1990 07 23BOARD OF ADJUSTMENTS AND APPEALS MINUTES
JULY 23, 1990
MEMBERS PRESENT: Carol Watson, Willard Johnson and Don Chmiel.
STAFF PRESENT: Paul Krauss, Planning Director and Sharmin A1-Jaff,
Planner I.
A 45 Foot Setback Variance from a Class B Wetland to Construct a
Deck and Three Season Porch
Staff presented the staff report.
Watson asked staff how the adjacent decks were approved.
Staff indicated that the City has been under a lot of pressure, the
work loads have been extremely high and there was a limited number
of staff at the time they were constructed. Since that time staff
has been checking all aspects of the building plan before approval.
Watson asked what the difference between a Type II, Type II and
Type III erosion control.
Staff indicated that Type I is basically a silt fence, Type II
contains hay bales and silt fence, and Type III contains a silt
fence, hay bales and snow fence.
Watson moved to approve Variance #90-4, seconded by Chmiel, with
the following condition:
®
The applicant shall use Type III erosion control along the
edge of the wetland before one shovel of dirt has been moved,
Ail voted in favor and the motion carried.
Willard Johnson moved, seconded by Watson, to close the public
hearing.
APPROVAL OF MINUTES
Johnson moved, seconded by Watson, to approve the minutes of
June 11, 1990. Johnson and Watson voted in favor and the motion
carried. Chmiel abstained.
The Board adjourned the meeting at 7:25 p.m.