Loading...
2 Capital Plan CAPITAL PLAN City of Chanhassen, MN DEPARTMENT SUMMARY 2002 thm 2006 t Department 2002 2003 2004 2005 2006 Totnl Major Equipment 597,600 616,700 457,200 631,600 495,000 2,798,100 Mun'cipal:Buildings 6,031,000 100,000 400,000 1,700,000 8,231,000 Park & Trail lmprmemmls 1,595.500 865,000 225,000 175,000 2,860,500 Sanlla"j Sea~r Improvements 695,000 690,000 370,000 520,000 120,000 2,395,000 Slreet Improvements 673,000 435,000 4,300,000 275,000 285,000 5,968,000 Sudace Water Management 560,000 415,000 450,000 1,425,000 Water S~ Improvements 1,555,000 3,630,000 1,607,000 4,175,000 1,252,000 12,219,000 Total 11,707,100 6,751.700 7,409,200 6,176,600 3,852,000 35,896,600 Department Major Equipment 100~ AemdLadd~rR~~ F~e l~pt.: ~ k~-lz Ra~o ~ ~ ~ ~ 8~ ~ ~ Refi~ T~~ Pu~~md~ ~~ ~.: ~t O~ T~ Dum~ T~ Repla~m~Add~ S~t S~ ~ R~ Pa~ E~i~T~m Fo~ 555C Cm~ ~ ~s~ Aud~al Eq~t Co~R~b~ Gm~~ ~0 M~ Rep~ Pu~ W~ ~ht ~ T~ ~ Sn~ B~er Gm~ ~r Repbm~ Tm~B~ Gm~ M~ Repbm~nt (1~) U~m~ 217 G~ R~ Pum~tor~ater Tank D~ T~m E~t T~ R~m F~m and Equip~nt CAPITAL PLAN City of Chanhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 ProjectO Priority 2002 EQ-O01 EQ-O02 EQ-O03 EQ-O05 EQ-O07 EQ-O09 EQ-010 EQ-011 EQ-013 EQ.014 EQ-015 EQ-016 EQ-017 EC.019 EC-021 EC-022 EC-023 EC-024 EC-025 EC-026 EC-027 EQ-028 EQ-029 EQ-030 EQ-033 EQ-034 EQ-035 EQ-036 EQ-037 EQ-038 EQ-039 EQ-042 EQ-043 EQ-045 2003 2004 2005 35,000 10,000 100,000 50,000 20,000 2,000 1,000 1,000 1,000 15,000 15,000 15,000 15,000 9,200 59,900 65,700 72,200 65,600 0 10,000 0 0 22,000 24,000 25,000 252,000 140,000 133,000 45,000 68,000 8,000 10,000 10,000 10,000 10,000 100,000 15,000 113,000 113,000 116,000 5,000 30,000 20,000 27,000 30,000 45,000 6,000 7,0OO 41,000 60,000 6,000 6,000 6,000 12,000 12,000 8,500 2006 70,000 52.000 140,000 22,000 40,000 85,000 Total 35,000 10.000 150,000 20,000 5,000 50,000 60,000 9,200 333,40O 10,000 123,000 525,000 140,000 45,000 22,000 21,000 8,000 115,000 85,000 342,000 5,000 30,000 47,000 75,000 6,000 7,000 41,000 60,000 18,000 24,000 8,500 ,J Department Recrealion Center Carpet Replacement Caner County Community Demographic Partnership WabEnabled ~ft~are C~ Records Retenlion System :Major Equipment Total Municipal Buildings P.~ic wo~ FauT~ Expens~ Endoead Salt & Sand Storage Fa=T~y F'~ Slaflon 1 and2 Refud~lshing Municipal Buildings Total Park & Trail Improvements Improvemenm Bandimem Community Park Development: City Center Park Playgrou~ Equipment: CuT Farms Park Signage: Kerber Pond Park Improvements: Meadow Green Park Rotmdhouse Renovation: Roundhouse Park Trait: Bandimera Park to Chanhassen Hills Trail: ti'ay 101 (S. Shore Dr. to Townline Dr.) Road & Trail Reconslmction: Lake Ann Park Mash Glen Trail Connector Tree Pla~ngs Park Sheltec Bandimere Community Park Half Court Baskelball: Bandimere Heights Park Skate Park Ramp Trash Receptacles Permanent Park Benches and Tables 'Tra*l Connectoc Hwy 5 at R~ey Creek Tra~ Connector:. Hwy 5 at Bluff Creek C~ Center Commons Park & TraU Lmprovements Total ProjectO E(~046 E(~047 EQ-048 EQ-049 MB-001 MB-O03 MB-O04 MB.O05 MB-O08 PK&T-001 PK&T-003 PK&T-004 PK&T-005 PK&T-006 PK&T-009 PK&T.012 PK&T-013 PK&T-014 PK&T-015 PK&T-018 PK&T-021 PK&T-022 PK&T-023 PK&T-024 PK&T-025 PK&T-026 PK&T-027 PK&T-028 Priority 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 3 1 1 2 1 1 1 2002 5,000 75,000 597,600 31,000 6,031,000 250,000 850,000 68,000 15,000 7,500 20,000 10,000 100,000 200,000 1,595,500 2003 5.000 616,700 100,000 lOO,OOO 25,000 275,000 10,000 50,000 485,000 20,000 865,000 2004 457,2O0 40,000 100,000 40,000 30,000 225,000 2005 400,000 175,000 175,000 2006 495,000 1,700,000 'I,700,OO0 Total 2,798,100 6,000,000 1,900,000 100,000 200,000 31,000 8,23t,000 65,000 375,000 40,000 10,000 50,000 30,000 250,000 850,000 485,000 68,000 175,000 15,000 7,500 40,000 10,000 100,000 75,000 200,000 2,860,500 Department Sanitary Sewer Improvements San~Wy Sewec. I.C-1 San~ Sewer:. BC-2 (Podion) General Repa~s (Emergency/Unplanned) Te~wise Sewer Unes Repa~ Wnho~, mflUraUonAnflow (m) SC. ADA System Repak & Mainlenance Smgtm~ Sew= Lmpmvemeats Total Street Improvements Cenlwj Bbd. Lyman Bb'd (West C~y Limas to TH 101) B~uminous Overlay:. Lake Lucy Rd. B~uminous Overlay:. Saddlebrook Curve B~undnous Overlay:. Lake Drive/Lake Ddve East B~unfaous Overby:. Audubon Rd. E~u-.dnous Oveday: West 78th SL B~minous Ove~y: ~nnewashte Parkway Annual Street Improvement Program Street Improvements Total Surface Water Management Lake Susan Watershed Lake Riley Watershed Lake Winnewashta Watershed Bluff Ceelc Alter Exbting Ponds Bluff Creek: Alter Existing Ponds Bluff Creek: Create Stormwater Ponds Bluff Creek: Create Stermwater Ponds Lake Lucy (Lake Project) Surface Water Management Total Project~ SS-002 8S-003 8S-005 SS-006 SS.00? 8S-008 8S.009 SS-010 ST-002 ST-004 ST-005 ST-006 ST-007 ST-008 ST-O09 ST-010 ST-011 ST-012 SWIVlP-003 SWMP-004 SWMP-005 SWMP-006 SWMP-008 SWIVlP.O09 SWMP-010 SWMP-011 Priority 2002 40,000 95,000 18,000 140.000 110,000 15,000 255,000 673,000 150,000 200.000 210,000 560,000 2003 315,000 25,000 50,000 15,000 85,000 690,0O0 170,000 265,000 435,0oo 150,000 215,000 50,000 415,000 2004 370)00 125,000 275,000 4,300,000 175,000 275,000 450,000 2005 275,000 275,000 2006 285,000 285,000 Total 200,000 400,000 315,000 430.000 IO0,OO0 220,000 40,000 3,900,000 95,000 18,000 140,000 110,000 15.000 170,000 125,000 1,355,000 150,000 150,000 t75,000 200,000 210,000 215.000 275,000 50,000 1,425,000 .J Department ProjecO/ Priority Water System Improvements Well#9 W-O01 0 Well#10 W-O02 0 Well#11 W-O03 0 Wa~Tower {2MG): Lyman Blvd. W-004 0 lake R~ Trunk Ii W-005 0 Water Improvements: TH 41 W-006 0 Water Improvements: Manchester Dr. W-007 0 Water Jmprovements: Minnewashla Loop W-008 0 Water ~: BC-1 (TC&W - Lyman) W-009 0 Water Impmvemen~ Lyman, Audubon, Powers W-010 0 tNater Tmalment Plant 1 W-011 0 General Walm' System Repairs W-013 0 SCADA System Upgrades/Maintenance W-014 0 Repainting: West 76th SI. Water Tower W-015 0 Uti~ Rate Study W-017 0 Well #12 W-018 0 Water Trealment Plant II W-019 0 Water System Improvements Total 2002 2003 2004 2005 2006 Total 70,000 630,000 700,000 72,000 530,000 602,000 75,000 675,000 750,000 75,000 3,300,000 3,375,000 110,000 110,000 335,000 335,000 130,000 130,000 270,000 270,000 400,000 400,000 370,000 210,000 5~0,000 45,000 50,000 50,000 50,000 195,000 100,000 10,000 10,000 10,000 130,000 40,000 40,000 25,000 25,000 77,000 77,000 500,000 500,000 1,555,000 3,630,000 1,607,000 4,t75,000 1,252,000 12,219,000 GRAND TOTAL. 11,707,100 6,751,700 7,409,200 6,176,600 3,852,000 35,896,600 Source Capital Replacement Fund Genaal Fund Park Dedication Fund Sewer & Water Assessments Sewer & Water Expansion Fund Sewer & Water Utility Fund Slreet~nts Surface Water Utility Fund Television (Cable) Fund Youth Sports As$'n Contribution CAPITAL PLAN City of Chanhassen, MN SOURCES OF REVENUE SUMMARY 2002 thru 2006 2002 2003 2004 2005 2006 6,000,000 0 555,700 636.000 370,000 951,000 1,584,000 319,900 335,700 352,200 345,600 360.000 378,000 170,000 4,025,000 1,595,500 865.000 225,000 175,000 1,245.000 515,000 850,000 560.000 625,000 3,655,000 862,000 3,990,000 1,175,000 380,000 150,000 265,000 145,000 697,000 40.000 560,000 415,000 450,000 10,000 10,000 10,000 10,000 10,000 0 4,096,700 1,713.400 4,573,000 2,860,500 3,170,000 10,307,000 1,637,000 40,000 1,425,000 Total 11,709,100 6,751,700 7,409,200 6,176,600 3,826,000 35.872,600 CAPITAL PLAN SoDrce Bond Proceeds R~x.qxl~ RenovalJon: Roundhouse Park Bond Proceeds Total City of Chanhassen, MN PROJECTS BY FUNDING SOURCE 2002 thru 2006 Project~ Priority 2002 IVB-001 0 6,000,000 PK&T-O09 0 6,000,000 2003 2004 2005 2006 Total 6,000,000 Source ~pJtal Rephcement Fund 1001L Aedal Ladda~ Rdmbishing ~~ ~ ~4 ~ H~ F~ ~: ~ ~ ~r ~ Re~ ~~ ~: ~hl D~ T~ D~ T~ R~b~Add~~ Eq~T~ T=~ F~ 5~C ~ C~ ~ Lhe S~ Co~=R~m= G~nds~ ~0 M~er Repla~nt P~c Wo~ ~ht D~ Tm~ Bo~t S~ Tm~ for G~ds M~ Repbmment Tm~ T=~~ G~ M~r ReCreant (10') ~e 217 G~ R~ Pump~o~r~ater Tank D~e T~m Eq~t Tm~g R~ F~m and Equip~nt Bo~t T~r A~nt ~ ~ ~n~ Dem~=phic Pa~emhip We~ ~~ Re~s Reten~n S~tem F~ ~n ~2 ~ion P~r= w~ Fa~ Ex~bn' en~ ~ & ~ Storage Fadli~ F~ S~n 1 and 2 R~hi~ Capi~ Rep]ac=m=m F~d To=l Projeet~ EQ-O01 EQ-O02 EQ-O03 EQ4)05 EQ-010 EQ-011 EQ-014 EQ-015 EQ-016 EQ-017 EQ-01g EQ-021 EQ-022 EQ-023 EQ-024 EQ-025 EQ-027 EG028 EG029 EQ.030 EQ.031 EQ.033 EC ~34 EC ,-035 EC~036 EC ~037 EC ~038 EC,039 EC-042 EQ.043 EQ..045 EQ-047 EQ-048 EQ. O4g MB-O02 MB-O03 MB-OIN MB.O05 MB-O08 Priority 20O2 20.000 2,OO0 15,000 9,200 0 22,000 100,000 115,000 30,000 6,000 12,000 8,500 100,000 7'5,000 31,000 555,700 2003 10,000 100,000 1,000 15,000 10,000 252,000 68,000 5,000 0 20,000 :30,000 7,000 6,000 12.000 100,000 636,000 2004 1.000 15,000 0 24,000 140,000 15,000 113,000~ 6,000 6,000 370,000 2005 35,000 1,000 15,000 0 133,000 45.000 8,000 116,000 27i000 45,000 41,000 60,000 200,000 951,000 2006 Total 10,000 26,000 97,000 525,0OO 140,000 140,000 45,000 22,000 22,000 21,000 21,000 40,000 40,000 115,000 85,000 85,000 344°0OO 5,000 0 1,200,000 1,584,000 30,000 47,000 75,000 6,000 ~ ' 7,000 41,000 60,000 18,000 24,000 8,500 100,000 75°000 0 1,400,000 100,000 200,000 31,000 4,096,700 j Soln'ce General Fund N,~ ~ ~rpet Replacement Cantor County Community Demographic Partnership Ammal Slme~ Improvement Program General Fund Total MSA L~nan mud (West C~ UmUs to TH ~0~) Bitunlinous Overlay:. Lake Lucy Rd. Bitumlnous Overlay:. Saddlebrook Curve Bibm/nom Ovedalc. lake Orive/Lake Drive East Bituminous Oveday: Audubon Rd. Bituminous Overlay:. Coulter Blvd. Bitmnklous Overlay:. West 78th St. Bilumlncm OvedaT. Minnewashta Parkway MSA Total Park Dedication Fund Improvements: Banclimere Community Park Developmont City Center Park Playgromd Equipment: Cuny Farms Park Signage: Kerber Pond Park Improvements: Meadow Green Park Play Area: Power Hill Park Roundtxmse Renova'dorc Roundhouse Park. Trail: Whitetail Ridge Ct. to Lake Lucy Ln. Trail: Banal'mere Pa~ to Chanhassen Hills 'i'mE Hwy 101 [S. Shore Dr. to Townline Dr.) Road & Trail Reconslmc~n: Lake Ann Park Mamh Glen Trail.Connector Tree Plantings Park Shellec Bandimere Community Park Half Court Baskelball: Bandimere Heights Park Skate Park Ramp Trash Receptacles Permanent Park Benches and Tables Trail ~ Hwy 5 at Riley Creek Tra~ Connects. Hwy 5 at Bluff Creek City Center Commons Park Dedication Fund Total Project~ EQ-013 EQ-046 EQ-047 ST-012 ST-004 ST-005 ST-006 ST-007 ST-008 ST-009 ST-010 ST-011 PK&T-001 PK&T-003 PK&T-004 PK&T-005 PK&T-006 PK&T-008 PK&T-O09 PK&T-011 PK&T~012 PK&T-013 PK&T.014 PK&T-015 PK&T-018 PK&T-021 PK&T-022 PK&T-023 PK&T-024 PK&T-025 PK&T-026 PK&T-027 PK&T-028 Priority 0 0 0 0 0 0 0 0 0 0 0 0 0 2 3 1 1 2 1 1 1 2002 59,900 5,000 255,000 95,000 18,000 140,000 110,000 15,000 378,000 250,000 850,000 68,000 15,000 7,500 20,000 10,000 100,000 75,000 200,000 1,595,500 2003 65,700 5,000 265,000 170,000 170,000 25,000 275,000 10,000 50,000 485,000 20,000 865~000 2004 72,200 5,000 '275,000 352,200 125,000 4,025,000 40,000 100,000 40,000 0 30,000 0 15,000 225,000 2005 65,600 5,000 275,000 345,600 175,000 175,000 2006 70,000 5,000 285,000 Total 333,400 5,0OO 20,000 1,355,000 1,713,400 3,900,000 95,000 18,000 140,000 110,000 15,000 170,000 125,000 4,573,000 65,000 375,000 40,000 10,000 50,000 0 30,000 0 250,000 850,000 485,000 68,000 15,000 175,000 15,000 7,500 10,000 100,000 75,00O 200,000 2,860,500 Sotirc~ Sewer & Water Assessments take RkyTmnkll Water In~ TH 41 Water improvements: Manchester Dr. Water lmpmv~nents: Mlnnewashta Loop Water ~ts: ec-~ (TC&W- Lyman) Water Improvements: Lyman, Audubon, Powers Sewer & Water Assessments Total Sewer & Water Expansion Fund put~c Works FaaT~ty Expansion $CADA System Repair & Maintenance Weg#9 Wel#10 Weft#11 Wate~Tower (2MG): Lyman Blvd. Water Treatment Plant 1 Repainfin9: West 76th St, Water Tower Sewer & Water Expansion Fund Total Server & Water Utility Fund Sump Pump Inspections General Repairs (Emergency/Unplanned) Televise Sewer Lines Repair MaPles, Infiltration/Inflow (I/I) General Wata* System Repaim SC, ADA System Upgrades/Maintenance UmyRmSt~y Well#12 WaterTreatment Plant II Sewer & Water Utility Fund Total Street Assessments Centuff Blvd. Street Assessments Total Project~ SS.002 SS-(X)3 8S*004 SS.005 WOO5 W-006 W-(X)7 W-008 WOO9 W-010 MB.O03 SS..010 W-O01 W. O02 W-O03 W.O04 W-011 W-015 SS-O06 SS-O07 SS-O08 SS-009 W.013 W.014 W.017 W.018 W.019 ST-O02 Priority .0 0 0 0 0 0 0 0 0 2002 110,000 335,000 130,000 270,000 1~245,000 85,000 500,000 40,000 625,000 25,000 50,000 15,000 120,000 45,000 100,000 25,000 380,000 40,000 40,000 2003 315,000 5t5,000 85,000 70,000 3,500,000 3,655,000 25,000 50,0O0 iSoooo 10,000 150,000 2004 400,000 370.000 85,000 630,000 72.000 75,000 862,000 25,000 60,000 120,000 50,00O 10,000 265,000 2005 210,000 560,000 530,OOO 75,000 3,300,000 3,990,000 25,000 60,000 50,000 10,000 145,000 2006 675,000 1,175,000 77.000 500,000 697,000 Total 200.000 400.000 315,000 430.000 110.000 335.000 130.000 270.000 400.000 580.000 500.000 340.000 700.000 602.000 750.000 3.375.000 4,000,000 40,000 10,307,000 195.000 130.000 25,000 77.000 500.000 1,637,000 40,000 40,000 SOUl*Ce Surface Water Utility Fund lake Susan Walefshed lakeWbmewashla Watel~ed Buff Cmelc Alter Exisling Prods Bluff Claek: ~ ExislJng Ponds Bluff Creek: Create Stormwater Ponds ~U~ C~ek: Create Stormw~ Ponds Water Utility Fund Total Project~ SWMP.003 SWI~.004 SWMP-005 SWMP-006 SWMP.008 SWMP-009 SWMP-010 SWMP.011 Priority 2002 150,000 200,000 210,000 2003 150,000 215,000 415,000 2004 175,000 275,000 450,000 2005 2006 Total 150,000 150,000 175,000 2(X),O00 210,000 215,000 275,000 50,000 1,425,000 Television (Cable) Fund Audio/Visual Equipment Television (Cable) Fund Total Youth Sports Ass'n Contribution Improvements: Bandimere Community Park Youth Sports Ass'n Contribution Total EQ.026 PK&T-001 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 50,000 50,000 GRAND TOTAL 11,709,100 6,751,700 7,409,200 ' 6,176,600 3,826,000 35,872,600 CAPITAL PLAN City of Chanhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 Department Major Equipment 100E Aerial Ladder Refulbishing Boet/Traaer/Molor R~mment Fke Dept.: 800 MHz Radio System Fire Dept.: Thermal Rescue Device Fire Dept.: 13/4 Inch Hose Fire Dept.: Laptop Computers Fire Oept~ PPE (Turnout/Helmets) Fire Dept.: Cascade System Air Bottle Refill Computer Purchases/Upgrades Telecemmun'~ation Purchases/Uixjrades Commune/Dev.: Light Duty Trucks Dump/Plow Truck Replacements/Additions V'~ratory Roll Packer Equipment Tra~rs TarKet~e Ford 555C Backhoe Crack Sealer Line Slriper Audio/7'mual Equipment Cop~ Rep~:ements Grotmdsmaster 580 Mower Replacement P~:~lic World. Light Duty Tracks Bobcat Snow Blower Bobcat Grounds Mower Replacement Tractor Tractor Boom Trailer Grounds Moea~ Replacement (10') Upgrade 217 Grass Rig Pump/Motor/Water Tank Dive Team Equipment  l!a~raining Room Furniture and Equipment 3obcat Trencher Attachment Project// Priority 2002 2003 2004 2005 EQ-O01 0 35,000 EQ-O02 0 10,000 EQ-O03 0 100,000 50,000 EQ-005 0 20,000 EQ-007 0 2,000 1,000 1,000 1,000 EQ-009 0 EQ-010 0 15,000 15,000 15,000 15,000 EQ-011 0 9,200 EQ-013 0 59,900 65,700 72,200 65,600 EQ-014 0 0 10,000 0 0 EQ-015 0 22,000 24,000 25,000 EQ-016 0 252,000 140,000 133,000 EQ-017 0 EQ-019 0 45,000 EQ-021 0 EQ-022 0 EQ-023 0 68,000 EQ-024 0 EQ-025 0 8,000 EQ-026 0 10.000 10,000 10,000 '10,000 EQ-027 0 100,000 15,000 EQ-028 0 EQ-029 0 113,000 113,000 116,000 EQ-030 0 5,000 EQ-033 0 30,000 EQ-034 0 20,000 27,000 EQ-035 0 30,000 45,OO0 EQ-036 0 6,000 EQ-037 0 7,000 EQ-038 0 41,000 EQ-039 0 60,000 EQ-042 0 6,000 6,000 6,000 EQ-043 0 12,000 12,000 EQ-045 4 8,500 2006 50,000 70,000 52 ,OOO 140,000 22,000 21,000 40,000 10,000 85,000 Total 35,000 10,000 150,000 20,000 5,000 50,000 60,000 9,200 333,400 10,000 123,000 525,OO0 140,000 45,000 22,000 21,000 68,000 40,000 8,000 50,000 115,000 85,000 342,000 5,000 30,000 47,000 75,000 6,000 7,0O0 41,000 80,000 18,000 24,000 8,5O0 Department Recreation Center Carpet Replacement Can~ ~ C,a~mun~y Oemograph~: Partnmh~ Web.Enabled Soflmm Com~ Records Retention System Major Equipment Total Project~ E(~046 E(~047 EC~048 E0-049 Priority 3 0 0 0 2002 ?~o000 2003 616,700 2004 $,000 2005 5,000 631,600 2006 5,000 495,000 Totnl 5,000 30,000 100,000 '- GRANDTOTAL 616,700 495,000 2,798,100 CAPITAL PLAN City of Chanhsssen, MN Project# EQ-001 P~ojm ~me 100ft. Aerial Ladder Refurbishing 2002 thru 2006 Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a ~s~on I This project, scheduled for halfway through thc expected life of the vehicle, includes repainting thc truck and ladder, adding new step grips on each ladder step, npgrading the pump to handle 2000 gallons per minute and class A foam, replacing tires, axels and suspension systems, adding a second master stream and adding SCBA to thc Officer's seat. (1989 Simon LTl) 'Justification ] This vehicle is expected to last 30 years. The recommended refurbishment will keep the ladder viable, functional and safe on the road as well as in the air. The project is consistent with the City Vehicle replacement schedule and advice from fleet maintenance. Leave as is - no changes for 2002. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 35,000 35,000 Total 35,000 35,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 35,000 35,000 Total 35,000 35,000 ~Operational Impact/Other ~_ ~egligible additional operating costs are anticipated. CAPITAL PLAN City of Chsnha.~sen, MN irr°Jm# EQ-002 · rrojectlqame Boat/Trailer/Motor Replacement 2002 thru 2OO6 Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a .'Involves a_dd_,_'ng a dive/rescue boat, trailer and motor. This wntercra~ is the primmy response unit for dive-related emergencies in the lakes and the Minnesota River. tt is used to transport rescuers and remove victims in near-drowning and drowning incidents, for fast water rescues in the Minnesota River, recovery activitim~ dice tom suppo~ ac~ss to fllooded areas during high water emerg~ci~s, 'The dive tmun needs a boat for their operations. NOTE: Fin~ Department recommends moving up schedule from 2003 at $10,000.00 to 2002. Justification - in water-related fatalities in year ending 2000 and 2001, :the Fire Departnm~ has initiated aggressive restructuring, training and certifying new divers. By year's end the Fire Department will lmve 15 certified divers. Part of the equipment fora safe dive operation is adding a zodiak boat, new motor and trailer. The estimated cost is $10,000.00 Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 10,000 10,000 Total 10,000 10,000 erafional Impact/Other ] igible additional °perati~,-~osts are anticipated. CAPITAL PLAN 2002 thru City of Chanhassen, MN ! Projea# EQ-003 . Project Name Fire Dept.: 800 MHz Radio System -- 2006 Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a Dcs~ption l Involves changing thc Fire Department radios to 800 mHz when Carver County makes its county-wide conversion. The existing system will begin to be phased out in 200.2, continuing ~hrough 2004. Justification The new system should improve radio coverage and provide additional channels for operations. It allows the Fire Department to continue to use the Carver County Communications Center. Carver County is migrating to a new radio/communication platform. This will improve inter-agency communication, radio performance and funaiom~ity. This one time expense is projected at $150,000.00 to convert thc existing radio system to 800 mhz. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 100,000 50,000 150,000 Total 100,000 50,000 150,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 100,000 50,000 150,000 Tot~] 100,000 50,000 150,000 I Operational tmpacCOther o additional optxating costs are anticipated. i CAPITAL PLAN 2002 City of Chonh~ssen, ~ ! rrojea# EQ-O0$ ! rrojm Nam Fire Dept.: Thermal Rescue Device thru 2OO6 Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a Involves purchasing one thermal imaging rescue device over a 3-year period (2000-2002). These devices are used by firefighters while searching for victims inside of the building during a structure fire. Thc device enables thc firefighter to see clearly while navigating a dark smoke-filled structure using infrared technology. Without this technology, firefighters are subject to dangerous zero-visibility conditions. This technolqgy will speed up fn~efighting operations significantly. Account ~400-~102-4705 Justification [ This project will erdmnce firefighter safety significantly, improve firefighting operations and allow for fast and safe victim searches. This is consistent with the City's risk manageme~ policy. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 40,000 ] Maintenance Equipment 20,000 ~0,000 Total Total ~o,000 ~o,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total i 40,000 ] Capital Replacement Fund . 20,000 20,000 Total Total ~o,o0o ~o,ooo Operational Impact/Other _ [ iThis t~roject may lower payroll expenses for paid on-call staffas a result of improved and more efficient fire fighting operations. CAPITAL PLAN 2002 thru 2006 City of Chsnhessen, MN ! rrojec~ # EQ-007 i rroject ~ame Fire Dept.: 1 3/4 Inch Hose Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a Description Involves replacing the existing I 1/2" hose with a 1 3/4" hose. This hose is connected to the fire trucks and is used by the firefighters to extinguish fire. There are 2 .trucks remaining that need this conversion - one truck will be convened in 2000. Account ~400=4104-4705 Justification [ Th~ existing hose is over 15 years old. The larger hose allows for significant improvement in water flow, which in turn, enhances firefighting capabilities. NOTE: $2000.00 to replace hose damaged due to firefighting. Prior Expenditures 2002 2003 2004 2005 2006 Total [ 5.500 [ Maintenance Equipment 2,000 1,000 1,000 1,000 5,000 Total Total 2,000 1,000 1,000 1,000 5,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total I 5,500 ] Capital Replacement Fund 2,000 1,000 1,000 1,000 5,000 Total Total 2,000 1,000 1,000 1,000 5,000 ;Operational Impact/Other tNo additional operating costs are anticipated. t CAPITAL PLAN 2002 t/~ 2006 Contact City of Chanhassen, MN Department Major Equipment ! rroject # EQ-009 Type Equipment ~ Useful Life i Project Name Fire Dept.: Laptop Computers ] _ ~ Category Office Equipment Priority n/a Description [ Involves installing laptops in all front-line vehicles to ennble responding personnel to access building pre-plans, hazardous materials data, hydrant and other utility maps, address locations, etc. Pre-Plans and Address Locations are planned for 2006 and defer remainder to 2006. Justification [ The project will enhance Fire Department operations, allowing for increased safety as a result of easy access to important information. It will also make it easier to lind best routes and/or alternative routes when responding to emergencies. Expenditures 2002 2003 2004 2005 2006 Total Office Equipment 50,000 50,000 Total ~0,00o ~0,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 50,000 50,000 Total 50,00o ~0,000 '~perational Impact/Other --] :No additional operating costs are anticipated. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN ~ i S"oJm# EQ-010 i rrojmName Fire Dept.: PPE (Turnout/Helmets) Contact Department Major Equipment Type Equipment Useful Life Category Fire Equipment Priority n/a Description I Replaeemmt of 3-5 sets per year as a result of damage received from firefighting activities. The City will also provide new members with new gear after they exanpl~ their probationmy periOd. Account #400-4105-4705 Justification Turnout gear lasts approximately 5-7 y~ars on average. NOTE: Turnover/retirement have made it necessary to add more firefighters. Instead of adding five to six we are now adding eight to nine additional per year. Additional new turnout gear needs to be ordered to replace damaged or worn out equipment. Cost of equipping one new firefighter is approximately $1500.00. Prior Total Expenditures Maintenance Equipment Total 2002 15,000 2003 15,000 2004 15,000 15,000 2005 15,000 2006 Total 60,000 60,000 Prior Funding Sources [ . 20.000 ] Capital Replacement Fund ~ Total Total 2002 15,000 15,000 2003 15,000 15,000 2004 15,000 2005 15,000 2006 Total 60,000 so,ooo '"Operational Impact/Other ~1o additional operating costs are anticipated. CAPITAL PLAN 2002 t/~ City of Chanhassen, MN i r~o~m # EQ-011 i rro~eetNarFire Dept.: Cascade System Air Bottle Refill 2006 Contact Department Major £quipment Type Equipment Useful Life Category Fire Equipment Priority n/a Description I The Cascade System is used to refill the SCBA (air packs) used by firefighters. The system is used fi~quently and it is anticipated that it will need to be refurbished in 2002. Justification 1) $6,000.00 needed for OSHA required blast containment system for filling air bottles (both firefighting and SCUBA tanks). ,2) Aerial truck lncathing air tnnks and piping need to increase from our old 2500 psi breathing air system to our current 4500 psi. This wOuld involve installing new high pressured air lines and tanks - $1200.00. =3) Add additional breal~ing masks for new fireflghters - 52000.00. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 9,200 9.200 Total 9,2O0 9,2O0 -Funding Sources 2002 2003 Capital Replacement Fund. 9,200 .' Total 9~0 2004 2005 2006' Total 9,200 9~,oo l Operational Impact/Other ~ additional operating costs are anticipated. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN EQ-013 - ~ r~oim s,-~ Computer Purchases/Upgrades Contact Department Major Equipment Type Equipment Useful Life Category Office Equipment Priority n/a D~scripfion j Funds the purchase ofreplacemcflt PCs, local nrea network equipment, network and local printers, peripheral hardware and all network and common-user soRware. Th~ mplamment schedule was reviewed by thc I.T. Task Force and is subject to modificntion by the City Manager and Department Heads. Account #101-1160-4703 Jus~on Thc replacement schedule for this equipment is based on thc following useful life expectancies: 3-5 years -- PCs, netwo~ servers 4-5 years - network printms Budgeting and purchasing PCs through this project allows the City greater flexibility to direct equipment to where it is needed most, rather than using individual .budgcts. Prior Expenditures 2002 2003 2004 2005 2006 Total ! 164,500 [ Office Equipment 59,900 65,700 72,200 65,600 70,000 333,400 Total Total 59,900 65,700 72,200 65,600 70,000 333,400 Prior Funding Sources 2002 2003 2004 2005 2006 Total ] 78,100 ] General Fund 59,900 65,700 72,200 65,600 70,000 333,400 Total Total 59,900 65,700 72,200 65,600 70,000 333,400 Operational Impact/Other o additional operating costs arc anticipated. CAPITAL PLAN 2002 ~h., 2006 City of Chanha.sen, MN r rroj=t # EQ-O 14 ~i Project ~ame Telecommunication Purchases/Upgrades Contact Department Major Equipment Type Equipment Useful Life Category Office Equipment Priority n/a ~ Des~ption [ This pmjozt funds expansion of the City Hall telephone system to thc new Library. Justification 1 There will be a need to provide telephones to the new Library building. This will fund the equipment and connections necessary to allow phone ~ervice using the recently installed phone switch in City Hall. Prior Expenditures 2002 2003 2004 2005 2006 Total [ 233,000 ] Office Equipment 0 10,000 0 0 10,000 Total Total 0 10,000 0 0 t0,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total ] 233,000 ] Capital Replacement Fund 0 10,000 0 0 10,000 Total Total 0. 10,000 0 0 10,000 i ~erafional Impact/Other . CAPITAL PLAN 2002 t/~u 2006 City of Ch~mhassen, MN rrojm# EQ-015 r~oj~t~,me Community Dev.: Light Duty Trucks Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a Description { Provides for scheduled replacements, starting in 2001. These purchases are consistent with thc Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to accommodate the time frames established by Hennepin County and thc State of Minesota Cooperative Purchasing Program. Accoum ~400.4107-4704 Justiflcatioll { Th~se vehick~ am used to provide building inspection s~vic~s throughou! the community. The average rep{acemeni age is 10 y~ars. Prior Expenditures 2002 2003 2004 2005 2006 { 21.000 ] Maintenance Equipment 22.000 24.000 25.000 52,000 Total Total 22,000 24,000 25,000 52,000 Prior Funding Sources 2002 2003 2004 2005 2006 ] 21.000 { Capital Replacement Fund 22,000 24.000 25.000 26,000 Total Total 22,000 24,000 25.000 26,000 .. Total Future ~23,000I 55,o0o I 123,000 Total Total 97.000 · 97,000 ::~pe_rational Impact/Other ___j_ These purchases will include a limited warranty and will reduce thc annual maintenance and repair costs as compared to thc vehicles replaced. CAPITAL PLAN 2002 tier. 2006 City of Chanhassen, MN i ~roje~ # EQ-O 16 i Proim~lme Dump/Plow Truck Replacements/Additions Cont,,ct Department Major Equipment Type Equipment Useful Life Category Street Equipment Priority n/a I Description ] These purchases anticil~tC 5 scheduled replacements and 2 additional dump trucks in thc City's inventory. Costs include chassis, dump box. hydraulic system, 'snow wing, snow plow and sander. Truck chassis costs ate higher due to new federal mandated anti-lock braking requirements effective since 2000. These vehicles are purchased using either t~ Hennepin County or State oflVlN cooperative bid systems. Orders for truck chassis are typically required to be placed up to one year in advance ofdelivery. Account ~8400-4108-4704 'Justification ] These vehicles are used to provide a variety of maintenance services throughout thc community including winjter emergency response for plowing and hauling snow. The average replacement age is 16.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the community creates an additional plow route approximately every 3 years. The truck scheduled for replacement in 2000 is a 1984 model (57,000 miles). Due to this truck's current value of $$,000, it will be kept in the fleet ns a backup. These vehicle purchases are consistent with the Vehicle Replacement Schedule. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 233,000] Vehicles 252,000 140,000 133,000 525.000 Total Total 252,000 140,000 133,000 Prior ' Funding Sources 2002 2003 2004 2005 2006 Total j 233,000 ] Capital Replacement Fund 252,000 140,000 133,000 525,000 Total Total 252,000 140,000 133,000 525,000 . ~O~ational Imp_act/Other [ These purchases will include a limited warranty and will reduce the nnnual maintenance and repair costs as compared to the vehicles replaced. : J CAPITAL PLAN 2002 thru 2006 City of Chsnhnnsen, MN : ~ ~ r~ojm# EQ-017 i r roject~ameStreet Sweeper 1Descripti°n 1 This project replaces the 1992 Athey Sweeper which is used to clean streets each spring and fall. Contact Department Type Useful Life Category Priority Major Equipment Equipment 8 Years Street Equipment n/a This unit is subject to heavy dust and din infiltration and needs regular maintenance to continue in running condition. Expenditures Vehicles Total 2002 2003 2004 2005 2006 Total 140,000 140,000 140,000 140,000 Funding Sources Capital Replacement Fund Total 20O2 2003 2004 2005 2006 Total 140,000 140,000 140,000 140,000 'Operational Impact/Other CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN Projm # EQ-019 ............................. ~ · r~ject Name Vibratory Roll Packer Contact Department Major Equipment Type Equipment Useful Life Category Street Equipment Priority n/a Description i Purchase is acheduled to replace the 1987 Rosco Vibratory Roll Packer. The purchase is consistent with the Vehicle Replacement Schedule (lst Quarter of 2002). Justification I This machin~ is used extensively in the patching and overlaying of City streets. Thc existing unit will be 15 years old. Expenditures 2002 2003 2004 2005 Vehicles 45,000 Total 45,000 2006 Total 45.000 45,000 Fund ing Sou rces 2002 2003 2004 2005 Capital Replacement Fund 45.000 Total 45,000 2006 Total ' 45,000 45,000 !Ope, rational Imp~c--~0-~h-er~ .......... -~ ,,t~is purchas~ will include a limited warranty and will reduce the annual maintenance and repair costs as compared to thc machine replaced. CAPITAL PLAN 2002 t/~ru 2006 City of Chtmhassen, MN , r~ojett# EQ-021 i rroject Name Equipment Trailers Description I Provides for replacement of an existing and and addition of a 20,000 lb (10 ton) capacity tandem axle trailer. Fund #400-0000-4705 Contact Department Major Equipment Type Equipment Useful Life Category. Street Equipment Priority n/a Justificnfion ] These trailers me used extensively in the paving operation to transport thc paver machine, roll packer and bobcat to each job site. The existing trailer is 20 yem's old and cannot haul all of thc equipment together. This is consistent with the Vchicle Replacement Schedule. Prior Expenditures 2002 2003 2004 2005 2006 Total [ 20,000 [ Maintenance Equipment 22,000 22,000 Total Total 22,000 22,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total ] 20,000 J Capital Replacement Fund 22,000 22,000 -Total Tot~! 22,000 22,000 !Operational Im_pact/Othe_[r_.._..__J ~oth purchases include a limited warranty. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i r~'oiect # EQ-022 , rrojm~ame Tar Kettle Contact Department Major Equipment Type Equipment Useful Life Category Street Equipment Priority n/a !Description I Provides for replacement of thc existing tar kettle. Justification ] Thc existing tar kettle is used extensively in the pavement maintenance operations. Duc to thc nature of its usc, the life cxpectency is approximately 5-6 years. This is consistent with the Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 21,000 21,000 Total 21,000 21,000 Funding Sources' 2002 2003 2004 2005 2006 Total. Capital Replacement Fund 21,000 21,000 Total 21,000 21,000 ~ Operational Impact/Other I !This purchase will include a limited warranty and will eliminate an expensive overhaul on thc existing unit. CAPITAL PLAN 2002 thru 2006 City of Chavhassen, MN ! rrojm# EQ-023 e~amt Ford 555C Backhoe Dcscr~tion ] · J~ovid~s fo~ th~ r~placement of an existing 1989 Tractor Backhoe. Contact Department Major Equipment Type Equipment Useful Life Categ°ry Priority n/a Justification I The Iractor backhoe is used extensively in maintenance operations. The existing machine currently has 2,300 hours of usage and will be nearly 15 years old at the lime of scheduled replacement. This is consistent with the Equipment Replacement Schedule. Expenditures 2002 2003 Maintenance Equipment 68,000 Total 68,000 2004 2005 2006 Total 68,000 68,000 Funding Sources 2002 2003 Capital Replacement Fund 68,000 Total 68,000 2004 2005 2006 Total 68,000 68,000 i Operational Impac~Other !This purcha~ will include a limited warranty and will reduce thc annual maintenance and repair costs as compared to the machine replaced. CAPITAL PLAN 2002 ~/,n, 2006 City of Chanhassen, MN ti' r~m # EQ-024 ..................................................................................................................................... ~ rrojett Naine Crack Sealer Contact Department Type Useful Life Category Priority Major Equipment Equipment n/a Description [ Pn)v~ fro' thc replacement ofnn existing crack senling machine. The crack sealer is used extensively in the pavement maintenance operations. Due to the nature of its use, the life expectency is approximately 6-8 years. This is ~xmsincnt ~ the Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 40,000 40,000 Total 40,0OO 40,oo0 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 40,000 40,000 Total 40,000 4o,ooo ~OPerafi_onal Impact/Other ] ;This pmchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to thc existing uniL , , CAPITAL PLAN 2002 tl~ru 2006 City of Chanhassen, MN I r~jt~ # EQ-025 i rroject Name Line Striper Provides for the replacement of an existing line-striping machine. Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a Justification I This machine is used to paint pavement mm-kings and stripe lanes on roads. This purchase will ensure timely and reliable pavement marking operations. It is consistent with thc Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 8,000 8,000 Total 8,000 8,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund - 8,000 8,000 Total 8,000 ' .8,ooo · : Operational Imp This purchase will include a limited warranty. i CAPITAL PLAN City of Chanha.~sen, MN irroleot # EQ-026 Project.the Aud____i_o..._/~_i_sual Equipment 2002 thru 2006 Contact Department Type Useful Life Category Priority Major Equipment Equipment n/a Description Provides for fl~c systematic maintenance and upgrading ofaudio/visual equipment. Replacement will occur in thc 1st Quarter of 2003. Accotmt g210-0000=4705 Justification [ The original A/V equipment was purchased in 1989, with thc remainder purchased in 1994. This project calls for thc systematic maintenance and upgrading ofthe A/V equipmenl and additional equipment as new technolog~ develops. Potential projects include: replacement of equipment including, but not limited to, replacing Ihe spotlight system in the Council Chambers and staffmicrophones. The~e replacements will ensure thc quality of official City meetings and video productions. ! Prior Expenditures 2002 2003 2004 2005 2006 Total ] 20,000 ] Maintenance Equipment 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Prior Funding Sources 2002 2003 2004 2005 2006 'Total - [ 20,000 ] Television (Cable) Fund 10,000 ' 10,000 10,000 10,000 .. 10,000. 50,000 Total Total 10,000 10,000 10,000 10,000 ~ .10,000 50,000' :Operational Impact/Other i ;This purchase will include a limited warranty. CAPITAL PLAN 2002 thru 2006 City of Ch nho. sen, MN irr°jeet # EQ-027 i Project Name Copier Replacements Contact Department Major Equipment Type Equipment Useful Life Category Priority tVa Description ] Provides for the purchase ofreplacement copiers for all City departments. The copiers will be evaluated each year and replaced as necessary. The manufacturers have stopped making replacement parts for some copiers in our inventory, so they will need to be replaced if parts availability becomes problematic. Account g400-4109-4703 ' Justifi~on I 'The project will replace copiers as they become obsolete or maintenance costs escalate to unacceptable levels. The manufacturers have stopped making replacement parts for some copiers in our inventory, so they will need to be replaced if parts availability becomes problematic. Copiers are genearlly replaced on a 7 year schedule. The 2000 budget will replace one of the five copiers located in various City departments. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 12,000 [ Maintenance Equipment 100,000 15,000 115,000 Total Total 100,000 15,000 115,000 Prior Funding Sources 2002 2003 2004 2005 i 12,000 J Capital Replacement Fund 100,000 15,000 To tal Total 100,000 · 15,000 2006 Total 115,000 115,000 Operational Impact/Other t ~These purchases will decrease annual maintenance costs because equipment is generally more reliable than earlier models. CAPITAL PLAN 2002 thru 2006 City of Chs,hassen, MN I ] Project # EQ-028 I rrojt~ Name Groundsmaster 580 Mower Replacement Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a 1 Description [ Provides far I addigon io and I replac~n~nt oran existing Toro 580, 15 foot, high volume grounds mower. ~ccotmt ft400-00(R}~705 Justification [ The City cm'rently has 3 high-production grounds mowers that cut a 15' pass. Each machine is used daily during the growing season and takes the place of 2 1/2 smaller machines used by the City. Due Io additional park development, an additional high-~Aoacity machine is needed. The oldest machine is scheduled to he replaced in 2002. This is consistent with the Equipment Replacement Schedule. Prior Expenditures 2002 2003 2004 2005 2006 Total I 72.042 ! Maintenance Equipment I~,,000 85.000 Total TOtal eS,ooo 85,ooo Prior Fundin~g Sources ! ?2,042 [ Cap~l Replacement Fund ToL~I Total 2002 2003 2004 2005 2006 Totni 85,000 85,000 85,000 85,000. Operational Impact/Other iThis purchase will include n limited warranty and reduce maintenance and repair expenses as compared to the unit replaced. Also, eac-~ o£these machines takes th-~--~ ~]ace of 2 1/2 smaller machines and makes thc mowing operation i 50% more efficient. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN ~ir~jm # EQ-029 i Project Name Public Works: Light Duty Trucks Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a Provides for 16 scheduled replacement Public Works light duty tracks, some with plows. Replacement units are generally purchased early in the year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program. l Justification These vehicles are used to provide a variety of services throughout the community. The average replacement age is 14 years. The additional trucks are required to meetgrowth needs in the maintenance operations. These purchases are consistent with the Vehicle Replacement Program. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 113.000 113,000 116,000 , 342.000 Total 113,000 113,000 116,000 342,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 115,000 113,000 116,000 344.000 Total 115,000 113,000 t16,000 344,000 ~-Operational Impact/Other purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced. City of Chanha.~sen, MN ~ rroj~# EQ-030 i rroject ~ne Bobcat Snow Blower 2002 tl~ 2006 Contact Department Type Useful Life Category Priority Major Equipment Equipment n/a Description Provides f~ replacmnem of an existing Bobcat Snow Blower. l,,stific~on [ ,The existing unit will be 15 years old and is at the end of its useful life. Rebuilding is not cost effective. This purchase is consistent wilh the Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 5,000 5,000 Total 5,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 5,000 5,000 Tot. il 5,000 5,000 ;-~perational lmpnct/Other [ ~'~his purchase will include ~ l-i-mited warranty and will reduce the annual maintennnce and repair costs ns compared to thc existing unit 2002 ~h,.u 2006 CAPITAL PLAN Contact City of Char~hessen, MN Department Major Equipment i Type Equipment rrojm # EQ-033 ! Useful Life · rroject Name Bobcat ~ Category Priority n/a Description ] Provides for replacanent of an existing 1994 model Park Maintenance Dept. bobcaL Justification ] The existing bobcai will be 8 years old in 2002, with an estimated 2,750 hours of usage and a major overhaul is needed. Improvements to the design mean that if is ~ operationally to purchas~ a new machine rather than overhauling the old. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 30,000 30,000 Total 3o,ooo 3o,ooo Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 30,000 30,000 Total 30,000 30,000 !~Operational Impa__ct/Other j ,This parehas~ will include a warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. -- Operating Budget Impact 2002 2003 2004 2005 2006 Maintenance 2,000 Total 2,ooo Total 2,000 2,000 CAPITAL PLAN 2002 City of Chanhassen, MN ! Project# EQ-034 ' rro]m~ame Grounds Mower Replacement thru 2006 Contact Department Major Equipment Type Equipment Useful Life Category Priority tva Description ] ,Provides for replacement of 4 existing lawn mowers over five years. Justification With the amount of parkland growing each year, there is increased wear and tear on the City's lawn mowers. They are 12-16 years old and are not dependable. Rebuilding is not cost effective. This is consistent with the Equipment Replacement Schedule. Prior Expenditures 2002 2003 2004 2005 2006 Total [ 18,452 ] Maintenance Equipment 20,000 27,000 47,000 Total Total 20,000 27,000 47,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total ] 20,000 [ Capital Replacement Fund 20,000 27,000 47,000 Total Total 20,000 27,000 47,000 i Operational Impact/Other ]This~ purchase will include a limite'~ warranty and will-reduce the annual maintenance and repair costs as compared to the existing unit. CAPITAL PLAN 2002 # ru 2006 City of Chsnha. sen, MN iPrOjf~t # EQ=035 ! Projetl Name Tractor Contact Department Type Useful Life Category Priority Major Equipment Equipment n/a !Description ] ,Provides for r~placen~nt of 3 existing tractors over a five year period. Account #400-4111-4705 Justifiaation [ 2000: unit is 2'/years dig with an estimated 4,500 hours of usage. It is used for a variety of Park Maintenance activities, including fertilizing, spraying, grading, ¢~. The new unit will be used for sweeping skating rinks. THIS WILL BE DELAYED UNTIL 2001 NOR A SIGNIFICANTLY REDESIGNED MODEL. 2002: Unit is 52 years old. it is smaller, used for seeding parks, raking beaches, grading and ballfield maintenance. 2003: Unit is 16 years old and is not dependable. Rebuilding is not cost effective. It is used for sweeping rinks and trails, grading/leveling parks, fertilizing and IThis project is consistent with the Equipment Replacement Schedule. Prior Expenditures 2002 2003 2004 2005 2006 Total { 43,900 ] Maintenance Equipment 30,000 45,000 75,000 To la ! Tota I 30,000 45,000 75,000 Prior I Total Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 30,000 45,000 75,000 ToNI 30,000 45,000 75,000 ',?_perational Impact/Other This pun:base will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. .-- CAPITAL PLAN Contsct City of Chanhassen, MN Department Major Equipment ipr°ira # EQ-036 Type Equipment i Useful Life Project Name TFactor Boom .......... Category Priority n/a 2002 thru 2006 I Descripti°n I .Prov/des for replacement of a Tractor Broom and head for the Ford tractor. Justification I Thc sweeper broom for thc tractor is used extensively in thc street sweeping operation and typically has a useful life of 7-8 years. This is consistent with thc Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 6,000 6,000 Total 6,000 6,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund - 6,000 6,000 Total 6,000 6,000 o ~_Op~rafional Impact/Other :This purchase will not increase maintenance and repair cxpcnscs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i~r~J~# EQ-037 ...................... ir~°Jm"ame Tra?.r___ Description ] Provides for addition ora trailer to the existing Park inventory. Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a Justification [ Trailer is needed io Iranspon medium-sized mowers to neighborhood parks. This is consistent with the Equipment Replacement Schedule. Expend itu res 2002 2003 2 004 Maintenance Equipment 7,000 Total ' 7,000 2005 2006 Total 7,000 7,000 Funding Sources 2002. 2003 Capital Replacement Fund 7,000 Total 7,000 2004 2005 2006 Total 7,000 7,000 i. Operational hnpact/Other ;Thc purchase will include a limited warrnnty. CAPITAL PLAN 2002 thru 2006 City of Cha~hassen, MN erojm# EQ-038 Proje~ Name Grounds Mower Replacement (10') Contact Department Major Equipment Type Equipment Useful Life Category Priority n/a Description [ Provides for addition ora i (}' high-volume grounds mower. Jnsfificafion J The increas~ of parkland has warranted the use ora mid-sized mower that can be transported to parks that are too far for the large mowers to drive. This is consistent with the Equipment Replacement Schedule. Expenditures 2002 2003 2004 2005 2006 Totni Maintenance Equipment 41,000 41.000 Total 41,000 41,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 41,000 41,000 Total 41,000 41,000 Ii Operational Impact/Other ~ machine would replace thc transporting of 2 smaller mowers to smaller neighborhood parks and reduce mowing time. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i~,'~, rroj~# E0-039 . Project Name Upgrade 217 Grass Rig Pump/Motor/Water Tank Contact Department Major Equipment Type Equipment Useful Life Category. Equipment Priority n/a Description ] Grass rig/rescue truck #217 is a 1977 Ford pickup. This truck mas as a backup rescue, grass fire rig, hose hauler, and utility truck and runs well. For its limited use it se~ves its propose, but it will be 28 years old upon replacement. 'Account #400-~! 12-4705 Justification Upgrading thc grass fire fighting capabilitcs with a new tank, pump, nnd pump motor to foam capabilities will enhance fir~ extinguishment. The new pump a.~-rnbly will be built as a "slide in" unit, so it could be utilitzed in a future Uuck. With these enhancements, a replacement may be pushed out for five years. Prior I 8,soo I Total Expenditures Maintenance Equipment Total 2002 2003 2004 2005 60,000 60,000 2006 Total 60,000 60,000 Prior Funding Sources [ . 8,500 ] Capital Replacement Fund - Total Total 'Operational Impact/6~-~r .......... 2002 2003 2004 2005 60,000 60,000 2006 Total 60,000 60,000 CAPITAL PLAN 2002 City of Chaphassen, MN r~o~m # EQ-042 rrojm Nme Dive Team Equipment .- 2006 Contact Department Major Equipment Type Improvement Useful Life Category Priority n/a Description [ Thc Chanhassm Fire Department Dive Team is continuing its improvement of equipment on the dive team. In order to fully outfit thc dive team additional equipment n__~ed_s to be purchased. The equipment would I~ drysuits, Aga full-face piece with communications, communication rope and control box, and safety back-up air bottle. Justification ] This equipment will keep thc dive team in compliance with National fire Protection Association (NFPA) and Occupational Safety ande Health Administration )OSHA) standards. This equipment will allow the dive team to safely respond to ice-related/winter water hazards. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 6,000 6,000 6,000 18,000 Total 6,000 ' 6,000 6,000 ' ' 18,000 Funding Sources 2002 Capital Replacement Fund. 6,000 Total 6,000 2003 2004 2005 2006 Total 6,000 6,000 .. 18,000 6,000 6;000 18,000 · Operational hnpact/Other CAPITAL PLAN 2002 thru 2006 City of Char~hassen, MN i troll# EQ-043 i rrolm~m~ Training Room Furniture and Equipment ! Contact Department Major Equipmmt Type Improvement Useful Life Category Priority n/a }Description ] The tables and chairs in the training room at the fire station are in dire need of replacement. This is the original training room furniture. Most of thc chairs are missing parts and the tables are falling apart. This project would include updating the training equipment in the room. We would like to add a fixed multi-media projector and overhead projector. Justification I T~ current furniture needs replacement and is not good for training. Thc room is highly used by the fire department. The current furniture is over 30 years old. Expenditures Maintenance Equipment Total 2002 12,000 2003 12o000 12,000 2004 2005 2006 Total 24,000 24,000 Funding Sources Capital Replacement Fund Total 2002 12,000 12,000 2003 12,000 2004 2005 2006 Total 24,000 24,000 !-~perational ImpacffOther CAPITAL PLAN 2002 thru 2006 City of Chenha.~sen, ~ : r~ojm# EQ-045 · ~ Project Name Bobcat Trencher Attachment Contact Department Major Equipment Type Equipment Useful Life Category Equipment Priority 4 Less Important !Description [ IThis is a new Iool that will attach to the new Bobcat to allow city crews Io perform trenching. The current process is to rent a trencher to replace drain tile and help with mility work when necessary. This purehnse will eliminate the time lag and staff effort neccssnry to loc. me and pick up a trencher. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 8,500 8,500 Total a,soo a,soo Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 8,500 8.500 Total 8,~00 · 8,~00 ~pemtional Impact/0tl}_er } CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN Project# EQ-046 Projttt Name Recreation Center Carpet Replacement - Description { This project provides new carpet in the reception area, meeting rooms 2 and 3 and the conference room. Contact Department Type Useful Life Category Priority Major Equipment Improvement 5-10 years Buildings 3 Important Jnstification ] This carpet is six years old, stained, and ratty. Expenditures 2002 Construction/Maintenance 5,000 Total 5,000 Funding Sources 2002 General Fund 5,000 Total 5,000 2003 2004 2005 2006 2003 2004 2005 2006 Total 5,000 5,000 Total 5,000 5.000 'Operational Imp~Oc~th-~r ........ ~ CAPITAL PLAN 2002 thru 2006 City of Chenhnssen, MN r~ojm# EQ-047 Carver County Community Demographic Partner Contact Department Major Equipment Type Improvement Useful Life Category Priority n/a Description ] Demographic information for planninE community programs and services, managinE resourses and infrastructure would be available to'the city through a database that is ca=ate, d coanty-wid=. Thc database includes school districts, the county, census information, health ca~ information alonE with State of Minnesota and city the ~e includes all entities in the city, the applicaton will be the best source for studying life-cycle housing, needs assessments for transportation, senior services, park & mc programs, trends in home ownership, and resident mm-over. Expenditures 2002 2003 2004 2005 2006 Total Planning/Design 10,000 10,000 Construction/Maintenance 5,000 5,000 5,000 5,000 20,000 Total 10,000 5,000 5,000 5,000 5,000 30,000 J Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 10,000 10,000 General Fund .- 5,000 5,000 5,000 5,000 20.000 Total 10,000 5,000 5,000 5,000 5,000 30,000 CAPITAL PLAN 2002 thru 2006 Contact City of Chsnhsssen, MN Department Major Equipment · Type Improvement irroj~# EQ-048 ! UsefulLlfe5-7 years ' l'ro]ea Name Web-Enabled Software ..... ~ Category Priority n/a This project will fund new software for Finance, Park & Recreation, and Building Inspection. V Justification I New software will allow web access to pay utility bills, process recreation registrations mad apply for building permits. Thc current software is adequate for current uses but is not web-enabled. There are nagging functional issues that continue to crop up and will probably not be fixed by the vendors in a timely manner. Expenditures 2002 2003 2004 2005 2006 Total Office Equipment 100,000 100,000 Total 100,000 100,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 100,000 100,000 Total 100,000 100,000 !~Operafional Impact~_.O_ ther CAP1TAL PLAN 2002 City of Chsnhassen, MN I rroject# EQ-049 !Project Name Computerized Records Retention System thru 2006 Contact Department Type Useful Life Category Priority Major Equipment Improvement n/a Description This project will fund a system that will scan and store records on CD's, rather than relying only on paper copies. Justification This type ofsystcm will allow records to bc rctricvcd much faster than thc current method. Thc possibility of lost or misfiled records will bc reduccd. Most of these systems also have readers that allow thc records to bc viewed over thc intcmct, which will allow easier access to city records for the general public. Expenditures 2002 2003 2004 2005 2006 Total Office Equipment 75,000 75,000 Total 75,ooo 75,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital RePlacement Fund 75,000 75,000 Total 75,000 75,000 T i Operational Impact/Othe~r__. 1 Department Municipal Buildings Public Wod;s Fadlity Expansion Senior Center Expansim Endmed Salt & Sand Storage Facility Fire Stalion 1 and 2 Refu~oishing Municipal Buildings Total CAPITAL PLAN City of Charthassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 Project~ Priority MB-O01 0 UB-O03 0 MB-O04 0 MB-O05 0 MB-O08 0 2002 31,000 6,031,000 2003 100,000 t00,000 2004 2005 200,000 400,000 2006 1,700,000 1,700,000 Total 6,000,000 1,900,000 100,000 200,000 31,000 8,231,000 GRAND TOTAL 6,031,000 100,000 4O0,000 1,700,000 8,231,000 CAPITAL PLAN 2002 thru 2006 Contact Department Municipal Buildings Type Improvement Useful Life Category Buildings Priority n/a i Description [ 7his proje~ provides for the expansion of the current library. Currently, the library has 5,$00 sq. fl. SchedulinE to be determined as part of Needs Anal~is. The city has hired a Library consultant to review the needs analysis for the Library expansion. This ~m'k is consistent with the policy of providing timely and efficient preventative maintenance of the City's buildings. Expenditures 2002 Construction/Maintenance 6,000,000 Total 6,000,000 2003 2004 2005 2006 Total 6,000,000 6,000,000 Funding Sources Bond Proceeds 2002 2003 2004 2005 2006 Total ~. 6,000,000 6,000,000 Total 6,000,000 6,000,000 ~: Operational Impact/Other .,,These projects generally improve building efficiencies. However, with the expansion, there will be a percentage increase based on the expande~! footprint of the :Library. CAPITAL PLAN 2002 thru 2006 Contact City of C]'l~r~ha~s{~II~ MN Department Municipal Buildings  F .................................................................................................................... i Type Improvement I Proj~t # MB-002 I )7 i i Useful Life ~ ~ Project Name Fire Station 02 Expansion ~' ! } Category Buildings i Priority n/a Description ] Upgrading o£Firc Station #2. This project calls for a new roof, lawn sprinkler system and interior remodeling. Station #2 was built in 1980 and has seen no major remodeling or updating since its original construction. This work is consistent with thc policy of providing timely and efficient preventative maintenance of thc City's buildings. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 0 0 Total 0 o Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 0 0 Total 0 0 il Operati°nal Impac~Other ,'This project will have no effect on operating costs. · CAPITAL PLAN 2002 thru 2006 Contsct Department Municipal Buildings Type Improvement Useful Life Category Buildings Priority n/a Description ] q'his project provides for the upgrade of she Operations and Maintenance Deparunent facilities located at 1591 Park Road. The building layout will be reconfigured for increased efficiency and centralized support. Plan development will begin in 2001' wiSh construction starting in early 2002. Account #459 & #710 ' Justific~on [ ,Currently, the Operations and Maintenance Department needs additional space for repairs, accessible meeting areas, file and plan storage, supervisory offices and ~uipment storage. Thb will be accomplished by centralizing activities around She current truck garage. iThe project provides for increased facility efficiency by centralizing activities. This concept was supported by She City Council in 1998. Expenditures 2002 2003 2004 --2005 2006 Planning/Design 200,000 Construction/Maintenance 1,700,000 ' Total . 200,000 1,70o,000 Total 200,000 1,700,000 1,900,o00 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund 200,000 1.200.000 1,400.000 Sewer & Water Expansion' Fun 500,000 500,000 Total 200,000 1,700,000 1,900,000 Operational Impact/Other --] ~rhis Project would increase operational costs based on the percentage of the footprint expansion. .J CAPITAL PLAN ,City of Chanhassen, MN ~' r~oiect# MB-004 ~ rroim Nam, Senior Center Expansion 2002 thru 2006 Contact Department Municipal Buildings Type Improvement Useful Life Category Priority n/a , D~eripfion This project provides for additional space to our current Senior Center based on increased usage ofthe facility. It will be developed in 2002, and construction will be completed in 2003. Justification { Based on increased usage of thc current Senior Center. This project is consistent with thc Comprehensive Plan. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 100,000 100,000 Tota I 1 o0,000 100,000 Funding Sources 2002 2003 2004 2005 2006 Total Capital Replacement Fund.. .100,000 100,000 To~l 100,000 100,000 ,'Operational .... Impact/Other {This project would increase operational costs based on the percentage of thc footprint expansion. 1 1 CAPITAL PLAN 2002 thru City of Chanh~.~sen, MN [P~ojm # MB-005 i rrojeet ~an~ Enclosed Salt & Sand Storage Facility 2O06 Contact Department Municipal Buildings Type Improvement Useful Life Category Priority n/a Desm-ipfion Provides for the construction of a building to house the winter salt/sand mix. Account ~/459 Justificntion [ it is anticipated that future EPA regulations mny require enclosures for salt/sand storage. The project provides for tm environmentally friendly facility and meet EPA guidelines. Expenditures 2002 2003 2004 .2005 2006 Total Construction/Maintenance 200,000 200,000 Total 200,000 200,000 Funding Sources 2002 2003 2004 2005 2006 . Total. Capital Replacement Fund' 200,000 200,000 Total 200,000 ~ 200,000 ' Operational Impact/Other i This project will have no effect on operating costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN ! r~ojeet # MB-008 i rroj~ ~ameFire Station 1 and 2 Refurbishin~ t Contact Department Municipal Buildings Type Improvemem Useful Life Category Priority n/a 1 Description [ Involves r~furbishing both Stations 1 and 2 in 2002. We will replace carpeting and repaint walls as needed. We will refurbish bay area floors and improve landscaping by adding irrigation to Station 2. Station 2 also needs new lounge area furniture and improved counters in the dispatch area. l Justificati°n I The hi~rical five year plan had projected $105,000 to maintain existing fire stations. The revised capital plan will save approximately $74,000. Expenditures 2002 Construction/Maintenance 31,000 Total 31,000 Funding Sources 2002 Capital Replacement Fund 31,000 Total 31,000 2003 2004 2005 2006 2003 2004 2005 2006 Total 31,000 31,0o0 Total 31,000 31,000 [_Opem_tional Impact/Other Department Park & Trail Improvements Improvements: Bandinere Community Park Devek~me~ City Cen~ Park Playground Equ'koment Cum/Farms Park Signage: Kefoer Pond Park Improvements: Meadow Green Park . Roundhouse Renovation: Roundhouse Park TraE Bandimem Park to Chanhassen Hills Tra~ Hwy 101 (S. Shore Or. to Townline Dr.) Road & Trail Recmstmc~n: Lake Ann Park Ma=h Glen Trail Connector Tree Plantings Park She~r. Bandimere Community Park ~Half Court Basketball: Bandimem Heights Park Skate Park Ramp Trash Receptacles Permanent Park Benches and Tables Trail Connector. Hwy 5 at R~y Creek Trail C~nectoc Hwy 5 at Bluff Creek City Center Commms Park & Trail Improvements Total CAPITAL PLAN City of Cha_nhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 ProjectO Priority 2002 PK&T-001 0 PK&T-O03 0 PK&T-004 0 PK&T-005 0 PK&T-006 0 PK&T-009 0 PK&T-012 0 250,000 PK&T-013 0 850,000 PK&T-014 0 PK&T-015 0 68,000 PK&T-018 0 15,000 PK&T-021 2 PK&T-022 3 PK&T-023 1 7,500 PK&T-024 1 20,00O PK&T-025 2 10,000 PK&T-026 1 100,000 PK&T-027 1 75,000 PK&T-O28 1 200,000 2003 2004 2005 2006 Total 25,0O0 40,0O0 275,00O 10O,00O 40,00O 10,000 50,000 485,00O 20,000 30,000 15,000 175,000 1,595,500 865,000 225,000 175,000 65,000 375,0O0 40,000 10,000 50,000 30,000 250,000 850,000 485,000 68,000 15,000 175,000 15,000 7,500 40,000 10,000 100,000 75,000. 200,000 2,860,500 GRAND TOTAL 1,595,500 865,000 225,000 175,000 2,860,500 CAPITAL PLAN 2002 ~-u 2006 City of Chanhassen, MN ~ r~ojm# PK&T-O01 1 l'roject Name Improvements: Bandimere Community Park Contact Department Park & Trail Improvements Type Improvement Useful Life Category Priority n/a Descript~gn BandimereFis a a 30-acre Community Park (9405 Great Plains Blvd. - TH 10 !). The following improvements are recommended: 2003 - Silo Restoration - $25,000 2004 o Play Equipment (Phase II) - $40,000 Account #410-0000-4705 Justification This project involves the implementation of recommendations set forth by thc Park & Recreation Commission. It is consistent with thc City's efforts to maintain its natural resources and the public's investment in community parks. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 25,000 25,000 Maintenance Equipment 40,000 40,000 Total 25,000 40,000 65,000 Funding Sources 2002 2003 2004 2005 2006 Total Park Dedication Fund 25.000 40,000 65,000 · Youth Sports Ass'n Contributio 0 0 Total 25,000 40,000 65,000 !These projects will increase annual operating costs by an estimated $2,000. CAPITAL PLAN 2002 a ru 2006 -City of Chanhsssen, MN ,i ~'rojectmm~ Development: City Center Park t Contact Department Park & Trail Improvements Type Improvement Useful Life Category Priority n/a Description I Cily Cenm' Park is a 10-acre Community Park - a collaborative effort between School District 112 and thc City to provide an active park for elementary school children and Chanhassen residents. Thc Master Plan developed by thc Park & Recreation Commission includes thc addition ora Park Shelter/Warming House (2003) and Senior Oard~ (2004). Thc Senior Gardens is an amenity requested by many ofthc seniors residing in Centennial Hills. Major improvements include planting beds, decorative arbors and hard surface paths. The garden will be located in thc NW comer of the park adjacent to Kerber Blvd. 'Account 8410-0000-4701 and #410-0000-4705 Justification J ~ity Center Park is home to thc largest outdoor skating venue in the City. The Shelter will replace a rental satellite building. The improvements arc consistent with ~ master plan. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 60,000 ] Construction/Maintenance 275.000 100,000 375,000 Total Total 275,000 100,000 375,000 Prior Funding Sources 2002 [ 60,000 [ Park Dedication Fund Total Total 200:3 2004 2005 2006 Total 275,000 100,000 375,000 275,000 100,000 375,000 !Operational Impact/Other ~ -- ~bese proj~ts will irmrease annual operating costs by an estimated $3,200. i k__. CAPITAL PLAN 2002 thru 2006 Contact City of Chonha. sen, MN Department ir~°jm# PK&T-004 .......................................... ~ ~ Type i ~roie~t~nme Playground Equipment: Curry Farms Park i Vsef-t ufe t ............ ! Category Priority Park & Trail lmprov~n~nt~ F. quipm~nt n/a Description I Improvements for Curry Proms Park arc part ora five-year plan to provide playground equipment rcplaccmcnt in 2004 (summer). Justification I Original wood equipment was installed in 1989 and is expected to have a 15-year life span. Comprehensive Plans call for an active recreation site within If2 mile of every household. Expenditures 2002 2003 2004 2005 2006 Total MaintenanCe Equipment 40,000 40,000 Total 40,000 40,000 Funding Sources 2002 2003 2004 2005 2006 Total Park Dedication Fund 40,000 40.000 Total 40,000 4o,ooo No additional operating costs arc anticipated. CAPITAL PLAN 2002 t/~ru 2006 City of Chsnhsssen, MN ~'~I Projm # PK&T-OOS I rroject Name Signage: Kerber Pond Park Contact Department Park & Trail Improvements Type Equipment Useful Life Category Priority n/a Install $ignage for an existing interpretive trail around Kerber Pond Park (summer). Note: Four or five locations will be selected for interpretive signage and other appropriate site nmenities (bench/table). The sign material will most likely be metal with an appropriate frame .and mounting standards. The project would only be completed if the signs can compliment their surroundings. Justificntion J Local history and its interpretation is an area in which the Park & Recreation Commission would like to expand. This will improve the overall experience at this location. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 10,000 10,000 Total 10,o00 10,o00 Funding Sources 2002 2003 2004 2005 2006 Total Park Dedication Fund 10,000 10,000 Totai ~0,000 ~0,o0o Operational Impact/Other [ IEffect on annual oPeration; ~'~ ~ssiT~;;~' ~o be $4067. CAPITAL PLAN 2002 thru City of Chanhassen, MN ] Project # PK&T-O06 i Project Nme I?p_.r_o_v_e_ments: Meadow Green Park 20O6 Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement n/a Description ] Provides for replacement of thc existing Novo playground structure at thc park. Justification ] The existing playground was installed in 1984 and is nearing the cad of its useful life. Prior Expenditures 2002 2003 ] 6,000 ] Maintenance Equipment 50,000 Total Total 50,000 2004 2005 2006 Total 50,000 50,000 Prior Funding Sources 2002 2003 ] 6,000 ] Park Dedication Fund _ 50,000 Total Total 50,000 2004 2005 2006 Total 50,000 50,000 Operational Impact/Other ....... ~ ~gligiblc additional °~ti~g ~:'~s'~'s~r~' ~nticipatcd. CAPITAL PLAN 2002 thru 2006 City of Chunhassen, ~ ' Pvojm# PK&T-008 ~ rrojm~am~ Play Area: Power Hill Park Contact Department Type Useful Life Category Priorily Park & Trail Improvements Improvement n/a Description I Involves thc construction of a Phase 11 play area at Power Hill Park (Flamingo Drive). , DELETED BY PARK & RECREATION COMMISSION Justification [ The Power Hill Service Area is large nnd contains a high population of children. The playground was designed to accept n Phase II expansion. The project is consistent with plans for all neighborhood parks. Expenditures 2002 2003 2004 2005 2006 Total Maintenance Equipment 0 0 Total 0 0 Funding Sources 2002 .2003 2004 2005 2006 Total Park Dedication Fund 0 ' 0 Total 0 0 '] Operational Impact/Other - ' !Effect on annual operations are estimated to be $400. CAPITAL PLAN 2002 thru 2006 City of Chenhassen, MN · Project# PK&T-009 Project Name Roundhouse Renovation: Roundhouse Park Contact Department Park & Trail Improvements Type Improvement Useful Life Category Priority n/a Description [ Involves building a neighborhood playground ns phase I1 of the renovation. Justification The Roundhouse is a local historic landmark and the namesake for the park. Functions include use ns a park shelter, wanning house and focal point. Account #410-0000-47~ Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources Bond Proceeds Park Dedication Fund Total 2002 2003 2004 2005 2006 Total 0 30,000 30,000 30,000 30,000 Operational Impact/Other --] projects w~ll increase annual operating costs by an estimated $2,200. CAPITAL PLAN 2002 thru 2006 City of Chpnha.~sen, MN iP~°jm # ~ ................................................................................................................................. PK&T-011 ~ i i Project Name Trail: Whitetail Ridge Ct. to Lake Lucy'Ln. ~ Description Involves the construction of a trail segment from Whitetail Ridge Court to Lake Lucy Lane. DELETED BY PARK & RECREATION COMMISSION Contact Department Park & Trail Improvements Type Improvement Useful Life Category Priority n/a Justification I The Galpin Blvd. Neighborhoods need a more direct link to Pheasant Hill Park. With the trail, the 1/2 mile service area radius of Pheasant Hill Park would be greatly enlarged. Expenditures 2002 2003 2004 2005 2006_ Total Construction/Maintenance - 0 0 Total o o Funding Sources 2002 2003 Park Dedication Fund . .. Total 2004 · 2005 2006 Total · 0 · ' 0 0 0 i Operational Impa~-~/Other ~~- annual oi~'~i*~ns are-estimaied to be $400. CAPITAL PLAN 2002 t/~, 2006 City of Ch~nh~.~s~n, MN i'rojc~t # PK&T-012 I ~rrojm Name Trail: B~_ndimere Park to Chanhassen Hills Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement n/a i Description [ Involves development of a trail system from Bandimere Park to Chanhassen Hills. Justification ] Thc trail is thc missing link in the South Highway 101 Trail System. It is identified in the Comprehensive Plan. Expenditures 2002 Construction/Maintenance 250,000 Total 250.000 2003 2004 2005 2006 Total 250,000 250,000 Funding Sources -2002 Park Dedication Fund 250,000 Total 250,000 2003 2004 2005 2006 Total . ?Operational Impact/Other ,r~c project~ will increa.~ annual operating costs by an estimated $1,000. 1 CAPITAL PLAN 2002 thru 2006 City of Chanhasscn, MN PK&T-013 Trail: Itwy 101 (S. Shore Dr. to Townline Dr.) Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement n/a Involves construction of a pedestrian trail concurrent with thc reconstruction of North Leg of TH 101. Planning meetings are being conducted. It is thc City's desire to complete this segment as soon as possible. It has been delayed due to the reconstruction of TH 101. Justification { TI~ tnfi{ segn~nt ~anks #1 in the Comprehensive Plan. Expenditures 2002 Construction/Maintenance 850,000 Total 850,000 2003 2004 2005 2006 Total 850,000 850,000 Funding Sources 2002 Park Dedication Fund 850,000 Total 850,000 2003 2004 2005 2006 Total 850,0O0 850,000 ~ Operational Impact/Other projects will increase annual operating costs by an estimated $3,000. - CAPITAL PLAN 2002 t/~u 2006 City of Cha~hassen, MN i Projm# PK&T-014 IProject Name Road & Trail Reconstruction: Lake Ann Park Contact Department Type Useful Life Cat~ory Priority Park & Trail Improvements Improvement n/a Description [ Involves lhe reconstruction of Lake Ann Park streets, parking lots and trail (original halfofthe park). Account ~410-0000-4701 ,The majority of these asphalt sections are over 25 years old and display multiple signs of failure. Expenditures 2002 2003 2004 Construction/Maintenance 485,000 Total 485,ooo 2005 2006 Total 485,00O 485,000 Funding Sources 2002 2003 2004 Park Dedication Fund 485,000 Total 485,000 2005 2006 Total 485,000 485,000 Operational Impact/Other City of Chenha~sen, MN i Project Name 2002 a~r. 2006 PK&T-OI5 Marsh Glen Trail Connector Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement n/a · Description t Construction ofan eight foot wide pedestrian trail connecting Mission Hills Lane to thc Lake Susan/Rice Marsh Lake trail. Justification ] Identified in thc city*s comprehensive trail plan. Nees to be constructed with the development of Marsh Glen (approved July 24, 2000). Expenditures -2002 Construction/Maintenance ~,000 - Total 68,000 2003 2004 2005 2006 Total 68,000 68,000 Funding Sources 2002 Park Dedication Fund 68,000 Total 68,ooo 2003 2004 2005 2006 Total 68,000 68,000 Operational Impact/Other i_ CAPITAL PLAN City of Chsnhassen, MN ~ Projm# PK&T-018 , rrojmnam, Tree Plantings 2002 thru 2006 Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement n/a ]Description [ This project funds tree plantings in various community and neighborhood parks. Playground and picnic areas receive priority. Justification ] The best time to plant {tees was 20 yeas ago - thc second best time is today. Prior Expenditures 2002 2003 2004 2005 [ 5,000 ] Construction/Maintenance 15,000 Total Total 2006 Total Prior Funding Sources 2002 2003 2004 2005 ] 5.000 [ Park Dedication Fund' 15,000 Total Total 15,000 2006 Total 15,000 15,000 ' Operational Impact/Other CAPITAL PLAN 2002 thru 2006 City of Chpnhassen, MN ! r~ojm# PK&T-021 i rrojmsame Park Shelter: Bandimere Community Park Contact Department Park & Trail Improvements Type Improvement Useful Life 50 Years Category Buildings Priority 2 Very Importnnt IThe construction of a multi,purpose community park shelter. Locating centrally between the ballficld and soccer fields, the shelter will offer shade, seating and concessions. Control systems for thc park's irrigation will be housed here and storage areas will be included in the design. Justification I Bandimcre Park is the second busiest park in town and hosts thousands of users each year. Provision of the services that a shelter can offer will greatly increase the level ofsatisfaction ofpark users. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 175,000 17'5,000 Total 175,000 175,000 Funding Sources 2002 2003 2004 2005 2006 Total Park Dedication Fund 175,000 175,000 Total 175,000 175,000 ~Operational Impact/Other CAPITAL PLAN 2002 thnt 2006 City of Chsnhassen, MN I rroJm# PK&T-022 ,i Pr°jettName Half Court Basketball: Bandimere Heights Park Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement 25 yeats Equipment 3 Important ~ ora half court asphalt basketball court with basketball assembly. Justification I introduction of a hard court play surface in this neighborhood pm'k will compliment the existing amenities. Expenditu res 2002 2003 2004 Construction/Maintenance 15,000 Total 15,ooo 2005 2006 Total. 15,000 15,000 Funding Sources 2002 2003 2004 Park Dedication Fund 15,000 Total 15,000 2005 2006 Total 15,000 15,000 !Operational Impact/Other 1 CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN rroject# PK&T-023 Project Name Skate Park Ramp Contact Department Type Useful Life Category Priority Park & Trail Improvements Equipment 7-10 years Equipment I Urgent This project provides an addi~o'~a{ ram-p at the Skate Park. Justification { The skate park is {he busiest park and recreation amenity in the city. This ramp wil{ provide added interest to the course and reduce congestion. Expenditures 2002 Construction/Maintenance 7,500 Total ?,~o0 2003 2004 2005 2006 Total 7,500 7,500 Funding Sources 2002 Park Dedication Fund 7,500 Total 7,500 2003 2004 2005 2006 Total 7,500 7,500 '- 1 i Operationa In~l~a~i/~; ........... i CAPITAL PLAN 2002 thru 2006 City of Chanh..~sen, MN · rroJett # PK&T-024 · Project Name Trash Receptacles , Contact Department Type Useful Life Category Priority Park & Trail Improvements Equipment 10-15 years Equipment I Urgent Description 1 This project funds the purchase of 75 waste containers with concrete bases. Justification 'Thc d~gartmcnt is in the second year of a three year program to replace our existing unsightly blue plastic trash containers. Expend itu res 2002 2 003 2004 Maintenance Equipment 20,000 20,000 Total ~0,ooo ~0,o00 2005 2006 Total 40,000 4(},000 Funding Sources 2002 2003 2004 Park Dedication Fund - 20,000 20,000 Total 20,000 20,000 2005 2006 Total 40,000 40,000 Operational Impact/Other CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN rrrojeet# PK&T-02$ ......................................................................................................... Project Name Permanent Park Benches and Tables Description This project funds the installation of permanent park benches and picnic tables. Contact Department Type Useful Life Category Priority Park & Trnil Improvements Equipment I0-15 years Equipment 2 Very Important Justification [ The availability of seating areas in city parks is one of the improvements most often requested by residents. Expenditures 2002 Construction/Maintenance 10,000 Total 10,00o 2003 2004 2005 2006 Total 10,000 Funding Sources 2002 Park Dedication Fund 10,000 TO~al 10,oo0 2003 2004 2005 2006 TOtal 10,000 !Operational Impact/Other,_~_! CAPITAL PLAN City of Chanha. sen, MN iPr°lin # PK&T-026 i r~olm Nme Trail Connector: 2002 thru 2006 Hwy 5 at Riley Creek Contact Department Park & Trail Improvements Type Equipment Useful Life 50 Yeats Category Park Equipment Priority 1 Urgent 'Description [ The Highway S/West 78th Street construction project includes underpasses to allow for pedestrian crossing at this location. This connector will mn from thc southern Highway 5 R.O.W. to the city's existing trail systems. Justification This connection is necessary to complete the underpass project and put these trails 'on line'. t Expenditures 2002 Construction/Maintenance 100,000 Total lOO,OOO 2003 2004 2005 2006 Total 100,000 100,000 Funding Sources 2002 Park Dedication Fund 100,000 Total 100,000 2003 2004 2005 2006 TOtal 100,000 100,000 i Operatio_nal Impact/Other___ CAPITAL PLAN 2002 thru 2006 Contact City of Chanhassen, MN Department Park & Trail Improvements ............................................................................................................ ~' Type Improvement · Project# PK&T-027 ! i Useful Life 30 Yea~ i Project Name Trail Connector: Hwy 5 at Bluff Creek t .... ' Category Park Equipment Priority 1 Urgent Description I The Highway 5/West 78th street construction project includes underpasses to allow for pedesuian crossing at this location. This connector will mn from the southern Highway 5 R.O.W. to the recreation center trail which currently terminates at the east end of the ballfields. Justification This connection is necessmy to complete the underpass project and put these trails "on line". Expenditures 2002 Construction/Maintenance 75,000 Total 75,000 2003 2004 2005 2006 Total ?5,000 75,000 Funding Sources 2002 Park Dedication Fund .~ 75,000 Total 75,0O0 2003 2004 2005 2006 Total 75,000 75,000 Operational Impact/Other -1 CAPITAL PLAN 2002 thr~ 2006 City of Chanhassen, MN · r~oj~ # PK& T-028 i rrojm ~ne City Center Commons Contact Department Type Useful Life Category Priority Park & Trail Improvements Improvement 30 Years Park Equipment 1 Urgent Description This projec~ will provide landscaping and nmcnitites for the City Center Commons adjacent to the new library. 'Justification I This represents a highly visible parcel in downtown and needs to b~ appropriately landscaped. Expenditures 2002 Construction/Maintena nce 200,000 Total 200,000 2003 2OO4 2005 2006 Total 200,000 Funding Sources 2002 Park Dedication Fund 200,000 Total 200,000 2003 2004 2005 2006 Total 200,000 ~00,000 Will incrtag annual operational costs by $4,000 per year. 1 CAPITAL PLAN City of Chanhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 Department Sanitary Sewer Improvements Sanlta~ ~ B~2 (Po~) Sum~~ Gene~ Re~ ~e~np~nn~ Repk ~n~. In~n~ (la) SCOA S~m Repk & ~h~nm S~ Sewer ~pmv~en~ To~l Project// Priority 2002 SS-002 0 SS-003 0 400,000 SS-O04 0 SS-O05 0 SS-006 0 25,000 SS-007 0 50,000 SS-008 0 15,000 SS-009 0 120,000 SS-010 0 85,000 695,000 2003 ~0,0~ 315,000 25,000 50,000 15,000 85,000 690,000 2004 80,000 25,000 60,000 120,000 85,000 370,000 2005 350,000 25,000 60,000 85,000 520,000 2006 120,000 Total 200,000 400,000 315,000 430,000 100,000 220,000 30,000 360,000 340,000 2,395,000 GRAND TOTAL 695,000 690,000 370,000 520,000 120,000 2,395,000 CAPITAL PLAN City of Chanhassen, MN ~oJm# SS-002 Project Name Sanitary Sewer: LC-1 Description LC-I Sub-district extension. 2002 t/~ 2006 Contact Department Type Useful Life Category Priority Sanitary Sewer Improvements Improvement n/a Justification Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sewer Policy Plan. Expend itu res 2002 2003 Construction/Maintenance 200,000 Total 200,000 2004 2005 2006 Total 200,000 200,000 Fu nd ing Sources 2002 2003. Sewer & Water Assessments 200,000 Total 200,000 - 2004 2005 2006 Total 200,000 200,000 ]Operation_al Impact/Other ]This project will increase maintenance costs. i CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN P~oiect# SS-003 ~i rro~ect Nme Sanitary Sewer: BC-8 Contact Department Type Useful Life Category Priority Snnitary Sewer Improvements Improvement n/a Descrription Trunk ex~nsion f~nn Point BC 3.1 to BC 4.2. Petition re~ived from d~velolgr d~siring service in 2000. However, TH 5/W~st 7$th Street project and BC-7 project must b¢ completed first. Justification [ Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sewer Policy Plan. Expenditures Construction/Maintenance Total Funding Sources Sewer & Water Assessments Total 2002 400,000 400,000 - 2002 400,000 400,000 2003 2003 2004 2004 2005 2005 2006 2006 Total 400,000 400,000 Total 400,000 400,000 ~q'his project will increase maintenance costs. -- CAPITAL PLAN 2002 thru 2006 City of Ch~nha.~sen, MN ! r~ojm # SS-004 i Project Name Sanitary Sewer: BC-9 Description I Trunk extension from Point BC 4.1 to Point BC $. 1. Development may require concurrent with BC-8 project Contact Department Type Useful Life Category Priority Sanitary Sewer Improvements Improvement n/a Justification Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sewer Policy Plan. Expenditures 2002 2003 Construction/Maintenance 315,000 Total 315,000 2004 2005 2006 Total 315,000 315,000 Funding Sources 2002 2003 Sewer & Water Assessments 315,000 Total 315,000 2004 2005 2006 Total 315,000 315,000 ! I ,Operational Impact/Other ] l~This prOject will increase maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chonhassen, MN ~ ~o~ect~ame Sanitary Sewer: BC-2 (Po__~ion) ............................ ~ Contact Department Type Useful Life Category priority Sanitary Sewer Improvements Improvement n/a , Description { Trunk extension from Point BC 1.1 to BC 1.2. 'Justification ] Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sewer Policy Plnn. Expenditures 2002 2003 2004 2005 Construction/Maintenance 80,000 350,000 Total 80,000 250,000 2006 Total 430,000 430,000 Funding Sources 2002 2003 2004 2005 Sewer & Water Assessments 80,000 350,000 Total 8o,ooo 350,000 ~ Operational Impact/Other ] This proj~t will increase maintenance costs. 2006 Total 430,000 430,000 CAPITAL PLAN City of Chanha.~sen, MN ~ Projec3 # ~ SS-006 !J Project Name Sump Pump Inspections 2002 thru 2006 Contact Department Type Useful Life Category Priority Sanitm7 Sewer Improvements Improvement n/a Descdption ] Inspections required to minimize sump pump discharge to sanitary sewer system. Account #700-7701-4300 Justification ] 2vlCES Loa~rant Agreement requires ongoing re-inspections to insure sump pump connections removed with 1996 project arc not reconnected. Identified in thc 1998 Comprehensive Sewer Policy Plan. J Prior Expenditures 2002 2003 2004 2005 2006 Total ] 50,000 ] COnstruction/Maintenance 25,000 25,000 25,000 25,000 100,000 Total Total 25,000 25,000 25,000 25,000 100,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total [ 50.000 [ Sewer & Water Utility Fund 25,000 25,000 .25,000 25,000 100,000 Total Total 25,000 25,000 25,000 25,000 100,000 i Operational Impact/Other ~} ]Will minimize sanitary sewer treatment costs for sump pump (clean) water. CAPITAL PLAN City of Chanha.~sen, MN 2002 thru 2006 Project# ss-oo7 rroj~ sa=e General Repairs (Emergency/Unplanned) Contact Department Sanitmy Sewer Improvements Type Improvement Useful Life Category Priority n/a Description Provides for crncrgmcy and unplanned repairs to thc sanitmy sewer system. Account tt700=7702-4551 Jnstific~on ] Sewer system failures such as pipe breaks, pump starters, motors and electrical control problems arc unpredictable, but inevitable. These failures arc most often emergencies in nature and require immediate repair action. This program is necessary to expedite repairs and maintain a high level of service. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 90,000 ] Construction/Maintenance 50,000 50,000 60,000 60,000 220,000 Total Total 50,000 50,000 60,000 60,000 220,000 Prior Funding Sources 2002 2003 2004 2005 2006 Total [ 90,000 ~ Sewer & Water Utility Fund 50,000 .. 50,000 ' 60,000 60,000 220,000 Total Total 50,000 50,000 60,000 60,000 220,000 ;-Operational Impact/Other ..... I iThis project will not increase maintenance costs. CAPITAL PLAN 2002 City of Chanhassen, MN [ Project # t SS-008 ! Project Name Televise Sewer Lines thru 2006 Contact Department Type Useful Life Category Priority Sanitary Sewer Improvements Improvement n/a Provides for annual televising of sanitary sewer lines suspected of having Icakages, rainfall inflow and/or ground water infiltration. Account #700-0000-4300 Justification I 'This program is important to verify the integrity of thc sanitary sewer piping system. Leaking pipes can pose a health risk. Clear water inflow and infiltrations also increase the City's cost for treatment of sewer flow. The program is required to maintain a reliable and safe sanitary sewer piping system. Prior Expenditures 2002 2003 2004 2005 2006 Total I 10,0001 Planning/Design 15,000 15,000 30,000 Total Total 15,000 15,000 3O,O0O Prior Funding Sources ' - 2002 2003 2004 2005 2006 I 10,000 ] Sewer & Water Utility Fund 15,000 15,000 Total Total 15,ooo 15,Oo0. Total 30,OO0 30,oo0 i Operational Imp-~t]~)~xe~- I__ ~'This program will not increase operational costs. It could lower costs by reducing thc volume ofscwer flow nccding treatment. CAPITAL PLAN 2002 ~/~u 2006 City of Ch. nhassen, MN rroject # SS-009 i rrojm Name Repair Manholes, Infiltration/Inflow (I/I) Contact Department Sanitary Sewer Improvements Type Improvement Useful Life Category Priority n/a ~ Description I Provides for planned repairs and maintenance to the sanitary sewer piping system. Account #700-7702-4551 This program is developed based on information obtained from the televising inspection program. The work is necessary to maintain the integrity of the sanitary sewer system. It is required to maintain a reliable and safe system. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 120,000 120,000 120,000 360,000 Total 120,000 120,000 120,000 360,000 Funding Sources 2002 2003 2004 2005 2006 Total Sewer & Water Utility Fund 120,000 120,000 120,000 360,000 Tot~I 120,000 120,000 120,000 360,000 Operational Impact/Other ~__ iThis program will not increase operational costs and may reduce sewer treatment costs. CAPITAL PLAN 2002 City of Chanhassen, MN - rrojm # SS-OIO ProjmName SCADA System Repair & Maintenance thFu 2006 Contact Department Sanitmy Sewer Impmvmnents Type Equipment ~ Useful Life Category Priority tVa Description ] Provides for the updating ofthc SCADA system control panels for thc City's 29 sanitary sewer pumping stations. Thc panels will be replaced over a $ ),car period. Accotmt#700-7702-4705 Justification [ Thc sewer lift station control panels have a defined, reliable or useful life span. It is becoming more difficult each year to get parts for older panels that arc no longer made and/or thc manufacturer is out of business. This replacement program will be a proactive approach to ensure reliable sewer service. Prior Expenditures ] 80,000 [. Maintenance Equipment Total Total 2002 2003 2004 2005 2006 Total 85,000 85.000 85,000 85,000 340,000 85,000 85,000 85,000 85,000 340,000 Prior I 80,0001 Total Funding Sources 2002 2003 2004 2005 2006 Total Sewer & Water Expansion Fun 85,000 85,000 85,000 85,000 ' 340,000 Total 85,000 85,000 .85,000 85,000 340,000 ~ Operational Impact/Other [rhi~ progr~ will likely decree annual repair and maintenance costs due to reduced problems and failures with the equipment. I' CAPITAL PLAN City of Chanhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 Department Street Improvements Century Blvd. ST-O02 Lyman Bird (West City Umits 1o TH 101) ST-004 Biluminous Ove~.. take Lucy Rd. ST-005 B'duminous Overlay:. Saddlebrook Curve ST-006 Bituminous Overlay:. take Drfve/l.ake Drive East ST-007 lll~Biluminous Overlay: Audubon Rd. ST-008 Bituminous Oveday:. Coulter Blvd. ST-O09 Biluminous Overlay: West 78~ St. ST-010 Bituminous Overlay: Minnewashta Parkway ST-011 Annual Street Improvement Program ST-012 Street Improvements Total ProjectO Priority 2002 0 40,000 0 0 95,000 0 18,000 0 140,000 0 110,000 0 15,000 0 0 0 255,000 673,000 2003 2004 2005 2006 Totnl 170,000 265,000 435,000 125,000 275,000 4,300,000 275,000 275,000 285,000 285,000 40,000 3,900,000 95,000 18,000 140,000 110,000 15,000 170,000 125,000 1,355,000 5,968,000 GRAND TOTAL 673,000 435,000 4,300,000 275,000 285,000 5,968,000 CAPITAL PLAN 2002 thn, 2006 Contact City of Chsnhassen, MN Oep.rt.ent Street Improvements iPr°ject # ST-002 i Type Improvement Useful Life i Projeci Name Century Blvd. i Category Priority n/a 1 Description 'Provides for construction of Century Boulevard including water 0039) and sewer (BC 2.3) improvements from its current north terminus to approximately 200 feet south of Trunk Highway 5. Justification Project is needed to provide service to developing areas. It is identified in the feasibility report for the Arboretum Business Park Public Improvements - Project No. 97-1. The connection of Century Boulevard to TH 5 is included in the THSAVest 78th Street Project. This project will complete the overall work scope identified in the feasibility study for Project No. 97-1. Prior Expenditures 2002 2003 2004 2005 2006 Total ] 825,000 [ Construction/Maintenance 40,000 40,000 Total Total 40,000 40,000 Prior Funding Sources 2002 2003 2004 ] 825.000 ] Street Assessments '40,000 Total Total 40,0o0 2005 ' 2006 · . Total ..40,000 40,000 i Operational Impact/Other I. 'This project will increase maintenance costs. CAPITAL PLAN 2002 thru 2006 Contact City of Chanhassen, MN Department Street Impmv~.~nents ! Type Improvement ! rro~ect # ST-004 ' Useful Life Project Name L Lyman_Blvd (West City Limits to TH 101) ! Cate~or~ Priority ~ Description ] Provides for reconstruction of Lyman Bouicvard'from West City limit to TH 101. It was idcntificd as a joint City/County project in a 1994 Master Agrccmcnt to bc constructed in 1996. A joint powers a§rccmcnt was drafted, however, not cxccuted duc to lack of funding. Justification [ As with any county road project, there will bc certain responsibilities bomc by thc City (c.g., stormwatcr, trail, lishting, sewer &watcr, etc.). Any MSA funds utilized for construction ora County State Aid Hishway distracts from thc City's ability to construct and maintain its Municipal State Aid Street System. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 3,900,000 3,900,000 Total 3,900,000 3,900,000 Funding Sources 2002 2003 2004 2005 2006 Total MSA 3,900,000 3,900,000 Total 3,900,000 3,900,000 Operational Impact/Other ~This project will increase maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chanhansen, MN : rroject # ST-005 rroject Name Bituminous.Overlay: Lake Lucy Rd. Contact Department Street Improvements Type Improvement Useful Life Category Priority n/a Description Provides for a bituminous overlay on Lake Lucy Road between Galpin Boulevard and Powers Boulevard. This project is consistent with thc 1999 Pavement Management Study. Account #4 ! $-0000-4540 Appropriate routine m~intenancc technique based on 1991 Pavement Management Study. Expenditures 2002 Construction/Maintenance 95,000 Total 95,ooo 2003 2004 2005 2006 Total 95,000 95,000 I Funding Sources 2002 MSA 95,000 Total 95,000 2003 2004 2005 2006 Total 95,000 95,000 !Operational Impact/Other --[ ?This project may decrease maintenance costs. CAPITAL PLAN City of Cha~hassen, MN Project# ST-006 ~lr ~i Pr°jeetName Bituminous Overlay: Saddlebrook Curve 2002 thru 2006 Contact Department Type Useful Life Category · Priority n/a Street Improvements Improvement Description Provides fro' a bituminous overlay of Saddlebrook Curve. Plans and specs will be prepared by Engineering Department for Spring 2002 bid opening. Account #415-0000-4540 Justification ] Appropriate routine maintenance technique based on 1991 Pavement Management Study. It is consistent with the 1999 Pavement Management Study. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 18,000 18,000 Total 18,000 - 18,000 Funding Sources 2002 2003 2004 2005 2006 Total MSA 18,000 18,000 Total 18,000 18,000 i Operational Impact~C~ .......... [This project may dec~-c'"a~ 1 CAPITAL PLaN 2002 thru 2006 City of Ch~nha~sen, MN 1 Project # ST-007 ProjectName Bituminous Overlay: Lake Drive/Lake Drive East Contact Department Stn~et Improvements Type Improvement Useful Life Category Priority n/a Provides for a bituminous overlay of Lake Drive and Lake Drive East. Plans and specs will be prepared by Engineering Department for Spring 2002 bid opening. Acconnt f/415-0000-4540 Justification I ~,ppropriate routine maintenance technique based on 1991 Pavement Management Study. It is consistent with the 1999 Pavement Management Study. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 140,000 140,000 Total 140,000 140,000 Funding Sources 2002 2003 2004 2005 2006 Total MSA 140,000 140;000 ' Total 140,000 140,000 ~1 Operational Impact/Other J ;This project may decrease maintenance costs. CAPITAL PLAN 2002 a~ru 2006 City of Chanh~.~sen, MN Project# ST-008 · Proj~t Name Bituminous Overlay: Audubon Rd. Contact Department Street Improvements Type Improvement Useful Life Category Priority n/a Description [ Provides for a bituminous overlay of Audubon Road between TH 5 and Lyman Boulevard. ~ Justification Appropriate routine maintenance technique based on 1991 Pavement Management Study. It is consistent with thc 1999 Pavement Management Study. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 110,000 110,000 Total 110,000 110,000 Funding Sources 2002 2003 2004 2005 2006 Total MSA 110,000 110,000 Total 110,000 110,000 L_Operational Impact/O_th_er iThis project may decrease maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Ch.snha.ssen, MN i Project# ST-009 i ~ro]ect name Bituminous Overlay: Coulter Blvd. Contact Department Street Improvements Type Improvement Useful Life Category Priority n/a ,1 Description Ptovide~ for a bitmninous overlay of Coulter Boulcvnrd between Audubon Rond and Pillsbury. lAppropria~ routine maintenance technique based on 1991 Pavement Management Study. It is consistent with the 1999 Pavement Management Study. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 15,000 15,000 Total 15,000 J Funding Sources 2002 2003 2004 2005 2006 Total MSA 15,000 15,000 Total 15,000 15,000 __ !Operational Impact/Other ] iThis project may decrease maintenance costs. t J CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i rroject # ST-O 10 Proj~tName Bitnminous Overlay: West 78th St. Contact Department Street Improvements Type Improv~nent Useful Life Category Priority n/a Description [ Provides for a bituminous overlay of West 78th Street between Powers Boulevard and TH 101. Justification Appropriate routine maintenance technique based on 1991 Pavement Management Study. It is consistent with thc 1999 Pavement Management Study. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 170,000 170,000 Total 170,000 170,000 Funding Sources 2002 2003 2004 2005 2006 Total MSA 170,000 170,000 Tota] 170,000 170,000 i Operationa~ Impact/Other [ ~ ' !This project may decrease maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN { r~ # ST-O11 ! rrojea Name Bituminous Overlay: Minnewashta Parkway Contact Department Street Improvements Type Improvement Useful Life Category Priority n/a Description ] Provides for a bituminousovcrlay of Minncwashta Parkway between TH 5 and TH 7. Justification Appropriate routine maintenance technique based on 1991 Pavement Management Study. It is consistent with the 1999 Pavement Management Study. ExPenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 125,000 125,000 Total 125,000 125,000 Funding Sources - 2002- 2003 2004 2005 2006 Total MSA 125,000 125,000 Total 125,000 125,000 i Operational Impact/Other ~] project may decrease maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN Project# ST-012 ?'roject N, me Annual Street !__m_.p_ro_v_e__m._ent Program Contact Department Type Useful Life Category Priority Description I Provides for routine sealcoating, maintenance, and impwvement of streets as recommended by the Pavement Management System. Justification [ Appwpriate routine maintenance based on the Pavement Management System. Street Improvements Improvement n/a Prior Expenditures 2002 2003 2004 2005 2006 I 470,000 ! Construction/Maintenance 255,000 265,000 275,000 275,000 285,000 Total Total 255,000 265,000 275,000 275,000 285,000 Total 1,355,000 1,355,000 Prior 147o,oool Tol~i Funding Sources 2002 2003 2004 2005 2006 Total General Fund 255,000. 265,000 275,000 275,000 285,000 1,355,000 Total 255,000 265,000 275,000 275,000 285,000 1,355,000 Operational Impact/Other ] ,~fhis project may decrease maintenance costs. Department Surface Water Management La'ke i~ley WaWslw:l Bluff Creek: Alter Existing Ponds Bluff Creek: Alter Existing Pond~ Bluff Creek Create Glmmvater Ponds ~qBluff Cree~ Create $~ Ponds Surface Water Management Total CAPITAL PLAN City of Chanhassen, MN PROJECTS BY DEPARTMENT 2002 thru 2006 ProjectO Priority 2002 SWMP-003 0 SWMP-004 0 SWMP-005 0 SWMP~ 0 SWM=-008 0 SWMP-009 0 SWMP-010 0 SWMP-011 0 200,000 210,000 560,000 2003 150,000 215,000 50,000 415,000 2004 175,000 275,000 450,000 2005 2006 Total 150,000 150,000 175,000 200,000 210,000 215,000 275,000 50,000 1,425,000 GRAND TOTAL 560,000 415,000 450,000 1,425,000 CAPITAL PLAN City of Chanhassen, MN .~oiect# SWMP-O0-3- ........................................................ · Project Name Lake Susan Watershed 2002 Description SWIvlP Projects 3.34, 3.2. Provides for modifications to an existing stormwater pond. Feasibility Study in 2002. thru 2006 Contact Department Surface Water Management Type Improvement Useful Life Category Priority n/a Justification ] These projects are identified, detailed and prioritized in thc City's Surface Water Manngcment Plan to meet water quality goals for Lake Susan. Will achieve better nutrient and sediment removal. Expenditures 2002 Construction/Maintenance 150,000 Total 15o,ooo 2003 2004 2005 2006 Total 150,000 Funding Sources Surface Water Utility Fund Total 2002 i5oiooo 150,000 200:3 2004 2005 · 2006 Total 150,000 150,000 !Operational Impact/Other ] ?Th~se projec~ with the annual op"rating budget of the Surface Management Plan, funded by the Storm Water Utility. W:~ter will be financed CAPITAL PLAN 2002 City of Chsnhassen, MN ~roject # SWMP-004 Y ~ i Project Name Lake Riley Watershed thru 2006 Contact Department Type Useful Life Category Priority Surface Water Management Impwvement n/a Description SWMP Projects 4. !, 4.6. Provides for the creation ofstormwnter ponds nt these locations. Fensibility Study in 2003. Justification I :These projects nm identified, detailed and prioritized in the City's Surface Water Management Plan to meet water quality goals for Lake Riley. Will reduce the sediment and nutrient loads into Lake Riley. Expenditures 2002 2003 2004 2005 2006 Totnl Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 150,000 150,000 Total 150,000 150,000 Operational Impact/Other I ~.Cl~-~'s~ projects will be financed with the annual operating budget of thc Surface Water Management Plan, funded by the Storm Water Utility. CAPITAL PLAN 2002 a, ru 2006 City of Chanhassen, MN ~ Project# ~ SWMP-005 } Project Name Lake Winnewashta Watershed ': Contact Department Type Useful Life Category Prioril~ Surface Water Management Improvement n/a iDescription I ~SWMP Pwjects 3.16, 1.9. Provides for th~ creation ofstormwater ponds at these locations. Feasibility Study in 2004. Justification ] These projects are identified, detailed and prioritized in the City's Surface Water Management Plan to meet water quality goals for Lake Winnewashta. Will reduce thc sediment and nutrient loads into Lake Winnewashta. Expenditures 2002 20.03 2004 2005 2006 Total Construction/Maintenance 175,000 175,000 Total 175,000 175,000 Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 175,000 175,000 Total 175,000 175,000 ~,..0p_ erational Impact/Other , iThese projects will be financed with the annual operating budget of the Surface Water Management Plan, funded by the Storm Water Utility. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN ! Projm Name i Bluff Creek: Alter Existing Ponds Contact Department Surface Water Management Type Improvement Useful Life Category Priority n/a ' D~scription I SWMP Projects 4.7, 5.19 Projects would alter existing ponds by excavation and outlet control. This project is scheduled for consideration in 2000. However, the actual project will be mansg/'d by the watershed district once their Feasibility Study is complete. Account F'/20-0000-4769 I Justification [ ,Projects would increase pond stornge capacity and water treatment capabilities. These projects nrc identified in the City of Chanhassen's Basic Water Management Project petition to the Riley, Purgatory, BluffCreek Wntershed District. This project is consistent with both the Surface Water Management Plan and the Bluff Creek Natural Resources Management Plan. Expenditures 2002 2003 '2004 2005 2006 Total Construction/Maintenance 200,000 200,000 Total 200,000 - 200,000 Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 200,000 200,000 Total 200,000 200,000 rLOperational Impact/OtJaer O ,.q'he Watershed District will provide 100~A funding for water resource-related projects, 50% for recreational trails and educational facilities and 25% ofthc costs for :land acquisition. The City's contribution to these projects will be funded through the Surface Water Management Program. CAPITAL PLAN City of Chanhassen, MN ~ project # SWMP-008 ir~ole~t ~ame Bluff Creek: Alter Exbfing Ponds 2002 t/~ru 2006 Contact Department Surface Water Management Type Improvement Useful Life Category Priority n/a Description ] SWMP Projects 2. ! 3, 4.12. Projects would alter existing ponds by excavation and outlet control. This project is scheduled for consideration in 2002. However, the actual project will be managed by the watershed disUict once their Feasibility Study is complete. Justification Projects would increas~ pond storage capacity and water treatment capabilities. These projects arc identified in the City of Chanhassm's Basic Water Mana~n~t Project petition to the Riley, Purgatory, BluffCreek Watershed District. This project is consistent with both the Surface Water Management Plan and the Bluff Cre~ Natural Resources Management Plan. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 210,000 210,000 Total 210,000 210,000 :. Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 210,000 210~000 . · Total 210,000 210,000 Operational Impact/Other I tThe Watershed District will p~ov~-d¢ 100% funding for water resource-related i~rojccts, 50% for recreational trails and educational facilities and 25% of the costs for lland acquisition. The City's contribution to these projects will be funded through the Surface Water Management Program. CAPITAL PLAN 2002 thru 2006 City of Chunho.qsen, MN SWMP-O09 , rrolmmane Bluff Creek: Create Stormwater Ponds Contact Department Surface Water Management Type Improv~nent Useful Life Category Priority n/a Description .SWMP Pro. j~ts 5.11, 7.9. Projects would create stormwater ponds at these locations. This project is scheduled for consideration in 2003. However, the actual project will be managed by the watmshed dimi'"'~ once their Feasibility Study is complete. 'Justification Proj~ts would reduce the sediment and nutrient loads into Lake Minnewashta. These projects nrc identified in thc City of Chanhassen's Basic Water Management Project petition tothe Riley, Purgatory, BluffCrcek Watershed District. This project is consistent with both the Surface Water Management Plan and the Bluff Creek Natural Resources Management Plan. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 215,000 215,000 Total 215,000 215,000 Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 215,000 215,000 Total 215,000 215,000 [-Operational Impac~6-tii~'- [The Watershed District ~-~i~p~o~;i~e~i'00% funding for water resource-related projects, 50% for recreational trails and educational facilities and 25% of the costs for land acquisition. The City's contribution to these projects will be funded through the Surface Water Management Program. CAP1TAL PLAN 2002 thru 2006 City of Chanhassen, MN ] Project # SWMP-O 10 i Project Name Bluff Creek: Create Stormwater Ponds Contact Department Surface Water Management Type Improvement Useful Life Category Priority n/a Description SWMP Projects 23, 3. I. Projects would create stormwater ponds at these locations. This project is scheduled for consideration in 2004. However, the actual project will be managed by the watershed district once their Feasibility Study is complete. Justifi~on Projects would reduce the sediment and nutrient loads into Lake Minncwashta. These projects arc identified in thc City of Chanhassen's Basic Water Management Project petition to thc Riley, Purgatory, BluffCreek Watershed District. This project is consistent with both the Surface Water Management Plan and the Bluff Creek Natural Resources Management Plan. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 275,000 275,000 Total 275,000 275,000 J Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 275,000 275,000 Total 275,000 275,000 !Operational Impact/Other t w o' - o The atcrshcd District will provide I00% funding for water resource-related projects, 50 ~ for recreational trails and educational facilities and 25% of the costs for iland acquisition. The City's contribution to these projects will be funded through thc Surface Water Management Program. J CAPITAL PLAN 2002 thru 2006 City of Chtanhassen, MN ~ Project # i SWMP-Oll I Project Name Lake Lucy (Lake Project) Description Provides for alum treatment to Lake Lucy. Contact Department Surface Water Management Type Improvement Useful Life Category Priority n/a Jusfifi~on These projects are identified, detailed and prioritized in thc City's Surface Water Managcmcnt Plan to meet water quality goals for I..kc Lucy. Will reduce the current phosphm'us content in thc lake and create a blanket which would prcvcnt furthcr loading of phosphorus from bottom sediments. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2002 2003 2004 2005 2006 Total Surface Water Utility Fund 50,000 50,000 Total 50,000 50,000 i Operational Impact/Other }. - :.These projects will be financed with the annual operating budget of the Surface Water Management Plan, funded by the Storm Water Utility. CAPITAL PLAN City of Chanhassen, MN PROIECTS BY DEPARTMENT 2002 thru 2006 Department Project0 Priority Water System Improvements Well #9 W-001 0 Welll~10 W-O02 0 Well#11 W-003 0 Wa~erTower {2MG): Lyman Blvd. W-O04 0 lake R~y Trunk II W-005 0 llllm~ W~ I~e~ts: TH41 W-006 0 Water Improvements: Manchester Dr. W-O07 0 Ware'Improvements: Minnewashta Loop W-O08 0 Water lmpmvemen~ BC-1 (TC&W- Lyman) W-009 0 Water Improvements: Lyrnan, Audubon, Powers W-010 0 Water Treatment Plant 1 W-011 0 General Water System Repairs W-013 0 SC, ADA System Upgrades/Maintenance W-014 0 ~lP~q~ R~i~: West 76th SL Water Tower W-015 0 Utmty Rate Study W-017 0 Well #12 W-018 0 Wata' ?reatment Plant II W-019 0 Warm' System Tmprovemcnts Total GRAND TOTAL 2002 110,000 335,0O0 130,O00 270,000 500,000 45,000 100,000 40,000 25oo00 1,555,ooo 1,555,ooo 2003 3,$O0,0O0 50,0O0 10,O00 3,630,000 3,630,000 2004 630,000 ?Z0O0 ?5,000 400.000 370,000 50,000 10,000 1,6o7,ooo 1,607,000 2005 530,000 75,000 3,300,000 210,000 50,000 10,000 4,175,000 4,175,000 2006 77,000 5O0,0O0 · 1,252,000 1,252,ooo Totnl 700,O00 602,000 750,000 3,375,000 110,0O0 335,000 130,O00 270,000 4O0,O00 580,000 4,000,000 195,000 130,000 - 40,O00 25°00O 77,000 500,000 12,219,000 12,219,000 CAPITAL PLAN City of Chanhassen, MN i r~oim # W'O01 ! rrojm ~amcWell #9 2002 thru 2006 Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a Description I Provide municipal Water supply well. Well siting and engineering will begin in 2003, with construction in 2004. 'Justification [ Needed to provide service to developing areas. Identified in the 1995 Comprehensive Water Supply and Distribution Plan. Expenditures Planning/Design Construction/Maintenance Total 2002 2003 2004 2005 70,000 70,000 630,000 630,000 2006 Total 70,000 630,000 700,000 Funding Sources Sewer & Water Expansion Fun - Total 2002 2003 2004 2005 .70,000 630,000 . 70,000 ~o,0oo 2006 Total 700,000 700,000 !t, O__p .erational Impact/Other i~fhis project will increase maintenance costs. ! CAPITAL PLAN City of Chanhassen, MN ! Project # W-O02 ~ Project Name Well #10 2002 thru 2006 Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a t Description ] Provide municipal water supply well. Well siting and engineering will begin in 2004, with construction in 2005. Justification I Needed to provide servic~ to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditures Planning/Design Construction/Maintenance Total 2002 2003 2004 72,000 72,000 2005 530,000 530,000 2006 Total ?2,000 530,000 6o2~0o Funding Sources Sewer & Water Expansion Fun Total 2002 2003 2004 ?2,000 72,000 2005 530,000 530,000 2006 Total ' 602,000 !Operational Impact/Other ] ~his project will increase maintenance costs. t CAPITAL PLAN 2002 thru 2006 City of Char~ha.~sen, MN Project # W-O03 Project Name Well #11 Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a Description · Provide mimicipal water supply well. Well siting and engineering will begin in 2005, with construction in 2006. Justification ] 'Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditures Planning/Design Construction/Maintenance Total 2002 2003 2004 2005 75,000 75,000 2006 Total 675,000 675,000 675,000 750,000 Funding Sources Sewer & Water Expansion Fun Tota! 2002 2003 2004 2005 . · 75,000 2006 Total 675,000 750,000 675,000 750,000 iThis project will increase maintenance costs. CAPITAL PLAN 2002 City of Chanhassen, MN Project# W-004 Project Name Water Tower (2MG): Lyman Blvd. thru 2006 Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a Description ] Construct 2.0 MG elevated water storage reservoir. Towcr siting and engineering will begin in 2004, with construction in 2005. Justification ] Needed to provide service to developing areas. Identified in the 1998 Comprcbensive Water Supply and Distribution Plan. Expenditures Planning/Design Construction/Maintenance Total 2002 2003 2004 2005 75,000 75,000 3,300,000 3,300,000 Funding Sources Sewer & Water Expansion Fun Tot;al 2002 2003 2004 2005 75,000 3,300,000 75,000 3,300,000 2006 2006 Total 75,000 3,300,000 3,375,000 Total 3,375,000 3,375,000 i Operational Impact/Other ,This project will increase maintcnance costs. CAPITAL PLAN 2002 thru 2006 City of C'h~nhassen, MN rrojm# W-005 -Project Name Lake Riley Trunk II Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a J Node 641 to PRV-10 to Node 602. , Justification ] Needed to provide service to developing areas. Identified in thc 1998 Comprehensive Water Supply and Distribution Plan. Expenditures 2002 ¢onstroction/rvlaintenanc~ 110,000 Total 110,000 2003 2004 2005 2006 Total 110,000 110,000 Funding Sources 2002 Sewer & Water Assessments 110,000 Total 110,000 2003 2004 2005 2006 Total 110,000 110,000 pemtional Impact/Other is project will increase maintenance costs. I ! CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN rrojut # W-006 ~N ' Pr°jmname Water Improvements: TH 41 Contact Department Type Useful Life Category Priorily Description Node 1021 - Node 1022 Node 102 ! - PRV-8 PRV-8 - Node 1023 ]qode 1023 -Node S01 Node 501 - Node 1024 Node 1024 - Node 639 Justification Neede2 to provide service to developing ~e~s. Identified in the 1~)$ Comprehensive Water Supply and Distribution Plan. Water System Improvements Impwvemcnt n/a Expenditures Construction/Maintenance Total Funding Sources Sewer & Water Assessments Total !Operational Impact/Other I IThis project will increase maintenance costs. 2002 335,000 335,000 2002 335,000 3351000 2003 2004 2003 2004 2005 2005 2006 2006 Total 335,000 335,000 Total 335,000 335,000 CAPITAL PLAN 2002 tl~ru 2006 City of Chsnhassen, MN ! i Pro]ectName Water Improvements: Manchester Dr. ! Node 1031 to Node 636. Contact Department Water System Improvements Type Improvement Useful Life Category Priority n/a Justification ] Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditures 2002 Construction/Maintenance 130,000 Total 130,000 2003 2004 2005 2006 Total 130,000 130,000 Funding Sources 2002 SeWer & Water Assessments 130,000 Total 130,0o0 2003 2004 2005 2006 Total 130;000 130,000 ?_p. erafional Impact/Other ~This project will increa~ maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i i Project # W-O08 i rroiect mine Water Improvements: Minnewashta Loop Contact Department Water System Improvements Type Improvement Useful Life . Category Priority n/a Description [ Node 1022 to Node :3. Justification ] Nccdcd to provide service to dcvcloping areas. Will also provide loop for west scrvicc area. Identified in thc 1998 Comprehensive Water Supply and Distribution Plan. Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 270,000 270,000 Total 270,000 270,000 Funding Sources 2002 2003 2004 2005 2006 Total Sewer & Water Assessments 270,000 270,000 Total 270,000 270,000 :Operational Impact/Other [ iThis project will increase maintenance costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN r~oj~# W-009 rroieetN, me Water Improvements: BC-1 (TC&W- Lyman) __i Node 510 m Node 612. Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a Justification ] Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plnn. Expenditures 2002 2003 2004 Construction/Maintenance 400,000 Total 400,000 2005 2006 Total 400,000 400,000 Funding Sources 2002 2003 2004 Sewer & Water Assessments 400,000 Total 400,000 2005 2006 Total 400,000 400,000 , Operational Impact/Other ;This project will increase maintenance costs. I 1 CAPITAL PLAN 2002 thru 2006 City of Chonhassen, ~ I Project # W-O 10 ~ i rrojm~ame Water Improvements: Lyman, Audubon, Powers Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a 'Description Node 510 to Node 1012 Node 1012 to Node 1013. Justification I Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditures Construction/Maintenance Total 2002 .2003 2004 370,000 370,000 :2005 210,000 2t0,000 2006 Total 580,000 5~,O00 Funding Sources Sewer & Water Assessments Tot~l 2002 2003 2004 370,000 370,000 2005 210,000 210,000 2006 Total 580,000 ~80,000 i Operntional Impact/Other IThis project will ~ncrcasc maintenance costs. i CAPITAL PLAN 2002 ~hru 2006 City of Chanhassen, MN Project# W-011 iPr°jectName Water Treatment Plant 1 Contact Department Water System Improvements Type Improvement Useful Life Category Priority n/a J !Description [ Construct Water Treatment Plant with siting and design in 2002, and construction in 2003. ~ Justification Public demand and high maintenance costs may require water treatment to address high iron and manganese levels. Potential need and sites are identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditures 2002 2003 2004 2005 2006 Total Planning/Design 500,000 500,000 Construction/Maintenance 3,500,000 3,500,000 Total '500,000 3,500,000 4,000,000 J Funding Sources ' 2002 2003 2004 2005 2006 Total Sewer & Water Expansion Fun 500,000 3,500,000. 4,000,000 Total 500,000 3,500,000 4,000,000 i Operational Impact/Other [ ~rhis project will increase maintenance costs. J CAPITAL PLAN 2002 thru 2006 City of Chs.ha.~sen, MN ! r~o/m # W-013 i r~oj~ct Same General Water System Repairs i _ Contact Department Water System Improvements Type Improvement Useful Life Category Priority n/a , Description ] Provides for emergmcy and unplanned repairs to the water system. This program is funded on an annual basis. Accoma I~/00-7702-4550 Justification I Warn' system fro'lures such as pipe breaks, valve/hydrant/pump/electrical control problems are unpredictable, but inevitable. These failures nrc most often emergencies in nnture and require immediate repair action. This program is necessary to expedite repairs and maintain a high level of service. Prior ! ~o,o00 I Total Prior I 9°,°°°1 Total Expenditures 2002 2003 2004 2005 2006 Total Construction/Maintenance 45,000 50,000 50,000 50,000 195,000 Total 45,000 50,000 50,000 50,000 195,000 Funding Sources 2002 2003 2004 2005 2006 Total Sewer & Water Utility Fund 45,000 50,000 ' 50,000 50,000 195,000 Total 45,000 50,000 50,000 50,000 195,000 ! Operational Impact/Other ~[ ~rhis program does not increase operational costs. CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN i r~oj.t # W-014 ! Project Name SCADA System Upgrades/Maintenance Contact Department Water System Improvements Type Equipment Useful Life Category Priority n/a Description [ Provides for the updating of the SCADA System control panels for a portion of the water system infrastructure (Wells 3,4,5,6,7 and towers 1 & 2). The program will ~be phased over 3 years. ~ccount #700-7702-4705 Justification ] £xisting control panels vary in age. Available parts for the older units are dwindling. Communication is based on a phone line system; replacement upgrades would [ change to radio communications. This upgrade program will be a proactive approach to ensure reliable water service. I Prior Expenditures 2002 2003 2004 2005 2006 Total [ 200,0001 Construction/Maintenance 100,000 10,000 10,000 10,000 130,000 Total Total lO0,0oo 10,ooo 10,000 lO,O00 13o,o0o Prior Funding Sources 2002 2003 2004 2005 2006 Total ] 200,000 ] Sewer & Water Utility Fund 100,000 10,000 10,000 10,000 · 130,000 Total Total 100,000 10,000 10,000 10,000 130,000 i-Operational Impact/Other ] iThis program will decrease annual repair and maintenance costs due to problems associated with equipment age. i CAPITAL PLAN 2002 thru 2006 City of Chanhassen, MN t Project # i W-015 ~*X! rroject Name Repainting: West 76th St. Water Tower Description Provides for ~he recoafing or,he interior and exterior surfaces of the W. 76th St. Wa~r Tower. Account#710 Contact Department Water System Improvements Type Improvement Useful Life Category Priority n/a Justification This type of infrastructure requires recoating approximately eveo, 10 years to protect the life of the metal structure and maintain healthy potable water. This project will extend the service life of this water storage facility. Expenditures Construction/Maintenance Total 2002 40,000 2003 2004 2005 2006 Total 40,000 40,000 Funding Sources Sewer & Water Expansion Fun Total 2002 40,000 40,000 2003 2004 2005 2006 Total 40,000 40,000 ,?Operational Impact/Ot~er ] IThis project does not increase operational costs. ! t CAPITAL PLAN City of Chsnhassen, MN ! Project # W-O 17 Project Name Utility Rate Study 2002 d~ru 2006 Contact Department Water System Improvements Type Improvement Useful Life Category Priority n/a Description I PrOVides for the review of current costs to provide sewer nnd water services and needed revisions to the utility rntes/structure. Account # 700-7701-4300 Justification [ ~t is important to ensure that utility rates represent thc City's cost to provide utility services. Thc Study ensures that the Utility Enterprise Fund is operated in a financially sound manner. Expenditures 2002 2003 2004 2005 2006 Total Planning/Design 25,000 25,000 Total 25,000 25,000 J Funding Sources 2002 Sewer.& Water Utility Fund - 25,000 Total 25,000 2003 2004 2005 2006 _. Total 25,000 25,000 I Op. erafional Impact/-0'~d ....... tThis project does not increase operational costs. Project PrOject Name CAPITAL PLAN City of Chanhassen, MN Description · 2002 thru 2006 Well #12 ] I Provide municipal water supply well. Well siting & design in 2006 with construction in 2007. Contact Department Type Useful Life Category Priority Justification ] Need to provide service to developing areas identified in the 1998 Comprehensive Water Supply & Distribution Plan. Water System Improvements Improvement n/a Expenditures Planning/Design Total Funding Sources Sewer & Water Utility Fund Total 2002 2003 2004 2005 2002 2003 2004 2005 2006 Total Future 77,000 77,000 I 6~5,000 I 77,000 77,0o0 Total 2006 Total Future ..ooo -.ooo I ~5.ooo I 77,000 77,0o0 Total !Operational Imp a-~/~)~ .... CAPITAL PLAN 2002 ti~ru 2006 City of Chanhassen, MN Project# W-019 Project Name Water Treatment Plant II Contact Department Type Useful Life Category Priority Water System Improvements Improvement n/a Description [ Consima Water Treatment Plant with siting and design in 2006 and construction in 2007. Justific4ffion Public Demant & High maintenance costs. Potential need and sites identified in 1998 Comprehensive Water Supply & Distribution Plan. Expenditures 2002 2003 2004 2005 2006 Total Planning/Design 500,000 500,0OO Total 500,000 500,000 Future 14,0oo,ooo1 Total Funding Sources 2002 2003 2004 2005 2006 Total Sewer & Water Utility Fund 500,OO0 500,000 Total 500,000 500,000 Future I 4,ooo,oool Total Operational Impact/Other i~roject will increase maintenanc-~' costs.