Loading...
3c. Approve Change Order No. 1 to TH 101 North Leg Project 88-22B1 7 CITY OF 3e CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 Action by City Administrator MEMORANDUM �(I do rseri i� 17i1. �} llodifie TO: Don Ashworth, City Manager Rejecte Date... - g -, I" FROM: Charles Folch, Director of Public Works /City Engineer Dete Submitted to Commiss DATE: February 7, 1994 Date Sr`mi±ted to council SUBJ: Approve Change Order No. 1 to the Trunk Highway 101 North Leg Project No. 88 -22B To date, the majority of the work associated with the Think Highway 101 North Leg Realignment Project No. 88 -22B has been completed. The remaining work to be completed includes sidewalk, landscape sod and tree installation along with the placement of the bituminous wearing course. Despite the difficult construction season we had last year the project was left in very good shape prior to the winter shutdown. As I am sure you recall, this project experienced some delays during planning process due to coordination with the Soo Line Railroad, MnDOT, and then finally (at the eleventh hour) a change of ownership to the Twin Cities and Western Railroad. Nevertheless, this contract had to be let prior to December 31, 1992 ' or risk the loss of the primary funding source (TIF) for this project as was dedicated through special legislation. This contract was let prior to the deadline; however, _MnDOT was still in the process of conducting final review of the plans. , Given this situation, staff fully expected to receive some minor change requests from MnDOT associated with their approval process which would likely incur some additional work items to the project. This anticipation became reality as 85% of the dollars associated with this change order was a direct result of changes and modifications made by MnDOT through the permit approval process, i.e. additional ponding and signal work items. In essence, had MnDOT approval been acquired prior to bidding the project, these additional work items would have been included in the plans and still paid for accordingly. It should also be noted that since the project is nearly substantially completed, it is not anticipated that any further change orders of significant dollar amounts will be necessary. It is therefore recommended that Change Order No: 1 to the Trunk Highway 101 North Leg Realignment Project No. 88 -22B in the amount of $97,869.24 be approved yielding a revised contract amount of $1,586,318.28. ktm Attachment: Change Order No. 1 dated January 12, 1994 ' c: Jon Horn, BRW gA=g\cher1es\noAMeg.cc3 i") i CITY OF CHANHASSEN City Copy CONTRACT AMENDMENT Contractor Copy ' ___,Inspector Copy Project: TH 101 Realignment (North Leg) ' City Project Number: 88 -22B Amendment Number: (1) One JAN J i v Date: January 12, 1994 Contractor: CS. McCrossan Construction, Inc. .;,, „ g The additions, revisions and corrections contained herein shall be made to the contract documents - f6i the ' project and shall become a part of the Scope of Work. Description of Changes: ' A. The Contractor has performed additional earthwork as necessary to construct a stormwater pond north of West 78th Street west of the Chanhassen Office Complex. The additional pond grading was required as a result of plan changes required by Mn /DOT as a part of their review of the ' project. The additional pond grading work has resulted in an increase in the contract quantity for Common Channel Excavation as follows: ' BID SCHEDULE A - GENERAL WORK ' B. The Contractor has performed additional work as necessary to install emergency vehicle preemption (EVP) equipment for the new West 78th Street and TH 101 signal system as requested by City staff. The installation of the EVP system has resulted in the creation of a new lump sum pay item for the work as follows: ' BID SCHEDULE E - SIGNAL SYSTEM Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ Add/ No. Quantity (Decrease) (Deduct) 15/ Common Channel CY $6.00 4,750.00 10,000.00 $60,000.00 2105.511 Excavation ' Net Contract Change Add $ 60,000.00 ' B. The Contractor has performed additional work as necessary to install emergency vehicle preemption (EVP) equipment for the new West 78th Street and TH 101 signal system as requested by City staff. The installation of the EVP system has resulted in the creation of a new lump sum pay item for the work as follows: ' BID SCHEDULE E - SIGNAL SYSTEM 014247 CAM Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ Add/ No. Quantity (Decrease) (Deduct) 4/ EVP System LS $6,985.80 0.00 1.00 $6,985.80 0565.602 Net Contract Change Add $6,985.80 014247 CAM C. Modifications have been made to the design for the new signal at the TH 101 and West 78th Street intersection as required by Mn /DOT as a part of their review of the project. These design modifications have resulted in additional costs for wiring, conduit, handhole and mast arm changes. The modifications to the signal system have resulted in the creation of a new lump sum pay item ' for the additional work as follows: BID SCHEDULE E - SIGNAL SYSTEM ' Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ AddJ No. Quantity (Decrease) (Deduct) 5/ Signal System LS $15,760.80 0.00 1.00 $15,760.80 Modifications Net Contract Change Add $ 1 5, 760.80 D. The Contractor has installed additional conduit, wire and handholes as necessary for the interconnection of the West 78th Street and TH 101 signal system with the new railroad crossing signals in the area. The additional work was required to coordinate the roadway intersection signal system with the final design for the railroad signal systems. The additional railroad signal system interconnection work has resulted in the creation of an new pay item for the work as follows: BID SCHEDULE E - SIGNAL SYSTEM Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ Add/ No. Quantity (Decrease) (Deduct) 6/ Railroad LS $7,033.40 0.00 1.00 $7,033.40 Interconnection Net Contract Change Add $7,033. E. As requested by City staff, all wiring for the streetlighting and tennis court lighting systems will be installed in conduit rather than direct bury as specified in the plans. This modification has resulted in an increase in the contract quantity for an existing pay item for underground conduit as follows: BID SCHEDULE G - LIGHTING IMPROVEMENTS Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ Add/ No. Quantity (Decrea (Deduct) 8/ 2" Conduit LF $250 1,985.00 2,615.00 $6,53750 Underground Net Contract Change Add $6,53 ;9 $14247 CA1-2 F. The Contractor utilized additional traffic control devices as directed by the Engineer to minimize traffic confusion resulting from the switch from Stage 1 to Stage 2 of the project. The traffic control devices included the installation of additional advance warning devices and the temporary use of a portable changeable message sign. The additional traffic control work has resulted in the creation of a new pay item as follows: BID SCHEDULE A - GENERAL WORK Seq. No./ Item Unit Unit Price Original Quantity Amount Mn /DOT Contract Increase/ Add/ No. Q uantity (Decrease) (Deduct) 78/ Additional Traffic LS $1,551.74 0.00 1.00 $1,551.74 0563.601 Control Net Contract Change Add $1,551.74 SUMMARY Current Contract Amount: $1,488,449.04 Item A Net Add $60,000.00 Item B Net Add 6,985.80 Item C Net Add 15,760.80 Item D Net Add 7,033.40 Item E Net Add 6,53750 Item F Net Add 1,551.74 Contract Amendment No. 1 Add: 97,86924 Amended Contract Amount: $1,586,31828 114247 CA1 -3 APPROVALS RECOMMENDED BY: BRW, Inc. B . Title Project Manager Date ACCEPTED BY: C.S. McCrossan Construction, Inc. BY itle V ►, ; te APPROVED BY: City of Chanhassen BY: Title City Engineer Date 814247 CA1-4