Loading...
5 SPR Holiday Inn Express I-- Z <l: _.l PROPOSAL: LOCATION: APPLICANT: CITY OF PC DATE: Sept. 2, 2003 CC DATE: Sept. 22, 2003 REVIEW DEADLINE: 9~29~03 llllll CASE #: Sub. #2003-13, SPR #2003-8 STAFF REPORT Request for subdivision approval to create two lots on 5.13 acres of land and site plan review for a three-story, 89 unit hotel on 3.01 acres with variances for signage and design standards, Holiday Inn Express Southeast comer of Hwy. 5 and Century Blvd. Steiner Construction Services, Inc. 3610 County Road 101 Wayzata, MN 55391 (952) 473-5650 Steve Slowey, WYLS, LLC P. O. Box 113 Yankton, SD 57078 (605) 665-8489 PRESENT ZONING: PUD, Planned Unit Development - Office Industrial Park 2020 LAND USE PLAN: Office/Industrial ACREAGE: 5.13 acres DENSITY: 0.39F.A.R. SUMMARY OF REQUEST: The applicant is requesting preliminary plat approval to subdivide a 5.16 acre lot in to two lots and site plan review for a three-story, 89 unit hotel on 3.13 acres with variances for signage (permitting a sign on the east wall of the building which does not have street frontage) and design standards (permitting 35 percent fenestration on the north elevation, rather then the required 50 percent fenestration). Notice of this public hearing has been mailed to all property owners within 1,000+ feet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision. '\ / QA'IO >,~O.LN30 p'eob[ e~.eA!Jd i Holiday Inn Express September 2, 2003 Page 2 The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets those standards, the City must then approve the site plan. This is a quasi-judicial decision. The City's discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi-judicial decision. PROPOSAL/SUMMARY The applicant is proposing the subdivision of one lot into two lots, one lot 2.03 acres and the other 3.13 acres, and development of one of the lots with a 53,000 square foot, three-story, brick, 89 unit hotel. The proposed subdivision complies with the requirements of the subdivision ordinance. The property was previously prepared for development with the interim use permit for the initial site grading. The applicant will be installing public water, sanitary sewer, and storm water improvements as part of the development. The proposed site plan complies with the requirements of the city code with the exception of the fenestration requirements on the northern elevation. The applicant has increased the amount of windows by 12 percent, but cannot comply with the 50 percent requirement due to the guest rooms. Staff supports the 15 percent variance for windows on the northern elevation. Staff is recommending approval of the subdivision and site plan. Signage is permitted on the street frontage of buildings by city code. By code, the applicant could provide wall signage on only the northern elevation of the hotel building. The applicant is requesting a sign variance to permit wall signage on the easterly building elevation, which does not have street frontage. Lot I will be permitted to have signage on two elevations, since it has street frontage on both Highway 5 and Century Boulevard. Staff is recommending denial of the sign variance. BACKGROUND On April 14, 2003, the Chanhassen City Council approved an ordinance amending the Planned Unit Development for Arboretum Business Park adding Personal Services as a permitted commercial use and as the Third Amendment to the Arboretum Business Park Development Contract/PUD Agreement. On December 10, 2001, the city approved an amendment to the Planned Unit Development (PUD #92-6) Development Contract/PUD Agreement for Arboretum Business Park incorporating printing as a light industrial use; permitting indoor recreation/health clubs and recording studios in the existing office-industrial buildings in the project; and prohibiting vocational schools, public buildings (except in Outlots A and B), screened outdoor storage, and food processing. Holiday Inn Express September 2, 2003 Page 3 On September 24, 2001, the Chanhassen City Council approved Interim Use Permit (IUP) #2001-1 to grade a portion of the Arboretum Business Park development and Conditional Use Permit (CUP) #2001-8 to permit development within the Bluff Creek Overlay District. The IUP and CUP included this property. On July 28, 1997, the City Council approved the following: the ordinance for PUD #92-6 rezoning approximately 154 acres from Agricultural Estate, A2, to Planned Unit Development, PUD, and the PUD #92-6 granting final plat approval for Arboretum Business Park. On June 23, 1997, the City Council approved a Resolution that the AUAR be revised to incorporate the summary of issues and mitigation plan contained in the staff report, that the revisions to the Traffic Study prepared by SRF outlined in the staff report be incorporated into the study, and that the revised AUAR be adopted by the City. On May 27, 1997, the City Council approved the following: Approved the first reading for rezoning the property from Agricultural Estate, A2, to Planned Unit Development, PUD. Approved the preliminary PUD #92-6 for an office/industrial business park and preliminary plat approval for 12 lots, two outlots and associated right-of-way subject to the plans dated April 4, 1997, revised May 23, 1997,with conditions. · The City Council approved Wetland Alteration Permit for Gateway Business Park subject to the conditions of preliminary PUD #92-6 approval. · The City Council approved Interim Use Permit #97-1 for Gateway West Planned Unit Development site subject to conditions. APPLICABLE REGULATIONS · Chapter 18, Subdivisions · Arboretum Business Park Development Standards · Site Plan Review, Chapter 20, Article 1I, Division 6 · Design Standards for Commercial, Industrial and Office-Institutional Development, Chapter 20, Article XXIII, Division 7 · Section 20-1303 (3) states that wall business signs shall be permitted on street frontage for each business occupant within the building only. SUBDIVISION REVIEW The proposed subdivision creates two lots where one was previously proposed. The creation of an additional lot beyond that one that received preliminary plat approval requires preliminary and final Holiday Inn Express September 2, 2003 Page 4 plat approval, rather than only final plat approval. Both lots exceed the minimum requirements of the subdivision ordinance. The development of the individual lots must comply with the Arboretum Business Park Development Design Standards. STREETS No public streets are proposed as part of this project. The applicant is proposing full access to the site from Century Boulevard. As the access will service the two lots, cross-access easements will need to be obtained and recorded against the lots. The shared drive aisle through the site will be a private street since it serves multiple lots. As such, the road must be a minimum of 26-feet wide, built to a 9-ton design, and enclosed within a 40-foot wide private easement. An internal sidewalk system shall be developed to bring pedestrians from the public trails on the west and (future) south sides into the site. The full access driveway onto Century Boulevard will be allowed; however, should the driveway cease to operate in a safe manner in the opinion of the property owner, or if any of the following conditions are met, the property owner shall be assessed 100% of the costs incurred to correct the conditions in a fashion acceptable to the City of Chanhassen: a. Level of service "F" at the intersection during peak AM and PM times. b. Level of service "D" or below at the intersection during non-peak times. c. Significant accidents that are attributed to the configuration of the intersection occur that indicate a mutually recognized safety concern at the intersection. TRAILS Steiner Development shall be responsible for planning, engineering, and constructing the "wetland trail." This trail follows an alignment generally described as the western edge of Outlots A & B. Connection points for this new trail construction shall be the terminus of the Trotter's Ridge trail and Autumn Ridge trail. Portions of said construction will occur off-site of the Arboretum plat within land owned by the City of Chanhassen. If the trail alignment is within property not owned by the City, then the developer shall dedicate a 20 foot wide trail easement centered on the trail alignment. Trail construction shall be completed in two phases: one north of Coulter Boulevard and one south of Coulter Boulevard. Each phase shall be completed contemporaneously with adjoining improvements. In consideration for this trail construction, the city shall compensate Steiner Development full costs of trail construction plus a 10% design and construction management fee. Bid documents, including plans and specifications, shall be approved by the Park & Recreation Director and City Engineer prior to soliciting bids. Project bidding shall occur in a competitive environment with a Holiday Inn Express September 2, 2003 Page 5 minimum of three bids being received. The results of the bidding process shall be reviewed with the Park & Recreation Director and City Engineer prior to award. Cash payment for trail construction shall be made from the City of Chanhassen to Steiner Development upon completion, inspection, and acceptance of the trail. In lieu of crediting trail fees against said trail construction, full trail fees shall be collected per city ordinance for all lots in the Arboretum Business Park. Said fees shall be deposited into the city's trail dedication account--the same account that will fund the cash payment being made to Steiner Development for trail construction. The current submittal refers to the required trail as "future," does not depict the entire segment, and fails to show a typical construction cross section for the trail. I plan on meeting with the applicant's engineer on the property to review these issues. Please ensure that these conditions are being met on future submittals from the applicant. COMPLIANCE TABLE Area (acres) Frontage (feet) Depth (feet) Code 1 200 200 Lot I 2.032 223 356 Lot 2 3.126 439 326 Total 5.158 GRADING, DRAINAGE AND EROSION CONTROL Minimal grading for the site is being proposed with a berm along the north side of Lot 2. The applicant should be aware that maximum grading slope is 3:1 and any off site grading will require a permit from the owner. Storm Water Management The proposed development is required to maintain existing runoff rates. Storm water calculations should be submitted to ensure the downstream storm water infrastructure is sized adequately for the proposed development. Drainage will be routed to an existing storm manhole on the west side of Century Boulevard. The applicant will need to submit proposed storm sewer sizing calculations showing that the existing storm sewer will accommodate the runoff. Easements Drainage and utility easements should be provided over all existing and proposed storm water infrastructure. Holiday Inn Express September 2, 2003 Page 6 Erosion Control Erosion Control Note #4 should include straw mulch (MNDOT Type 1 mulch) application with seed for stabilization. Currently, the note reads "All disturbed areas shall be stabilized with seed, sod or rock base." Seed without mulch is not considered stabilization under the NPDES permit. Category 3 (straw or wood fiber) blanket should be applied following seeding in the proposed swale in the northeast comer of the site. Sediment Control The silt fence used should be heavy-duty machine sliced silt fence, metal T-posts with 4 to 6 foot spacing. Existing vegetation should be conserved as much as practicable while installing and during construction. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type III erosion control fence, which is a heavy-duty silt fence, be used for the area adjacent to the existing wetland just south of the site. In addition, erosion control blankets will be required on the steep slopes on the site. The silt fence end in the southwest comer of the site should be angled up slope to inhibit water from flowing around the silt fence. Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after pavement of the parking lots. Before pavement, inlet protection could consist of heavy-duty mono-mono silt fence with 4 foot spacing of metal T-posts and 1" rock around silt fence material. After paving of parking lots, mulch socks, sand bags or rock and wire could be used as temporary inlet control. Surface Water Management Fees Based on the proposed developed area of 5.13 acres, the total SWMP fee, due payable to the City at the time of final plat recording, is $51,772. Other Agencies Beginning March 10, 2003 all developments disturbing l-acre or more or part of a contiguous development which will disturb more than 1-acre require a National Pollutant Discharge Elimination System (NPDES) permit from the Minnesota Pollution Control Agency (MPCA). The owner/operator of the proposed development must apply for and receive the NPDES permit prior to beginning construction activities. Any development disturbing more than l-acre and creating more than 1-acre of impervious surface must also have permanent storm water treatment. The Arboretum Business Park PUD addressed permanent storm water treatment as a part of the overall review process. Holiday Inn Express September 2, 2003 Page 7 The applicant should apply for and obtain a permit from the Riley-Purgatory-Bluff Creek Watershed District and comply with their conditions of approval. UTILITIES The proposed sanitary sewer and water-mains in the main drive aisle will be considered public utility lines since they will serve more than one lot. A minimum 35-foot wide public easement will be required over the public sewer and water-main. The end of the public sewer and water- main shall be at the property line between Lot 1 and Lot 2. The underlying property has been previously assessed for sewer, water and street improvements. The remaining assessment due payable to the City is $137,272.40. This remaining balance may be re-spread against the newly platted lots on a per-area basis. In addition, the sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2003 trunk hookup charge is $1,440 for sanitary sewer and $1,876 for water-main. Sanitary sewer and water-main hookup fees may be specially assessed against the parcel at the time of the building permit issuance. Public utility improvements will be required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. GENERAL SITE PLAN/ARCHITECTURE The developer is proposing a three-story, brick building with a pitched, asphalt shingled roof. The total building area is approximately 53,000 square feet. The building is in an "L" shape with the short leg of the "L" in a north south orientation. ARCHITECTURAL COMPLIANCE Size, Portion and Placement The main entry to the building is located in the northwest comer of the building. The entrance to the building faces Century Boulevard. A canopy, supported by columns is proposed over the drop off entrance. The ground level of the building is visually distinct from the upper stories through the use of the darker brick material. Material, Color and Detail The applicant is proposing a dark brown brick veneer on the ground elevation and on all three levels on the gable ends of the building. A light sand colored brick veneer is proposed for the Holiday Inn Express September 2, 2003 Page 8 second and third floors. A white exterior insulation finishing system (EIFS) is proposed at the gable ends where signage is being proposed. Soldier course cornices are proposed at the top of the building. Three story windows are proposed in the public areas of the building. Height and Roof Design Building height is limited to 3 stories or 40 feet in the Overlay District otherwise they must be consistent with the underlying district. The proposed hotel is 3 stories with a height of approximately 35 feet. The building has asphalt shingled, 4/12 pitched roof which complies with the ordinance requirements. The entrance canopy has a standing seam metal roof. Facade transparency Fifty percent of the first floor elevation that is viewed by the public, adjacent to public right-of- way, shall include transparent windows and or doors. All other areas shall include landscaping material and architectural detailing and articulation. The north elevation contains only 35 percent window and door openings on the first floor. The developer has increased the amount of glass from the normal Holiday Inn Express area of 23 percent to 35 percent by adding window area in the public portions of the building including the great room, pantry and meeting rooms. The balance of the wall area includes guest rooms which do not permit the increase in window area without potentially impacting privacy and safety. To meet this threshold, sliding windows or windows across the width of the room would be necessary. Such window treatments would be out keeping with the rest of the building architecture. Site Furnishing The developer has not provided site furnishing as part of the project. Staff would suggest that the developer provide a patio area outside of the pool including tables and chairs. Benches should be located throughout the site to provide an opportunity for viewing of the natural area to the south. A bicycle rack shall also be included as part of the project. Loading areas, refuse area, etc. The applicant is proposing a trash enclosure/maintenance building in the northeast comer of the building constructed of material similar to the building. Landscaping Minimum requirements for landscaping on Lot 2 of the Holiday Inn Express development include 3,237 sq. ft. of landscaped area around the parking lot, 13 trees for the parking lot, and buffer yard plantings along the north and west property lines. The developer's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Vehicular use landscape area Trees/vehicular use area: Overstory trees Required Proposed 3,237 sq. ft. >3,237 sq. ft. 13 canopy trees 3 canopy trees Holiday Inn Express September 2, 2003 Page 9 Islands/peninsulas Hwy. 5 Buffer yard B - 440' 20' width 7 islands/peninsulas 9 canopy trees 13 understory trees 22 shrubs 5 islands/peninsulas 25 canopy 24 understory 0 shrubs The developer does not meet minimum requirements for parking lot plantings. Staff recommends that the developer add groupings of overstory trees on the south and east sides of the parking lot. The grouping will provide shade to the parking lot, but not intrude on the scenic views in those directions. Two landscape peninsulas will also need to be added, one in the northern parking lot and one in the southern park lot. Staff recommends that the open area to the south and east be left natural and only a minimum amount of mowing be done along the south curb line. The developer is also short on shrub plantings along Hwy. 5, but with the large number of over- and understory trees combined with the rise in elevation from the highway, staff recommends that the proposed plantings for the Highway 5 buffer yard be accepted. A revised landscape plan must be submitted to the city for final approval. Lot Frontage and Parking location The site is on Highway 5. Access is provided via Century Boulevard. The majority of site parking is provided to the south and east of the building. Building Height Building Setback Parking stalls Parking Setback Hard surface coverage COMPLIANCE TABLE PUD Holiday Inn Express 3 stories 3 stories N- 70'E- 0' N- 98'E- 144' W-O'S-O' W- 57' S- 125' 99 stalls 99 stalls N- 50'E- 0' N- 50'E- 74' W-O'S -0' W-O'S -73' 70%* 54% Lot Area I acre 3.126 acres * The development may average 70% impervious surface over the entire project. Individual lots may exceed the 70% coverage. Holiday Inn Express September 2, 2003 Page 10 Variances Required - Requesting sign variance to permit signage on the eastern building elevation and a variance to permit fenestration of 35%, rather than 50%. Parkin~ Standards: Hotels: one per room plus one per two employees. The applicant has provided 99 spaces. ACCESS The applicant is proposing full access to the site from Century Boulevard. As the access will service the two lots, cross-access easements will need to be obtained and recorded against the lots. An internal sidewalk system shall be developed to bring pedestrians from the public trails on the west and (future) south sides into the site. LIGHTING/SIGNAGE Signage is permitted on the street frontage of buildings by city code. By code, the applicant could provide wall signage on only the northern elevation of the building. The applicant is requesting a sign variance to permit wall signage on the easterly building elevation, which does not have street frontage. Staff is recommending denial of the sign variance. The applicant could install a monument sign on the Highway 5 frontage if additional signage is required. Each property shall be allowed one monument sign per street frontage. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. (Note that the monument sign shown on the site plan is located within the public right-of-way and may not be located there.) All signs shall require a separate sign permit. RECOMMENDATION Staff recommends that the Planning Commission adopt the following three motions: A. "The Planning Commission recommends approval of preliminary plat Subdivision #2003-13, shown on plans prepared by Schoell & Madson, Inc. dated received August 01, 2003 and dated 07/01/03, respectively, based on the findings in the attached findings of fact and recommendation and subject to the following conditions: 1. The development of the individual lots must comply with the Arboretum Business Park Development Design Standards. o The developer shall be responsible for planning, engineering, and constructing the "wetland trail." The city shall compensate the developer full costs of trail construction plus a 10% design and construction management fee. 3. Full trail fees shall be collected pursuant to city ordinance for all lots in the Arboretum Business Park 6th Addition. Holiday Inn Express September 2, 2003 Page 11 o o ° ° ° 10. 11. If the trail alignment is within property not owned by the City, then the developer shall dedicate a 20 foot wide trail easement centered on the trail alignment. Vacate the permanent roadway, drainage and utility easement on the southwest comer of the parcel and dedicate the public drainage and utility easement with the plat. Public utility improvements will be required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Before building permit issuance, permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MNDOT, etc. A private storm sewer easement against Lot 1 must be obtained from the owners and recorded before the building permit issuance. The underlying property has been previously assessed for sewer, water and street improvements. The remaining assessment due payable to the City is $137,272.40. This remaining balance may be re-spread against the newly platted lots on a per-area basis. In addition, the sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2003 trunk hookup charges are $1440 for sanitary sewer and $1876 for water-main. Sanitary sewer and water-main hookup fees may be specially assessed against the parcel at the time of the building permit issuance. The proposed sanitary sewer and water-mains in the main drive aisle will be considered public utility lines since they will serve more than one lot. A minimum 35-feet wide public utility easement will be required over the public sewer and water-main. The end of the public sewer and water-main shall be at the property line between Lot I and Lot 2. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type III erosion control fence, which is a heavy-duty silt fence, be used for the area adjacent to the existing wetland just south of the site. In addition, erosion control blankets will be required on the steep slopes on the site. The main drive aisle through the site will be a private street since it serves multiple lots. As such, the road must be a minimum of 26-feet wide, built to a 9-ton design, and enclosed within a 40-feet wide private easement. A cross-access easement must be obtained and recorded before building permit issuance. The developer must submit testing reports verifying that the driveway is built to a 9-ton design. Holiday Inn Express September 2, 2003 Page 12 12. The full access driveway onto Century Boulevard will be allowed; however, should the driveway cease to operate in a safe manner in the opinion of the property owner, or if any of the following conditions are met, the property owner shall be assessed 100% of the costs incurred to correct the conditions in a fashion acceptable to the City of Chanhassen: a. Level of service "F" at the intersection during peak AM and PM times. b. Level of service "D" or below at the intersection during non-peak times. c. Significant accidents that are attributed to the configuration of the intersection occur that indicate a mutually recognized safety concern at the intersection. 13. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign all plans. 14. Storm water calculations should be submitted to ensure the downstream storm water infrastructure is sized adequately for the proposed development. 15. Drainage and utility easements shall be provided over all existing and proposed storm water infrastructure. 16. Private easement for the shared storm sewer must be obtained and recorded against the lots before building permit issuance. 17. Erosion Control Note #4 should include straw mulch (MNDOT Type 1 mulch) application with seed for stabilization. 18. Category 3 (straw or wood fiber) blanket should be applied following seeding in the proposed swale in the northeast corner of the site. 19. The silt fence used should be heavy-duty machine sliced silt fence, metal T-posts with 4 to 6 foot spacing. Existing vegetation should be conserved as much as practicable while installing and during construction. 20. The silt fence end in the southwest corner of the site should be angled up slope to inhibit water from flowing around the silt fence. 21. Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after pavement of the parking lots. Before pavement, inlet protection could consist of heavy-duty mono-mono silt fence with 4 foot spacing of metal T-posts and 1" rock around silt fence material. After paving of parking lots, mulch socks, sand bags or rock and wire could be used as temporary inlet control. 22. Based on the proposed developed area of 5.13 acres, the total SWMP fee, due payable to the City at the time of final plat recording, is $51,772. Holiday Inn Express September 2, 2003 Page 13 23. The owner/operator of the proposed development must apply for and receive the NPDES permit prior to beginning construction activities 24. The applicant shall apply for and obtain a permit from the Riley-Purgatory-Bluff Creek Watershed District and comply with their conditions of approval." B. "The Planning Commission recommends approval of Site Plan #2003-8, plans prepared by Schoell & Madson, Inc. and Lightowler Johnson Associates, Inc., dated received August 01, 2003 and dated 07/01/03 and revised 8/25/03, respectively, with a 15 percent variance from the 50 percent fenestration requirement to permit 35 percent fenestration on the northern building elevation on Lot 2, Block 1, Arboretum Business Park 6th Addition based on the findings in the attached findings of fact and recommendation and subject to the following conditions: 1. The developer shall enter into a site plan agreement with the City and provide the stipulated. 2. The developer shall record the final plat for Arboretum Business Park 6th Addition. 3. The developer shall plant 13 overstory trees in and around the parking lot to meet minimum requirements. 4. At least three grouping of overstory trees, with a minimum of three trees each, shall be located along the south curb line. 5. The slope located along the southern and eastern property lines shall be left natural. The applicant will be allowed to mow along the parking lot and trail if necessary. 6. A revised landscape plan shall be submitted for city review and approval. 7. Two landscape peninsulas shall be added, one in the northern parking lot and one in the southern park lot. 8. The developer shall install site furnishing including benches, bicycle racks, and tables. 9. The internal sidewalk system shall be constructed to bring pedestrians from the public trails on the west and south sides into the site. 10. All signs shall require a separate sign permit. 11. Show the driveway dimension on the site plan to read 26 feet in width and the access corner radius. Holiday Inn Express September 2, 2003 Page 14 12. Storm sewer design data will need to be submitted for staff review before city council approval. 13. Sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2003 trunk hookup charges are $1440 for sanitary sewer and $1,876 for water-main. Sanitary sewer and water-main hookup fees may be specially assessed against the parcel at the time of the building permit issuance. 14. On the grading plan: a. Add storm sewer schedule. b. Add silt fence around proposed storm sewer line from MH1 to the existing manhole. c. Revise the erosion control fence from type II to type HI per city plate 5300. d. Show all proposed 2' contours. e. Show the pedestrian ramps at both sides of the access off Century Boulevard. f. Show all existing and proposed easements. g. Revise the flat elevation in the northeast portion of the parking lot. h. Revise the side slope to 3:1 maximum along the north side of Lot 2. 15. On the utility plan: a. Show the public drainage and utility easement. b. Show the existing and proposed storm manholes rim elevations. c. Show the water and sanitary services size, type and class. d. Relocate Sanitary MH3 to the property line between Lot 1 and Lot 2 where the public sewer line must end. e. All of the public watermain will be PVC C-900 pipe. Revise where necessary. 16. Add all applicable City of Chanhassen latest detail plates. 17. Show Century Boulevard existing street lights. 18. Seed and mulch or sod the site within two weeks of grading. If dirt is required to be brought into or out of the site, provide a haul route for review and approval. 19. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 20. Concrete driveway apron, per City detail plate #5207, is required at the proposed access point to the site. 21. The building must be protected with automatic fire sprinkler systems. 22. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. Holiday Inn Express September 2, 2003 Page 15 23. Five accessible parking spaces must be provided. 24. Accessible guest rooms, and accessibility to recreational features, must be provided in accordance with Minnesota State Building Code Chapter 1341. 25. The building owner and or their representatives should meet with the Inspections Division to discuss plan review and permit procedures. 26. The plans were reviewed for general building code compliance only. A detailed plan review cannot be done until complete plans are provided." C. "The Planning recommends denial of a sign variance to permit signage on the eastern building elevation based on the findings in the attached findings of fact and recommendation." ATTACHMENTS 2. 3. 4. 5. 6. 7. 8. 9. i0. 11. 12. 13. 14. 15. 16. Findings of Fact and Recommendation Development Review Application Steiner Construction Services Narrative dated 8/1/03 Reduced Copy Preliminary Plat Reduced Copy Grading, Drainage & Erosion Control Reduced Copy Utility Reduced Copy Site Plan Reduced Copy Landscape Plan Reduced Copy First Floor Plan Reduced Copy Second Floor Plan Reduced Copy Third Floor Plan Reduced Copy Exterior Elevations Reduced Copy Refuse/Building Maintenance Plan Carver Soil and Water Conservation District to Robert Generous Dated 8/12/03 Memo from Mark Littfin to Robert Generous dated 8/18/03 Public Hearing Notice and Mailing List Holiday Inn Express September 2, 2003 Page 16 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Steiner Construction Services, Inc. and Steve Slowey, WYLS, LLC for Subdivision approval to create two lots and Site Plan Review approval for a three-story, 89 unit hotel with variances for signage and fenestration. On September 2, 2003, the Chanhassen Planning Commission met at its regularly schedule meeting to consider the application of Steiner Construction Services, Inc. and Steve Slowey for subdivision approval and site plan approval with variances for signage and fenestration for the property located at the southeast comer of Highway 5 and Century Boulevard. The Planning Commission conducted a public hearing on the proposed site plan which was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT The property is currently zoned Planned Unit Development - Office Industrial Park. 2. The property is guided by the Land Use Plan for office/industrial. The legal description of the property is: Lots I and 2, Block 1, Arboretum Business Park 6th Addition (formerly Outlot D, Arboretum Business Park); and site plan for Lot 2, Block 1, Arboretum Business Park 6th Addition. Holiday Inn Express September 2, 2003 Page 17 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: (1) The proposed subdivision is consistent with the zoning ordinance; (2) The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; (3) The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; (4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; (5) The proposed subdivision will not cause significant environmental damage; (6) The proposed subdivision will not conflict with easements of record; and (7) The proposed subdivision is not premature. A subdivision is premature if any of the following exists: Lack of adequate storm water drainage. Lack of adequate roads. Lack of adequate sanitary sewer systems. Lack of adequate off-site public improvements or support systems. 5. Site Plan Section 20-110: (1) The proposed development is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) The proposed development is consistent with the site plan review requirements; (3) The site plan preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping Holiday Inn Express September 2, 2003 Page 18 with the general appearance of the neighboring developed or developing or developing areas; (4) The site plan creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) The site plan creates a functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) The site plan protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. 6. Signage: The city council, upon the recommendation of the planning commission, may grant a variance from the requirements of this article where it is shown that by reason of topography or other conditions, strict compliance with the requirements of this article would cause a hardship; provided that a variance may be granted only if the variance does not adversely affect the spirit or intent of this article. The proposed hotel is the tallest building in the area and has sufficient visibility. Signage on the north elevation of the building is clearly visible to the general public. Holiday Inn Express September 2, 2003 Page 19 7. Fenestration: The applicant has increased the amount of glass from the normal Holiday Inn Express amount of 23 percent to 35 percent by adding window area in the public areas of the building including the great room, pantry and meeting rooms. However, without increasing the amount of windows in each guest room, which may lead to privacy and security issues, the applicant is unable to meet the 50 percent fenestration requirement. The planning report #Sub #2003-13 and SPR #2003-8 dated September 2, 2003, prepared by Robert Generous, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the preliminary plat, site plan review with a variance for fenestration and denial of the variance for signage on the eastern building elevation. ADOPTED by the Chanhassen Planning Commission this 2na day of September, 2003. CHANHASSEN PLANNING COMMISSION BY: Its Chairman ATTEST: Secretary o7 ~:~.'o3 15:28 FA\ .952227111.1} Ci'I'Y 131" CHANIIASSEN ~ll):: CITY OF CHANHASSEN 7700 MARKET BOULEVARD CHANHASSEN, MN 55317 (952) 227-1100 DEVELOPMENT REVIEW APPLICATION A?PL!CANT:Steiner Construction Services, LLC (Phillip Baum) ADDRESS: 3610 Cot]nty Road 101 Wavzata MN 55391 TELEPHONE(Daytime)(952) 473-5650 OWNER: Steve Slowey, WYT.S, ADDRESS:p O Box 113 Y~nkf~n ~D 57078 TELEPHONE: (605) 665-8489 f,T,~ Comprehensive Plan Amendment __ Temporary Sales Permit Conditional Use Permit Vacation of ROW/Easements Interim Use Permit X Variance Non-conforming Use Permit Wetland Alteration Permit __ Planned Unit DeVelopment* Rezoning Sign Permits Zoning Appeal Zoning Ordinance Amendment X Sign Plan Review Site Plan Review* 52,000 Sq. Subdivision* X Notification Sign ~ '~' __-- Escrow for Filing Fees/Attorney Cost** ($50 CU P/SPR/VAC/VARRVAP/Metes Ft. Total Building and Bounds, $400 Minor SUB) ', TOTAL FEES 1,695.00 A list of all property owners within 500 feet of the boundaries of the property must be included with the application. Building material samples must be submitted with site plan reviews. *Twenty-six full size folded copies of the plans must be submitted, including an 8V=" X 11" reclucerJ cop? for each plan sheet. Escrow will be required for otller applications through the development contract .NOTE ~ When multiple applications are processed, the appropriate fee shall be charged for each application. '-. l:i I-2{!3 / I : 42Plt F~..OH × NO ZONING Cor~merc _J ~_l nk~L'ESTED LAN'~ LJS~ O~SIGNATION_ ¢OR THIS ~tEQLJEST 3pp!i~abfe C~ Ordinance p¢ov~sions. ~for~ filing tt~ ap¢~c~tion, you ShoUld co~fer w~b *bp ;':ar,~: ,: the s~ific Ordnance and ¢r~edural r~u~remenls ~pll~n tO your appfkumcn. ~.,c;.~,r~x,u,~t$ ann a~ency review, Therefore, the ci~ is rmtifyi~g th~ applicant ~at t~e city requires fOr davelcpm~ revi~_ ¢ev~opmenl roview shall be aompi~ wJ~lin 120 days ' ' ..... Dat~ ~%¢~-~ ~ - ~ .- ....... 8- t - O 3 Construction Services, LLC i()32) 4~.~-~)~:~() FaX (952) 473-7058 August 1st, 2003 PROPOSALFOR HOLIDAY INN EXPRESS (& RESTAURANT PAD) CENTURY AVENUE & HIGHWAY 5 Chanhassen, Minnesota We are proposing an 86 room-Holiday Inn Express and a pad for future development. We are asking approval of the plan as presented. When a tenant for the pad has been determined, documents will be submitted for approval of that structure. The hotel will be 3 stories in height. We are requesting two variances to your ordinances; 1. We are requesting an additional sign on the building. One sign is on the gable end on the east elevation and the other is above the large window facing the highway (north elevation). 2. We are requesting a variance in the amount of glass on the elevation facing the highway. These variances will be discussed in the section relating to the building. SITE PLAN / LANDSCAPE PLAN The attached documents show a site development that meets setback, parking, landscape and screening requirements of the City of Chanhassen. The site will be subdivided into two separate sites (see tabulation on drawings for areas) with cross easements for parking as shown on the drawings. Parking requirements are met for each portion of the site. We are connecting the hotel site to the existing trail along Century Avenue and the trail to be constructed at the base of the hotel site adjacent to the wetlands. The Site Plan shows this connection. The landscape plan shows the distribution, size and species of the plantings. UTILITY / GRADING PLAN The attached drawings show the utilities and grading. They are sized to the requirements of the lot division. Storm sewer design will accommodate the run off from our site without affecting other sites in any way. Stoiner Construction Services, LLC THE HOTEL BUILIDING The building is of three story wood construction. The materials are labeled on the drawings. The exterior materials are of two different color brick with an accent of EIFS at gable ends (as shown on the attached drawings), The first floor of the building has been treated differently by using a different color brick from the brick used for the upper two floors. The total building will be sprinkled to meet 13 R standards as is normal. In treating the first floor we have increased the amount of glass from the normal Holiday Inn Express amount to 35%. We have increased the glass in all the public areas. It is impossible to increase the glass in the rooms. We have therefore increased the glass from a normal 23% to the 35% and are asking for a variance from the 50% standard. We are also asking for a variance by adding one standard sign on the building facing east (see sheet A-5). The standard sign is on north elevation of building facing Hwy 5. See the colored elevations and perspective sketch for details. 696~Z'£:[ 'WV ~z§:g§:0[ ~00~/90/R0 '6"nP'-I-Old-~Jd\00'['[\6~np\9z0\~Z'[09\~N]\:g 'oN ID]CO~d NOlil(](3~ H±9 >~¥'d SS3NISQ8 BQI3UQS~J¥ g '0 N AYMHOIH :~ / V .I. S 696~g'£:[ 'J.U!AID2 'WV 8Jz:~G:0[ £00g/c)0/~0 'SMp'Su!pDJ~\00[[\6~p\gz0\gZ[09\~)NB\:J 9/0 ELL09 'ON 133P0~Jd I~l'S AId VNIl~ll'l::ll:ld 0N303~ N'~Jd ONIAYd J g '0 N AV~HE) IH 31V.L$ 696~U8:I 'WV 0[:~0:H £00~/90/g0 '5~P'Aa-!I!4-D\00II\5~aP\9/0\ZZI09\~N~\:_4 AI:IYNI~Iq3I:Id g '0 N ~ 0 x Ln NV'Id 3dVOSQNV'I Xl~VNlfll'131:ld / / / / / L / / / / . NOT lO SCALE NOT TO SCALE ARCHITECTURAL SIT[ DETAILS CAR VER ~¢~'tO~l C~,t,, 219 East Frontage Road ~ Waconia, MN 55387 ~ '! ~14{i ,n Phone: 952-442-5101 Au~sl 12, 2003 Robert Generous, Senior Planner CiW of Chanhassen 7700 Market Boulevard Chantmssen, MN 55317 Re: Proposed Holiday Express Development Mr. Generous: Thank you for sending a copy of the 2003-8 Site Plan, Holiday Express development to the SWCD office. Please review the following storm water, erosion, and sediment control comments and recommendations. Storm Water Beginning March 10, 2003 all developments disturbing 1-acre or more or part of a contiguous development which will disturb more than 1-acre require a National Pollutant Discharge Elimination System (NPDES) permit from the Pollution Control Agency (PCA). The owner / operator of the proposed development must apply for and receive the NPDES permit prior to beginmng construction activities. Any development disturbing more than l-acre and creating more than l-acre of impervious surface must also have permanent storm water treatment. It appears this is being done as the Holiday Express prehminary plan shows the storm water runoff being managed by existing storm water infrastructure. Erosion Control Erosion Control Note #4 should include straw mulch (MNDOT Type 1 mulch) application with seed for stabilization. Currently, the note reads "All disturbed areas shall be stabihzed with seed, sod or rock base". Seed without mulch is not considered stabilization under the NPDES permit. Category. 3 (straw or wood fiber) blanket should be applied following seeding in the proposed swale in the NE comer of the site. Sediment Control The silt fence used should be heavy-duty machine sliced silt fence, metal T-posts with 4 to 6 foot spacing. Existing vegetation should be conserved as much as practicable while installing and during construction. The silt fence end in the SW comer of the site should be angled up slope to inhibit water from flowing around the silt fence. Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after pavement of the parking lots. Before pavement, inlet protection could consist of heavy-duty mono-mono silt fence with 4 foot spacing of metal T-posts and 1' rock around silt fence material. After paving of parking lots, mulch socks, sand bags or rock and wire could be used as temporary, inlet control. If there are any questions regarding this review please contact the SWCD office. Sincerely~. . A~-b"n Mitek, CPFJSC-IT Urban Conservation Technician ~.N EQI \1, 01'1'01~'1'1 NITY EMPI,OYER CITYOF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952227.1170 Finance Phone: 952,227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952,227.1120 Fax: 952.227.1110 Recreation Cen~er 2310 Coulter Boulevard Phone: 952.227,1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site wwwci.chanhassen.mn.us MEMORANDUM TO: Robert Generous, Senior Planner FROM: Mark Littfin, Fire Marshal DATE: August 18, 2003 SUB J: Request for subdivision approval to create two lots on 5.13 acres of land and site plan review for a 3-story 89 unit hotel on 3.01 acres with variances for signage and design standards located at the southeast corner of Highway 5 and Century Boulevard, property zoned PUD, Steiner Construction Services Inc. and Steve Slowey, Holiday Inn Express. Planning Case: 2003-13 Subdivision and 2003-8 Site Plan I have reviewed the site plan for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time. If additional plans or changes are submitted, the appropriate code or policy items will be addressed. A 1 O-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, Qwest, Excel Energy, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. 2. Indicate on utility plans location of PIV (post indicator valve). Contact Chanhassen Fire Marshal for exact location. Fire lane signs and yellow curbing will be required. Contact Chanhassen Fire Marshal for exact locations of each. Pursuant to 2000 Minnesota Uniform Fire Code Section 503.3. The fire department sprinkler connection shall be located adjacent to a main entrance to the building. This must be done in conjunction with the design of the sprinkler system by the fire sprinkler contractor. Contact Chanhassen Fire Marshal for exact location of fire department sprinkler connection. The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, h iving businesses, w nd nga s, and beautiful parks. A great place to tive, work, and play. Mr. Robert Generous August 18, 2003 Page 2 Submit radius turns and dimensions to City Engineer and Chanhassen Fire Marshal for review and approval. This is to ensure that fire department apparatus can safely negotiate driving around the building. Builder must comply with Chanhassen Fire Department/Fire Prevention Division policy regarding water service installation for commercial/industrial buildings. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #34-1993. Copy enclosed. Builder must comply with Chanhassen Fire Department/Fire Prevention Division policy regarding maximum allowable size of domestic water service on a combination domestic/fire sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #36-1994. Copy enclosed. Builder must comply with Chanhassen Fire Department/Fire Prevention Division policy regarding notes to be included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #04-1991. ML/be g:\safety\ml\plrev2003-13 CHANHASSEN FIRE DEPARTMENT FIRE PREVENTION BUREAU 7700 MARKET BLVD. PO BOX 147 CHANHASSEN, MN 55317 (952) 227-1150 FAX: (952) 227-1190 WATER SERVICE INSTALLATION POLICY FOR COMMERCIAL AND INDUSTRIAL BUILDINGS Revised 6/12/02 1) 2) The Inspections Division shall be responsible for issuance of permits No permit shall be issued until approval of plans have been obtained from the following: a) Engineering Department b) Fire Marshal c) Minnesota Department of Health d) Plumbing Inspector Mechanical inspectors will do all installation inspections and witness the hydrostatic and conductivity tests. Call (952) 227- 1180 to schedule an inspection. Inspection and Test Requirements a) All pipes shall be inspected before being covered. Phone (952) 227- 1180, to schedule inspections. A 24 hour notice is required. b) Conductivity test is required. The pipe shall be subjected to minimum 350 amp test for a period of not less than 5 minutes. c) Hydrostatic test required. All pipe shall be subjected to a hydrostatic pressure of 150 PSI for 2 hours. Allowable pressure drop shall not exceed 1 PSI. d) Pipe shall not be run under buildings - NFPA 24, 8-3.1. 3) Upon approval of the hydro test, the plumbing inspector shall submit a copy of the inspection report to the utility superintendent. The inspection report shall note whether the system is ready for main flush and drawing of water sample for the bug test. Water Service Installation 34-1993 Page I of 2 4) Water main flushing shall be witnessed by the utility superintendent. 5) a) Watermain flushing may be scheduled by contacting the utility superintendent at 474-2086. A 24 hour notice is required. b) The utility superintendent shall obtain a water sample for a bacteria test after the main flush and deliver to a testing company. The contractor shall be responsible for testing costs. Allow two weeks for testing results to be returned to the City. c) Upon receiving approval of the water sample test, the utility superintendent shall submit a copy to each plumbing inspector and turn water on to the tested and approved sections of the piping. An additional supervised flush and flow test will be required and witnessed by the Fire Marshal for services supplying fire suppression systems. The flush and flow test shall be performed in accordance with 1991 edition of NFPA 13, Sec. 8-2.1. Contact the Chanhassen Fire Marshal at (952) 227-1150. 6) Watermain installations shall comply with: 7) a) Minnesota Plumbing Code, Chapter 4715 b) Chanhassen Engineering Department, Watermain Specifications c) National Fire Protection Association, Chapter 24 Only authorized city employees are permitted to operate city water control valves. For water turn on or off contact the utility superintendent by phone (952) 227-1308. A 24 hour notice is required. Water Service Installation 34-1993 Page 2 of 2 CITYOF CHANHASSE 690 G~y Center Drive, PO Box 147 Chanhassen, Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.937.9152 Public Safety Fax 612934.2524 Web www. cl. chanhassen, mn, us CHANHASSEN FIRE DEPARTMENT POLICY MAXIMUM ALLOWED SIZE OF DOMESTIC WATER SERVICE ON A COMBINATION DOMESTIC/FIRE SPRINKLER SUPPLY LINE 1. Domestic water line shall not be greater than ¼ pipe size of the combination service water supply line. 2. 1 ½" domestic off 6" line. 3. 2" domestic off 8" line. 4. 2 ½ domestic off 10" line. Option Domestic sizes may be increased if it can be calculated hydraulically that the demand by all domestic fixtures will not drop the fire sprinkler water below its minimum gallonage required. Option Combination domestic and fire line service shall have an electric solenoid valve installed on the domestic side of the service. This valve shall be normally powered open and close on loss of electric power or signal from the system water flow indicator. Must be approved by the Chanhassen Fire Marshal and Chanhassen Mechanical Inspector. Approved- Building Official App~oo~arshal Chanhassen Fire Department Water Line Sizing Policy #36-1994 Date: 06/10/94 Revised: 11/24/99 Page 1 of 1 The Gty o£ Chanhassen. A ~rowine community with clean lakes, aualirv schooh, a charminv downtown, thrivin¢ businesses, and beautiful varks. A ~reat ,lace to [i,2e, work. and CHANHASSEN FIRE DEPARTMENT FIRE PREVENTION BUREAU 7700 Market Blvd BOX 147 CHANHASSEN, MN 55317 (952) 227-1150 FAX: (952) 227-1190 CHANHASSEN FIRE DEPARTMENT POLICY # 06-1991 REQUIREMENTS FOR FIRE LANE SIGNAGE Revised 6/10/02 NO PARKING FIRE LANE 1. Signs to be a minimum of 12" x 18". 2. Red on white is preferred. 3. 3M or equal engineer's grade reflective sheeting on aluminum is preferred. 4. Wording shall be: NO PARKING FIRE LANE Signs shall be posted at each end of the fire lane and at least at 75 foot intervals along the fire lane. 6. All signs shall be double sided facing the direction of travel. 7. Post shall be set back a minimum of 12" but not more than 36" from the curb. (NOT TO-- GRADE 8. SCALE) A fire lane shall be required in front of fire dept. connections extending 5 feet on each side and along all areas designated by the Fire Chief. ANY DEVIATION FROM THE ABOVE PROCEDURES SHALL BE SUBMITTED IN WRITING, WITH A SITE PLAN, FOR APPROVAL BY THE FIRE CHIEF. IT IS THE INTENTION OF THE FIRE DEPARTMENT TO ENSURE CONTINUITY THROUGHOUT THE CITY BY PROVIDING THESE PROCEDURES FOR MARKING OF FIRE LANES. Fire Lane Instillation 06-1991 Page 1 of 1 10. 11. CHANHASSEN FIRE DEPARTMENT FIRE PREVENTION BUREAU 7700 MARKET BLVD. PO BOX 147 __ ? CHANHASSEN, MN 55317 (952) 227-1150 FAX: (952) 227-1190 CHANHA,q,qEN FIRE DEPARTMENT NOTE,q TO RE INCI,IIDED ON Al,l, ,qlTE PI,AN,q Revised 6/12/02 Fire Marshal must witness the flushing of underground sprinkler service line, per NFPA 13-8-2.1. A final inspection by the Fire Marshal before a Certificate of Occupancy is issued. Fire Department access roads shall be provided on site during all phases of construction. The construction of these temporary roads will conform with the Chanhassen Fire Department requirements for temporary access roads at construction sites. Details are available. Onsite fire hydrants shall be provided and in operating condition during all phases of construction. The use of liquefied petrole~m gas shall be in conformance with NFPA Standard 58 and the Minnesota Uniform Fire Code. A list of these requirements is available. (See policy #33-1993) All fire detection and fire suppression systems shall be monitored by an approved UL central station with a UL 72 Certificate issued on these systems before final occupancy is issued. An 1 I" x 14" As Built shall be provided to the Fire Department. The As Built shall be reproducible and acceptable to the Fire Marshal. (See policy #07-1991). An approved lock box shall be provided on the building for fire department usc. The lock box should be located by the Fire Department connection or as located by the Fire Marshal. High-piled combustible storage shall comply with the reqmrements of Article #81 of the Minnesota lJniform Fire Code. High-piled combustible storage is combustible materials on closely packed piles more than 15' in height or combustible materials on pallets or in racks more than 12' in height. For certain special-hazard commodities such as rubber tires, plastics, some flammable liquids, idle pallets, etc. the critical pile height may be as low as 6 feet. Fire lane signage shall be provided as required by the Fire Marshal. (See policy #06-1991). Maximum allowed size of domestic water service on a combination domestic/fire sprinkler supply line policy must be followed. (See policy #36-1994). Notes For Site Plan 04-1991 Page 1 of 1 NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, SEPTEMBER 2, 2003 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 7700 MARKET BLVD. PROPOSAL: Holiday Inn Express APPLICANT: Steiner Construction Services and Steve Slowey LOCATION: SE Corner of TH 5 and Century Blvd. NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicants, Steiner Construction Services, Inc., and Steve SIowey, are requesting subdivision approval to create two lots on 5.13 acres of land and site plan review for a three-story, 89 unit hotel on 3.01 acres with variances for signage and design standards located at the southeast corner of Hwy. 5 and Century Blvd., property zoned PUD, Holiday Inn Express. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Bob at 227-1131 or e-mail bgenerous@ci.chanhassen.mn.us. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on August 21,2003. Smooth Feed SheetsTM Use template for 5160® ~,RBORETUM VILLAGE COMMUNITY 315 NORTHWEST PKYSUITE 140 EAGAN MN 55121 JOSPEH NOVOGRATZ 7667 EQUITABLE DR #210 EDEN PRAIRIE MN 55344 CHRISTOPHER J COHEN 7661 CENTURY BLVD CHANHASSEN MN 55317 JEFFREY G HEINEMANN 7617 CENTURY BLVD =HANHASSEN MN 55317 SEAN J & JENNIFER L STAUM 7652 CENTURY BLVD CHANHASSEN MN 55317 JEFFREY R HILDEBRAND & SARAH K PANGERL 2786 CENTURY CIR CHANHASSEN MN 55317 LAWRENCE B REID 27780 ISLANDVIEW RD EXCELSIOR MN 55331 JOHN R & SARAH L LAABS 7645 CENTURY BLVD CHANHASSEN MN 55317 BRIAN J URICK 2782 CENTURY CIR CHANHASSEN MN 55317 I'AMMY M MONTE 7625 CENTURY BLVD CHANHASSEN MN 55317 MARIE L BENZ 7656 CENTURY BLVD CHANHASSEN MN 55317 GLORIA A BLOMQUIST 2774 CENTURY CIR CHANHASSEN MN 55317 STEVEN D & DORRIT V MURRAY DONALD V MURRAY 7629 CENTURY BLVD CHANHASSEN MN 55317 DONALD D JR & CORI K WALLIS 7649 CENTURY BLVD CHANHASSEN MN 55317 DARREN WALTER & KAREN HEDLUND 7672 CENTURY BLVD CHANHASSEN MN 55317 LYNN M ANDERSON 7640 CENTURY BLVD CHANHASSEN MN 55317 CATHY A PRENOSIL 7660 CENTURY BLVD : !CHANHASSEN MN ,i 55317 THOMAS W & LUANNE M WRIGHT 7665 CENTURY BLVD CHANHASSEN MN 55317 PAVEL ~ KOPYLOV & LYUBOV I KOPYLOVA 7633 CENTURY BLVD CHANHASSEN MN 55317 THERESE M BAUER 7653 CENTURY BLVD CHANHASSEN MN 55317 VIRGINIA BECKER 2790 CENTURY CIR CHANHASSEN MN 55317 CHAD ALEXCEN 7644CENTURY BLVD CHANHASSEN MN 55317 JOSEPH T MCDONALD 14648 N SCOTTSDALE RD SCOTTSDALE AZ 85254 TERESA L MARTELL 2794 CENTURY CIR CHANHASSEN MN 55317 CHAD R OVERSKEI& MELANIE A CHRISTENSEN 7637CENTURY BLVD CHANHASSEN MN 55317 ADAM R & STEPHANIE S TOLLEFSON 7657 CENTURY BLVD CHANHASSEN MN 55317 PETER SCHWARZKOPF& JENNIFER LAUSTIN 7676CENTURY BLVD CHANHASSEN MN 55317 PATRICK S KASID 7648 CENTURY BLVD CHANHASSEN MN 55317 JOHN CALDWELL& CHERYLGLATZMAIER 7668CENTURYBLVD CHANHASSEN MN 55317 RAYMOND J & JOAN A GILGENBACH 7669 CENTURY BLVD CHANHASSEN MN 55317 AVERY® Address Labels Laser 5160® Smooth Feed SheetsTM Use template for 5160® JOHN B & CAROLINA M FRASER 2770 CENTURY CIR CHANHASSEN MN 55317 CHRISTOPHER A RASMUSSEN & NICOLE L RASMUSSEN 7681 CENTURY BLVD CHANHASSEN MN 55317 JEFFREY FTOMSICH & STEPHANIEJ KUTZ 2755CENTURY CIR CHANHASSEN MN 55317 KEVIN A MILTON 2795 CENTURY CIR CHANHASSEN MN 55317 ANGELINA T BROWN 2787 CENTURY CIR CHANHASSEN MN 55317 THOMAS G & STACY R NEVERS 2767 CENTURY CIR CHANHASSEN MN 55317 ASIM SYED MOHAMMED 2766 CENTURY CIR CHANHASSEN MN 55317 iLUNDGREN BROS CONSTRUCTION :935 WAYZATA BLVD E WAYZATA MN 55391 JONATHAN ROMAN ABAD & SHANNON G ABAD 2759 CENTURY CIR CHANHASSEN MN 55317 JACQUELYN R LARSON 7673 CENTURY BLVD CHANHASSEN MN 55317 JOYCE E NOON 7685CENTURY BLVD CHANHASSEN MN 55317 NANCY L WRIGHT 2763 CENTURY CIR CHANHASSEN MN 55317 KATHERINE A POHLEN 2762 CENTURY CIR CHANHASSEN MN 55317 TRAVIS P LAKE 2783 CENTURY CIR CHANHASSEN MN 55317 KIMAN & JUNG JOO 7693 CENTURY BLVD ' CHANHASSEN MN 55317 ROBERTFBADER 2758CENTURY CIR CHANHASSEN MN 55317 JEFFREY R & KATHLEEN FORSBERG 2779 CENTURY ClR CHANHASSEN MN 55317 PULTE HOMES OF MINNESOTA CORP St~T~::)I~IW~ EAG~..-~ MN 55121 CHARLES A WHITE 2754CENTURY CIR CHANHASSEN MN 55317 MARK NELSON & BRITTNEY PARMER 2775 CENTURY CIR CHANHASSEN MN 55317 ARLENE LAVESTRUZ 2877ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 JUDY E OLSON 2750 CENTURY CIR CHANHASSEN MN 55317 STEPHEN F & JOLENE P PANCIOCCO 2771 CENTURY CIR CHANHASSEN MN 55317 RINGO & TRISHA LEIPOLD 2875 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 ADAM T & AMY E BLOOMQUIST 2791 CENTURY CIR CHANHASSEN MN 55317 LESLIE E JOHNSON 7689 CENTURY BLVD CHANHASSEN MN 55317 PULTE HOMES OF MINNESOTA CORP EAGAN ~.--~ M N 55121 BRETT PETERSON 7677 CENTURY BLVD CHANHASSEN MN 55317 CHAD A ROSWICK 2751 CENTURY CIR CHANHASSEN MN 55317 JILL M ROSCKES 2879 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 AVERY® Address Labels Laser 5160® Smooth Feed SheetsTM Use template for 5160® KIMBERLY B FARNIOK 2869 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 PULTE HOMES OF MINNESOTA CORP ~815 Northwest Parkway, Suite -~40 EAGAN MN 55121 HELSENE PARTNERS LLC 5685 GRANT LORENZ RD EXCELSIOR MN 55331 LORETTA POOL 2687 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 ERIC WAYNE JESKE 2843 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 CENTURY 2000 PARTNERS LLP 3610 SOUTH HWY 101 WAYZATA M N 55391 JEFF LACUGNATO 2873 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 KARRY A SCHEIRER 2841 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 DANA L & PATRICIA L DONNAY 2871 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 PULTE HOMES OF MINNESOTA CORP 8t.[ITtZ::)RI'OHW EST PKY~ E~N 55121 ARBORETUM VILLAGE C,.,.Q.MMUNITY EA..~,/ MN 55121 PULTE HOMES OF MINNESOTA CORP 8U]T'E)'Ffi:)HWEST PKY ~ EAGAN ~.~'MT~ 55121 DEREK & LAURA SCHILLING 2847 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 CHASKA GATEWAY PARTNERS 3610 CO RD 101 WAYZATA MN 55391 CAROLE FINK 2845 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 'KINDERCARE REAL ESTATE CORP ,ATTN:TAXDEPT !650 NE Holloday'?St. #1400 PORTLAND OR 97232 JEAN M SCHULTZ 2865 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 CITY OF CHANHASSEN C/O BRUCE DE~ CH,.~4'ASSEN MN 55317 KOREN HAWK 2849 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 US BANK NA ATTN: AMY HERNESMAN 2800 LAKE ST E MINNEAPOLIS MN 55406 TRAVIS EARSLEY 2839 ARBORETUM VILLAGE TRL CHANHASSEN MN 55317 CITY OF CHANH~ CIO BRUCE~AdONG Pi~l~ (~I~:]ET BLVD CH~4RASSEN MN 55317 ~'~ AVERY® Address Labels Laser 5~_60®