Loading...
Application Planning Case No. ()q- I~ CITY OF CHANHASSEN 7700 Market Boulevard- P.O. Box 147 Chanhassen, MN 55317 - (952) 227-1100 CITY OF CHANHASSEN RECEIVED DEVELOPMENT REVIEW APPLICATION OCT 1 6 2009 CHANHASSEN PLANNiNG DEPT PLEASE PRINT Applicant Name and Address: Walker Parking Consultants 1660 South Hwy 100, Suite 350 Minneapolis, MN 55416 Contact: Scot t Froemminq, P. E . Phone: 952 - 595- 9116 Fax:952 - 595- 9518 Email: Scott.froemming@walkerparking.com Owner Name and Address: SouthWest Transit 13500 Technology Drive Eden Prairie, MN 55344 Contact: Len Simich Phone:952-949-2287 Fax: 9520974-7997 Email: Lsimich@swtransit. or~ NOTE: Consultation with City staff is reauired prior to submittal, including review of development plans Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit (CUP) Vacation of Right-of-Way/Easements (VAC) Interim Use Permit (IUP) X Variance (VAR) Non-conforming Use Permit Wetland Alteration Permit (WAP) Planned Unit Development* Zoning Appeal Rezoning Zoning Ordinance Amendment Sign Permits X Sign Plan Review Notification Sign - $200 (City to install and remove) x Site Plan Review (SPR)* Escrow for Filing Fees/Attorney Cost** - $50 CUP/SPRlVACNARlWAP/Metes & Bounds - $450 Minor SUB TOTAL FEE $ x X Subdivision* An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. *Sixteen (16) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced copy for each plan sheet along with a diaital CODY in TIFF-Group 4 (*.tif) format. **Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews. NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. PROJECT NAME: Chanhassen Station SouthWest Transit LOCATION: 500 Market Street, Chanhassen, MN 55317 LEGAL DESCRIPTION AND PID: See Site Plan Review TOTAL ACREAGE: 1.45 acres WETLANDS PRESENT: YES x NO PRESENT ZONING: CBD Central Business District REQUESTED ZONING: CBD Central Business District PRESENT LAND USE DESIGNATION: Commercial REQUESTED LAND USE DESIGNATION: Commercial REASON FOR REQUEST: Construction of new Park and Ride facility and associated access roadway. FOR SITE PLAN REVIEW: Include number of existing employees: and new employees: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. Signature of Applicant Date Signature of Fee Owner Date G:\plan\forms\Development Review ApplicationDOC Rev. 1/08 PROJECT NAME: LOCATION: LEGAL DESCRIPTION AND PID: TOTAL ACREAGE: WETLANDS PRESENT: YES NO PRESENT ZONING: REQUESTED ZONING: PRESENT LAND USE DESIGNATION: REQUESTED LAND USE DESIGNATION: REASON FOR REQUEST: FOR SITE PLAN REVIEW: Include number of existing employees: and new employees: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. ---) (. /0' 15, OC1_ Date /C>-/~ c>y , Date f G plan\forms\Development Review Application.DOC Rev. 1/08 PROJECT NARRATIVE SOUTHWEST TRANSIT - CHANHASSEN STATION PARK AND RIDE WALKER PARKING CONSULTANTS SITE PLAN REVIEW - 500 MARKET STREET OCTOBER 16, 2009 In 2006, SouthWest Transit secured $7 million in federal funds to be used for the construction of a new Park and Ride facility in downtown Chanhassen. The new multi- level ramp at the time was conceived to accommodate up to 520 vehicles. For this project to come to fruition, the City of Chanhassen in concert with the land Owner and Southwest Transit, have come to agreement on land transfers to accommodate the new structure and associated access roadway. Certain elements of the project program have been modified as a result of negotiation between the project stakeholders. The project includes the construction of a 420 stall Park and Ride Transit facility, the construction of a public roadway to access the site, as well as related building demolition and utility relocation. Construction will commence in two phases. First phase will include building demolition and utility relocations. Second phase will include roadway construction, Park and Ride facility, and bus transit platform and turn around area. The project borrows from the palette of the existing SouthWest transit stations on 101, Highway 212, and from the public buildings surrounding the site. A similar brick blend will be used to face precast wall panels and dark metal accents will provide consistent design elements to the transit stations. Buff colored precast spandrel panels, sills and banding, as well as a buff colored brick accent wall at the east stair/lobby relate to the nearby library and city hall facilities. Pedestrian areas will have brick pavers and landscaping similar to the surrounding public facilities. Vertical circulation elements will be accentuated with aluminum curtain wall and architectural lighting. The addition of the Park and Ride facility within the downtown area of Chanhassen provides for future tax base enhancing development, and provides a locally accessible public transportation hub. To accommodate these improvements, a parking stall size variance is being requested. The proposed stall size is 8'-6/1 X 18'-0/1 slightly smaller than 9'-0 X18'-0 Chanhassen City Code. This request is put forth as a result of limitation of site areas transferred, limited location of site areas transferred, and City staff building height limitation preference. The project as defined within the Site Plan Review document is a well thought-out design compromise of all of the identified interested parties. The design team and SouthWest Transit feel the design criteria of the Park and Ride facility and associated access roadway meets the requirements for a modern, high service level transit station. i: \21-3590-00-swLchanhassen \correspondence \city chanhassen \city process \ variance \southwest transit narrative. doc