Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
02-24-08-06 0032076 - Westwood Church
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS WEST 78TH ST.TANADOONA DR.T R U N K H I G HW A Y N O . 4 1AB0RETUM BLVDN:\0032076.00\DWG\CIVIL\0032076CV.DWG HOPE HOUSE EXPANSION © 2024 Westwood Professional Services, Inc.SHEET INDEXPRELIMINARY DOCUMENTSWESTWOOD COMMUNITY CHURCH -HOPE HOUSE EXPANSIONEXCELSIOR, MNPREPARED FOR:WESTWOOD CHURCH3121 WESTWOOD DRIVEEXCELSIOR, MN 55331CONTACT: JIM THEISPHONE: 612-618-1727EMAIL: JIM.THEIS@WESTWOODCC.ORGSITEVicinity Map(NOT TO SCALE)SHEETSREVISIONDATENO.....................FORFOREXISTING CONDITIONS, REMOVALS, SITE,GRADING, EROSION CONTROL, UTILITIES,TREE PRESERVATION AND LANDSCAPEPREPARED BY:PROJECT NUMBER: 0032076.00CONTACT: DAVID BADEPhone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free PRELIMINARY DOCUMENTSWESTWOOD COMMUNITY CHURCH -HOPE HOUSE EXPANSIONEXCELSIOR, MNFORFOREXISTING CONDITIONS, REMOVALS, SITE, GRADING,EROSION CONTROL, UTILITIES, TREE PRESERVATIONAND LANDSCAPEINITIAL SUBMITTAL DATE: 08/06/2024SHEET: C001 OF 11PROJECT NUMBER: 0032076.00Sheet List TableSHEET NUMBERSHEET TITLEC001COVERC100EXISTING CONDITIONS AND REMOVALPLANC200SITE AND PAVING PLANC300GRADING AND EROSION CONTROL PLANC400SWPPP NARRATIVEC401SWPPP NOTESC402SWPPP MAPSC500UTILITY PLANC600DETAILSL100LANDSCAPE PLANL101LANDSCAPE NOTES + DETAILS 1010100610081014 10141010100810121014100610061008100810101008101210141016101810041010100410061008101210141 0 1 6 9901000986988992994996998100210041006 1010100810121004100610001002100410061008 101010081000 9949969981002 100 0 1010 100 2 1004 1006 100 8 1012 101410101008101210141016WEST 78TH STREET225.90S89°30'55"E190.71N00°25'05"W 17.74 N00°14'16"W 20.60N89°14'53"E90.50N00°25'05"W 248.27S89°22'56"E300.01 N00°44'38"WMAILE8970UELBX SSPUGPUGPUGPUGPUGPUGPUGSANSANSANSANSANSANSANSANSANSANPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGSTO STO STOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOWATWATWATWATWATWATWATREMOVE BITUMINOUS DRIVEREMOVE WOODEN BUILDINGREMOVE WOODEN DECKREMOVECONCRETE PADREMOVE SEPTIC FIELDEXISTINGBUILDINGSHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076EX01.DWG 08/06/2024HOPE HOUSE EXPANSIONC100 EXCELSIOR, MN HOPE HOUSE EXPANSION EXISTING CONDITIONS AND REMOVAL PLAN 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.00PROPERTY LINE\\\\\\CURB & GUTTERSAW CUT PAVEMENTSANSANITARY SEWERWATWATER MAINSTOSTORM SEWERCONCRETEBITUMINOUSBUILDINGTREELIGHT POLETRAFFIC SIGNEXISTINGPROPOSEDSANWATSTOCONSTRUCTION BARRICADEWATHYDRANTWATGASGASGASPUGUNDERGROUND ELECTRICPUGTUGUNDERGROUND TELEPHONETUGPOHOVERHEAD ELECTRICPOHTOHOVERHEAD TELEPHONETOHFOTELEPHONE FIBER OPTICFOCTVCABLE TELEVISIONCTVRETAINING WALLFENCEXSOIL BORING LOCATIONSB-19TREE LINEXEXISTINGREMOVALS\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\REMOVAL LEGEND1.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THISPLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITYLOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIEDIMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.2.CONTRACTOR SHALL COORDINATE LIMITS OF REMOVALS WITH PROPOSED IMPROVEMENTSAND FIELD VERIFY CONDITION OF EXISTING APPURTENANCES TO REMAIN. CONTRACTORSHALL BE RESPONSIBLE FOR PROTECTING OR REPLACING MISCELLANEOUS ITEMS (SUCH ASFENCES, SIGNS, IRRIGATION HEADS, ETC.) THAT MAY BE DAMAGED BY CONSTRUCTION.3.CONTRACTOR SHALL PLACE ALL NECESSARY EROSION CONTROL MEASURES REQUIRED TOMAINTAIN SITE STABILITY PRIOR TO EXECUTING ANY SITE REMOVALS.4.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITY PROVIDERS FORREMOVAL AND/OR RELOCATION OF EXISTING UTILITIES AFFECTED BY SITE DEVELOPMENT. ALLPERMITS, APPLICATIONS AND FEES ARE THE RESPONSIBILITY OF THE CONTRACTOR.REMOVAL NOTESSSX*XXX1VERIFY EXISTING SANITARY/SEPTIC LINE LOCATION DEPTH AND CONDITION. DOCUMENT WITH MEASUREMENTS AND PICTURES2VERIFY EXISTING WELL LOCATION AND DOCUMENT.3REMOVE EXISTING TREES AND SHRUBS AS REQUIRED FOR NEW SITE, GRADING, DRAINAGE, AND UTILITIES.4VERIFY NEW LOCATION FOR SANITARY SEWER SERVICE AND PROVIDE DESIGN/BUILD INFORMATION TO ENGINEER AND ARCHITECT.5VERIFY NEW LOCATION OF GAS SERVICE AND METER.SITE KEYNOTES1234512333333345 WEST 78TH STREETMAILPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGSTO STO STOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOWATWATWATWATWATWATWAT12'32'12'32'56'18'22'18'R5'R5'22'10'24'R80'R80'42' R 6 0 ' R 2 0 'R80'R30'R15'R15'22'14' (TYP)14' (TYP)18' (TYP)9' (TYP)PROPOSEDBUILDING 1696 SFFFE =1014EXISTINGBUILDING 1407 SFFFE =1014PROPOSEDREC ZONE 2,500 SFPROPOSEDGAZEBO 324 SF782319199' (TYP)31' 28'850'50'18'18'R8'11'5'SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076SP01.DWG 08/06/2024HOPE HOUSE EXPANSIONC200 EXCELSIOR, MN HOPE HOUSE EXPANSIONSITE AND PAVING PLAN 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.001.BACKGROUND INFORMATION FOR THIS PROJECT PROVIDED BY WESTWOOD PROFESSIONALSERVICES, INC.2.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THISPLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITYLOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES ARE FOUND, THEENGINEER SHOULD BE NOTIFIED IMMEDIATELY.3.REFER TO BOUNDARY SURVEY FOR LOT BEARINGS, DIMENSIONS AND AREAS.4.ALL DIMENSIONS ARE TO EDGE OF BITUMINOUS OR EXTERIOR FACE OF BUILDING UNLESSOTHERWISE NOTED.5.REFER TO ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS AND LOCATIONS OFEXITS, RAMPS, AND TRUCK DOCKS.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFICCONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGGERSAND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OFTHESE DEVICES SHALL BE APPROVED BY THE CITY AND ENGINEER PRIOR TO PLACEMENT.TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS.7.CONTRACTOR SHALL MAINTAIN FULL ACCESS TO ADJACENT PROPERTIES DURINGCONSTRUCTION AND TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TOADJACENT PROPERTIES.GENERAL SITE NOTESPROPERTY LINESETBACK LINEEASEMENT LINECURB AND GUTTERLOT LINEPOND NORMAL WATER LEVELRETAINING WALLCONCRETE PAVEMENTNUMBER OF PARKING STALLSTRANSFORMERSITE LIGHTINGEXISTINGPROPOSEDFENCEXXHEAVY DUTY BITUMINOUS PAVEMENTNORMAL DUTY BITUMINOUS PAVEMENTTRAFFIC SIGNPOWER POLEBOLLARD / POSTCONCRETE SIDEWALKTIP-OUT CURB AND GUTTERSITE LEGENDT1.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THISPLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITYLOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES ARE FOUND, THEENGINEER SHALL BE NOTIFIED IMMEDIATELY.2.ALL DIMENSIONS ARE TO FACE OF CURB OR EXTERIOR FACE OF BUILDING UNLESS OTHERWISENOTED.3.REFER TO ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS AND LOCATIONS OFEXITS, RAMPS, AND TRUCK DOCKS.4.BITUMINOUS PAVEMENT AND CONCRETE SECTIONS TO BE IN ACCORDANCE WITH THERECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.5.SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & UNLESS OTHERWISENOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE.PAVING NOTES·PROPOSED ZONING:R-2, Church-Other Residence·PARCEL DESCRIPTION:LOT 3010 - 250093200·PROPERTY AREA:47,045 SF (1.08 AC)·EXISTING IMPERVIOUS SURFACE:15,856 SF (33.7%)·PROPOSED IMPERVIOUS SURFACE:21,752 SF (46.2%)·BUILDING GROSS SIZE:3,099 SFBUILDING SETBACK PER CODE:35'- FRONT30'- REAR15'- SIDE·PARKING SPACE/DRIVE AISLE:9' WIDE X 18' LONG, 24' AISLE·PARKING RATIO REQUIREMENTCITY OF EXCELSIORHOUSE:1 SPACE / 300 SF OF BLDGHOUSE (3,009/300)10.33 SPACESTOTAL SPACES REQUIRED:11 SPACES·PARKING PROVIDED:13 SPACESSITE DEVELOPMENT SUMMARY7DRIVEWAY ENTRANCE8PRIVATE CONCRETE SIDEWALK19PAVEMENT SECTIONS23CONSTRUCTION JOINT1SITE DETAILS (SI-0XX)512345678912111013 PROPOSEDBUILDING 1696 SFFFE =1014EXISTINGBUILDING 1407 SFFFE =10142.0% 2.0%2.0%2.0% 2.0%1.1%2.0%2.0%2.3%2.3%2.0%12.7613.1012.8012.0012.3711.5010.6510.8010.4813.0012.5011.7512.2511.9113.0014.0012.321.5%1.5%13.6213.8313.5213.80101010081009101110121013101 4101010091011101213.8313.7013.472.0%2.0%2.2%2.0%2.0%12.179.509.228.608.329.659.3710.2011.6711.2911.8311.899.796.307.027.3010.0310.4013.6013.3213.6313.3013.8513.002.3%2.0%2.0%SFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF S F S FSFSFSFSFSFSFSFSFSFSF PROPOSEDREC ZONE 2,500 SF2.0%2.0%3:1 3:1 3:11005101010061007100810093:1 NWLNWLN W L NWLNWLNWLNWLNWLNWLHWLHWLHWL HWL HWLHWLHWLHWLHWLHWL HWLNWLNWLNWLNWLNWLNWLNWL NWL HWLHWLHWLHWLHWLHWLHWLHWL HWLHWL 10.0810.2811.551005 10021003100410061007100810091.5%PROPOSEDGAZEBO 324 SF1 0 1 0 10101010101010071008 1009100910091011101110111011101210121013101310141014WEST 78TH STREET1010100610081014 10141010100810121014100610061008100810101008101210141016101810041010100410061008101210141 0 1 6 9901000986988992994996998100210041006 1010100810121004100610001002100410061008 101010081000 9969981002 100 0 1010 100 2 1004 1006 100 8 1012 101410101008101210141016MAILE8970UELBXPUGPUGPUGPUGPUGPUGPUG PUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGSTO STO STOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOWATWATWATWATWATWATWATROCK CONSTRUCTION ENTRANCE3:11.0%3.7%2.4%2.0%4.9%2.0%SILT FENCE (TYP)SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076GD01.DWG 08/06/2024HOPE HOUSE EXPANSIONC300 EXCELSIOR, MN HOPE HOUSE EXPANSION GRADING AND EROSION CONTROL PLAN 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.001.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS PLANARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITY LOCATIONSPRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANYDISCREPANCIES ARE FOUND.2.CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONSOF VESTIBULE, SLOPED PAVEMENT, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDINGDIMENSIONS, EXACT BUILDING UTILITY ENTRANCE LOCATIONS, AND EXACT LOCATIONS ANDNUMBER OF DOWNSPOUTS.3.ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARDSPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE RESTORATION" AS PREPARED BYTHE CITY ENGINEERS ASSOCIATION OF MINNESOTA.4.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE SIX INCHES OF TOPSOIL AND SOD OR SEED. THESEAREAS SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. SEE LANDSCAPE PLANFOR PLANTING AND TURF ESTABLISHMENT.5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROLDEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TOCONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BEAPPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORMTO APPROPRIATE MNDOT STANDARDS.6.ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISE INDICATED ON THIS SHEET.7.CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND PROVIDE ASMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS WHERE ELEVATIONS ARESHOWN OR BETWEEN SUCH POINTS AND EXISTING GRADES.8.SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER FLOW LINEUNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE.9.SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS.10.CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS AFTER THE SITE GRADINGAND UTILITY CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOILMATERIAL IN A MANNER ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES.11.CONTRACTOR SHALL PROVIDE A STRUCTURAL RETAINING WALL DESIGN CERTIFIED BY A LICENSEDPROFESSIONAL ENGINEER.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES INCLUDING THENATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS.13.PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, WILL BEREQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE ACCOMPLISHED BY MAKING MINIMUM OF2 COMPLETE PASSES WITH FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, INEACH OF 2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OF THEINDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BE EXCAVATED AND RE-COMPACTEDAS SPECIFIED HEREIN.14.EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS SHALL BECOMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS OUTLINED IN MNDOT2105.3F1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER.15.EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, SHALL BECOMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE ORDINARY COMPACTION METHOD ASOUTLINED IN MNDOT 2105.3F2.16.ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT GEOTECHNICALENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BECOMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BERESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THEGEOTECHNICAL ENGINEER.GRADING NOTESPROPERTY LINESILT FENCEPOND NORMAL WATER LEVELROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETEMERGENCY OVERFLOWSOIL BORING LOCATIONSTORM SEWERDRAIN TILEWATER MAINSANITARY SEWEREXISTINGPROPOSEDINDEX CONTOURINTERVAL CONTOURRETAINING WALLSFGRADING LIMITSCURB AND GUTTERFLARED END SECTION (WITH RIPRAP)TURF REINFORCEMENT MATGRADING & EROSION CONTROL LEGENDSTOWATSANGLSB-19SB-19E.O.F.HEAVY DUTY SILT FENCEHDSFREDUNDANT SILT CONTROLRSC982980982980 SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076SW01.DWG 08/06/2024HOPE HOUSE EXPANSIONC400 EXCELSIOR, MN HOPE HOUSE EXPANSIONSWPPP NARRATIVE 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com. . . . . . . . . . ### ## or ##PROJECT NUMBER: 0032076.00SWPPP NARRATIVETHE SWPPP IS PREPARED IN ACCORDANCE WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) REGULATIONS AS ESTABLISHED BYTHE CLEAN WATER ACT. THE MINNESOTA POLLUTION CONTROL AGENCY'S CONSTRUCTION GENERAL PERMIT MN R100001 (CSGP) (EXPIRATION DATE:JULY 31, 2028) PROVIDES A FRAME WORK OF REQUIREMENTS FOR COMPLIANCE TO DISCHARGE STORMWATER FROM A CONSTRUCTION SITE.THE SWPPP IS FOR IMPLEMENTATION BY THE OWNER AND OPERATOR, AS LISTED BELOW, AT PROJECT NAME. THIS REPORT SHALL BE ON THE SITE AT ALLTIMES DURING CONSTRUCTION. THE OWNER MUST ALSO KEEP THIS SWPPP ON FILE FOR THREE YEARS AFTER SUBMITTAL OF THE NOTICE OFTERMINATION. THE FOLLOWING ARE OUTLINED IN THIS SWPPP:- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION PRIOR TO AND DURING CONSTRUCTION- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION AFTER CONSTRUCTION- SOURCES OF STORMWATER AND NON-STORMWATER POLLUTION- INSPECTION AND MAINTENANCE PROCEDURESTHE GRADING AND EROSION CONTROL PLAN PREPARED FOR PROJECT NAME SHALL BE CONSIDERED PART OF THE SWPPP.PROJECT LOCATIONTHIS DOCUMENT PRESENTS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR PROJECT NAME IN CITY, STATE. THE SITE IS LOCATED IN THE(DESCRIBE GENERAL LOCATION OF SITE; I.E. INTERSECTION QUADRANT).PROJECT CONTACT INFORMATIONOWNER/DEVELOPER:CONTRACTOR:CONTACT NAMECONTACT NAMECOMPANY NAMECOMPANY NAMEADDRESSADDRESSADDRESSADDRESSCONTACT NUMBERCONTACT NUMBERCONTACT E-MAILCONTACT E-MAILIDENTIFY PERSONNEL INVOLVED WITH THE PROJECT AND THEIR RELATED NECESSARY TRAINING COMMENSURATE WITH THEIR TASK PRIOR TOCOMMENCEMENT OF CONSTRUCTION ACTIVITIES.SWPPP DESIGNER:SWPPP INSPECTION:BMP INSTALLER:CONTACT NAMECOMPANY NAMEADDRESSADDRESSCONTACT NUMBERCONTACT E-MAILTRAINING COURSE/ENTITYEXPIRATION DATEOWNER/OPERATOR RESPONSIBILITIESOWNER-DEVELOPMENT OF SWPPP PRIOR TO APPLICATION/NOI SUBMITTAL.-SUBMIT A COMPLETE AND ACCURATE APPLICATION FORM (NOI)-COMPLIANCE WITH ALL TERMS AND CONDITIONS OF CONSTRUCTION GENERAL STORMWATER PERMIT-SWPPP SUBMITTAL FOR 30 DAY REVIEW FOR PROTECT GREATER THAN 50 ACRES & DISCHARGING TO SPECIAL/IMPAIRED WATERS WITHIN 1 MILE OFSITE DISCHARGE.-KEEPING PERMIT COVERAGE UP-TO-DATE (TRANSFER/SUBDIVISION)-SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER ALL PERMIT TERMINATION CONDITIONS AS LISTED IN SECTION 13 ARE COMPETE-SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS OF MEETING REQUIREMENTS OF FINAL STABILIZATION-IDENTIFY WHO HAS LONG TERM OPERATION AND MAINTENANCE RESPONSIBILITY OF THE PERMANENT STORMWATER SYSTEM.-DEVELOP CHAIN OF RESPONSIBILITY WITH ALL OPERATORS TO ENSURE NPDES COMPLIANCE.-IDENTIFY TRAINED PERSONNEL TO DEVELOP THE SWPPP, INSTALL AND MAINTAIN BEST MANAGEMENT PRACTICES, AND OVERSEE THE SWPPP ANDCONDUCT INSPECTIONSOPERATOR-COMPLETION OF AN ACCURATE NOI WITH THE OWNER-COMPLIANCE WITH CSGP SECTIONS 3, 4, 6-22, 24 AND ANY APPLICABLE REQUIREMENTS FOR CONSTRUCTION ACTIVITY IN SECTION 23 (MINN. R. 7090)-KEEPING THE PERMIT UP-TO-DATE WITH THE OWNER (PARTIAL, WHOLE, CONTRACTOR, BUILDER, ETC)-COMPLETE AND SIGN APPLICATIONS FOR PERMIT TRANSFER AND MODIFICATION AND NOTICE OF TERMINATION WITH OWNER AS NEEDED.PROJECT DESCRIPTIONTHE SITE IS APPROXIMATELY XX.XX ACRES. CONSTRUCTION WILL CONSIST OF, BUT IS NOT LIMITED TO, .........PROJECT AREA =DISTURBED AREA =EXISTING IMPERVIOUS AREA =PROPOSED IMPERVIOUS AREA =PRE-DEVELOPMENT SITE CONDITIONS(DESCRIBE THE EXISTING SITE VEGETATION AND SOILS, EXISTING DRAINAGE AREAS, STORM WATER MANAGEMENT SYSTEM AND ULTIMATE STORM WATERDISCHARGE LOCATION/WATER BODY, AND DESCRIBE ANY EXISTING SOURCES OF CONTAMINATION / POTENTIAL STORMWATER POLLUTANTS FOUNDPREDEVELOPMENT SUCH AS CONTAMINATED SOILS, MATERIALS, ETC. AND MITIGATION NEEDED.)SOIL TYPESTHE SITE CONTAINS(DESCRIBE EXISTING SOIL TYPES) (DOES THE SITE CONTAIN ERODIBLE SOILS?) REFER TO GEOTECHNICAL REPORT DATED XX/XX/XXXX COMPLETED BYXXXXXXXX.POST-DEVELOPMENT SITE CONDITIONS(DESCRIBE PROPOSED SITE DEVELOPMENT/IMPROVEMENTS, SITE VEGETATION AND SOILS, PROPOSED DRAINAGE AREAS, PERMANENT STORM WATERMANAGEMENT SYSTEM AND ULTIMATE STORM WATER DISCHARGE LOCATION/WATER BODY)STORM WATER MANAGEMENT PLANTHE TEMPORARY STORMWATER MANAGEMENT PLAN WILL CONSIST OF(DESCRIBE TEMPORARY BASIN LOCATION, CALCULATIONS, REQUIRED STORAGE, STORAGE PROVIDED AND MAXIMUM DISCHARGE RATE. ANY DEWATERINGAND PUMPED DISCHARGES WHICH MAY BE NEEDED AND HOW PRETREATMENT AND DISCHARGE CONTROLS WILL BE IMPLEMENTED)THE PERMANENT STORM WATER MANAGEMENT PLAN WILL CONSIST OF (DESCRIBE THE PERMANENT STORM WATER MANAGEMENT PLAN (I.E. WETSEDIMENTATION BASIN, INFILTRATION/FILTRATION, GRASS SWALES, REGIONAL PONDS) AND IDENTIFY THE PERSON OR PARTY RESPONSIBLE FOR THELONG TERM MAINTENANCE AND OPERATION OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM / INCLUDE CONTACT INFORMATION)REFER TO THE PROJECT NAME STORMWATER MANAGEMENT REPORT FOR MORE INFORMATION REGARDING THE PRE-DEVELOPMENT SITE CONDITIONS,POST-DEVELOPMENT SITE CONDITIONS, STORM WATER MANAGEMENT CALCULATIONS, AND DRAINAGE AREA MAPS.THE SITE STORM WATER DETENTION FACILITY WILL BE CONSTRUCTED TO MEET OR EXCEED LOCAL, STATE AND FEDERAL REQUIREMENTS.TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMP'S ALONG WITH THE PROCEDURES TO BE USED TO ESTABLISHED ADDITIONALTEMPORARY BMP'S AS NECESSARY FOR SITE CONDITIONS DURING CONSTRUCTION ARE IDENTIFIED ON THE SITE GRADING AND EROSION CONTROL PLANPREPARED FOR THE DEVELOPMENT OF THIS PROJECT, AND WITHIN THE PROJECT STORM WATER POLLUTION PREVENTION PLAN.POTENTIAL STORM WATER POLLUTANTSPOTENTIAL POLLUTANT SOURCES, INCLUDING CONSTRUCTION AND WASTE MATERIALS THAT ARE USED OR STORED AT THE SITE, ARE DESCRIBED IN THESECTION. BY IMPLEMENTATION OF THESE BMPS, THE POTENTIAL POLLUTANT SOURCES ARE NOT REASONABLY EXPECTED TO AFFECT THE STORM WATERDISCHARGES FROM THE SITE.CONSTRUCTION MATERIALS, CHEMICALS AND WASTE MATERIALS THAT WILL BE USED OR STORED AT THE SITE:CONSTRUCTION SEQUENCETHE INTENDED SEQUENCING OF MAJOR SITE CONSTRUCTION ACTIVITIES IS AS FOLLOWS:1.INSTALL PERIMETER CONTROL DEVICES (SILT FENCE, BIO-LOGS, ETC.) AND INLET PROTECTION TO EXISTING STRUCTURES AS SHOWN ON PLAN.INSTALL TREE PROTECTION FENCE AS SHOWN ON PLAN.2.INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE.3.CLEAR AND GRUB SITE.4.STRIP AND STOCKPILE TOPSOIL.5.ROUGH GRADE OF SITE.6.STABILIZE DENUDED AREAS AND STOCKPILES.7.INSTALL SANITARY SEWER, WATERMAIN, STORM SEWER AND SERVICES.8.INSTALL INLET PROTECTION AROUND CATCH BASINS.9.INSTALL STREET SECTION.10.INSTALL CURB AND GUTTER.11.INSTALL PAVEMENT.12.INSTALL SMALL UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.)13.FINE GRADE BOULEVARD, LANDSCAPE AREAS, SEED AND MULCH.14.REMOVE ACCUMULATED SEDIMENT.15.FINAL GRADE.16.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD AND LANDSCAPING, REMOVE SILT FENCEAND RESEED ANY AREAS DISTURBED BY THE REMOVAL.CONSTRUCTION NOTESIT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR MAINTAIN A STOCKPILE OF EROSION CONTROL DEVICES AND SEDIMENT CONTROL BMP'S ON SITEAT ALL TIMES FOR IMMEDIATE USAGE. IN THE EVENT OF AN ACCIDENTAL SEDIMENT DISCHARGE TO WATERS OF THE STATE, OR ANY DISCHARGE OFHAZARDOUS MATERIAL OF REPORTABLE QUANTITY, CONTACT THE MPCA STATE DUTY OFFICER AT 1-800-422-0798.TIMING OF BMP INSTALLATIONTHE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED TO MINIMIZE EROSION FROM DISTURBED SURFACES AND CAPTURESEDIMENT ON SITE. THE FOLLOWING LIST DEFINES THE TIMING OF EROSION PREVENTION AND SEDIMENT CONTROL MEASURES IN SPECIFIC AREAS.·PRIOR TO START OF CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTED PRIOR TOCONSTRUCTION:1.INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND THE PERIMETER OF AREAS TO BE GRADED AND ALL AREAS WHICH ARE NOT TO BEDISTURBED AS SHOWN ON THE GRADING AND EROSION CONTROL PLAN.2.CONSTRUCT GRAVEL CONSTRUCTION ENTRANCES AT FIELD ENTRANCES TO THE SITE AS SHOWN ON THE CONSTRUCTION PLANS.3.INLET PROTECTION IS TO BE INSTALLED AT ALL STORM WATER INLETS WHICH HAVE THE POTENTIAL TO RECEIVE STORM WATER RUNOFF FROM THECONSTRUCTION SITE WITHIN 200 FEET OF LIMITS OF CONSTRUCTION.4.INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND ALL TEMPORARY INACTIVE STOCKPILES. ALL SILT FENCES FOR STOCKPILES SHALL BEINCIDENTAL TO GRADING CONTRACT IF STOCKPILES ARE PLACED OUTSIDE OF SILT FENCES SHOWN ON THE PLAN.·DURING CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTED DURINGCONSTRUCTION:1.PHASE GRADING WORK TO MINIMIZE THE DURATION THAT ANY DISTURBED SOIL IS EXPOSED.2.ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER EXPOSED SOIL AREAS IF NOT BEING ACTIVELYGRADED AND/OR IF NOT AT FINAL GRADE WITHIN 7 OR 14 DAYS OF DISTURBANCE ACTIVITY TEMPORARILY OR PERMANENTLY CEASING.TEMPORARY SEED MIX 22-111, APPLIED AT A RATE OF 30.5 LBS/ACRE, SHALL BE USED PRIOR TO WINTER, IF SITE NOT SODDED.3.STRIP AND STOCKPILE TOPSOIL FOR REPLACEMENT OF 6 INCHES OF TOPSOIL OVER TURF AREAS WHEN GRADING IS COMPLETE.4.PLACE A MINIMUM OF 2 TONS/ACRE OF STRAW ON ALL AREAS AFTER REACHING FINAL GRADE WITH TOPSOIL AND ANCHOR STRAW WITH EITHERA STRAIGHT DISK, HYDROMULCH OR POLYMER.5.STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE DITCHES THAT DRAIN WATER FROM THE CONSTRUCTION SITE MUST BE INITIATEDWITHIN 24 HOURS OF CONNECTING THE DRAINAGE DITCH TO ANY CONVEYANCE SYSTEM THAT DISCHARGES TO SURFACE WATERS. THE FIRST 200LINEAR FEET MUST BE STABILIZED WITHIN 24 HOURS. THE REMAINING DITCH SHALL BE STABILIZED WITHIN 7 OR 14 DAYS.6.INSTALL SILT FENCE AROUND ALL TEMPORARY INACTIVE STOCKPILES WHICH ARE NOT PLACED WITHIN EXISTING SILT FENCES OR OTHERPERIMETER CONTROLS.7.TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7 DAYS BEFOREAPRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARD DETAIL.8.SUFFICIENT PERSONNEL, EQUIPMENT, AND MATERIALS SHALL BE MOBILIZED WITHIN 24 HOURS OF A WRITTEN ORDER BY THE OWNER OROWNER'S REPRESENTATIVE TO CONDUCT CORRECTIVE WORK AND INSTALL TEMPORARY EROSION CONTROL WORK IN THE CASE OF ANEMERGENCY.9.REMOVE ANY SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC STREETS AT THE END OF THE DAY OR WITHIN 24 HOURS OF DETECTION, ORMORE FREQUENT AT DIRECTION OF SITE INSPECTOR.10.COLLECT ALL CONSTRUCTION DEBRIS IN DUMPSTERS AND ROLL-OFF BOXES, EMPTY WHEN DEBRIS REACHES TOP OF DUMPSTER11.INSPECT POLLUTION CONTROL MEASURES AS SPECIFIED WITHIN SECTION 11 OF THE GENERAL PERMIT.·INLET SEDIMENT CONTROL BMP REMOVALIF INLET SEDIMENT CONTROLS (WIMCO TYPE OR EQUAL) BMP'S ARE REMOVED FOR FLOODING / FREEZING CONCERNS UPON REQUEST OF THEMUNICIPALITY, WATERSHED DISTRICT OR OTHER AGENCY, DOCUMENTATION SHALL BE ATTACHED TO THE INSPECTION REPORTS AND THIS SWPPP OR BEAVAILABLE WITHIN 72 HOURS OF REQUEST. DOCUMENTATION SHALL BE A WRITTEN FORM OF CORRESPONDENCE VERIFYING THE NEED FOR REMOVAL.·UPON COMPLETION OF CONSTRUCTION ACTIVITIESPERMIT TERMINATION CONDITIONS ARE ACHIEVED FOR THE PROJECT WHEN PERMANENT EROSION CONTROL BMP'S ARE APPLIED TO THE SITE. THEPERMANENT EROSION CONTROL BMP'S MAY BE A COMBINED OF VEGETATIVE AND NON-VEGETATIVE COVER TYPES. ADDITIONAL REQUIREMENTS TOACHIEVING FINAL STABILIZATION PERMIT TERMINATION CONDITIONS INCLUDE :1.ALL SOIL DISTURBING ACTIVITY IS COMPLETED. ALL DISTURBED AREA WITHOUT PERMANENT IMPERMEABLE SURFACES ARE VEGETATED FOR FINALSTABILIZATION.2.PERMANENT STORMWATER TREATMENT SYSTEM (IF REQUIRED) IS CONSTRUCTED AND ACCUMULATED SEDIMENT HAS BEEN REMOVED FROMCONSTRUCTION ACTIVITY. CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM TEMPORARY SEDIMENT BASINS THAT ARE TO BE USED ASPERMANENT WATER QUALITY MANAGEMENT BASINS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TODESIGN CAPACITY.3.THE VEGETATIVE COVER FOR THE SITE IS AT A DENSITY, WITH UNIFORM PERENNIAL COVER OF 70% OF THE EXPECTED FINAL GROWTH DENSITY.4.ALL TEMPORARY, SYNTHETIC BMP'S HAVE BEEN REMOVED.PERMANENT VEGETATION ESTABLISHMENT(DESCRIBE THE PERMANENT TURF TO BE ESTABLISHED - I.E. SOD, SEED AND MULCH, NATIVE PLANTINGS, TREES AND SHRUBS, LANDSCAPEMULCH...)PERMANENT TURF SHALL FOLLOW THE RECOMMENDATIONS PER NOTES AND SPECIFICATIONS IN THE GRADING AND/OR LANDSCAPE PLAN. SEED THAT ISTO OCCUR AFTER OCTOBER 20TH SHALL CONFORM TO THE MNDOT SPECIFICATIONS FOR DORMANT SEEDING.SWPPP INSPECTIONS AND MAINTENANCEEROSION AND SEDIMENT CONTROL INSPECTIONSCONSTRUCTION ACTIVITY AND ALL SUPPORT ACTIVITIES MUST BE INSPECTED (USING MPCA CONSTRUCTION STORMWATER INSPECTION CHECKLIST OR ANALTERNATIVE FORM) WITHIN THE PARAMETERS OF THE SCHEDULE BELOW. THE INSPECTOR SHALL BE A PERSON TRAINED AND FAMILIAR WITH THEREQUIREMENTS OF THIS SWPPPP AND THE MPCA MN R100001 PERMIT. ALTERNATES WILL INCLUDE INDIVIDUALS TO BE DESIGNATED BY THE OWNER ANDMAY INCLUDE CONTRACTOR PERSONNEL OR OTHER QUALIFIED INDIVIDUALS AND SHALL BE LISTED IN THE PROJECT CONTACT INFORMATION SECTION OFTHIS PLANINSPECTION SCHEDULE-IF THE SITE IS ACTIVE: INSPECTION NEEDED ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL GREATER THAT 0.5 INCHES.-INACTIVE AND STABILIZED AREAS: INSPECTION NEEDED ONCE EVERY 30 CALENDAR DAYS.-INACTIVE AREAS WITH FINAL STABILIZATION: INSPECTION NEEDED ONCE EVERY MONTH FOR 12 MONTHS (NOT INCLUDING FROZEN CONDITIONS).-SUBJECT TO WINTER/FROZEN CONDITIONS: NOT APPLICABLE/NOT NEEDED IF NO CONSTRUCTION ACTIVITY IS OCCURRING.SCOPE OF INSPECTION SHALL INCLUDE:1.RECORD DATE AND TIME OF INSPECTION2.NAME OF PERSON(S) CONDUCTING INSPECTION3.FINDINGS OF THE INSPECTION4.LOCATION AND CORRECTIVE ACTIONS NEEDED5.CORRECTIVE ACTIONS TAKEN (DATE.TIME/BY WHOM)6.DATE AND AMOUNT OF RAINFALL (RAINFALL AMOUNTS TO BE TAKEN FROM AN ONSITE RAIN GAUGE)7.OBSERVED DISCHARGES LOCATIONS8.DESCRIBE DISCHARGE (COLOR, ODOR, FLOATING. SETTLED, SOLIDS, FOAM, OIL SHEEN)9.THE SITE INSPECTOR WILL VISUALLY CHECK A DISCHARGE FROM A TEMPORARY OR PERMANENT SEDIMENTATION BASIN TO ENSURE ADEQUATETREATMENT IS OBTAINED AND DISCHARGE WATER WILL NOT CONTRIBUTE EXCESSIVE SEDIMENT OR OTHER NUISANCE CONDITIONS.10.RECORD CHANGES MADE TO THE SWPPP. AMENDMENTS FROM INSPECTIONS NEED TO BE COMPLETED WITHIN 7 DAYS.11.ALL INSPECTIONS SHALL BE DOCUMENTED WITHIN 24 HOURS AFTER COMPLETING THE FIELD INSPECTION AND AVAILABLE IN PAPER ORELECTRONIC FORM ON SITE.MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICESTHE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENTBMPS AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THECONTRACTOR MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION PREVENTION MANAGEMENT MEASURES TOENSURE INTEGRITY AND EFFECTIVENESS DURING ALL ROUTINE AND POST RAINFALL EVENTS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED,OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOWACCESS UNLESS ANOTHER TIME FRAME IS SPECIFIED BELOW.THE FOLLOWING GUIDELINES WILL BE USED TO DETERMINE IF THE EROSION AND SEDIMENT CONTROL DEVICES REQUIRE MAINTENANCE, REPAIR, ORREPLACEMENT:1.ALL NON-FUNCTIONAL BMPS - OBSERVED CONDITION; SEDIMENT OVERTOPPING, UNDER WATER, SCOURED ENDS, UNDERMINED, DESTROYED,NON-FUNCTION AS DESIGNED, ETC. - SHALL BE MAINTAINED OR REPLACED BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY ORNOTIFICATION, OR AS SOON AS FIELD CONDITIONS ALLOW.2.PERIMETER SEDIMENT CONTROL (SILT FENCE, FIBER LOGS, BERMS, ETC.) - OBSERVED CONDITION TO BE 1/2 FULL OF SEDIMENT, FLATTENED TO 1/2HEIGHT, DRIVEN OVER, UNDERMINED, SCOURED, MOVED FOR ACCESS, ETC. - SHALL BE MAINTAINED, REPAIRED OR SUPPLEMENTATION OFPERIMETER SEDIMENT CONTROL SHOULD BE DONE BY THE END OF NEXT BUSINESS DAY OR AD FIELD CONDITIONS ALLOW.3.INLET PROTECTION BMPS, CONVEYANCES, SURFACE WATERS - OBSERVED CONDITION; SEDIMENT DEPOSITION, SEDIMENT DELTAS ANACCUMULATION OF SEDIMENT MATERIAL, DEVICES APPEAR PLUGGED WITH SEDIMENT - REMOVAL/CLEAN OUT OF ACCUMULATED SEDIMENT ANDDELTAS TO BE REMOVED WITHIN 7 DAYS, STABILIZE AS NEEDED IF SOILS ARE EXPOSED DURING REMOVAL/CLEAN OUT.4.TEMPORARY SEDIMENT BASINS AND TRAPS/PERMANENT SEDIMENT BASINS - OBSERVED TO HAVE SEDIMENT DEPOSITION AND ACCUMULATIONTO 12 OF THE STORAGE VOLUME - CLEAN OUT, REMOVE ACCUMULATED SEDIMENT MATERIAL WITHIN 7 DAYS OF OBSERVATION, OR AS FIELDCONDITIONS ALLOW ACCESS.5.SITE EXIT LOCATIONS, ROCK EXIT PADS, OTHER ANTI-TRACKING PRACTICES - OBSERVED TO HAVE ACCUMULATED SEDIMENT IN ROCK OR OTHERANTI-TRACKING BMP, TRACKING OF SEDIMENT FROM THE SITE ONTO PAVED SURFACES - TOP DRESS ROCK, MAINTAIN ROCK EXIT OR OTHERANTI-TRACKING CONTROLS, SCRAP PAVED SURFACES, SWEEP PAVED SURFACES WITHIN 1 CALENDAR DAY OF DISCOVERY.6.PAVED SURFACES AND ADJACENT STREETS - OBSERVED TO BE TRACKED WITH SEDIMENT AND SOIL MATERIAL FRO THE SITE HAULING OR ACCESS -SWEEP WITHIN 1 CALENDAR DAY OF DISCOVERY, ADDITIONAL AND/OR MORE FREQUENT SWEEPING MAY BE NEEDED TO MAINTAIN PUBLIC SAFETYOR PREVENT WASHING FROM FORECASTED RAINS.TERMINATION OF COVERAGETHE PROJECT PERMIT MAY BE TERMINATED IN ONE OF THE FOLLOWING SCENARIOS:1.ALL CONSTRUCTION ACTIVITY IS COMPLETE, TEMPORARY SYNTHETIC BMP'S ARE REMOVED, ACCUMULATED SEDIMENT FROM CONSTRUCTION ISREMOVED, AND PERMANENT COVER HAS BEEN ACHIEVED WITH VEGETATIVE AND/OR NON-VEGETATIVE COVER. THE NOTICE OF TERMINATIONFORM FROM THE PCA SHOULD BE COMPLETED WITHIN 30 DAYS OF MEETING THE CONDITIONS ABOVE. UPON MIDNIGHT OF THE POST MARKEDDATE, THE PERMIT COVERAGE IS TERMINATED UNLESS OTHERWISE NOTIFIED BY THE MPCA. OR:2.WITHIN 30 DAYS OF SELLING OR OTHERWISE LEGALLY TRANSFERRING OWNERSHIP OF THE SITE IN IT'S ENTIRETY (INCLUDING STREET SWEEPINGAND STORMWATER INFRASTRUCTURE) FROM THE ORIGINAL OWNER TO ANOTHER PARTY TAKING RESPONSIBILITY OF OWNERSHIP. THETERMINATION IS EFFECTIVE UPON MIDNIGHT OF THE SUBMISSION DATE OF THE NOT. IF A PORTION OF THE SITE IS TRANSFERRED (I.E. OUTLOTS,LOTS/BLOCKS) THAT PORTION OF THE SITE IS TERMINATED FROM THE ORIGINAL PERMIT COVERAGE AT MIDNIGHT OF THE SUBMISSION DATE. OR:3.PERMIT COVERAGE CAN BE TERMINATED IF ALL OF THE FOLLOWING ARE MET:3.a.CONSTRUCTION ACTIVITY HAS CEASED FOR 90 DAYS; AND3.b.AT LEAST 90% OF THE AREA OF THE ORIGINALLY PROPOSED ACTIVITY HAS BEEN COMPLETED AND PERMANENTLY ESTABLISHED WITHVEGETATION OR NON-VEGETATIVE COVER; AND3.c.WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; AND3.d.THE SITE IS COMPLIANT WITH PERMIT SECTIONS 13.3 THROUGH 13.7.4.WHERE THE PROJECT OBTAINED PERMIT COVERAGE BUT NEVER STARTED CONSTRUCTION ACTIVITY DUE TO CANCELLATION OR OTHER REASONS,DOCUMENTATION SHOULD BE SENT TO THE PCA WITH THE NOT FORM AND IS SUBJECT TO PCA APPROVAL.WHEN SUBMITTING FOR NOT, GROUND OR AERIAL PHOTOGRAPHS MUST BE SUBMITTED SHOWING PERMANENT/VEGETATIVE COVER REQUIREMENTSHAVE BEEN MET.SWPPP BMP QUANTITIESSILT FENCEXX LFBIO-ROLLXX LFINLET PROTECTIONXX EACHCULVERT PROTECTIONXX EACHTEMPORARY SEED MIX (22-111)XX LBSPERMANENT SEED MIX (25-131)XX LBSSODXX SFMULCHXX TONEROSION CONTROL BLANKETXX SFROCK CONSTRUCTION ENTRANCE1 EACHSTREET SWEEPING1 EACHPOTENTIAL POLLUTANTLOCATIONCONTROL MEASURE ANTIFREEZEVARIOUSSECONDARY CONTAINMENT / DRIP PANDIESEL FUELVARIOUSSECONDARY CONTAINMENT / DRIP PANFERTILIZERLANDSCAPE CONTRACTORSECONDARY CONTAINMENTGASOLINE IN EQUIPMENT/FUELING AREASECONDARY CONTAINMENT / DRIP PANGLUE/ADHESIVESCONTRACTORSECONDARY CONTAINMENTHYDRAULIC OILS/FLUIDSCONTRACTORSECONDARY CONTAINMENTPAINTSCONTRACTORSECONDARY CONTAINMENTGREASECONTRACTORSECONDARY CONTAINMENT / DRIP PANSANITARY WASTEPORTABLE BATHROOMSSERVICE PROVIDER TO SECURE UNITS FROMTIPPING OVER AND MAINTAINEDSOIL AMENDMENTS VARIOUS SECONDARY CONTAINMENTLANDSCAPING MATERIALSLANDSCAPECONTRACTORCONTRACTOR RESPONSIBLECONCRETETRUCK WASHOUT WASHOUT AREACONCRETE / MORTAR MOBILE MIXERS.C. / WASHOUT AREARECEIVING WATERS WITHIN 1 MILE OF THE PROJECT SITENAMETYPEIMPAIRED (Y/N)SPECIAL (Y/N)DISTANCE/ DIRECTION FROM SITE*LAKE XXX IS IMPAIRED FOR NUTRIENTS, ... SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076SW01.DWG 08/06/2024HOPE HOUSE EXPANSIONC401 EXCELSIOR, MN HOPE HOUSE EXPANSIONSWPPP NOTES 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com. . . . . . . . . . ### ## or ##PROJECT NUMBER: 0032076.00SWPPP NOTESLISTED BELOW ARE ADDITIONAL BMP'S THAT MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THE EROSIONCONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IF PRIOR APPROVALFROM AN OWNER HAS BEEN GIVEN.1.WORK ADJACENT TO RESIDENTIAL PROPERTIES·INSTALL SILT FENCE FOR PERIMETER BARRIER BETWEEN TOE OF FILL ANDPROJECT BOUNDARY.·INSTALL RUNOFF DIVERSIONS TO TEMPORARY SEDIMENT BASINS IF 10 OR MORE ACRES ARE DRAININGTOWARD THE PROPERTY BOUNDARY.2.IMPORTANT VEGETATION·SAFETY FENCE OR A SIMILAR METHOD OF PROTECTION SHALL BE INSTALLED TO PROTECT IMPORTANTVEGETATION AND PROHIBIT VEHICULAR TRAFFIC.·A SECONDARY SILT FENCE SHALL BE INSTALLED AT FIELD OFFICES, STORED EQUIPMENT (INCLUDING VEHICLEPARKING), CONSTRUCTION MATERIAL LOCATIONS, AND TOPSOIL OR FILL STOCKPILES INSTALLED WITHIN A 25-FOOT MINIMUM BUFFER OUTSIDE THE DRIP LINE OF TREES.3.BLUFF PROTECTION·TREES SHALL BE SELECTIVELY TRIMMED ALONG BLUFFS OR CLEARED TO ALLOW EQUIPMENT TO OPERATE ONLYWITHIN CONSTRUCTION LIMITS SHOWN ON THE PLAN.·GRUBBING OF ROOTS SHALL BE AVOIDED EXCEPT WHERE NECESSARY TO COMPLETE WORK.·MACHINE SLICED SILT FENCE OR BIO-ROLLS SHALL BE PLACED AROUND STOCKPILES ON SLOPES NOT ALREADYCONTAINED BY SILT FENCES, AND NO STOCKPILES SHALL BE PLACED WITHIN 30 FEET OF BLUFF EDGE.TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·RUNOFF FROM THE TOP OF BLUFFS MAY BE DIRECTED DOWN LONG OR STEEP SLOPES THROUGH SLOPE DRAINS.·PLASTIC SHEETING MAY BE USED TO PROTECT SMALL, STEEP AREAS OF EXPOSED SOIL.·FILL SLOPES SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS OF COMPLETION OF WORK. INSTALL EROSIONCONTROL BLANKET ACCORDING TO AND AS INDICATED ON THE PLAN.4.DITCH PROTECTION (TEMPORARY OR PERMANENT)·THE LAST 200 FEET OF ANY DITCH CONNECTING TO A SURFACE WATER SHALL HAVE TEMPORARY ORPERMANENT STABILIZATION MEASURES IN PLACE WITHIN 24 HOURS OF DIRECT CONNECTION TO A SURFACEWATER. DITCHES MAY BE KEPT IN A "SMOOTH" ROUGH GRADED CONDITION IN ORDER TO PROPERLY INSTALLEROSION CONTROL SEEDING, MULCH, MATS AND BLANKETS.·STABILIZATION METHODS FOR DITCH BOTTOM WETTED PERIMETER MAY INCLUDE ONE OF THE FOLLOWING ORCOMBINATIONS OF EROSION CONTROL BLANKET, MATS, RIPRAP, BIO-ROLLS OR ROCK CHECK DAMS. THEMETHOD CHOSEN WILL BE BASED ON AN ANALYSIS OF THE SLOPE AND VELOCITY OF THE RUNOFF. THESE AREADDITIONAL BMP'S WHICH MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THE EROSION CONTROLPLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IF PRIOR APPROVAL FROMAN OWNER HAS BEEN GIVEN.·WHERE DITCH GRADES EXCEED 5%, ROCK CHECK DAMS OR EQUIVALENT BMP SHALL BE INSTALLED. CHECKDAMS TO BE SPACED SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE ELEVATION OF THE TOE OF THEUPSTREAM DAM. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OFSEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·ABOVE THE WETTED PERIMETER, THE DITCH WILL BE STABILIZED BY SEEDING AND MULCH AND/OR EROSIONCONTROL BLANKETS DEPENDING ON SIDE SLOPE STEEPNESS AND LENGTH.·ALL DITCHES WILL BE STABILIZED WITHIN 14 DAYS.5.WORK NEXT TO STREAMS·NO DISTURBANCE SHALL OCCUR IN IMPAIRED STREAMS OR PROTECTED WATERS. THIS WILL BE ACCOMPLISHEDUSING TEMPORARY BRIDGING TO SPAN STREAMS FOR ACCESS DURING BRIDGE OR ROADWAY CONSTRUCTION.ALSO, PIERS AND PILING WILL NOT BE PLACED IN THE STREAM.·CONSTRUCTION ACTIVITIES NEXT TO STREAMS WILL BE SCHEDULED FOR PERIODS WHEN FLOWS AREAANTICIPATED TO BE LOW.·GRUBBING OF ROOTS SHALL BE KEPT TO A MINIMUM.·A 4-FOOT WIDE BUFFER OF VEGETATION SHALL BE LEFT ON STREAM BANKS.·THE PRIMARY BMP SHALL BE MACHINE SLICED SILT FENCE AND HAY BALES PLACED ALONG THE BUFFER. AS AREDUNDANT BMP, A FLOATING SILT CURTAIN MAY LINE THE CHANNEL BANKS DURING PERIODS OF FLOWINGWATER. THE FLOATING SILT CURTAIN SHALL NOT BE PLACED ACROSS A STREAM.·SHOULD THE PREVIOUS BMPS PROVE UNSUCCESSFUL, THE SILT FENCE/HAY BALES WILL BE REPLACED BYSANDBAGS, PLYWOOD BARRIERS OR SHEETPILE CUTOFFS AS DIRECTED BY THE OWNER AND TO THESATISFACTION OF THE ENGINEER.6.WORK IN STREAMS·CONSTRUCTION ACTIVITIES IN STREAMS WILL BE SCHEDULED FOR PERIODS WHEN FLOWS ARE ANTICIPATED TOBE AT A MINIMUM.·FLOATING SILT CURTAIN SHALL NOT BE PLACED ACROSS STREAMS.·TEMPORARY LOW FLOW DRAINAGE CROSSINGS (FORDS) SHALL BE CONSTRUCTED OF CLEAN STABILIZINGMATERIAL SUCH AS ROCK. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORSMETHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·UPON COMPLETION OF WORK THE CROSSING WILL BE REMOVED AND THE STREAM BANKS STABILIZED.STABILIZATION ACTIVITIES WILL COMMENCE WITHIN 24 HOURS OF THE CROSSING BEING REMOVED.TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·LARGE CULVERTS SHALL BE CONSTRUCTED UNDER DRY CONDITIONS.·IF THERE IS FLOWING WATER DURING CONSTRUCTION THE FLOW MAY BE DIVERTED AROUND THE WORK SITE INA STABLE MANNER USING SANDBAGS AND PLASTIC SHEETING, PLYWOOD, OR SIMILAR METHODS.·IF A BYPASS CHANNEL IS NECESSARY, IT WILL BE STABILIZED WITH RIPRAP OR PLASTIC SHEETING BEFOREDIVERTING THE STREAM. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHODOF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·IF DEWATERING OF CONTAMINATED WATER FROM EXCAVATION IS NEEDED, THE CONTAMINATED WATER SHALLBE PUMPED TO A TEMPORARY SEDIMENT BASIN.7.WORK NEXT TO WETLANDS·PRESERVE A 50' (100' FROM SPECIAL WATERS) NATURAL BUFFER, OR IF A BUFFER IS INFEASIBLE, PROVIDEREDUNDANT SEDIMENT CONTROLS PRIOR TO DISTURBANCE OF UP-GRADIENT AREAS.·FILL SLOPES ADJACENT TO WETLANDS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS OF COMPLETION OFWORK. INSTALL EROSION CONTROL BLANKET AS INDICATED ON THE EROSION CONTROL / GRADING PLAN.8.WORK IN WETLANDS·WORKPADS AND PATHS MADE OF WOOD CHIPS, LOG MATS, MUD MATS, OR GEOTEXTILE AND CRUSHED ROCKMAY BE USED.·HEAVY DUTY SILT FENCES WITH HAY BALES MAY BE USED FOR PERIMETER CONTROL TO LIMIT THE SIZE OF THECONSTRUCTION SITE AS INDICATED ON THE GRADING PLANS. IN THE CASE OF OPEN WATER WETLANDS,FLOATING SILT CURTAINS SHALL BE INCORPORATED AS WELL AS INDICATED ON THE GRADING PLANS.·SOIL STOCKPILES SHALL NOT BE PLACED IN EXISTING WETLANDS.·TOPSOIL IMPORTED TO RESTORE WETLANDS SHOULD NOT CONTAIN THE FIRST 12 INCHES OF INPLACE SOIL.TOPSOIL THAT MAY CONTAIN PURPLE LOOSESTRIFE OR OTHER NOXIOUS WEEDS SHOULD NOT BE IMPORTED TOWETLANDS.9.LONG-STEEP CUT/FILL SLOPES·THERE WILL BE NO UNBROKEN SURFACE SLOPE LENGTHS OF GREATER THAN 75 FEET FOR SLOPES WITH A GRADEOF 3:1 OR STEEPER WITHIN 200 FEET OF SURFACE WATERS. ALL EXPOSED AREAS WITH A CONTINUOUS POSITIVESLOPE WITHIN 200 FEET OF A SURFACE WATER WILL HAVE A TEMPORARY OR PERMANENT COVER YEAR ROUND.THE EXPOSED SOILS SHALL BE STABILIZED WITHIN 14 DAYS·PLANNED SLOPES OF 3:1 (H:V) OR STEEPER AND GREATER THAN 75 FT IN LENGTH WILL BE TEMPORARILY ORPERMANENTLY STABILIZED IN INCREMENTS NOT TO EXCEED 75 FT, PRIOR TO CONSTRUCTION OR DISTURBING ANEW INCREMENT.·LONG SLOPES SHOULD BE BROKEN INTO SHORTER LENGTHS BY INSTALLING STRAW BIOROLLS IN INTERLOCKINGHERRINGBONES AS SHOWN ON THE GRADING PLAN. IF TEMPORARY SEEDING AND MULCH CAN NOT BE USEDON SLOPES STEEPER THAN 3:1, THEN THE SLOPE MAY BE COVERED WITH TARPS OR PLASTIC SHEETING.TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·THE SOIL SURFACE ON RE-VEGETATED SLOPES WILL BE ROUGHENED USING ANY APPROPRIATE IMPLEMENT THATCAN BE SAFELY OPERATED ON THE SLOPE, SUCH AS BULLDOZERS OR DISKS. THE GROOVES SHALL BE CREATEDPERPENDICULAR TO THE SLOPE TO HELP ESTABLISH VEGETATIVE COVER, REDUCE RUNOFF VELOCITY, INCREASEINFILTRATION, AND PROVIDE FOR SEDIMENT TRAPPING.10.CULVERT INLET/OUTLET PROTECTION·SOD MAY BE PLACED AND ANCHORED AT CULVERT INLETS AS SHOWN ON THE GRADING PLAN, UNLESSVELOCITIES REQUIRE RIPRAP.·AT LEAST ONE 2-FOOT WIDE STRIP OF SOD OR FIBER BLANKET SHALL BE PLACED ALONG THE EDGES OF CULVERTHEADWALLS AND WINGWALLS AS SHOWN ON THE GRADING AND/OR UTILITY PLANS.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7 DAYS BEFORE APRON ISINSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARD DETAIL.11.STORM SEWER INLET PROTECTION·STORM DRAIN INLETS SHALL BE PROTECTED UNTIL THE DISTURBED AREAS THAT COULD DISCHARGE TO ANINLET HAVE BEEN STABILIZED.·INFRASAFE SEDIMENT CONTROL BARRIERS OR APPROVED EQUAL SHALL BE USED WHEN CASTINGS ARE NOT INPLACE. AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·INFRASAFE DEBRIS COLLECTION DEVICE OR APPROVED EQUIVALENT SHALL BE USED WHEN CASTINGS ARE INPLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·DOCUMENTATION IS NEEDED WITHIN 72 HOURS IF REMOVAL OF PROTECTION BMPS IS NEEDED DUE TO WINTERCONDITIONS OR FLOODING CONCERNS.12.STORM WATER POND OUTLETS·TEMPORARY OR PERMANENT ENERGY DISSIPATION MEASURES SHALL BE IN PLACE AT THE STORM WATER PONDOUTLETS WITHIN 24 HOURS OF DIRECT CONNECTION TO A SURFACE WATER.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO APRON INSTALLATION AND SHALL BE INSTALLEDUNDER THE APRON LIP.·POND EMERGENCY SPILLWAYS SHALL BE LINED BASED ON THE DESIGN DISCHARGE FLOW VELOCITY AND ASINDICATED ON GRADING AND/OR UTILITY PLANS.13.TEMPORARY SEDIMENT BASINS·TEMPORARY SEDIMENT BASINS WILL BE PROVIDED WHERE 10 OR 5 OR MORE ACRES OF DISTURBED SOIL DRAINTO A COMMON LOCATION. THE BASIN SIZE IS BASED ON RUNOFF FROM A 2-YEAR, 24 HOUR STORM, FOR EACHACRE DRAINED TO THE BASIN. AT A MINIMUM, THE BASIN WILL PROVIDE 1800 CUBIC FEET OF STORAGE FOREACH ACRE DRAINED TO THE BASIN.·SEDIMENT BASINS WILL DETAIN WATER LONG ENOUGH TO SETTLE OUT AT LEAST 75 PERCENT OF THE SEDIMENT.THE USE OF FLOCS MAY BE NECESSARY. THE DISCHARGE QUALITY SHALL BE EQUAL TO OR BETTER THAN THERECEIVING WATER. THE TEMPORARY BASIN MAY BE DRAWN DOWN WITH A PUMP TO INCREASE CAPACITY FORTHE NEXT RAIN EVENT. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHODOF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·THE SEDIMENT PONDS WILL BE EXCAVATED TO MAINTAIN THE NECESSARY SEDIMENT CAPACITY ANDCONTAINMENT.·TEMPORARY SEDIMENT FOREBAYS WILL BE CONSTRUCTED TO CAPTURE SEDIMENT BEFORE IT ENTERS THE POND,IF NECESSARY.·THE SEDIMENT PONDS WILL BE MONITORED BY THE CONTRACTOR TO DETERMINE THE SEDIMENT LEVEL IN THEPOND.·WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE TEMPORARY BASIN REACHES ½ FULL (50% OF THE STORAGEVOLUME) THE BASIN SHALL BE DRAINED USING PUMPS AND ENERGY DISSIPATION AND SEDIMENT REMOVALSHALL BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OF THE BASIN BEING 1/2 FULL OF SEDIMENT, OR ASSOON AS FIELD CONDITIONS ALLOW ACCESS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·TEMPORARY SEDIMENT BASINS WILL HAVE A STABILIZED EMERGENCY OVERFLOW AND CONTAIN ENERGYDISSIPATION AT BASIN OUTLET.14.DEEP UTILITIES: WATER AND SANITARY/GAS LINE·SILT FENCE OR A SIMILAR TYPE OF PERIMETER CONTROL SHALL BE PLACED DOWN GRADIENT OF THE EXCAVATEDSOIL IF WORK IS DONE WITHIN 200 FEET OF WETLANDS OR STREAMS.·DISTURBANCE OF CHANNEL BANKS, WETLANDS, AND IMPORTANT VEGETATION AREAS SHALL BE MINIMIZED TOTHE EXTENT POSSIBLE.·THE UTILITY CONSTRUCTION SITE SHALL BE SEEDED WITH A TEMPORARY·SEED MIX AND MULCH AFTER INSTALLATION IF THE SITE WILL BE IDLE FOR 7, 14, OR 21 DAYS DEPENDING UPONSLOPES OF STEEPER THAN 3:1, 3:1 TO 10:1 AND FLATTER THAN 10:1 RESPECTIVELY.15.STOCKPILES (TEMPORARY AND PERMANENT)·LOCATE STOCKPILES A MINIMUM OF 100 FEET FROM CATCH BASIN INLETS, PONDS, AND SITE DRAINAGE ROUTES·PERIMETER CONTROLS SUCH AS SILT FENCE SHALL BE INSTALLED AROUND ALL STOCKPILES PRIOR TO INITIATIONOF STOCKPILING IF NOT PLACED WITHIN EXISTING SILT FENCES OR OTHER SEDIMENT CONTROL.·TEMPORARY SEED AND MULCH SHALL BE USED TO STABILIZE THE STOCKPILES AND THE STOCKPILES SHALL BESHAPED TO FACILITATE SEEDING AND MINIMIZE EROSION AND SHALL BE SEEDED WITHIN 7 DAYS. TEMPORARYEROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·IF TEMPORARY SEED AND MULCH CANNOT BE USED, THEN THE STOCKPILES SHALL BE COVERED WITHHYDROMULCH, TARPS OR PLASTIC SHEETING AS APPROVED BY THE OWNER.·IF STOCKPILES MUST BE PLACED WITHIN A CONVEYANCE A TEMPORARY BYPASS SHALL BE INSTALLED (I.E. PVCPIPE) TO ADEQUATELY CONVEY RUNOFF. TEMPORARY BYPASS BMPS SHALL BE INCIDENTAL TO THE CONTRACTUNLESS PREVIOUSLY APPROVED BY THE OWNER / ENGINEER16.CONSTRUCTION DEWATERING·DURING DEWATERING ACTIVITIES, THE SEDIMENT LADEN WATER CANNOT CAUSE NUISANCE CONDITIONS ANDMUST DISCHARGE TO A SEDIMENT CONTROL DESIGNED TO PREVENT DISCHARGE WITH VISUAL TURBIDITY.OPTIONS FOR REDUCING THE TURBIDITY OF THE WATER INCLUDE:oCONSTRUCT A TEMPORARY SEDIMENT TRAP FOR TURBID WATER DISCHARGE.oUSE A PORTABLE SEDIMENT TRAP SYSTEM.o APPLY NATURAL BASED FLOCCULENT TECHNOLOGY SUCH AS CHITOSAN IN SEDIMENT TRAPS OR ASERIES OF DITCH CHECKS TO CONTAIN SEDIMENT.oUSE A FILTER BAG SYSTEMo PUMP TO A TEMPORARY SEDIMENT BASIN.·TO THE EXTENT FEASIBLE, USE WELL-VEGETATED UPLAND AREAS OF THE SITE TO INFILTRATE DEWATERINGWATER BEFORE DISCHARGE.·ENERGY DISSIPATION WILL BE PROVIDED AT ALL DISCHARGE POINTS.·DEWATERING OR BASIN DRAINING ACTIVITIES WILL NOT CAUSE EROSION IN RECEIVING CHANNELS ORADVERSELY IMPACT WETLANDS.·DEWATERING DISCHARGE MUST BE VISUALLY CHECKED. PHOTOGRAPH DISCHARGE AT THE BEGINNING AND ATLEAST EVERY 24 HOURS OF OPERATION. DEWATERING THAT ONLY LASTS FOR A FEW MINUTES, AS OPPOSED TOHOURS, AND DO NOT REACH SURFACE WATERS, DO NOT REQUIRE PHOTOGRAPHS OR DOCUMENTATION.·IF NUISANCE CONDITIONS RESULT (SEDIMENT PLUME IN THE DISCHARGE, DISCHARGE APPEARS CLOUDY OROPAQUE, HAS A VISIBLE CONTRAST, HAS A VISIBLE OIL FILM, HAS AQUATIC HABITAT DEGRADATION),DEWATERING MUST BE CEASED IMMEDIATELY AND CORRECTIVE ACTIONS MUST OCCUR BEFORE DEWATERING ISRESUMED.·ALL EROSION CONTROL OR SEDIMENT TRAPS REQUIRED FOR CONSTRUCTION DEWATERING SHALL BECONSIDERED INCIDENTAL TO THE CONSTRUCTION ACTIVITY REQUIRING DEWATERING.17.CONSTRUCTION ENTRANCES·A TEMPORARY CRUSHED ROCK OR WOOD CHIP PAD SHALL BE LOCATED WHERE VEHICLES LEAVE THECONSTRUCTION SITE.·THE CONSTRUCTION ENTRANCE PAD SHALL BE AT LEAST 50 FEET IN LENGTH.·GEOTEXTILE FABRIC MAY BE PLACED UNDER THE CRUSHED ROCK OR WOOD CHIPS TO PREVENT MIGRATION OFMUD FROM UNDERLYING SOIL INTO THE CONSTRUCTION ENTRANCE MATERIAL.·ROCK PADS SHALL BE CONSTRUCTED OF ROCK 1 TO 3 INCHES IN SIZE AND PLACED IN 6 INCH LAYERS.·CONSTRUCTION ENTRANCES SHALL BE INSPECTED AT LEAST EVERY 7 DAYS AND MAINTAINED AS NEEDED.·TRACKED SEDIMENTS SHALL BE REMOVED FROM PAVED SURFACES AT THE END OF EACH DAY USING PICK-UPTYPE STREET SWEEPER.·IF TRACKING INTO ROADWAY BECOMES PROBLEMATIC THE ENTRANCE PADS SHALL BE LENGTHENED ORANOTHER TECHNIQUE APPLIED. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORSMETHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·THE CONSTRUCTION ENTRANCE SHALL BE MONITORED CLOSELY DURING WET CONDITIONS. IF TRACKING INTOADJACENT ROADWAYS OCCURS, THE FREQUENCY OF STREET SWEEPING SHALL BE INCREASED.18.CONCRETE TRUCK WASHOUT·CONCRETE TRUCKS SHALL UTILIZE THE CONCRETE WASHOUT AREA SHOWN ON THE PLANS TO WASH ANDRINSE THEIR EQUIPMENT PRIOR TO LEAVING THE SITE.·WASHOUT OF CONCRETE MIXER TRUCKS WILL BE PERFORMED IN THE DESIGNATED AREAS ONLY.·WASHOUTS WILL BE CONSTRUCTED AND MAINTAINED TO PROVIDE SUFFICIENT CONTAINMENT FOR ALL LIQUIDAND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.·WASHOUTS SHALL BE CLEARLY MARKED ON SITE WITH SIGNAGE BY THE UTILITY CONTRACTOR WITH APPROVALFROM OWNER.·WASHOUTS SHALL BE LOCATED A MINIMUM OF 50 FEET FROM DRAINAGE FACILITIES AND WATERCOURSES.·CONCRETE WASHOUT AREAS WILL HAVE AN IMPERMEABLE LINER TO PREVENT CONCRETE WASHOUT WATERFROM INFILTRATING/CONTACTING WITH SOIL.·IMPERMEABLE LINER SHALL CONSIST OF 10 MIL POLYLINER.·WASHOUT SYSTEMS CAN BE USED AS ALTERNATE WASHOUT AREAS.19.VEHICLE MAINTENANCE·ROUTINE MAINTENANCE OF VEHICLES AND EQUIPMENT SHALL OCCUR IN STAGING AREAS ONLY.·VEHICLE WASHING SHOULD BE AVOIDED. IF WASHING IS NECESSARY, RUNOFF FROM THE WASHING WILL BECONTAINED AND LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTEPROPERLY DISPOSED OF.·ENGINE DEGREASING SHALL BE AVOIDED. IF DEGREASING IS NECESSARY, RUNOFF FROM THE OPERATION WILLBE CONTAINED IN A LINED SEDIMENT TRAP AND PROPERLY DISPOSED OF AT A TREATMENT FACILITY.·ALL REQUIRED SEDIMENT TRAPS AND CONTAINMENT FACILITIES AND PROPER DISPOSAL OF WASHWATER/DEGREASING AT A TREATMENT FACILITY SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.20.FUELING·ANY FUEL TANK OR TRUCK STORED ON THE PROJECT SITE SHALL BE PROTECTED BY A SECONDARYCONTAINMENT SYSTEM.·FUELING AREAS SHALL NOT BE WASHED OR RINSED WITH WATER SINCE THIS COULD CAUSE FUEL SPILLS TO BEDISCHARGED INTO STORM WATER SYSTEMS.·ABSORBENT MATERIALS SHALL BE AVAILABLE ON SITE FOR USE IN CLEANING UP SMALL SPILLS.·ALL REQUIRED FUEL CONTAINMENT AND CLEAN-UP MATERIALS AND THE PROPER DISPOSAL OF THE MATERIALSSHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.21.HAZARDOUS MATERIALS·HAZARDOUS MATERIALS SHALL BE PROPERLY STORED TO PREVENT VANDALISM OR UNAUTHORIZED ACCESS.·CONTAINMENT UNITS SHALL BE INSTALLED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.·MPCA STORING AND DISPOSAL REQUIREMENTS SHALL BE FOLLOWED FOR ALL HAZARDOUS WASTE.·NO HAZARDOUS MATERIAL SHOULD BE STORED WITHIN 200 FEET OF AN IDENTIFIED CRITICAL AREA.·ABSORBENT MATERIALS SHALL BE AVAILABLE FROM THE CONTRACTOR ON SITE FOR USE IN CLEANING UPSMALL SPILLS.·IF BUILDING MATERIALS, CHEMICALS, OR GENERAL REFUSE IS BEING USED, STORED, DISPOSED OF, OROTHERWISE MANAGED INAPPROPRIATELY, THE CONTRACTOR SHALL CORRECT SUCH DEFECTS WITHIN 24HOURS OF DETECTION OR NOTIFICATION.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSAL SHALL BEINCIDENTAL TO THE CONSTRUCTION CONTRACT.22.CHEMICAL CONTAINMENT·GASOLINE, OIL, PAINT, SOLVENTS, AND OTHER CHEMICALS NECESSARY FOR CONSTRUCTION ARE NOT ALLOWEDTO CONTACT THE GROUND SURFACE, BE EXPOSED TO GROUNDWATER OR BE RELEASED TO A SURFACE ORGROUNDWATER EXCEPT IN DE MINIMIS QUANTITIES.·ALL PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINER, WITH ORIGINAL LABELS STILL ATTACHED, UNLESSTHE CONTAINER IS NOT RESEALABLE.·HAZARDOUS MATERIALS SHALL BE RETURNED TO THE HAZARDOUS MATERIAL STORAGE AREA AT THE END OFEACH DAY.·AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE REQUIRED JOB.·THE CONTRACTOR SHALL PROVIDE TANKS OR BARRELS TO COLLECT LIQUID BYPRODUCTS THAT POSE APOLLUTION HAZARD.·THE POLLUTANTS SHALL BE REMOVED FROM THE SITE ON A WEEKLY BASIS AND DISPOSED OF IN ACCORDANCEWITH FEDERAL, STATE AND LOCAL REGULATIONS.·ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, IN ACCORDANCE WITH THEMANUFACTURE'S RECOMMENDED METHODS.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSAL SHALL BEINCIDENTAL TO THE CONSTRUCTION CONTRACT·ALL STORAGE AREAS SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS.23.SOLID WASTE·SOLID WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS AND PROPERLY DISPOSED OF ON A REGULARBASIS.·CONTAINERS SHALL BE COVERED TO PREVENT WIND BLOWING THE WASTE AROUND THE SITE.·MPCA DISPOSAL REQUIREMENTS WILL BE FOLLOWED FOR ALL SOLID WASTE.·SOLID WASTE STORAGE CONTAINERS AND PROPER DISPOSAL SHALL BE CONSIDERED INCIDENTAL TO THECONSTRUCTION CONTRACT.24.DUST CONTROL·THE CONTRACTOR SHALL USE A VARIETY OF DUST CONTROL INCLUDING BUT NOT LIMITED TO THE FOLLOWING:A.RAPID STABILIZATION METHODS ON SLOPESB.WATER ON ROADWAYS AND GRADED AREASC.ALTERNATIVES: IN THE FORM OF VEGETABLE POLYMERS, WATER AND CALCIUM CHLORIDE PETROLEUMEMULSION RESINS, OR ACRYLIC COPOLYMERS MAY ALSO BE USED.·ALL REQUIRED DUST CONTROL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT AS PERSPECIFICATIONS.25.WINTER STABILIZATION·COVER EXPOSED SOILS ON OR AROUND NOV. 15TH AND/OR PRIOR TO TERMINATION OF CONSTRUCTIONACTIVITIES FOR WINTER·ALL EXPOSED SOILS TO BE COVERED WITH 2 TONS TYPE 1 MULCH·ALL EXPOSED SOILS TO BE SEEDED WITH MNDOT SEED MIX 21-112ALL LOW POINTS IN ROADS TO BEADEQUATELY DRAINED IN ACCORDANCE WITH NPDES DEWATERING REQUIREMENTS PART IV. CONSTRUCTIONACTIVITY REQUIREMENTS. SECTION D. DEWATERING AND BASIN DRAINING.·PERIMETER SILT FENCE OR OTHER CONTROLS TO BE INSTALLED 3-5 FEET FROM THE BACK OF THE CURB ANDOUT OF THE PLOWED SNOW AREA.·PERIMETER CONTROLS AROUND PERMANENT STORMWATER BASINS TO BE INSTALLED AND MAINTAINED·INLET CONTROLS TO BE REMOVED ACCORDING TO LEGAL REQUIREMENTS WITH DOCUMENTATION WITHIN 72HOURS FROM LEGAL AUTHORITY.·IF WORK HAS OCCURRED NEAR OR IN STREAMS OR OTHER SURFACE WATERS, THE EXPOSED SOILS SHALL BESTABILIZED TO PROTECT AGAINST FLOODING AND SPRING RUNOFF TO THE 100-YR FLOOD ELEVATION.·ALL TEMPORARY AND PERMANENT STORMWATER BASINS AND SEDIMENT BASINS SHOULD HAVE OUTLETS ANDSTABILIZED EMERGENCY OVERFLOWS INSTALLED AS PER THE GRADING AND/OR UTILITY PLAN AND AT THEAPPROVAL OF THE OWNER.26.NON-STORMWATER DEWATERING·HYDRANT FLUSHING: FLUSHING OF HYDRANTS WILL BE DISCHARGED·THROUGH TEMPORARY PIPES AS NECESSARY, ONTO IMPERVIOUS SURFACES OR TO STABILIZED ARES WITHENERGY DISSIPATION AT THE DISCHARGE POINT. THE DISCHARGE SHOULD BE COLLECTED BY THE STORMWATER BASINS AND STORM SEWER SYSTEM.·POTABLE WATER DISCHARGE: ALL WATER LINES WILL BE FLUSHED USING HOSES AND DISCHARGED ONTO ANIMPERVIOUS SURFACE AND DIRECTED TO THE STORM SEWER INFRASTRUCTURE BY NON-EROSIVE MEANS.27.WORK NEAR SPECIAL WATERS·EXPOSED SOILS MUST BE STABILIZED WITHIN 7 DAYS OF ACTIVITY TEMPORARILY OR PERMANENTLY CEASED.·TEMPORARY SEDIMENT BASIN NEEDED WITHIN AREAS 5 ACRE DISTURBANCE WITH COMMON POINT OFDISCHARGE.·IF WORK IS NEAR SPECIAL WATERS REFER TO APPENDIX A OF THE NPDES PERMIT FOR ADDITIONAL NOTES ANDREQUIREMENTS.·MAINTAIN AT ALL TIMES, 100 FT UNDISTURBED BUFFER AROUND SPECIAL WATERS.·NO UNTREATED DEWATERING WILL TAKE PLACE AND DISCHARGE TO "SPECIAL WATERS"·SEE PERMIT FOR ADDITIONAL NOTES AND REQUIREMENTS28.WORK NEAR OR IN IMPAIRED WATERS·EXPOSED SOILS MUST BE STABILIZED WITHIN 7 DAYS OF ACTIVITY TEMPORARILY OR PERMANENTLY CEASED.·TEMPORARY SEDIMENT BASIN NEEDED WITHIN AREAS 5 ACRE DISTURBANCE WITH COMMON POINT OFDISCHARGE.·IF WORK IS NEAR SPECIAL WATERS REFER TO APPENDIX A OF THE NPDES PERMIT FOR ADDITIONAL NOTES ANDREQUIREMENTS.·NO UNTREATED DEWATERING WILL TAKE PLACE AND DISCHARGE TO "IMPAIRED WATERS"·SEE PERMIT FOR ADDITIONAL NOTES AND REQUIREMENTS29.WORK IN KARST AREAS·SEE PERMIT FOR ADDITIONAL NOTES AND REQUIREMENTS30.INFILTRATION/FILTRATION AREAS·FENCE OFF AREA PRIOR TO BEGINNING CONSTRUCTION.·EXCAVATION AREA SHALL TAKE PLACE AFTER CONTRIBUTING AREAS ARE AT FINAL GRADE AND STABILIZED.·DO NOT USE HEAVY/WHEELED EQUIPMENT IN FILTRATION AREA.·DIVERSIONS, REDUNDANT SEDIMENT AND EROSION CONTROLS MUST BE USED TO PROTECT AREA.·ENSURE 8 FT MAINTENANCE ACCESS IS ADEQUATE FOR AREA.·IF GRADING MUST OCCUR IN FILTRATION AREA, LEAVE GRADE 3 FT HIGH TEMPORARILY UNTIL AREA CAN BEFINAL GRADED AND STABILIZED SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076SW01.DWG 08/06/2024HOPE HOUSE EXPANSIONC402 EXCELSIOR, MN HOPE HOUSE EXPANSIONSWPPP MAPS 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com. . . . . . . . . . ### ## or ##PROJECT NUMBER: 0032076.00SWPPP AMENDMENTSTHIS PLAN AND THE ATTACHMENTS MUST BE AMENDED WITHIN 7 DAYS TO INCLUDE ADDITIONAL REQUIREMENTS OR MODIFIED REQUIREMENTS WHICH TAKE PLACEDURING CONSTRUCTION IF ONE OR MORE OF THE FOLLOWING OCCUR:1.THERE IS A CHANGE IS DESIGN CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT SIGNIFICANTLY IMPACTS THE DISCHARGE OFPOLLUTANTS FROM THE SITE TO SURFACE OR GROUNDWATER.2.INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER, OPERATOR, ENVIRONMENTAL PROTECTION AGENCY, MINNESOTA POLLUTION CONTROL AGENCY OFFICIALSINDICATE THIS PLAN IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS.3.THIS SWPPP IN NOT ACHIEVING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN STORMWATER DISCHARGES OR IF THIS PLAN IS NOT CONSISTENT WITH THEMN R1000011 CONSTRUCTION GENERAL PERMIT.4.IF THE MPCA NOTIFIES THE OWNER AND/OR OPERATOR (i.e. PERMITTEES) THAT ADDITIONAL REQUIREMENTS ARE NEEDED, REQUIREMENTS ARE NOT BEING NET FORTMDL OR OTHER WATER QUALITY STANDARDS, OR THAT THE SWPPP DID NOT INCORPORATE THE NECESSARY REQUIREMENTS.5.CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITECHARACTERISTICS.THE FOLLOWING TABLE SHOULD BE COMPLETED AS NECESSARY DURING CONSTRUCTION TO DOCUMENT CHANGES AND AMENDMENTS TO THIS DOCUMENT.AMENDMENTS MUST BE MADE BY ONE OF THE FOLLOWING INDIVIDUALS:THOSE PREPARING THIS DOCUMENT; THOSE OVERSEEING THE IMPLEMENTATION OF THE SWPPP;THOSE REVISING THE SWPPP; THOSE PERFORMING INSPECTIONS FOR THE PROJECT; AND/OR OTHER QUALIFIED INDIVIDUAL.PLACE THE AMENDMENT NUMBER NEXT TO ALL APPLICABLE CHANGES, REDLINES, AND INFORMATION IN THE DOCUMENT TO REFERENCE BACK TO THE CHANGESSUMMARIZED BELOW.AMENDMENT NO.VICINITY MAP/IMPAIRED WATERS MAPWEB SOIL SURVEY MAPSOIL MAP UNIT SYMBOL LEGENDINFEASIBILITY DETERMINATION (ITEMS 5.13, 5.14 AND 5.15)TEMPORARY SEDIMENT BASINIF PERMITTEE DETERMINES A TEMPORARY SEDIMENT BASIN TO MEET SECTION 14 IS INFEASIBLE, DOCUMENT THISDETERMINATION; PERMITTEES TO CONSIDER PUBLIC SAFETY, SITE FACTORS SUCH AS SITE SOILS, SLOPE, AND AVAILABLEAREA ON SITE.BUFFER ZONE AS DESCRIBED IN PERMIT ITEMS 9.17 AND 23.11DATEREASON, LOCATION, AND BRIEF DESCRIPTION OF CHANGE OR AMENDMENTREQUESTED BYPREPARED BY WEST 78TH STREET90.50N00°25'05"W 248.27S89°22'56"E300.01 N00°44'38"WEX-MHRE = 1001.49MAILEX-MHRE = 1003.82EX-MHRE = 1003.92982.79 983.23983.31PUGPUGPUGPUGPUGPUGPUGPUGPUGPUG PUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGSTO STO STOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOWATWATWATWATWATWATWATPROPOSED LIGHT POLEUNDERGROUND ELECTRIC LINERAIN GARDENEXISTING STORM SEWERGAS GAS GAS GAS GAS GAS GAS GAS GAS 0 4'4'NEW WM SERVICECONNECTIONNEW WM SERVICECONNECTIONCONNECT TO EXISTING WMVERIFY WM SIZE AND LOCATIONCOORDINATE NEW WM SERVICESIZE WITH ARCHITECT AND CONTRACTORNEW SANITARY CONNECTION BY OTHERSNEW GAS CONNECTION BY OTHERSCOORDINATE NEW GAS SERVICESTUB WITH ARCHITECT AND CONTRACTORCOORDINATE NEW SANITARYSERVICE STUB WITH ARCHITECTAND CONTRACTORCB-200RE=1013.00IE=1010.50 (8" W)D=5.5219 LF-8" PVC @ 3.88%CB-100RE=1008.19IE=1006.50 (8" NE)D=4.760 LF-8" PVC @ 0.83%RAIN GARDEN8" IE= 1002.008" IE= 1006.00CL III RIP RAPCL III RIP RAPPROPOSEDBUILDING 1696 SFFFE =1014EXISTINGBUILDING 1407 SFFFE =1014PROPOSEDREC ZONE 2,500 SFNWLNWLN W L NWLNWLNWLNWLNWLNWLHWLHWLHWL HWL HWLHWLHWLHWLHWLHWL HWLNWLNWLNWLNW L NWLNWLNWLNWL HWLHWLHWLHWLHWL HWLHWLHWLHWLHWL PROPOSEDGAZEBO 324 SFSHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076UT01.DWG 08/06/2024HOPE HOUSE EXPANSIONC500 EXCELSIOR, MN HOPE HOUSE EXPANSIONUTILITY PLAN 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.00SANEXISTINGPROPOSEDSANITARY SEWERSTOSTORM SEWERWATWATER MAINEASEMENT LINEPROPERTY LINEWATHYDRANTGATE VALVEDRAIN TILEFLARED END SECTION (WITH RIPRAP)LIGHT POLEGASGASGASPUGUNDERGROUND ELECTRICPUGTUGUNDERGROUND TELEPHONETOHPOHOVERHEAD ELECTRICPOHTOHOVERHEAD TELEPHONETOHFOTELEPHONE FIBER OPTICFOCTVCABLE TELEVISIONCTVFMFMSANITARY SEWER FORCE MAINCURB AND GUTTERUTILITY LEGEND1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES ASSHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTORSHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SANITARY SEWER, STORM SEWER AND WATER MAIN MATERIAL AND INSTALLATIONS SHALL BE PER CITYREQUIREMENTS, MINNESOTA PLUMBING CODE, AND IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARDSPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER AND STORM SEWERINSTALLATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATE AND LOCAL PERMITS FORTHE PROPOSED WORK OR VERIFY WITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEESSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER.4.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSIONS OF DOORWAYS, RAMPS,TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY CONNECTION LOCATIONS.5.ALL PRIVATE LARGE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE LOCALJURISDICTION AND MINNESOTA PLUMBING CODE. ALL SMALL / DRY UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCEWITH THE SPECIFICATIONS OF THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE THE SERVICELINE CONSTRUCTION WITH THE UTILITY COMPANIES.6.CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, AND UTILITIES SHALL BEINSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BE NOTIFIED 48-HOURS PRIOR TO COMMENCING WITH THEUTILITY CONSTRUCTION OR ANY REQUIRED TESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANYPIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY.ANY ADVERSE CONSEQUENCES OF SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THERESPONSIBILITY OF THE CONTRACTOR.7.WATER MAIN LENGTHS AS SHOWN ARE APPROXIMATE HORIZONTAL LENGTHS. ALLOW FOR ADDITIONAL PIPE WHENINSTALLING ON SLOPES OR WHEN DEFLECTIONS ARE REQUIRED. THE JOINT DEFLECTIONS SHALL NOT EXCEED THEMAXIMUM RECOMMENDED BY THE PIPE MANUFACTURER OR BY LOCAL GOVERNING SPECIFICATIONS. FITTINGS REQUIREDTO CONSTRUCT WATER MAIN SHALL BE INCLUDED IN WATER MAIN CONSTRUCTION.8.PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS.9.A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER LINE CROSSINGS WITH SANITARY SEWER ORSTORM SEWER AND WATER LINES SHALL CROSS ABOVE ANY SEWER. IF THIS IS NOT ACHIEVABLE, SANITARY AND STORMSEWER SHALL BE CONSTRUCTED OF A MATERIAL APPROVED FOR USE WITHIN A BUILDING AND AS LISTED IN TABLE 701.2OF THE MINNESOTA PLUMBING CODE. THE WATER LINE SHALL NOT HAVE JOINTS OR CONNECTION WITHIN 10-FEET OF THECROSSING. INSULATE CROSSINGS WITH STORM SEWER.10.UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE SHOWN OR NOTED.11.DUCTILE IRON WATER LINES SHALL BE CLASS 52, PER AWWA C115 OR C151. COPPER WATER LINES SHALL BE TYPE K PERASTM B88. PVC WATER LINES SHALL BE PER AWWA C900 AND INSTALLED PER AWWA C605 IF ALLOWED BY CITY.12.ALL WATER LINES SHALL HAVE 8' MINIMUM COVER. INSULATE WATER MAIN IF LESS THAN 8' OF COVER. INSULATION SHALLBE DOW STYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF THICKNESS.13.SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE AND NOT WITHIN 10' OF WATER LINE SHALL BE POLYVINYLCHLORIDE (PVC) SDR 35 OR 26. SDR 26 IS REQUIRED FOR DEPTHS GREATER THAN 15 FEET. SANITARY AND STORM SEWERPIPE WITHIN 10 FEET OF THE BUILDING AND UNDER FOOTINGS, AND WITHIN10 FEET OF WATER LINE SHALL BE SCHEDULE40 PER ASTM D2665. ALL PLASTIC SANITARY SEWER SHALL BE INSTALLED PER D2321. SOLVENT WELD JOINTS MUSTINCLUDE USE OF A PRIMER WHICH IS OF A CONTRASTING COLOR TO THE PIPE AND CEMENT. ALL SANITARY SEWER SHALLBE TESTED ACCORDING TO MINNESOTA PLUMBING CODE, PART 712.0.14.STORM SEWER PIPE:A.RCP AND HDPE PIPE MAY BE INSTALLED WITH APPROVAL OF LOCAL GOVERNING AGENCY OR MN DEPARTMENT OFLABOR .B.REINFORCED CONCRETE PIPE SHALL BE CLASS 5 FOR PIPE DIAMETERS 18" AND SMALLER, CLASS 3 FOR PIPE DIAMETERS21" AND LARGER UNLESS OTHERWISE NOTED, PER ASTM C76, WITH GASKETS PER ASTM C443.C.HDPE STORM PIPE 4- TO 10-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OF AASHTO M252. HDPE STORM PIPE12- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OF ASTM F2306. FITTINGS SHALL BE PER ASTM D3212AND INSTALLED PER ASTM D2321.D.PVC STORM SEWER PIPE AND FITTINGS SHALL BE SCHEDULE 40 PIPE PER ASTM D2665 AND INSTALLED PER ASTMD2321.E.CORRUGATED METAL PIPE (CMP) FOR SIZES 18- TO 120-INCH AND MUST MEET ASTM A760 OR ASTM A796 AND BEINSTALLED PER ASTM A798. CMP MAY NOT BE INSTALLED WITHIN 10-FEET OF A WATERMAIN, WATER SERVICE, OR ABUILDING.F.ALL STORM SEWER JOINTS AND STRUCTURE CONNECTIONS SHALL BE GASTIGHT OR WATERTIGHT AS REQUIRED BYMINNESOTA PLUMBING CODE, PART 707.3. STORM SEWER LOCATED WITHIN 10-FEET OF A BUILDING AND/OR WATERLINE SHALL BE TESTED PER MINNESOTA PLUMBING CODE, PART 712.15.ALL NONCONDUCTIVE PIPE SHALL BE INSTALLED WITH A LOCATE (TRACER) WIRE PER MINNESOTA PLUMBING CODE604.10.1.16.AFTER CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN AS-BUILT RECORD OFUTILITY CONSTRUCTION. THE AS-BUILT SHALL INCLUDE LOCATION AND LENGTH DEVIATIONS OR CHANGES TO THE PLAN.CONTRACTOR TO VERIFY WITH OWNER OR ENGINEER WHETHER A PLAN WITH POST-CONSTRUCTION ELEVATIONS ISREQUIRED.17.ALL CATCH BASIN CASTINGS IN CURB SHALL BE SUMPED 0.15 FEET AND MANHOLE CASTINGS IN PAVED AREAS SHALL BESUMPED 0.05 FEET. RIM ELEVATIONS ON PLAN REFLECT THE SUMPED ELEVATIONS.GENERAL UTILITY NOTESSDT SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076DT01.DWG 08/06/2024HOPE HOUSE EXPANSIONC600 EXCELSIOR, MN HOPE HOUSE EXPANSIONDETAILS 4040908/06/2024 DAVID BADE 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com. . . . . . . . . . ### ## or ##PROJECT NUMBER: 0032076.00SI19PAVEMENT SECTIONS SHOWN ARE FOR PLANNING PURPOSES ONLY.REFER TO GEOTECHNICAL REPORT FOR FINAL PAVEMENT SECTIONS.LAST REVISED:08/15/17PAVEMENT SECTIONS2" MnDOT TYPE SPWEA340E WEARING COURSE2" MnDOT TYPE SPNWB330E BASE COURSE12" MnDOT SPEC. 3138 CLASS 56" CONCRETE PAVEMENT W/ #4 REBAR AT 16" O.C. EACH WAY4" MnDOT SPEC. 3138 CLASS 5CONCRETE PAVEMENTBITUMINOUS PAVEMENT (HEAVY DUTY)BITUMINOUS PAVEMENT (STANDARD DUTY)COMPACTED SAND SUBGRADE (100% STANDARD PROCTOR)COMPACTED SAND SUBGRADE (100% STANDARD PROCTOR)MNDOT SPEC. 2357 BITUMINOUS TACK COAT2" MnDOT TYPE SPWEA340E WEARING COURSE2" MnDOT TYPE SPNWB330E BASE COURSE8" MnDOT SPEC. 3138 CLASS 5COMPACTED SAND SUBGRADE (100% STANDARD PROCTOR)MNDOT SPEC. 2357 BITUMINOUS TACK COAT6"MAX.AANOTES:1.PROVIDE A RELATIVELY FLAT MINIMUM 4'x4' LANDING BEHIND THE PEDESTRIAN RAMP, 2% MAXIMUM CROSS SLOPE BOTH DIRECTIONS.2.CURB RAMP AREA TO BE CONCRETE AND MEET LATEST ADA REQUIREMENTS. RAMP CROSS SLOPE 2% MAXIMUM. BACK-TO-BACK PEDESTRIAN RAMPS SHALL HAVE MINIMUM 48'' LANDING BETWEEN, OR PROVIDE AT-GRADE CROSSING.3.SIDE FLARES TO BE CONCRETE AND IMPLEMENTED WHERE ADJACENT TO PAVED AREAS. FLARED SLOPE TO BE 10% MAXIMUM. EXISTING CURB RAMP ALTERATIONS, WITH NO LANDING, SHALL BE 8.33% MAXIMUM. PROVIDE 10% MAXIMUM SLOPE, UNLESS NOTED OTHERWISE.4.ANY VERTICAL LIP THAT OCCURS AT THE FLOW LINE MAY NOT BE GREATER THAN 1/4 INCH.5.ADA REQUIRED DETECTABLE WARNING SURFACE(TRUNCATED DOMES) SHALL BE 2' MIN. IN DIRECTION OF LANDING AT CURB AND SHALL EXTEND THE FULL WIDTH OF THE LANDING. AREA SHALL BE CONTRASTING COLOR TO THE ADJACENT WALKING SURFACE WITH A PREFABRICATED CAST IRON TRUNCATED DOME INSERT MEETING THE ADA DOME SIZE AND SPACING REQUIREMENTS.ALAST REVISED:08/15/17PUBLIC PEDESTRIAN CURB RAMPSI09AA332233FACE OFCURBBACK OFCURBFACE OFCURB15158"5' MIN.4' MIN. ORPER PLAN5' MIN.5'-4"MIN.2'8"5' MIN.5' MIN.4' MIN. ORPER PLAN5'-4"MIN.2'CURB FACEOR GUTTER5% APPROACHSLOPE MAXSEE NOTE #41/2" PREFORMEDJOINT FILLER MATERIALRAMP5'-4" MIN.LANDING4' MIN.RAMP 8.33%MAX. SLOPECONCRETE WALKDET. WARN.SURFACEROUND ALL SLOPEDINTERSECTIONSSIDE FLARE 10%MAX. SLOPESIDE FLARE5' MIN.RAMP4' MIN.SIDE FLARE5' MIN.ELEVATION OF RAMPSECTION A-APLAN VIEW OF DIAGONAL RAMPPLAN VIEW OF PERPENDICULAR RAMP2"PRIVATE CONCRETE SIDEWALKSI08NOTES:1.SEE ARCHITECTURAL PLANS FOR WALK SCORING AND JOINT LAYOUT.2.WALK SHALL BE PER MnDOT SPEC 2521 MIX NO. 3A32 WITH A 28-DAY DESIGN STRENGTH OF 3900-PSI.LAST REVISED:08/15/17FINISH GRADESEE PLAN4" CONCRETE WALK WITHCONTRACTION JOINTS EVERY 5' ANDEXPANSION JOINTS EVERY 100' OR AT90° INTERSECTIONS2% CROSS SLOPE6" MIN.4" MNDOT SPEC 3138 CLASS 5AGGREGATE BASE1.5'** E8970UELBXSSPUGPUGSANSANSANSANSANSANSANSANSANSANPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOWATWATWATWAT12'32'12'32'56'18'22'18'R5'R5'22'10'24'R80'R80'42' R 6 0 ' R 2 0 'R80'R30'R15'R15'22'14' (TYP)14' (TYP)2.0% 2.0%2.0%2.0%2.0%1.1%2.0%2.0%2.3%2.3%2.0%12.7613.1012.8012.0012.3711.5010.6510.8010.4813.0012.5011.7512.25100010101010 9969981002 100410041006 10061008 100810121012100210041006100811.9113.0014.0012.321.5%1.5%13.6213.8313.5213.801010100810091011101210131014101010091011101213.8313.7013.472.0%2.0%2.2%2.0%2.0%12.179.509.228.608.329.659.3710.2011.6711.2911.8311.899.796.307.027.3010.0310.4013.6013.3213.6313.3013.8513.002.3%2.0%2.0%SFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF S FSFSFSFSFSFSFSFSFSFSFSF 2.0%2.0%3:1 3:1 3:11005101010061007100810093:1NWL NWLN W L NWLNWLNWLNWLNWLNWLHWLHWLHWL HWL HWLHWLHWLHWLHWLHWLHWLNWLNWLNWLNWLNWLNWLNWLNWLHWLHWLHWLHWLHWLHWLHWLHWLHWLHWL 10.0810.2811.551005 10021003100410061007100810091.5% 1 0 1 0 10101010101010071008 1009100910091011101110111011101210121013101310141014GAS GAS GAS GAS GAS GAS GAS GAS GAS 0 4'WEST 78TH STREET225.90S89°30'55"E190.71N00°25'05"W 17.74 N00°14'16"W 20.60N89°14'53"E90.50N00°25'05"W 300.01 N00°44'38"W SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076PL01.DWG 08/06/2024HOPE HOUSE EXPANSIONL100 EXCELSIOR, MN HOPE HOUSE EXPANSIONLANDSCAPE PLAN 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.00ASHREDDED HARDWOOD MULCH (TYP.)BEDGER (TYP.)CSOD (TYP.)ALANDSCAPE KEYNOTESLANDSCAPE LEGENDSHRUBSOVERSTORY DECIDUOUS TREEPERENNIALSEDGEROVERSTORY CONIFEROUS TREE.LANDSCAPE SUMMARYPLANT SCHEDULE#2 CONT.--GRD5'-0" O.C.--CAD5'-0" O.C.--DBH3'-0" O.C.NOTE: QUANTITIES ON PLAN SUPERSEDE LIST QUANTITIES IN THE EVENT OF A DISCREPANCY.COMMON/BOTANICAL NAMECODELOCATION--SPACING O.C.BASESIDESLOPEBASE/SIDESIDESLOPEBASEBASE18" O.C.BASEBASEBASEQTYCPSJPWBONBFINEABESCURGOASWG18" O.C.18" O.C.18" O.C.18" O.C.24" O.C.18" O.C.18" O.C.18" O.C.SIZEPLUGPLUGPLUGPLUGPLUGPLUGPLUGPLUGPLUGBASE/SIDEKFG18" O.C.PLUGGRAY DOGWOOD / CORNUS RACEMOSARED-OSIER DOGWOOD / CORNUS SERICEA (STOLONIFERA)DWARF BUSH HONEYSUCKLE / DIERVILLA LONICERA------------------SIDESLOPESJP24" O.C.PLUG--SIDESLOPEPEVTUR18" O.C.18" O.C.PLUGPLUGCRF18" O.C.PLUG------SIDESLOPEBASE/SIDEBASE/SIDE#2 CONT.#2 CONT.SDO18" O.C.PLUGBJD18" O.C.PLUGASD18" O.C.PLUG------SIDESLOPESIDESLOPESIDESLOPEBASEBASEBASEGBLBPH18" O.C.18" O.C.PLUGPLUGJLA18" O.C.PLUG------SIDESLOPESIDESLOPEIRN18" O.C.PLUGIRONWEED / VERONIA FASICULATA--BASESIDESLOPEGCN18" O.C.PLUG--BASEGHC18" O.C.PLUG--REMARKSHEIGHT: 3-6'HEIGHT: 1-3'HEIGHT: 4-6'HEIGHT: 4-6'HEIGHT: 2-2.5'HEIGHT: 4-6'HEIGHT: 3-5'HEIGHT: 2'HEIGHT: 1.5-3' HEIGHT: 3'HEIGHT: 5-7'HEIGHT: 1-3'HEIGHT: 2-3'HEIGHT: 3'HEIGHT: .75-1'HEIGHT: .75-1'HEIGHT: .75-1'HEIGHT: 2-3'HEIGHT: .75-1'HEIGHT: 1-1.5'HEIGHT: 4-6'HEIGHT: 2-3'HEIGHT: 2-9'---PBS18" O.C.PLUG--BASE/SIDEHEIGHT: 4-6'POA18" O.C.PLUG--SIDESLOPEHEIGHT: 1-1.5'SIDESLOPEYAM18" O.C.PLUG--HEIGHT: 2-3'PPP18" O.C.PLUG--SIDESLOPEHEIGHT: 2-3'GREAT BLUE LOBELIA / LOBELIA SIPHILITICACARDINAL FLOWER / LOBELIA CARDINALISTURTLEHEAD / CHELONE GLABRACULVER'S ROOT / VERONICASTRUM VIRGINICUMGREEN HEADED CONEFLOWER / RUDBECKIA LACINIATABLUE FLAG IRIS / IRIS VERSICOLORBONESET / EUPATORIUM PERFOLIATUMJOE-PYE-WEED / EUPATORIUM MACULATUMCATERPILLER SEDGE / CAREX CRINITANEW ENGLAND ASTER / SYMPHYOTRICHUM NOVAE-ANGLIAEPRAIRIE BLAZING STAR / LIATRIS PYCNOSTACHYABROWN-EYED-SUSAN / RUDBECKIA SUBTOMENTOSAKARL FOERSTER FEATHER REED GRASS / CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER'PRAIRIE ONION / ALLIUM STELLATUMBAJA DAYLILY / HEMEROCALLIS 'BAJA'APRICOT SPARKLES DAYLILY / HEMEROCALLIS 'APRICOT SPARKLES'STELLA DE ORO DAYLILY / HEMEROCALLIS 'STELLA DE ORO'JACOBS LADDER / POLEMONIUM REPTANSPRAIRIE PHLOX / PHLOX PILOSABLUE PHLOX / PHLOX DIVARICATAPEARLY EVERLASTING / ANAPHALIS MARGARITACEAGOLDEN ALEXANDERS / ZIZIA AUREAGOLDSTRUM CONEFLOWER / RUDBECKIA FULGIDASWITCHGRASS / PANICUM VIRGATUMSWEET JOE-PYE-WEED / EUPATORIUM PURPUREUMCOMMON YARROW / ACHILLEA MILLEFOLIUM SHEET NUMBER:DATE:DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA PREPARED FOR: Phone :hLWeZaWer 'rLYe 6XLWe Fax 0LnneWonNa 01 Toll Free VERTICAL SCALE: HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED:INITIAL ISSUE: REVISIONS: N:\0032076.00\DWG\CIVIL\0032076PL01.DWG 08/06/2024HOPE HOUSE EXPANSIONL101 EXCELSIOR, MN HOPE HOUSE EXPANSION LANDSCAPE NOTES + DETAILS 3121 WESTWOOD DRIVE EXCELSIOR, MN 55331 WESTWOOD CHURCH EJK GAB EJK/DJW 08/06/2024PRELIMINARY DOCUMENTS© 2024 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'20'40'60'1" = 20'. . . . . . . . . . 20' 4' or 2'PROJECT NUMBER: 0032076.001.CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TOVERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTSOR LANDSCAPE MATERIAL.2.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS.3.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEENCOMPLETED IN THE IMMEDIATE AREA.4.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSIONOF ANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR.5.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THEGUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTENACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONEYEAR GUARANTEE COMMENCING UPON PLANTING.6.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADESHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS:ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC.ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTHRATIO OF NO LESS THAN 5:3.7.PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOSTCURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.8. PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES.9.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN MATERIALSIF NECESSARY; TEMPORARY ONLY.10.PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THE TOPOF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED DOWN TOTHE ROOT COLLAR/ROOT FLAIR. WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOTCOLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.11.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAKAPART PEAT POTS.12.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POORBRANCHING OF EXISTING AND PROPOSED TREES.13.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST.14.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONEYEAR.15.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIORTO PLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE NEEDOF ANY SOIL AMENDMENTS.16.BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECTTOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGERTHAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE. MINIMUM6" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH TOPSOIL FOR TREE, SHRUBS,AND PERENNIALS.17.MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUBPLANTING BEDS SHALL HAVE 4" DEPTH OF SHREDDED HARDWOOD MULCH. SHREDDEDHARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS. PERENNIAL ANDORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH SHREDDED HARDWOOD MULCH. MULCH TOBE FREE OF DELETERIOUS MATERIAL AND NATURAL COLORED, OR APPROVED EQUAL. MULCH TOMATCH EXISTING CONDITIONS (WHERE APPLICABLE).18.EDGING TO BE COMMERCIAL GRADE VALLEY-VIEW BLACK DIAMOND (OR EQUAL) POLY EDGINGOR SPADED EDGE, AS INDICATED. POLY EDGING SHALL BE PLACED WITH SMOOTH CURVES ANDSTAKED WITH METAL SPIKES NO GREATER THAN 4 FOOT ON CENTER WITH BASE OF TOP BEAD ATGRADE, FOR MOWERS TO CUT ABOVE WITHOUT DAMAGE. UTILIZE CURBS AND SIDEWALKS FOREDGING WHERE POSSIBLE. SPADED EDGE TO PROVIDE V-SHAPED DEPTH AND WIDTH TO CREATESEPARATION BETWEEN MULCH AND GRASS. INDIVIDUAL TREE, SHRUB, OR RAIN-GARDEN BEDSTO BE SPADED EDGE, UNLESS NOTED OTHERWISE. EDGING TO MATCH EXISTING CONDITIONS(WHERE APPLICABLE).19.BOULDERS TO BE FIELDSTONE BOULDERS, SIZED BETWEEN 36"-48" IN BOTH WIDTH AND HEIGHT.BOULDERS AVAILABLE FROM ROCK HARD LANDSCAPE SUPPLY,www.rockhardlandscapesupply.com/, 952.207.4456.20.ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. PARKING LOTISLANDS TO BE SODDED WITH SHREDDED HARDWOOD MULCH AROUND ALL TREES ANDSHRUBS. SOD TO BE STANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OFLAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE.SLOPES OF 3:1 OR GREATER SHALL BE STAKED. SEED AS SPECIFIED AND PER MN/DOTSPECIFICATIONS. IF NOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN.21.PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE DESIGN/BUILDBY LANDSCAPE CONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE SHOP DRAWINGS TOLANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.CONTRACTOR TO PROVIDE OPERATION MANUALS, AS-BUILT PLANS, AND NORMALPROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP DURING FIRSTYEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL PARTS AND LABOR.ALL INFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE OBTAINED FROM THEGENERAL CONTRACTOR.22.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT ISFULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDEWATER FOR CONTRACTOR.23.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREASADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION.24.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER.LAST REVISED:10/23/18SHRUB & PERENNIALCONTAINER PLANTINGLA27-CN.T.S.2XCONT.DIAMETERSET CONTAINER ROOT SOIL ONUNDISTURBED SUBSOIL OR MILDCOMPACTED SOIL FOR DEPTH TO MATCHFINISH GRADESCARIFY SIDES AND BOTTOM OF HOLE.DEPTH PER CONTAINER SOIL DEPTHBACKFILL PLANT PIT WITH SPECIFIEDPLANTING SOIL OR AS APPROVEDEDGING AT PLANTING BEDS, AS SPECIFIED,ADJACENT TO LAWN AREASMULCH AS SPECIFIED (AND FILTER FABRIC,AS INDICATED)REMOVE CONTAINER, SCARIFY SIDES, ANDSET SOIL MASS ON COMPACTED SOIL BASEMOUND, MATCHING SHRUBS NATURALGROUNDLINE WITH FINISHED GRADELAST REVISED:10/19/18DECIDUOUS TREEPLANTINGLA28N.T.S.SET ROOT BALL ON UNDISTURBED SUBSOILOR COMPACTED SOIL MOUND MATCHINGTREES NATURAL GROUNDLINE WITH FINISHEDSITE GRADE.REFER TO AMERICAN STANDARD FORNURSERY STOCK FOR MINIMUM BALL SIZE.ROOT FLARE TO BE PLANTED AT OR NEARFINISHED GROUNDLINE.SCARIFY SIDES AND BOTTOM OF HOLE.BACKFILL PLANT PIT WITH SPECIFIED BACKFILLSOIL.FORM 3" DEEP WATERING BASIN.PLACE MULCH, DEPTH AS SPECIFIED, OVERPLANT PITS - DO NOT PILE AGAINST TRUNK.TREE WRAP MATERIAL FROM GROUNDLINEUPWARD TO FIRST BRANCHES, AS REQUIRED.PRUNE OUT MISDIRECTED BRANCHES.PROVIDE ONE CENTRAL LEADER.GUYING AND STAKING, AS REQUIRED, FORONE (1) YEAR ON ALL DECIDUOUS ANDCONIFEROUS TREES:TOP STAKES 5' ABOVE GROUND (MAX.)OR TO FIRST BRANCH. BOTTOM OFSTAKE 3' (MIN.) BELOW GROUND.STAKING POSTS TO BE 2"X2" STAINEDWOOD OR PAINTED STEEL DELINEATORPOSTS. PLACE 3 POSTS EQUIDISTANTAROUND AND OUTSIDE ROOT BALL.SECURE TREE TO POSTS WITH 16" LONGPOLYPROPYLENE OR POLYETHYLENE, 40MIL., 1.5" WIDE STRAP.2XBALLDIAMETERSET ROOT BALL ON UNDISTURBED SUBSOILOR COMPACTED SOIL MOUND MATCHINGTREES NATURAL GROUNDLINE WITHFINISHED SITE GRADE.REFER TO AMERICAN STANDARD FORNURSERY STOCK FOR MINIMUM BALL SIZE.ROOT FLARE TO BE PLANTED AT OR NEARFINISHED GROUNDLINE.SCARIFY SIDES AND BOTTOM OF HOLE.BACKFILL PLANT PIT WITH SPECIFIEDBACKFILL SOIL.FORM 3" DEEP WATERING BASIN.PLACE MULCH, DEPTH AS SPECIFIED, OVERPLANT PITS - DO NOT PILE AGAINST TRUNK.PRUNE OUT MISDIRECTED BRANCHES.PROVIDE ONE CENTRAL LEADER.GUYING AND STAKING, AS REQUIRED, FORONE (1) YEAR ON ALL DECIDUOUS ANDCONIFEROUS TREES:TOP STAKES 5' ABOVE GROUND (MAX.)OR TO FIRST BRANCH. BOTTOM OFSTAKE 3' (MIN.) BELOW GROUND.STAKING POSTS TO BE 2"X2" STAINEDWOOD OR PAINTED STEEL DELINEATORPOSTS. PLACE 3 POSTS EQUIDISTANTAROUND AND OUTSIDE ROOT BALL.SECURE TREE TO POSTS WITH 16" LONGPOLYPROPYLENE OR POLYETHYLENE, 40MIL., 1.5" WIDE STRAP.2XBALLDIAMETERLAST REVISED:10/19/18EVERGREEN TREEPLANTINGLA29N.T.S.