Loading...
1_Development Review Application_Santa Vera Apts - signedCOMMUNITY DEVELOPMENT DEPARTMENT Planning Division – 7700 Market Boulevard Mailing Address – P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1100 / Fax: (952) 227-1110 APPLICATION FOR DEVELOPMENT REVIEW Submittal Date: PC Date: CC Date: 60-Day Review Date: Section 1: Application Type (check all that apply) (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) Comprehensive Plan Amendment ......................... $700 Conditional Use Permit (CUP) Single-Family Residence ................................ $400 All Others......................................................... $600 Interim Use Permit (IUP) In conjunction with Single-Family Residence .. $400 All Others......................................................... $600 Rezoning (REZ) Planned Unit Development (PUD) .................. $750 Minor Amendment to existing PUD ................. $100 All Others......................................................... $600 Sign Plan Review ................................................... $150 Site Plan Review (SPR) Administrative .................................................. $100 Residential/Commercial/Industrial Districts .. $750** Subdivision (SUB) Plat 3 lots or less ........................................... $500 Plat over 3 lots ............................................. $1250 Metes & Bounds (2 lots) ................................ $300 Consolidate Lots ............................................ $150 Administrative Subd. (Line Adjustment) ........ $150 Final Plat………………………………..…... $700* Vacation of Easements/Right-of-way (VAC) ........ $300 (Additional recording fees may apply) Variance (VAR) .................................................... $200 Wetland Alteration Permit (WAP) Single-Family Residence ............................... $150 All Others ....................................................... $275 Appeal of Administrative Decision ....................... $200 Zoning Ordinance Amendment (ZOA) ................. $500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. Notification Sign (City to install and remove) ...................................................................................................................... $200 Escrow for Recording Documents (check all that apply) ........................................................................... $ per document Conditional Use Permit - $50 Interim Use Permit - $50 Site Plan Agreement - $85 Wetland Alteration Permit - $50 Easements (____ easements) - $85 Vacation - $85 Variance - $50 Metes & Bounds Sub (2 deeds) - $250 Deeds - $100 TOTAL FEE: *Includes $450 escrow for attorney costs. **Additional escrow may be required for other applications through the development contract. Section 2: Required Information Description of Proposal: Property Address or Location: Parcel #: Legal Description: Total Acreage: Wetlands Present? Yes No Present Zoning: Requested Zoning: Present Land Use Designation: Requested Land Use Designation: Existing Use of Property: Check box if separate narrative is attached. 4/4/2025 n n n n n n n n Santa Vera Apartments Phase II 621 Santa Vera Drive 257620020 Lot 2 of block 1 of saratoga 3rd addition 3.82 PUD Residential Res High Density Apt 4+ units 4 Section 3: Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only t o the right to object at the hearings on the application or during the appeal period. If this applicatio n has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Signature: Date: PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Signature: Date: PROJECT ENGINEER (if applicable) Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: Property Owner Email______________________________ Name: Applicant Email______________________________ Address: Engineer Email______________________________ City/State/Zip: Other* Email______________________________ Email: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. INSTRUCTIONS TO APPLICANT: Complete all necessary form fields, then select SAVE FORM to save a copy to your device. PRINT FORM and deliver to city along with required documents and payment. SUBMIT FORM to send a digital copy to the city for processing. Ryan C. Sailer (Apr 3, 2025 09:28 MDT) Ryan C. Sailer Headwaters Ryan Sailer 6757 Karmen Ave NE Albertville, MN 55301 612-508-4627 rcs@headwaters.build 4/3/2025 Santa Vera Apartments LLC Mike Hoagberg 6757 Karmen Ave NE Albertville, MN 55301 612-723-3330 mjh@headwaters.build 4/3/2025 Measure Group Josh McKinney PO Box 10 612-440-0934 Wayzata, MN 55391 605-310-9766 jmckinney@measuregrp.com Liz Shirley & Bjorn Strommen n n n rcs@headwaters.build 6757 Karmen Ave NE jmckinney@measuregrp.com Albertville, MN 55301 lts@headwaters.build, bas@headwaters.build Michael J Hoagberg (Apr 3, 2025 11:29 EDT) Michael J Hoagberg Development Review Application_Santa Vera Apts Final Audit Report 2025-04-03 Created:2025-04-03 By:Liz Shirley (liz@headwatersdevelopment.com) Status:Signed Transaction ID:CBJCHBCAABAACXblPbXA3lt37DAAw99SaP2RgCxrf0y9 "Development Review Application_Santa Vera Apts" History Document created by Liz Shirley (liz@headwatersdevelopment.com) 2025-04-03 - 3:00:23 PM GMT Document emailed to rcs@headwaters.build for signature 2025-04-03 - 3:01:31 PM GMT Email viewed by rcs@headwaters.build 2025-04-03 - 3:24:54 PM GMT Signer rcs@headwaters.build entered name at signing as Ryan C. Sailer 2025-04-03 - 3:28:00 PM GMT Document e-signed by Ryan C. Sailer (rcs@headwaters.build) Signature Date: 2025-04-03 - 3:28:02 PM GMT - Time Source: server Document emailed to mjh@headwaters.build for signature 2025-04-03 - 3:28:04 PM GMT Email viewed by mjh@headwaters.build 2025-04-03 - 3:29:19 PM GMT Signer mjh@headwaters.build entered name at signing as Michael J Hoagberg 2025-04-03 - 3:29:54 PM GMT Document e-signed by Michael J Hoagberg (mjh@headwaters.build) Signature Date: 2025-04-03 - 3:29:56 PM GMT - Time Source: server Agreement completed. 2025-04-03 - 3:29:56 PM GMT