Hydrology Report 1-18-08 BKBM ENGINEERS - ._........~_. 5930 Brooklyn Boulevard Minneapolis, MN 55429-2518 (763) 843-0420 Fax: (763) 843-0421 E-mail: bkbm@bkbm.com HYDROLOGY FOR JIMMY JOHN'S CHANHASSEN, MN JANUARY 18,2008 EXISTING SITE DESCRIPTION: The existing site is located in Chanhassen, Minnesota at the Market Street Station development. The site is specifically located in the northwest corner of the Market Street Station development, near the north drive entrance, off of Market Boulevard. EXISTING SITE DRAINAGE CHARACTERISTICS: Table I briefly summarizes the ground cover characteristics and drainage routing of each numbered drainage area. Currently the drainage on the site sheet flows to catch basins in the parking area of the Market Street Station development. Table 1: Existin Site Draina Drainage Area No. Description Drainage Routes to: Sheet flows to catch basins in the Market Street Station develo ment Rough graded site to be develo ed EXISTING SITE DRAINAGE FLOW RATES: HydroCAD using the NRCS Method of Abstractions was used for the existing site hydrologic study, modeling with Type II, 24-hour rainfall events for Carver County, Minnesota. Table 2 lists the derived curve runoff numbers for each cover type. Table 2: NRCS Hydrologic Soil Group and Runoff Curve Numbers Ground Cover Type Hydrologic Soil Curve Number Group (CN) Grass Areas C 72 PavingJBldg Roofs C 98 Peak runoff computations were done for the 2-year, I a-year and I 00-year/24-hour return period rainfall events (refer to Table 3). The weighted curve number for each drainage area is based on a weighted average of each area of ground cover type as listed in Table 2. Time of concentration was estimated to be 5 minutes. Peak HydroCAD runoff computations are summarized in Table 4 and are included as an appendix to this report. ::;!,'y' 0= Cr!Uj~f\S~-=~ PECf.:II/i=:1 BKBM ENGINEERS An Equal Opportunity Employer JAr,I; S 2008 CH,~~~rlASS~N Pl_A~J~J!~;G Di:P Table 3: Carver County 24- hour Duration Storm Events for Each Return Period (inches) 2-year 10-year 100-year 2.75" 4.20" 5.95" Table 4: Summary of Peak Runoff Rates: Existin!! Draina!!e Areas Drainage Carver County 24-hour Storm Events Peak Area No. Runoff Rates 2-year lO-year lOO-year (efs) (cfs) (cfs) 1 0.20 0.51 0.94 Total 0.20 0.51 0.94 PROPOSED DEVELOPMENT DESCRIPTION: New construction on the site is to consist of an approximate 1,500 square-foot Jimmy John's restaurant, sidewalks, and plaza area. The new construction would increase the impervious area on site from 73 square-feet to 4,146 square-feet, an increase of54%. PROPOSED SITE DRAINAGE ROUTING: Table 5 gives a brief summary and routing of the proposed drainage patterns on site. Table 5: Proposed Site Draina2e Descriptions Drainage Description Drainage Routes to: Area No. Proposed building roof, sidewalks, Sheet flows to storm sewer system in 1 plaza the Market Street Station development via yard drains and a roof drain lead PROPOSED SITE STORM WATER TREATMENT AND RATE CONTROL: It is the understanding of BKBM Engineers that the Market Street Station Master Plan has accounted for this development in their storm water treatment and runoff rate control design. Due to this, treatment and rate control are not part of the Jimmy John's project. Table 6 summarizes proposed runoff rates for the site. Table 6: Summary of Peak Runoff Rates: Proposed Drainage Areas Drainage Hennepin County 24-hour Storm Events Peak Area No. Runoff Rates 2-year 10-year 100-year ( c fs) (cfs) (cfs) I 0.46 0.85 1.32 Total 0.46 0.85 1.32 The proposed HydroCAD computations for runoff rates indicate an increase in storm water runoff rates for the proposed site when compared to existing conditions. Table 7 summarizes the runoff rates for existing and proposed conditions. Table 7: Comparison of Peak Runoff Rates: Existing vs. Proposed (cfs) Condition 1- year! 10-year/ 100-year/ 24-hr 24-hr 24-hr Existing 0.20 0.51 0.94 Proposed 0.46 0.85 1.32 Existing ~Ubcay B ~ ~ Proposed Drainage Diagram for 08170 . Jimmy John's (Existing & Propose Prepared by BKBM Engineers, Printed 1/17/2008 HydroCAOO 8.50 sin 001655 @ 2007 HydroCAD Software Solutions LLC 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAD@ 8.50 sIn 001655 @ 2007 HydroCAD Software Solutions LLC Type /I 24-hr 2-year Rainfal/=2.75" Printed 1/17/2008 Paqe 2 Time span=0.01-28.00 hrs, dt=0.01 hrs, 2800 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+ Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Existing Runoff Area=7,516 sf 0.97% Impervious Runoff Depth=0.66" Tc=5.0 min CN=72 Runoff=0.20 cfs 0.010 af Subcatchment2S: Proposed Runoff Area=7,516 sf 55.16% Impervious Runoff Depth=1.45" Tc=5.0 min CN=86 Runoff=0.46 cfs 0.021 af Total Runoff Area = 0.345 ac Runoff Volume = 0.030 at Average Runoff Depth = 1.06" 71.93% Pervious = 0.248 ac 28.07% Impervious = 0.097 ac 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAD@ 8.50 sin 001655 @ 2007 HydroCAD Software Solutions LLC Type /I 24-hr 2-year Rainfal/=2.75" Printed 1/17/2008 Paqe 3 Runoff Summary for Subcatchment 1S: Existing = 0.20 cfs @ 11.97 hrs, Volume= 0.010 af, Depth= 0.66" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 2-year Rainfall=2.75" * Area (sf) 7,443 73 7,516 7,443 73 * Tc Length (min) (feet) 5.0 0.22~ 0.21-' 0.2~ . 0.19: 0.18': / 0.17~ : 0.16: 0.15~ : 0.14~ " .. 0.13- . ~ 0.12~ . ~ 0.11-' o _ u:: 0.1-: 0.09: / 0_08-' / 0.07~ :. 0.06-: 0.05~ / 0.04~ 0.03~ 0.02' 0.D1 ~ . 0' CN Description 72 98 72 Weighted Average Pervious Area Impervious Area Slope Velocity Capacity Description (fUft) (fUsec) ( cfs) Direct Entry, Subcatchment 1S: Existing Hydrograph Type U24-hn2-year m Ralnfali=2. "15" t'{unoffArea=1~ 516 sf RunoffVolurrie=O~01 Oaf RurioffDepth=O.66" m mTc=5.0miri CN=72 > , 2 i j; 12 14 16 18 20 22 24 26 28 Time (hours) 6 8 10 4 10 Runoffl 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAD@ 8.50 sIn 001655 @ 2007 HydroCAD Software Solutions LLC Type /I 24-hr 2-year Rainfal/=2.75" Printed 1/17/2008 Paqe 4 Runoff 5ummaryfor 5ubcatchment 25: Proposed = 0.46 cfs @ 11.96 hrs, Volume= 0.021 af, Depth= 1.45" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 2-year Rainfall=2.75" * * Area (sf) 3,370 4,146 7,516 3,370 4,146 CN Description 72 98 86 Weighted Average Pervious Area Impervious Area Tc Length (min) (feet) 5.0 Slope Velocity Capacity Description (ftIft) (ftIsec) ( cfs) , , 0.5~ . 0.48~ , 0.46, . 0.44: / 0.42: 0.4': . 0.38' 0.36, , 0.34,: . 0.32~ , _ 0.3-: -t 0.28c: -; 0.26~ .2 0.24: , ... 0.22~ . 0.2~ , 0.18-: 0.16~ .' O.14~ 0.12-; . 0.1~ . 0.08~ , 0.06" 0.045 /. 0.02; 0' , Direct Entry, 5ubcatchment 25: Proposed Hydrograph Typ.~'. JI24..hr.2..year Rainfall==2.75" . Runoff Area=7,516sf - RunoffVolume=O~021af ...... ...... ............. no ... ... Runoff Depth=1.45" Tc=5.0 min CN=86 , , 26 28 , 2 , 6 10 , , 12 14 16 18 Time (hours) 4 8 10 RunOff' 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAO@ 8.50 sIn 001655 @ 2007 HydroCAO Software Solutions LLC Type 1/ 24-hr 10-year Rainfal/=4.20" Printed 1 /17/2008 Paqe 5 Time span=0.01-28.00 hrs, dt=0.01 hrs, 2800 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+ Trans method - Pond routing by Stor-Ind method Subcatchment1S: Existing Runoff Area=7,516 sf 0.97% Impervious Runoff Oepth=1.60" Tc=5.0 min CN=72 Runoff=0.51 cfs 0.023 af Subcatchment2S: Proposed Runoff Area=7 ,516 sf 55.16% Impervious Runoff Oepth=2.73" Tc=5.0 min CN=86 Runoff=0.85 cfs 0.039 af Total Runoff Area = 0.345 ac Runoff Volume = 0.062 af Average Runoff Depth = 2.17" 71.93% Pervious = 0.248 ac 28.07% Impervious = 0.097 ac 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAO@ 8.50 sIn 001655 @ 2007 HydroCAO Software Solutions LLC Type /I 24-hr to-year Rainfal/=4.20" Printed 1 /17/2008 Paqe 6 Runoff Summary for Subcatchment 1S: Existing = 0.51 cfs @ 11.97 hrs, Volume= 0.023 af, Depth= 1.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 10-year Rainfall=4.20" * * Area (sf) 7 ,443 73 7,516 7,443 73 CN Description 72 98 72 Weighted Average Pervious Area Impervious Area T c Length (min) (feet) 5.0 Slope Velocity Capacity Description (ft/ft) (ft/sec) ( cfs) lil ! 0.3~' ~ . o . u: 0.25' Direct Entry, Subcatchment 1 S: Existing Hydrograph 0.5 , 24 26 0.55~ ~ 0.45~ Type II 24~hr10~year Rainfall=4.20" Runoff Area=7,516 sf Ru n offV6 I uri"e=O; 023m af " Runoff Depth=1.60'" Tc=5.0riiin CN=72 Ok 0.35~ ' 0.2~ 0.15~ 0.1": 0.05- , '" 8 10 0- , ' 20 "" . 4 , . 18 , 2 22 6 12 14 16 Time (hours) I 0 RunOff~ 28 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAO@ 8.50 sin 001655 @ 2007 HydroCAO Software Solutions LLC Type /I 24-hr 10-year Rainfal/=4.20" Printed 1/17/2008 Paae 7 Runoff = Summary for Subcatchment 2S: Proposed 0.85 cfs @ 11.96 hrs, Volume= 0.039 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 10-year Rainfall=4.20" * * Area (sf) 3,370 4,146 7,516 3,370 4,146 Tc Length (min) (feet) 5.0 : , o.g,' : , 0.85~ 0.8~ ' 0.75 - 0.7 0.65~ 0.6': . iii 0.55: ! 0.5:' ~ 0.45: '. u: 0.4': 0.35: 0.3 : 0.25- 0.2: 0.15, O.le 0.05- O' CN Description 72 98 86 Weighted Average Pervious Area Impervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) Direct Entry, Subcatchment 2S: Proposed Hydrograph Type II 24-hr 10-year . ... "'" ... ... n. m Rainfall=4.20" RUnoff Area=T516Sf ..mm 'mm m RunoffVolume=O;039af Runoff Depth:::2.73" Tc=5.0min CN=86 ., . 2 . . 1< 8 , , 26 28 , . 4 , 6 10 . .. 12 14 16 18 Time (hours) I D Runoff~ 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAO@ 8.50 sIn 001655 @ 2007 HydroCAO Software Solutions LLC Type /I 24-hr 100-year Rainfal/=S.9S" Printed 1/17/2008 Paqe 8 Time span=0.01-28.00 hrs, dt=0.01 hrs, 2800 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+ Trans method - Pond routing by Stor-Ind method Subcatchment1S: Existing Runoff Area=7,516 sf 0.97% Impervious Runoff Oepth=2.95" Tc=5.0 min CN=72 Runoff=0.94 cfs 0.042 af Subcatchment2S: Proposed Runoff Area=7,516 sf 55.16% Impervious Runoff Oepth=4.36" Tc=5.0 min CN=86 Runoff=1.32 cfs 0.063 af Total Runoff Area = 0.345 ac Runoff Volume = 0.105 af Average Runoff Depth = 3.66" 71.93% Pervious = 0.248 ac 28.07% Impervious = 0.097 ac 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAD@ 8.50 sIn 001655 @ 2007 HydroCAD Software Solutions LLC Type /I 24-hr 100-year Rainfal/=S.9S" Printed 1/17/2008 Paqe 9 Runoff = Summary for Subcatchment 1S: Existing 0.94 cfs @ 11.96 hrs, Volume= 0.042 af, Depth= 2.95" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=5.95" * Area (sf) 7,443 73 7,516 7,443 73 * Tc Length (min) (feet) 5.0 1- ~ .!:!.. ~ o u: 0- . CN Description 72 98 72 Weighted Average Pervious Area Impervious Area Slope Velocity Capacity Description (fUft) (fUse c) ( cfs) Direct Entry, Subcatchment 1 S: Existing Hydrograph 2 , 4 , 6 Type II 24-hr 100-year Rainfall=5.95" Runoff Area=7,516sf Runoff Volume=O.042 af Runoff Depth=2.95" Tc=5.0 min CN=72 , I: . 12 14 16 Time (hours) i >, 18 20 . , 24 . " >, i:' 8 10 , 26 22 I 0 Runoff_ 28 08170 - Jimmy John's (Existing & Proposed) Prepared by BKBM Engineers HydroCAO@ 8.50 sIn 001655 @ 2007 HydroCAO Software Solutions LLC Type" 24-hr tOO-year Rainfal/=S.9S" Printed 1/17/2008 Paqe 10 Runoff = Summary for Subcatchment 2S: Proposed 1.32 cfs @ 11.96 hrs, Volume= 0.063 af, Depth= 4.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.01-28.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=5.95" * Area (sf) 3,370 4,146 7,516 3,370 4,146 * Tc Length (min) (feet) 5.0 -;; ~ ~ o u: o CN Description 72 98 86 Weighted Average Pervious Area Impervious Area Slope Velocity Capacity Description (fUft) (fUsee) ( cfs) Direct Entry, Subcatchment 2S: Proposed Hydrograph Type 1I:24-hr 100-year Rainfall=5.95" Runoff Area=7,516 sf Runoff Volume=O.063 af Runoff Depth=4.36" Tc=5.0 min CN=86 2 , " i' >. . 1< 6 8 , , 18 10 12 14 16 Time (hours) 4 20 , 'I 22 , 26 , 24 10 Runoffl , , 28 January 17,2008 MEEETING MINUTES From: Steve Doughty Re: Prior Lake YMCA at Shepherds' Path PAl Project No. 85110.07206 Subject: Date: Project Meeting No.4 January II, 2008, at YMCA Metropolitan Minneapolis (Downtown Offices) Present: Phil Nyvall Anita Lancello Bydlon Rob Howard Steve Doughty Not Present: Thomas LaSalle Matt Jensen Jon Donovan Paul Kangas Cory Casperson Paul Holmes Erica Larson Dan Klecker Ben Ptacek Edward Ueda Association Abbreviations: YMCA YMCA LSLL LaSalle Group, Ltd. SHEP Shepherds Path, LLC SUN Sunde Land Surveying LCKS Loucks Associates CPL City of Prior Lake PAl Pope Associates Inc. YMCA YMCA Pope Associates Pope Associates LaSalle Group Dunham Loucks Associates Loucks Associates Clark Engineering Corp. Pope Associates Pope Associates Pope Associates Pope Associates Pope Associates E.mail pnyva tt@ymcampts.org; alancelto@ymcampls.org rhoward@popearch.com sd 0 u ghtr@PJ?jJ~i!I:.f: h. ~.!!l E-mail tom tasa tte@lasattegrp.com matt. jensen@dunhameng.com idonova n@toucksassociates.com pkangas@toucksassociates.com ccasperson@clark.eng.com pholmes@popearch.com elarson@Popearch.com d klecker@popearch.com bptacek@popearch.com eueda@p..QQearch.com The following memorandum is submitted as representative of the items of Information exchanged, actions agreed upon and discussions that took place. If no exceptions are received by Pope Associates Inc. within five (5) days of issuance of the memorandum, then it shall be deemed all are in agreement with the contents of the memorandum. Pope Associatt~S Inc. 1255 Energy Park Drive'l St. Paul, ~IN 55108.5118 M,lin ((,511 (,42"'200 I Fax (e.51) 642.1101 www.popeilrch.com Prior Lake YMCA at Shepherds' Path Project Meeting No.4 January II, 2008 Page 2 of 3 Review of Schedule Info. 4.01 Info. 4.02 Site Related Issues Info. 4.03 Info. 4.04 PAI/LCKS 4.05 PAI/LCKS 4.06 P AI/LCKS 4.07 Info. 4.08 Info. 4.09 Info. 4.10 A summary of the milestone project dates are as follows: a.) PAl to provide current schematic, plants, and site plans to Phil Nyvall, no later than Friday, January 18,2008, for inclusion into contractor RFP submittal. b.) General Contractor RFP - will be issued by YMCA during the week of January 21,2008. c.) City Submittal-Major Amendment to PUD - Feb. 11,2008 (City Submittal for Administrative Subdivision to be submitted coincidentally). d.) Commence Design Development - March 10,2008. e.) City Submittal for Final PUD - April 12, 2008. Next review meeting is scheduled for 2:30 pm, Friday, January 18, 2008, at the Minneapolis YMCA (downtown) location. This will be the regularly scheduled meeting day/time until further notice. An updated draft of the YMCA land parcel was distributed on January 15, 2008 to all parties. The updated existing conditions site survey has been received and was distributed to all parties. The YMCA site design will include a continuation of the existing fire lane_ This will require a redefinition/relocation of the easement that is currently placed on the YMCA site locating the future fire lane paving. Heavy-duty pavement section will be required at this fire lane to accommodate fire equipment. It was confirmed at the City that a portion of this fire lane will be located directly on the loo-year high water line. The project will include a retaining wall to achieve this due to the grade change. The retaining wall (heights dependent on finish grades) will be a maximum of 2'-11" to avoid being defined as a building element. The fire lane will be approximately 12'-0" wide and an additional retaining wall will be required at the northern edge of the fire lane to accommodate larger play areas for the proposed YMCA. The site design must address a school bus drop-off and will adequately address turning radiuses at existing landscape islands. It was confirmed that a traffic study will not be required for this project as per discussions between Anita (YMCA) and City representatives. Anita (YMCA) will obtain parking use studies from similar sized YMCAs, by February 4,2008. The concept plans propose a shared use utility service area, currently located at the northwest corner of the existing building. The size of this area and equipment requirements are to be confirmed with mechanical and service functions for the building. It is estimated that there will be weekly deliveries of miscellaneous building support materials for the building occurring at this location. DUN has been asked to provide initial space requirement for transformers or any other equipment that will be placed at this location. Prior Lake YMCA at Shepherds' Path Project Meeting NO.4 January 11,2008 Page 3 of 3 Info. Info. 4.12 Building Design Info. 4.13 Info. 4.14 4.11 Current plan square footage, as reflected on the concept plans: . 27,000 sq. ft. ...................... 1st Floor . 20,000 sq. ft. ..................... 2nd Floor . 8,000 sq. ft. ......................... 1st Floor Future Expansion . 5,000 sq. ft. ......................... 2nd Floor Future Expansion · 60,000 sq. ft. ....................... Total sq. ft. (as requested within PUD Amendment) Phil Nyvall (YMCA) is preparing a RFP for general contractor selection. This will be sent out no later than the week of January 21, 2008. PAl will provide concept design documents for that submittal. It is estimated, based on the schedule, by the first week of February, 2008, that general contractor interviews will be held. PAl will coordinate appropriately timed review meetings to ensure that the design documents are accurately defining all material design detail approvals and shop drawings as they relate to finish colors, locker types, toilet partitions, etc. This effort is to avoid any discrepancies during the submittal review and construction process. PAl will contact Fabcon regarding the possible incorporation of their structural panels to be used on the project. It is unintended that the Fabcon panels will not be used as an architectural finish panel; only to be used as a structural panel with an applied veneer finish on the exterior. Special attention will be paid to electrical conduit, utility connections that will be required within the panel as we proceed with the design process using this precast panel system. G:\8 SIIO\on06\Corr\Meeting Minutes\Project Meeting#o4_oH l-08.doc