Loading...
Approval Letter 1-27-09 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952,227,1190 Engineering Phone: 952.227.1160 Fax: 952,227,1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952,227,1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952.227,1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952.227.1310 Senior Center Phone: 952,227.1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us January 27, 2009 Mr. Paul Oehme, P.E. Engineering/Public Works Director City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Re: Public Works Facility - Planning Case #08-25 Dear Mr. Oehme: This letter is to confirm that on January 26,2009, the Chanhassen City Council approved the following: A. "Site Plan for an 82,500 square-foot, one-story office/warehouse building with a mezzanine storage area and setback Variances from the creek and wetland for the parking lot area, plans prepared by Oertel Architects and the City of Chanhassen, dated 12/05/08, subject to the following conditions: 1. The developer shall provide exterior benches and/or tables. 2. Signage shall require a separate sign permit review to determine compliance with City ordinance. 3. The applicant shall mitigate for the lost functions and values of any buffer variance by replacing an equivalent area of buffer in a location which will provide the maximum water quality benefit. Preliminary review indicates that area to be northeast of the wetland. 4. The applicant shall restore the stream channel as well as the top of bank and flood plain for Riley Creek including the removal of any construction and other debris in the area. 5. The applicant shall prepare a vegetation management plan for Riley Creek. This management plan shall be created in conjunction with the landscaping plan and the Environmental Resources Specialist and Water Resources Coordinator should be consulted in the creation of this plan. Chanhassen is a Community for life - Providing for Today and Planning for Tomorrow Mr. Paul Oehme January 27, 2009 Page 2 6. The applicant will modify the existing NPDES permit to identify the construction manager for the project. 7. The applicant will provide adequate treatment for drainage directed to the wetland. 8. The applicant should look for ways to promote infiltration and incorporate alternative stormwater management best management practices into the site design and build. One such measure is the construction of a bio-infiltration feature at the outlet from the drive aisle northeast of the wetland. Other features to investigate include pervious pavement systems, cisterns, biofiltration trenches, preservation or re-establishment of vegetation, etc. 9. The final 200 feet of the swale located west of the proposed facility needs to be protected with Category 2, Wood Fiber IS Erosion Control Blanket. 10. Those areas to be planted in BWSR seed mix U7 should be seeded at a rate of 15LBS PLS/acre where PLS means "Pure Live Seed". 11. The buildings are required to have automatic fire extinguishing systems. 12. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 13. Retaining walls over four feet high must be designed by a professional engineer and a permit must be obtained prior to construction. 14. The 51-inch and 45-inch oaks located near the northwest and southeast comers of the building shall be protected by fencing throughout construction. 15. The site plan must show the dimensions of the lots. 16. The northern access must be revised so that the maximum width does not exceed 36 feet. 17. An encroachment agreement is required for the portion of the parking area that lies within the public right-of-way. 18. If feasible, the runoff from the cold storage area access should be conveyed to the existing storm sewer. 19. Revised drainage calculations and storm sewer sizing must be submitted to ensure that the existing downstream infrastructure can accommodate the proposed runoff. Mr. Paul Oehme January 27, 2009 Page 3 20. An encroachment agreement is required to construct the northern retaining wall within the drainage and utility easement. 21. The proposed top and bottom of wall elevations must be shown. 22. The drainage and utility easement over the abandoned portion of the sanitary sewer must be vacated. 23. The existing drainage and utility easements and abandoned utilities must be labeled on the plan sheet. 24. The utility plan must include a note regarding the connection to the existing storm sewer." B. "Conditional use permit for outdoor storage, subject to the following condition: 1. The proposed development must comply with the approved site plan, plans prepared by Oertel Architects and the City of Chanhassen, dated 12/05/08." Construction plans must address the conditions of approval. Detailed occupancy related requirements will be addressed when complete building plans are submitted. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. All erosion control and tree protection measures shall be installed and inspected prior to beginning construction activity. An encroachment agreement is required for the portion of the parking area that lies within the public right-of-way. If you have any questions or need additional information, please contact me at (952) 227-1131 or bgenerous@ci.chanhassen.mn.us. S~ IL /' i~./0~ I Robert Generous, AICP Senior Planner ec: Kate Aanenson, Community Development Director Alyson Fauske, Assistant City Engineer Todd Gerhardt, City Manager Jerry Mohn, Building Official g:\plan\2008 planning cases\08-25 public works facility site plan\approvalletter.doc