Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2024-0626 Roers Chanhassen OPC - Public improvements
Chanhassen Apartments - Public Improvements Opinion of Probable Construction Cost Date: 6/25/2024 Sequence Number Item Unit Quantity Estimated Unit Price Total Cost Parking Lot and Roads 1 B618 Concrete Curb and Gutter LF 316 20.00$ 6,321.50$ 2 Class V TN 510 20.00$ 10,195.19$ 3 Bit. Base Course TN 172 105.00$ 18,085.59$ 4 Bit. Wear Course TN 134 115.00$ 15,389.32$ SUBTOTAL 49,991.60$ Utilities- Watermain 5 6" PVC C-900 LF 178 40.00$ 7,101.60$ 6 10" PVC C-900 LF 905 75.00$ 67,840.58$ 7 18" PVC C-900 LF 389 250.00$ 97,167.25$ 8 Connect to Existing EA 5 2,500.00$ 12,500.00$ 9 6" Gate Valve EA 9 3,500.00$ 31,500.00$ 10 8" Gate Valve EA 1 4,500.00$ 4,500.00$ 11 10" Gate Valve EA 11 5,500.00$ 60,500.00$ 12 18" Butterfly Valve EA 1 9,500.00$ 9,500.00$ 13 Hydrant EA 3 6,700.00$ 20,100.00$ 14 Fittings (Bends, Tees, Reducers LBS 4680 9.00$ 42,120.00$ SUBTOTAL 352,829.43$ Erosion & Sediment Control (Phase 2 BMP Quantities) 15 Silt Fence LF 267 2.00$ 534.00$ 16 Inlet Protection EA 12 225.00$ 2,700.00$ 17 Silt Dike LF 1414 8.00$ 11,312.00$ SUBTOTAL 14,546.00$ Demolition & Removals 18 Remove Bituminous Surface SF 18401 2.00$ 36,802.00$ 19 Remove Concrete Curb and Gutter LF 339 6.00$ 2,032.19$ 20 Remove Clearing and Grubbing AC 0 3,500.00$ 835.84$ 21 Remove Water Line LF 197 25.00$ 4,927.05$ 22 Sawcut Pavement LF 20 4.00$ 80.42$ SUBTOTAL 44,677.50$ Estimated Projected Costs 462,044.53$ Contingency 10% 46,204.45$ TOTAL ESTIMATED COST 508,248.99$