Loading...
Approval Letter 3-18-08 CITY OF CHANHASSEN 7700 Market Boulevard POBox 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax 952.227.1110 Park & Recreation Phone 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us March 18, 2008 Mike Korsh, Director of Real Estate Development Kraus-Anderson Realty Company 4210 West Old Shakopee Road Bloomington, MN 55437-2951 Re: Crossroads of Chanhassen - Planning Case 08-01 Dear Mr. Korsh: This letter is to formally notify you that on March 10, 2008, the Chanhassen City Council adopted the following: "The City Council approves the Planned Unit Development amendment in the attached ordinance for Chanhassen Gateway clarifying setbacks, signage, and retail building size incorporating the changes as shown below (amendments are shown in bold), and including the attached Findings of Fact and Recommendation: CHANHASSEN GA TEW A Y PUD DEVELOPMENT DESIGN STANDARDS a. Intent The purpose of this zone is to create a MIXED USE PUD including a NEIGHBORHOOD COMMERCIAL, OFFICE AND RESIDENTIAL. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive development. Each structure proposed for development shall proceed through site plan review based on the development standards outlined below. Exhibit A reflects the site layout and buildings as referenced herein. CROSSR.OADS Or- CHAN~S~~/" ~ ~w/ I!~ Exhibit A / , lym,lftlouilPwotd ~. '\ ( ~'-l.~A.'llfR\(J"Il.. The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. .!. .. ."~,, "'~'" ..", Mr. Mike Korsh March 18,2008 Page 2 of 17 b. Permitted Uses . The permitted uses in this zone should be limited to appropriate commercial and service uses consistent with meeting the daily needs of the neighborhood. The uses shall be limited to those as defined herein. If there is a question as to whether or not a use meets the definition, the Community Development Director shall make that interpretation. The type of uses to be provided on these lots shall be low intensity neighborhood oriented retail and service establishments to meet daily needs of residents. Commercial and office uses shall be limited to the area located south of Highway 212. Residential uses shall be located north of Highway 212 and along the western portion of the southern half. . Small to medium-sized restaurant-not to exceed 8,000 square feet per building (no drive-thru windows except drive-thru windows are allowed for tenants whose primary use is the sale of coffee. The drive-thru lane shall be screened and the exterior wall of the drive-thru shall contain the same level of architectural detail as any other elevation visible by the public. . Banks with a drive-in service window . Office . Day care . Neighborhood scale commercial: No tenant in any building may occupy more than 8,000 square feet except in Buildings 4C and 4G. In Buildings 4C and 4G a tenant may occupy no more than 10,000 square feet. The liquor store may not occupy more than 60% of the total area of Building 4G. No individual service component of a retail building shall occupy more than 8,000 square feet of the building . Convenience store with or without gas pumps and car wash. . Specialty retail (Book Store, Jewelry, Sporting Goods Sale/Rental, Retail Sales, Retail Shops, Apparel Sales, etc.) . Personal Services (an establishment or place of business primarily engaged in providing individual services generally related to personal needs, such as a Tailor Shop, Shoe Repair, Self-Service Laundry, Laundry Pick-up Station, Dry Cleaning, Dance Studios, etc). . Residential High Density (8-16 units per net acre). The total number of units for the entire site may not exceed 150 units. c. Building Area . Commercial/Office - Not to exceed 75,000 square feet for the entire development . Maximum Commercial/Office lot usage is a Floor Area Ratio of 0.3 . Maximum office/commercial building area per tenant may not exceed 8,000 square feet . Maximum residential units may not exceed 150 units. d. Prohibited Ancillary Uses . Drive-thru Windows except banks, coffee shops or pharmacies. Mr. Mike Korsh March 18,2008 Page 3 of 17 . Outdoor storage and display of merchandise such as propane, salt, window washer fluid, etc. except on the sidewalk surrounding the convenience store 4A. The outdoor display of merchandise shall not impede nor interfere with pedestrian traffic. e. Setbacks The PUD ordinance requires setbacks from roadways and exterior property lines. The following table displays those setbacks. Boundary Building! Parking Setbacks (feet) Lyman Boulevard 20120 Highway 101 North of Highway 312 SO/50 Highway 101 South of Highway 312 20/20 Highway 312 SO/50 Northerly Project Property Line 50/20 Westerly Project Property Line 50/20 Internal Project property lines 0/0 Internal Right-of-Way (Crossroads Boulevard) 20/20 Hard Surface Coverage-Residential 50% Commercial and Office Hard Surface Coverage 70% Maximum Commercial (Retail) Building/Structure Height 1 story Maximum Office Building/Structure Height 2 stories Maximum Residential Building/Structure Height 35 or 3 stories, whichever is less f. Non Residential Building Materials and Design There shall not be underdeveloped backsides of buildings. All elevations shall recei ve nearly equal treatment and visual qualities. Buildings and site design shall comply with design standards outlined in Article XXIII. General Supplemental Regulations, Division 7 of the Zoning Ordinance. g. Residential Standards Buildings and site design shall comply with design standards outlined in Article XXIII. General Supplemental Regulations, Division 9 of the Zoning Ordinance. 1. All units shall have access onto an interior private street. 2. A design palette shall be approved for the entire project. The palette shall include colors for siding, shakes, shutters, shingles, brick, stone, etc. 3. All foundation walls shall be screened by landscaping or retaining walls. Mr. Mike Korsh March 18,2008 Page 4 of 17 h. Site Landscaping and Screening The intent of this section is to improve the appearance of vehicular use areas and property abutting public rights-of-way; to require buffering between different land uses; and to protect, preserve and promote the aesthetic appeal, character and value of the surrounding neighborhoods; to promote public health and safety through the reduction of noise pollution, air pollution, visual pollution and glare. 1. The landscaping standards shall provide for screening for visual impacts associated with a given use, including but not limited to, truck loading areas, trash storage, parking lots, Large unadorned building massing, etc. 2. Each lot for development shall submit a separate landscaping plan as a part of the site plan review process. 3. All open spaces and non-parking lot surfaces, except for plaza areas, shall be landscaped, rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included in pedestrian areas and plazas. 4. Undulating berms, north of Lyman Boulevard, north and south of Highway 312 and west of Highway 101 shall be sodded or seeded at the conclusion of grading and utility construction. The required buffer landscaping may be installed where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. 5. Loading areas shall be screened from public right-of-ways. Wing walls may be required where deemed appropriate. 6. Native species shall be incorporated into site landscaping, whenever possible. i. Street Furnishings Benches, kiosks, trash receptacles, planters and other street furnishings should be of design and materials consistent with the character of the area. Wherever possible, street furnishings should be consolidated to avoid visual clutter and facilitate pedestrian movement. j. Signage The intent of this section is to establish an effective means of communication in the development, maintain and enhance the aesthetic environment and the business's ability to attract sources of economic development and growth, to improve pedestrian and traffic safety, to minimize the possible adverse effect of signs on nearby public and private property, and to enable the fair and consistent enforcement of these sign regulations. It is the intent of this section, to promote the health, safety, general welfare, aesthetics, and image of the community by regulating signs that are intended to communicate to the public, and to use signs which meet the city's goals: Mr. Mike Korsh March 18,2008 Page 5 of 17 a. Establish standards which permit businesses a reasonable and equitable opportunity to advertise their name and service; b. Preserve and promote civic beauty, and prohibit signs which detract from this objective because of size, shape, height, location, condition, cluttering or illumination; c. Ensure that signs do not create safety hazards; d. Ensure that signs are designed, constructed, installed and maintained in a manner that does not adversely impact public safety or unduly distract motorists; e. Preserve and protect property values; f. Ensure signs that are in proportion to the scale of, and are architecturally compatible with, the principal structures; g. Limit temporary commercial signs and advertising displays which provide an opportunity for grand opering and occasional sales events while restricting signs which create continuous visual clutter and hazards at public right-of-way intersections. j.1. Proiect Identification Sign One project identification sign for the commercial portion of the development located at the entrance off of Highway 10 1. Project identification signs shall not exceed 80 square feet in sign display area nor be greater than eight feet in height. The sign shall be setback a minimum of 10 feet from the property line. As an alternative, the project identification sign may be located at the southeast corner of Lot 2, Block 1. If the sign is located in the right-of-way, an encroachment agreement must be obtained. Otherwise, the sign must maintain a 10 foot setback from property lines and may not exceed 24 square feet nor be higher than 5 feet. j.2. Monument Sign One monument sign shall be permitted at the entrance to the development off of Lake Susan Drive. One monument sign per lot shall be permitted for the commercial portion of the site. One multi-tenant sign shall be permitted at the entrance into the development off of Highway 101 and two signs off of Lyman Boulevard. These signs shall not exceed 24 square feet in sign display area nor be greater than 5 feet in height except Kwik Trip, located on Lot 1, Block 1, shall be permitted a 48 square-foot, 8-foot high monument sign. These signs must comply with all ordinances pertaining to size and percent of sign area dedicated to gas prices as well as any other applicable regulations. These signs shall be set back a minimum of 10 feet from the property line. Mr. Mike Korsh March 18,2008 Page 6 of 17 j.3. Wall Si2ns a. The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend above parapet height. The letters and logos shall be restricted to a maximum of 30 inches in height. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. b. Second story illuminated signs that can be viewed from neighborhoods outside the PUD site, are prohibited. c. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. d. Wall signs are limited to two elevations per building. j.4. Festive Fla2sfBanners a. Flags and banners shall be permitted on approved standards attached to the building facade and on standards attached to pedestrian area lighting. b. Flags and banners shall be constructed of fabric or vinyl. c. Banners shall not contain advertising for individual users, businesses, services, or products. d. Flags and banners shall project from buildings a maximum of two feet. e. Flags and banners shall have a maximum area of 10 square feet. f. Flags and banners which are torn or excessively worn shall be removed at the request of the city. j.5. Buildin2 Directory a. In multi-tenant buildings, one building directory sign may be permitted. The directory sign shall not exceed eight square feet. j.6 Directional Si2ns a. On-premises signs shall not be larger than four (4) square feet. The maximum height of the sign shall not exceed five (5) feet from the ground. The placement of directional signs on the property shall be so located such that the sign does not adversely affect adjacent properties (including site lines or confusion of adjoining ingress or egress) or the general appearance of the site from public rights-of-way. No Mr. Mike Korsh March 18,2008 Page 7 of 17 more than four (4) signs shall be allowed per lot. The city council may allow additional signs in situations where access is confusing or traffic safety could be jeopardized. b. Off-premises signs shall be allowed only in situations where access is confusing and traffic safety could be jeopardized or traffic could be inappropriately routed through residential streets. The size of the sign shall be no larger than what is needed to effectively view the sign from the roadway and shall be approved by the city council. c. Bench signs are prohibited except at transit stops as authorized by the local transit authority. d. Signs and Graphics. Wherever possible, traffic control, directional and other public signs should be consolidated and grouped with other street fixtures and furnishings to reduce visual clutter and to facilitate vehicular and pedestrian movement. A system of directional signs should also be established to direct traffic within the commercial area and away from residential areas. j.7. Prohibited Si2ns . Pylon signs are prohibited. . Back lit awnings are prohibited. . Window Signs are prohibited except for company logo/symbol and not the name. Such logo shall not exceed 10% of a window area. . Menu Signs are prohibited. j.8. Si2n Desi2n and Permit ReQuirements a. The sign treatment is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and material and height throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. b. All signs require a separate sign permit. c. Wall business signs shall comply with the city's sign ordinance for the Neighborhood business district for determination of maximum sign area. Wall signs may be permitted on the "street" front and primary parking lot front of each building. k. Lighting 1. Lighting for the interior of the development shall be consistent throughout the development. High pressure sodium vapor lamps with decorative natural colored pole shall be used throughout the development parking lot area for lighting. Decorative, pedestrian scale lighting shall be used in plaza and sidewalk areas and may be used in parking lot areas. Parking lot light poles may not exceed 25 feet in height. Mr. Mike Korsh March 18, 2008 Page 8 of 17 2. Light fixtures in areas other than parking lots should be kept to a pedestrian scale (12 to 18 feet). Street light fixtures should accommodate vertical banners for use in identifying the commercial area. 3. All light fixtures shall be shielded. Light level for site lighting shall be no more than Yz foot candle at the project perimeter property line. This does not apply to street lighting. 4. Lighting for parking areas shall minimize the use of lights on pole standards in the parking area. Rather, emphasis should be placed on building lights and poles located in close proximity to buildings. I. Non Residential Parking 1. Parking shall be provided based on the shared use of parking areas whenever possible. Cross access easements and the joint use of parking facilities shall be protected by a recorded instrument acceptable to the city. 2. The development shall be treated as an integrated shopping center and provide a minimum of one space per 200 square feet of commerciallretail area. The office/personal service component shall be treated as an integrated office building and provide 4.5 space per 1,000 square feet for the first 49,999 square feet, four per thousand square feet for the second 50,000 square feet, and 3.5 per thousand square feet thereafter. m. Residential Parking shall comply with city code requirements." VARIANCE "The City Council approves variance request #08-01 to allow a 20-foot setback from Lyman Boulevard and a 20-foot setback from Highway 101, as shown in plans dated received January 18, 2008 and including the attached Findings of Fact and Recommendation with the following condition: 1. Approval of the variance applications is contingent upon approval of the final plat, site plan and the PUD amendment - Planning Case 2008-0 I." PRELIMINARY PLAT "The City Council approves the preliminary plat for Planning Case 08-01 for Crossroads of Chanhassen as shown in plans dated received January 18,2008, and including the attached Findings of Fact and Recommendation, subject to the following conditions: 1. Full park fees in lieu of parkland dedication shall be collected in full at the rate in force upon final plat submission and approval. Mr. Mike Korsh March 18,2008 Page 9 of 17 2. The width of the sidewalk located west of Highway 101 shall be increased to 8 feet. 3. Encroachment agreements are required for any extensive landscaping or signage and sidewalk proposed. 4. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $186,153.00. 5. Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Tvpe of Slope Steeper than 3:1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. 6. The proposed stormwater pond shall be constructed prior to disturbing up-gradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet shall be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. 7. The applicant shall locate all boulevard trees behind the sidewalk along the public street. Trees are not permitted between the sidewalk and the street. 8. The applicant must submit a landscape plan with a complete Plant Schedule and all species and quantities noted on the plan. 9. Resize the pond to the required dead storage. Lower the normal water level (NWL) of the pond to 908.0. MnDOT requirements regarding the rate to the wetland and the bounce of the wetland must still be met. 10. The proposed storm sewer will need to be adjusted. High points on the public street should be located near the access points to allow better sight distance. Resize the pond to minimum requirements to allow the county storm to remain in place. Rational method calculations are needed for the sizing of the storm sewer. 11. The grading plan needs to be revised. The HWL listed on the plans does not match the hydrologic calculations. The drainage calculations need to be reorganized. Revise the outlet to the wetland so that the flared end section is adjacent to the wetland buffer. Show Mr. Mi ke Karsh March 18,2008 Page 10 of 17 emergency overflows on the plan. 12. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. 13. Remove or lower the retaining wall along the existing watermain. The dead storage in the pond is oversized. Changes in grading and removing some of the excess dead storage should allow the wall to be removed in this area. 14. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. 15. The sanitary sewer, storm sewer, and watermain within the public right-of-way and along the Old Highway 101 corridor shall be publicly owned and maintained. All other utilities shall be covered by a cross-access agreement. The proposed watermain must wet tap the existing watermain. 16. Utility plans shall show both plan view and profiles of all utilities (sanitary sewer, water, and storm sewer lines. 17. Determine actual elevations of existing utilities. A minimum vertical separation of 18 inches is required at all storm, sanitary, and watermain crossings. Also, provide 10 feet of horizontal separation between storm, sanitary and watermain. Any gas, electric, cable, or telephone located outside of a public easement must be relocated. 18. Each new lot is subject to the sanitary sewer and water hookup charges. The 2008 trunk hookup charge is $1,769 for sanitary sewer and $4,799 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 19. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. The applicant is also required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. The applicant must be aware that all public utility improvements will require a preconstruction meeting before building permit issuance. Permits from the appropriate regulatory agencies will be required, including the MPCA, Dept. of Health, Carver County, Watershed District and MnDOT. 20. A drainage and utility easement of 20 feet is required over the existing county storm sewer. Remove the drainage and utility easements from the private utilities and cover these with cross-access agreements. 21. The developer will need to work with the City and MnDOT to acquire access to the site and acquire the land from Old Highway 101. Mr. Mike Korsh March 18,2008 Page 11 of 17 22. Access to the site must be via a public street designed to Minnesota State Aid Standards. This street will be maintained by the City. The public street connection on Highway 101 must align with the lanes provided with the off ramp of Highway 212. Survey existing lanes to ensure that the proposed lanes will line up with existing. The public street must be named and the name found acceptable by the City. Modify the right-of-way at intersection of Lyman Boulevard and the public street to accommodate the trail. No parking will be allowed on this public street. Add no parking signs to plans. 23. Upon completion of the public street, the applicant shall submit a set of "as-built" plans signed by a professional engineer. 24. Remove any objects placed in the horizontal sight triangles of the intersections. A commercial drive entrance shall be added to each connection with the public road matching City Detail 5207. 25. Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of $3,600 per acre. 26. The preliminary plat needs to be adjusted. Fix the text error for Parcel 3 and determine why the boundary does not close. 27. Encroachment agreements are required before the construction of the signs within the drainage and utility easements. Shift the pylon sign 10 feet south of its current location to allow room for the pond access road. 28. All outstanding assessments must be paid prior to final plat. 29. A left turn lane leading into the Kwik Trip site located on Lot 1, Block 1, shall be added to the Crossroads Boulevard design." SITE PLAN "The City Council approves the seven site plans consisting of a 5,300 square-foot convenience store with gas pumps and a 2,805 square-foot car wash (Buildings 4A), a multi-tenant building with an area of 11,000 square feet (Building 4B), a two-story multi-tenant building with a first floor area of 13,800 square feet and second floor area of 15,000 square feet (Building 4C), a one- story retail building with an area of 8,000 square feet (Building 4D), a 5,000 square-foot bank with drive-thru window (Building 4E), a 3,400 square-foot retail building (Building 4F), and a 10,000 square- foot Deli and Liquor Store (Building 40), Planning Case 08-01 for Crossroads of Chanhassen as shown in plans dated received January 18,2008, and including the attached Findings of Fact and Recommendation, subject to the following conditions: Conditions common to all site plans: 1. All landscape islands must have a minimum interior width of 10 feet. Mr. Mike Korsh March 18,2008 Page 12 of 17 2. Staff recommends that Cornell structural soil be used in all parking lot islands. 3. The applicant shall increase canopy trees within the east and south bufferyards to meet minimum requirements. 4. The applicant must submit a landscape plan with a complete Plant Schedule and all species and quantities noted on the plan. 5. The applicant shall remove Norway maple and Colorado spruce from the Plant Schedule. All species of ash will only be allowed in minimal quantities. 6. A wetland buffer 16.5 feet in width and a 30-foot setback from the wetland buffer must be maintained around Wetland 1. Secondary structures are allowed to encroach up to 50% of the setback. It appears that the retaining wall has exceeded the allowed encroachment and should be moved. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. 7. A vegetation management plan needs to be developed for the buffer. Currently the buffer is dominated by reed canary grass and agricultural weeds. The buffer for a Manage 3 wetland must have, at a minimum, 50% dominance of native plant species. 8. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. A Storm Water Pollution Prevention Plan (SWPPP) has been developed and submitted to the appropriate agencies for review. The Carver Soil and Water Conservation District is to be invited to the preconstruction meeting for the project. 9. It shall be noted on the SWPPP that all areas that will not be permanently stabilized within the timeframe required by the NPDES permit shall be temporary mulched and seeded. A note shall be included in the dewatering section of the SWPPP that states: "If construction of the proposed temporary/permanent sediment pond is not completed prior to dewatering, the City's on-site construction observer must approve proposed dewatering methods prior to beginning dewatering." 10. All silt fence that is not laid parallel to the contours, or that have a continuous run greater than 300 feet, shall have J Hooks installed every 50 -75 feet. This shall be noted on the plans and discussed at the preconstruction meeting. 11. Energy dissipation shall be provided at the inlet to the proposed pond and at the end of. the discharge pipe that outlets to the wetland within 24 hours of pipe installation. The discharge location for the outlet of the proposed pond shall be evaluated to ensure that the proposed discharge will not cause erosion issues. Reinforced erosion control matting may be required. 12. A stable emergency overflow (EO F) for the stormwater pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. The overland route from the Mr. Mike Korsh March 18,2008 Page 13 of 17 EOF shall be shown on the plan set. 13. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets shall be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. 14. The plans shall be revised to show a 75-foot rock construction entrance wherever construction traffic will access the site. The rock construction entrance shall be constructed in accordance with Chanhassen's Standard Detail 5301. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 15. In the event that dewatering is needed, the field inspector shall be contacted prior to any dewatering activities. 16. All diversions necessary to direct stormwater flow to the temporary basin shall be clearly indicated on the plan. 17. A concrete washout area needs to be shown on the plan. 18. A detail for the temporary pond outlet needs to be included in the plan. 19. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. 20. Make a notation in the SWPPP that the contractor with overall day-to-day responsibilities of the project/General Contractor must be the contractor for the NPDES permit. The applicant needs to have an individual qualified to complete stormwater inspection reports weekly, and after each one-half inch rainfall event. A box will need to be placed on site for these specific documents. 21. Cross-access and cross-parking agreements shall submitted to the City for approval and recording. 22. Fire Marshal Conditions: a. An additional fire hydrant (one) will be required near the car wash. Contact Chanhassen Fire Marshal for exact location. b. The 4-inch water line shown for the gas station and car wash is required to be a minimum of 6 inches per NFPA 13 Sec.15.1.3.1. c. Contact Chanhassen Fire Marshal for locations of NO PARKING FIRE LANE signs, and curbing to be painted yellow. Per MSFC Sec. 503.3. Mr. Mike Korsh March 18,2008 Page 14 of 17 d. A 3-foot clear space shall be maintained around the circumference of fire hydrants except as otherwise required or approved. Per MSFC Sec. 508.5.5. e. Posts, fences, vehicles, growth, trash, storage and other materials shall not be placed or kept near fire hydrants, fire department inlet connections or fire protection system control valves in a manner that would prevent such equipment or fire hydrants from being immediately discernible. The fire department shall not be deterred or hindered from gaining immediate access to fire protection equipment or fire hydrants Per MSFC Sec. 508.5.4. f. When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction, except when approved alternate methods of protection are provided. Temporary street signs shall be installed at each intersection when construction of new roadways allows passage by vehicles in accordance with section 505.2 of the MN. State Fire Code. Per Sec. 501.4. 23. Building Official Conditions: a. The buildings are required to have automatic fire extinguishing systems. b. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. c. Retaining walls over four feet high must be designed by a professional engineer and a permit must be obtained prior to construction. d. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for the proposed buildings, including but not limited to: allowable size, protected openings and fire-resistive construction. These requirements will be addressed when complete building and site plans are submitted. e. Detailed occupancy related requirements will be addressed when complete building plans are submitted. f. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss property line issues as well as plan review and permit procedures. 24. All rooftop and ground equipment must be screened from views. 25. Approval of the site plan applications is contingent upon approval of the final plat, variance and the PUD amendment - Planning Case 2008-01. Conditions specific to individual sites: Mr. Mike Korsh March 18, 2008 Page 15 of 17 1. Building 4A with an area of 5,300 square feet convenience store, gas pumps and a 2,805 square-foot car wash located on Lot 1, Block 1. a. The monument sign may not exceed 48 square feet in area nor be higher than 8 feet. The sign shall be located 10 feet from the property line. b. No more than two signs are permitted on the convenience store and one sign on the carwash buildings. Signs on the convenience store shall be limited to the north and east elevation. Sign on the carwash shall be limited to the east elevation. c. Outdoor storage of merchandise may be permitted on the sidewalk around the convenience store with the condition that the outdoor display of merchandise shall not impede nor interfere with pedestrian traffic. d. No signage is permitted on the canopy nor can it be illuminated. Lights below the canopy must be recessed. e. A one-way is required for the lane between the gas station and the car wash. Add sign and arrows showing one-way traffic. f. Show turning movement for appropriate size delivery trucks. g. Adjust clean out on the west side of the gas station so that it is less than 100 feet between the cleanout and the catch basin. h. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines. 1. The watermain must be relocated because it is too close to the building. Also, the sanitary sewer and storm sewer must maintain a lO-foot separation. J. Shift underground gas tanks 5 feet south of their current location. k. Staff will work with the applicant to improve the architecture of the car wash and gas station/convenience store to make them more compatible with the buildings in the overall development. The item will be brought back at the time of final plat approval for approval by the City Council. 2. Building 4B, a multi-tenant building with an area of 11,000 square feet located on Lot 2, Block 1. a. Approval of this site plan is contingent upon approval of the PUD amendment to allow drive-thru windows for coffee shops. b. Signs shall be limited to the east and west elevations of the building. c. Drive-thru lane shall be widened to 16 feet. Mr. Mike Korsh March 18,2008 Page 16 of 17 d. Show turning movements for appropriate size delivery trucks. e. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines. 3. Building 4C, a two-story multi-tenant building, first floor with an area of 13,800 square feet, second floor with area of 11,000 square feet, located on Lot 2, Block 1. a. Drop off lane shall be widened to 22 feet. b. The wall signs are limited to the north and south elevations only. Any signage on the second floor may not be illuminated. c. Show turning movements for appropriate size delivery trucks. d. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb line. 4. Building 4D, a one-story retail building with an area of 8,000 square feet located on Lot 2, Block 1. a. Show turning movements for appropriate size delivery trucks. b. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines. 5. Building 4E, a 5,000 square-foot bank with a drive-thru, located on Lot 3, Block 1. a. Approval of the site plan is contingent upon vacation of old Highway 101. b. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines. 6. Building 4F, a 3,400 square-foot retail building located on Lot 1, Block 2. 1. Approval of the site plan is contingent upon vacation of old Highway 101. 2. Trash enclosure drive shall be widened to 16 feet. 3. Show turning movements for appropriate size delivery trucks. 4. Show drainage arrows and percent of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines. 7. Building 4G, a 10,000 square-foot Deli and Liquor Store located on Lot 2, Block 2. a. Trash enclosure drive shall be widened to 16 feet. Mr. Mike Korsh March 18,2008 Page 17 of 17 b. Show turning movements for appropriate size delivery trucks. c. Show drainage arrows and % of slope to ensure 1 % minimum slope across the asphalt surface and .5% minimum slope along the curb lines." Site Plan Agreements must be prepared by our offices for recording; however, cost estimates for the improvements must be submitted to our offices before the agreement can be prepared. Final plat documents must be submitted to the City four weeks prior to the City Council meeting in which you wish to have your final plat approved. Enclosed is the list of items required for submittal for final plat approval. If you have any questions, please feel free to contact me at 952.227.1134 or e-mail at sal i aff@ci.chanhassen.mn.us. Sincerely, ~~~ ~~ Sharmeen Al-laff Senior Planner Encs. g:\plan\2006 planning cdscs\06-18 southwest village\spr-prL'sub-pulblllcnd-\:lr appnw:r11ctlcr.d('c ITEMS REQUIRED FOR FINAL PLAT CONSIDERATION The following items are required to be submitted a minimum of 30 days prior to City Council meeting and payment of a $250.00 final plat review fee: 1. Submit three (3) sets of full size, 50 scale construction plans and specifications for staff review and redline. . Utility plans shall show both plan view and profiles of all utilities (sanitary sewer, water and storm sewer lines). The plan view must show all drainage and utility easements. . Grading and drainage plans shall show dwelling type and elevations, wetlands and wetland buffer areas, stormwater pond NWL and HWL, EOF and catch basin and storm manhole numbers. . The construction plans and specifications shall be in accordance to the City's latest edition of Standard Specifications & Detail Plates. . The plans shall include traffic signage and street light placement. 2. Drainage calculations for water quantity and quality ponding with maps showing drainage areas for pre-and post-development conditions and contributing areas to catch basins. 3. Hydraulic calculations and drainage map for the storm sewer design. 4. Tree Preservation Easements (if applicable). 5. Trail Easements (if applicable). 6. Engineer's Cost Estimate of Improvements: a. Sanitary sewer system. b. Water system. c. Storm sewer drainage system including cleaning and maintenance. d. Streets, sidewalk and trails. e. Erosion control. f. Site restoration (seeding, sodding, etc.). g. Site grading h. Street lights & signs i. Engineering, surveying & inspection j. Landscaping 7. Five (5) sets (folded) of final plat, one (1) set of reductions (8W' x 11"), and a digital copy in .tif format. 8. Digital copy of the legal description of the property in a .doc format. 9. Lot tabulations Failure to provide any of the above items by the required deadline will result in delaying consideration of final plat before the City Council. Updated 11-29-06 g:\eng\forms\final plat submittal.doc