Loading...
Letter from Neil Klingelhutz 6-29-07 NTC HOMES, ~C. 9731 MEADOWLARK LANE CHANHASSEN, MN 55317 612-685-5580 June 29,2007 City of Chanhassen Attn: Joseph Shamla Re: Interim Use Pennit Planning Case 07-16 The following is in response to your letter dated June 18,2007 #2 - Erosion Control 48" CB1\H-I will be protected with silt fence, staked hay bales & filter material as shO\m on survey. Once grading is completed, the top soil shall be placed over fill and site will remain cropland and be seeded with oats/winter \vheat/alfalfa mix dependent upon the time of year. #5 - r would assume existing hydrologic calculations were assessed prior to MNDOT's . installation of the 48 CBMH culvert. Since this project will neither redirect nor add to the existing flow, new calculations would not be necessarv. ~ . #7 - Due to the uncertainty of \vhen a grading permit will be issued, the haul site will likely change. A detailed haul route will be provided to the City once the permits are issued and a specific haul site is identified (prior to any hauling) S;;;f $ , NTC Homes. Inc. ~ Neil Klingelhutz CITY Of' CHANHASSEN A~CEJVED AUG 1 B 2007 CHANHASSEN PLANNING DEPT