Loading...
Email from Mark Gilbertson 1-4-08 Auseth. Angie From: Sent: To: Subject: mjgilbertson@ashland.com Friday, January 04, 2008 12:51 AM Auseth, Angie VICC - 335 79th St., Chanhassen, MN Attachments: 1 st Gen Late 80s bldg.jpg; VICC Betore & After Examples.pdt; 01-42.pdt; DSC00153.jpg; IMG_0864.jpg; IMG_9624.JPG; IMG_9626.JPG; IMG_9627.JPG; IMG_9629.JPG; IMG_ 9631.JPG; 01-42_MN_right.jpg; 01-42_MN_tronCjpg; 01-42_MN_pylon.jpg; 01-42 _MN_rear.jpg 1st Gen Late 80s VIOC Before & bldg.jpg (99 ... After Examples.p... 01-42.pdf (1 MB) DSC00153.jpg (100 IMG_0864.jpg (82 IMG_9624,JPG (53 IMG_9626,JPG (41 KB) KB) KB) KB) rg (I IMG_9627.JPG (49 IMG_9629,JPG (61 IMG_9631.JPG (58 )1-42_MN_right.jpg 01-42_MN_fronCj 01-42_MN_pylon.jpOl-42_MN_rear.jpg KB) KB) KB) (653 KB) pg (634 KB) 9 (480 KB) (541 KB) Angie, Thank you for taking the time to speak with me this afternoon regarding Valvoline's intentions to upgrade the appearance of our Chanhassen facility. As I mentioned we are in the process of rolling out a new prototype building design and are trying to go through and freshen up some of our older facilities as well. The location in Chanhassen opened on 9/30/1991 and has seen a few prototype changes during that time period. Here is a look at the prototype design of the late 1980's through late 1990's: (See attached file: 1st Gen Late 80s bldg.jpg) And here are a few shots of some locations we have recently converted in other markets. (See attached file: VIOC Before & After Examples.pdf) Here are some photos showing the existing Chanhassen location including a copy of the site plan: (See attached file: 01-42.pdf) (See attached file: DSC00153.jpg) (See attached file: IMG_ 0864.jpg) (See attached file: IMG_9624.JPG) (See attached file: IMG_9626.JPG) (See attached file: IMG_9627.JPG) (See attached file: IMG_9629.JPG) (See attached file: IMG_9631.JPG) And here are the same photos retouched to show the proposed new sign package: (See attached file: 01-42_MN_right.jpg) (See attached file: 01-42_MN_front_.jpg) (See attached file: 01-42_MN-pylon.jpg) (See attached file: 01-42_MN_rear.jpg) The above proposed sign drawings are based on the following sign code criteria: Pylon Sign: pole w/ 55 SF sign Front Elevation: SF or Sign Text Left Elevation: Right Elevation: Code Allows: 64 SF @ 8' OAH Proposed Reuse Existing 15% of wall = 94 SF > Max 90 SF 50 1 wallo. nly X 1 wall only"" - none - - none - 1 Rear Elevation: 1 wall only - none - I did review the aerial photo that you sent and am surprised by the configuration of the BP property, I thought we abutted the highway right-of-way line. As you can see from our site plan and the attached photos our pylon is located in the SE corner of our property and is now blocked from view by the recent expansion of the facility to the east of us. Our intention would be to reuse or the existing pole at a minimum or preferably relocate it to optimize visibility from Hwy 5. A pylon/monument sing at the end of a cul-de-sac is of little value to us. Please review the attached information and contact me with your comments. I welcome to opportunity to sit down with you to discuss our project in person and answer any questions you may have. Sincerely, Mark J. Gilbertson Valvoline Instant Oil Change 763-494-3380 Office 763-494-0032 Fax 859-357-4491 E-Fax 612-991-6580 Cell MJGilbertson@Ashland.com This electronic mail may contain information that is privileged, proprietary and confidential and/or exempt from disclosure under applicable law. This transmission is intended solely for the individual or entity designated above. If you are not the intended recipient, you should understand that any distribution, copying, or use of the information contained in this transmission by anyone other than the intended recipient is unauthorized and strictly prohibited. If you have received this electronic mail in error, please immediately notify the sender and destroy all copies which you may have of this communication. 2