETER OF BUILDING. REFER TO FOUNDATION DETAILS AND SPECIFICATION FOR MORE INFORMATION. SEE PLUMBING DRAWINGS FOR SUMP LOCATION. 18. INTERIOR ELEVATION MARKERS BASED ON PLAN NORTH DIRECTION 19. UNLESS NOTED OTHERWISE, ALL LOWER LEVEL WALLS TO BE TYPE "M8". A021 1/8" = 1'-0" 2 COVERED STAGE FLOOR PLAN ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 1 A024 PAVILION ROOF 117' -6" PAVILION LEVEL 1 106' -6" 2 A024 3 A024 PAPBPCPDPE MP-1A FBR-1 MP-3 MP-1B OVERHEAD COILING DOOR AE03 11' - 0"5 A024 PAVILION ROOF 117' -6" PAVILION LEVEL 1 106' -6" P1P2P4P3 MP-1A FBR-1 MP-3 MP-1A AE03 R-1 5 A024 PAVILION ROOF 117' -6" PAVILION LEVEL 1 106' -6" 6 A024 P1 P2 P4P3 MP-1B FBR-1 MP-3 17' - 0"3' - 4"3' - 4"3' - 4"4' - 0"3' - 4"4' - 0"3' - 4" RECESS BRICK VENEER 1/2" 1 A024 PAVILION ROOF 117' -6" PAVILION LEVEL 1 106' -6" 2 A024 3 A024 PA PB PC PD PE MP-1B Architecture Interior Design Landscape Architecture Engineering 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:12:18 PMAuthor Checker 2612-01 A023 PARK PAVILION EXTERIOR ELEVATIONS CHANHASSEN CIVIC CAMPUS A023 1/8" = 1'-0" 2 PAVILION EXTERIOR ELEVATION -EAST A023 1/8" = 1'-0" 1 PAVILION EXTERIOR ELEVATION -NORTH A023 1/8" = 1'-0" 3 PAVILION EXTERIOR ELEVATION -SOUTH A023 1/8" = 1'-0" 4 PAVILION EXTERIOR ELEVATION -WEST KEYNOTES - EXTERIOR ELEVATION AE03 PRE-FINISHED METAL COPING, COLOR: TBD EXTERIOR ELEVATION GENERAL NOTES 1. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 2. REFER TO CIVIL DRAWINGS FOR GRADE ELEVATION AROUND THE PERIMETER OF THE BUILDING. 3. REFER TO STRUCTURAL DRAWINGS FOR FOOTING DEPTHS AND TYPES. 4. REFER TO PLUMBING DRAWINGS FOR LOCATIONS OF HOSE BIBS, ROOF OVERFLOW DRAINS, ETC. 5. REFER TO ELECTRICAL DRAWINGS FOR EXTERIOR LIGHT FIXTURE TYPES AND LOCATIONS. 6. REFER TO ARCHITECTURAL FLOOR PLANS AND WALL SECTIONS FOR WALL TYPES. ISSUE # DATE DESCRIPTION NORTHEAST PERSPECTIVE NORTH PERSPECTIVE Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL STN-1 STONE VENEER MASONRY PAVILION -EXTERIOR ELEVATION MATERIAL LEGEND FBR-1 FACE BRICK -TAN MP-1A ACM PANEL MP-2 METAL CLADDING MP-3 METAL CLADDING CONC-1 CAST-IN-PLACE CONCRETE (B.O.D.: LONGBOARD, BLEND 4" & 6" V-GROOVE PLANK, LIGHT FIR) (B.O.D.: LONGBOARD, 4" CASTELLATION PLANK, SATIN BLACK) (B.O.D.: PAC-CLAD, ACM, METALLIC SILVER) (B.O.D.: READINGROCK, ROCKCAST, LILY WHITE BLEND, SLATE FINISH) (B.O.D.: SUMMIT BRICK, 751L DOVE, SIZE: MODULAR) SSR-1 STANDING SEAM METAL ROOF (B.O.D.: PAC-CLAD, SNAP-CLAD, SLATE GRAY) MP-4 METAL CLADDING (B.O.D.: LONGBOARD, PANELS, SATIN BLACK) 1 A402 2 A401 1 A401 3 A502 3 A502 11 33 55 66 77 A A B B G G F F H D D C C J J 2 A503 2 A503 2 A501 2 A501 1 A501 1 A501 1 A503 1 A503 2 A502 2 A502 1 A502 1 A502 3 A402 4 A402 A153 1 A710 3 A711 3 A701 3 5 A451 44 22 7 A451 3 A555 A151 14 STORAGE 002 BOILER/ SPRINKLER 001 ARCHIVE STOR. 003 STAIR A STA-0 ELEC 011 LOCKERS 005 RR 006 MUD ROOM 007 CORRIDOR 004 STAIR B STB-0 FACILITIES 010 GENERATOR 012 001002003 004.2006 007.1 005007.2010011012004.1RAMP UP000.1 4" C.I.P. CONC. CURB CI-16 E.7 CI-16 CI-16 0 M8 0 M8 1 M8 CI-16 CI-16 K 0.5 194' - 3 1/2" 87'-11" 88'-2" 88'-4" 88'-2"88'-2" 88'-2" 88'-2" 88'-2" 88'-2" 87'-11" 88'-4"88'-4" 87'-11" 87'-11" 88'-2" 88'-2" 88'-4" 87'-11" 87'-11" 88'-2" 88'-4" 88'-2" 88'-4" 88'-2" 88'-4" 88'-4" 88'-4" 88'-4" 88'-2" 88'-4" 0" 88'-4" 88'-4" 88'-4" 88'-8"88'-8"STB-0STA-0 1 M8 1 M8 1 M12 1 M12 1 M12 10' - 5"10' - 0"44' - 0"10' - 0"26' - 6"3' - 9 1/4"7' - 6"4' - 0"CURB 2' - 0" CLEAR 22' - 4"CURB 2' - 0" 88'-4"DRIVE AISLE24' - 0"DRIVE AISLE 24' - 8"DRIVE AISLE20' - 6"D.7 D.9 E.9 DRIVE AISLE 24' - 1 7/8" TYP. STALL WIDTH 10' - 0"9' - 0"9' - 0"9' - 0"9' - 0"16' - 5 1/2"30' - 2"22' - 2"7' - 6"18' - 0"27' - 10"14' - 2"122' - 8"16' - 4"29' - 0"23' - 0"10' - 6"27' - 6"16' - 4"194' - 3 1/2" 46' - 7 1/2"22' - 2"1' - 6"32' - 0"18' - 0"27' - 10"14' - 2"122' - 8"16' - 4"29' - 0"23' - 0"10' - 6"27' - 6"16' - 4"6%16%8%88'-11" 85'-9" 96'-6" CI-16 MPM-1 C-8 VMC-8 6 A554 CI-16 15.00° 4' - 3"21' - 0" 32' - 0"26' - 0" 32' - 0" 1' - 4" 7' - 6"15' - 0"8"14' - 5"9' - 2"6' - 8"25' - 4"1' - 0"13' - 0"21' - 0"1 M8 7' - 0"4' - 8"7' - 8"8"7' - 0"9' - 7 3/4"28' - 4"21' - 6 1/4"12' - 4"19' - 8 3/8"6' - 4"2' - 8"1' - 9 1/2"2' - 0"1' - 10"4' - 0"6' - 4" A07 3' - 4"4"4" 3' - 4" 1' - 4"3' - 4" 3' - 4" 4" 3' - 10" 4"6' - 4"1' - 4"2' - 8"3' - 4"1 M8 1 M8 0 M8 3' - 10"4' - 0" 0 M8 6' - 4"8" 88'-4" 0 M8 GARAGE 000 C-8C-8 19' - 1"8' - 11"28' - 7 53/64"VMS-6 87'-11" 88'-2" 88'-2" 88'-2" 87'-11"88'-2" 88'-2" A04 A04 A04 A04 A04 36 35 34 33 32 31 30 29 28 27 26 25 24 23 16 15 20 21 22 1918 131211109876 5 4 2 1 14 A05 A05 A05 A05 A05 A05 A05 22' - 0" TRENCH DRAIN 6 " A07 A07 A07 A07 A07A07 A07 FC-1 Architecture Interior Design Landscape Architecture Engineering TRUE NORTH PLAN NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:02:54 PMAuthor Checker 2612-01 A100 LOWER LEVEL - FLOOR PLAN CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL A04 FOUNDATION PERIMETER DRAIN TILE A05 STEEL BOLLARD, TYP A07 FLOOR DRAIN, REFER TO PLUMB FLOOR PLAN GENERAL NOTES 1. GENERAL NOTES APPLY TO ALL DRAWING SHEETS. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES UPON DISCOVERY. 4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL BUILDING CODES. COMPLIANCE WITH ALL APPLICABLE CODES WILL BE REQUIRED TO BE MET OR EXCEEDED. 5. REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS AND CEILING FINISHES. 6. REFER TO CODE PLANS FOR LOCATIONS OF RATED WALLS, SMOKE BARRIERS, FIRE EXTINGUISHER CABINETS, ETC. 7. REFER TO INTERIOR FINISH PLANS AND ROOM FINISH SCHEDULE FOR ROOM FINISHES. 8. REFER TO INTERIOR FURNITURE PLANS FOR FURNITURE/FIXTURE LAYOUT. 9. REFER TO SHEET G140 FOR TYPICAL MOUNTING ELEVATIONS. 10. ARCHITECTURAL FINISHED FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR TOPPING. 11. UNLESS NOTED OTHERWISE, ALL NON-RATED INTERIOR WALLS SHALL BE TYPE "S4", EXTENDING UP TO UNDERSIDE OF FLOOR OR ROOF ABOVE WITH MINERAL WOOL ACOUSTIC BATT INSULATION. SCRIBE GYPSUM BOARD TO IRREGULARITIES OF DECK ABOVE AND SEAL AROUND ALL PENETRATIONS WITH ACOUSTIC SEALANT. 12. PLAN DIMENSIONS ARE TO FINISHED SURFACE OF MASONRY WALLS, OR CENTERLINE OF STUDS AT METAL STUD INTERIOR WALLS, UNLESS NOTED OTHERWISE. REFER TO SHEET A602 CONSTRUCTION ASSEMBLY TYPES FOR MORE INFORMATION. 13. COORDINATE ALL LOCATIONS FOR IN-WALL BLOCKING AND/OR WALL BACKING FOR ITEMS SUCH AS TOILET ACCESSORIES, GRAB BARS, CASEWORK, WALL-MOUNTED FIXTURES, MARKER BOARDS, VISUAL DISPLAY BOARDS, AUDIO-VISUAL EQUIPMENT, HANDRAILS, ETC. INSTALL FIRE-RESISTIVE TREATED WOOD BLOCKING OR METAL BACKING PLATES IN METAL STUD PARTITIONS. 14. TRANSITIONS BETWEEN FINISH FLOOR ELEVATION(S) SHALL NOT EXCEED 1/2 INCH, UNLESS NOTED OTHERWISE. 15. PROVIDE 4 INCH HIGH CONCRETE HOUSEKEEPING PADS BELOW ALL FLOOR-MOUNTED INTERIOR MECHANICAL AND ELECTRICAL EQUIPMENT. VERIFY EXACT SIZES AND LOCATIONS WITH AFFECTED TRADES. 16. CONTRACTOR SHALL COORDINATE ALL REQUIRED FLOOR/WALL/ROOF PENETRATION SIZES AND LOCATIONS WITH ASSOCIATED TRADES PRIOR TO CUTTING. 17. CONTRACTOR SHALL INSTALL CONTINUOUS PERFORATED DRAIN TILE AROUND THE OUTSIDE PERIMETER OF BUILDING. REFER TO FOUNDATION DETAILS AND SPECIFICATION FOR MORE INFORMATION. SEE PLUMBING DRAWINGS FOR SUMP LOCATION. 18. INTERIOR ELEVATION MARKERS BASED ON PLAN NORTH DIRECTION 19. UNLESS NOTED OTHERWISE, ALL LOWER LEVEL WALLS TO BE TYPE "M8". A100 1/8" = 1'-0" 1 LOWER LEVEL FLOOR PLAN -CITY HALL LOWER LEVEL (CIVIL 970.83= ARCH 88'-4") LEVEL 1 (CIVIL 982.5' = ARCH 100'-0") SCHEDULE - TOILET & BATH ACCESSORIES KEYNOTE DESCRIPTION NOTES T1 ELECTRIC HAND DRYER T2 AUTO PAPER TOWEL DISPENSER_WASTE RECEPTACLE (ASI-646924A) T3 DOUBLE-ROLL TOILET TISSUE DISPENSER T5 SANITARY NAPKIN DISPOSAL T7 TRANSFER TYPE SHOWER GRAB BAR - 36" @ CONTROL WALL, 18" FROM CONTROL WALL ALONG BACK WALL T10 BABY CHANGING STATION T13 GRAB BAR - 42" T14 GRAB BAR - 18" T15 GRAB BAR - 36" T24 FOLDING ADA SHOWER BENCH T25 42"Wx21"Hx20"D ADA LOCKER BENCH SCHEDULE - EQUIPMENT NO. DESCRIPTION MANUF. MODEL NOTES E1 30" INDUCTION RANGE KITCHENAID KSIS730PSS OFOI E2 30" RANGE HOOD PROLINE PLJW 185.30 OFOI E3 36" FRENCH DOOR REFRIGERATOR - - OFOI E4 WALL OVEN OFOI E5 COFFEE MAKER - PLUMBED - - OFOI E6 ACCESSIBLE HEIGHT DISHWASHER - - OFOI E7 COUNTER MICROWAVE - 3300 OFOI E8 24" WIDE UNDERCOUNTER REFRIGERATOR - - OFOI E9 UNDER COUNTER ICE MAKER FOLLETT E7UC100A OFOI E10 MULTI-FUNCTION PRINTER - - OFOI E12 24-INCH LE METAL LOCKER Spacesaver Corp - NIC E27 WALL-MOUNTED DISPLAY - - <varies> E30 VENDING MACHINE Generic Generic OFOI ISSUE # DATE DESCRIPTION 01/24/2024 BID PACKAGE 1 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 2 A402 1 A402 2 A401 1 A401 3 A502 3 A502 11 33 55 66 77 A A B GF F H H EC C J J 2 A503 2 A503 2 A501 2 A501 1 A501 1 A501 1 A503 1 A503 2 A502 2 A502 1 A502 1 A502 A803 A803 3 A803 1 A803 6 A803 A801 1 A804 5 4 A80318 A803 1415 11 A804 3 2 3 A402 4 A402 A710 2 A711 2 A152 6 A152 1 A151 1 A152 11 A701 2 5 A451 6 A451 44 2 2 8 5 2 A803 A803 4 A802 4 A801 2 1 7 A451 7 9 10 4 A555 1 A551 OPEN TO RAMP BELOW VESTIBULE 102 LOBBY 101 WORK RM 111 CONFERENCE 110 STORAGE 112 ELEC 113 STAIR A STA-1 OFFICE 114 OFFICE 115 OFFICE 116 CLASSROOM 148 CONFERENCE 149 COMMUNITY ROOM 143 OFFICE 151 CORRIDOR 109 KITCHEN 150 110.2143.3113112 STA-1.1 111STA-1.2VESTIBULE 103 OPEN OFFICE 106 COPY/ MAIL 108 OFFICE 107 OFFICE 119 OFFICE 118 OFFICE 117 CONFERENCE 121 OFFICE 122 CONFERENCE 127 STORAGE 129 DATA 129A RR 126 RR 125 OPEN OFFICE 128 SHARED OFFICE 131 OFFICE 132 OFFICE 133INTERVIEW 134 STAIR B STB-1 STORAGE 124 VESTIBULE 100 TABLE STOR. 136 TRAINING ROOM 135 ELECTION STOR. 137 FAMILY RR 138 ELEC/AV 139 MEN'S RESTROOM 141 WOMEN'S RESTROOM 140 CLASSROOM 146 RR 145 RR 144 JAN. 142 STOR. 147 SERVICE COUNTER 105 RECEPTION 101A CORRIDOR 104 OPEN OFFICE 120 HUDDLE 123 PUBLIC STAIR STC-1 147145108105130 129 128.1134.1 134.2125126124100.2 100.1 136135.1137.2139138140141103.2103.1144142 128.2 A8014 3 13 149110.1137.1 STB-1.2127.1129ARR 130 143.2143.1A802 1 A802 2 12 A712 05 000.1 ROOF OVERHEADROOF OVERHEADROOF OVERHEAD ROOF OVERHEADRO OF O VE RH E AD ROOF OVERHEAD102.2 B.7 D.3 D.6 E.3 E.7 E.2 E.8 F.7 17 S6 T4T4 T4 T4 T4 T4 S6T4 T4 S6 S6 T4 S6 T3 15.00° K 0.5 0.5 3 A03 TYP1' - 2"(8) BOLLARDS REFER TO /4 A015 A02 A02 4 A451 SF-8 SF-9 SF-11 SF-12 SF-11 SF-8 SF-10 SF-9 SF-8 SF-7 SF-2 SF-1 SF-19SF-13 SF-11 SF-11 SF-11 SF-11 SF-11 9"10' - 10"6' - 4"11' - 3"9' - 7"1' - 8"13' - 11"F.O.SHTG9"5' - 4 1/8"7' - 0"15' - 1 7/8"3 A451 SF-60 SF-61 GW-68 GW-65 SF-51 SF-50 SF-54 SF-55 SF-59 SF-58 SF-52 148146ALIGN FURRING @ COLUMN T4 A8026 7' - 2"8' - 10" T4 4"5' - 0"4' - 8"4' - 9" FIN.13' - 1"A8025ROOF OVERHEADE.9 T4 T48%16%4' - 0"21' - 0" OPEN ABOVE OPEN ABOVE OPEN ABOVE OPEN ABOVE 16' - 5 1/2"38' - 10"13' - 6"7' - 6"14' - 1"25' - 2"36' - 9"6' - 7"35' - 5" 194' - 3 1/2"122' - 8"16' - 4"29' - 0"23' - 0"10' - 6"27' - 6"16' - 4"194' - 3 1/2" 16' - 5 1/2"30' - 2"22' - 2"1' - 6"4' - 11"21' - 0"5' - 3"22' - 9"28' - 1"27' - 10"14' - 2" 0 M8 M12 1 M12 T4 T4 3%STB1.13 1/2"5" 11' - 1" 6 A554 1' - 2"2' - 0"56' - 4"13' - 0"F.O.SHTG9"F.O.SHTG 9"F.O.SHTG9"8' - 4 3/4"F.O.CMU 9"F.O.CMU9"12' - 7"F.O.SHTG9"F.O.SHTG 9" 11' - 11"6' - 1"9' - 0" 7' - 11" SA4F.O.SHTG1' - 0 5/8"105.2 10' - 5"2' - 11" 2' - 7 1/2"5' - 6"15' - 2"9" 1' - 1 1/2"2' - 8" 9"14' - 2"4' - 4"3' - 1"8 1/2"11' - 3"9' - 7"1' - 8"13' - 11"F.O.SHTG9"10"10' - 6"1' - 0" 3' - 0 1/2"8' - 0 1/4"6" 3' - 8" T4T4 T4T4 4"6' - 8"8' - 7"14' - 5 1/2"9' - 6" A152 16 T2ALIGN2' - 8"1' - 0" T4 T4 A23 A07 1' - 0" 11"11' - 1" T1 T1 7' - 10"T2 2' - 7"1' - 7" 4 1/2"ALIGNT4 11' - 5 1/4"1' - 8"4' - 0"1' - 8"4' - 0"2' - 8"14' - 7 1/2"7 1/2"SA4 ALIGN ALIGN9"5"9"4"17' - 0" SF-56 SF-57 4"16' - 6" 8"5' - 8" 6' - 6"6' - 6"1' - 8"6' - 6"1' - 8"4' - 0"1' - 8"4' - 0"16 1' - 3" T4 T3T3 T4 T4 ALIGN 9"ALIGN 9"6 1/2"13' - 1 7/8"10"135.2VMS-6 6' - 0"4' - 0"6' - 0"4' - 3"4' - 1"10' - 0"2' - 0"6' - 0"10' - 0"4' - 0"8"6' - 7"7"6' - 0"2' - 0"4' - 0"6' - 0"6' - 0"2' - 0"6' - 0"2' - 10"4' - 0"2' - 0"4' - 0"2' - 0"4' - 0"8' - 0"4' - 0"2' - 0"4' - 0"8' - 11 1/4" FBM-8 MSB-8 VMS-6 VMB-12 FBM-12 VMS-6 MSS-6 VMS-6 VMS-6 VMS-6 VMS-6VMS-6 A06 4' - 2"SF-14 A802 7 VMC-16 VMC-8 SF-15 SF-16 10"102.1 FIN 4' - 0"4' - 0"11' - 0"A11 5' - 0"8' - 5" A11 2' - 6" T4 T4T4 T4T4 SF-17 10' - 0"9"114 115 116 119 118 117 121 122 107.11311321335' - 8"2' - 6"107.2 127.2GW-68 16' - 6"4"3' - 8"FIN1' - 4"1' - 2 5/8"FIN 1' - 1"FIN 2' - 1 1/2" T1 T1 151 8"5' - 6"2' - 0"4' - 0"SF-56 Architecture Interior Design Landscape Architecture Engineering TRUE NORTH PLAN NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:03:27 PMAuthor Checker 2612-01 A101 LEVEL 1 - FLOOR PLAN CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL A02 WALL-MOUNTED KNOX BOX LOCATION A03 6 INCH DIAMETER CONCRETE FILLED STEEL PIPE BOLLARD WITH PLASTIC COVER A06 MANUAL OPERABLE PARTITION, SEE BID ALTERNATES. A07 FLOOR DRAIN, REFER TO PLUMB A11 FLOOR BOX LOCATION FOR PODIUM CONNECTION, REFER TO ELEC./TECH. A23 24"x24" MOP SINK AND FAUCET, REFER TO PLUMBING. FLOOR PLAN GENERAL NOTES 1. GENERAL NOTES APPLY TO ALL DRAWING SHEETS. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES UPON DISCOVERY. 4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL BUILDING CODES. COMPLIANCE WITH ALL APPLICABLE CODES WILL BE REQUIRED TO BE MET OR EXCEEDED. 5. REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS AND CEILING FINISHES. 6. REFER TO CODE PLANS FOR LOCATIONS OF RATED WALLS, SMOKE BARRIERS, FIRE EXTINGUISHER CABINETS, ETC. 7. REFER TO INTERIOR FINISH PLANS AND ROOM FINISH SCHEDULE FOR ROOM FINISHES. 8. REFER TO INTERIOR FURNITURE PLANS FOR FURNITURE/FIXTURE LAYOUT. 9. REFER TO SHEET G140 FOR TYPICAL MOUNTING ELEVATIONS. 10. ARCHITECTURAL FINISHED FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR TOPPING. 11. UNLESS NOTED OTHERWISE, ALL NON-RATED INTERIOR WALLS SHALL BE TYPE "S4", EXTENDING UP TO UNDERSIDE OF FLOOR OR ROOF ABOVE WITH MINERAL WOOL ACOUSTIC BATT INSULATION. SCRIBE GYPSUM BOARD TO IRREGULARITIES OF DECK ABOVE AND SEAL AROUND ALL PENETRATIONS WITH ACOUSTIC SEALANT. 12. PLAN DIMENSIONS ARE TO FINISHED SURFACE OF MASONRY WALLS, OR CENTERLINE OF STUDS AT METAL STUD INTERIOR WALLS, UNLESS NOTED OTHERWISE. REFER TO SHEET A602 CONSTRUCTION ASSEMBLY TYPES FOR MORE INFORMATION. 13. COORDINATE ALL LOCATIONS FOR IN-WALL BLOCKING AND/OR WALL BACKING FOR ITEMS SUCH AS TOILET ACCESSORIES, GRAB BARS, CASEWORK, WALL-MOUNTED FIXTURES, MARKER BOARDS, VISUAL DISPLAY BOARDS, AUDIO-VISUAL EQUIPMENT, HANDRAILS, ETC. INSTALL FIRE-RESISTIVE TREATED WOOD BLOCKING OR METAL BACKING PLATES IN METAL STUD PARTITIONS. 14. TRANSITIONS BETWEEN FINISH FLOOR ELEVATION(S) SHALL NOT EXCEED 1/2 INCH, UNLESS NOTED OTHERWISE. 15. PROVIDE 4 INCH HIGH CONCRETE HOUSEKEEPING PADS BELOW ALL FLOOR-MOUNTED INTERIOR MECHANICAL AND ELECTRICAL EQUIPMENT. VERIFY EXACT SIZES AND LOCATIONS WITH AFFECTED TRADES. 16. CONTRACTOR SHALL COORDINATE ALL REQUIRED FLOOR/WALL/ROOF PENETRATION SIZES AND LOCATIONS WITH ASSOCIATED TRADES PRIOR TO CUTTING. 17. CONTRACTOR SHALL INSTALL CONTINUOUS PERFORATED DRAIN TILE AROUND THE OUTSIDE PERIMETER OF BUILDING. REFER TO FOUNDATION DETAILS AND SPECIFICATION FOR MORE INFORMATION. SEE PLUMBING DRAWINGS FOR SUMP LOCATION. 18. INTERIOR ELEVATION MARKERS BASED ON PLAN NORTH DIRECTION 19. UNLESS NOTED OTHERWISE, ALL LOWER LEVEL WALLS TO BE TYPE "M8". A101 1/8" = 1'-0" 1 LEVEL 1 FLOOR PLAN -CITY HALL LEVEL 1 (CIVIL 982.5' = ARCH 100'-0") SCHEDULE - TOILET & BATH ACCESSORIES KEYNOTE DESCRIPTION NOTES T1 ELECTRIC HAND DRYER T2 AUTO PAPER TOWEL DISPENSER_WASTE RECEPTACLE (ASI-646924A) T3 DOUBLE-ROLL TOILET TISSUE DISPENSER T5 SANITARY NAPKIN DISPOSAL T7 TRANSFER TYPE SHOWER GRAB BAR - 36" @ CONTROL WALL, 18" FROM CONTROL WALL ALONG BACK WALL T10 BABY CHANGING STATION T13 GRAB BAR - 42" T14 GRAB BAR - 18" T15 GRAB BAR - 36" T24 FOLDING ADA SHOWER BENCH T25 42"Wx21"Hx20"D ADA LOCKER BENCH SCHEDULE - EQUIPMENT NO. DESCRIPTION MANUF. MODEL NOTES E1 30" INDUCTION RANGE KITCHENAID KSIS730PSS OFOI E2 30" RANGE HOOD PROLINE PLJW 185.30 OFOI E3 36" FRENCH DOOR REFRIGERATOR - - OFOI E4 WALL OVEN OFOI E5 COFFEE MAKER - PLUMBED - - OFOI E6 ACCESSIBLE HEIGHT DISHWASHER - - OFOI E7 COUNTER MICROWAVE - 3300 OFOI E8 24" WIDE UNDERCOUNTER REFRIGERATOR - - OFOI E9 UNDER COUNTER ICE MAKER FOLLETT E7UC100A OFOI E10 MULTI-FUNCTION PRINTER - - OFOI E12 24-INCH LE METAL LOCKER Spacesaver Corp - NIC E27 WALL-MOUNTED DISPLAY - - <varies> E30 VENDING MACHINE Generic Generic OFOI ISSUE # DATE DESCRIPTION 01/24/2024 BID PACKAGE 1 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 2 A402 1 A402 2 A401 1 A401 3 A502 3 A502 11 33 55 66 77 A A B B GF F HED D C C J J 2 A503 2 A503 2 A501 2 A501 1 A501 1 A501 1 A503 1 A503 2 A502 2 A502 1 A502 1 A502 A801 1 3 A402 4 A402 A154 1 A711 1 A153 6 A701 1 A153 11 A153 16 A153 21 A710 1 A804 8 11 A154 A80515 14 13 A805 11 12 A8052 1 3 6 A451 44 22 A804 10 A80412 A804 A805 7 A8046 A802 4 A801 2 7 A451 13 3 A555 4 A555 1 A551 STORAGE 210 OFFICE 221 OFFICE 230 OFFICE 229 STORAGE 236 OFFICE 220 WORK RM 219 OFFICE 222 OFFICE 223 COPY/MAIL 218 MECH 215 SERVER 226 OFFICE 228 STORAGE 227STAIR A STA-2 STOR. 224 ALCOVE 216 OPEN TO BELOW OPEN TO BELOW 219217 STA-2225 226224227236214209.1215BREAK 209 SESSION CONF. 202 AV/STOR 205 RR 204 JAN. 206 OFFICE 240 OFFICE 232 OFFICE 248 OFFICE 231 OFFICE 239 OFFICE 238 OFFICE 250 RR 244 ADMIN CONF 252 PLOTTER 246 RR 208 OFFICE 249 OFFICE 233 RR 212 INTRV/CONF 251 RR 243 STAIR B STB-2 RR 207 BREAK 245 CORRIDOR 200 OPEN TO BELOW OPEN TO BELOW CORRIDOR 203 CONFERENCE 235 HUDDLE 234 STORAGE 242 HUDDLE 241 OPEN OFFICE 225 OPEN OFFICE 237 OPEN OFFICE 247 209.2 210212206 242244243245202.1204205203.2 251.1208207200A8014 3 8 A1547 A80415 A804 A805 8A80416 A805 4 A802 1 A802 2 6 5 9 9 17 OPEN OFFICE 217 209.3202.2 A712 04ROOF OVERHEADROOF OVERHEADOPEN TO BELOW235 B.7 D.3 D.6 E.3 E.7 E.2 E.8 F.7 VESTIBULE BELOW VESTIBULE BELOW 10.00°15.00°15.00°10 7 K K 0.5 0.5 3 SB1 WELLNESS 214 CW -14 CW-2 CW-3CW-4 CW -5 CW -6 CW -7 CW -8 CW -9 CW-10 CW -11 CW -12 CW -13 SF-22 SF-23 SF-25 SF-41 SF-38SF-32SF-30 SF-27 CW -1 1 M8 1 S6 1 S6 1 S61 S6 1 S6 T3 T4 T4 T4 T4 S6 T4 T4 S6 S6 T4 T4 T4 T4 S6 S6 T4T4 T4 S6 T3 S6 S6 S6 S6 T6 T4 SB1 SB1 T4 T4 S6 T4 3.00°AHU SEE MECH. ALIGN CW -16CW-17 GW-78GW-77 GW-76 GW -84 GW -85 SHIPS LADDER TERRACE TERRACE A8026 201.12' - 0"5' - 2"A8025 3 CANOPY BELOW R-3FIN10 1/2"FIN10 1/2"STB-23' - 5"3' - 5"4' - 11"9"A4 A4 7' - 7 1/4"4' - 10" 10" E30 T4 17 18 16 1' - 1 3/8"16' - 4"2' - 0"5' - 6" SF-24 F.O.SHTG 3 5/8"F.O.SHTG1' - 0 5/8"16' - 4"29' - 0"23' - 0"10' - 6"27' - 6"16' - 4"16' - 5 1/2"30' - 2"22' - 2"6' - 5"21' - 0"5' - 3"22' - 9"10' - 1"18' - 0"27' - 10"14' - 2"F.O.SHTG9"F.O.SHTG1' - 2"F.O.SHTG 1' - 0" 7' - 6" CLR 3' - 7" 2' - 0"12' - 0 3/4" T4 COUNCIL CHAMBERS 201 SA4 10"5' - 11"9' - 6"9"2' - 0"2' - 8"1' - 0" T2ALIGN 7' - 0"8' - 7"ALIGN6"11 3/4"3"T4 FIN 2' - 8" R-44"6' - 4"7' - 8"11' - 3"9"1' - 2"9' - 4"6' - 3"F.O. SHTG9"3"10' - 9"10' - 2"6' - 7"3' - 8"11' - 11"F.O.SHTG9"16' - 9 1/2"14' - 4"3' - 2"8' - 2 1/2"7' - 10"7' - 3"12' - 0" F.O. SHTG 9"1' - 10"15' - 1"3' - 5"2' - 0"10' - 11"14 1' - 8"12' - 3"1' - 1 57/256"7' - 4"4 ' - 0 "2 ' - 0 "4 ' - 0 "2 ' - 0 "4 ' - 0 "2 ' - 0 "3' - 11 7/8"2' - 6"4' - 0"2' - 0"16' - 0"2' - 0"4' - 0"2' - 0"5.00° 2' - 11 17/256" 4' - 0 1/2"7' - 2"2' - 2" T4 T4 1' - 3"4' - 6 1/4"ALIGN 11' - 0"1' - 0"8' - 4"3' - 0"5' - 8"ALIGN9' - 6"3" 1' - 0"9' - 2"8' - 10"9"1' - 0 5/8" 10' - 6"10' - 6" 1' - 0"11' - 3"9' - 7"1' - 8"13' - 11"F.O.SHTG9"T4 T4 8 3/8" E27 T1 T3 FIN1' - 8"FIN 1' - 5" 4' - 10 1/2"4' - 0"5' - 8" F.O.SHTG 9"4"ALIGN 1' - 1 11/16"ALIGN 1' - 2"1' - 8"SF-40 1' - 8"26' - 4"35' - 1" E.O.S.2" E.O.S.13' - 1"12' - 1" E.O.S. 7' - 6" E.O.S. EOS 1' - 4"88.00°88.00°5.00°A08 MPS-6VMS-6 VMS-6MPS-6 MPS-6 MPS-6 VMS-6 MSS-6 MSS-6 MSS-6MSS-6MSS-6 MSS-6 VMS-6 MSS-6 MSS-6 MPS-6 VMS-6 VMB-12 MPS-6 MPS-6 VMS-6 MPS-6MPS-6MPS-6 5 A401 6 A401 7 A401 SF-31SF-29 SF-28 SF-26 R-5 R-4 2 A671 8 A850 8 A850 1 A850 1 A850 1 A850 1 A850 R-4 5' - 0"1 4 0 .0 0 °11"A154 4 T4 T4 A155 2 A1553 A155 9 A155 8 A155 10 A155 11 A155 12 A155 7 A155 1 A155 6 A155 5 A155 42' - 8"3' - 4"230229.2 223 222 221 220 2' - 3" FINFIN 1' - 1" T4 T4 229.1 228 231 232 233 240 239 238 249248250251.2252.1252.2 T4 Architecture Interior Design Landscape Architecture Engineering TRUE NORTH PLAN NORTH 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:03:39 PMAuthor Checker 2612-01 A102 LEVEL 2 - FLOOR PLAN CHANHASSEN CIVIC CAMPUS KEYNOTES - ARCHITECTURAL A08 DRINKING FOUNTAIN, SEE PLUMBING FLOOR PLAN GENERAL NOTES 1. GENERAL NOTES APPLY TO ALL DRAWING SHEETS. 2. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 3. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES UPON DISCOVERY. 4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL BUILDING CODES. COMPLIANCE WITH ALL APPLICABLE CODES WILL BE REQUIRED TO BE MET OR EXCEEDED. 5. REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS AND CEILING FINISHES. 6. REFER TO CODE PLANS FOR LOCATIONS OF RATED WALLS, SMOKE BARRIERS, FIRE EXTINGUISHER CABINETS, ETC. 7. REFER TO INTERIOR FINISH PLANS AND ROOM FINISH SCHEDULE FOR ROOM FINISHES. 8. REFER TO INTERIOR FURNITURE PLANS FOR FURNITURE/FIXTURE LAYOUT. 9. REFER TO SHEET G140 FOR TYPICAL MOUNTING ELEVATIONS. 10. ARCHITECTURAL FINISHED FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR TOPPING. 11. UNLESS NOTED OTHERWISE, ALL NON-RATED INTERIOR WALLS SHALL BE TYPE "S4", EXTENDING UP TO UNDERSIDE OF FLOOR OR ROOF ABOVE WITH MINERAL WOOL ACOUSTIC BATT INSULATION. SCRIBE GYPSUM BOARD TO IRREGULARITIES OF DECK ABOVE AND SEAL AROUND ALL PENETRATIONS WITH ACOUSTIC SEALANT. 12. PLAN DIMENSIONS ARE TO FINISHED SURFACE OF MASONRY WALLS, OR CENTERLINE OF STUDS AT METAL STUD INTERIOR WALLS, UNLESS NOTED OTHERWISE. REFER TO SHEET A602 CONSTRUCTION ASSEMBLY TYPES FOR MORE INFORMATION. 13. COORDINATE ALL LOCATIONS FOR IN-WALL BLOCKING AND/OR WALL BACKING FOR ITEMS SUCH AS TOILET ACCESSORIES, GRAB BARS, CASEWORK, WALL-MOUNTED FIXTURES, MARKER BOARDS, VISUAL DISPLAY BOARDS, AUDIO-VISUAL EQUIPMENT, HANDRAILS, ETC. INSTALL FIRE-RESISTIVE TREATED WOOD BLOCKING OR METAL BACKING PLATES IN METAL STUD PARTITIONS. 14. TRANSITIONS BETWEEN FINISH FLOOR ELEVATION(S) SHALL NOT EXCEED 1/2 INCH, UNLESS NOTED OTHERWISE. 15. PROVIDE 4 INCH HIGH CONCRETE HOUSEKEEPING PADS BELOW ALL FLOOR-MOUNTED INTERIOR MECHANICAL AND ELECTRICAL EQUIPMENT. VERIFY EXACT SIZES AND LOCATIONS WITH AFFECTED TRADES. 16. CONTRACTOR SHALL COORDINATE ALL REQUIRED FLOOR/WALL/ROOF PENETRATION SIZES AND LOCATIONS WITH ASSOCIATED TRADES PRIOR TO CUTTING. 17. CONTRACTOR SHALL INSTALL CONTINUOUS PERFORATED DRAIN TILE AROUND THE OUTSIDE PERIMETER OF BUILDING. REFER TO FOUNDATION DETAILS AND SPECIFICATION FOR MORE INFORMATION. SEE PLUMBING DRAWINGS FOR SUMP LOCATION. 18. INTERIOR ELEVATION MARKERS BASED ON PLAN NORTH DIRECTION 19. UNLESS NOTED OTHERWISE, ALL LOWER LEVEL WALLS TO BE TYPE "M8". A102 1/8" = 1'-0" 1 LEVEL 2 FLOOR PLAN -CITY HALL SCHEDULE - TOILET & BATH ACCESSORIES KEYNOTE DESCRIPTION NOTES T1 ELECTRIC HAND DRYER T2 AUTO PAPER TOWEL DISPENSER_WASTE RECEPTACLE (ASI-646924A) T3 DOUBLE-ROLL TOILET TISSUE DISPENSER T5 SANITARY NAPKIN DISPOSAL T7 TRANSFER TYPE SHOWER GRAB BAR - 36" @ CONTROL WALL, 18" FROM CONTROL WALL ALONG BACK WALL T10 BABY CHANGING STATION T13 GRAB BAR - 42" T14 GRAB BAR - 18" T15 GRAB BAR - 36" T24 FOLDING ADA SHOWER BENCH T25 42"Wx21"Hx20"D ADA LOCKER BENCH SCHEDULE - EQUIPMENT NO. DESCRIPTION MANUF. MODEL NOTES E1 30" INDUCTION RANGE KITCHENAID KSIS730PSS OFOI E2 30" RANGE HOOD PROLINE PLJW 185.30 OFOI E3 36" FRENCH DOOR REFRIGERATOR - - OFOI E4 WALL OVEN OFOI E5 COFFEE MAKER - PLUMBED - - OFOI E6 ACCESSIBLE HEIGHT DISHWASHER - - OFOI E7 COUNTER MICROWAVE - 3300 OFOI E8 24" WIDE UNDERCOUNTER REFRIGERATOR - - OFOI E9 UNDER COUNTER ICE MAKER FOLLETT E7UC100A OFOI E10 MULTI-FUNCTION PRINTER - - OFOI E12 24-INCH LE METAL LOCKER Spacesaver Corp - NIC E27 WALL-MOUNTED DISPLAY - - <varies> E30 VENDING MACHINE Generic Generic OFOI ISSUE # DATE DESCRIPTION 01/24/2024 BID PACKAGE 1 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 LEVEL 1 100' -0" LEVEL 2 114' -0" ROOF BEARING 128' -0" LOWER LEVEL 88' -4" A B GF HEDC J 2 A503 1 A503 2 A502 1 A502 MP-2 MP-1A STN-1 MP-2 MP-1A MP-3 MP-1A STN-1MP-3MP-4 MP-3 STN-1 MP-4 MP-2 D.6 F.7 MP-3MP-1A MP-1A MP-1A MP-5 MP-5 MP-5 MP-1A MP-1A MP-3 MP-1A MP-2 MP-1A AE03 AE06AE03AE03AE07AE06 AE08 AE10 AE04 AE05 AE02 SF-43 SF-44 SF-23 SF-24 SF-8 SF-9 SF-11 SF-12 SF-11 SF-8 SF-10 SF-9 SF-8 SF-25 SF-7 SF-6 CW -12 CW-11 CW-10 CW-9 CW -3 MP-1B SF-2 AE01 SF-5SF-3SF-3 R03 R03R03 R03 R03 MP-2 MP-3 MP-3 MP-4 A451 3 AE23 MP-2 MP-2 6 A672 1 A674 AE2814' - 0"14' - 0"11' - 8"14' - 0"14' - 0"11' - 8"CLOCK TOWER35' - 0"LEVEL 1 100' -0" LEVEL 2 114' -0" ROOF BEARING 128' -0" LOWER LEVEL 88' -4" ABGFHDCJ 2 A503 2 A502 1 A502 MP-1A STN-1 STN-1 STN-1 MP-1A MP-1A MP-1A STN-1 28' - 6 3/8"16' - 0"16' - 0"16' - 0" D.6 MP-1A 23' - 9" AE02 AE09 AE17 AE06 AE09 AE19 AE20 AE18 AE208"8"8"1' - 4"SF-45 CW -14 SF-38 SF-19 SF-18 SF-31 SF-15 SF-13 SF-29 SF-46 SF-37 SF-36 SF-17 SF-16 SF-35 SF-34SF-39 SF-33 SF-14 SF-32 MP-1B SF-30 FBR-2 AE21 AE21 AE21 AE21 MP-232' - 3 119/128"MP-2 MP-1B FBR-2 6 A672 1 A674 STN-1 STONE VENEER MASONRY CITY HALL -EXTERIOR ELEVATION MATERIAL LEGEND FBR-2 FACE BRICK MP-1A ACM PANEL MP-2 METAL CLADDING MP-3 METAL CLADDING CONC-1 CAST-IN-PLACE CONCRETE (B.O.D.: LONGBOARD, BLEND 4" & 6" V-GROOVE PLANK, LIGHT FIR) (B.O.D.: LONGBOARD, 4" CASTELLATION PLANK, SATIN BLACK) (B.O.D.: PAC-CLAD, ACM, METALLIC SILVER) (B.O.D.: HALQUIST STONE, CUT STONE, COLOR: BLEND 70% REGAL, 30% ODESSA, FINISH: SANDBLAST) MP-4 METAL CLADDING (B.O.D.: LONGBOARD, PANELS, SATIN BLACK) (B.O.D.: GLEN-GERY, COLOR/FINISH: BLACK PEARL SMOOTH, SIZE: SAXON) MP-1B ACM PANEL (B.O.D.: PAC-CLAD, ACM, BLACK) MP-5 METAL CLADDING (B.O.D.: LONGBOARD, PANELS, LIGHT FIR) FBR-3 FACE BRICK (*BID ALTERNATE) (B.O.D.: GLEN-GERY, COLOR/FINISH: COLUMBIA, SIZE: ROMAN MAXIMUS) 1 A503 MP-2 STN-1 STN-1 6 A672 2 A401 1 A401 3 A401 LEVEL 2 114' -0" ROOF BEARING 128' -0" SF-22 MP-1A MP-3 MP-2 AE16 LEVEL 2 114' -0" ROOF BEARING 128' -0" MP-1AMP-3 AE16 LEVEL 2 114' -0" ROOF BEARING 128' -0" 1 A502 SF-23 SF-24 MP-3MP-1AMP-2 MP-2MP-3 Architecture Interior Design Landscape Architecture Engineering 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 4:24:26 PMAuthor Checker 2612-01 A401 OVERALL EXTERIOR ELEVATIONS CHANHASSEN CIVIC CAMPUS A401 1/8" = 1'-0" 1 EXTERIOR ELEVATION -WEST A401 1/8" = 1'-0" 2 EXTERIOR ELEVATION -OVERALL EAST KEYNOTES - EXTERIOR ELEVATION AE01 ALUM. GUARDRAIL W/ GLASS PANEL INFILL AE02 PAINTED STEEL COLUMN, SEE STRUCT. AE03 PRE-FINISHED METAL COPING, COLOR: TBD AE04 MASONRY LEDGE AE05 FOOTING, SEE STRUCT. AE06 RTU W/ INTEGRATED SCREENING, SEE MECH. AE07 THROUGH-WALL LOUVER, SEE MECH. COLOR: TBD AE08 FIN WALL W/ METAL PANEL WRAP AE09 CONTROL JOINT AE10 CONTROL JOINT, WALL BEYOND COLUMN AE16 PAINTED STEEL TUBE, SEE STRUCT. AE17 SUB-GRADE LEDGE, REFER TO STRUCT. FOR LEDGE STEP AE18 INSULATED OVERHEAD HIGH-SPEED COILING DOOR WITH CUSTOM EXTERIOR PAINT FINISH. AE19 STEEL BOLLARD, SEE LANDSCAPE AE20 INSULATED METAL DOOR, COLOR: TBD AE21 THROUGH WALL ROOF OVERFLOW SCUPPER. AE23 ROOF OVERFLOW DRAIN LAMBS TONGUE, REFER TO PLUMBING. AE28 STEEL CABLE GUARDRAIL, FACE MOUNTED BETWEEN COLUMNS; 3 1/2" VERTICAL SPACING. COLOR: BLACK EXTERIOR ELEVATION GENERAL NOTES 1. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 2. REFER TO CIVIL DRAWINGS FOR GRADE ELEVATION AROUND THE PERIMETER OF THE BUILDING. 3. REFER TO STRUCTURAL DRAWINGS FOR FOOTING DEPTHS AND TYPES. 4. REFER TO PLUMBING DRAWINGS FOR LOCATIONS OF HOSE BIBS, ROOF OVERFLOW DRAINS, ETC. 5. REFER TO ELECTRICAL DRAWINGS FOR EXTERIOR LIGHT FIXTURE TYPES AND LOCATIONS. 6. REFER TO ARCHITECTURAL FLOOR PLANS AND WALL SECTIONS FOR WALL TYPES. A401 1/8" = 1'-0" 3 EXTERIOR ELEVATION -WEST @ TOWER ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL A401 1/8" = 1'-0" 6 TERRACE ELEVATION -NORTH A401 1/8" = 1'-0" 7 TERRACE ELEVATION -WEST A401 1/8" = 1'-0" 5 TERRACE ELEVATION -SOUTH Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 STN-1 STONE VENEER MASONRY CITY HALL -EXTERIOR ELEVATION MATERIAL LEGEND FBR-2 FACE BRICK MP-1A ACM PANEL MP-2 METAL CLADDING MP-3 METAL CLADDING CONC-1 CAST-IN-PLACE CONCRETE (B.O.D.: LONGBOARD, BLEND 4" & 6" V-GROOVE PLANK, LIGHT FIR) (B.O.D.: LONGBOARD, 4" CASTELLATION PLANK, SATIN BLACK) (B.O.D.: PAC-CLAD, ACM, METALLIC SILVER) (B.O.D.: HALQUIST STONE, CUT STONE, COLOR: BLEND 70% REGAL, 30% ODESSA, FINISH: SANDBLAST) MP-4 METAL CLADDING (B.O.D.: LONGBOARD, PANELS, SATIN BLACK) (B.O.D.: GLEN-GERY, COLOR/FINISH: BLACK PEARL SMOOTH, SIZE: SAXON) MP-1B ACM PANEL (B.O.D.: PAC-CLAD, ACM, BLACK) MP-5 METAL CLADDING (B.O.D.: LONGBOARD, PANELS, LIGHT FIR) FBR-3 FACE BRICK (*BID ALTERNATE) (B.O.D.: GLEN-GERY, COLOR/FINISH: COLUMBIA, SIZE: ROMAN MAXIMUS) LEVEL 1 100' -0" LEVEL 2 114' -0" ROOF BEARING 128' -0" LOWER LEVEL 88' -4" 3 A502 13567 2 A501 1 A501 4 2 STN-1 STN-1 MP-3 MP-1A MP-1A STN-1 MP-3 MP-4 MP-3 MP-4 MP-1A MP-3 MP-1A MP-1A MP-4AE06 AE03 AE09 AE09 AE03 SF-28 CW -1 SF-11 SF-11 SF-11 SF-11 SF-11 CW-13 FBR-2 SF-27 SF-26 MP-1B CW-15 SF-478"1' - 6"AE07 A451 4 2" DEEP, TRIMLESS FACE LIT ALUMINUM FABRICATED SIGNAGE, PIN MOUNTED, MATTE BLACK PAINTED FINISH AE09 1' - 6"8"8"1' - 6"2" DEEP, TRIMLESS FACE LIT ALUMINUM FABRICATED SIGNAGE, PIN MOUNTED, MATTE BLACK PAINTED FINISH 2" DEEP, TRIMLESS FACE LIT ALUMINUM FABRICATED SIGNAGE, PIN MOUNTED, BRUSHED ALUM FINISH 3/8" DEEP CUT ALUMINUM SIGNAGE, ADHESIVE MOUNTED, BRUSHED ALUM FINISH8"10"AE24 MP-1B 5 A672CLOCK TOWER35' - 0"LEVEL 1 100' -0" LEVEL 2 114' -0" ROOF BEARING 128' -0" LOWER LEVEL 88' -4" 3 A502 1 3 5 6 7 2 A501 1 A501 42 STN-1 STN-1 MP-3 MP-3 MP-3MP-3MP-3 MP-1A STN-1 STN-1 MP-1A MP-1A MP-1A MP-1A MP-1A AE13 AE03 AE09AE06 AE01 AE16 SF-3 CW -8 CW-7 CW -6 CW -5 CW-4 CW -2 SF-1 SF-40SF-41SF-42 SF-3SF-4SF-4 SF-20SF-21 EQUAL EQUAL 20' - 0"5 A672 AE28 CLOCK TOWER35' - 0"14' - 0"14' - 0"11' - 8"67 5 A557 AE09 6 7 5 A557 AE09AE09 5 A672 1 A402 4 A402 2 A402 3 A402 @ TOWER @ TOWER A402 1/8" = 1'-0" 2 EXTERIOR ELEVATION -SOUTH Architecture Interior Design Landscape Architecture Engineering 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 4:24:38 PMAuthor Checker 2612-01 A402 OVERALL EXTERIOR ELEVATIONS CHANHASSEN CIVIC CAMPUS A402 1/8" = 1'-0" 1 EXTERIOR ELEVATION -NORTH KEYNOTES - EXTERIOR ELEVATION AE01 ALUM. GUARDRAIL W/ GLASS PANEL INFILL AE03 PRE-FINISHED METAL COPING, COLOR: TBD AE06 RTU W/ INTEGRATED SCREENING, SEE MECH. AE07 THROUGH-WALL LOUVER, SEE MECH. COLOR: TBD AE09 CONTROL JOINT AE13 FACE MOUNTED ALUM. CLOCK - SILHOUETTE DESIGN, INTEGRATED CLOCK MECHANICS BEHIND WALL, ACCESSED FROM REAR. BACKLIGHTING OF RAISED CLOCK MARKINGS AE16 PAINTED STEEL TUBE, SEE STRUCT. AE24 ALUMINUM PARAPET LADDER. AE28 STEEL CABLE GUARDRAIL, FACE MOUNTED BETWEEN COLUMNS; 3 1/2" VERTICAL SPACING. COLOR: BLACK EXTERIOR ELEVATION GENERAL NOTES 1. DO NOT SCALE THE DRAWINGS. WHERE DIMENSIONS ARE NOT PROVIDED OR ARE UNCLEAR, REQUEST CLARIFICATION FROM THE ARCHITECT. 2. REFER TO CIVIL DRAWINGS FOR GRADE ELEVATION AROUND THE PERIMETER OF THE BUILDING. 3. REFER TO STRUCTURAL DRAWINGS FOR FOOTING DEPTHS AND TYPES. 4. REFER TO PLUMBING DRAWINGS FOR LOCATIONS OF HOSE BIBS, ROOF OVERFLOW DRAINS, ETC. 5. REFER TO ELECTRICAL DRAWINGS FOR EXTERIOR LIGHT FIXTURE TYPES AND LOCATIONS. 6. REFER TO ARCHITECTURAL FLOOR PLANS AND WALL SECTIONS FOR WALL TYPES. A402 1/8" = 1'-0" 4 EXTERIOR ELEVATION -NORTH @ TOWER 2 A402 1/8" = 1'-0" 3 EXTERIOR ELEVATION -SOUTH @ TOWER ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024 Architecture Interior Design Landscape Architecture Engineering 222 North Second Street Long & Kees Bldg Suite 101 Minneapolis, MN 55401 612.339.3752 www.bkvgroup.com © 2021 BKV Group SHEET NUMBER SHEET TITLE DRAWN BY CHECKED BY COMMISSION NUMBER PROJECT TITLE CONSULTANTS N O T FO R C O N S TR U C TIO N CERTIFICATION Autodesk Docs://2612-01 Chanhassen Civic Campus/2612-01 Chanhassen CC_AI_2023.rvt2/16/2024 12:07:20 PMAuthor Checker 2612-01 A403 EXTERIOR RENDERINGS CHANHASSEN CIVIC CAMPUS AERIAL FROM SOUTHWEST AERIAL FROM NORTHEAST SOUTHWEST PERSPECTIVE NORTHEAST PERSPECTIVENORTHWEST PERSPECTIVE SOUTHEAST PERSPECTIVE ISSUE # DATE DESCRIPTION 02/16/2024 DEVELOPMENT SUBMITTAL Paul Michell License Number Date 61543 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Architect under the laws of the state of Minnesota 02/16/2024