Loading...
1 Site Plan 2860 Water Tower PlCiTY OF PC DATE: June 5, 2001 CC DATE: June 25, 2001 REVIEW DEADLINE: 7/3/01 CASE #: SPR #2001-6 By: RG, JS, ST, ML, MS STAFF REPORT PROPOSAL: Request for site plan review for a 32,000 sq. ft. office/manufacturing building (Phase I) Parker Hannifin Corporation. -. LOCATION: 2860 Water Tower Place - Lot 2, Block 1, Arboretum Business Park 2nd Addition APPLICANT: Parker Hannifin Corporation 7850 Park Drive Chanhassen, MN 55317 (952) 474-0909 Steiner Development 3610 South County Road 101 Wayzata, MN 55391 (952) 473-5650 PRESENT ZONING: 2020 LAND USE PLAN: Planned Unit Development, PUD (office industrial park) Office/Industrial ACREAGE: 5.4 acre parcel DENSITY: 0.136 F.A.R. SUMMARY OF REQUEST: The applicant, Parker Hannifin is requesting site plan review approval for the first phase of a corporate building within the Arboretum Business Park. This phase of the building is 32,000 square feet. The second phase of the building would add another 32,000 square feet of area. Notice of this public hearing has been mailed to all property owners within 500 feet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets those standards, the City must then approve the site plan. This is a quasi-judicial decision. W 82nd .St. Ad;~:~etur~Bou l-evard__ Future Street 82ndStreet ....... --~4 A 5 Au 6 Au c~o~t~ Parker Hannifin Corporation June 5,2001 Page 2 PROPOSAL/SUMMARY The developer is requesting site plan approval to build a 32,000 square foot one story office - manufacturing building within the Arboretum Business Park. This building represents the first phase of development on this site and the building is designed to permit a 32,000 square foot expansion to the west. The main entrance is located to the south and has an anodized aluminum entrance awning over it. The loading docks are located to the north, have a metal canopy over them, and will be screened from public views by berming and landscaping. The primary building material is burnish, scored brick in a Buffstone (sandy-beige) color. Horizontal accent bands consisting of a soldier course of dark mod (brownish-red) brick are run on the south, east and part of the north and west sides of the building. The building base consists of walnut colored (brown), rock face block. The building materials are a high quality. The proposed development should be a welcome addition to the community. The plans show an alternate of using flush architectural metal panels on the west expansion wall area. Staff is unfamiliar with this material, however, we believe that the use of this material would be incompatible with the development design standards which state that "metal siding will not be approved except as support material to one of the above materials or curtain wall on office components or, as trim or as HVAC screen." Additionally, this side has a minimal amount of articulation and should incorporate the three primary materials along its length. The site plan, as submitted, was deficient on landscaping quantities. However, as part of the review, staff has provided the required numbers of plants and can easily verify that the revised landscaping plans comply with the requirements. The building will be connected to the street via a concrete sidewalk providing pedestrian and bicycle access to the property. The developer shall provide areas for bicycle parking and storage. The site appears within the Bluff Creek Overlay District secondary zone. However, staff believes this is an error based on conditions before the approval of the business park and the wetland alteration permit. Staff will be revising this line to more accurately depict the areas within Arboretum Business Park which are within the primary and secondary zones (specifically, the lands east of Century Boulevard). (The site plan appears to comply with most of the proposed design criteria being developed and reviewed by the city. Building components appear to have good proportions. There is sufficient architectural detail on all elevations except for the proposed expansion elevation which will have, at a minimum, two building materials. The entrance is located to the primary street and is covered by a metal awning. The south elevation has over 50 percent transparent windows. Staff is concerned that the east elevation of the building does not have additional articulation. While the developer proposes windows and a patio area in the southeast comer of the building, the remainder of the wall has little articulation. Staff believes that this elevation could be improved through any of the following methods: add overhead windows, incorporate column elements, incorporate patterns with the accent bricks, or install tall, narrow trees adjacent to the building. Staff would also recommend that a smaller canopy or trellis be installed over the patio area.) Parker Hannifin Corporation June 5,2001 Page 4 parcel immediately to the north is slated to be developed for a corporate headquarter type use (see attached PUD Plan for Arboretum Business Park). This future development should also act to screen this area from views from Highway 5. Arboretum Business Park was designed to have building pads terraced to preserve some of the original topography of the site. The building pad for this site (993) is approximately 29 feet above the finished floor elevation (964) of the 113,600 square feet office-industrial-warehouse buildings (Steiner Building 2) located on the property to the east. The Heartland America building (finish floor elevation 980), a 101,600 square foot office industrial building (Steiner Building 1) located south and east of the site, is approximately 13 feet below the floor elevation of this building. The building is approximately 22 feet lower than the finished floor elevation (1015) for a 59,990 sq. ft. office warehouse building (Steiner Building m) and the 55,911 square foot office/showroom building (All About Lights) located south and west across Water Tower Place from this site. The proposed building pad to the west is approximately 12 feet higher (1005) than the finished floor elevation for this building. The proposed site plan, subject to the modifications contained in the staff report, appears to meet or exceed the development design standards for Arboretum Business Park. COMPLIANCE TABLE PUD Parker Hannifin (Phase I) Building Height 3 stories 1 story Building Setback N-0' E-0' W-0' S-30'/Max 100' N- 130' E-96' W-35' S-93' Parking stalls 82 108 stalls Parking Setback N-0' E-0' N-45' E-48' W-0' S-20' W-26' S-20' Hard surface 70%* 75.1% Coverage Lot Area 1 acre 5.4 acres Variances Required - none Parking Standards: Office - 4.5 spaces per 1,000 square feet; Manufacturing - 1 parking space for each employee on the major shift and 1 space for each motor vehicle when customarily kept on the premises. Staff has estimated the required parking at 82 spaces. The applicant has provided 108 spaces. At least three of these spaces will be lost with the additional landscape peninsulas. Parker Hannifin Corporation June 5, 2001 Page 5 LANDSCAPING Minimum requirements for landscaping include 3,874 sq. ft. of landscaped area around the parking lot, 16 trees for the parking lot, and buffer yard plantings along the property lines. Applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Vehicular use landscape area Trees/parking lot North prop. line - buffer yard B, 54O' South prop. Line - buffer yard B, 380' East prop. line - buffer yard B, 480' West prop. Line - buffer yard B, 45O' Required Proposed 3,874 sq. ft. >3,874 sq. ft. 16 overstory 5 overstory 8 islands/peninsulas 5 islands/peninsulas 5 overstory 0 overstory 11 understory 13 understory 22 shrubs 0 shrubs 4 overstory 2 overstory 8 understory 4 understory 15 shrubs 0 shrubs 5 overstory trees 3 overstory 10 understory trees 5 understory 19 shrubs 5 shrubs 5 overstory - 0 overstory 9 understory 3 understory 18 shrubs 9 shrubs Proposed landscaping does not meet minimum ordinance requirements. Staff recommends that a revised landscape plan that meets minimum requirements be submitted to the city prior to City Council approval. Additional landscape peninsulas shall be located in the northern parking lot (two additional) and at the north end of the parking spaces on the east side of the building. Trees shall be added in each of the landscaping peninsulas and in the southeast comer of the building. If these landscape peninsulas are less than 10 feet in width, then aeration tubing shall be installed. All new landscaped areas shall have irrigation system installed pursuant to city ordinance. BLUFF CREEK NATURAL RESOURCE MANAGEMENT PLAN This site appears within the secondary corridor of the Bluff Creek Overlay District (BCO). These boundaries were based on wetland fingers that were in place prior to the development of Arboretum Business Park. However, staff now believes that the boundary for the BCO is for all purposes limited to the east side of Century Boulevard, which acts as a delineator for the district. The development of Arboretum Business Park (formerly known as Gateway) was reviewed under an Alternate Urban Areawide Review (AUAR) to determine the development's impacts on natural systems. The development of this site is consistent with the AUAR. While the development impacted 2.93 acres of wetland, they created 6.65 acre of new wetland and storm water ponds. The city approved a wetland alteration permit as well as wetland mitigation plan Parker Hannifin Corporation June 5,2001 Page 6 as part of the development approval. This approval, in essence, altered the area that should be included in the BCO. The secondary zone boundary shall be realigned east of Century Boulevard. The primary zone boundary shall be determined as part of any development approvals for the two parcels east of Century Boulevard. Staff will, as permitted by the ordinance, be reevaluating these boundaries as developments are reviewed. LI GHTING/SI GNA GE Lighting for the interior of the business center should be consistent throughout the development. A decorative, shoe box fixture 20 foot tall 400 watt metal Halide lot light with a square ornamental pole shall be used for area lighting. All light fixtures shall be shielded with a 90 degree light cut-off. Any wall mounted lighting shall be shielded from direct off-site view. Light level for site lighting shall be no more than V2 candle at the property line. All freestanding signs be limited to one monument sign per street frontage. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. The sign treatment is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and material throughout the development. The developer has shown a monument sign at the entrance to the site. Wall signage shall be permitted per city ordinance for industrial office park site. The applicant has shown wall signage on either the north or east elevations. City ordinance permits wall signage on street frontage only, however, we have in the past permitted wall signage on other elevations provided that wall signage is only permitted on the number of building elevations for which signage would be permissible. In this instance, wall signage would be permitted on only one building elevation. All signs shall require a separate sign permit. PARKS AND OPEN SPACE Arboretum Business Park dedicated sufficient park land to meet the park land dedication requirement. However, the developer is responsible for trail fees. As required by ordinance, the developer shall pay trail fees pursuant to city ordinance at the time of building permit approval. GRADING/DRAINAGE/EROSION CONTROL The proposed drainage plan is consistent with the approved drainage plan for the development. Storm water from the building and adjacent parking lot will be conveyed via storm sewer to an existing catch basin in Water Tower Place. Storm sewer sizing calculations for a 10-year, 24-hour storm event must be submitted for review and approval. In addition, grading on the west side of the proposed building needs to be revised to avoid ponding water on the future building site. Proposed erosion control consists of silt fence along all sides except the west side of the site. A rock construction entrance is proposed at the entrance to the site; however, the length needs to be increased to 75 feet as per City Detail Plate No. 5301. Parker Hannifin Corporation June 5, 2001 Page 7 UTILITIES Municipal sewer and water is available to the site from Water Tower Place. A sewer and water service is proposed to be extended from the existing service stubs. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. The location and number of fire hydrants should be reviewed and approved by the City's Fire Marshal. STREETS The proposed driveway entrance to the site from Water Tower Place must be a minimum of 26 feet in width per City Code. Staff is recommending that the proposed 5-foot wide sidewalk, which is shown on the site plan along the east side of the driveway, be moved to the west side of the driveway. This would eliminate the need for pedestrians to cross the truck entrance when entering/leaving the building. SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: ao An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; Co Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and Parker Hannifin Corporation June 5, 2001 Page 8 do Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: Subject to the revisions contained in the staff report, the proposed site plan is consistent with all plans and specifications and development design standards for the Arboretum Business Park Planned Unit Development. RECOMMENDATION Staff recommends that the Planning Commission adopt the following motion: "The Planning recommends approval of Site Plan #2001-6, as shown on the plans prepared by Steiner Development, Inc., dated May 4, 2001, subject to the following conditions: The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. o The developer shall work with staff to provide additional articulation to the eastern building elevation. ge 4~ A revised landscape plan that meets minimum requirements shall be submitted to the city prior to City Council approval. Additional landscape peninsulas shall be located in the northem parking lot (two additional) and at the north end of the parking spaces on the east side of the building. Trees shall be added in each of the landscaping peninsulas. If these landscape peninsulas are less than 10 feet in width, then aeration tubing shall be installed. 5. All new landscaped areas shall have irrigation system installed pursuant to city ordinance. 6. The developer shall provide areas for bicycle parking and storage. o A decorative, shoe box fixture 20 foot tall 400 watt metal Halide lot light with a square omamental pole shall be used for area lighting. All light fixtures shall be shielded with a 90 degree light cut-off. Any wall mounted lighting shall be shielded from direct off-site view. Parker Hannifin Corporation June 5, 2001 Page 9 o A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, Xcel Energy, US West, Cable TV and transformer boxes. This is to ensure that the fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. o Fire lane signs and yellow curbing will be required. Contact Chanhassen Fire Marshal for exact curbs to be painted and exact location of fire lane signs. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #6-1991 and Section 904-1 1997 Uniform Fire Code. 10. Comply with water service installation policy for commercial and industrial buildings. Pursuant to Inspection Division Water Service Installation Policy #34-1993. Copy enclosed. 11. Comply with the Chanhassen Fire Department/Fire Prevention Division Policy regarding maximum allowed size of domestic water on a combination domestic/fire sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #36-1994. 12. Comply with the Chanhassen Fire Department/Fire Prevention Division Policy regarding notes to be included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #4-1991. 13. The building is required to have an automatic fire extinguishing system. 14. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 15. Five (5) handicapped accessible parking spaces are required for the 108 spaces provided. 16. Detailed occupancy retailed requirements cannot be reviewed until complete plans are submitted. (It does appear however that exiting from the office area does not comply with the code.) 17. Utility Plan: If the addition is built MH 1 would have to be relocated and piping materials must comply with the code. 18. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 19. The developer shall pay trail fees pursuant to city ordinance at the time of building permit approval. 20. Grading on the west side of the proposed building needs to be revised to avoid ponding water on the future building site. 21. Move the proposed sidewalk to the west side of the driveway. Also, show this sidewalk on the grading plan. Parker Hannifin Corporation June 5, 2001 Page 10 22. The developer shall apply for and obtain a permit from the Watershed District. 23. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. 24. Revise the site plan and grading plan to comply with the minimum driveway entrance width of 26 feet. 25. The applicant shall provide detailed storm sewer sizing calculations for a 10-year, 24-hour storm event prior to building permit approval. 26. The rock construction entrance shall be increased to a minimum of 75 feet in length as per City Detail Plate No. 5301. 27. On the detail sheet, show the revised 2001 City detail plates for Nos. 1004 and 5207. 28. Prior to building permit issuance, all plans must be signed by a professional civil engineer registered in the state of Minnesota. 29. Show the location of the existing street lights along Water Tower Place. Also, show the location of the existing catch basins in Water Tower Place, west 'of the sanitary sewer stub to the site. 30. Show a benchmark on the grading plan. 31. The site plan needs to be revised to show a proposed 5-foot concrete sidewalk following the main entrance out to the southeasterly comer of the site. 32. The existing water stub to the site is an 8-inch service. As such, an 8" x 6" reducer will be needed. 33. On the site plan, label the drive aisle and entrance widths. Also, show the proposed curb radius at the entrance drive." ATTACHMENTS 1. Findings of Fact and Recommendation 2. Development Review Application 3. Reduced Copy Site Plan 4. Reduced Copy Building Elevations 5. Reduced Copy Overall Floor Plan 6. Memo from Mark Littfin to Robert Generous dated 5/11/01 7. PUD Plan Arboretum Business Park 8. Gateway West Overlay 9. Public Hearing Notice and Mailing List Parker Hannifin Corporation June 5,2001 Page 11 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION Application of Parker Hannifin Corporation for Site Plan Review On June 5,2001, the Chanhassen Planning Commission met at its regularly schedule meeting to consider the application of Parker Hannifin Corporation for a site plan review for the property located at 2860 Water Tower Place. The Planning Commission conducted a public hearing on the proposed site plan was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT . o . The property is currently zoned Planned Unit Development, PUD (office industrial park). The Land Use Plan guides the property for office/industrial land uses. The legal description of the property is: Lot 2, Block 1, Arboretum Business Park 2nd Addition 4. Section 20-110: (a) Is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (b) Is consistent with this division; (c) Preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (d) Creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; Parker Hannifin Corporation June 5, 2001 Page 12 (e) Creates a functional and harmonious design for structures and site features, with special attention to the following: 1). An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; 2). The amount and location of open space and landscaping; 3). Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4). Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (f) Protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views,'light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. o The planning report #2001-6 SPR dated June 5, 2001, prepared by Robert Generous, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the site plan review. ADOPTED by the Chanhassen Planning Commission this 5th day of June, 2001. CHANHASSEN PLANNING COMMISSION BY: Its Chairman ATTEST: Secretary Parker Hannifin Corporation June 5, 2001 Page 13 Arboretum Business Park Development Standards a. Intent The purpose of this zone is to create a PUD light industrial/office park. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below. Photo-composite images of proposed development adjacent to Highways 5 and 41 shall be submitted as part of the review process. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Ancillary uses may be permitted as listed below if they are ancillary to a principal use on the individual lot. Commercial/retail uses are prohibited except those uses specifically noted below. b. Permitted Uses The permitted uses in this zone should be limited to light industrial, warehousing, and office as defined below. The uses shall be limited to those as defined herein. If there is a question as to whether or not a use meets the definition, the City Council shall make that interpretation. Permitted uses shall be allowed on the different Blocks and Lots for which they are specified below. The Blocks and Lots specified below are those designated on the attached PUD plan. The Block and Lot designations in final plats approved for phases of development may differ from those specified below. However, the permitted uses shall continue to be those specified below for the Lots identified in the PUD plan. Light Industrial - The manufacturing, compounding, processing, assembling, packaging, or testing of goods or equipment or research activities entirely within an enclosed structure, with no outside storage. There shall be negligible impact upon 'the surrounding environment by noise, vibration, smoke, dust or pollutants. (Lots 3, 4, and 5, Block 1; Lot 1, Block 2; Lots 1, 2, 3, and 5, Block 4; and the Wrase property) Warehousing - Means the commercial storage of merchandise and personal property. (Lots 3, 4, and 5, Block 1; and Lots 1, 2, 3, and 5, Block 4) Office - Professional and business office. (Lots 1, 2, 3, 4, and 5, Blockl; Lot 1, Block 2; LOt 1, Block 3; Lotsl, 2, 3, 4, and 5, Block 4; and the Wrase property) Health Services- establishments primarily engaged in furnishing medical, surgical and other health services to persons. (Lots 1 and 2, Block 1; LOt 1, Block 3; and Lot 4, Block 4) Conferences/Convention Center - establishments designed to accommodate people in assembly, providing conference and meeting services to individuals, groups, and organizations. (Lot 5, Block 4) Indoor Recreation/Health Club - establishments engaged in operating reducing and other health clubs, spas, and similar facilities featuring exercise and other physical fitness conditioning. (Lot 1, Block 3; and Lot 4, Block 4) Parker Hannifin Corporation June 5,2001 Page 14 Hotel/Motel-establishments engaged in furnishing lodging, or lodging and meals, to the general public. (Lot 1, Block 3; and Lot 4, Block 4) Utility Services - Water towers and reservoir. (Lots 3, 4, and 5, Block 1; Lots 1, 2, and 3, Block 4; and the Wrase property) Commercial uses (permitted on lots specified as commercial in development standards tabulation box) 1. Restaurant, permitted on Lot 1, Block 3 or Lot 4, Block 4 (one stand-alone restaurant). 2. Convenience store with or without gas pumps, not to exceed 12,000 square feet, on Lot 1 or 2, Block 1, only. (One convenience store.) 3. Banks, with or without drive up windows (Lots 1 and 2, Block 1; Lot 1, Block 3; and LOt 4, Block 4). 4. Day Care - establishments providing for the care and supervision of infants and children on a daily basis. (Lots 1 and 2, Block 1; Lot 1, Block 3; and Lot 4, Block 4) Ancillary Uses (in conjunction with and integral to a primary use) 1. Fast Food (no drive-through and only in conjunction with and integral to a convenience store). 2. Restaurant (only in conjunction with hotel/motel or convention/conference center). 3. Showroom - showroom type display area for products stored or manufactured on-site provided that no more than 20 percent of the floor space is used for such display and sales. [for entire development]. (Amended 8/25/97) 4. Telecommunication Towers and Antennas by conditional use permit only. 5. Car wash, in conjunction with convenience store. 6. Day Care Interim Uses (Amended 7/26/99) Church facilities, i.e., assembly or worship halls and associated office, meeting, and other required spaces, subject to the following criteria: 1. The church shall not occupy more than six percent (6%) of the one building on Lots 3 and 4, Block 2, Arboretum Business Park 2nd Addition. 2. The church congregation may not exceed 200 adult members. 3. Shall be reviewed and approved in accordance with the same procedures specified in the city code for conditional use permits. Prohibited uses Contractors Yard Lumber Yard · Home Improvement/Building Supply Garden Center Parker Hannifin Corporation June 5, 2001 Page 15 · Auto related including sales and repair · Home furnishings and equipment stores · General Merchandise Store c. Setbacks The development is regulated by the Highway 5 and the PUD Standards. There are no minimum requirements for setbacks on interior lot lines in the PUD zone. The following setbacks shall apply: Street Frontage Hwys. 5 & 41 Coulter & Century Boulevards 82nd & Water Tower Place Minimum Setback Maximum Setback Building/Parking Building/Parking 70/50 150 * 50/20 100 30/20 NA *Lot 5, Block 4, must only meet the maximum setback on one Highway frontage. The average hard surface coverage does not include Outlots A and B. The PUD standard for hard surface coverage is 70% for office and industrial uses. Any one site/lot can exceed the 70 percent requirement but in no case can the entire finished development exceed 70 percent. d. Development Standards Tabulation Box 1. Building Area LOT/USE ACRES Building Size/FAR PARKING (square feet) 82nd Street Dedication 1.80 htefior Roadway 10.54 Upland 16.6 30 Wetland 28.7 Ponds 3.01 ~t 3, Block 1 10.02 131,006 262 Lot 4, Block 1 5.45 71,218 142 Lot 5, Block 1 4.41 57,688 115 LOt 1, Block 4 4.38 57,199 114 Lot 2, Block 4 5.40 70, 597 141 Lot 3, Block 4 8.98 117,371 235 Lot 1, Block 2 12.23 159,822 320 Lot 5, Block 4 23.20 (.4 FAR) 404,279 (3/1000) 1,213 Parker Hannifin Corporation June 5, 2001 Page 18 o 3~ o . o . . the design guide for all of the specific site landscape developments. Each lot must present a landscape plan for approval with the site plan review process. o Storage of material outdoors is prohibited unless it has been approved under site plan review. All approved outdoor storage must be screened with masonry fences and/or landscaping. e Undulating or angular berms or elevation changes of 3' in height shall be placed along Coulter Boulevard, and Century Boulevard. The berms shall be sodded or seeded at the conclusion of each project Phase grading and utility construction. The required buffer landscaping may be installed incrementally, but it shall be required where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. 8. Loading areas shall be screened 100 percent year round from public right-of-ways. Wing walls may be required where deemed appropriate. Signage All freestanding signs be limited to monument signs. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. The sign treatment is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and material throughout the development. The applicant should submit a sign package for staff review. Each property shall be allowed one monument sign per street frontage. The signage will have consistency throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. Consistency in signage shall relate to color, size, materials, and heights. The Arboretum Business Park PUD shall be permitted two Arboretum Business Park identification signs. One sign per project entrance, at West 82nd and Century Boulevard and at Highway 41 and the westerly roadway, shall be permitted. Said sign shall not exceed 80 square feet in sign area nor be greater than eight feet in height. Wall signage shall be permitted per city ordinance for industrial office park site. All signs shall require a separate sign permit. In addition to the two signs identified in g. 5. above, signage for the main entrance on Highway 5 and Century Boulevard shall be reviewed and approved by the Planning Commission and City Council. Parker Hannifin Corporation June 5,2001 Page 19 h. Lighting o Lighting for the interior of the business center should be consistent throughout the development. The street lights should be designed consistent with the existing lighting along the existing Coulter Boulevard. ge . A decorative, shoe box fixture (high pressure sodium vapor lamps or metal halide lights) with a square ornamental pole shall be used throughout the development area for area lighting. Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 candle at the property line. This does not apply to street lighting. i. Alternative Access o 4 o Each site shall accommodate transit service within the individual development whenever possible. Pedestrian access shall be provided from each site to the public sidewalk and trail system. The developer and site users shall promote and encourage Traffic Demand Management Strategies. 4. Each site shall provide areas for bicycle parking and storage. CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 (612) 937-1900 DEVELOPMENT REVIEW APPLICATION Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit Vacation of ROW/Easements Interim Use Permit Non-conforming Use Permit Planned Unit Development* Rezoning Sign Permits variance Wetland Alteration Permit Zoning Appeal ., Zoning Ordinance Amendment Sign P~an Review ...~Site PJan Review* ,~2~'~. ,¢¢, SubdMsion* .~2"Notification Sign · X Escrow for Filing Fees/Attorney Cost** ($50 CUP/SPRNACNAR/WAP/Metes and Bounds, $400 Minor SUB) TOTAL FEE $ ~,,~z~. ~O A list of all property owners within 500 feet of the boundaries of the property must be included with the application. Budding material samples must be submitted with site plan reviews. 'Twenty-six full size folded copies of the plans must be submitted, including an 8W' X 11" reduced copy of ;transparency for each plan sheet. Escrow will be required for other applications through the development contract :NOTE-When muttiple applications are processed, the appropriate fee shall be charged for each application. PROJECT NAME LOCATION LEGAL DESCRIPTION ~---¢~7"c~,/ TOTAL ACREAGE WETLANDS PRESENT PRESENT ZONING REQUESTED ZONING YES ~ NO PRESENT LAND USE DESIGNATION REQUESTED LAND USE DESIGNATION REASON FOR THIS REQUEST This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within ten business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within ten business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application._ I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day extension for development review. Development review shall be completed within 120 days unless additional review extensions are approved by the applicant. Signa~u-rb of Fee' Owner Application Received on ~'~/~b ( Fee Pai~ Date Receipt No. ~ The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. If not contacted, a copy of the report will be mailed to the applicant's address. (~)FJJ" :N / / I PARKING REQUIREMENTS 1 SITE DATA I ALTERNATE SITE DATA ~ ~ ~ laI, IPROJECT TEAM I KEY PLAN AO ELEVATION ~:~ A/~S,~._o~ LE'VATI 0 H Z 0 A2 · · MANUFAC, TU~IN~: i , QOVERALL FLOOR PI A1 .. . C]TYOF 690 G~y Center Drive, .PO Box 147 Chanhassen, Minnesota 55317 Phone 612.93Z 1900 General tax 612.93Z5739 Engineering t ax 612.93Z9152 Public Safety tax 612.934.2524 Web www. ci. chanhassen, mn. us WATER SERVICE INSTALLATION POLICY FOR COMMERCIAL AND INDUSTRIAL BUILDINGS 1) The Inspections Division shall be responsible for issuance of permits No permit shall be issued until approval of plans have been obtained from the following: 2) a) Engineering Department b) Fire Marshal c) Minnesota Department of Health d) Plumbing Inspector MeChanical insPectors will do all installati6n inSpectiOns and witness the hydrostatic and cOnductivity tests. Call 937,1900 ext. 31 Ioschedule an inspection,' !:~ '-'; :,:-:.i..~!i~ ~-' :.::;~:iI .: -"i' -. .:'...~ i '~ !~ ii,::/~'i ~!i, InspeCtion and Test ReqUirements 'i"':i)5.15~:~: i! i' i: :.!.i!.' ;-'. ~5~-i:~5' :5 a) All pipes shall be inspected before being Covered. Phone 937-1900; ext. 31, to schedule inspections. A 24 hour notice is required.: i: :i':!- b) Conductivity test is required. ThePipe shall be subjected to ~. (:: minimum'350 amp'test for a period 0fnot less than 5 rnin. utes.:; :: c) Hydrostatic test required. All pipe shall be subjected t° a : · hydrostatic pressure of 150 PSI for 2 hours. Allowable pressure: drop shall not exceed 1 PSI. .'..';: ' . Pipe shall not be run under buildings- NFPA 24, 8-3.1 . : '~.'! .ii!':.'.· .:: ~:.~: i:- : i .~ i: :i-'~ Inspections Division :-:~5:~" ':'/.i i:~ ,i'-,! ~ ::'.:::! ~ : ~:~! i!:.i: WaterServiceinstallation ::: i ... ,': !:: !!' ,.i:::i:. ii!~ ~'::'.i::i 'i !i-.:!i.~:': Policy #34-1993 ~ ?.i ~, .';ii,,:.: : ' i:'i~i i'!.~. !i. i:i!.~.:.!i:.-) i:!i!::..::. !'(.Date: ~ 04/15/93 ':~ i,:.::i.-.~;~:::..~.~:.~.~ ~:,..: ..~ '.,".ii~ .-:.:)-~'.i-..,! il)i:!'i.:':i i:ii:i/::, iii!:,ReviSed: 4/17/96 ~'":':T:!:5:?::.:.: :'( i: ' :5¢ :!~-¢-': ' The City of Chanhassen. A growing community with clean lakes, qual~9, schools, a charming downtown, thriving businesses, and beautiful pades. A great place to live, work, and pla~ CITYOF Chanhassen, Minnesota 55317 Phone 612.93ZI900 General Fax 612.93Z5739 £nginee~ng Fax 612. 93 Z 9152 Public Safety Fax 612.934.2524 Web wuav. ci. chanhassen, mn. us CHANHASSEN FIRE DEPARTMENT POLICY MAXIMUM ALLOWED SIZE OF DOMESTIC WATER SERVICE ON A COMBINATION DOMESTIC/FIRE SPRINKLER SUPPLY LINE 1. Domestic water line shall not be greater than ¼ pipe size of the combination service water supply line. 2. 1 ½" domestic off 6" line. 3. 2" domestic off 8" line. -'_ :_. ... 4. 2 ½ domestic off 10" line. :i:!'~i:ii::. Optionl' -' ..... :~- - · .. Domestic sizes mgy be increased if it can. be iciilculated.hydraulically that the demand by all domestic fixtures will not drop the frre sprinkler water ' below its minimum gallonage~equired.~ . ;_:'i- :_' ;.:: )'i:.. '-...::- · '.-- "~'. i:. -:: ~i:~:. :: -:':::- :-:. -'. i'_- -:~:::i:..~ ':'_:i!_.' -':'.i' :) Option2: ;-'i !/;: 'i-'.::':-~ !.i'-':!i' :' i-:. :!}i:.::;:' "i~/!i~I'-::5) :~ i---:-:ii':'?---'~"il'~ Combination domestic and fire line service shall have an electric solenoid valve installed on the domestic side of the service. This _ -. valve shall be normally powered open and close on loss of electric power or signal from the system water flow indicator._:. ~- -: Must be approved by the ChanhaSsen Fire Marshal and chanhaSsen -' '.": MechanicalInspector.. - -: .~ : .?: _ ::~ - ......_... -: . -:: . . . . - i-.~'- _ . '. %J~(,,/~.~~, //e -- ._~ Chanhassen Fire Department ~ W ,-) //~/6(_,/~K. :- i : i7 :rWater Line Sizing ~.: ~_ ApproVed- B ~uilding Official ,: .;i -i:_-::'i :~ :-~Policy#36-1994-: _': __-~._.-:~:~-.:~---:iii!-i'!:-~ )i:_i':i:i.):~. :-Date: 06/10/94 ~, ~': - ' :::: ii'! :'i' "-_:-iii"?:! !i---;: (5.i.;':'~:- --Revised: 1-1/24/9.9'5...' The City of Cha,dmssen. A growing community with clean lakes, quality schools, a charming downtoum, thriving businesses, and beautiful parks. A greatplace to live, work, and pla3 690 City Center Drive, PO aox I47' £hanhassen, Minnesota 55317 Phone 612.93Z 1900 General Fax 612.93Z5739 Engineering.Fax 612.93Z9152 t~blir Safety Fax 612.934.2524 Web www. ci. chanhassen, mn. us CHANI-IASSEN FIRE DEPARTMENT POLICY CHANI-IASSEN FIRE DEPARTMENT NOTES TO BE INCLUDED ON ALL SITE PLANS . Fire Marshal must witness the flushing of underground sprinkler service line, per NFPA 13-8-2.1. . A final inspection by the Fire Marshal before a Certificate of Occupancy is issued. 3. Fire Department access roads shall be ':provided on site during all phases of construction. The constmqtion of these temporary roads will conform with the Chanhassen Fife-D~p._.artment requirements for temporary access roads at constmctiqnsi~t, eg:i~i:~etails are available. :7: ;.~:-' -::-'3'7 '-: '. ' ¢-: :_.': ¢.,:~-~ i: '' ;': :5 ::' :;5: ?~X%:~:~ . . · 4. ':.;.','.O~ite' £~.e hydrants :~shall be pro....v,'.~ded 'an~.}~?~er-.gBng condition 5.' i:(i~e:~-uS~ of.ii~e~ed:':~a~:dlem:g~:i::iha!l::'i~:~':-in?~~ance with -:':,:NFPA S~ta~!~ ..~d 58 and the MinnesaN uniform Fife.-CO~e'2: A list of, 'these.re.quireme,nts is.gyai!able. :(See ~O!ic? ;¢33.,_"..'-i'99}) ii i~{i::):.:. 6. ~',I'rre dete6tio~':~d frr'~-sd~pressioiX:iYsiems ;shall ~.i~ :~:;.aP..'pro:ved UL::gen.~.~al :station ~wi...'~'.g"UL'}72, 7. An. As?Built shall.be reproducible anil gcCep .ta.b!e to the Fire · .(~ee gpl. icy #~7,-! 99 !), .':!.':..: :::' '.:. ::!~5,'.-';;';:. 5;.::.:'? :i-,..-::~'~.-: ,-'t-::;::::{!'.':'fi · .. :,:..~.~',¢:?.75i:::: (.'. ;:.:: ::75 ?.:- ..:'5 ~' :;',?: ..:-: '.:.;-,}:'; J :' :~:' :~! :'-5; ..~} }i:! .:'?i)"..:::!:~¢ ::: .' ':';5'_? 3'L.7 :':? ,:i.; '-!5;; ?.-:~.? 73:-!~c:;:5 '.<!7;i :!?:.i?.:ff ?i!! ~:.!i;;~!i:¢::i-?:::~i~ Lc15-5! ".~5"-:::';i';,/:~g =:.~' :o f ~'-? c:?.~.:-.;.,;.:.::.::.,....... ::.....: .......... The Ci~. o. f Cha~assen. A growing community with clean lakes, quali~y schools, a charming downtown, thriving businesses, and beautiful parks. A greatplace to live, work, and pla3 o o 10. 11. An approved lock box shall be provided on the building for fire department use. The lock box should be located by the Fire Department connection or as located by the Fire Marshal. High-piled combustible storage shall, comply with the requirements . of Article #81 of the Minnesota Uniform Fire Code.' High-piled c--~mbustible storage is combustible materials on closely packed piles more than 15' in height or combustible materials on pallets or in racks more than 12' in heightl For certain .special-hazard. commodities such as rubber tires, plastics, some flammable liquids, idle pallets, etc. the critical pile height may be as low as 6 feet. Fire lane signage shall be provided as required by .the Fire Marshal. (See policy #06-1991).. Maximum allowed size. of domestic water service on a combination domestic/fire sprinkler supply line policy must be followed. (See policy #36-1994). Apprdged- Public Safety Director ChanhassenFire Department Fire Prevention Policy #04-199t Date: 11/22/91 Revised: 06/05/98 Page 2 of 2 Z66! *~l~[ ZI; ~)09 ,00£ ,0 I II NI~ 'NEISSVHNVHD II::lVd SS3NISfla INflJ.~HOaHV NV'I~I CIfl(I '~ L._ '. "/' .. :I :'i?',i . :lOIddO 'I¥1UISnONI .; I, 101 31NI13 ;131gdO --- MNVg 1SVd I. S101 AId;]S AJ.I'IIJ.I1 wm-sno,~ lOUd asvuM S3a3V SZ' tS !. = 1V101 ;L't,[ = MOH 9S'85, = S9'88 = S101 an13 HllV-dH SOlNII:) b'~OlddO MNVg :laV3 Ava 1NVUnVIS--JU..,~ ~ ~' [ S101 .... :lOIddO ~u;tS ~Llql/n IVlUlSnONI ~ g-S S101 l S- I. S.L01 ii=liN:lO .IIN3ANOO / ~]ON~ltEI=INt NOIIOflOOUd /Saal~lVnOOV=JH ~JOI'VIR qVll:iJ. SnONI HO~IV--J b-'~ a ;I31ddO __ 9 .!.01 / J . . GATEWAY WEST ~A~AS.~ ~ I 8TBNER DEV~OPM~T, INC OVERLAY / 3e~o tuG.AY 101 s  WAY~T~ ~ NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, JUNE 5, 2001 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 690 CITY CENTER DRIVE PROPOSAL: Site Plan Review APPLICANT: Parker Hannifin Corporation LOCATION: 2860 Water Tower Place NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Parker Hannifin Corporation, is requesting site plan review for a 32,000 sq. ft. office/manufacturing building (Phase I) on a 5.4 acre parcel zoned Planned Unit Development (office industrial park) located at 2860 Water Tower Place, Lot 2, Block 1, Arboretum Business Park 3rd Addition. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Bob at 937-1900 ext. 141. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been Published in the Chanhassen Villager on May 24, 2001. ~mn I~ mn Rid ®091;S Jasel · COEUR TERRA LLP 3610 SOUTH HWY 101 WAYZATA MN 55391 CI'UV' OF CHANHASSEN C/O SCOTT BOTCHER 690 CITY CENTEg. I~X 14 MN 55317 CITY OF CHANHASSEN C/O SCOTT BOTCHER 690 CITY CEN_..T~O BOX 14 CHAN~N MN 55317 CHASKA GATEWAY PARTNERS 3610 CO RD 101 WAYZATA MN 55391 CHASKA GATEWAY PARTNERS 3610 CO RD 101 WAYZA~MN 55391 CHASKA GATEWAY PA~S 3610 CO RD 10.L.-./ W~ MN 55391 CENTURY 2000 PARTNERS LLP 3610 SOUTH HWY 101 WAYZATA MN 55391 WATERTOWER PARTNERS LLC PO BOX 26~ WACONIA MN 55387 CHASKA GATEWAY PARTNERS 3610 CO RD 101 ....~-~'~ W~ MN 55391 ~HASKA GATE--ERS .~610 CO RD~LOq~ . WAYZ~.-T~ MN 5539 ! sloqel ssaJpp¥