Loading...
Administrative Section ADMINISTRA TIVE SECTION Park & Trail Conditions of Approval Associated with the Request for Planned Unit Development Amendment to Lakeside Letter from Campbell Knutson Re: City of Chanhassen - Lot 2, Block 2, Minnewashta Heights CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952,227.1180 Fax: 952.227.1190 . Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952,227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952,227,1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM TO: Bob Generous, Senior Planner Todd Hoffman, Park and Recreation Director 11/ March 1, 2010 FROM: DA TE: SUBJ: Park & Trail Conditions of Approval Associated with the Request for Planned Unit Development Amendment to Lakeside; Subdivision and Site Plan Review for 22 Residential Units on Property Zoned Planned Unit Development-Residential (PUD-R) and located on Outlots B & E, Lakeside - LAKESIDE TWINHOMES. The original site plan for Lakeside was approved in 2006. At that time, the following conditions associated with Parks and Trails were approved: 1. Payment of full park dedication fees at the rate in force upon final plat approval in lieu of parkland dedication. 2. The applicant shall provide all design, engineering, construction and testing services required of the "Lyman Boulevard Trail." All construction documents shall be delivered to the Park and Recreation Director and City Engineer for approval prior to the initiation of each phase of construction. The trail shall be 10 feet in width, surfaced with bituminous material, and constructed to meet all city specifications. The applicant shall be reimbursed for the actual cost of construction materials for the Lyman Boulevard Trail. This reimbursement payment shall be made upon completion and acceptance of the trail and receipt of an invoice documenting the actual costs for the construction materials utilized in its construction. 3. The trail connection at the northeast comer ofthe site connecting the Lakeside area to the future Highway 212 trail and underpass, as depicted in the applicanCs plans, is completed. Application of original conditions of approval to LakeSide Twin Homes: 1. Payment of Park Dedication Fees totaling $110,000 ($5,000/Unit) in lieu of parkland dedication shall be collected for the 22 residential twin homes being requested for Outlots B & E. 2. The improvements described in item No.2 (above) have been completed and accepted by the City. 3. The trail connection described in NO.3 (above) must be completed when the final outlot (adjacent to Highway 212) is developed. g:\plan\2010 planning cases\IO-06lakeside pud amendment\park and recreation directors report.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow