Loading...
Final Plat Approval Letter 12-21-09 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180- Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us December 21, 2009 Len Simich, Executive Director SouthWest Transit Commission 13500 Technology Drive . Eden Prairie, MN 55344 Re: Chanhassen Transit Station Final Plat Approval- Planning Case 09-18 Dear Mr. Simich: This letter is to formally notify you that on December 14, 2009, the Chanhassen City Council adopted the following motion: "The Chanhassen City Council adopts the attached resolution approving the final plat for the Chanhassen Transit Station with the following conditions: 1. Outlot B and Lot 1, Biock 2 shall be conveyed to the City. 2. Existing public and private utilities must be encompassed by a ten-foot wide drainage and utility easement centered over the utility 3. The main drive aisle dimensions to the parking ramp shown on Sheet C200 must be clarified. 4. The parking ramp and surface parking area shall be privately owned and maintained. 5. The sidewalks within Outlot B shall be maintained by SouthWest Transit. 6. The grading plan is incomplete. It must show the existing two-foot contours on the north and west side of the proposed construction limits. The proposed contours must tie in to the existing contours. 7. The proposed concrete spillway that would convey runoff from the western 25 to 50 feet of the parking lot on Lot 1, Block 1 must be eliminated from the design as it would direct runoff across a sidewalk. 8. The hydrology calculations must be revised to include the drainage area to the north, particularly the flared end section that discharges approximately 55 feet north of CB B. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Len Simich December 21, 2009 Page 2 of 3 9. The developer's engineer and the City's engineering consultant must coordinate their respective designs to ensure that the rate and volume control requirements are met. 10. Hydraulic calculations must be submitted with the final plat submittals. 11. The developer's engineer must work with the City's engineering consultant for the public street project to ensure that the City's storm sewer design will be able to accommodate the runoff from the parking ramp storm sewer. 12. A building permit is required for the proposed retaining wall. 13. It is the developer's responsibility to coordinate any small utility relocation with the appropriate utility company. 14. The utility plan must be changed to reflect the following: a. Show the directional flow arrows on existing and proposed utilities. b. Adjust the line work so that the proposed storm sewer can be seen on the plan. c. Show the connection to the existing storm sewer on the southwest corner of the construction limits. d. Include a note where the rain leaders connect to the existing storm sewer. 15. Full park fees shall be paid in lieu of parkland dedication and/or trail construction. The fees shall be collected for Lot 1 Block 1 (1.45 acres) as a condition of approval for Chanhassen Transit Station. The park fees shall be collected in full at the rate in force upon final plat submission and approval. The current park and trail fee charge for commercial property is $12,500 per acre. 16. All plans must be revised to reflect a continuous sidewalk along the north edge of Market Street. 17. Approval of the subdivision is contingent upon approval of the vacation of the drainage and utility easement. 18. The executed temporary easement agreement must be submitted before the final plat is recorded." Mr. Len Simich December 21, 2009 Page 3 of 3 If you have any questions, please feel free to contact me at 952.227.1134 or e-mail at sal i aff@ci.chanhassen.mn.us. Sincerely, Sharmeen Al-Jaff Senior Planner SAJ:ktm c: Scott Froemming, P.E., Walker Parking Consultants Jon Horn, Kimley-Hom and Associates, Inc. ec: Todd Gerhardt, City Manager Kate Aanenson, Community Development Director Paul Oehme, City Engineer/Public Works Director Alyson Fauske, Assistant City Engineer g:\plan\2009 planning cases\09-l8 chanhassen station park and ride\approvalletter final plat.doc