Geo Eval - Chanhassen Multi-Family Development, B2307983
Geotechnical Evaluation Report
Chanhassen Multi-Family Development
SW Quadrant of Market Boulevard and West 78th Street
Chanhassen, Minnesota
Prepared for
Roers Companies, LLC
Professional Certification:
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Aaron R. Schulzetenberg, PE
Senior Engineer
License Number: 57248
June 10, 2024
Project B2307983
Braun Intertec Corporation
AA/EOE
Braun Intertec Corporation
11001 Hampshire Avenue S
Minneapolis, MN 55438
Phone: 952.995.2000
Fax: 952.995.2020
Web: braunintertec.com
June 10, 2024 Project B2307983
Mr. Nick Asta
Roers Company, LLC
Two Carlson Parkway, Suite 400
Plymouth, MN 55447
Re: Geotechnical Evaluation
Chanhassen Multi-Family Development
SW Quadrant of Market Boulevard and West 78th Street
Chanhassen, Minnesota
Dear Mr. Asta:
We are pleased to present this Geotechnical Evaluation Report for the proposed multi-family development
at the referenced site in Chanhassen, Minnesota. Please see the attached report for a detailed discussion
on the field exploration results and our recommendations. The report should be read in its entirety.
Thank you for making Braun Intertec your geotechnical consultant for this project. If you have questions
about this report, or if there are other services that we can provide in support of our work to date, please
contact Aaron Schulzetenberg at 701.516.4337 (aschulzetenberg@braunintertec.com) or Brad McCarter
at 612.708.2790 (bmccarter@braunintertec.com).
Sincerely,
BRAUN INTERTEC CORPORATION
Aaron R. Schulzetenberg, PE
Senior Engineer
Bradley J. McCarter, PE
Director, Senior Engineer
c: Andy Bollig; Roers Companies, LLC
Tony Asta; Roers Companies, LLC
Bob Loken; ESG Architecture
Mitchell Cookas; Kimley-Horn and Associates, Inc.
Table of Contents
Description Page
A. Introduction ...................................................................................................................................... 1
A.1. Project Description .............................................................................................................. 1
A.2. Site Conditions and History ................................................................................................. 2
A.3. Purpose ................................................................................................................................ 5
A.4. Background Information and Reference Documents .......................................................... 5
A.5. Scope of Services ................................................................................................................. 5
B. Results .............................................................................................................................................. 6
B.1. Geologic Overview .............................................................................................................. 6
B.2. Boring Results ...................................................................................................................... 7
B.3. Groundwater ....................................................................................................................... 8
B.4. Laboratory Test Results ....................................................................................................... 8
C. Recommendations ........................................................................................................................... 9
C.1. Design and Construction Discussion ................................................................................... 9
C.1.a. Building Subgrade Preparation .............................................................................. 9
C.1.b. Reuse of On-Site Soils ............................................................................................. 9
C.1.c. Deep Structural Fill ............................................................................................... 10
C.1.d. Groundwater Impacts .......................................................................................... 10
C.1.e. Construction Disturbance ..................................................................................... 10
C.1.f. Pavement Support ................................................................................................ 11
C.2. Temporary Retention ........................................................................................................ 11
C.2.a. Excavated Slopes .................................................................................................. 11
C.2.b. Temporary Retention Considerations .................................................................. 11
C.2.c. Owner Considerations .......................................................................................... 13
C.3. Site Grading and Subgrade Preparation ............................................................................ 13
C.3.a. Building Subgrade Excavations ............................................................................. 13
C.3.b. Excavation Oversizing ........................................................................................... 15
C.3.c. Excavation Dewatering ......................................................................................... 16
C.3.d. Engineered Fill Materials and Compaction .......................................................... 16
C.3.e. Special Inspections of Soils ................................................................................... 17
C.4. Spread Footings ................................................................................................................. 18
C.5. Below-Grade Walls ............................................................................................................ 18
C.5.a. Drainage Control .................................................................................................. 18
C.5.b. Configuring and Resisting Lateral Loads ............................................................... 20
C.6. Interior Slabs ..................................................................................................................... 21
C.6.a. Subgrade Modulus ............................................................................................... 21
C.6.b. Moisture Vapor Protection .................................................................................. 21
C.7. Frost Protection ................................................................................................................. 21
C.7.a. General ................................................................................................................. 21
C.7.b. Frost Heave Mitigation ......................................................................................... 21
C.8. Pavements and Exterior Slabs ........................................................................................... 23
C.8.a. Pavement and Exterior Slab Subgrade Preparation ............................................. 23
C.8.b. Pavement Subgrade Proofroll .............................................................................. 24
C.8.c. Design Sections .................................................................................................... 24
C.8.d. Concrete Pavements ............................................................................................ 25
C.8.e. Subgrade Drainage ............................................................................................... 25
Table of Contents (continued)
Description Page
C.8.f. Performance and Maintenance ........................................................................... 25
C.9. Utilities .............................................................................................................................. 26
C.9.a. Subgrade Stabilization .......................................................................................... 26
C.9.b. Corrosion Potential .............................................................................................. 26
C.10. Stormwater........................................................................................................................ 26
C.11. Equipment Support ........................................................................................................... 26
D. Procedures ...................................................................................................................................... 27
D.1. Penetration Test Borings ................................................................................................... 27
D.2. Exploration Logs ................................................................................................................ 27
D.2.a. Log of Boring Sheets ............................................................................................. 27
D.2.b. Geologic Origins ................................................................................................... 27
D.3. Material Classification and Testing ................................................................................... 28
D.3.a. Visual and Manual Classification .......................................................................... 28
D.3.b. Laboratory Testing ............................................................................................... 28
D.4. Groundwater Measurements ............................................................................................ 28
E. Qualifications .................................................................................................................................. 28
E.1. Variations in Subsurface Conditions .................................................................................. 28
E.1.a. Material Strata ..................................................................................................... 28
E.1.b. Groundwater Levels ............................................................................................. 29
E.2. Continuity of Professional Responsibility .......................................................................... 29
E.2.a. Plan Review .......................................................................................................... 29
E.2.b. Construction Observations and Testing ............................................................... 29
E.3. Use of Report ..................................................................................................................... 29
E.4. Standard of Care ................................................................................................................ 29
Appendix
Soil Boring Location Sketch
Log of Boring Sheets ST-1 to ST-19 (36 pages)
Descriptive Terminology of Soil
A. Introduction
A.1. Project Description
This Geotechnical Evaluation Report addresses the design and construction of the proposed multi-family
development, located at 591 West 78th Street in Chanhassen, Minnesota. The project will include the
construction of two apartment buildings. The west apartment building will have an approximate
footprint of 57,755 square feet, and the east apartment building will have an approximate footprint of
45,329 square feet. Portions of the below grade levels will be exposed on the south side of the West
Building, and the south and west sides of the East Building while the north side will have 2 levels below
grade. Associated sitework is anticipated to consist of installation of underground utilities, surficial
pavement for drive lanes and parking lots, and a stormwater management system in the northeast
corner of the site. Table 1 provides project details.
Table 1. Building Description
Aspect
Description
West Building East Building
Below grade levels 2 (Provided) 1 (Provided)
Above grade levels 6 (Provided) 5 (Provided)
Finish Floor Elevation
Lowest level floor elevation
977 (Provided)
954.33 (Provided)
977 (Provided)
965.67 (Provided)
Column loads (kips) 700 (Assumed) 450 (Assumed)
Wall loads (kips per lineal foot) 10 to 14 (Assumed) 10 to 12 (Assumed)
Nature of construction
▪ Concrete slab-on-grade lowest
basement/garage level
▪ 3 stories of precast and CIP
concrete, with wood framing
above
▪ Concrete slab-on-grade lowest
basement/garage level
▪ 2 stories of precast and CIP
concrete, with wood framing
above
Site grading
General exterior site grades will be altered by less than
3 feet, excavations up to 24 feet will be needed in areas to reach the
basement slab grade (not including footings, elevator pits,
or soil corrections)
Assumed pavement loads Light-duty: 50,000 ESALs*
Heavy-duty: 100,000 ESALs*
*Equivalent 18,000-lb single axle loads based on 20-year design.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 2
The figure below shows an illustration of the proposed site layout.
Figure 1. Site Layout
Figure prepared by ESG Architecture dated August 24, 2023.
We have described our understanding of the proposed construction and site to the extent others
reported it to us. Depending on the extent of available information, we may have made assumptions
based on our experience with similar projects. If we have not correctly recorded or interpreted the
project details, the project team should notify us. New or changed information could require additional
evaluation, analyses and/or recommendations.
A.2. Site Conditions and History
Currently, the site exists as eight parcels of land totaling 4.08 acres and has been developed with two
existing commercial buildings, Country Inn & Suites by Radisson and the Chanhassen Cinema. The site is
bound to the north by West 78th Street, to the west by Market Boulevard, and to the south and east by
retail and residential buildings and associated surface parking lots.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 3
Generally the site is relatively flat on the north and south sides, with current grades ranging from about
970 to 976 on the north half, and about 962 to 970 on the south half. Generally, the site slopes
downward, from north to south. There is an existing retaining wall consisting of modular block and
cast-in-place concrete on the south side of the existing hotel building that is up to approximately
10 feet in height.
Historically, the site was primarily used for agricultural purposes until the early-1960s when a commercial
building was constructed on the east half of the site. By 1970, an addition to the commercial building had
been constructed to the south and the site generally remained the same until construction of the existing
hotel building before 1991. Later in the mid-2000s, portions of the existing building on the southeast side
of the site were either demolished or renovated into what is now the Chanhassen Cinema. After 2008,
the site remaining generally configured as it is today. Photographs 1 through 3 display site conditions
outlined in red in 1970, 1991, and 2013, respectively.
Photograph 1. Aerial Photograph of the Site in 1970
Photograph provided by Historical Image Gatherers.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 4
Photograph 2. Aerial Photograph of the Site in 1991
Photograph provided by Historical Image Gatherers.
Photograph 3. Aerial Photograph of the Site in 2013
Photograph provided by Historical Image Gatherers.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 5
A.3. Purpose
The purpose of our geotechnical evaluation was to characterize subsurface geologic conditions at
selected exploration locations, evaluate their impact on the project, and provide geotechnical
recommendations for use in the design and construction of the proposed development.
A.4. Background Information and Reference Documents
We reviewed the following information:
▪ Aerial photographs prepared by Historical Information Gatherers (HIG) showing the historical
and existing site conditions.
▪ District Site Plan prepared by ESG Architecture, dated June 21, 2023.
▪ Geologic atlas showing the general soil types present in the area. Specifically, we reviewed
Minnesota Geological Survey, Miscellaneous Map Series, Map M-178, Surficial Geology,
dated 2007.
▪ Draft Phase I Environmental Site Assessment prepared by Braun Intertec Corporation dated
October 12, 2023.
A.5. Scope of Services
We performed our scope of services for the project in accordance with our Proposal for Geotechnical
Evaluation (QTB183063), dated August 11, 2023. The following list describes the geotechnical tasks
completed in accordance with our authorized scope of services.
▪ Reviewing the background information and reference documents previously cited.
▪ Staking and clearing the exploration location of underground utilities. Braun Intertec
Corporation selected and staked the new exploration locations. We acquired the surface
elevations and locations with GPS technology using the State of Minnesota’s permanent GPS
base station network. The Soil Boring Location Sketch included in the Appendix shows the
approximate locations of the borings.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 6
▪ Performing 19 standard penetration test (SPT) borings, denoted as ST-1 to ST-19, to nominal
depths of 20 to 35 feet below grade across the site.
▪ Performing laboratory testing on select samples to aid in soil classification and engineering
analysis.
▪ Preparing this report containing a boring location sketch, logs of soil borings, a summary of
the soils encountered, results of laboratory tests, and recommendations for structure and
pavement subgrade preparation and for use in the design and construction of foundations,
interior and exterior slabs, below-grade walls, utilities, stormwater improvements, and
pavements.
We performed this geotechnical evaluation concurrently with a Phase I Environmental Assessment (ESA)
which we will submit separately. The project team should review the Phase I ESA report in conjunction
with this geotechnical evaluation report to understand both the geotechnical and environmental aspects
of the site and how they may impact one another.
Our scope of services did not include environmental services or testing and our geotechnical personnel
performing this evaluation are not trained to provide environmental services or testing. We can provide
environmental services or testing at your request.
B. Results
B.1. Geologic Overview
A review of the surficial geology map indicates this site is predominantly underlain by glacial till
deposited clayey soils.
We based the geologic origins used in this report on the soil types, in-situ and laboratory testing, and
available common knowledge of the geological history of the site. Because of the complex depositional
history, geologic origins can be difficult to ascertain. We did not perform a detailed investigation of the
geologic history for the site.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 7
B.2. Boring Results
Table 2 provides a summary of the soil boring results, in the general order we encountered the strata.
Please refer to the Log of Boring sheets in the Appendix for additional details. The Descriptive
Terminology sheet in the Appendix includes definitions of abbreviations used in Table 2.
Table 2. Subsurface Profile Summary*
Strata
Soil Type -
ASTM
Classification
Range of
Penetration
Resistances Commentary and Details
Pavement
section --- ---
▪ Overall thickness ranges from about 15 to 24 inches, and
consists of either concrete or bituminous pavement.
▪ Bituminous thickness ranges from about 3 to 12 inches.
▪ Concrete thickness ranges from about 4 to 6 inches.
▪ Apparent aggregate base thickness ranges from about
10 to 16 inches.
Topsoil/
Topsoil fill SM, SC, CL ---
▪ Predominantly black CL or dark brown SM.
▪ Variable thickness, not present at all borings.
▪ Thicknesses when encountered at boring locations varied
from about 1 to 2 feet.
▪ Moisture condition generally dry or moist.
Fill SM, SC, CL 3 to 18 BPF
▪ Moisture condition generally dry or moist.
▪ Thicknesses when encountered at boring locations varied
from 1 1/2 to 9 feet.
▪ Predominantly clayey sand or sandy lean clay, that
occasionally contains layers of slightly organic soils.
▪ Existing fill contained variable amounts of debris,
including bituminous.
Alluvial CL-ML 7 to 10 BPF
▪ Only encountered at Boring ST-2.
▪ Penetration resistances indicate material in a medium to
stiff condition.
▪ Moisture condition generally moist.
Glacial
deposits
SP-SM, SM 20 to 34 BPF
▪ Chemical odor noted in Boring ST-18 from about 7 to
14 feet below existing grades.
▪ Predominantly glacial till with intermixed layers of glacial
outwash.
▪ Variable amounts of gravel; may contain cobbles and
boulders.
▪ Penetration resistance of cohesionless soils generally in a
medium to stiff condition.
▪ Penetration resistance of cohesive soils generally in a
medium to very stiff condition.
▪ Higher penetration resistances influenced by rock in
sampler.
▪ Moisture condition generally moist.
SC, CL, ML
5 BPF to
50 blows for
6 inches of
penetration
*Abbreviations defined in the attached Descriptive Terminology sheet.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 8
We did not perform gradation analysis on the apparent aggregate base material encountered as part of
the pavement section, in accordance with our scope of work. Therefore, we cannot conclusively
determine if the encountered material satisfies a particular specification.
For simplicity in this report, we define existing fill to mean existing, uncontrolled or undocumented fill.
B.3. Groundwater
Groundwater was encountered between depths of 3 and 35 feet below existing grades in Borings ST-8,
ST-10, and ST-14. Given the range of depths/elevations, and the lack of groundwater observed in the
native sands at depth in Boring ST-7, it does not appear that our borings penetrated the hydrostatic
groundwater surface, but instead encountered perched deposits of groundwater trapped within more
permeable layers of soil present throughout the more cohesive, less permeable strata that was
predominantly encountered across the site.
The depths/elevations at which perched groundwater accumulates seasonally and annually could be
shallower/higher at the exploration locations and between exploration locations. Variations should be
anticipated. In some cases, the amount of perched groundwater may be significant.
Project planning should anticipate seasonal and annual fluctuations of groundwater.
B.4. Laboratory Test Results
Representative samples obtained during drilling were selected for applicable laboratory testing.
Laboratory testing of select samples included moisture content (ASTM D2216), P200 (ASTM C117),
organic content (ASTM D2974), and Atterberg Limit (ASTM D4318) testing. The results of laboratory tests
are discussed in the following sections of this report and are shown on the boring logs in the Appendix
adjacent to samples tested.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 9
C. Recommendations
C.1. Design and Construction Discussion
C.1.a. Building Subgrade Preparation
The soil borings performed for this evaluation generally encountered surficial topsoil or pavements
overlying existing fill and occasionally alluvial soils underlain by glacial soils to the boring termination
depths. Topsoil, pavements, existing fill, alluvial soils, and near surface layers of soft, wet clay or silt soils
will need to be removed to expose the competent glacial soils. In addition, any demolished structures
and/or abandoned utility lines and associated trenches will need to have soil conditions assessed and
improved as needed for support of future structures. Based on the results of the borings, unsuitable soils
within the building footprints extend to depths of about 1 1/2 to 19 feet below existing grades.
The existing fill observed in the borings was variable in consistency and information regarding its age,
placement, and compaction was not available. If left in place, existing fill can lead to detrimental
settlement leading to poor structural performance if structures are directly supported on them. Soil
correction excavations to prepared foundation and slab subgrades are anticipated to consist of topsoil
and pavement stripping, removal of fill and zones of soft alluvial soils, and glacial clay soils (i.e., clays with
an N-Value of 6 or less).
Once the site has been prepared as recommended, we anticipate the new proposed structures may be
supported using conventional spread footing foundations and ground supported slabs.
C.1.b. Reuse of On-Site Soils
The laboratory testing of the on-site clay fills indicates the material contains layers of slightly organic soils
and above the assumed optimum moisture content of the material. Re-use may be challenging as
segregation of the organic soils would be required prior to re-use and stockpiling of onsite soils may be
limited due to site constraints.
The laboratory testing of the native glacial soils indicates the material is near or above its optimum
moisture content, and appears suitable for re-use as engineered fill.
If on-site soils are re-used for engineered fill, project planning should anticipate moisture condition may
be required to achieve compaction prior to re-use.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 10
Moisture conditioning and reuse of clayey soils will require spreading or disking the soils in favorable
weather which means low humidity, sun or wind, most common in June, July, or August. If grading the
soil in wet weather or winter when weather is cold, wet, or limited daylight hours, additional import of
soils may be needed. This could include borrow from suitable soils on site or importing soils. If importing
soil you may need to import sand at higher cost to grade the site in winter.
If on-site clays will be used as backfill of basement walls, post-placement settlement of the compacted
backfill should be accounted for. This should be closely considered in design of at grade features with a
horizontal distance from the wall equal to the height of the backfill. The site plan we have been provided
indicates a patio, including a pool, and some parking spaces at the facility should account for this. Section
C.4 contains more details and recommendations for wall backfill and considerations for clay backfill.
C.1.c. Deep Structural Fill
We understand that for the north side of the west building, there will be two levels below grade adjacent
to at-grade interior slab, and will require about 25 feet of wall backfill to establish grade. If on-site clayey
soils are used to backfill areas in excess of 10 feet, unfavorable amounts of settlement are anticipated as
clays will continue to settle under their own weight. Even when compacted properly, settlement of deep
clay backfill on the order of 1 to 3 percent of the backfill height are anticipated, and can take 6 to
12 months to occur. Unless a construction delay is observed following placement of the full height of the
backfill, we recommend the project team consider backfilling the below-grade basement walls for the
west building with imported sands (SP, SP-SM). In addition to aiding in building performance, the use of
sand backfill in this area will provide improved design parameters for wall design.
C.1.d. Groundwater Impacts
We anticipate excavations for the building and soil corrections will not encounter hydrostatic
groundwater. However, perched water should be anticipated and may be encountered across the site
above layers of less permeable soil layers of clay and silt soils. As evidenced in Borings ST-8 and ST-14,
perched water can be as shallow as 3 feet below grade. Where zones of perched water are encountered, it
should be removed from excavations prior to fill or foundation placement. Given the sloping topography
water may drain for some time and if encountered during construction, the geotechnical engineer should
review. Additional considerations for the control of perched water may apply to this site such as French
drains to route the water away from construction depending on the volume of water encountered.
C.1.e. Construction Disturbance
The clayey soils present across the site are sensitive to disturbance, particularly if they are wet.
Contractors should select equipment and construction techniques that minimize soil disturbance
especially in exterior areas. Soils that become disturbed and cannot be compacted should be replaced
with clean sand or crushed rock without fines.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 11
C.1.f. Pavement Support
Based on our borings, it is our opinion the pavements can be constructed over the on-site fills or native
glacial soils as long as the in-place soils can be stabilized and pass a proofroll test. Some subcuts to
remove zones of soft, wet clays and slightly organic soils are recommended when these soils will be
within 3 feet of pavement subgrade. Note some drying and compaction of the soil may be needed to
provide a stiff base to place and compact subsequent fill soil or to pass a proofroll.
C.2. Temporary Retention
Currently, open cuts will likely be possible along the south and east sides of the West Building and north,
south, and west sides of the East Building. Some temporary retention may be needed to retain soil at
other parts of the site.
C.2.a. Excavated Slopes
Based on the borings, we anticipate on-site soils in excavations will consist of clays. These soils are
typically considered Type B Soil under OSHA (Occupational Safety and Health Administration) guidelines.
OSHA guidelines indicate unsupported excavations in Type B soils should have a gradient no steeper than
1:1V. Slopes constructed in this manner may still exhibit surface sloughing. OSHA requires an engineer to
evaluate slopes or excavations over 20 feet in depth and based on available plans will need to be
considered for this site.
An OSHA-approved qualified person should review the soil classification in the field. Excavations must
comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This
document states excavation safety is the responsibility of the contractor. The project specifications
should reference these OSHA requirements.
C.2.b. Temporary Retention Considerations
In areas where an open cut excavation is not possible, the contractor will need to use a temporary
retention system. Typically, temporary retention systems consist of soldier piles with wood lagging and
we anticipate this would be considered at this site. We recommend that the project team consider
several other issues before selecting a retention system, including:
▪ Vibrations that occur during installation and removal of some temporary systems can be
annoying or disturbing to neighbors.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 12
▪ High-level vibrations can damage adjacent structures and can densify loose soil, causing
settlement of structures, pavements, and utilities. The vibrations primarily affect looser
sands, while not encountered within the borings performed for this evaluation, these soils
may be present away from the soil borings performed for this evaluation. Sands, if present
away from the borings are subject to densification, such as existing fill which may be present
below the adjacent street, parking lot and any nearby utility trenches. As this affect
diminishes with distance, this is mostly a concern for structures within 10 to 15 feet but can
be a consideration up to 25 feet from the retention system. This should be considered as part
of retention system selection.
▪ Depending on the final design parameters and requirements, some lateral movement of the
retention system may occur. This movement can result in soil subsidence, which may affect
adjacent pavements, utilities, and structures up to a horizontal distance equal to the height
of the wall.
▪ Obstructions within the soil strata could impact retention system installations such as debris
or boulders. The contractor should anticipate some obstructions during installation.
▪ Retention systems in excess of about 10 feet in vertical heights also need to consider the
use of tie-back anchors in their design. Tie-backs need to also consider right-of-way impacts
to adjacent site features as well as structural impacts, including footing interference. These
tie-backs may be temporary or permanent in nature. Tie-backs need to be designed by a
licensed engineer.
▪ Some localized soil loss through the wall may occur, particularly with wood lagged systems in
areas of loose, poorly graded sand which may be present below the adjacent streets or
within existing utility trenches. These voids can also result in subsidence. Techniques should
minimize soil loss or voids during construction should not be allowed to occur.
▪ Even with low vibration levels, our experience indicates that vibration-related complaints and
damage claims tend to increase when vibration levels become noticeable or are annoying.
We recommend designing the temporary shoring using the parameters in Table 3.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 13
Table 3. Lateral Parameters for Shoring Design
Material
Wet Unit
Weight
(pcf)
Friction
Angle
(deg)
Active Equivalent
Fluid Pressure*
(pcf)
At-Rest Equivalent
Fluid Pressure*
(pcf)
Passive Equivalent
Fluid Pressure
(pcf)
Clayey Soils and Existing
Fill (SC, CL) 125 26 50 70 320
* Based on Rankine model for soils in a region behind the wall extending at least 2 horizontal feet beyond the bottom outer
edges of the wall and then rising up and away from the wall at an angle no steeper than 60 degrees from horizontal.
Designs should also consider the slope of any backfill and dead or live loads, including the weight of the
wall, retained fill and any structures, placed within a horizontal distance behind the walls that is equal to
the height of the retained soils. The wall designer should evaluate the amount of movement that will
occur during construction, evaluate the impact on the wall and structures it retains, and describe the
monitoring of systems to evaluate wall movement.
C.2.c. Owner Considerations
Due to the associated risk with excavating for up to 2 levels below grade within an existing slope, we
recommend using performance-based specifications and design-build contracting for this work. We
recommend requiring the contractor to have at least five years of experience in performing this work in this
region, and to demonstrate performing the proposed protection system(s) on at least three previous projects
of similar size and scope. The specifications should require the design engineer be licensed in the State of
Minnesota. We can assist you with developing a list of pre-qualified contractors prior to bidding, reviewing
contractor experience as part of the bidding process, and reviewing submitted designs on your behalf.
Structures located near the project site may experience vibrations during construction activities.
Excessive ground vibration levels can damage structures, e.g., cracked walls and foundations. Although
vibration levels during construction may not necessarily cause damage, our experience is that
vibration-related complaints and damage claims tend to increase when vibration levels become
noticeable or are annoying. For this reason, we recommend recording vibration levels during
construction. We also recommend performing pre-construction surveys on structures within the affected
area to document existing conditions. The owner or contractor can then perform a comparative post-
construction survey in response to any vibration-related damage claims.
C.3. Site Grading and Subgrade Preparation
C.3.a. Building Subgrade Excavations
Generally, we anticipate excavations to reach the lowest level for the west building will remove the
majority of unsuitable soils. However, we recommend removing unsuitable materials from within each
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 14
building footprint and its oversize areas. We define unsuitable materials as existing fill, frozen materials,
organic soils, existing structures, existing utilities, vegetation, alluvial soils, and soft/loose soils. Tables 4
and 5 shows the anticipated excavation depths and bottom elevations for each of the borings performed
within or near the west and east apartment buildings, respectively.
Table 4. Building Excavation Depths – West Building
Location
Approximate
Surface Elevation
(feet)
Anticipated
Excavation Depth
(feet)
Anticipated
Bottom Elevation
(feet)
Anticipated Depth
Below Lowest Floor
FFE = 954.3
(feet)
ST-1 973.4 19 954 1/2 Cut to grade
ST-2 973.9 9 965 Cut to grade
ST-3 975.5 1 1/2 974 Cut to grade
ST-4 971.4 7 964 1/2 Cut to grade
ST-5 974.3 7 967 1/2 Cut to grade
ST-6 974.0 4 970 Cut to grade
ST-7 967.2 4 963 Cut to grade
ST-8 964.2 4 960 Cut to grade
ST-9 965.3 7 958 1/2 Cut to grade
Table 5. Building Excavation Depths – East Building
Location
Approximate
Surface Elevation
(feet)
Anticipated
Excavation Depth
(feet)
Anticipated
Bottom Elevation
(feet)
Anticipated Depth
Below Lowest Floor
FFE = 965.67
(feet)
ST-10 960.9 7 954 11 1/2 A
ST-11 959.3 7 952 1/2 13 A
ST-12 961.4 1 1/2 960 5 1/2
ST-13 964.2 4 960 5 1/2
ST-14 964.1 2 962 3 1/2
ST-15 970.5 9 961 1/2 4
ST-16 974.7 9 965 1/2 Cut to grade
ST-17 974.0 1 1/2 972 1/2 Cut to grade
A Anticipated fill depth is greater than 10 feet, see Table 6
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 15
Excavation depths will vary between the borings. Portions of the excavations may also extend deeper
than indicated by the borings. A geotechnical representative should observe the excavations to make the
necessary field judgments regarding the suitability of the exposed soils.
The contractor should use equipment and techniques to minimize soil disturbance. If soils become
disturbed or are wet, we recommend excavation and replacement with engineered fill.
C.3.b. Excavation Oversizing
When removing unsuitable materials below structures for soil corrections, we recommend the
excavation extend outward and downward at a slope of 1H:1V (horizontal:vertical) or flatter. See Figure 2
for an illustration of excavation oversizing.
Figure 2. Generalized Illustration of Oversizing
1. Engineered fill as defined in C.3
2. Excavation oversizing minimum of 1 to 1
(horizontal to vertical) slope or flatter
3. Engineered fill as required to meet
pavement support or landscaping
requirements as defined in C.3
4. Backslope to OSHA requirements
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 16
C.3.c. Excavation Dewatering
We recommend removing groundwater or collected perched/rainwater from the excavations. Project
planning should include temporary sumps and pumps for excavations in low-permeability soils, such as
clays and clayey sands.
C.3.d. Engineered Fill Materials and Compaction
Table 6 below contains our recommendations for engineered fill materials.
Table 6. Engineered Fill MaterialsA
Locations To Be Used
Engineered Fill
Classification
Possible Soil
Type
Descriptions Gradation
Additional
Requirements
▪ Below foundations
▪ Below interior slabs
▪ Behind below-grade
walls, beyond drainage
layerB
▪ Pavements
▪ Structural fill
▪ Retained fillB
▪ Pavement fill
SP, SP-SM, SM,
SC, CL
(excludes ML,
MH, CH)
100% passing
2-inch sieve
< 2% Organic
Content (OC)
Plasticity Index (PI)
< 20
▪ Drainage layer
▪ Non-frost-susceptible
▪ Free-draining
▪ Non-frost-
susceptible fill
▪ Clean Sand
SP
100% passing 1-inch
sieve
< 50% passing
#40 sieve
< 5% passing #200
sieve
< 2% OC
▪ Deep structural fill
defined as wall backfill
or structural fill placed
greater than 10 feet
below overhead
footings, slabs, or
other structuresC
▪ Deep structural
fill SP, SP-SM
100% passing 1-inch
sieve
< 12% passing #200
sieve
< 2% OC
A More select soils comprised of coarse sands with < 5% passing #200 sieve may be needed to accommodate work occurring in
periods of wet or freezing weather.
B Fill should match lateral earth pressures utilized by the structural engineer for below grade or retaining wall design.
C To limit the risk of settlement from fill consolidation.
We recommend spreading engineered fill in loose lifts of approximately 8 to 12 inches thick. We
recommend compacting engineered fill in accordance with the criteria presented below in Table 7. The
project documents should specify relative compaction of engineered fill, based on the structure located
above the engineered fill, and vertical proximity to that structure.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 17
Table 7. Compaction Recommendations Summary
Reference
Relative Compaction,
percent
(ASTM D698 –
Standard Proctor)
Moisture Content Variance from Optimum,
percentage points
< 12% Passing #200 Sieve
(typically SP, SP-SM)
> 12% Passing #200 Sieve
(typically CL, SC, ML, SM)
Within building pad
(below foundation and
interior slabs) and
oversizing zones
98 ±3 -1 to +3
Within 3 feet of
pavement subgrade 100 ±3 -2 to +1
Below exterior slabs not
subject to vehicle loads
(i.e. stoops, sidewalks) or
more than 3 feet below
pavement subgrade
95 ±3 ±3
Adjacent to below-grade
wall 95* ±3 -1 to +3
*Increase compaction requirement to meet compaction required for structure supported by this engineered fill.
The project documents should not allow the contractor to use frozen material as engineered fill or to place
engineered fill on frozen material. Frost should not penetrate under foundations during construction.
We recommend performing density tests in engineered fill to evaluate if the contractors are effectively
compacting the soil and meeting project requirements.
C.3.e. Special Inspections of Soils
We recommend including the site grading and placement of engineered fill within the building pad under
the requirements of Special Inspections, as provided in Chapter 17 of the International Building Code,
which is part of the Minnesota State Building Code. Special Inspection requires observation of soil
conditions below engineered fill or footings, evaluations to determine if excavations extend to the
anticipated soils, and if engineered fill materials meet requirements for type of engineered fill and
compaction condition of engineered fill. A licensed geotechnical engineer should direct the Special
Inspections of site grading and engineered fill placement. The purpose of these Special Inspections is to
evaluate whether the work is in accordance with the approved Geotechnical Report for the project.
Special Inspections should include evaluation of the subgrade, observing preparation of the subgrade
(surface compaction or dewatering, excavation oversizing, placement procedures and materials used for
engineered fill, etc.) and compaction testing of the engineered fill.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 18
C.4. Spread Footings
Table 8 below contains our recommended parameters for foundation design.
Table 8. Recommended Spread Footing Design Parameters
Item Description
Maximum net allowable bearing pressure (psf) 4,000
Minimum factor of safety for bearing capacity failure 3.0
Minimum width (inches):
Perimeter strip footings
Column pads
24
36
Minimum embedment below final exterior grade for heated
structures (inches) 42
Minimum embedment below final exterior grade for
unheated structures or for footings not protected from
freezing temperatures during construction (inches)
60
Total estimated settlement (inches) Less than 1
Differential settlement Typically about 1/2 of total settlement*
* Actual differential settlement amounts will depend on final loads and foundation layout. If needed, we can further evaluate
differential settlement based on final foundation plans and loadings.
C.5. Below-Grade Walls
The entire footprint of each apartment building is anticipated to have at least one level of below grade
parking with up to two levels depending on adjacent site grades, where the lowest floor elevation is
approximately 22 feet below the main floor. The following recommendations should be used for
designing the perimeter below grade walls.
C.5.a. Drainage Control
We recommend installing drain tile to remove water behind the below-grade walls, at the location shown
in Figure 3 The below-grade wall drainage system should also incorporate free-draining, engineered fill or
a drainage board placed against the wall and connected to the drain tile.
Even with the use of free-draining, engineered fill, we recommend general waterproofing of below-grade
walls that surround occupied or potentially occupied areas because of the potential cost impacts related
to seepage after construction is complete.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 19
Figure 3. Generalized Illustration of Wall Engineered Fill
The materials listed in the sketch should meet the definitions in Section C.3.f. Low-permeability material is
capable of directing water away from the wall, like clay, topsoil or pavement. The project documents
should indicate if the contractor should brace the walls prior to filling and allowable unbalanced fill heights.
As shown in Figure 3, we recommend Zone 2 consist of retained, engineered fill, and this material will
control lateral pressures on the wall. However, we are also providing design parameters for using other
engineered fill material. If final design uses non-sand material for engineered fill, project planning should
account for the following items:
▪ Other engineered fill material may result in higher lateral pressure on the wall.
▪ Other engineered fill material may be more difficult to compact.
▪ Post-construction consolidation of other engineered fill material may result in settlement-
related damage to the structures or slabs supported on the engineered fill. Post-construction
settlement of other engineered fill material may also cause drainage towards the structure.
The magnitude of consolidation could be up to about 3 percent of the wall fill thickness.
1. 2-foot wide area of Free-
Draining Engineered Fill or
Drainage Board
2. Retained Engineered Fill
3. 1 foot of Low-Permeability
Soil or Pavement
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 20
C.5.b. Configuring and Resisting Lateral Loads
Below-grade wall design can use active earth pressure conditions, if the walls can rotate slightly. If the
wall design cannot tolerate rotation, then design should use at-rest earth pressure conditions. Rotation
up to 0.002 times the wall height is generally required for walls supporting sand. Rotation up to 0.02
times the wall height is required when wall supports clay.
Table 9 presents our recommended lateral coefficients and equivalent fluid pressures for wall design of
active, at-rest and passive earth pressure conditions. The table also provides recommended wet unit
weights and internal friction angles. Designs should also consider the slope of any engineered fill and
dead or live loads placed behind the walls within a horizontal distance that is equal to the height of the
walls. Our recommended values assume the wall design provides drainage so water cannot accumulate
behind the walls. The construction documents should clearly identify what soils the contractor should
use for engineered fill of walls.
Table 9. Recommended Below-Grade Wall Design Parameters – Drained Conditions
Retained Soil
Wet Unit
Weight,
pcf
Friction Angle,
degrees
Active
Equivalent Fluid
Pressure*
(pcf)
At-Rest
Equivalent Fluid
Pressure*
(pcf)
Passive Equivalent
Fluid Pressure
(pcf)
Imported Sand
(SP, SP-SM) 115 34 35 55 N/A
Clay Backfill
(SC, CL) 130 26 55 75 330
*Based on Rankine model for soils in a region behind the wall extending at least 2 horizontal feet beyond the bottom outer
edges of the wall footings and then rising up and away from the wall at an angle no steeper than 60 degrees from horizontal.
Sliding resistance between the bottom of the footing and the soil can also resist lateral pressures. We
recommend assuming a sliding coefficient equal to 0.35 between the concrete and soil.
Alternatively, to improve the sliding coefficient to 0.55, we recommend that a minimum of 18 inches be
subcut below the wall footing be performed and replaced with 2-inch diameter crushed rock. The rock
should be placed in lifts no greater than 6 inches and compacted with multiple passes by a large
(minimum 3 1/2 foot diameter) smooth-drum, vibratory roller.
The values presented in this section are un-factored.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 21
C.6. Interior Slabs
C.6.a. Subgrade Modulus
The anticipated floor subgrade is anticipated to consist of native clayey soils or engineered fill overlying
the native glacial soils. We recommend using a modulus of subgrade reaction, k, of 125 pounds per
square inch per inch of deflection (pci) to design the slabs. If the slab design requires placing 6 inches of
compacted crushed aggregate base immediately below the slab, the slab design may increase the
k-value by 50 pci. We recommend that the aggregate base materials be free of bituminous. In addition to
improving the modulus of subgrade reaction, an aggregate base facilitates construction activities and is
less weather sensitive.
C.6.b. Moisture Vapor Protection
Excess transmission of water vapor could cause floor dampness, certain types of floor bonding agents to
separate, or mold to form under floor coverings. If project planning includes using floor coverings or
coatings, we recommend placing a vapor retarder or vapor barrier immediately beneath the slab. We
also recommend consulting with floor covering manufacturers regarding the appropriate type, use and
installation of the vapor retarder or barrier to preserve warranty assurances.
C.7. Frost Protection
C.7.a. General
Clayey soils will underlie exterior slabs, as well as pavements. We consider these soils to be moderately
to highly frost susceptible. Soils of this type can retain moisture and heave upon freezing. In general, this
characteristic is not an issue unless these soils become saturated, due to surface runoff or infiltration, or
are excessively wet in situ. Once frozen, unfavorable amounts of general and isolated heaving of the soils
and the surface structures supported on them could develop. This type of heaving could affect design
drainage patterns and the performance of exterior slabs and pavements, as well as any isolated exterior
footings and piers.
Note that general runoff and infiltration from precipitation are not the only sources of water that can
saturate subgrade soils and contribute to frost heave. Roof drainage and irrigation of landscaped areas in
close proximity to exterior slabs, pavements, and isolated footings and piers, contribute as well.
C.7.b. Frost Heave Mitigation
To address most of the heave related issues, we recommend setting general site grades and grades for
exterior surface features to direct surface drainage away from buildings, across large paved areas and
away from walkways. Such grading will limit the potential for saturation of the subgrade and subsequent
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 22
heaving. General grades should also have enough “slope” to tolerate potential larger areas of heave,
which may not fully settle after thawing.
Even small amounts of frost-related differential movement at walkway joints or cracks can create
tripping hazards. Project planning can explore several subgrade improvement options to address this
condition.
One of the more conservative subgrade improvement options to mitigate potential heave is removing
any frost-susceptible soils present below the exterior slab areas down to a minimum depth of 4 feet
below subgrade elevations. We recommend filling the resulting excavation with non-frost-susceptible fill.
We also recommend sloping the bottom of the excavation toward one or more collection points to
remove any water entering the engineered fill. This approach will not be effective in controlling frost
heave without removing the water.
An important geometric aspect of the excavation and replacement approach described above is sloping
the banks of the excavations to create a more gradual transition between the unexcavated soils
considered frost susceptible and the engineered fill in the excavated area, which is not frost susceptible.
The slope allows attenuation of differential movement that may occur along the excavation boundary.
We recommend slopes that are 3H:1V, or flatter, along transitions between frost-susceptible and non-
frost-susceptible soils.
Figure 4 shows an illustration summarizing some of the recommendations.
Figure 4. Frost Protection Geometry Illustration
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 23
Another option is to limit frost heave in critical areas, such as doorways and entrances, via frost-depth
footings or localized excavations with sloped transitions between frost-susceptible and non-frost-
susceptible soils, as described above.
Over the life of slabs, cracks will develop and joints will open up, which will expose the subgrade and
allow water to enter from the surface and either saturate or perch atop the subgrade soils. This water
intrusion increases the potential for frost heave or moisture-related distress near the crack or joint.
Therefore, we recommend implementing a detailed maintenance program to seal and/or fill any cracks
and joints. The maintenance program should give special attention to areas where dissimilar materials
abut one another, where construction joints occur and where shrinkage cracks develop.
C.8. Pavements and Exterior Slabs
C.8.a. Pavement and Exterior Slab Subgrade Preparation
We recommend the following steps for pavement and exterior slab subgrade preparation, understanding
the site will have a grade change of 3 feet or less. Note that project planning may need to require
additional subcuts to limit frost heave.
1. Strip unsuitable soils consisting of topsoil, organic soils, vegetation, existing structures and
pavements from the area, within 3 feet of the surface of the proposed pavement grade.
2. Have a geotechnical representative observe the excavated subgrade to evaluate if additional
subgrade improvements are necessary.
3. Slope subgrade soils to areas of sand or drain tile to allow the removal of accumulating
water.
4. Scarify, moisture condition and surface compact the subgrade with at least five passes of a
large roller with a minimum drum diameter of 3 1/2 feet.
5. Place pavement engineered fill to grade and compact in accordance with Section C.3.f to
bottom of pavement and exterior slab section. See Section C.7 for additional considerations
related to frost heave.
6. Proofroll the pavement or exterior slab subgrade as described in Section C.3.e.
To improve long-term pavement performance, consideration may be given to the incorporation of
18 inches of granular engineered fill in paved areas, in addition to the recommendations above, as a sand
subbase. Section C.8 provides recommended pavement design sections with and without the sand subbase.
Note, we recommend sloping subgrade soils to promote drainage and removal of accumulated water.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 24
C.8.b. Pavement Subgrade Proofroll
After preparing the subgrade as described above and prior to the placement of the aggregate base, we
recommend proofrolling the subgrade soils with a fully loaded tandem-axle truck. We also recommend
having a geotechnical representative observe the proofroll. Areas that fail the proofroll likely indicate
soft or weak areas that will require additional soil correction work to support pavements.
The contractor should correct areas that display excessive yielding or rutting during the proofroll, as
determined by the geotechnical representative. Possible options for subgrade correction include
moisture conditioning and recompaction, subcutting and replacement with soil or crushed aggregate,
chemical stabilization and/or geotextiles. We recommend performing a second proofroll after the
aggregate base material is in place, and prior to placing bituminous or concrete pavement.
C.8.c. Design Sections
As previously discussed, the subgrade will primarily be clayey, so we recommend considering the
incorporation of a clean, free draining sand subbase into pavement design. Inclusion of the subbase
section will promote drainage of the subgrade and reduce frost impact to the overlying pavement. Our
scope of services for this project did not include laboratory tests on subgrade soils to determine an
R-value for pavement design. Based on our experience with similar clay soils anticipated at the pavement
subgrade elevation, we recommend pavement design assume an R-value of 12. Note the contractor may
need to perform limited removal of unsuitable or less suitable soils to achieve this value.
Table 10 provides recommended pavement sections, based on the soils support and traffic loads for
sections with or without a sand subbase.
Table 10. Recommended Pavement Sections
Pavement Type Layer
Minimum Thickness
(inches)
MnDOT
Specification/Designation
Light duty
pavement
Bituminous 1 1/2 (wear course) SPWEA340C
2 (non-wear course) SPWEB330C
Aggregate Base 5 8 Class 5 or 6
Sand Subbase 18 0 MnDOT Select Granular
Heavy duty
pavement -
Flexible
Bituminous 2 (wear course) SPWEA340C
2 (non-wear course) SPWEB330C
Aggregate Base 6 10 Class 5 or 6
Sand Subbase 18 0 MnDOT Select Granular
Heavy duty
pavement -
Rigid
Concrete 6 6 3A21 (slipform placement)
3A41 (fixed-form placement)
Aggregate Base 4 6 Class 5 or 6
Sand Subbase 18 0 MnDOT Select Granular
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 25
Note that the recommended thicknesses included in Table 10 are minimum design values and
contingencies should be included for tolerances in individual course thickness.
C.8.d. Concrete Pavements
We assumed the concrete pavement sections in Table 10 will have edge support. We recommend placing
an aggregate base below the pavement to provide a suitable subgrade for concrete placement, reduce
faulting and help dissipate loads. Appropriate mix designs, panel sizing, jointing, doweling and edge
reinforcement are critical to performance of rigid pavements. We recommend you contact your civil
engineer to determine the final design or consult with us for guidance on these items.
C.8.e. Subgrade Drainage
We recommend installing perforated drainpipes throughout pavement areas at low points, around catch
basins, and behind curb in landscaped areas. We also recommend installing drainpipes along pavement
and exterior slab edges where exterior grades promote drainage toward those edge areas. The
contractor should place drainpipes in small trenches, extended at least 8 inches below the granular
subbase layer, or below the aggregate base material where no subbase is present.
C.8.f. Performance and Maintenance
We based the above pavement designs on a 20-year performance life for bituminous and a 35-year life
for concrete. This is the amount of time before we anticipate the pavement will require reconstruction.
This performance life assumes routine maintenance, such as seal coating and crack sealing. The actual
pavement life will vary depending on variations in weather, traffic conditions and maintenance.
It is common to place the non-wear course of bituminous and then delay placement of wear course. For
this situation, we recommend evaluating if the reduced pavement section will have sufficient structure to
support construction traffic.
Many conditions affect the overall performance of the exterior slabs and pavements. Some of these
conditions include the environment, loading conditions and the level of ongoing maintenance. With
regard to bituminous pavements in particular, it is common to have thermal cracking develop within the
first few years of placement, and continue throughout the life of the pavement. We recommend
developing a regular maintenance plan for filling cracks in exterior slabs and pavements to lessen the
potential impacts for cold weather distress due to frost heave or warm weather distress due to wetting
and softening of the subgrade.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 26
C.9. Utilities
C.9.a. Subgrade Stabilization
Earthwork activities associated with utility installations located inside the building area should adhere to
the recommendations in Section C.3.
For exterior utilities, we anticipate the soils at typical invert elevations will be suitable for utility support.
However, if construction encounters unfavorable conditions such as soft clay, organic soils or perched
water at invert grades, the unsuitable soils may require some additional subcutting and replacement
with sand or crushed rock to prepare a proper subgrade for pipe support. Project design and construction
should not place utilities within the 1H:1V oversizing of foundations.
C.9.b. Corrosion Potential
Based on our experience, the soils encountered by the borings are moderately corrosive to metallic
conduits, but only marginally corrosive to concrete. We recommend specifying non-corrosive materials
or providing corrosion protection, unless project planning chooses to perform additional tests to
demonstrate the soils are not corrosive.
C.10. Stormwater
The soils on the site are predominantly clayey and are not conducive to efficient infiltration, thus we do
not recommend project planning consider infiltration as part of stormwater management.
Based on the Minnesota Stormwater Manual, the soils at this site are generally considered as Hydrologic
Soil Group D and can allow for an infiltration rate of 0.06 inches per hour or less.
This geotechnical evaluation does not constitute a review of site suitability for stormwater infiltration or
evaluate the potential impacts, if any, from infiltration of large amounts of stormwater.
C.11. Equipment Support
The recommendations included in the report may not be applicable to equipment used for the
construction and maintenance of this project. We recommend evaluating subgrade conditions in areas of
shoring, scaffolding, cranes, pumps, lifts and other construction equipment prior to mobilization to
determine if the exposed materials are suitable for equipment support, or require some form of
subgrade improvement. We also recommend project planning consider the effect that loads applied by
such equipment may have on structures they bear on or surcharge – including pavements, buried
utilities, below-grade walls, etc. We can assist you in this evaluation.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 27
D. Procedures
D.1. Penetration Test Borings
We drilled the penetration test borings with an all-terrain vehicle-mounted core and auger drill equipped
with hollow-stem auger. We performed the borings in general accordance with ASTM D6151 taking
penetration test samples at 2 1/2- or 5-foot intervals in general accordance to ASTM D1586. The boring
logs show the actual sample intervals and corresponding depths.
We sealed penetration test boreholes meeting the Minnesota Department of Health (MDH)
Environmental Borehole criteria with an MDH-approved grout.
D.2. Exploration Logs
D.2.a. Log of Boring Sheets
The Appendix includes Log of Boring sheets for our penetration test borings. The logs identify and
describe the penetrated geologic materials, and present the results of penetration resistance and other
in-situ tests performed. The logs also present the results of laboratory tests performed on penetration
test samples, and groundwater measurements.
We inferred strata boundaries from changes in the penetration test samples and the auger cuttings.
Because we did not perform continuous sampling, the strata boundary depths are only approximate. The
boundary depths likely vary away from the boring locations, and the boundaries themselves may occur as
gradual rather than abrupt transitions.
D.2.b. Geologic Origins
We assigned geologic origins to the materials shown on the logs and referenced within this report, based
on: (1) a review of the background information and reference documents cited above, (2) visual
classification of the various geologic material samples retrieved during the course of our subsurface
exploration, (3) penetration resistance testing performed for the project, (4) laboratory test results, and
(5) available common knowledge of the geologic processes and environments that have impacted the
site and surrounding area in the past.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 28
D.3. Material Classification and Testing
D.3.a. Visual and Manual Classification
We visually and manually classified the geologic materials encountered based on ASTM D2488. When we
performed laboratory classification tests, we used the results to classify the geologic materials in
accordance with ASTM D2487. The Appendix includes a chart explaining the classification system we
used.
D.3.b. Laboratory Testing
The exploration logs in the Appendix note most of the results of the laboratory tests performed on
geologic material samples. We performed the tests in general accordance with ASTM procedures.
D.4. Groundwater Measurements
The drillers checked for groundwater while advancing the penetration test borings, and again after auger
withdrawal. We then filled the boreholes or allowed them to remain open for an extended period of
observation, as noted on the boring logs.
E. Qualifications
E.1. Variations in Subsurface Conditions
E.1.a. Material Strata
We developed our evaluation, analyses and recommendations from a limited amount of site and
subsurface information. It is not standard engineering practice to retrieve material samples from
exploration locations continuously with depth. Therefore, we must infer strata boundaries and
thicknesses to some extent. Strata boundaries may also be gradual transitions, and project planning
should expect the strata to vary in depth, elevation and thickness, away from the exploration locations.
Variations in subsurface conditions present between exploration locations may not be revealed until
performing additional exploration work, or starting construction. If future activity for this project reveals
any such variations, you should notify us so that we may reevaluate our recommendations. Such
variations could increase construction costs, and we recommend including a contingency to
accommodate them.
Roers Companies, LLC
Project B2307983
June 10, 2024
Page 29
E.1.b. Groundwater Levels
We made groundwater measurements under the conditions reported herein and shown on the
exploration logs, and interpreted in the text of this report. Note that the observation periods were
relatively short, and project planning can expect groundwater levels to fluctuate in response to rainfall,
flooding, irrigation, seasonal freezing and thawing, surface drainage modifications and other seasonal
and annual factors.
E.2. Continuity of Professional Responsibility
E.2.a. Plan Review
We based this report on a limited amount of information, and we made a number of assumptions to help
us develop our recommendations. We should be retained to review the geotechnical aspects of the
designs and specifications. This review will allow us to evaluate whether we anticipated the design
correctly, if any design changes affect the validity of our recommendations, and if the design and
specifications correctly interpret and implement our recommendations.
E.2.b. Construction Observations and Testing
We recommend retaining us to perform the required observations and testing during construction as
part of the ongoing geotechnical evaluation. This will allow us to correlate the subsurface conditions
exposed during construction with those encountered by the borings and provide professional continuity
from the design phase to the construction phase. If we do not perform observations and testing during
construction, it becomes the responsibility of others to validate the assumption made during the
preparation of this report and to accept the construction-related geotechnical engineer-of-record
responsibilities.
E.3. Use of Report
This report is for the exclusive use of the addressed parties. Without written approval, we assume no
responsibility to other parties regarding this report. Our evaluation, analyses and recommendations may
not be appropriate for other parties or projects.
E.4. Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality.
No warranty, express or implied, is made.
Appendix
ST-1
ST-2 ST-3
ST-4 ST-5
ST-6
ST-7
ST-8
ST-9
ST-18 ST-19
ST-16 ST-17
ST-15
ST-14
ST-13
ST-12
ST-10
ST-11
W. 78TH STREET
MARKET BOULEVARDMARKET ST
R
E
E
T
F:\2023\B2307983\CAD\B2307983.dwg,Geotech,9/28/2023 5:32:49 AMbraunintertec.com
952.995.2000
Minneapolis, MN 55438
11001 Hampshire Avenue S
Project No:
B2307983
Drawn By:
Date Drawn:
Checked By:
Last Modified:9/28/23
Drawing No:
Project Information
Drawing Information
B2307983
JAG
8/28/23
AS
Chanhassen
Multi-Family
Development
591 W. 78th Street
Chanhassen, Minnesota
Soil Boring
Location SketchN
DENOTES APPROXIMATE LOCATION OF
STANDARD PENETRATION TEST BORING
0
SCALE:1"= 80'
80'40'
Elev./
Depth
ft
972.6
0.8
964.4
9.0
961.4
12.0
954.4
19.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
LEAN CLAY (CL), trace roots, black, moist
(TOPSOIL FILL)
FILL: SANDY LEAN CLAY (CL), trace Gravel,
slightly organic, dark brown and gray, moist
CLAYEY SAND (SC), trace Gravel, brown and
gray, moist, medium (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 24 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-4-4
(8)
9"
3-3-3
(6)
17"
3-4-5
(9)
18"
2-3-4
(7)
17"
2-3-3
(6)
17"
2-2-3
(5)
18"
3-5-8
(13)
18"
6-8-9
(17)
18"
15-9-10
(19)
18"
qₚtsf
2.75
2.5
4
MC
%
20
22
Tests or Remarks
OC=2%
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-1
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181136.7 EASTING:559376.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:973.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-1 page 1 of 2
Elev./
Depth
ft
937.4
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
4-7-8
(15)
18"
qₚtsf
2
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 31.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-1
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181136.7 EASTING:559376.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:973.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-1 page 2 of 2
Elev./
Depth
ft
972.6
1.3
969.9
4.0
964.9
9.0
961.9
12.0
959.9
14.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 5 inches of concrete over 11
inches of apparent aggregate base
FILL: LEAN CLAY (CL), contains lenses of Silt,
brown, moist
SILTY CLAY (CL-ML), brown, moist, medium to
stiff (ALLUVIUM)
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, very stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, dark
brown, moist, stiff to hard (GLACIAL TILL)
Becoming gray at 19 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-4-5
(9)
16"
4-6-4
(10)
18"
3-3-4
(7)
17"
4-5-6
(11)
18"
5-9-10
(19)
17"
9-10-13
(23)
18"
6-6-7
(13)
18"
5-7-7
(14)
18"
9-9-9
(18)
18"
qₚtsf
3.75
2.25
2.5
MC
%
30
24
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-2
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181146.2 EASTING:559523.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:973.9 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-2 page 1 of 2
Elev./
Depth
ft
937.9
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, dark
brown, moist, stiff to hard (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
10-13-20
(33)
0"
qₚtsf
MC
%Tests or Remarks
No recovery
Water not observed at end
of drilling.
Water not observed to
cave-in depth of 29.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-2
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181146.2 EASTING:559523.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:973.9 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-2 page 2 of 2
Elev./
Depth
ft
974.0
1.5
966.5
9.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 6 inches of concrete over 12
inches of apparent aggregate base
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 24 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
3-4-5
(9)
18"
3-5-5
(10)
18"
4-6-6
(12)
18"
4-4-7
(11)
18"
4-7-7
(14)
18"
4-7-7
(14)
18"
4-7-9
(16)
18"
4-6-6
(12)
18"
4-8-9
(17)
18"
qₚtsf
2.5
3
3
2.5
3.75
MC
%
18
20
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-3
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181142.1 EASTING:559673.1
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:975.5 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-3 page 1 of 2
Elev./
Depth
ft
939.5
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
4-6-7
(13)
17"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 30.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-3
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181142.1 EASTING:559673.1
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:975.5 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-3 page 2 of 2
Elev./
Depth
ft
970.6
0.8
964.4
7.0
962.4
9.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
LEAN CLAY (CL), trace roots, black, moist
(TOPSOIL FILL)
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown to gray, moist
Slightly organic at 5 feet
CLAYEY SAND (SC), contains lenses of Silt,
brown and gray, moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
Becoming dark brown at 19 feet
Becoming gray at 24 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-3-3
(6)
17"
3-4-4
(8)
18"
2-4-5
(9)
17"
3-4-4
(8)
18"
3-4-6
(10)
18"
3-5-6
(11)
18"
5-9-10
(19)
18"
4-6-7
(13)
18"
8-11-13
(24)
0"
qₚtsf
2.5
3
2.25
4
2.75
MC
%
20
19
Tests or Remarks
OC=5%
LL=33, PL=18, PI=15
No recovery
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-4
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181048.2 EASTING:559374.4
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:971.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-4 page 1 of 2
Elev./
Depth
ft
935.4
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
5-8-10
(18)
18"
qₚtsf
3.25
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 30.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-4
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181048.2 EASTING:559374.4
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:971.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-4 page 2 of 2
Elev./
Depth
ft
973.4
0.9
970.3
4.0
967.3
7.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
LEAN CLAY (CL), trace roots, black, moist
(TOPSOIL FILL)
FILL: SILTY SAND (SM), fine to medium-
grained, trace Gravel, trace bituminous debris,
brown, moist
FILL: SANDY LEAN CLAY (CL), trace Gravel,
dark brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
Becoming gray at 26 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-3-3
(6)
16"
4-3-2
(5)
15"
3-4-5
(9)
17"
3-4-4
(8)
18"
4-6-7
(13)
18"
8-8-12
(20)
18"
15-13-11
(24)
1"
9-10-7
(17)
17"
12-8-10
(18)
18"
qₚtsf
3
2.25
3.25
MC
%
20
19
Tests or Remarks
No recovery
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-5
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181049.1 EASTING:559556.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:974.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-5 page 1 of 2
Elev./
Depth
ft
938.3
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
8-8-10
(18)
18"
qₚtsf
3
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 30.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-5
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181049.1 EASTING:559556.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:974.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-5 page 2 of 2
Elev./
Depth
ft
972.2
1.8
970.0
4.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 6 inches of concrete over 16
inches of apparent aggregate base
FILL: CLAYEY SAND (SC), trace Gravel,
brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 24 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-2-3
(5)
16"
3-5-6
(11)
18"
3-6-6
(12)
18"
3-6-7
(13)
18"
6-7-10
(17)
18"
5-8-10
(18)
18"
6-7-11
(18)
18"
3-6-6
(12)
18"
2-4-5
(9)
18"
qₚtsf
3.5
4.25
1.75
2
MC
%
18
20
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-6
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181048.1 EASTING:559687.4
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:974.0 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-6 page 1 of 2
Elev./
Depth
ft
938.0
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
4-6-8
(14)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 31.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-6
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181048.1 EASTING:559687.4
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:974.0 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-6 page 2 of 2
Elev./
Depth
ft
965.9
1.3
963.2
4.0
960.2
7.0
943.2
24.0
939.2
28.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 5 inches of concrete over 10
inches of apparent aggregate base
FILL: CLAYEY SAND (SC), trace Gravel,
slightly organic, gray, moist
CLAYEY SAND (SC), trace Gravel, brown,
moist, medium (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 19 feet
CLAYEY SAND (SC), trace Gravel, brown,
moist, very stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist, stiff (GLACIAL TILL)
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-4-4
(8)
17"
2-3-4
(7)
18"
4-5-7
(12)
18"
5-6-8
(14)
18"
6-8-11
(19)
18"
4-7-8
(15)
18"
5-6-8
(14)
18"
8-12-13
(25)
17"
4-6-8
(14)
18"
qₚtsf
2
3
4
4
2.5
1.75
3
MC
%
17
17
Tests or Remarks
Blow count influenced by
rock in sampler
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-7
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180930.1 EASTING:559370.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:967.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-7 page 1 of 2
Elev./
Depth
ft
933.2
34.0
931.2
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist, stiff (GLACIAL TILL)
POORLY GRADED SAND with SILT (SP-SM),
fine to medium-grained, trace Gravel, brown,
moist, dense (GLACIAL OUTWASH)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
6-17-17
(34)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-7
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180930.1 EASTING:559370.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:967.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-7 page 2 of 2
Elev./
Depth
ft
962.3
1.9
960.2
4.0
940.2
24.0
935.2
29.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 7 inches of bituminous over 16
inches of apparent aggregate base
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist, very stiff (GLACIAL TILL)
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-3-4
(7)
17"
3-4-5
(9)
18"
4-5-7
(12)
18"
4-5-7
(12)
18"
4-6-7
(13)
18"
4-5-8
(13)
18"
4-5-7
(12)
18"
5-6-8
(14)
18"
9-10-11
(21)
18"
qₚtsf
2.25
3
3
3
3.25
3
3.5
MC
%
20
19
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-8
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180906.3 EASTING:559527.1
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:964.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-8 page 1 of 2
Elev./
Depth
ft
928.2
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist, very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
5-7-9
(16)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water observed at 17.0 feet
with a cave-in depth of 28.0
feet immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-8
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180906.3 EASTING:559527.1
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:964.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-8 page 2 of 2
Elev./
Depth
ft
964.0
1.3
961.3
4.0
958.3
7.0
953.3
12.0
951.3
14.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 4 inches of bituminous over 11
inches of apparent aggregate base
FILL: CLAYEY SAND (SC), trace Gravel,
brown, moist
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, very stiff to stiff (GLACIAL TILL)
Becoming gray at 19 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
4-3-3
(6)
14"
3-2-4
(6)
12"
4-7-7
(14)
18"
4-7-8
(15)
18"
5-6-8
(14)
18"
4-6-8
(14)
18"
6-8-9
(17)
18"
3-5-6
(11)
18"
4-4-6
(10)
18"
qₚtsf
2.5
3.25
3.5
2.25
2.5
1.25
MC
%
19
18
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-9
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180909.1 EASTING:559654.7
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:965.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-9 page 1 of 2
Elev./
Depth
ft
929.3
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, very stiff to stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
3-5-7
(12)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-9
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180909.1 EASTING:559654.7
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:965.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-9 page 2 of 2
Elev./
Depth
ft
959.6
1.3
953.9
7.0
946.9
14.0
941.9
19.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
CLAYEY SAND (SC), trace Gravel, dark brown,
moist (TOPSOIL FILL)
FILL: LEAN CLAY (CL), trace Gravel, contains
seams of black Clay, brown and gray, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, contains
lenses of Sand, brown, moist, stiff (GLACIAL
TILL)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist to wet, medium to very stiff (GLACIAL
TILL)
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
4-7-11
(18)
18"
5-6-6
(12)
16"
3-4-5
(9)
18"
3-4-5
(9)
18"
4-5-5
(10)
18"
4-8-5
(13)
18"
3-4-4
(8)
18"
3-4-5
(9)
18"
3-5-7
(12)
6"
qₚtsf
2.25
2.75
MC
%
11
20
Tests or Remarks
OC=2%
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-10
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180653.8 EASTING:559804.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/01/23 END DATE:09/01/23
SURFACE
ELEVATION:960.9 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-10 page 1 of 2
Elev./
Depth
ft
924.9
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, gray,
moist to wet, medium to very stiff (GLACIAL
TILL)
With layer of SILTY SAND, wet at 35 feet
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
8-8-11
(19)
8"
qₚtsf
MC
%Tests or Remarks
Water observed at 35.0 feet
at end of drilling.
Water not observed to
cave-in depth of 27.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-10
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180653.8 EASTING:559804.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/01/23 END DATE:09/01/23
SURFACE
ELEVATION:960.9 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-10 page 2 of 2
Elev./
Depth
ft
957.3
2.0
952.3
7.0
945.3
14.0
940.3
19.0
930.3
29.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SILTY SAND (SM), fine to medium-grained,
with Gravel, dark brown, dry (TOPSOIL FILL)
FILL: CLAYEY SAND (SC), trace Gravel,
brown, dry
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, very stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, very stiff (GLACIAL TILL)
Becoming gray at 24 feet
SILTY SAND (SM), fine to medium-grained,
trace Gravel, brown, moist, medium dense
(GLACIAL TILL)
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-2-3
(5)
10"
1-1-2
(3)
2"
3-4-6
(10)
18"
3-4-6
(10)
18"
4-6-10
(16)
18"
4-6-11
(17)
18"
4-9-11
(20)
18"
5-7-11
(18)
18"
8-9-11
(20)
18"
qₚtsf
2.5
3
2.25
2
MC
%
16
18
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-11
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180656.9 EASTING:559921.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/01/23 END DATE:09/01/23
SURFACE
ELEVATION:959.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-11 page 1 of 2
Elev./
Depth
ft
925.3
34.0
923.3
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SILTY SAND (SM), fine to medium-grained,
trace Gravel, brown, moist, medium dense
(GLACIAL TILL)
SANDY SILT (ML), fine-grained, gray, wet,
loose (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
2-4-5
(9)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 13.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-11
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180656.9 EASTING:559921.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/01/23 END DATE:09/01/23
SURFACE
ELEVATION:959.3 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-11 page 2 of 2
Elev./
Depth
ft
960.1
1.3
953.4
8.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 3 inches of bituminous over 12
inches of apparent aggregate base
CLAYEY SAND (SC), trace Gravel, contains
lenses of Silt, brown and gray, moist, medium
to stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 12 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-3-4
(7)
18"
4-4-5
(9)
17"
3-4-5
(9)
18"
4-7-10
(17)
18"
5-8-11
(19)
18"
4-7-9
(16)
18"
4-8-9
(17)
18"
4-7-8
(15)
18"
3-6-7
(13)
18"
qₚtsf
2.25
3.25
2.5
2.75
2.75
2
MC
%
27
20
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-12
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180798.0 EASTING:559794.6
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:961.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-12 page 1 of 2
Elev./
Depth
ft
927.4
34.0
925.4
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
LEAN CLAY (CL), contains lenses of Silt, gray,
moist, very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
8-8-10
(18)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-12
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180798.0 EASTING:559794.6
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:961.4 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-12 page 2 of 2
Elev./
Depth
ft
962.2
2.0
960.2
4.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 12 inches of bituminous over 12
inches of apparent aggregate base
FILL: SANDY LEAN CLAY (CL), trace Gravel,
slightly organic, gray, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to stiff (GLACIAL TILL)
Becoming gray at 19 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-4-4
(8)
17"
3-3-4
(7)
18"
4-4-5
(9)
18"
3-4-4
(8)
18"
4-4-7
(11)
18"
4-6-9
(15)
18"
4-7-8
(15)
18"
4-5-6
(11)
18"
5-6-7
(13)
2"
qₚtsf
2
2
2.25
3.25
2.25
2.5
2.75
MC
%
20
19
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-13
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180824.7 EASTING:559928.8
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:964.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-13 page 1 of 2
Elev./
Depth
ft
928.2
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
4-6-7
(13)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 29.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-13
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180824.7 EASTING:559928.8
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/06/23 END DATE:09/06/23
SURFACE
ELEVATION:964.2 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Cloudy
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-13 page 2 of 2
Elev./
Depth
ft
962.8
1.3
962.1
2.0
960.1
4.0
955.1
9.0
952.1
12.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 4 inches of bituminous over 11
inches of apparent aggregate base
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown, moist
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
Becoming gray at 18 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
3-4-6
(10)
17"
5-6-7
(13)
18"
5-6-8
(14)
0"
5-7-8
(15)
17"
4-6-8
(14)
18"
4-6-9
(15)
18"
5-7-9
(16)
18"
6-13-14
(27)
17"
6-8-10
(18)
3"
qₚtsf
2.25
4
2.25
MC
%
19
18
Tests or Remarks
Blow count influenced by
rock in sampler
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-14
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180891.8 EASTING:559794.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:964.1 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-14 page 1 of 2
Elev./
Depth
ft
928.1
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
4-6-9
(15)
17"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water observed at 3.0 feet
with a cave-in depth of 22.0
feet when rechecked 12
hours after drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-14
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180891.8 EASTING:559794.9
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/05/23 END DATE:09/05/23
SURFACE
ELEVATION:964.1 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-14 page 2 of 2
Elev./
Depth
ft
968.8
1.7
966.5
4.0
961.5
9.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 7 inches of bituminous over 13
inches of apparent aggregate base
FILL: CLAYEY SAND (SC), trace Gravel,
brown, moist
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
Becoming gray at 19 feet
With SILTY SAND layers at 20 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
4-5-8
(13)
17"
2-3-4
(7)
18"
5-7-6
(13)
18"
5-3-4
(7)
18"
3-4-6
(10)
18"
4-7-8
(15)
18"
4-7-9
(16)
18"
3-5-7
(12)
18"
5-6-8
(14)
14"
qₚtsf
2
2.5
3.25
3.25
MC
%
25
19
Tests or Remarks
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-15
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180935.1 EASTING:559926.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:970.5 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-15 page 1 of 2
Elev./
Depth
ft
934.5
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium to very stiff (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
3-5-6
(11)
18"
qₚtsf
2.25
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 29.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-15
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:180935.1 EASTING:559926.2
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:970.5 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Blacktop WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-15 page 2 of 2
Elev./
Depth
ft
973.2
1.5
970.7
4.0
967.7
7.0
962.7
12.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 5 inches of bituminous over 13
inches of apparent aggregate base
FILL: LEAN CLAY (CL), slightly organic, black,
moist
FILL: SILTY SAND (SM), fine to medium-
grained, trace Gravel, brown, moist
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to hard (GLACIAL TILL)
Becoming gray at 24 feet
COBBLE layer at 30 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-2-3
(5)
17"
4-5-5
(10)
17"
2-3-3
(6)
18"
3-3-4
(7)
18"
4-7-7
(14)
18"
4-7-8
(15)
18"
4-7-10
(17)
18"
4-6-7
(13)
18"
5-6-50/3"
(REF)
15"
qₚtsf
1.5
2.75
2.5
3.5
2.5
MC
%
9
26
Tests or Remarks
P200=15%
Blow count influenced by
Cobble
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-16
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181043.1 EASTING:559768.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:974.7 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-16 page 1 of 2
Elev./
Depth
ft
938.7
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to hard (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
3-6-7
(13)
18"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 28.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-16
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181043.1 EASTING:559768.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:974.7 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-16 page 2 of 2
Elev./
Depth
ft
972.7
1.3
970.0
4.0
960.0
14.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SILTY SAND (SM), fine-grained, trace roots,
dark brown, dry (TOPSOIL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, medium (GLACIAL TILL)
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
With layers of SAND at 10 feet
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to hard (GLACIAL TILL)
Becoming dark brown at 19 feet
Becoming gray at 24 feet
With COBBLE layer at 30 feet
Continued on next page
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-4-4
(8)
17"
4-6-6
(12)
18"
3-4-5
(9)
18"
5-6-8
(14)
18"
3-4-6
(10)
17"
3-4-5
(9)
18"
6-8-11
(19)
18"
5-8-10
(18)
18"
50/6"
(REF)
1"
qₚtsf
2.25
4
2.5
MC
%
18
28
Tests or Remarks
No recovery, blow count
influenced by Cobbles
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-17
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181036.9 EASTING:559894.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:974.0 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-17 page 1 of 2
Elev./
Depth
ft
938.0
36.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, stiff to hard (GLACIAL TILL)
END OF BORING
Boring then grouted
35
40
45
50
55
60 SampleBlows
(N-Value)
Recovery
26-10-11
(21)
17"
qₚtsf
MC
%Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 28.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-17
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181036.9 EASTING:559894.5
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/07/23 END DATE:09/07/23
SURFACE
ELEVATION:974.0 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-17 page 2 of 2
Elev./
Depth
ft
975.2
1.3
969.5
7.0
962.5
14.0
955.5
21.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 4 inches of concrete over 11
inches of apparent aggregate base
FILL: CLAYEY SAND (SC), trace Gravel,
contains seams of black Clay, brown, moist
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, very stiff to stiff (GLACIAL TILL)
Becoming gray at 19 feet
END OF BORING
Boring then grouted
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
3-4-4
(8)
17"
4-4-4
(8)
0"
4-5-6
(11)
18"
4-5-6
(11)
18"
5-6-7
(13)
18"
5-7-9
(16)
18"
5-6-7
(13)
18"
qₚtsf
MC
%
16
18
Tests or Remarks
No recovery
Chemical-like odor noted
between 7 and 14 feet
Water not observed while
drilling.
Water not observed to
cave-in depth of 17.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-18
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181129.2 EASTING:559808.1
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:976.5 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-18 page 1 of 1
Elev./
Depth
ft
974.2
1.4
971.6
4.0
963.6
12.0
954.6
21.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
PAVEMENT, 4 inches of concrete over 13
inches of apparent aggregate base
FILL: SANDY LEAN CLAY (CL), trace Gravel,
brown, moist
CLAYEY SAND (SC), trace Gravel, brown,
moist, stiff to very stiff (GLACIAL TILL)
SANDY LEAN CLAY (CL), trace Gravel, brown,
moist, very stiff to stiff (GLACIAL TILL)
Becoming gray at 19 feet
END OF BORING
Boring then grouted
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
2-3-4
(7)
16"
4-4-7
(11)
18"
4-7-8
(15)
18"
5-11-11
(22)
18"
5-8-9
(17)
18"
5-8-10
(18)
18"
4-7-7
(14)
18"
qₚtsf
MC
%
22
18
Tests or Remarks
Water not observed while
drilling.
Water not observed to
cave-in depth of 18.0 feet
immediately after
withdrawal of auger.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2307983
Geotechnical Evaluation
Chanhassen Multi-Family
591 W 78th Street
Chanhassen, Minnesota
BORING:ST-19
LOCATION: Captured with RTK GPS.
DATUM:NAD 1983 HARN Adj MN Carver (US Feet)
NORTHING:181126.2 EASTING:559892.0
DRILLER:S. Hull LOGGED BY:A. Schulzetenberg START DATE:09/08/23 END DATE:09/08/23
SURFACE
ELEVATION:975.6 ft RIG:75011 METHOD:3 1/4" HSA SURFACING:Concrete WEATHER:Sunny
B2307983 Braun Intertec Corporation Print Date:06/10/2024 ST-19 page 1 of 1
Descriptive Terminology of Soil
Based on Standards ASTM D2487/2488
(Unified Soil Classification System)
Group
Symbol Group NameB
Cu ≥ 4 and 1 ≤ Cc ≤ 3D GW Well‐graded gravelE
Cu < 4 and/or (Cc < 1 or Cc > 3)D GP Poorly graded gravelE
Fines classify as ML or MH GM Silty gravelE F G
Fines Classify as CL or CH GC Clayey gravelE F G
Cu ≥ 6 and 1 ≤ Cc ≤ 3D SW Well‐graded sandI
Cu < 6 and/or (Cc < 1 or Cc > 3)D SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandF G I
Fines classify as CL or CH SC Clayey sandF G I
CL Lean clayK L M
PI < 4 or plots below "A" lineJ ML SiltK L M
Organic OL
CH Fat clayK L M
MH Elastic siltK L M
Organic OH
PT Peat Highly Organic Soils
Silts and Clays
(Liquid limit less than
50)
Silts and Clays
(Liquid limit 50 or
more)
Primarily organic matter, dark in color, and organic odor
Inorganic
Inorganic
PI > 7 and plots on or above "A" lineJ
PI plots on or above "A" line
PI plots below "A" line
Criteria for Assigning Group Symbols and
Group Names Using Laboratory TestsA
Soil Classification
Coarse‐grained Soils (more than 50% retained on No. 200 sieve)Fine‐grained Soils (50% or more passes the No. 200 sieve) Sands
(50% or more coarse
fraction passes No. 4
sieve)
Clean Gravels
(Less than 5% finesC)
Gravels with Fines
(More than 12% finesC)
Clean Sands
(Less than 5% finesH)
Sands with Fines
(More than 12% finesH)
Gravels
(More than 50% of
coarse fraction
retained on No. 4
sieve)
Liquid Limit − oven dried
Liquid Limit − not dried <0.75 Organic clay K L M N
Organic silt K L M O
Liquid Limit − oven dried
Liquid Limit − not dried <0.75 Organic clay K L M P
Organic silt K L M Q
ParticleSize Identification
Boulders.............. over 12"
Cobbles................ 3" to 12"
Gravel
Coarse............. 3/4" to 3" (19.00 mm to 75.00 mm)
Fine................. No. 4 to 3/4" (4.75 mm to 19.00 mm)
Sand
Coarse.............. No. 10 to No. 4 (2.00 mm to 4.75 mm)
Medium........... No. 40 to No. 10 (0.425 mm to 2.00 mm)
Fine.................. No. 200 to No. 40 (0.075 mm to 0.425 mm)
Silt........................ No. 200 (0.075 mm) to .005 mm
Clay...................... < .005 mm
Relative ProportionsL, M
trace............................. 0 to 5%
little.............................. 6 to 14%
with.............................. ≥ 15%
Inclusion Thicknesses
lens............................... 0 to 1/8"
seam............................. 1/8" to 1"
layer.............................. over 1"
Apparent Relative Density of Cohesionless Soils
Very loose ..................... 0 to 4 BPF
Loose ............................ 5 to 10 BPF
Medium dense.............. 11 to 30 BPF
Dense............................ 31 to 50 BPF
Very dense.................... over 50 BPF
A. Based on the material passing the 3‐inch (75‐mm) sieve.
B. If field sample contained cobbles or boulders, or both, add "with cobbles or boulders,
or both" to group name.
C. Gravels with 5 to 12% fines require dual symbols:
GW‐GM well‐graded gravel with silt
GW‐GC well‐graded gravel with clay
GP‐GM poorly graded gravel with silt
GP‐GC poorly graded gravel with clay
D. Cu= D60/ D10 Cc = 𝐷30 2/ ሺ𝐷10 𝑥 𝐷60)
E. If soil contains ≥ 15% sand, add "with sand" to group name.
F. If fines classify as CL‐ML, use dual symbol GC‐GM or SC‐SM.
G. If fines are organic, add "with organic fines" to group name.
H. Sands with 5 to 12% fines require dual symbols:
SW‐SM well‐graded sand with silt
SW‐SC well‐graded sand with clay
SP‐SM poorly graded sand with silt
SP‐SC poorly graded sand with clay
I. If soil contains ≥ 15% gravel, add "with gravel" to group name.
J. If Atterberg limits plot in hatched area, soil is CL‐ML, silty clay.
K. If soil contains 15 to < 30% plus No. 200, add "with sand" or "with gravel", whichever is
predominant.
L. If soil contains ≥ 30% plus No. 200, predominantly sand, add “sandy” to group name.
M. If soil contains ≥ 30% plus No. 200 predominantly gravel, add “gravelly” to group name.
N. PI ≥ 4 and plots on or above “A” line.
O. PI < 4 or plots below “A” line.
P. PI plots on or above “A” line.
Q. PI plots below “A” line.
Laboratory Tests
DD Dry density,pcf qp Pocket penetrometer strength, tsf
WD Wet density, pcf qU Unconfined compression test, tsf
P200 % Passing #200 sieve LL Liquid limit
MC Moisture content, %PL Plastic limit
OC Organic content, %PI Plasticity index
Consistency of Blows Approximate Unconfined
Cohesive Soils Per Foot Compressive Strength
Very soft................... 0 to 1 BPF................... < 0.25 tsf
Soft........................... 2 to 4 BPF................... 0.25 to 0.5 tsf
Medium.................... 5to 8 BPF .................. 0.5 to 1 tsf
Stiff........................... 9 to 15 BPF................. 1 to 2 tsf
Very Stiff................... 16 to 30 BPF............... 2 to 4 tsf
Hard.......................... over 30 BPF................ > 4 tsf
Drilling Notes:
Blows/N‐value: Blows indicatethe driving resistance recorded
for each 6‐inch interval. The reported N‐value is the blows per
foot recorded by summing the second and third interval in
accordance with the Standard Penetration Test, ASTM D1586.
PartialPenetration:If the sampler could not be driven
through a full 6‐inch interval, the number of blows for that
partial penetration is shown as #/x" (i.e. 50/2"). The N‐value is
reported as "REF" indicating refusal.
Recovery: Indicates the inches of sample recovered from the
sampled interval. For a standard penetration test, full recovery
is 18", and is 24" for a thinwall/shelby tube sample.
WOH: Indicates the sampler penetrated soil under weight of
hammer and rods alone; driving not required.
WOR: Indicates the sampler penetrated soil under weight of
rods alone; hammer weight and driving not required.
Water Level: Indicates the water level measured by the
drillers either while drilling ( ), at the end of drilling ( ),
or at some time after drilling ( ).
Moisture Content:
Dry:Absence of moisture, dusty, dry to the touch.
Moist: Damp but no visible water.
Wet: Visible free water, usually soil is below water table.
5/2021