Loading...
Resolution 2008-26 Approving Final Plat CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: Avril 14, 2008 RESOLUTION NO: 2008-26 MOTION BY: Tiornhom SECONDED BY: McDonald A RESOLUTION APPROVING A FINAL PLAT CREATING AUDUBON CORPORATE CENTER 1ST ADDITION WHEREAS, David A. Stockdale and Jane K. Anderson have requested a subdivision of their property into two lots of 2.65 and 3.62 acres; and WHEREAS, the proposed subdivision complies with all requirements of the Chanhassen City Code; and WHEREAS, the Chanhassen Planning Commission held a public hearing on March 18, 2008 and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance and recommended approval of the subdivision. NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves the final plat for Audubon Corporate Center 15t Addition (planning Case #08-07) creating one lot, one outlot and public right-of-way for Audubon Road for the property legally described as follows: Part of the North half of the Southwest Quarter of Section 14, Township 116, Range 23, Carver County, Minnesota, described as follows: Beginning at a point on the west line of said North half of the Southwest Quarter, 821.90 feet, measured along said west line, southerly of the northwest corner of said North Half of the Southwest Quarter said west line assumed to bear South 2 degrees 11 minutes 01 seconds East; thence North 87 degrees 48 minutes 59 seconds East, a distance of 550.00 feet; thence North 2 degrees 11 minutes 01 seconds West, parallel with said west line, a distance of 180.00 feet; thence North 32 degrees 05 minutes 05 seconds West, a distance of 662.31 feet to the southeasterly right of way line of the Chicago, Milwaukee, S1. Paul and Pacific Railroad, as recorded in Bock 23 of Deed, page 266; thence South 55 degrees 32 minutes 41 seconds West, along said southeasterly right of way line, a distance of 260.00 feet to said west line ofthe North half of the Southwest quarter; thence South 2 degrees 11 minutes 01 seconds East, along said west line, a distance of 615.32 feet to the point of beginning. Subject to County Road No. 17 over the westerly 33;00 feet of the above described parcel. The approval of the subdivision is subject to the following conditions: 1 1. Lot 1, as shown in the preliminary plat, shall be designated as Outlot A until the ultimate development of the lot is determined and a revised grading plan submitted that shows the wetland impacts. 2. The applicant shall use BWSR U8 in all graded areas along the eastern property line. 3. Existing City boulevard trees will be protected with fencing during all phases of construction. The applicant will be responsible for replacing any trees that die as a result of construction activity. 4. The north lot will be required to provide buffer yard and parking lot landscaping as required by ordinance at the time of site plan approval. 5. All trees on the north lot within the wetland buffer and setback shall be preserved until a final grading plan is approved for the lot. The developer shall work with staff as part of the development of the site to preserve these trees through revised grading and the use of retaining walls. 6. A wetland buffer 20 feet in width and a 30-foot setback from the wetland buffer must be maintained around all wetlands on the property. Secondary structures are allowed to encroach up to 50% of the setback. It appears that the retaining wall has exceeded the allowed encroachment and needs to be moved out of this 15-foot setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must instal! wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. 7. The retaining wall needs to be moved so that it is at least 15 feet from the edge of the buffer or 35 feet from the wetland edge. 8. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency (MPCA) for this site. 9. The proposed storm water pond shall be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet shall be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. 10. A detailed construction plan needs to be created for the pond construction which shows how water quality of the existing pond and adjacent water body will be protected. At a minimum, this must show how the pond will be dewatered and what best management practices will be employed. 2 11. All silt fence that is not laid parallel to the contours shall have J Hooks installed every 50- 75 feet. 12. A stable emergency overflow (BOP) for the stormwater pond shall be provided. The EOP could consist of riprap and geotextile fabric or a turf reinforcement mat (a permanent erosion control blanket). A typical detail shall be included in the plan. The overland route from the EOF to the existing wetland shall be shown on the plans and shall be encumbered by a drainage and utility easement. 13. Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Tvpe of Slope Steeper than 3:1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or manmade systems that discharge to a surface water. 14. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets shall be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. 15. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $59,365.80. 16. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. 17. Full park fees in lieu of parkland dedication and/or trail construction shall be collected as a condition of approval for this subdivision. The park fees shall be collected in full at the rate in force upon final plat submission and approval. 18. Approval of the subdivision in no way should convey to the applicant, the land owner or any subsequent owners and occupants approval of the wetland impacts indicated within Wetland 2 as shown on the conceptual grading plan or any other wetland impacts resulting from the development of this parcel. Any grading which, as a result of the development of Lot 1, occurs on Lot 2 must provide sediment and erosion control best management practices to protect the wetland and the buffer area. 3 19. No burning shall be issued for trees to be removed. Trees and shrubs must be removed from site or chipped. 20. Remove all existing structures prior to the commencement of grading. 21. This site must be mass graded to minimize future truck traffic upon completion of the southern parcel. A 20-foot buffer is required around the wetland on the northern parcel to prevent grading from taking place. Please revise the grading plan and show silt fence in this location so the contractor can determine the grading limits. Also, the building pad elevation of the northern parcel shall be lowered to an elevation of 952 to minimize the impacts to the wetland. 22. The grading plan needs to be revised. The proposed contours on the northern property need to be revised showing the wetland buffer of 20 feet. Show the existing conditions within 100 feet of the property line. 23. Normal water level of the existing wetlands should be shown on the plan. Also, include the normal water level and high water level of the revised pond. Show emergency overflows on the plan. Keep a minimum of 2 percent slope in the grass areas, i percent in the pavement areas, and .5 percent along the curb lines. 24. Development of the northern parcel will require a stormwater pond to treat the water prior to discharge into the wetland. This pond should discharge to the wetland northeast of the site. 25. Revise the drainage calculations. The existing drainage map should include three areas: One area discharges to the northern wetland, one to the eastern wetland and one to the existing pond. Revise the calculations to show the pre- and post-development peak discharge into the northern and eastern wetland. Post-development peak discharges must remain less than pre-development peak discharges for the 2-, 10-, and 100-year storm events. Drainage calculations must be signed by a Professional Engineer registered in the State of Minnesota. 26. Rational method calculations, including drainage map, must be provided for the sizing of the storm sewer. 27. IT importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. 28. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. Additional top and bottom elevations should be added to the retaining wall. 29. All of the utilities within the boundary spould be privately owned and maintained. These utilities must be covered by a cross-access agreement. The proposed watermain 4 connection into Chanhassen Lakes Business Park 7th Addition must wet tap the existing watennain. 30. Utility plans shall show both plan view and profiles of all utilities (sanitary sewer, water, and stonn sewer lines). 31. Detennine actual elevations of existing utilities. A minimum vertical separation of 18 inches is required at all stonn, sanitary, and watennain crossings. Provide details of each crossing to ensure minimum separation. 32. Each new lot is subject to the sanitary sewer and water hookup charges. Lot 1, Block 1 will get credit for 8 trunk sanitary sewer charges. Lot 2 will get credit for 15 trunk sanitary sewer charges. No truJ1k water charges have been paid. The 2008 trunk hookup charge is $1,769 for sanitary sewer and $4,799 for watennain. Sanitary sewer and watennain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 33. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. The applicant is also required to provide the City with the necessary financial security in the fonn of a letter of credit or cash escrow in the amount of $13,200.00 to guarantee the installation of the pond, erosion control, and seeding. The applicant must also notify the City after installation of the erosion control and 48 hours prior to the commencement of grading. Permits from the appropriate regulatory agencies wi!! be required, including the ~1PCA and the Dept. of Health. 34. Easements are required to provide access to Lot 1, Block 1. A private drive easement will be required to provide access to Lot 1, Block 1 off of Audubon Road. An additional private easement will be required to provide truck access through Chanhassen Lakes Business Park 7th Addition and up to Lot 1, Block 1. The easements for the gas line and power line must be shown on the plat. No work will be allowed in this area without the approval of the owner of the easement. A drainage and utility easement will be required over the proposed pond for Lot 2, Block 1. Also, a temporary drainage and utility easement should be placed on the entire Lot 1, Block 1 until the time of final plat of this parcel. Provide location and easement for pond access. 35. Shift proposed drive off of Audubon Road so that the center of the driveway is located 70 feet north of the Kingdom Hall drive. Due to limited site distance, this driveway location will be limited to passenger vehicles only. Truck-trailer access must be provided to Lot 1, Block 1 through Chanhassen Lakes Business Park 7th Addition. 36. The boundary survey and preliminary plat need to be revised. Add existing conditions and property lines within 100 feet ofthe boundary. Also, the legal description does not match the bearings on the preliminary plat. 5 37. Upon completion of the public street, the applicant shall submit a set of "as-built" plans signed by a professional engineer. 38. Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of $3,600 per developable acre. 39. Ail outstanding assessments must be paid prior to final plat. Passed and adopted by the Chanhassen City Council this 14th day of April, 2008. ATTEST: ~D.~ Todd Gerhardt, City Clerk/Manager tL~ Thomas A. Furlong, Mayor YES Furlong Ernst Litsey NO ABSENT rvlcDonald Tjornhom 6