3 St. Hubert Church ExpansionPROPOSAL:
LOCATION:
APPLICANT:
CITY OF
PC DATE: March 5, 2002
CC DATE: April 8, 2002
REVIEW DEADLINE: 4/2/02
Extended to June 1, 2002
CASE #: SPR 96-11 File 2
Rv-RG M'T. ST T,H..TS
STAFF
rEPORT
Request for an amendment to the Villages on the Ponds PUD to increase the
maximum allowable institutional building area and site plan review for a
41,522 sq. ft. exlSansion to the existing building, St. Hubert Catholic
Community.
Lot 1, Block 2, Villages on the Ponds, 8201 Main Street
Opus Northwest Construction Corp.
10350 Bren Road West
Minnetonka, MN 55343
(952) 656-4457
St. Hubert Catholic Community
8201 Main Street
Chanhassen, MN 55317
PRESENT ZONING: PUD, Planned Unit Development
2020 LAND USE PLAN: Mixed Use
ACREAGE: 9.28 acres of land
DENSITY: NA
SUMMARY OF REQUEST: The applicant is requesting an amendment to the Planned Unit
Development to permit up to 135,000 square feet of institutional uses within the Villages on the
Ponds. The current design standards specify that the PUD must be amended if institutional uses
exceed 127,000 square feet. This amendment would require the reallocation of 10,150 square feet
of retail square footage to the institutional use. The applicant is also requesting site plan review for
a 41,522 square foot expansion that would extend the school to the south as well create a fellowship
hall and miscellaneous space on the north side of the church and gymnasium.
Notice of this public hearing has been mailed to all property owners within 500 feet.
/
Market BIv6
.iii
St. Hubert Catholic Community
March 5, 2002
Page 2
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City has a relatively high level of discretion in approving rezonings, PUD's, and
amendments to PUD's because the City is acting in its legislative or policy making capacity. A
rezoning or PUD, and amendment thereto, must be consistent with the City's Comprehensive
Plan.
The City's discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements. If it meets those standards, the City must
then approve the site plan. This is a quasi-judicial decision.
PROPOSAL/SUMMARY
The applicant is requesting an amendment to the PUD standards which require that the standards be
amended if more than 127,000 square feet of institutional use is proposed within the development.
The applicant is requesting a total of 135,000 square feet of institutional use, an increase of 8,000
square feet. Staff has had meetings with the representatives from Villages on the Ponds to
determine if this proposed change will still permit the type and quantity of development that was
originally approved. Based on the analysis of the potential build out of the project, the reallocation
to institutional uses would still allow the remainder of the development to proceed as originally
envisioned. Staff has prepared an amendment to section d. 5. of the design standards incorporating
these changes. The proposed institutional expansion will require the reallocation of 10,150 square
feet of commercial square footage to institutional use.
The applicant is also requesting site plan review for a 41,522 square foot expansion that would
extend the school to the south as well as create a fellowship hall and miscellaneous space on the
north side of the church and gymnasium. The proposed expansion will bring the total building area
to 133,574 square feet.
The school expansion would be two stories, adding 18 additional classrooms. The exterior
elevation would continue the use of reddish brown brick as the primary color with sandy brick
accent bands, squares and window headers. The roof over the school would be flat with a parapet
wall surrounding the edge. The top of the parapet would be covered with copper colored metal
coping. Window frames would be grayish silver aluminum. The connection between the existing
school and the new wing would be a glass curtain wall atrium area. Outside of the expansion to the
east would be a small outdoor seating area.
The church expansion extends the building to the north as one story with a wood shake roof. The
expansion includes additional worship space, narthex, a small library, a fellowship hall/dining
room expansion, toilet facilities, and additional storage space. An aluminum-framed canopy is
being extended over a car drop off area at the northerly entrance. The building material will use
reddish brown brick as the primary color with sandy brick accents patterns and window and door
headers. The roof will be sloped up to the existing gymnasium wall and a parapet extension to the
entrance area. The top of the parapet would be covered with copper colored metal coping.
Window frames would be grayish silver aluminum. Entrance accents will be provided at all
building entrances through the use of dormer extensions above the doors. A chimney will be
St. Hubert Catholic Community
March 5, 2002
Page 3
located on the north end of the fellowship hall for the fireplace. The proposed expansion will
provide significant architectural detailing.
On the eastern elevation, a garage and receiviflg area is being extended out from the building. This
expansion will have a fiat roof with the reddish brown brick as the building material. Two
overhead doors will be located on the east side and one overhead door on the north side. Staff
recommends that these doors be similar in color to surrounding bricks.
Staff is recommending approval of the site plan for the church and school expansion subject to the
recommended conditions of approval.
BACKGROUND
On November 26, 2001, the Chanhassen City Council approved an amendment to the Villages on
the Ponds Design Standards, section d. Development Site Coverage and Building Height,
o
The maximum building height shall be Sector I - four stories (residential with street level
commercial or office/50 ft.), (retail and office buildings without residences above shall be
limited to three stories/40 ft.) except for the lot on the corner of Promenade Pond and
Great Plains Boulevard shall be limited to two stories and 30 feet, Sector II - three
stories/40 ft., Sector III - three stories/40 ft., and Sector IV - four stories/50 feet. Building
height limitations are exclusive of steeples, towers, and other architectural and roof
accents.
And,
,
The following table shall govern the amount of building area for the different uses'
Commercial/ Office/Service Institutional Dwelling TOTAL
Retail (sq. ft.) (sq. ft.) (sq. ft.) Units sq. ft.
Sector I 114,500 83,500 0 160 198,000
Sector Il 60,000 * 14,000 0 0 74,000
Sector IH 0 0 100,000 0 100,000
Sector IV 0 0 0 162 0
TOTAL 174,500 97,500 100,000 322 372,000
* Includes 47,200 square foot, 106-unit motel.
Building square footages may be reallocated between sectors and between uses subject to
approval by the Planning Director, with the intent not to increase the total traffic load. The
following factors shall be used in calculating the reallocation of building square footages
between uses:
1 Residential apartment unit = 3 congregate care (assisted living or dementia) unit.
1 Residential apartment unit = 2 elderly (independent) unit.
St. Hubert Catholic Community
March 5, 2002
Page 4
1 Residential apartment unit = 360 square feet of office/service.
1 Residential apartment unit = 90 square feet of retail.
1 Residential apartment unit = 440 square feet of institutional.
950 square feet of office/service = 1,000 square feet of institutional.
300 square feet of retail = 1,000 square feet of office/service.
290 square feet of retail = 1,000 square feet of institutional.
In no instance shall more than 27,000 square feet of addition institutional building square footage
be reallocated without an amendment to the PUD.
6. Buildings adjacent to pedestrian sidewalks must have commercial/office on the majority of
the street frontage.
On August 13, 2001, the City Council approved an amendment to PUD 95-2, Villages on the
Ponds, to permit a drive through window on Lot 1, Block 1, Villages on the Ponds 2nd Addition,
as a conditional use.
On September 23, 1996, the City Council approved PUD 95-2, Villages on the Ponds, including
a Comprehensive Land Use Plan amendment from Office/industrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use-Commercial, High Density Residential,
Institutional and Office; Preliminary planned unit development for up to 291,000 sq. ft. of
commercial/office buildings, 100,000 sq. ft. of institutional buildings, and 322 dwelling units;
rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat
dated "Received September 19, 1996" for two lots and ten outlots and public right-of-way.
On September 9, 1996, the City Council approved Site Plan 96-11 for a 96,288 square foot
school church facility for St. Hubert Catholic Community on Lot 1, Block 2, Villages on the
Ponds.
On August 12, 1996, the City Council granted preliminary approval of PUD #92-1 including a
Comprehensive Land Use Plan amendment from Office/industrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use-Commercial, High Density Residential,
Institutional and Office; Preliminary planned unit development for up to 291,000 sq. ft. of
commercial/office buildings, 100,000 sq. ft. of institutional buildings, and 322 dwelling units;
Rezoning from lOP and RSF to PUD, Planned Unit Development (first reading); Preliminary plat
for 13 lots and 3 outlots and public right-of-way; Wetland Alteration Permit to fill and excavate
wetlands on site; vacation of right-of-way and easements; Environmental assessment Worksheet
(EAW) findings of Negative Declaration of the need for additional environmental investigation;
and Indirect Source Permit Review for the Villages on the Ponds project.
APPLICABLE REGULATIONS
Section 20-106 through 20-122, Site Plan Review
Villages on the Ponds Development Design Standards
St. Hubert Catholic Community
March 5, 2002
Page 5
ANALYSIS OF POTENTIAL BUILD OUT
Project Commercial Office/Service
(sq. ft.) (sq. ft.)
Permitted 174,500 97,500
Lake Susan Apartments
Peddler Cyclery 5,018. 6,077
Foss Swim School 9,800
Houlihan's 7,362 81
Culvers 4,768
Building 4 7,425 7,425
Building 17 30,000
Americlnn 44,013 1,492
Americlnn (expansion) 6,870
St. Huberts
Presbyterian Homes 4,500 4,500
Retail E 24,980 50,914
Retail C 15,500 15,500
Retail C-1 24,000 520
Retail G 8,000 8,000
St. Hubert Expansion
TOTALS 152,436 134,309
Balance 22,064 (36,809)
Balance Equivalents
Conversion to Commercial
Residential
(units)
322
Balances after conversion
and exchanges
162
69
5O
4O
Institutional
(sq, ft,)
100,000
Date
Approved
6/28/1999
6/28/1999
6/14/1999
5/11/1998
9/24/2001
9/22/1997
8/11/1997
2/24/1997
96,288 12/9/1996
11/26/2001
38,712
321 135,OOO
1 (35,000)
22,064 (11,043) 90 (10,150) square feet
871 sq. ft. - 1 unit 0
Bldg Sq
Ft
C/O/Ins.
11 095
9 800
7 443
4 768
14 850
30000
45.505
6 87O
96.288
9 000
75 894
31 000
24,520
16,000
38,712
421,745
The above table begins with the approved square footages for each type of use in the design standards.
The table then goes through all the approved and potential development within the project, subtracting
each building's square footage from the total square footage for that use. The bottom five building square
footages are based on estimates of the potential development for each remaining site based on parking,
market conditions and site area. The balance in each use is shown at the bottom of the table (negative
numbers show that the initial square footage has been exceeded). We then convert all the uses to a
common factor, in this case commercial. The converted office (11,043 sq. ft. of commercial) and
institutional (10,150 sq. ft. of commercial) are subtracted from the commercial balance, leaving a balance
of 871 square feet of commercial.
Based on the analysis of the potential build out of the project, the reallocation to institutional uses
would still allow the remainder of the development to proceed as originally envisioned (a mixed
use project). Staff has prepared an amendment to section d. 5. of the design standards incorporating
these changes. The proposed institutional expansion will require the reallocation of 10,150 square
feet of commercial square footage to institutional use. The table will be amended to show this.
However, we are recommending that no additional institutional square footage be permitted without
and amendment to the PUD.
The overall goal is to maintain the trip generation rates under those that were originally approved as
part of the Environmental Assessment Worksheet for the concept plan. The conversion factors
St. Hubert Catholic Community
March 5, 2002
Page 6
adopted at the previous PUD amendment would maintain these ratios even though the projected
total square footages may be larger.
GENERAL SITE PLAN/ARCHITECTURE
The exterior elevation would continue the use of reddish brown brick as the primary color with
sandy brick accent bands, squares, patterns and window headers. The roof over the school would
be flat with a parapet wall surrounding the edge. The top of the parapet would be covered with
copper colored metal coping. Window frames would be grayish silver aluminum. The roof over
the church expansion would be sloped, with cedar shake shingles. Entrance accents will be
provided at all building entrances through the use of dormer extensions above the doors. A
chimney will be located on the north end of the fellowship hall for the fireplace. The proposed
expansion will provide significant architectural detailing.
The following setbacks shall apply:
Market Blvd.: Buffer yard & Setback
Interior Side Lot Line: Buffer yard & setback
East Perimeter Side Lot Line (adjacent to
residential): Buffer yard & setback
Building/Parking Proposed
50', 20' 525', 300'
0',0' 12',0'
50', 50' 60', 20'
The proposed expansion meets or exceeds the requirement for architectural detailing required in
both the Villages on the Ponds design standards as well as the city's overall design standards.
LANDSCAPING
The applicant meets required landscaping standards. Staff proposes that an additional overstory
tree be added to the northerly landscape boulevard island. The applicant shall guarantee the
survival of all transplanted material similar to the requirements for landscaping installation on
other projects, e.g., for one year past date of acceptance of landscaping.
GRADING DRAINAGE & EROSION CONTROL
Minimal grading will be required for this project to elevate the proposed building pad to 925.
The proposed grading will include filling on the southeast corner. A maximum slope of 3:1 is
allowed where it is applicable or a retaining wall must be used. The applicant should be aware
that any retaining walls over 4-feet need to be designed by a registered engineer. Retaining walls
are not allowed in public easements. The extent of the grading will be the digging and filling of
trenches for the sanitary sewer pipe. The plans do propose erosion control fencing around the
perimeter of the site. Type 11I silt fence must be used and extended around the excavated area to
prevent any migration of the excavated material and an erosion control blanket should be
installed within two weeks of completion on the sloped area. ' '
St. Hubert Catholic Community
March 5, 2002
Page 7
No drainage or storm sewer improvements are proposed with this project. The plan is not clear
as to if the proposed building's roof drain will be connected to the existing roof drain then
conveyed via the existing storm sewer system and finally discharge into the existing pond located
in the southwest comer of the lot or how the roof will drain. Design calculations will need to be
submitted for the additional site drainage. The applicant should be aware that any off-site
grading would require an easement from the appropriate property owner.
UTILITIES
The plans propose to abandon a portion of an existing public sewer line and reroute it around the
proposed building expansion area. A new sewer line will replace the existing line. The applicant
is also proposing that the end of the watermain be realigned. The proposed water and sanitary
sewer lines must be centered within a 20-foot wide utility easement. This easement will be
required to be signed and submitted to the City prior to beginning construction. The applicant
will also be required to provide the necessary financial security in the form of a cash escrow or
letter of credit to guarantee installation of the public utilities. Utility improvements will be
required to be constructed in accordance with the City's latest edition of Standard Specifications
and Detail Plates.
STREETS
No major street improvements have been proposed with this project. Five parking spaces will be
eliminated, however, due to the building expansion.
LI GHTING/SI GNA GE
While no lighting is proposed on the plans, any lighting would have to follow the following
standards. Lighting for the interior of the villages should be consistent throughout the
development. A shoe box fixture (high pressure sodium vapor lamps) with decorative natural
colored pole shall be used throughout the development parking lot area for lighting. Decorative,
pedestrian scale lighting shall be used in plaza and sidewalk areas and may be used in parking lot
areas. The maximum height of light fixtures in the parking lot is 30 feet. All fixtures must be
shielded with a total cutoff angle of 90 degrees or less. Wall pack units, if used, shall be shielded
and directed downward so that no direct glare is visible off site.
No additional signage is proposed for the development. On-site traffic control signage may be
required.
MISCELLANEOUS
Detailed occupancy requirements have been reviewed with the applicant but cannot be completed
until complete plans are submitted. The owner and or their representative shall continue meeting
with the Inspections Division to discuss plan review and permit procedures.
St. Hubert Catholic Community
March 5, 2002
Page 8
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1)
Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
(2) Consistency with this division;
(3)
Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing or developing
areas;
(4)
Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5)
Creation of functional and harmonious design for structures and site features, with
special attention to the following:
ao
An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
Co
Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
d°
Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6)
Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: Subject to the revisions contained in the staff report, the proposed site plan is
consistent with all plans and specifications and development design standards for the
St. Hubert Catholic Community
March 5, 2002
Page 9
Villages on the Ponds Planned Unit Development and meets site plan findings 1 through
6 enumerated above.
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following motions:
"The Planning Commission recommends approval of the amendment to the Planned Unit
Development Standards for Villages on the Ponds amending section d. as follows:
1. Development Site Coverage and Building Height
1. The following table shall govern the amount of building area for the different uses:
Commercial/ Office/Service Institutional Dwelling TOTAL
Retail (sq. ft.) (sq. ft.) (sq. ft.) Units sq. ft.
Sector I 104,350 83,500 0 160 187,850
Sector II 60,000 14,000 0 0 74,000
Sector 111 0 0 135,000 0 135,000
Sector IV 0 0 0 162 0
--
TOTAL 164,350 97,500 135,000 322 396,850
Building square footages may be reallocated between sectors and between uses subject to
approval by the Planning Director, with the intent not to increase the total traffic load. The
following factors shall be' used in calculating the reallocation of building square footages
between uses:
1 Residential apartment unit = 3 congregate care (assisted living or dementia) units.
1 Residential apartment unit = 2 elderly (independent) units.
1 Residential apartment unit = 360 square feet of office/service.
1 Residential apartment unit = 90 square feet of retail.
1 Residential apartment unit = 440 square feet of institutional.
950 square feet of office/service = 1,000 square feet of institutional.
300 square feet of retail = 1,000 square feet of office/service.
290 square feet of retail = 1,000 square feet of institutional.
In no instance shall additional institutional building square footage be reallocated without an
amendment to the PUD."
"The Planning Commission recommends approval of Site Plan #96-11 File 2, plans prepared by
Opus Architects & Engineers, Inc., dated 1/30/02, subject to the following conditions:
o
A 20-foot wide utility easement over the proposed sewer line and watermain shall be
prepared and submitted to the City prior to beginning construction.
St. Hubert Catholic Community
March 5, 2002
Page 10
o
The applicant will also be required to provide the necessary financial security in the form
of a cash escrow or letter of credit to guarantee installation of the public utilities.
o
Provide the City with a copy of the MPCA sanitary sewer extension permit and
Department of Health watermain permit.
4. Add the latest City standard detail plate nos. 1002, 2101, 2109, 2202, 2203, 5300.
5. Show all existing utilities.
6. Show the proposed sewer pipe type, class, slope, invert and rim elevations.
7. Silt fence type m must be used and removed when construction is completed.
8. Revise the north sign arrow to point in the correct direction.
9. Vacate existing utility easements.
10. Add a benchmark to the plans.
11.
Type 111 silt fence must be used and extended around the excavated area to prevent any
migration of the excavated material and an erosion control blanket should be installed
within two weeks of completion on the sloped area.
12. Slope should be 3:1 maximum or a retaining wall built.
13.
14.
15.
16.
17.
Design calculations will need to be submitted for the additional site drainage.
Eliminate proposed manhole no. 101 and connect to existing manhole no. 6 as shown on
the City's as-builts.
The applicant shall enter into a site plan agreement with the City and provide the
necessary security to guarantee erosion control, site restoration and landscaping.
The overhead doors shall be similar in color to the surrounding brick.
The standpipe connections in the existing school portion of the building must be extended
into the new school addition. The standpipes were an accepted alternate means of
protection in lieu of providing access roads around the building.
18.
19.
The additions are required to have an automatic fire extinguishing system.
The building plans must be prepared and signed by design professionals licensed in the
State of Minnesota.
St. Hubert Catholic Community
March 5, 2002
Page 11
20.
The proposed Fellowship Hall must be a minimum of Type II-I HR construction and must
be separated from existing Buildings A & B by area separation walls.
21.
The roof/canopy at the drop off area on the north side of the building must be constructed
of noncombustible materials.
22. An addition overstory tree shall be added to the northerly landscape boulevard island.
23.
The applicant shall guarantee the survival of all transplanted material for one year past the
date of installation final acceptance of site landscaping.
ATTACHMENTS
1. Findings of Fact and Recommendation
2. Overall Site Plan - Villages on the Ponds
3. Development Review Applications
4. Letter from David F. Bangasser and Jeffrey L. Walker to Bob Generous dated 2/1/02
5. Reduced Copy of Site Plan
6. Reduced Copy of Floor Plans
7. Reduced Copy of Building Elevations
8. Memo fi'om Greg Hayes to Robert Generous dated 2/11/02
9. Public Hearing Notice and Mailing List
St. Hubert Catholic Community
March 5, 2002
Page 12
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
Application of Opus and St. Hubert Catholic Community for Site Plan Review and an
amendment to the development design standards for Villages on the Ponds.
On March 5, 2002, the Chanhassen Planning Commission met at its regularly schedule
meeting to consider the application of St. Hubert Catholic Community for a site plan review for
the property located at 8201 Main Street and an amendment to the design standards for Villages
on the Ponds. The Planning Commission conducted a public hearing on the proposed site plan
and amendment preceded by published and mailed notice. The Planning Commission heard
testimony from all interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development, PUD.
2. The property is guided by the Land Use Plan for Mixed Use.
3. The legal description of the property is: Lot 1, Block 2, Villages on the Ponds
4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible
adverse affects of the proposed amendment. The six (6) affects and our findings
regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City
Comprehensive Plan.
St. Hubert Catholic Community
March 5, 2002
Page 13
b) The proposed use is or will be compatible with the present and future land uses of
the area.
c) The proposed use conforms to all performance standards contained in the Zoning
Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is
proposed.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
5. Section 20-110:
(1)
(2)
(3)
(4)
(5)
Is consistent with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
Is consistent with this division;
Preserves the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing or developing areas;
Creates a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
Creates a functional and harmonious design for structures and site features, with
special attention to the following:
ao
An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
St. Hubert Catholic Community
March 5, 2002
Page 14
do
Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6)
Protects adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and
air and those aspects of design not adequately covered by other regulations which
may have substantial effects on neighboring land uses.
o
The planning report #96-11 File 2 dated March 5, 2002, prepared by Robert
Generous, et al, is incorporated herein.
RECOMMENDATION
plan review.
The Planning Commission recommends that the City Council approve the site
ADOPTED by the Chanhassen Planning Commission this 5th day of March, 2002.
CHANHASSEN PLANNING COMMISSION
BY:
Its Chairman
ATTEST:
Secretary
g:\plan\bg\villageskst, hubert's expansion.doc
.00~
,OO& ,OS
e::losouuuAI 'uossequeq3
; OIIIIU
--
--
,~o,~,~ :::-"~IIIIIIIIRIIIIIIIIIIIII
.i-o. 11V~3~ --
0
o
o
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPLICATION '
TELEPHONE (Day time)
.
Comprehensive Plan Amendment
Conditional Use Permit
OWNER:
ADDRESS:
TELEPHONE:
Temporary Sales Permit
Vacation of ROW/Easements
Interim Use Permit
Non-conforming Use Permit
Planned Unit Development*
Rezoning
Variance
Wetland Alteration Permit
Zoning Appeal
Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign ~ l ~'~
Site Plan Review*
SubdMsion*
X. Escrow for Filing Fees/Attorney Cost**
($50 CU P/SPRNACNAR/WAP/Metes
and Bounds, $400 Minor SUB)
TOTAL FEE $ 3cc~ '"'
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application. ·
:augcrmg material samples must be submitted with site plan reviews.
'Twenty-six full size folded copies of the plans must be submitted, including an 8W' X 11" reduced copy of
/~-~r~.n~.y [or each plan sheet.
Escrow will be required for other applications through the development contract
ND'DE- When multiple applications are processed, the appropriate fee shall be charged for each application.
TOTAL ACREAGE ~/.
YES '/- NO
I:rFL~SIENT ZONING
.P~EQ~ ZONING
PRF_SIENT LAND USE DESIGNATION
REQUF_STED LAND USE DESIGNATION
REASON FOR THIS REQUEST
This application must be completed in full and be typewritten or cleady printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
I::)ep~ent to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A Written
z'zetice of apjalJcaUon deficiencies shall be mailed to the applicant within ten business days of applrcation.
Thi~, is to cert~ that I am making application for the descried action by the City and that I am responsible for complying with
all City requirements with regard to this request. This applicat, ion should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either
copy of Owner's Duplicate Certificate of-Title, Abstract of Title or purchase agreement), or I am the authorized person to make
~is application and the fee owner has also signed this application.
I W~ll keep myself informed of the deadlines for submission of matedal and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
rny kn~dge. .
'The city hereby notities the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
exte~i~ns are approved by the applicant.
si~n'azur~'lf,~o~licant Date
S~gnature of Fee Own/er Date
.At:~l'~aIion Receivecl on Fee Paid Receipt No.
-I'he applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting.
If rmt c~r~tacted, a copy of the report will be mailed to the applicant's address.
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPUCATION '
,~PPJJCANT:
ADDRESS:
TELEPHONE(Daytime) ~-~5'z ~c-
· ~S'Z- ~50
Comprehensive Plan Amendment
Conditional Use Permit
OWNER:
ADDRESS:
TELEPHONE:
Temporary Sales Permit
Vacation of ROW/Easements
Interim Use Permit
·
variance
Non-conforming Use Permit
Planned Unit Development*
Wetland Alteration Permit
Zoning Appeal
, ~ Rezoning
.Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign I¢ l ~"~
i '/- Site Plan Review*
Escrow for Filing Fees/Attorney Cost**
($50 CUP/SPR/VACNAR/WAP/Metes
and Bounds, $400 Minor SUB)
Subdivision* TOTAL FEE $ ~,~:,0 -
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Bugcrmg material samples must be submitted with site plan reviews.
~rwenty-six full size folded copies of the plans must be submitted, including an 8W' X 11" reduced copy of
tr,-~-~,,y [-o~ each plan sheet.
Escrow will be required for other applications through the development contract
:NDTE-When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME
lEGAL DESCRIPTION
W'ET!_AN~S PRESENT
YES v- NO
]=3=.ESENT ZONING
P,~EQU~ I J~D ZONING
LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST ?<<~,; ~.~-r, ~.~
-J'his application must be completed in full and be typewritten or cleady printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A Written
nDtice of ap. PlJcation deficiencies shall be mailed to the applicant within ten business days of application.
q'hi~ is to certify that I am making application for the described action by the City and that ! am responsible for complying with
all City requirements with regard to this request. This applicat, ion should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either
copy of Owner's Duplicate Certificate of-Title, Abstract of Title or purchase agreement), or I am the authorized person to make
this applJca~ and the fee owner has also signed this application.
~ W~'I1 keep myself informed of the deadlines for submission of matedal and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information i have submitted are true and correct to the best of
The cTty hereby notifies the applicant that development review cannot be completed within 60 days due to public headng
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
exter~bns are approved by the applicant.
Date
Date
Receipt No.
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting.
:if rmt contacted, a copy of the report will be mailed to the applicant's address.
OPUS.
THE OPUS GROUP
A R C H I T E C T S
CONTRACTORS
D E V E L O P E R S
February 1, 2002
OPUS NORTHWEST CONSTRUCTION CORPORATION
10350 Bren Road West
Minnetonka, MN 55343
Phone 952-656-4444
Fax 952-656-4529
www. opuscorp.com
Mr. Bob Generous
City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
RE: PROPOSED EXPANSION
ST. HUBERT CATHOLIC COMMUNITY CHURCH & SCHOOL
Dear Bob'
On behalf of St. Hubert Catholic Community, we are pleased to submit the following applications
pertaining to the proposed additions to the existing St. Hubert Catholic Community facility:
· Site Plan Review application, including a check in the amount of $860 and all associated
plans and renderings, for the proposed additions to the existing facility.
Vacation of Easement Application, including a check in the amount of $300 for the
proposed re-alignment of an existing sanitary sewer line on the south side of the existing
facility.
Planned Unit Development Amendment application, including a check in the amount of
$300 for the proposed change to the maximum allowable institutional area included in the
P.U.D. for the Villages on the Ponds development.
We request the City of Chanhassen review these applications in order for consideration by the
Planning Commission at the public hearing on March 5, 2002 and by the City Council at the council
meeting on March 25, 2002.
St. Hubert Catholic Community has continued to grow since the existing facility was completed in
1997. The Parish leadership has determined that construction of a fellowship hall addition and the
construction of additional classrooms is necessary to continue to meet the needs of the parish.
The Parish is currently in the process of raising funds for the planned construction. It may be
decided to phase construction with up to eight class rooms being built at a later date. The length of
the classroom addition will be approximately 60 feet shorter than what is shown on the attached site
plan if the eight class rooms were delayed. The Parish leadership anticipates resolving this issue
prior to the March 5, 2002 Planning Commission hearing.
Allentown · Atlanta · Austin · Chicago · Columbus · Dallas ' Denver · Fort Lauderdale · Houston - Indianapolis · Kansas City · Los Angeles · Miami · Milwaukee · Minneapolis
Ol'allQ. e CotllllV ° Orlando · Pensacola · Philadelphia · Phoenix · Portland · Sacramento · San Francisco · San Jose · Seattle · St. Louis · Tampa · X~,ashinlaton, D.C.
OPUS,
Mr. Bob Generous
February 1, 2002
Page 2 of 2
The fellowship hall and classroom additions shown on the attached site plan will increase the size of
the St. Hubert Catholic Community facility to approximately 133,000 square feet of floor area. The
previous agreement between St. Hubert Catholic Community and AUSMAR allowed for a
minimum expansion of 108,000 square feet of floor area. The Parish leadership has reached a
verbal agreement with Lotus Realty to allow up to a maximum of 135,000 square feet of floor area.
We understand that the maximum allowable institutional area included in the P.U.D. for the
Villages on the Ponds development is 127,000 square feet of floor area. We are requesting an
amendment to the P.U.D., increasing the allowable institutional area for the development to include
135,000 square feet of floor area for St. Hubert Catholic Community.
Thank you for your consideration in reviewing this project. If you have any questions or require
any additional information, please call either Dave Bangasser at 952-656-4457 or Jeff Walker at
952-656-4524
Sincerely,
OPUS NORTHWEST CONSTRUCTION CORPORATION
David F. Bangasser
Senior Project Manager
· ~' ~ ':1
,...~ .'-\ ,~-.'~' ~. [~ .................
Jeffrey L. Walker
Project Manager
attachments
JW~FI~
!
i
'~JI '~Jee~J!bJ3
<>
o
0
[] [] [] [] [] [] [] [] [] [] [] []
[]
L
CITYOF
CHANHASSEN
690 City Center D;ive
PO Box i47
Cha,hasse,, Mimzesota 553 ] 7
Photle
952.937. I900
General Fax
952,937,5739
~,gin ee~'i,g Dgm 'tm e, t Fax
9fiZ 93 Z 9152
B,i/di,g Depart,tent Fax
952.934.2524
~3b Site
tvw~ ci. cha,hasse,, m,. ~cs
MEMORANDUM
TO:
Robert Generous, Senior Planner
FROM:
Greg Hayes, Fire Inspector/Training Coordinator
DATE:
February 11,2002
SUBJECT:
Request for an amendment to Villages on the Ponds PUD to
increase the maximum allowable institutional building area and
site plan review for a 41,522 square foot expansion to the
existing building on 9.2 acres of land zoned PUD, located on
Lot 1, Block 2, Villages on the Ponds, 8201 Main Street, OPUS
Northwest Construction Corp, St. Hubert's Catholic Community
Church
Planning Case: 96-11 Site Plan - File 2 (60 day review 4/3/02)
I have reviewed the site plan review for the above project. In order to comply with the
Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city
ordinance/policy requirements. The site plan is based on the available information submitted at
this time. If additional plans or changes are submitted, the appropriate code or policy items
will be addressed.
Tile standpipe connections in tile existing school portion of the building must be
extended into the new school addition. The standpipes were an accepted alternate
means of protection in lieu of providing access roads around tile building.
If you have an), questions, feel free to give me a call.
GH/be
g:\safe~'\gh\plrev96- ] 1
The City of Chauhasseu. A growi~ly, commtmity with ctea, lakes, c~a/ia' school,,', a cha;vni,¢ dow,tow,, t/,'ivi,¢ bmi, esses, a,d bemaifid oat'ks. A ~reat o/ace to live. work.